Loading...
10 Staff Report - Winchester Class IV Contract Amendment PREPARED BY: Ying Smith Transportation and Mobility Manager Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Director of Parks and Public Works 110 E. Main Street Los Gatos, CA 95030 ● 406-354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 6/16/2020 ITEM NO: 10 DATE: June 10, 2020 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Authorize the Town Manager to Execute a First Amendment to the Agreement with Kimley-Horn and Associates, Inc., Modifying the Scope and Increasing the Total Compensation by $139,430.32 for a Total Contract Amount not to Exceed $339,430.32 for Engineering Design for the Winchester Boulevard Class IV Bikeway Project (CIP# 411-813-0240) RECOMMENDATION: Authorize the Town Manager to execute a first amendment to the agreement (Attachment 1) with Kimley-Horn and Associates, Inc., modifying the scope and increasing the total compensation by $139,430.32 for a total contract amount not to exceed $339,430.32 for engineering design for the Winchester Boulevard Class IV Bikeway project (CIP# 411-813-0240). BACKGROUND: Winchester Boulevard is a major arterial street parallel to Highway 17, which borders both the Town of Los Gatos and the City of Monte Sereno. The Los Gatos Bicycle and Pedestrian Master Plan (BPMP) identifies Class IV bike lanes along Winchester Boulevard as an improvement project. At the December 17, 2019 meeting, the Town Council authorized an Agreement for Consultant Services with Kimley-Horn and Associates, Inc. for the Winchester Boulevard Complete Streets design (CIP# 411-813-0238) in the amount not to exceed $200,000. The design work started in January 2020. The Winchester Boulevard Class IV Protected Bikeway Project is a separate project included in the Fiscal Year 2020-21 Capital Improvement Program Budget for a total amount of $982,455, including a Transportation Fund for Clean Air (TFCA) grant of $293,900 from the Bay Area Air Quality Management District. PAGE 2 OF 3 SUBJECT: Winchester Boulevard Class IV Bikeway Project (CIP #411-813-0240) DATE: June 10, 2020 DISCUSSION: The Winchester Boulevard Class IV Bikeway project scope includes pavement work on Winchester Boulevard south of Lark Avenue and the installation of a Class IV bikeway. The existing Pavement Condition Index (PCI) of this section of roadway is below 50, which is in the “Poor” condition category. Similar to the Blossom Hill Road Bicycle and Pedestrian project completed last year, the pavement reconstruction will be coordinated to coincide with the construction of the new Class IV bicycle lanes. By combining the pavement work and the construction of the Class IV bike lanes, the Town can realize cost savings and less interruption to traffic operations. The work for the combined projects will be constructed in the summer of 2021. Only the design for the bikeway project is being included in the consultant services agreement. The pavement reconstruction will be designed by Town staff. The attached First Amendment to Agreement for Consultant Services, including the scope of services and associated cost proposal, has been negotiated with Kimley-Horn and Associates, Inc. Staff is recommending adding the Class IV Bikeway design to the agreement with Kimley-Horn and Associates because the team has made satisfactory progress in the current scope for the Winchester Boulevard Complete Streets Design. Treatments recommended in the Winchester Boulevard Complete Streets project will likely include enhanced bike lanes with landscaped separations, pedestrian crossings, sidewalk improvements, pedestrian refuge islands, landscaped medians, intersection modifications, and stormwater retention. The Town has been awarded a grant of $1.73 million for final design of Complete Streets improvements in the Measure B program. Based on this project’s ranking in the application process, the Measure B dollars are anticipated in the 2022 – 2026 time frame with construction occurring following design and upon identification of construction funding. CONCLUSION: Staff is recommending the Town Council authorize the Town Manager to execute a First Amendment to Consultant Services Agreement for Winchester Boulevard Class IV Bikeway Design. If the Council approves this agenda item, staff and consultant will begin the design this summer and issue the construction bid in early 2021. The street resurfacing work will be completed in the summer ahead of the bikeway installation. COORDINATION: This report was coordinated with the Town Attorney’s Office and the Finance Department. PAGE 3 OF 3 SUBJECT: Winchester Boulevard Class IV Bikeway Project (CIP #411-813-0240) DATE: June 10, 2020 FISCAL IMPACT: Project #411-813-0240 Winchester Boulevard Class IV Bikeway in the Fiscal Year 2020/21 – 2024/25 Capital Improvement Program Budget has sufficient budget for the contract amendment. ENVIRONMENTAL ASSESSMENT: The recommended action is not a project as defined under CEQA, and no further action is required. The construction of improvements is a project as defined under CEQA and is Categorically Exempt, Section 15064.3 (2). A Notice of Exemption was filed on September 5, 2019. Attachments: 1. First Amendment to Agreement for Consultant Services 2. Agreement for Consultant Services