Loading...
11 Attachment 1-B Cost Proposal 5-22-20Date: May 22, 2020 Item Description Quantity Unit3 Unit Price Row Price 1.1 F&I  Controllers Units and Software1 14 EA 4,171$              58,394$           1.2 Furnish Ethernet Switches, Fiber Optic1 7 EA 2,029$              14,203$           1.3 Furnish Ethernet Switches, FO+1‐leg Copper1 2 EA 2,674$              5,348$              1.3 Furnish Ethernet Switches, FO+2‐legs Copper1 2 EA 3,319$              6,638$              1.4 Furnish Ethernet Switches, Ethernet‐over‐copper1 5 EA 1,567$              7,835$              1.7 F&I ASCS Software and Hardware2 1 LS 93,436$           93,436$           1.8 System Testing and Acceptance 1 LS 7,844$              7,844$              1.9 Training and Documentation 1 LS 14,206$           14,206$           1.10A System License, Warranty, and Support (Monthly)4 36 EA ‐$                  ‐$                  1.10B System License, Warranty, and Support (Annual)4 3 EA 13,522$           40,566$           248,470$         19,878$           2.1 F&I  Controllers Units and Software 18 EA 4,171$              75,078$           2.2 Furnish Ethernet Switches, Fiber Optic 2 EA 2,029$              4,058$              2.3 Furnish Ethernet Switches, FO+1‐leg Copper 2 EA 2,674$              5,348$              2.4 Furnish Ethernet Switches, Ethernet‐over‐copper 8 EA 1,567$              12,536$           2.5 Furnish Ethernet Switches, Cellular1 5 EA 423$                 2,115$              2.7 F&I ATMS Software and Hardware 1 LS 117,466$         117,466$         2.8 System Testing and Acceptance 1 LS 10,860$           10,860$           2.9 Training and Documentation 1 LS 19,670$           19,670$           2.10A System License, Warranty, and Support (Monthly)4 36 EA ‐$                  ‐$                  2.20B System License, Warranty, and Support (Annual)4 3 EA 14,321$           42,963$           290,094$         23,208$           581,649$         Vendor Name: Econolite Systems, Inc. Contact Name: Marc A. Porter Contact Email: mporter@econolite.com Contact Phone: 310‐418‐1663 Contingency (8%)                                            Town of Los Gatos 2. Advanced Traffic Management System ATMS SUBTOTAL GRAND TOTAL Notes: 1. Quantity includes one spare 2. If ASCS requires ATMS to function, include a proportional share of the ATCS cost in this item. 3. EA = Each, LS = Lump Sum 4. Fill out Item 1.10A OR 1.10B.  Do not include pricing on both lines. Contingency (8%) ADAPTIVE  SUBTOTAL Adaptive Signal Control and Advanced Traffic Management Systems Federal Number: STPLN1 6084(227) PRICE PROPOSAL FORM 1. Adaptive Signal Control System