06 Attachment 2 - FY 2020-21 -2024-25 Proposed Capital Improvement ProgramCALIFORNIA
T ĔĜē Ĕċ L ĔĘ G ĆęĔĘ
Capital Improvement Program Budget
Fiscal Years 2020/21 — 2024/25 ATTACHMENT 2
Cover Photos: Constantino, Evie Julian
TOWN OF LOS GATOS
CALIFORNIA
PROPOSED
Capital Improvement Program
for
Fiscal Years July 1, 2020 to June 30, 2025
Town Council
Marcia Jensen ............................................................. Mayor
Barbara Spector .................................................... Vice Mayor
Rob Rennie .................................................. Council Member
Marico Sayoc ............................................... Council Member
Prepared under the direction of:
Laurel Prevetti ........................................................................................................... Town Manager
Stephen D. Conway ................................................................................................. Finance Director
110 E. Main Street, Los Gatos, CA 95030
www.losgatosca.gov
PROPOSED TABLE OF CONTENTS
i
INTRODUCTION
Town Manager’s Message .................................................................................................................... A – 1
FY 2019/20 Completed or Withdrawn CIP Projects .............................................................................. A – 9
Budget Process Overview ..................................................................................................................... A – 13
FINANCIAL SUMMARIES
Program Summaries
Streets Program ............................................................................................................................... B – 5
Parks Program .................................................................................................................................. B – 5
Public Facilities Program .................................................................................................................. B – 6
Fund Summaries
Total CIP Fund Summary .................................................................................................................. B – 9
Fund 411 - GFAR Fund ..................................................................................................................... B – 10
Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12
Fund 421 – Grants Fund................................................................................................................... B – 14
Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16
Fund 472 – Utility Underground Fund ............................................................................................. B – 18
Fund 481 – Gas Tax Fund ................................................................................................................. B – 20
STREETS PROGRAM
Street Reconstruction & Resurfacing Projects
Street Repair & Resurfacing ............................................................................................................. C – 6
Street Repairs, Maintenance & Safety Projects
Traffic Calming Project ..................................................................................................................... C – 12
Curb, Gutter & Sidewalk Maintenance ............................................................................................ C – 14
Retaining Wall Repairs ..................................................................................................................... C – 16
Annual Street Restriping .................................................................................................................. C – 18
Guardrail Replacement Projects ...................................................................................................... C – 20
Massol Intersection Improvements ................................................................................................. C – 22
Shannon Road Repair ...................................................................................................................... C – 24
Roadside Fire Fuel Reduction .......................................................................................................... C – 26
Parking Lot 4 Repair & Waterproofing ............................................................................................ C – 28
Street Improvement Projects
Downtown Parking Lots Seal Coat & Restriping. ............................................................................. C – 34
Hernandez Avenue Storm Drain Improvements ............................................................................. C – 36
Shannon Road Class 1 Multi-Use Path ............................................................................................. C – 38
PROPOSED TABLE OF CONTENTS
ii
Sidewalk Improvements – Multiple Locations ................................................................................. C – 40
Utility Undergrounding Improvements ........................................................................................... C – 42
Traffic Signal Modernization ............................................................................................................ C – 44
Bicknell Road Storm Drain Improvements ....................................................................................... C – 46
Bicycle & Pedestrian Improvements ................................................................................................ C – 48
Stormwater Master Plan .................................................................................................................. C – 50
Stormwater System – Pollution Prevention Compliance ................................................................ C – 52
Public Arts Gateway ......................................................................................................................... C – 54
Parking Program Implementation ................................................................................................... C – 56
Annual Storm Drain Improvements ................................................................................................. C – 58
Pilot School Busing ........................................................................................................................... C – 60
ADA Transition Plan ......................................................................................................................... C – 62
Highway 17/9 Interchange and Capacity Improvements ................................................................ C – 64
Downtown Streetscape Revitalization ............................................................................................. C – 66
E. Main Street Speed Table/Raised Crosswalk ................................................................................ C – 68
Local Road Safety Plan ..................................................................................................................... C – 70
Blossom Hill Road Traffic Safety ...................................................................................................... C – 72
Winchester Class IV Bikeway ........................................................................................................... C – 74
VMT Mitigation Program ................................................................................................................. C – 76
Kennedy Sidewalk – LGB to Englewood........................................................................................... C – 78
Winchester Boulevard Complete Streets Final Design .................................................................... C – 80
Bridge Projects
Quito Road - Bridge Replacement ................................................................................................... C – 86
Highway 17 Bicycle & Pedestrian Bridge – Design .......................................................................... C – 88
PARKS AND TRAILS PROGRAM
Park Improvement Projects
Parks Playground Fibar Project ........................................................................................................ D – 6
Creek Trail & Parks Pathway & Parking Lot Seal Coat & Striping .................................................... D – 8
Town Plaza Turf Repairs................................................................................................................... D – 10
Outdoor Fitness Equipment ............................................................................................................. D – 12
Vegetation Management – Town-wide ........................................................................................... D – 14
Trail Improvement Projects
Open Space Trail Upgrades .............................................................................................................. D – 20
Forbes Mill Footbridge Improvements ............................................................................................ D – 22
Charter Oaks Trail Repair ................................................................................................................. D – 24
Trailhead Connector Project ............................................................................................................ D – 26
PROPOSED TABLE OF CONTENTS
iii
PUBLIC FACILITIES PROGRAM
Infrastructure Projects
Building Replacement at Corporation Yard ...................................................................................... E – 6
Facilities Assessment. ....................................................................................................................... E – 8
Library Carpet Replacement ............................................................................................................ E – 10
Town Beautification ......................................................................................................................... E – 12
ADA Upgrade Public Restrooms – Adult Recreation Building ......................................................... E – 14
ADA Restrooms and HR Offices ....................................................................................................... E – 16
Plaza Level Railings – Code Upgrade ............................................................................................... E – 18
Waterproofing – Town-wide ........................................................................................................... E – 20
Sound Mitigation Library Lobby ....................................................................................................... E – 22
Fire Suppression (Halon) for Server Rooms ..................................................................................... E – 24
Police Headquarters Roof Repair ..................................................................................................... E – 26
Adult Recreation Center – Floor Repair ........................................................................................... E – 28
Equipment Projects
Information System Upgrade .......................................................................................................... E – 34
Audio / Video System Upgrade ........................................................................................................ E – 36
Town-Wide Document Imaging Project .......................................................................................... E – 38
Engineering Document Archiving .................................................................................................... E – 40
Silicon Valley Regional Interoperability Project (SVRIP) Services ................................................... E – 42
EOC Communication Upgrades ....................................................................................................... E – 44
IT Disaster Recovery Improvements ................................................................................................ E – 46
Computer Aided Dispatch and Records Management System (CAD/RMS) .................................... E – 48
REFERENCE
Glossary .................................................................................................................................................. F – 1
Index....................................................................................................................................................... F – 7
Introduction
This Page Intentionally Left Blank
A - 1
TOWN OF LOS GATOS
CIVIC CENTER 110 E. MAIN STREET LOS GATOS, CA 95030
May 6, 2020
Honorable Mayor and Town Council:
I am pleased to submit to you the Proposed Fiscal Year (FY) 2020/21 – 2024/25 Five-Year Capital
Improvement Program (CIP) for the Town of Los Gatos. The CIP is a comprehensive five-year capital
improvement plan designed to identify projects to develop and maintain the Town’s infrastructure,
consistent with the Town Council Core Goals of high quality infrastructure, community character, public
safety, fiscal stability, good governance, and civic enrichment.
This CIP budget message contains:
• Town’s Core Goals and Strategic Priorities
• CIP Financial Summary - Funding Sources
• Proposed FY 2020/21 – 2024/25 CIP Overview
• Proposed FY 2020/21 CIP Overview
• FY 2019/20 Completed or Withdrawn Projects
• Budget Process Overview
Guidance for determining capital improvement projects is also derived from key plans, including the
General Plan, Bicycle and Pedestrian Master Plan, and the Council’s Strategic Priorities. Specifically, in
January 2020, the Town Council established the 2020-22 Strategic Priorities (see page A-2). The Core
Goals and Strategic Priorities guide the preparation of both the Capital and Operating Budgets. In terms
of capital projects, the Town Council stated its priorities to begin to implement the Comprehensive
Parking Study, continue mobility improvements for all transportation modes, manage the vegetation on
Town lands to protect against wildfire, and advance other needed improvements. All of these efforts
support improving and enhancing traffic/transportation, public safety, and quality of life within the
context of prudent fiscal management.
In addition to the aforementioned guidance, on December 9, 2019, the Town’s Sales Tax Oversight
Committee convened its first meeting. Per the Measure G Sales Tax Ordinance, the Committee’s role is
to review the revenues and potential expenditures and advise the Town Council on whether such
expenditures meet the Town Council’s objectives as stated in the Ordinance. After reviewing example
expenditures from the FY 2019/20 CIP, the Committee’s recommendation to Council was to expend
Measure G funds on capital projects associated with road repair and maintenance.
All proposed capital projects are described in this document. The reserves and operating expenditures
are discussed in more detail in the Proposed FY 2020/21 Operating Budget.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 2
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 3
CIP FINANCIAL SUMMARY – FUNDING SOURCES
As in the past, the Town continues to be challenged in its attempts to secure a reliable ongoing source of
revenue for the Capital Improvements Program. The proposed five-year CIP reflects $6.0 million in
ongoing Gas Tax dedicated sources to help fund the proposed $38 million of planned capital
improvements. The balance of CIP funding of $32 million is funded by one–time appropriations from
the General Fund Appropriated Reserve (GFAR), Utility Undergrounding Funds, Traffic Mitigation Funds,
Grant Funds, and Storm Drain Funds as follows:
Ongoing Gas Tax 6,050,270$
GFAR 16,067,108
Utility Undeground Funds 4,436,000
Traffic Mitigation Funds 415,027
Grant Funds 11,114,483
Storm Drain Funds 240,000
Total Funding Available 38,322,888$
Funding Sources for the FY 2020/21 - 2024/25 CIP
One-Time
GAS TAX
State Gasoline Tax revenue is distributed to the Town from the State of California and recorded in the
Gas Tax Fund. This tax is also known as the “Highway Users Tax” or the “Motor Vehicle Fuel License
Tax.” The gasoline tax is an 18-cent per gallon tax on fuel used to propel a motor vehicle or aircraft. Gas
Tax revenue is allocated to the Town based on a per gallon of gas purchased within the Town limits and
based on population. The estimated Gas Tax revenue totals approximately $1.2 million for FY 2019/20
due to the Road Recovery and Repair Act of 2017 (SB1). These funds can only be used for new
construction and reconstruction of Town streets.
LOCAL 2010 AND 2016 MEASURE B
As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA)
assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. This funding source
is expected to generate approximately $180,000 annually for Los Gatos, which will be used for street
rehabilitation Town-wide.
In 2016, Santa Clara County voters approved Measure B, a transportation focused sales tax measure.
After several years of legal challenges, the funding from Measure B has begun to flow. The most
important element of this measure is ongoing road maintenance funding to the Town of $580,663.
Additional funds may be distributed to local projects on a competitive basis.
GFAR
The primary source of funding for the Town’s capital program is the Town’s General Fund Appropriated
Reserve (GFAR). By Council direction, this fund receives transfers from the General Fund’s designated
Reserve for Future and Special Projects, which receives most of the Town’s annual revenues above
operating expenditures after funding all legally restricted reserves at their required levels, including
receipt of one-time funds from grants, property sales, and other reserves. Because of the availability of
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 4
General Fund “one-time” funding sources in recent years, the Council approved a General Fund transfer
to the GFAR fund in the amount of $2.7 million for FY 2013/14, an additional “one-time” source
allocation of $6.6 million for FY 2014/15, and additional funding of $6.9 million for the Almond Grove
Street Rehabilitation project in FY 2016/17, $2.8 million funding in FY 2017/18, $2.4 million transfer in
FY 2018/19, and $5.8 million transfer in FY 2019/20. For FY 2020/21, the transfer to GFAR is proposed
to be $3.4 million.
After these allocations, the Reserve for Future Capital and Special Projects forecasted June 30, 2020
balance is $3.3 million. Sufficient balances are anticipated for the following four years of the Plan to
allocate approximately $550,000 from the General Fund Reserve for Capital and Special Projects for FY
2021/22 through FY 2024/25.
The other revenue source for GFAR is the Construction Impact Fee and a Refuse Vehicle Road Impact
Fee. This Construction impact fee is assessed on construction projects based on the square foot size of
the project at a rate of $1.14 per square foot. These fees are intended to recover the damage caused to
Town streets by construction traffic. Construction Impact fees generate at least $110,000 annually.
Refuse Vehicle Road impact Fee estimated to generate $610,000 for FY 2020/21.
The funding from GFAR greatly enhances the Town’s ability to implement the CIP; however, it is not
enough to support future annual infrastructure maintenance or construct new facilities. Establishing a
reliable, dedicated source of funding for basic capital improvements beyond the use of accumulated
reserves remains a long-term need and important goal for the Town.
UTILITY UNDERGROUND FUNDS
The Utility Undergrounding Fund serves as a funding source for activities generally undertaken in
conjunction with street improvement projects. The Town receives approximately $30,000 annually in
Utility Undergrounding funding which is derived from a Town construction tax of 18 cents charged for
each square foot of building addition or alteration within the Town. Total cash balances currently on
hand from the utility undergrounding construction tax are approximately $3.1 million at FY 2019/20
year-end. In addition, the Town may have access to over $3.8 million in Rule 20A funds allocated from a
percentage of electric bills. PG&E retains and tracks these monies. The Town has identified a project to
underground utilities along Los Gatos Boulevard south of Lark Avenue. These projects rely on PG&E for
scheduling and have long lead times. Staff expects a six year project design timeline, and is expecting
project construction in FY 2020/21.
TRAFFIC MITIGATION FUNDS
The traffic impact mitigation fee assures that each new development or expansion of use pays its fair
share of the transportation improvements needed to accommodate the cumulative traffic impacts. The
fee is paid in full prior to issuance of the building permit for new development or expansion of use. This
fee continues to play an important role in the Town’s ability to fund roadway improvements. Traffic
Mitigation Funds must be used solely for construction of identified traffic and transportation
improvement projects.
GRANT FUNDS
The Town receives grant funds from various sources that help address some of the maintenance and
improvement costs associated with Town infrastructure. Grants include federally funded Surface
Transportation Program (STP) funds which pay for general roadway capital improvements, and a
combination of Federal Innovative Deployment to Enhance Arterials (IDEA) grant funds and State
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 5
Vehicle Registration Fee (VRF) grant funds are contributing to the Traffic Signal Modernization project.
In addition, the Town utilizes Community Development Block Grant funds for specific qualifying projects,
usually focused on accessibility. Total grant funding for FY 2020/21 is estimated at $1,479,200.
STORM DRAIN FUNDS
The Town also receives funding from its Storm Drain Fund, which relies on an established charge of
$0.75 per square foot of impervious surface created by new development. Depending on development
activity, this fee produces approximately $100,000 in revenue annually. This fee has not been adjusted
for several years and should be evaluated in the future as part of the NPDES storm water permit process
and as part of a continuous review of development related fees.
The remaining sources are primarily one-time funds from State or Federal government or from special
revenue funds that have often fluctuated in tandem with the economy and the state budget. Examples
of one-time funds include Valley Transportation Authority/Transportation Fund for Clean Air (VTA/TFCA)
funds and State Proposition 42 Gas Tax funds.
PROPOSED FY 2020/21 – 2024/25 CIP OVERVIEW
The Capital Improvement Program is broadly grouped into the following categories:
Streets Program, which maintains and ensures functional streets, pedestrian, and bike systems.
Parks Program, which repairs or improves parks, park buildings, trails, and urban forestry.
Public Facilities Program, which constructs and repairs public buildings, and purchases
equipment.
The proposed CIP projects include both new and carry-forward projects from the prior year as part of
the multi-year programming of $33.5 million. Approximately $28.7 million (85.8%) is allocated to the
streets, retaining walls, sidewalks, and curbs category; $1.6 million (4.7%) is allocated to parks and trails
projects; and $3.2 million (9.5%) is allocated to public facility projects. Allocations are summarized
below by type of major improvements within the program categories.
Carry-forward from
2019/20 2020/21
Carry-forward and New FY
2020/21 2021/22 2022/23 2023/24 2024/25
Total By
Category
Total By
Program
StreetsReconstruct/Resurfacing 3,305,576$ 2,211,715$ 5,517,291 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 17,241,235$ Maintenance & Safety 3,413,980 2,435,000 5,848,980 435,000 435,000 435,000 435,000 7,588,980 Street Improvements 8,870,133 8,195,786 17,065,919 1,546,250 1,162,390 - 65,000 19,839,559 Bridges 235,087 50,000 285,087 5,430,303 - - - 5,715,390 50,385,165$
ParksPark Improvements 850,247 25,000 875,247 - 25,000 - 25,000 925,247$ Trail Improvements 683,812 - 683,812 3,262,500 - - - 3,946,312 4,871,560$
Public FacilitiesInfrastructure Projects 1,975,285 285,000 2,260,285 35,000 35,000 35,000 35,000 2,400,285$ Equipment Projects 921,291 - 921,291 - - - - 921,291 3,321,576$
TOTALS 20,255,412$ 13,202,501$ 33,457,913$ 13,545,446$ 4,619,907$ 3,432,517$ 3,522,517$ 58,578,300$
Five Year CIP Summary
FY 2020/21 - 2024/25 CIP by Program
Total funding for street reconstruction and resurfacing for the next five years is planned at $17.2 million
with approximately $5.5 million allocated in FY 2020/21 including carryovers. Over the five-year period,
the CIP proposes $33.1 million for various other street-related infrastructure improvements including
street maintenance and resurfacing; curb, gutter and sidewalk maintenance; street intersection
improvements; retaining wall reconstruction; crosswalk ramps and safety devices; and storm drain
improvements.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 6
Total funding for parks and trail improvements for the next five years is planned at $4.8 million with
approximately $1.5 million allocated in FY 2020/21 including carryovers.
Total funding for public facilities infrastucture improvements and equipment projects for the next five
years is planned at $3.2 million with approximately $3.8 million allocated in FY 2020/21 including
carryovers.
Although the Proposed FY 2020/21-2024/25 CIP is a five-year plan, only the first year of the plan is
formally adopted with funds appropriated by the Town Council as part of the budget process. Future
year projects are funded with designated cash reserves on hand, supplemented by estimated annual
revenues for capital funding purposes such as Gas Tax funds and state transportation funds. The scope
and funding estimates may change based on the Town’s fiscal situation and evolving priorities.
PROPOSED FY 2020/21 OVERVIEW
$33.4 million is being proposed in the first year of the CIP and is comprised of approximately $20.2
million in carryover funds from FY 2019/20 and approximately $13.2 million in new funding.
The first year of the five year plan (FY 2020/21) continues funding for the Town Council Strategic
Priorities, including basic infrastructure needs. Street maintenance remains high Council priority as the
Town is making progress to improve its Pavement Condition Index (PCI), a standard rating of street
conditions. The PCI reached a recent high rating of 74 in 2008 due to concentrated investments and is
now at the level of 70 (2019 survey data). With the new County and State Transportation Funds, the
investment in street maintenance of $2,962,517 per year will allow the Town’s PCI to increase to 72
within the next five years. This investment continues to leave a deferred maintenance backlog in excess
of $10M.
The complete list of the proposed FY 2020/21 carry-forward and proposed projects (categorized by
funds and programs) can be found on page A-7. Projects are listed in the Financial Summary section and
further described in the project detail pages by category. Below is a summary by category. The total FY
2020/21 CIP is $33.5 million.
Grant and TotalAwardsEstimated
Street Projects 14,349,805$ 4,228,718$ 1,210,054$ 8,928,701$ 28,717,278$
Park Projects 1,483,841 75,218 - - 1,559,060
Public Facilities Projects 3,114,576 67,000 - - 3,181,576
TOTAL OF CARRY-FORWARD & NEW PROJECTS 18,948,222$ 4,370,936$ 1,210,054$ 8,928,701$ 33,457,913$
* Other Funds include Storm Drain Fund, Traffic Mitigation Funds, Utility Underground Funds
GFAR Gas Tax Other *
Carry-forward & New FY 2020/21 CIP Projects
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 7
GFAR Grants and Gas Tax Other TotalCARRY-FORWARD PROJECTS Awards
Streets *Street Repair & Resurfacing 4,307,237$ -$ 1,210,054$ -$ 5,517,291$ *Annual Street Restriping 169,772 - - - 169,772 *Traffic Calming Projects 19,250 - - - 19,250 *Curb, Gutter & Sidewalk Maintenance 1,667,395 - - - 1,667,395 *Retaining Wall Repairs 536,486 - - - 536,486 *Quito Road - Bridge Replacement 285,087 - - - 285,087 Guardrail Replacement Projects 92,809 980,100 - - 1,072,909 Downtown Parking Lots Seal Coat & Restriping 52,585 - - - 52,585 Hernandez Avenue Storm Drain Improvements - - - - - *Shannon Road Class 1 Multi-use Path 109,896 940,100 - 70,204 1,120,200 Sidewalk Improvements - Multiple Locations 60,000 - - - 60,000 Hwy 17 Bicycle & Pedestrian Bridge-Design - - - - - Pilot School Busing Program 355,056 87,000 - - 442,056 *Utility Undergrounding Improvements - - - 6,766,000 6,766,000 *Traffic Signal Modernization - 1,769,418 - 978,289 2,747,707 Bicycle & Pedestrian Improvements 272,095 - - 33,650 305,745 *Bicknell Road Storm Drain Improvements - - - 60,258 60,258 Stormwater Master Plan 180,000 - - - 180,000 *Annual Storm Drain Improvement Prj - - - 420,300 420,300 Stormwater System - Pollution Prevention Compliance 298,578 - - - 298,578 *Public Art Gateway 25,004 - - - 25,004 Downtown Streetscape Revitalization 1,972,384 - - - 1,972,384 Massol Intersection Improvements 383,167 - - - 383,167 ADA Transition Plan 110,000 - - - 110,000 Highway 17/9 Interchange and Capacity Improvements - - - 600,000 600,000 Winchester Boulevard Complete Streets (Final Design)79,948 - - - 79,948 Parks Open Space Trail Upgrades 152,000 - - - 152,000 *Parks Playground Fibar Project 61,540 - - - 61,540 Charter Oaks Trail Repair Project 364,891 75,218 - - 440,109 Forbes Mill Footbridge Improvements 61,224 - - - 61,224 Town Plaza Turf Repairs 28,000 - - - 28,000 Creek Trail & Parks Path & Parking Lot Seal & Striping 225,000 - - - 225,000 Outdoor Fitness Equipment 60,000 - - - 60,000 Trailhead Connector 30,479 - - - 30,479 Vegetation Management - Town-wide 500,707 - - - 500,707 Public Facilities Audio/Video System Upgrade 42,552 - - - 42,552 Information System Upgrade 77,026 - - - 77,026 Town-wide Document Imaging Project 16,990 - - - 16,990 *Building Replacement at Corporation Yard 977,613 - - - 977,613 Police Headquarters Roof Repair 2,248 - - - 2,248 Library Carpet Replacement 56,500 - - - 56,500 Engineering Document Archiving 11,716 - - - 11,716 Facilities Assessment 80,000 - - - 80,000 *Town Beautification 16,924 - - - 16,924 Silicon Valley Regional Interoperability Project (SVRIP) Service 62,967 - - - 62,967 IT Disaster Recovery Improvements 169,845 - - - 169,845 EOC Communications Upgrade 29,382 - - - 29,382 ADA Upgrade Public Restrooms - Adult Recreation Bldg.183,000 67,000 - - 250,000 Fire Suppression (Halon) for Server Rooms 200,000 200,000 Plaza Level Railings - Code Upgrade 30,000 30,000 Waterproofing Town-wide 75,000 75,000 ADA Restrooms and HR Offices 450,000 450,000 Sound Mitigation in Library Lobby 22,000 22,000 Computer-Aided Dispatch and Records Management System 510,814 510,814
TOTAL OF CARRY-FORWARD PROJECTS (INCLUDES NEW ALLOCATIONS)15,475,167$ 3,918,836$ 1,210,054$ 8,928,701$ 29,532,758$
NEW PROJECTSStreets Roadside Fire Fuel Reduction 250,000$ -$ -$ -$ 250,000$ Parking Lot 4 Repair/Waterproofing 250,000 - - - 250,000 Shannon Road Repair 1,500,000 - - - 1,500,000 Blossom Hill Road Traffic Study 125,000 - - - 125,000 E. Main St. Speed Table/Raised Crosswalk 83,000 86,200 - - 169,200 Local Road Safety Plan 28,000 72,000 - - 100,000 Winchester Class IV Bikeway 688,555 293,900 - - 982,455 VMT Mitigation Program 250,000 - - - 250,000 Parking Program Implementation 198,500 - - - 198,500 Public Facilities Adult Recreation - Floor Repair 100,000 - - - 100,000
TOTAL OF NEW PROJECTS 3,473,055$ 452,100$ -$ -$ 3,925,155$
TOTAL OF CARRY-FORWARD & NEW PROJECTS 18,948,222$ 4,370,936$ 1,210,054$ 8,928,701$ 33,457,913$
* These carry-forward projects include new money for FY 2019/20 in the amount of $20,255,412.
Carry-forward & FY 2020/21 CIP Projects
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 8
FY 2019/20
COMPLETED, CONSOLIDATED, OR WITHDRAWN PROJECTS
Several projects are expected to be completed by the end of FY 2019/20. The table below outlines the
projects, funding sources, and total expenses of the completed projects, which is estimated to be $0.6
million. More details about the completed projects can be found beginning on page A-9.
Grant & Traffic Total
Awards Mitigation Estimated
Street Program
Cut-Through Traffic/Wood Road Roundabout Not Proceeding 222,284$ -$ 211,772$ -$ 434,056$
Downtown Parking Study Completed 158,892 - - - 158,892
One-Way Downtown Street Pilot Completed 216,368 - - - 216,368 224 W. Main Street Property Acquisition (Parking Lot 6)Withdrawn 7,813 - - - 7,813
Almond Grove Street Rehabilitation Completed 12,328,275 - - - 12,328,275
Park Program
Fence Replacement - Shire Court Completed 996 - - - 996 Public Facilities Program
Neighborhood Emergency Preparedness (CERT)Completed 49,928 - - - 49,928 Energy Efficiency Upgrade - Town-wide Completed 1,699,247 - - - 1,699,247 TOTAL OF COMPLETED PROJECTS 14,683,803$ -$ 211,772$ -$ 14,895,575$ * Other Funds include Storm Drain Fund, Gas Tax Funds, Utility Underground Funds
Projects Completed or Withdrawn in FY 2019/20
GFAR Other *
CONCLUSION
The challenge of finding a reliable ongoing revenue stream available for capital projects continues to be
a Town priority. Recognizing the realities of funding challenges and uncertain local economic trends, the
Town’s FY 2020/21 – 2024/25 Capital Improvement Plan continues a strategy of funding the Town’s
most urgent capital needs.
I wish to thank all of the Departments, in particular Department Directors and members of their
management and support staff, for their many hours of work and tireless efforts to present this Capital
Improvement Program to the Town Council, as well as the following staff members:
Stephen Conway, Finance Director
Gitta Ungvari, Finance and Budget Manager
Matt Morley, Parks and Public Works Director
Lisa Petersen, Assistant Parks and Public Works Director/Town Engineer
Mark Gaeta, Accountant
Maurice de Castro, Accountant
Bobby Gonzalez, Senior Administrative Analyst
Melissa Ynegas, Administrative Analyst
Dorrie Romeo, Administrative Technician
Kinjal Buch, Senior Engineering Technician
Respectfully submitted,
Laurel Prevetti
Town Manager
PROPOSED COMPLETED OR WITHDRAWN CIP PROJECTS
FY 2019/20
A - 9
A Almond Grove Rehabilitation E Cut-Through Traffic/Wood Road Roundabout – Not
Proceeding
B Fence Replacement – Shire Court F Downtown Parking Study
C Energy Efficiency Upgrade – Town-wide G One-Way Downtown Street Pilot
D Neighborhood Emergency Preparedness –
Town-wide H 224 West Main Property Acquisition (Parking Lot 6)
– Withdrawn
PROPOSED COMPLETED OR WITHDRAWN CIP PROJECTS
FY 2019/20
A - 10
A Almond Grove Street Rehabilitation Project
Almond Grove Street Rehabilitation Project
This project rehabilitated ten streets, providing safe and functional streets and sidewalks. Given the magnitude of
this project, the street rehabilitations were phased over
several years to minimize construction impacts to the
community. Phase 1 completed two streets in 2017 and
Phase 2 completed eight streets over three years with
construction completion in early 2020.
The total project cost was approximately $13,000,000.
B Fence Replacement – Shire Court
Fence Replacement – Shire Court
This project replaced the existing 2x4 wood fence on Shire
Court due to rotting. It is an essential safety barrier as it
sits above a retaining wall and borders open space.
The total project cost was approximately $55,000.
C Energy Efficiency Upgrade – Town-wide
Energy Efficiency Upgrade – Town-wide
This project completed various improvements in Town-
owned facilities, which improves energy efficiency and
provides cost savings over the long term. Many of the
previous fixtures and equipment throughout Town-owned
facilities were outdated. While these items were
functional, they were not the most energy efficient option.
The budget for this project included the energy audit that
was completed in FY 18/19 and the installation of energy-
saving devices in Town facilities. This project also
absorbed past capital projects, including HVAC Chiller
Repair (2115), Mechanic Bay Heater (2307), Youth
Recreation Center HVAC Replacement (2205), Civic Center
Building Energy Efficiency Measures (2110), and Civic
Center Exterior Light Replacement (2112).
The total project cost was approximately $1,664,000.
PROPOSED COMPLETED OR WITHDRAWN CIP PROJECTS
FY 2019/20
A - 11
E Cut-Through Traffic/Wood Road Roundabout
Cut-Through Traffic/Wood Road Roundabout
This project implemented various measures such as the
deployment of portable message signs, messages on
Caltrans changeable message signs, signal modifications,
and temporary street closures to reduce cut-through
traffic among other measures.
Staff explored advancing the design of a permanent
traffic circle at Santa Cruz Avenue at Wood Road, but it
was ultimately decided to not proceed with this project.
The total project cost was approximately $970,000.
F Downtown Parking Study
Downtown Parking Study
This project funded a consultant to examine parking
holistically in the downtown and high school areas.
The project scope included analyzing existing parking
capacity, providing a recommendation for residential
parking around Los Gatos High School, providing
recommendations for parking management for time
limited parking, analyzing paid parking, and more. The
findings will be implemented in the new Parking Program
Implementation project.
The total project cost was approximately $110,000.
D Neighborhood Emergency Preparedness
Neighborhood Emergency Preparedness
This project added new Neighborhood Incident Command
Posts (NICPs) and enhanced existing Posts throughout the
Town’s Community Emergency Response Team (CERT)
neighborhoods. The NICPs were upgraded with critical
medical, safety, communication and other necessary
equipment for use in the event of an emergency.
The total project cost was approximately $50,000.
PROPOSED COMPLETED OR WITHDRAWN CIP PROJECTS
FY 2019/20
A - 12
G One-Way Downtown Street Pilot
One-Way Downtown Street Pilot
This project funded the implementation of a one-way
streets pilot for North Santa Cruz and University Avenue
between Highway 9 and Main Street.
The total project cost was approximately $233,000.
H 224 West Main Property Acquisition
224 West Main Property Acquisition (Parking Lot 6)
In 2009, the Town purchased a property next to Parking Lot
6 to expand the existing parking lot. This property was
purchased by Town Housing/Redevelopment Agency
(RDA) funds. Because the State dissolved redevelopment
agencies, it is necessary that the Town use an alternative
funding source for this purchase if affordable housing is
not constructed at this site. This acquisition is withdrawn
and reserve funds in the amount of $1,460,210.00 for
GFAR are available for future consideration.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 13
BUDGET PROCESS OVERVIEW
The Town of Los Gatos adopts an annual Operating and Capital Budget and an annual budget update of
the five year Capital Improvement Program (CIP) for the Town of Los Gatos. The budgets contain summary
level information for revenue and expenditure appropriations for the fiscal year beginning July 1st and
ending June 30th. The budget documents are prepared in accordance with generally accepted accounting
principles (GAAP).
Budget Purpose
The Operating and Capital Summary Budget and the Capital Improvement Program serve as the Town’s
financial plan, as well as a policy document, a communications tool, and an operations guide. Developed
with an emphasis on long range planning, service delivery, and program management, a fundamental
purpose of these documents is to provide a linkage between the services and projects the Town intends
to accomplish, and the resources committed to get the work done.
The format of the budget facilitates this linkage by clearly identifying the program purpose, key projects,
and work plan goals in relation to revenue and expenditures appropriations.
CIP Purpose
In particular, the CIP is designed to identify projects and funds required to adequately develop and
maintain the Town’s infrastructure, which is consistent with the Town Council strategic goal of
maintaining the condition and availability of public facilities. The following plans provide additional
guidance in developing priorities for capital improvement projects:
• General Plan
• Street Improvement Program
• Bicycle and Pedestrian Master Plan
In addition, project prioritization criteria such as health and safety issues, infrastructure or system
condition, short term versus long term impacts, and availability of external funding sources are assessed
as part of the process that staff uses to rank projects from high to low in preparing the proposed CIP. As
it develops and matures in its application, the Town’s Infrastructure Assessment Program will further
support the Town’s long-range Capital Improvement Program, focusing attention on the current and
future infrastructure needs of the community and balancing the community’s needs with funding
requirements and financial resources. Other technology tools used in CIP development include the use
of the geographic information system, the traffic monitoring system, electronic files for tracking unfunded
projects and replacement schedules, and an asset management program to track work requests.
The Town’s capital projects are categorized as follows:
The Streets Program provides funding for maintaining a functional street and pedestrian system.
Proposed projects are consistent with the General Plan, provide for a safe and efficient traffic flow through
intersections while minimizing unnecessary traffic movement and noise through residential
neighborhoods, and provide street lighting for traffic safety at intersections and on public streets. Also
included are sidewalk and bicycle lane improvements.
The Public Facilities Program includes projects for constructing and repairing public buildings and
purchasing equipment. Town buildings include the Civic Center, the Library, Adult Recreation Center, Tait
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 14
Avenue and Forbes Mill properties, and other assets. Although the Town owns the three fire stations
within Town limits, the Santa Clara County Fire District maintains them under contract.
The Parks Program includes projects for parks, park buildings, urban forestry, trails, and urban
beautification.
Basis of Budgeting and Accounting
Developed on a program basis with fund level authority, the Operating and Capital Budgets represent
services and functions provided by the Town in alignment with the resources allocated during the fiscal
year.
The Town’s Governmental Funds consist of the General Fund, Special Revenue Funds, Debt Service Funds,
and Capital Project Funds for both the Town and the Successor Agency of the Town of Los Gatos
Redevelopment Agency (RDA). RDA debt is continuing to be paid for the Certificate of Participation (COPs)
used to finance the Library. Basis of Accounting and Budget refers to the timing factor concept in
recognizing transactions. This basis is a key component of the overall financial system because the budget
determines the accounting system. For example, if the budget anticipates revenues on a cash basis, the
accounting system must record only cash revenues as receipts. If the budget uses an accrual basis,
accounting must do likewise. The Town’s budgeting and accounting systems both use a combination of
modified accrual and full accrual basis in the accounting and budget systems.
Governmental Fund and Successor Agency Fund budgets are developed using the modified accrual basis
of accounting. Under this basis, revenues are estimated for the period if they are susceptible to accrual,
e.g. amounts can be determined and will be collected within the current period. Principal and interest on
general long-term debt are budgeted as expenditures when due, whereas other expenditures are
budgeted for liabilities expected to be incurred during the current period.
Proprietary Fund budgets are adopted using the full accrual basis of accounting whereby revenue budget
projections are developed recognizing revenues expected to be earned during the period, and
expenditures are developed for expenses anticipated to be incurred in the fiscal year. The Town maintains
one type of proprietary fund: Internal Service Funds.
The Town’s Fiduciary Funds are also budgeted under the modified accrual basis. The Town administers
five trust funds. Trust funds are subject to trust agreement guidelines.
Summary of Budget Development
The Town develops its budgets with a team-based approach. Town Management and the Finance
Department guide the process through budget development; however, program budgets and workplans
are developed with each Department’s Director, Analyst, and Program Manager’s oversight and expertise.
This approach allows for hands-on planning and creates a clearer understanding for both management
and staff of a program’s goals and functions to be accomplished in the next budget year.
The Development Process
Typically, both the Operating and Capital Budget and Capital Improvement Program processes begin early
in the calendar year with the Town Council and Town Manager’s collaborative development and
refinement of initiatives and directives for the upcoming budget year as reflected in the Council adopted
strategic priorities.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 15
In January, the budget preparation process begins officially for staff with a budget kickoff meeting. Budget
assumptions, directives, and initiatives developed by Town Council and management are provided to set
the Town’s overall objectives and goals. Department staff identifies and analyzes program revenue and
expenditure projections in coordination with Finance/Budget staff and Town Management. Town staff
also consults with Town Commissions for their input on specific investments. Capital improvement
projects are assessed and refined, and CIP funding and appropriation requirements are finalized.
Through rounds of budget briefings and revisions, final proposed program budget and work plans are
developed by the end of April. Operational and capital workplans are finalized and the Finance/Budget
staff prepares financial summary information. Per the Town Code, the Town Manager submits the entire
proposed budget package to the Town Council for its consideration, including Departmental budgets and
work plans.
CIP Development Process
The long term Capital Improvement Program includes projects that have a value of $25,000 or more with
a minimum useful life of 5 years at a fixed location. Equipment, operating, and maintenance costs
associated with the CIP projects are identified where feasible, and will be included in future operating
budgets. Cost estimates for new projects are based on 2017 dollars; however, engineering estimates for
carryover projects from the prior year are updated to reflect current industry costs.
Under direction from the Town Manager’s Office, the Parks and Public Works Department took the lead
in the preparation of the proposed projects for consideration in the FY 2020/21 – 2024/25 Capital
Improvement Program. In coordination with other Town Departments, projects were reviewed to ensure
that the Town’s priorities are addressed within available resources. In some cases, previously approved
projects have been deferred due to reallocation of funding to other priorities and thus have been noted
as unfunded projects in each program section of the CIP.
The Town Manager’s Office reviews the prioritized list of proposed capital improvement projects and
funding sources in conjunction with the preparation of the FY 2018/19 Operating Budget. The Proposed
CIP is then presented by the Town Manager to the Town Council. The Proposed CIP is also submitted to
the Planning Commission for review to ensure that the proposed projects are consistent with the Town’s
General Plan as required by State law (Government Code Section 65401). The Planning Commission will
review the CIP to make sure it consistent with the General Plan on May 13, 2020.
The CIP is reviewed during this time to determine funding capabilities and project priorities, and to refine
project work plans. Although the CIP budget document is prepared separately from the Operating and
Capital Budget, CIP program information is incorporated into the Operating and Capital Summary Budget
document through the resulting financial appropriations and service level requirements.
Budget Adoption
During the month of May, the Town Council reviews the proposed Operating and Capital Summary
Budget, and the Capital Improvement Program for the five-year period at a public hearing. Notice of the
hearing is published in a local newspaper at least ten days prior to the Council’s public hearing date. The
public is invited to participate and copies of the proposed budgets are available for review in the Clerk
Department, on the Town website, and at the budget hearing.
Final Council-directed revisions to the proposed budget are made and the budget documents are
resubmitted to the Town Council for final adoption consistent with Los Gatos Town Code Section
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 16
2.30.295(b), which requires the Town Manager to annually prepare and submit a budget to the Town
Council. This is accomplished in June at a noticed public hearing.
Budget Amendments
During the course of the fiscal year, workplan changes and unanticipated needs necessitate adjustments
to the adopted budgets. The Town Manager is authorized to transfer appropriations between categories,
departments, projects, and programs within a fund in the adopted budget, whereas the Town Council
holds the authority for budget increases and decreases, and transfers between funds that may be
approved at any Town Council meeting.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 17
FISCAL YEAR SURPLUS FLOW OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Introduction Section
A - 18
CAPITAL IMPROVEMENT PROGRAM
All Other Funds
•Traffic Mitigation
•Grant
•Storm Drain
•Utility
Underground
New Projects and Multiyear Projects (carryforward)
Financial Summaries
This Page Intentionally Left Blank
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 1
FINANCIAL SUMMARIES
PROGRAM SUMMARIES
Streets Program ....................................................................................................................................... B – 5
Parks Program ........................................................................................................................................ B – 5
Public Facilities Program.......................................................................................................................... B – 6
FUND SUMMARIES
Total CIP Fund Summary ......................................................................................................................... B – 9
GFAR Fund ............................................................................................................................................... B – 10
Traffic Mitigation Fund ............................................................................................................................ B – 12
Grants and Awards Project Fund ............................................................................................................. B – 14
Storm Basin Funds ................................................................................................................................... B – 16
Utility Underground Fund........................................................................................................................ B – 18
Gas Tax Fund ........................................................................................................................................... B – 20
0
50
100
150
200
250
300
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 2
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 3
FINANCIAL SUMMARIES
BY PROGRAM
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 4
FY 2020/21
BUDGET BY PROGRAM CATEGORY
(Includes Carryforward and FY 2020/21 Budget)
Street
Reconstruction & Resurfacing
16%Street
Maintenance,
Repair & Safety
17%
Street
Improvements
51%
Bridges1%
Park Improvements3%Trail Improvements
2%
Infrastructure
7%
Equipment
3%
Carryforward
&
Budget by Program Category FY 2020/21 Category %
Streets Program
Street Reconstruction 5,517,291$ 16%
Maintenance, Repair & Safety Projects 5,848,980 17%
Street Improvements 17,065,919 51%
Bridges 285,087 1%
Streets Program 28,717,278$ 86%
Parks and Trails Program
Park Improvements 875,247$ 3%
Trail Improvements 683,812 2%
Parks Program 1,559,060$ 5%
Public Facilities Program
Infrastructure 2,260,285$ 7%
Equipment 921,291 3%
Public Facilities 3,181,576$ 10%
TOTAL PROJECT FUNDING 33,457,913$ 100%
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 5
Street Reconstruction & Resurfacing
9901 Street Repair & Resurfacing 16,008,551$ 2,302,980$ 3,305,576$ 2,211,715$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 35,552,766$
Street Maintenance, Repair & Safety
9910 Traffic Calming Projects 195,301 20,449 9,250 10,000 10,000 10,000 10,000 10,000 275,000
9921 Curb, Gutter & Sidewalk Maintenance 2,856,864 6,539 1,367,395 300,000 300,000 300,000 300,000 300,000 5,730,798
9930 Retaining Wall Repairs 1,422,178 4,113 436,486 100,000 100,000 100,000 100,000 100,000 2,362,777
9902 Annual Street Restriping 180,228 - 144,772 25,000 25,000 25,000 25,000 25,000 450,000
0120 Guardrail Replacement Projects 136,986 205 1,072,909 - - - - - 1,210,100
0236 Massol Intersection Improvements 31,250 35,583 383,167 - - - - - 450,000
0008 Shannon Road Repair - - - 1,500,000 - - - - 1,500,000
0130 Roadside Fire Fuel Reduction - - - 250,000 - - - - 250,000
0708 Parking Lot 4 Repair/Waterproofing - - - 250,000 - - - - 250,000
Street Improvements
0705 Downtown Parking Lots Seal Coat & Restriping 24,915 22,500 52,585 - - - - - 100,000
0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - - - 65,000 82,180
0218 Shannon Road Class 1 Multi-use Path 104 69,000 180,100 940,100 - - - - 1,189,304
0221 Sidewalk Improvements - Multiple Locations - - 60,000 - - - - - 60,000
0225 Utility Undergrounding Improvements - - 2,330,000 4,436,000 - - - - 6,766,000
0227 Traffic Signal Modernization 63,975 118,007 2,332,680 415,027 - - - - 2,929,689
0410 Bicknall Avenue Storm Drain Improvements 145,432 15,500 35,258 25,000 - - - - 221,190
0231 Bicycle & Pedestrian Improvements 249,293 291,489 305,745 - - - - - 846,527
0413 Stormwater Master Plan 3,060 16,940 180,000 - - - - - 200,000
2009 Public Art Gateway - 4,500 20,500 4,504 - - - - 29,504
0414 Stormwater System - Pollution Prevention Compliance 1,422 - 298,578 - - - - - 300,000
0420 Annual Storm Drain Improvements 29,700 - 270,300 150,000 - - - - 450,000
0128 Pilot School Busing Program 148,683 224,035 42,056 400,000 87,000 - - - 901,774
0129 ADA Transition Plan - - 110,000 - - - - - 110,000
0237 Highway 17/9 Interchange and Capacity Improvements - - 600,000 - - - - - 600,000
0235 Downtown Streetscape Revitalization - - 1,972,384 - - - - - 1,972,384
0238 Winchester Boulevard Completer Streets (Final Design)- 200,053 79,948 - 1,459,250 - - - 1,739,250
0131 E. Main St. Speed Table/Raised Crosswalk - - - 169,200 - - - - 169,200
0132 Local Road Safety Plan - - - 100,000 - - - - 100,000
0239 Blossom Hill Road Traffic Study - - - 125,000 - - - - 125,000
0240 Winchester Class IV Bikeway - - - 982,455 - - - - 982,455
0133 VMT Mitigation Program - - - 250,000 - - - - 250,000
0241 Kennedy Sidewalk - LGB to Englewood - - - - - 1,162,390 - - 1,162,390
0242 Parking Program Implementation - - - 198,500 - - - - 198,500
Bridges
0801 Quito Road - Bridge Replacement 64,594 - 235,087 50,000 - - - - 349,681
0803 Hwy 17 Bicycle & Pedestrian Bridge-Design - 234,000 - - 5,430,303 - - - 5,664,303
Total Streets Projects 21,579,715$ 3,565,894$ 15,824,777$ 12,892,501$ 10,247,946$ 4,559,907$ 3,397,517$ 3,462,517$ 75,530,773$
STREETS PROGRAM SUMMARY
2022/23 Budget 2023/24 Budget 2024/25 Budget
Expended
Through 2018/19
2019/20
Estimated Actuals
Estimated
Carryfwd to 2020/21 2020/21 Budget Total Budgeted2021/22 Budget
Park Improvements
4605 Parks Playground Fibar Project 63,460$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 25,000$ 175,000$
4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - - 225,000 - - - - - 225,000
4202 Town Plaza Turf Repairs 8,116 - 28,000 - - - - - 36,116
4006 Outdoor Fitness Equipment - - 60,000 - - - - - 60,000
4508 Vegetation Management - Town-wide - - 500,707 - - - - - 500,707
Trail Improvements
4504 Open Space Trail Upgrades - - 152,000 - - - - - 152,000
4503 Charter Oaks Trail Repair Project 72,942 - 440,109 - - - - - 513,051
4507 Forbes Mill Footbridge Improvements 27,397 3,207 61,224 - - - - - 91,828
4505 Trailhead Connector 214 486,747 30,479 - 3,262,500 - - - 3,779,940
Total Parks Projects 172,128$ 489,954$ 1,534,060$ 25,000$ 3,262,500$ 25,000$ -$ 25,000$ 5,533,641$
2020/21
Budget
2021/22
Budget
2023/24
Budget
Expended Through
2018/19
2019/20 Estimated
Actuals
Estimated Carryfwd to
2020/21
PARKS AND TRAILS PROGRAM SUMMARY
2024/25
Budget Total Budgeted
2022/23
Budget
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 6
Infrastructure
2302 Building Replacement at Corporation Yard 75,942 112,245 952,613 25,000 25,000 25,000 25,000 25,000 1,265,800
2001 Facilities Assessment 24,142 - 80,000 - - - - - 104,142
2503 Library Carpet Replacement - - 56,500 - - - - - 56,500
2002 Town Beautification 94,240 8,462 6,924 10,000 10,000 10,000 10,000 10,000 159,625
2117 ADA Restrooms and HR Offices - - 300,000 150,000 - - - - 450,000
2116 Plaza Level Railings - Code Upgrade - - 30,000 - - - - - 30,000
2010 Waterproofing Town-wide - - 75,000 - - - - - 75,000
2504 Sound Mitigation in Library Lobby - - 22,000 - - - - - 22,000
6004 Fire Suppression (Halon) for Server Rooms - - 200,000 - - - - - 200,000
2601 ADA Upgrade Public Restrooms - Adult Recreation Bldg.51,882 - 250,000 - - - - - 301,882
2118 Police Headquarters Roof Repair - 47,752 2,248 - - - - - 50,000
2206 Adult Recreation - Floor Repair - - - 100,000 - - - - 100,000
Equipment
6101 Information System Upgrade 188,975 103,553 77,026 - - - - - 369,554
6001 Audio/Video System Upgrade 68,048 - 42,552 - - - - - 110,600
6003 Town-wide Document Imaging Project 198,011 - 16,990 - - - - - 215,000
2305 Engineering Document Archiving 8,284 40,000 11,716 - - - - - 60,000
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 395,176 486 62,967 - - - - - 458,628
6103 EOC Communications Upgrade 19,618 1,000 29,382 - - - - - 50,000
6104 IT Disaster Recovery Improvements 7,942 22,213 169,845 - - - - - 200,000
6301 Computer-Aided Dispatch and Records Management System 10,290 14,186 510,814 - - - - - 535,290
Total Facilities Projects 1,142,549$ 349,897$ 2,896,576$ 285,000$ 35,000$ 35,000$ 35,000$ 35,000$ 4,814,022$
Total Streets, Parks and Trails, and Public Facilities Projects 22,894,392$ 4,405,745$ 20,255,412$ 13,202,501$ 13,545,446$ 4,619,907$ 3,432,517$ 3,522,517$ 85,878,436$
PUBLIC FACILITIES PROGRAM
2022/23 Budget 2023/24 Budget 2024/25 Budget Total Budgeted
Expended
Through 2018/19
2019/20
Estimated Actuals
Estimated
Carryfwd to 2020/21 2020/21 Budget 2021/22 Budget
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 7
FINANCIAL SUMMARIES
BY FUND
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 8
FY 2020/21
PROJECT SUMMARY BY FUND
(Includes Carryforward and FY 2020/21 Budget)
GFAR
57%
Traffic
Mitigation Fund5%
Grant Funds13%Storm Drain
Funds1%
Utility
Underground
Fund
20%
Gas Tax Fund
4%
`
Carryforward
&
Budget by Fund FY 2020/21 Fund %
GFAR 18,948,222$ 57%
Traffic Mitigation Fund 1,611,939 5%Grant Funds 4,370,936 13%
Storm Drain Funds 480,558 1%
Utility Underground Fund 6,836,204 20%
Gas Tax Fund 1,210,054 4%
Total Budget by Fund 33,457,913$ 100.0%
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 9
Beginning Fund Balance
411 GFAR 4,295,606$ 8,518,983$ 13,417,762$ 2,789,898$ 1,130,822$ 499,506$ 249,890$
411 Reserved for Parking 1,460,210 - 2,920,420 1,460,210 1,460,210 1,460,210 1,460,210
411 Reserved for Comcast PEG 50,000 - 100,000 50,000 50,000 50,000 50,000
411 Reserved for Almond Grove 2,579,997 - - - - - -
411 VTA Vehicle Registration Fees 133,169 - - - - - -
471 Traffic Mitigation 304,648 304,648 304,648 304,648 304,648 304,648 304,648
421 Grant Fund 124,615 124,615 (415,876) (210,038) (297,038) (297,038) (297,038)
461 Storm Basin #1 932,416 932,416 993,373 892,843 943,203 994,741 1,047,465
462 Storm Basin #2 1,800,548 1,800,548 1,820,150 1,749,278 1,803,928 1,859,766 1,916,821
463 Storm Basin #3 (104,407) (104,407) (119,883) (297,465) (296,405) (295,284) (294,111)
472 Underground Utilities 3,079,685 3,079,685 3,062,696 110,019 140,569 171,269 202,129
481 Gas Tax 853,821 853,821 311,158 228,422 282,586 336,750 390,914
Total Beginning Fund Balance 15,510,308$ 15,510,308$ 22,394,449$ 7,077,815$ 5,522,523$ 5,084,568$ 5,030,928$
Revenues
411 GFAR 13,177,383$ 11,285,571$ 7,227,765$ 2,264,339$ 2,390,463$ 2,390,463$ 2,390,463$
471 Traffic Mitigation 2,246,440 293,234 1,621,939 10,000 10,000 10,000 10,000
421 Grant Fund 3,211,080 74,006 4,576,774 8,742,593 805,690 - -
461 Storm Basin #1 49,150 60,957 49,470 50,360 51,538 52,724 53,949
462 Storm Basin #2 53,770 19,602 79,128 54,650 55,838 57,054 58,289
463 Storm Basin #3 1,620 24 2,976 1,060 1,121 1,173 1,236
472 Underground Utilities 52,490 32,011 3,883,527 30,550 30,700 30,860 31,010
481 Gas Tax 1,364,620 1,364,620 1,233,317 1,370,218 1,370,218 1,370,218 1,370,218
Total Revenues 20,156,552$ 13,130,025$ 18,674,895$ 12,523,770$ 4,715,568$ 3,912,493$ 3,915,166$
TOTAL SOURCE OF FUNDS 35,666,861$ 28,640,334$ 41,069,344$ 19,601,585$ 10,238,091$ 8,997,061$ 8,946,094$
Capital Program Expenditures
411 GFAR 19,744,392$ 2,948,755$ 18,948,222$ 3,505,799$ 2,604,163$ 2,222,463$ 2,247,463$
471 Traffic Mitigation 2,228,282 283,234 1,611,939 - - - -
421 Grant Fund 3,472,206 614,496 4,370,936 8,829,593 805,690 - -
461 Storm Basin #1 100,000 - 150,000 - - - -
462 Storm Basin #2 100,000 - 150,000 - - - -
463 Storm Basin #3 121,058 15,500 180,558 - - - 65,000
472 Underground Utilities 2,449,204 49,000 6,836,204 - - - -
481 Gas Tax 1,801,282 1,801,282 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054
Total Capital Program Expenditures 30,016,424$ 5,712,269$ 33,457,913$ 13,545,446$ 4,619,907$ 3,432,517$ 3,522,517$
Transfers Out & Other Sources
411 GFAR 417,616 417,616 417,616 417,616 417,616 417,616 417,616
411 GFAR Designated for Parking 1,460,210$ -$ 2,920,420$ 1,460,210$ 1,460,210$ 1,460,210$ 1,460,210$
411 Reserved for Comcast PEG 50,000 - 100,000 50,000 50,000 50,000 50,000
471 Traffic Mitigation 10,000 10,000 10,000 10,000 10,000 10,000 10,000
481 Gas Tax 106,000 106,000 106,000 106,000 106,000 106,000 106,000
Total Transfers Out & Designated 2,043,826$ 533,616$ 3,554,036$ 2,043,826$ 2,043,826$ 2,043,826$ 2,043,826$
Unrestricted 3,606,611$ 22,394,449$ 4,057,395$ 4,012,313$ 3,574,358$ 3,520,718$ 3,379,751$
TOTAL USE OF FUNDS 35,666,861$ 28,640,334$ 41,069,344$ 19,601,585$ 10,238,091$ 8,997,061$ 8,946,094$
FY 2024/25Carryfwd &
FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24USE of FUNDS Adjusted Budget
FY 2019/20
Estimated
FY 2019/20
FY 2023/24Estimated
FY 2019/20 FY 2024/25
Source and Use Summary Schedule
All Capital Improvement Program Funds
Adjusted Budget
FY 2019/20
Carryfwd &
FY 2020/21 FY 2021/22 FY 2022/23SOURCE of FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 10
Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed
2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDS
Beginning Fund BalanceDesignated for Parking 1,460,210$ -$ 2,920,420$ 1,460,210$ 1,460,210$ 1,460,210$ 1,460,210$ Reserved for Comcast PEG 50,000 - 100,000 50,000 50,000 50,000 50,000 Reserved for Almond Grove 2,579,997 - - - - - -
VTA Vehicle Registration Fees 133,169 - - - - - - Unrestricted 4,295,606 8,518,983 13,417,762 2,789,898 1,130,822 499,506 249,890 Total Beginning Fund Balance 8,518,983$ 8,518,983$ 16,438,182$ 4,300,108$ 2,641,032$ 2,009,716$ 1,760,100$ RevenuesUse of Reserves - Parking -$ -$ -$ -$ -$ -$ -$ Construction Impact Fees 110,000 86,915 110,000 110,000 110,000 110,000 110,000 Refuse Vehicle Road Impact Fee 619,553 619,553 619,553 745,676 871,800 871,800 871,800 School Busing Fare Revenue 46,500 16,935 46,500 - - - - Developers Contributions 428,000 350,000 78,000 78,000 78,000 78,000 78,000 Cost Sharing - Curbs & Gutters 10,000 58,188 10,000 10,000 10,000 10,000 10,000 Cost Sharing - Traffic Calming 10,000 - 10,000 10,000 10,000 10,000 10,000 Slurry Seal - 49,075 - - - - - Pavement Rehab-Crack & Seal - Measure B Funding 180,000 - 360,000 180,000 180,000 180,000 180,000 Other Contributions - 27,370 - - - - - One-way Downtown Street - 910 - - - - - Other Contributions - City of San Jose 275,000 208,831 66,169 - - - - Misc CIP refund - 64,865 - - - - - 2016 Measure B Funding 1,741,989 1,507,338 815,314 580,663 580,663 580,663 580,663 PG&E Financing for Energency Efficiency Upgrades (2008)1,439,995 - 1,439,995 - - - - Library Lobby Sound Mit 20,755 - 20,755 - - - - Operating Transfers In From General Fund 5,858,207 5,858,207 3,401,479 550,000 550,000 550,000 550,000 From Open Space Reserve 152,000 152,000 - - - - - From General Plan Update - - 250,000 - - - - From Stores and Vehicle Maintenance Funds 972,384 972,384 - - - - - From Equipment Replacement 525,000 525,000 - - - - - From Facility Maintenance 788,000 788,000 - `- - -
Total Revenues 13,177,383$ 11,285,571$ 7,227,765$ 2,264,339$ 2,390,463$ 2,390,463$ 2,390,463$
TOTAL SOURCE OF FUNDS 21,696,366$ 19,804,553$ 23,665,947$ 6,564,447$ 5,031,495$ 4,400,179$ 4,150,563$
USE OF FUNDSTotal Completed Projects 4,607,713$ 1,273,078$ -$ -$ -$ -$ -$ Carryforward ProjectsOpen Space Trail Upgrades 152,000 - 152,000 - - - - Parks Playground Fibar Project 36,540 - 61,540 - 25,000 - 25,000 Forbes Mill Footbridge Improvements 64,431 3,207 61,224 - - - - Charter Oaks Trail Repair Project 364,891 - 364,891 - - - - Creek Trail & Parks Path & Parking Lot Seal & Striping 225,000 - 225,000 - - - - Town Plaza Turf Repairs 28,000 - 28,000 - - - - Outdoor Fitness Equipment 60,000 - 60,000 - - - - Trailhead Connector 174,226 143,747 30,479 - - - - Vegetation Management - Town-wide 500,707 - 500,707 - - - - Building Replacement at Corporation Yard 1,064,858 112,245 977,613 25,000 25,000 25,000 25,000 Library Carpet Replacement 56,500 - 56,500 - - - - Facilities Assessment 80,000 - 80,000 - - - - Information System Upgrade 180,579 103,553 77,026 - - - - Audio/Video System Upgrade 42,552 - 42,552 - - - - Town-wide Document Imaging Project 16,990 - 16,990 - - - - Engineering Document Archiving 51,716 40,000 11,716 - - - - Police Headquarters Roof Repair 50,000 47,752 2,248 - - - - Town Beautification 15,386 8,462 16,924 10,000 10,000 10,000 10,000 Silicon Valley Regional Interoperability Project (SVRIP) Service 63,452 486 62,967 - - - - EOC Communications Upgrade 30,382 1,000 29,382 - - - - IT Disaster Recovery Improvements 192,058 22,213 169,845 - - - - ADA Upgrade for Public Restrooms - Rec Building 183,000 - 183,000 - - - - Fire Suppression (Halon) for Server Rooms 200,000 - 200,000 - - - - Plaza Level Railings - Code Upgrade 30,000 - 30,000 - - - - Waterproofing Town-wide 75,000 - 75,000 - - - - ADA Restrooms and HR Offices 300,000 - 450,000 - - - - Sound Mitigation in Library Lobby 22,000 - 22,000 - - - - Computer-Aided Dispatch and Records Management System 525,000 14,186 510,814 - - - - Street Repair & Resurfacing 3,807,274 501,698 4,307,237 1,626,339 1,752,463 1,752,463 1,752,463 Annual Street Restriping 144,772 - 169,772 25,000 25,000 25,000 25,000 Traffic Calming Projects 29,699 20,449 19,250 10,000 10,000 10,000 10,000 Curb, Gutter & Sidewalk Maintenance 1,373,934 6,539 1,667,395 300,000 300,000 300,000 300,000 Retaining Wall Repairs 440,599 4,113 536,486 100,000 100,000 100,000 100,000 Quito Road - Bridge Replacement 235,087 - 285,087 - - - - Guardrail Replacement Projects 93,015 205 92,809 - - - - Downtown Parking Lots Seal Coat & Restriping 75,085 22,500 52,585 - - - - Shannon Road Class 1 Multi-use Path 129,896 20,000 109,896 - - - - Sidewalk Improvements - Multiple Locations 60,000 - 60,000 - - - - Pilot School Busing Program 266,091 224,035 355,056 - - - - Bicycle & Pedestrian Improvements 394,306 122,211 272,095 - - - - Stormwater Master Plan 196,940 16,940 180,000 - - - - Stormwater System - Pollution Prevention Compliance 298,578 - 298,578 - - - - Public Art Gateway 25,000 4,500 25,004 - - - - Winchester Boulevard Complete Streets (Final Design)280,000 200,053 79,948 463,250 - - - Downtown Streetscape Revitalization 1,972,384 - 1,972,384 - - - - Massol Intersection Improvements 418,750 35,583 383,167 - - - - ADA Transition Plan 110,000 - 110,000 - - - - New ProjectsAdult Recreation - Floor Repair - - 100,000 - - - - Kennedy Sidewalk - LGB to Englewood - - - - 356,700 - - Roadside Fire Fuel Reduction - - 250,000 - - - - Parking Lot 4 Repair/Waterproofing - - 250,000 - - - - Shannon Road Repair - - 1,500,000 - - - - Blossom Hill Road Traffic Study - - 125,000 - - - - E. Main St. Speed Table/Raised Crosswalk - - 83,000 - - - - Local Road Safety Plan - - 28,000 - - - - Winchester Class IV Bikeway - - 688,555 - - - - BPOC over Highway 17 (final design)- - - 946,210 - - - VMT Mitigation Program - - 250,000 - - - - Parking Program Implementation - - 198,500 - - - -
Total Project Expenditures 19,744,392$ 2,948,755$ 18,948,222$ 3,505,799$ 2,604,163$ 2,222,463$ 2,247,463$ p Operating Transfers Out
Transfer to Equipment Replacement -$ -$ -$ -$ -$ Transfer to GF 417,616 417,616 417,616 417,616 417,616 417,616 417,616Total Operating Transfers Out 417,616$ 417,616$ 417,616$ 417,616$ 417,616$ 417,616$ 417,616$
Designated for Parking 1,460,210$ -$ 2,920,420$ 1,460,210$ 1,460,210$ 1,460,210$ 1,460,210$
Reserved for Comcast PEG 50,000 - 100,000 50,000 50,000 50,000 50,000
Reserved for VTA Vehicle Registration Fees 133,169 - - - - - - Unrestricted 24,148 16,438,182 1,279,688 1,130,822 499,506 249,890 (24,726)
Total Ending Fund Balance 1,534,358$ 16,438,182$ 4,300,108$ 2,641,032$ 2,009,716$ 1,760,100$ 1,485,484$
TOTAL USE OF FUNDS 21,696,366$ 19,804,553$ 23,665,947$ 6,564,447$ 5,031,495$ 4,400,179$ 4,150,563$
GENERAL FUND APPROPRIATED RESERVES (GFAR)STATEMENT OF SOURCE AND USE OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 11
Carryforward Projects4504Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ -$ 152,000$ 1605 Parks Playground Fibar Project 63,460 36,540 25,000 - 25,000 - 25,000 175,000
3104 Charter Oaks Trail Repair Project 109 364,891 - - - - - 365,000 4507 Forbes Mill Footbridge Improvements 30,603 61,224 - - - - - 91,828 4202 Town Plaza Turf Repairs 8,116 28,000 - - - - - 36,116 4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - - 225,000 4006 Outdoor Fitness Equipment - 60,000 - - - - - 60,000 4505 Trailhead Connector 143,961 30,479 - - - - - 174,440
4508 Vegetation Management - Town-wide - 500,707 - - - - - 500,707 6001 Audio/Video System Upgrade 68,048 42,552 - - - - - 110,600 6101 Information System Upgrade 292,528 77,026 - - - - - 369,554
6003 Town-wide Document Imaging Project 198,011 16,990 - - - - - 215,000 2302 Building Replacement at Corporation Yard 188,187 952,613 25,000 25,000 25,000 25,000 25,000 1,265,800 2118 Police Headquarters Roof Repair 47,752 2,248 - - - - - 50,000 2503 Library Carpet Replacement - 56,500 - - - - - 56,500 2305 Engineering Document Archiving 48,284 11,716 - - - - - 60,000
2001 Facilities Assessment 24,142 80,000 - - - - - 104,142 2002 Town Beautification 102,702 6,924 10,000 10,000 10,000 10,000 10,000 159,625 6305 Silicon Valley Regional Interoperability Project (SVRIP) Servi 395,661 62,967 - - - - - 458,628 6104 IT Disaster Recovery Improvements 30,155 169,845 - - - - - 200,000 6103 EOC Communications Upgrade 20,618 29,382 - - - - - 50,000
2601 ADA Upgrade Public Restrooms - Adult Recreation Bldg.- 183,000 - - - - - 183,000 6004 Fire Suppression (Halon) for Server Rooms - 200,000 - - - - - 200,000 2116 Plaza Level Railings - Code Upgrade - 30,000 - - - - - 30,000
2010 Waterproofing Town-wide - 75,000 - - - - - 75,000 2117 ADA Restrooms and HR Offices - 300,000 150,000 - - - - 450,000
2504 Sound Mitigation in Library Lobby - 22,000 - - - - - 22,000 6301 Computer-Aided Dispatch and Records Management System 24,476 510,814 - - - - - 535,290 9901 Street Repair & Resurfacing 8,629,582 3,305,576 1,001,661 1,626,339 1,752,463 1,752,463 1,752,463 19,820,547
9902 Annual Street Restriping 180,228 144,772 25,000 25,000 25,000 25,000 25,000 450,000 9910 Traffic Calming Projects 215,750 9,250 10,000 10,000 10,000 10,000 10,000 275,000 9921 Curb, Gutter & Sidewalk Maintenance 2,863,403 1,367,395 300,000 300,000 300,000 300,000 300,000 5,730,798
9930 Retaining Wall Repairs 1,426,291 436,486 100,000 100,000 100,000 100,000 100,000 2,362,777 0801 Quito Road - Bridge Replacement 64,594 235,087 50,000 - - - - 349,681
0120 Guardrail Replacement Projects 137,191 92,809 - - - - - 230,000 0705 Downtown Parking Lots Seal Coat & Restriping 47,415 52,585 - - - - - 100,000 0218 Shannon Road Class 1 Multi-use Path 20,104 109,896 - - - - - 130,000
0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - - 60,000 0803 Hwy 17 Bicycle & Pedestrian Bridge-Design - - - 946,210 - - - 946,210
0128 Pilot School Busing Program 372,718 42,056 313,000 - - - - 727,774 0231 Bicycle & Pedestrian Improvements 217,906 272,095 - - - - - 490,000 0413 Stormwater Master Plan 20,000 180,000 - - - - - 200,000
0414 Stormwater System - Pollution Prevention Compliance 1,422 298,578 - - - - - 300,000 2009 Public Art Gateway 4,500 20,500 4,504 - - - - 29,504 0235 Downtown Streetscape Revitalization - 1,972,384 - - - - - 1,972,384 0236 Massol Intersection Improvements 66,833 383,167 - - - - - 450,000 0129 ADA Transition Plan - 110,000 - - - - - 110,000
0238 Winchester Boulevard Complete Streets (Final Design)200,053 79,948 - 463,250 - - - 743,250 New Projects2206Adult Recreation - Floor Repair - - 100,000 - - - - 100,000 4509 Kennedy Sidewalk - LGB to Englewood - - - - 356,700 - - 356,700 0130 Roadside Fire Fuel Reduction - - 250,000 - - - - 250,000
6004 Parking Lot 4 Repair/Waterproofing - - 250,000 - - - - 250,000 2116 Shannon Road Repair - - 1,500,000 - - - - 1,500,000 2010 Blossom Hill Road Traffic Study - - 125,000 - - - - 125,000
2117 E. Main St. Speed Table/Raised Crosswalk - - 83,000 - - - - 83,000 2504 Local Road Safety Plan - - 28,000 - - - - 28,000 6301 Winchester Class IV Bikeway - - 688,555 - - - - 688,555 0235 VMT Mitigation Program - - 250,000 - - - - 250,000 0236 Parking Program Implementation - - 198,500 - - - - 198,500
Total GFAR Projects 16,154,801$ 13,461,002$ 5,487,220$ 3,505,799$ 2,604,163$ 2,222,463$ 2,247,463$ 45,682,911$
2021/22
Budget
2023/24
Budget
2020/21
Budget
Total
Budgeted
Expended
Through
2019/20
Estimated
Carryfwd to
2020/21
2022/23
Budget
GFAR FUND PROJECT SUMMARY
2024/25
Budget
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 12
Adjusted
Budget Estimated
Budget &
Carryfwd Proposed Proposed Proposed Proposed2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDS
Beginning Fund BalanceUnrestricted 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$
Deferred Traffic MitigationTotal Beginning Fund Balance 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$
RevenuesDeferred Revenue 2,130,313$ 293,234$ 1,621,939$ 10,000$ 10,000$ 10,000$ 10,000$
In-Lieu Fees 116,126 - - - - - - Total Revenues 2,246,440$ 293,234$ 1,621,939$ 10,000$ 10,000$ 10,000$ 10,000$
TOTAL SOURCE OF FUNDS 2,551,087$ 597,882$ 1,926,587$ 314,648$ 314,648$ 314,648$ 314,648$
USE OF FUNDSCompleted ProjectsTLG / Shannon Imrpovement 20,000$ -$ -$ -$ -$ -$ -$
Cut-Through Traffic/Wood Road Roundabout 261,581 33,446 - - - - -
Blossom Hill/Cherry Blossom Intersection Improve 500,000 - - - - - -
Carryforward Projects
Hwy 17 Bicycle & Pedestrian Bridge-Design 147,005$ 147,005$ -$ -$ -$ -$ -$ Bike & Pedestrian Improvements 34,028 378 33,650 - - - - Traffic Signal Modernization 665,668 102,406 978,289 - - - -
Highway 17/9 Interchange and Capacity Improve 600,000 - 600,000 - - - - Proposed Projects
Total Project Expenditures 2,228,282$ 283,234$ 1,611,939$ -$ -$ -$ -$
10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$
Total Operating Transfers 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$
Ending Fund Balance
Unrestricted 312,805$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$
Total Ending Fund Balance 312,805$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$ 304,648$
TOTAL USE OF FUNDS 2,551,087$ 597,882$ 1,926,587$ 314,648$ 314,648$ 314,648$ 314,648$
TRAFFIC MITIGATION FUNDSTATEMENT OF SOURCE AND USE OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 13
Carryforward Projects
0803 Hwy 17 Bicycle & Pedestrian Bridge-Design 147,005 - - - - - - 147,005 0227 Traffic Signal Modernization 125,000 563,262 415,027 - - - - 1,103,289
0231 Bicycle & Pedestrian Improvements 41,350 33,650 - - - - - 75,000 0237 Highway 17/9 Interchange and Capacity Improvements - 600,000 - - - - - 600,000
New ProjectsTotal Traffic Mitigation Projects 313,355$ 1,196,912$ 415,027$ -$ -$ -$ -$ 1,925,294$
TRAFFIC MITIGATION FUND PROJECTS
Expended Through
2019/20
Total
Budgeted
2024/25
Budget
Estimated Carryfwd to
2020/21
2021/22
Budget
2020/21
Budget
2022/23
Budget
2023/24
Budget
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 14
Adjusted
Budget Estimated
Budget &
Carryfwd Proposed Proposed Proposed Proposed
2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDSBeginning Fund Balance
Unrestricted 124,615$ 124,615$ (415,876)$ (210,038)$ (297,038)$ (297,038)$ (318,413)$ Total Beginning Fund Balance 124,615$ 124,615$ (415,876)$ (210,038)$ (297,038)$ (297,038)$ (297,038)$
Revenues
Traffic Signal Modernization 1,387,596 60,258 1,327,339 - - - -
Charter Oaks Trail Repair Project 98,889 12,290 86,599 - - - - Trailhead Connector 343,000 1,458 341,542 3,262,500 - - - Hwy 17 Bicycle & Pedestrian Bridge-Design 52,995 - 52,995 4,484,093 - - -
Bike & Ped Improvements (BHR East & West)281,500 - 242,000 - - - -
Guardrail Replacement Projects 980,100 - 980,100 - - - - ADA Upgrade Public Restrooms - Adult Recreation Bldg 67,000 - 67,000 - - - - Sidewalk Improvements Shannon/LGB/Cherry Blossom - - 940,100 - - - -
E. Main St. Speed Table/ Raised Crosswalk - - 86,200 - - - - Winchester Class IV Bikeway - - 293,900 - - - - Local Road Safety Program - - 72,000 - - - - Kennedy Sidewalk between LGB and Engelwood - - - - 805,690 - -
Winchester Blvd. Complete Streets (Final Design)- - - 996,000 - - - School Bus Pilot Program - - 87,000 - - - -
Total Revenues 3,211,080$ 74,006$ 4,576,774$ 8,742,593$ 805,690$ -$ -$
TOTAL SOURCE OF FUNDS 3,335,695$ 198,621$ 4,160,898$ 8,532,555$ 508,652$ (297,038)$ (297,038)$
USE OF FUNDS
Completed ProjectsCarryforward ProjectsCharter Oaks Trail Repair Project 75,218$ -$ 75,218$ -$ -$ -$ -$ Trailhead Connector 343,000 343,000 - 3,262,500 - - -
ADA Upgrade Public Restrooms - Adult Recreation Bldg 67,000 - 67,000 - - - - School Bus Pilot Program - - 87,000 87,000 - - - Traffic Signal Modernization 1,785,019 15,601 1,769,418 - - - - Hwy 17 Bicycle & Pedestrian Bridge-Design 52,995 86,995 - 4,484,093 - - -
Bike & Ped Improvements 168,873 168,900 - - - - - Winchester Blvd. Complete Streets (Final Design)- - - 996,000 - - - Guardrail Replacement Projects 980,100 - 980,100 - - - - Sidewalk Improvements Shannon/LGB/Cherry Blossom - - 940,100 - - - -
Proposed ProjectsE. Main St. Speed Table/ Raised Crosswalk - - 86,200 - - - - Winchester Class IV Bikeway - - 293,900 - - - -
Local Road Safety Program - - 72,000 - - - -
Kennedy Sidewalk between LGB and Engelwood - - - - 805,690 - -
Total Expenditures 3,472,206$ 614,496$ 4,370,936$ 8,829,593$ 805,690$ -$ -$
Ending Fund Balance
Unrestricted (136,511)$ (415,876)$ (210,038)$ (297,038)$ (297,038)$ (297,038)$ (297,038)$
Total Ending Fund Balance (136,511)$ (415,876)$ (210,038)$ (297,038)$ (297,038)$ (297,038)$ (297,038)$
TOTAL USE OF FUNDS 3,335,695$ 198,621$ 4,160,898$ 8,532,555$ 508,652$ (297,038)$ (297,038)$
GRANT FUND
STATEMENT OF SOURCE AND USE OF FUNDS
Note: The grants function primarily on a reimbursement basis.
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 15
Carryforward Projects
4503 Charter Oaks Trail Repair Project 72,833 75,218 - - - - - 148,051 4505 Trailhead Connector 343,000 - - 3,262,500 - - - 3,605,500
2601 ADA Upgrade Public Restrooms - Adult Recreation Bldg.51,882 67,000 - - - - - 118,882
0120 Guardrail Replacement Projects - 980,100 - - - - - 980,100 0218 Shannon Road Class 1 Multi-use Path - - 940,100 - - - - 940,100 0803 Hwy 17 Bicycle & Pedestrian Bridge-Design 86,995 - - 4,484,093 - - - 4,571,088
0128 Pilot School Busing Program - - 87,000 87,000 - - - 174,000
0227 Traffic Signal Modernization 56,982 1,769,418 - - - - - 1,826,400 0231 Bicycle & Pedestrian Improvements 281,527 - - - - - - 281,527 0238 Winchester Boulevard Complete Streets (Final Design)- - - 996,000 - - - 996,000
New Projects0241Kennedy Sidewalk - LGB to Englewood - - - - 805,690 - - 805,690
0131 E. Main St. Speed Table/Raised Crosswalk - - 86,200 - - - - 86,200 0132 Local Road Safety Plan - - 72,000 - - - - 72,000 0240 Winchester Class IV Bikeway - - 293,900 - - - - 293,900 Total Grant Funded Projects 893,219$ 2,891,736$ 1,479,200$ 8,829,593$ 805,690$ -$ -$ 14,899,438$
2021/22 Budget 2024/25 Budget
Estimated
Carryfwd to 2020/21
Expended
Through 2019/20 2020/21 Budget
GRANT FUNDED PROJECTS
2022/23 Budget 2023/24 Budget Total Budgeted
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 16
Adjusted
Budget Estimated
Budget &
Carryfwd Proposed Proposed Proposed Proposed
2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDS
Beginning Fund Balance
Unrestricted 2,628,557$ 2,628,557$ 2,693,640$ 2,344,656$ 2,450,726$ 2,559,223$ 2,670,175$
Total Beginning Fund Balance 2,628,557$ 2,628,557$ 2,693,640$ 2,344,656$ 2,450,726$ 2,559,223$ 2,670,175$
Revenues
Drainage Fees 92,500$ 80,583$ 120,374$ 94,350$ 96,237$ 98,162$ 100,125$
Interest 12,040 - 11,200 11,720 12,260 12,790 13,350
Total Revenues 104,540$ 80,583$ 131,574$ 106,070$ 108,497$ 110,952$ 113,475$
TOTAL SOURCE OF FUNDS 2,733,097$ 2,709,140$ 2,825,214$ 2,450,726$ 2,559,223$ 2,670,175$ 2,783,650$
USE OF FUNDS
Completed Projects
Carryforward Projects
Hernandez Ave Storm Drain Improvements - - - - - - 65,000
Bicknall Avenue Storm Drain Improvements 50,758 15,500 60,258 - - - -
Annual Storm Drain Improvement Prj 270,300 - 420,300 - - - -
Proposed Projects
Total Expenditures 321,058$ 15,500$ 480,558$ -$ -$ -$ 65,000$
Ending Fund Balance
Unrestricted 2,412,039$ 2,693,640$ 2,344,656$ 2,450,726$ 2,559,223$ 2,670,175$ 2,718,650$
Total Ending Fund Balance 2,412,039$ 2,693,640$ 2,344,656$ 2,450,726$ 2,559,223$ 2,670,175$ 2,718,650$
TOTAL USE OF FUNDS 2,733,097$ 2,709,140$ 2,825,214$ 2,450,726$ 2,559,223$ 2,670,175$ 2,783,650$
STORM BASIN FUNDSSTATEMENT OF SOURCE AND USE OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 17
Carryforward Projects
0409 Hernandez Avenue Storm Drain Improvements 17,180$ -$ -$ -$ -$ -$ 65,000$ 82,180$
0410 Bicknell Road Storm Drain Improvements 160,932 35,258 25,000 - - - - 221,190
0420 Annual Storm Drain Improvement Prj 29,700 270,300 150,000 - - - - 450,000
New ProjectsTotal Storm Basin Funds Projects 207,812$ 305,558$ 175,000$ -$ -$ -$ 65,000$ 753,370$
Total
Budgeted
Estimated
Carryfwd to
2020/21
2020/21
Budget
2021/22
Budget
2023/24
Budget
2024/25
Budget
2022/23
Budget
Expended
Through
2019/20
STORM BASIN FUNDS PROJECTS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 18
Adjusted
Budget Estimated
Budget &
Carryfwd Proposed Proposed Proposed Proposed
2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDS
Beginning Fund Balance
Unrestricted 3,079,685$ 3,079,685$ 3,062,696$ 110,019$ 140,569$ 171,269$ 202,129$
Total Beginning Fund Balance 3,079,685$ 3,079,685$ 3,062,696$ 110,019$ 140,569$ 171,269$ 202,129$
Revenues
Construction Tax 30,000$ 9,521$ 50,479$ 30,000$ 30,000$ 30,000$ 30,000$
Interest 22,490 22,490 22,490 550 700 860 1,010
Balamce from PG&E - - 3,810,558 - - - -
Total Revenues 52,490$ 32,011$ 3,883,527$ 30,550$ 30,700$ 30,860$ 31,010$
TOTAL SOURCE OF FUNDS 3,132,175$ 3,111,696$ 6,946,223$ 140,569$ 171,269$ 202,129$ 233,139$
USE OF FUNDS
Completed Projects
Carryforward Projects
PG&E Undergrounding 2,330,000$ -$ 6,766,000$ -$ -$ -$ -$
Sidewalk Improve Shannon/LGB/Cherry Bl 119,204 49,000 70,204 - - - -
New Projects
Total Expenditures 2,449,204$ 49,000$ 6,836,204$ -$ -$ -$ -$
Operating Transfers
Total Operating Transfers -$ -$ -$ -$ -$ -$ -$
Ending Fund Balance
Unrestricted 682,971 3,062,696 110,019 140,569 171,269 202,129 233,139
Total Ending Fund Balance 682,971$ 3,062,696$ 110,019$ 140,569$ 171,269$ 202,129$ 233,139$
TOTAL USE OF FUNDS 3,132,175$ 3,111,696$ 6,946,223$ 140,569$ 171,269$ 202,129$ 233,139$
UTILITY UNDERGROUND FUNDSTATEMENT OF SOURCE AND USE OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 19
Carryforward Projects0225Utility Undergrounding Improvements -$ 2,330,000$ 4,436,000$ -$ -$ -$ -$ 6,766,000$ 0218 Shannon Road Class 1 Multi-use Path 49,000 70,204 - - - - - 119,204$ New ProjectsTotal Utility Undergrounding Projects 49,000$ 2,400,204$ 4,436,000$ -$ -$ -$ -$ 6,885,204$
2023/24
Budget
UTILITY UNDERGROUND FUND PROJECTS
Total
Budgeted
2022/23
Budget
2024/25
Budget
Expended
Through
2019/20
Estimated
Carryfwd to
2020/21
2020/21
Budget
2021/22
Budget
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 20
Adjusted
Budget Estimated
Budget &
Carryfwd Proposed Proposed Proposed Proposed
2019/20 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
SOURCE OF FUNDS
Beginning Fund Balance
Unrestricted 853,821$ 853,821$ 311,158$ 228,422$ 282,586$ 336,750$ 390,914$
Total Beginning Fund Balance 853,821$ 853,821$ 311,158$ 228,422$ 282,586$ 336,750$ 390,914$
Revenues
Gas Tax 500,722$ 500,722$ 458,122$ 509,024$ 509,024$ 509,024$ 509,024$
Gas Tas - Traffic Congestion 257,284 257,284 247,247 274,719 274,719 274,719 274,719
Loan Repayment 34,509 34,509 - - - - -
Road Maintenance Rehabilitation 570,895 570,895 526,739 585,265 585,265 585,265 585,265
Interest 1,210 1,210 1,210 1,210 1,210 1,210 1,210
Total Revenues 1,364,620$ 1,364,620$ 1,233,317$ 1,370,218$ 1,370,218$ 1,370,218$ 1,370,218$
TOTAL SOURCE OF FUNDS 2,218,441$ 2,218,441$ 1,544,476$ 1,598,640$ 1,652,804$ 1,706,968$ 1,761,132$
USE OF FUNDS
Carryforward Projects
St Repair & Resurfacing 1,801,282 1,801,282 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054
Proposed Projects
Total Expenditures 1,801,282$ 1,801,282$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$
Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$
Total Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$
Ending Fund Balance
Unrestricted 311,158$ 311,158$ 228,422$ 282,586$ 336,750$ 390,914$ 445,078$
Total Ending Fund Balance 311,158$ 311,158$ 228,422$ 282,586$ 336,750$ 390,914$ 445,078$
TOTAL USE OF FUNDS 2,218,441$ 2,218,441$ 1,544,476$ 1,598,640$ 1,652,804$ 1,706,968$ 1,761,132$
GAS TAX FUND STATEMENT OF SOURCE AND USE OF FUNDS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 21
Carryforward Projects9901Street Repair & Resurfacing 9,681,949$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 15,732,219$
New ProjectsTotal Gas Tax Fund Projects 9,681,949$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 15,732,219$
Total
Budgeted
Estimated
Carryfwd to
2020/21
2020/21
Budget
2021/22
Budget
2022/23
Budget
Expended
Through
2019/20
2023/24
Budget
2024/25
Budget
GAS TAX FUND PROJECTS
PROPOSED CAPITAL IMPROVEMENT PROGRAM
Financial Summaries
B - 22
Streets Program
This Page Intentionally Left Blank
STREETS PROGRAM DIRECTORY PROPOSED
C - 1
STREET RECONSTRUCTION AND RESURFACING PROJECTS PAGE
9901 Street Repair & Resurfacing C – 6
STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS
9910 Traffic Calming Projects C – 12
9921 Curb, Gutter & Sidewalk Maintenance C – 14
9930 Retaining Wall Repairs C – 16
9902 Annual Street Restriping C – 18
0120 Guardrail Replacement Projects C – 20
0236 Massol Intersection Improvement C – 22
0008 Shannon Road Repair C – 24
0130 Roadside Fire Fuel Reduction C – 26
0708 Parking Lot 4 Repair & Waterproofing C – 28
STREET IMPROVEMENT PROJECTS
0705 Downtown Parking Lots Seal Coat & Restriping C – 34
0409 Hernandez Avenue Storm Drain Improvements C – 36
0218 Shannon Road Class 1 Multi-Use Path C – 38
0221 Sidewalk Improvements – Multiple Locations C – 40
0225 Utility Undergrounding Improvements C – 42
0227 Traffic Signal Modernization C – 44
0410 Bicknell Road Storm Drain Improvements C – 46
0231 Bicycle & Pedestrian Improvements C – 48
0413 Stormwater Master Plan C – 50
0414 Stormwater System – Pollution Prevention Compliance C – 52
0232 Public Arts Gateway C – 54
0242 Parking Program Implementation C – 56
0420 Annual Storm Drain Improvements C – 58
0128 Pilot School Busing C – 60
0129 ADA Transition Plan C – 62
0237 Highway 17/9 Interchange and Capacity Improvements C – 64
0235 Downtown Streetscape Revitalization C – 66
0131 E. Main Street Speed Table/Raised Crosswalk C - 68
0132 Local Road Safety Plan C -70
0239 Blossom Hill Road Traffic Study C - 72
0240 Winchester Class IV Bikeway C - 74
0133 VMT Mitigation Program C - 76
0241 Kennedy Sidewalk – LGB to Englewood C - 78
0238 Winchester Boulevard Complete Streets Final Design C - 80
BRIDGE PROJECTS
0801 Quito Road – Bridge Replacement C – 86
0803 Highway 17 Bicycle & Pedestrian Bridge – Design C – 88
PROPOSED STREETS PROGRAM
C - 2
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 3
PROJECT LOCATIONS
A Street Repair & Resurfacing
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 4
PROGRAM SECTION DIRECTORY PAGE
9901 Street Repair & Resurfacing C – 6
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 5
The Streets Program’s Street Reconstruction & Resurfacing section contains Capital Improvement Program projects that
resurface or repave the Town’s streets as the primary scope of work. Projects may also encompass minor components of
streetscape or street improvements; however, to be categorized in the Street Reconstruction & Resurfacing section, projects
must have pavement rehabilitation as their main purpose. Safety issues, traffic levels, the Pavement Condition Index,
available funding sources, project costs, and community impacts are all considerations in prioritizing Street Reconstruction &
Resurfacing projects in the five-year Capital Improvement Program.
This section contains an annual ongoing street rehabilitation project. The dedicated ongoing funding sources for street
repair are the Gas Tax, which was increased by SB 1, and Proposition 42, which total approximately $1.2 million for FY
2020/21. In addition, Countywide Measure B (Nov 2016) increased the sales tax by ½ cent for 30 years to fund
transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance.
The Los Gatos annual allocation will be $580,633. Additional sources include grant funding, if secured, such as state
programs that focus on funding specific street categories or that funds rehabilitation of specific arterial or collector streets.
Other than the funds mentioned above, Los Gatos has limited designated funding sources for maintaining the Town’s roadway
system. The Town has a Construction Impact Fee (approximately $110,000 annually) and a Refuse Vehicle Road Impact Fee
(approximately $610,000 annually). Both of these sources recover costs for additional street and roadway repairs due to the
disproportionate amount of wear and tear caused by construction and other heavy vehicles.
STREET RECONSTRUCTION & RESURFACING PROJECTS SUMMARY
* Total FY 2019/20 Carryforward $3,305,576
Carryforward Projects
9901 Street Repair & Resurfacing 18,311,531$ 5,517,291$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 35,552,766$
New Projects
Total Street Reconstruction Projects 18,311,531$ 5,517,291$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 35,552,766$
Expended Through
2019/20
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
STREET RECONSTRUCTION PROJECTS
Total
Budgeted
2020/21 Budget &
Carryfwd*
2024/25
Budget
2022/23
Budget
2023/24
Budget
2021/22
Budget
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 6
Town Wide
Project Name Street Repair & Resurfacing Project Number 811-9901
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description
This is an ongoing annual project for street rehabilitation throughout Town to enhance vehicle safety
and to maintain the Town’s roadway infrastructure.
Location This project occurs in various locations including Town-wide arterials, collectors, and neighborhood
streets. To meet the SB1 requirements, every year the Council adopts a resolution identifying the
streets needing repair. The final streets for the current construction season are identified at the time
the specifications are brought forward for Council approval, which generally occurs in the spring.
Project
Background
Street rehabilitation projects are identified and prioritized according to pavement quality reflected by
the Pavement Condition Index (PCI), field inspection, traffic level, and safety issues. Every three years,
the Town conducts a full assessment on the condition of the streets through a consultant who
specializes in the field. This assessment is funded through a grant from the Metropolitan
Transportation Commission. The PCI information that results from the survey feeds into a street
maintenance software program called StreetSaver. Every jurisdiction in the Bay Area uses the same
program and methodology, making it the best practice in the industry.
With the PCI information in the StreetSaver database, the program can provide future high-level
maintenance programs for the Town. The program emphasizes maintaining streets that have a good
(above 70) PCI at that level as ongoing preventive maintenance is more cost efficient than allowing
streets to reach lower PCI levels. As with many computer-generated reports, the output requires some
validation and adjustment. Staff conducts this element of the work through field observations and
consideration of project proximity, all with an eye towards maximizing the value to the Town. The
resulting list, sized to the available budget, creates the annual list of streets for this project.
Streets in good condition should be maintained with slurry seals. Streets in worse condition can often
be treated with a rubber cape seal, which is a cost effective solution for these streets, and is especially
suited for residential streets and lower speed collector streets. For arterial streets with a lower PCI, an
asphalt overlay is often the preferred solution with the best return on investment over time. Costs are
much higher for this approach. Streets in the poor condition category often need to be reconstructed.
Reconstruction is the highest cost solution for fixing streets. The Town has focused its resources on
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 7
arterials and collector streets and has used asphalt overlays, rubber cape seal and slurry seal.
Residential streets are typically treated with rubber cape seal and slurry seal.
The dedicated ongoing funding sources for street repair are the Gas Tax, which was increased by SB 1,
and Proposition 42, which total approximately $1,200,000 for FY 2020/21.
In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½
cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic
distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633.
As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA)
assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. Eighty percent of
the revenues collected by the VTA are returned to the local municipality in which they were generated.
The remaining twenty percent is used for regional and County-wide projects. This funding source is
expected to generate approximately $180,000 annually for Los Gatos, which will be used for street
rehabilitation Town-wide.
Other than the annual revenues mentioned above, Los Gatos has limited designated funding sources
for maintaining the Town’s roadway system. The Town has a Construction Impact Fee (approximately
$110,000 annually) and a Refuse Vehicle Road Impact Fee (approximately $610,000 annually). Both of
these sources recover costs for additional street and roadway repairs due to the disproportionate
amount of wear and tear caused by construction and other heavy vehicles.
Operating Budget Impacts
Conducting preventive maintenance on the Town’s roadways extends the life of the streets and reduces the need for extensive reconstruction in the future, reducing staff time spent on road
maintenance. Engineering staff time for project design and oversight is addressed in the FY 2020/21
Operating Budget.
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 8
Project
Components &
Estimated
Timeline
Fall 2020 Design Prepare plans and specifications
Winter 2021 Bid Process Council approves plans and authorizes bidding the project
Summer 2021 Construction Council awards the contract and construction process begins
Fall 2021 Completion Project completed
Senate Bill 1 (2017-2018, Beall) Road Repair and Accountability Act project list:
Location Description Scheduled
Completion
Estimated
Useful Life
Winchester from Lark to Santa Cruz Placement of rubber cape seal or overlay to
maintain pavement surface. These are arterial
roads and are critical for transit needs in the
Town.
Fall 2021 10 - 25
years
Union Avenue from Blossom Hill Road to
Los Gatos-Almaden Road
Placement of rubber cape seal or overlay to
maintain pavement surface. This is an arterial
road and is critical for transit needs in the Town.
Fall 2022 10 - 25
years
Quito Road from Bicknell to Woodbank
Placement of rubber cape seal or overlay to
maintain pavement surface. This is an arterial
road and is critical for transit needs in the Town.
Fall 2023 10 - 25
years
Santa Cruz Avenue from Blossom Hill
Road to Highway 9
Placement of rubber cape seal or overlay to
maintain pavement surface. This is a collector
road and is critical for transit needs in the Town.
Fall 2024 10 - 25
years
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Vehicle License Fee - 2010 Measure B 1,173,355$ 8,185$ 255,088$ 180,000$ 435,088$ 180,000$ 180,000$ 180,000$ 180,000$ 2,336,628$
VTA Allocation - 2016 Measure B - 1,507,338 234,651 580,663 815,314 580,663 580,663 580,663 580,663 4,645,304
Other GFAR 6,954,529 (1,013,825) 2,815,837 240,998 3,056,835 865,676 991,800 991,800 991,800 12,838,615
Total GFAR 8,127,884$ 501,698$ 3,305,576$ 1,001,661$ 4,307,237$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 19,820,547$
GAS TAX & PROP 42
Road Maintenance and Rehabilitation Account (RMRA) -$ 570,895$ -$ 585,265$ 585,265$ 585,265$ 585,265$ 585,265$ 585,265$ 3,497,220$
Other Gas Tax & Prop 42 7,880,666 1,230,387 - 624,789 624,789 624,789 624,789 624,789 624,789 12,234,999
TOTAL GAS TAX & PROP 42 7,880,666$ 1,801,282$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 15,732,219$
TOTAL SOURCE OF FUNDS 16,008,551$ 2,302,980$ 3,305,576$ 2,211,715$ 5,517,291$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 35,552,766$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 8,127,884 501,698 3,305,576 1,001,661 4,307,237 1,626,339 1,752,463 1,752,463 1,752,463 19,820,547
TOTAL GFAR 8,127,884$ 501,698$ 3,305,576$ 1,001,661$ 4,307,237$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 19,820,547$
GAS TAX & PROP 42
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 7,880,666 1,801,282 - 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 15,732,219
TOTAL GAS TAX & PROP 42 7,880,666$ 1,801,282$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 15,732,219$
TOTAL USE OF FUNDS 16,008,551$ 2,302,980$ 3,305,576$ 2,211,715$ 5,517,291$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 35,552,766$
STREET REPAIR & RESURFACING Project 811-9901
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 9
PROJECT LOCATIONS
A Traffic Calming Projects F Massol Intersection Improvements
B Curb, Gutter, & Sidewalk Maintenance G Shannon Road Repair
C Retaining Wall Repairs H Roadside Fire Fuel Reduction
D Annual Street Restriping I Parking Lot 4 Repair & Waterproofing
E Guardrail Replacement Project
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 10
PROGRAM SECTION DIRECTORY PAGE
9910 Traffic Calming Projects C – 12
9921 Curb, Gutter, & Sidewalk Maintenance C – 14
9930 Retaining Wall Repairs C – 16
9902 Annual Street Restriping C – 18
0120 Guardrail Replacement Project C – 20
0236 Massol Intersection Improvements C – 22
0008 Shannon Road Repair C – 24
0130 Roadside Fire Fuel Reduction C - 26
0708 Parking Lot 4 Repair & Waterproofing C – 28
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 11
The Streets Program’s Street Repair, Maintenance & Safety Projects section contains Capital Improvement Program projects
that repair, maintain, or enhance safety features of the Town’s streets and parking lots as the primary scope of work. Projects
may also encompass minor components of streetscape or street improvements; however, to be categorized in this section,
street repair, maintenance, or safety enhancements must be the project’s main purpose. Safety issues, available funding sources, project costs, and community impacts are all considerations in prioritizing Street Repair, Maintenance & Safety
projects in the five-year Capital Improvement Program.
This section contains annual ongoing projects as well as one-time projects. GFAR funding is utilized for the Traffic Calming
Projects, which are funded at $10,000 annually. The Annual Street Restriping Project is funded at $25,000 per year. The Curb,
Gutter, and Sidewalk Maintenance Project is funded at $300,000 per year. The Retaining Wall Repairs Project is typically
funded with an ongoing GFAR stream of $100,000 per year. While annual appropriations are planned for these ongoing
projects, funding adjustments may occur from year to year to align with changing priorities and schedules.
One-time projects are prioritized by safety factors, community impacts, and the availability of grant funding. GFAR funds may
also be utilized to fund a portion of grant driven projects as a grant’s local “match requirement.”
Los Gatos does not have an ongoing designated funding source for projects in this section.
STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS SUMMARY
* Total FY 2019/20 Carryforward $3,413,980
Carryforward Projects
9910 Traffic Calming Projects 215,750$ 19,250$ 10,000$ 10,000$ 10,000$ 10,000$ 275,000$
9921 Curb, Gutter & Sidewalk Maintenance 2,863,403 1,667,395 300,000 300,000 300,000 300,000 5,730,798
9930 Retaining Wall Repairs 1,426,291 536,486 100,000 100,000 100,000 100,000 2,362,777
9902 Annual Street Restriping 180,228 169,772 25,000 25,000 25,000 25,000 450,000
0120 Guardrail Replacement Projects 137,191 1,072,909 - - - - 1,210,100
0125 Massol Intersection Improvements 66,833 383,167 - - - - 450,000
New Projects
0008 Shannon Road Repair - 1,500,000 - - - - 1,500,000
0130 Roadside Fire Fuel Reduction - 250,000 - - - - 250,000
0708 Parking Lot 4 Repair/Waterproofing - 250,000 - - - - 250,000
Total Maintenance & Safety Projects 4,889,696$ 5,848,980$ 435,000$ 435,000$ 435,000$ 435,000$ 12,478,676$
2022/23
Budget
2020/21 Budget &
Carryfwd*
2021/22
Budget
Total
Budgeted
2024/25
Budget
2023/24
Budget
Expended Through
2019/20
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 12
Project Name Traffic Calming Projects Project Number 812-9910
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description In accordance with the Town’s Traffic Calming Policy, this project involves conducting minor traffic
studies, developing and implementing traffic improvements, and installing roadway devices to further
enhance school pedestrian and roadway safety near high-use crosswalks.
Location In FY 2020/21, funds will be used to develop a traffic calming project for Shannon Road between Los
Gatos Boulevard and Short Road. The process begins with neighborhood meetings for staff to work with residents to develop a temporary traffic calming plan (TTCP). Staff will then poll the residents to
determine if the devices should be installed as temporary devices. If a super majority supports the
TTCP, staff will have the proposed devices installed. Four to six months after installation, staff will
conduct another traffic study in the area to determine the effectiveness of these devices. Upon the
completion of this study, staff will poll the residents to determine if the devices should be made
permanent. If necessary, funds will be used to remove these devices.
Project
Background
In 2002, the Town implemented a Traffic Calming Policy to address and mitigate neighborhood traffic
and pedestrian safety issues, such as speeding and cut-through traffic. This program relies on residents
to bring projects forward at the neighborhood level. At the time the Policy was adopted, twelve project
areas were under review for traffic calming improvements. To date, 14 projects have been processed,
completed, or closed. Traffic calming improvements such as speed bumps, traffic circles, center
medians, and bulb-outs were installed where appropriate to slow vehicles or enhance pedestrian
safety.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as they are
identified and delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 13
Project Components
& Estimated Timeline
Summer 2020 Construct the speed hump for Massol Avenue removed by the Almond Grove
Roadway Project. Schedule, notify residents and hold Neighborhood Traffic
Calming meetings for Shannon Road.
Fall 2020 Hold Neighborhood Traffic Calming meeting(s) for Shannon Road
Winter 2020 Poll Shannon Road residents
Spring 2021 Install temporary traffic calming devices for Shannon Road
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 195,301$ 20,449$ 9,250$ 10,000$ 19,250$ 10,000$ 10,000$ 10,000$ 10,000$ 275,000$
TOTAL SOURCE OF FUNDS 195,301$ 20,449$ 9,250$ 10,000$ 19,250$ 10,000$ 10,000$ 10,000$ 10,000$ 275,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 195,301 20,449 9,250 10,000 19,250 10,000 10,000 10,000 10,000 275,000
TOTAL GFAR 195,301$ 20,449$ 9,250$ 10,000$ 19,250$ 10,000$ 10,000$ 10,000$ 10,000$ 275,000$
TOTAL USE OF FUNDS 195,301$ 20,449$ 9,250$ 10,000$ 19,250$ 10,000$ 10,000$ 10,000$ 10,000$ 275,000$
TRAFFIC CALMING PROJECTS Project 812-9910
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 14
TOWN-WIDE
Project Name Curb, Gutter, & Sidewalk Maintenance Project Number 813-9921
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This is an ongoing annual project for the repair and replacement of hazardous curbs, gutters, and
sidewalks throughout Town to enhance pedestrian and bicyclist safety and to improve water runoff
infrastructure.
Location Curb, gutter, and sidewalk repair projects occur throughout the Town based on priority needs.
Project
Background
Curb, gutter, and sidewalk improvements in public parking lots and rights-of-way have historically been
funded by the Town. The intent of this project is to keep pace with the deterioration of sidewalks and
curbs. Specific project locations are identified and prioritized based on the level of damage and
accompanying potential safety issues.
The primary source of damage to sidewalks, curbs and gutters is tree root intrusion. Most of the streets
in Town have mature trees in the planter areas between the sidewalks and curbs. These trees were
planted many years ago without consideration of root growth and its impacts to the sidewalk, curb,
and street. Over time, the tree roots cause cracks and raised concrete, leading to uneven surfaces. Staff
develops an annual plan for sidewalk repair based on the level of damage as observed and reported by
staff and residents, confirmed by staff inspection. The level of repair and maintenance performed in
any given year has been limited by available annual funding. Funds are utilized predominantly to
address locations where paving projects create a requirement for curb ramps and curb and gutter repair.
In addition to sidewalk, curb and gutter maintenance, this project is used for installing Americans with
Disabilities Act (ADA) accessible curb ramps on Town streets as required by federal law following Town
street maintenance projects. Title II of the ADA obligates a jurisdiction to provide compliant curb ramps
whenever streets are resurfaced from one intersection to another. ADA compliance has required a
substantial portion of the annual funding allocation.
Operating Budget Impacts Potential trip and fall injuries and lawsuits against the Town should be reduced by eliminating
hazardous curb, gutter, and sidewalk conditions. Engineering staff time associated with these projects
will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 15
Project Components
& Estimated Timeline
Fall 2020 Design Project design & development
Winter 2021 Bid Process Project bidding & contract award
Spring 2021 Construction Project construction
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 2,856,864$ 6,539$ 1,367,395$ 300,000$ 1,667,395$ 300,000$ 300,000$ 300,000$ 300,000$ 5,730,798$
TOTAL SOURCE OF FUNDS 2,856,864$ 6,539$ 1,367,395$ 300,000$ 1,667,395$ 300,000$ 300,000$ 300,000$ 300,000$ 5,730,798$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 2,856,864 6,539 1,367,395 300,000 1,667,395 300,000 300,000 300,000 300,000 5,730,798
TOTAL GFAR 2,856,864$ 6,539$ 1,367,395$ 300,000$ 1,667,395$ 300,000$ 300,000$ 300,000$ 300,000$ 5,730,798$
TOTAL USE OF FUNDS 2,856,864$ 6,539$ 1,367,395$ 300,000$ 1,667,395$ 300,000$ 300,000$ 300,000$ 300,000$ 5,730,798$
CURB, GUTTER & SIDEWALK MAINTENANCE Project 813-9921
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 16
Project Name Retaining Wall Repairs Project Number 815-9930
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description The Retaining Wall Repair and Replacement Program focuses on the repair and/or replacement of
retaining walls that have become structurally deficient.
Location Retaining wall repair projects are identified throughout the Town and are prioritized in order of repair
based on safety issues, roadway impacts, retaining wall damage, and project costs.
Project
Background
Retaining walls are installed to hold a hillside from sliding and are placed alongside a street at strategic
locations where hillside erosion is anticipated. If the retaining wall fails, the street subsequently fails;
therefore, it is important to maintain the retaining walls as they are an integral part of the hillside
roadway system. Some existing retaining walls have reached the end of their serviceable life and
require replacement. Hillside locations are prioritized over smaller roadside embankments in
accordance with the potential impacts from failures.
Retaining walls are visually inspected annually; however, unanticipated weather events can quickly
erode a wall’s integrity and cause failure. Town staff continues to monitor and schedule retaining wall
installation and replacement as needed. Due to limited yearly funding for this project, projects are typically bid every two or three years.
Operating
Budget Impacts
Once repaired, improved retaining walls reduce ongoing operating costs associated with maintenance
and emergency response. Engineering staff time associated with these projects will be charged to the
project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 17
Project
Components &
Estimated Timeline
Fall 2021 Design Project design & development
Winter 2022 Bid Process Project bidding & contract award
Summer 2022 Construction Project construction
Fall 2022 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 1,422,178$ 4,113$ 436,486$ 100,000$ 536,486$ 100,000$ 100,000$ 100,000$ 100,000$ 2,362,777$
TOTAL SOURCE OF FUNDS 1,422,178$ 4,113$ 436,486$ 100,000$ 536,486$ 100,000$ 100,000$ 100,000$ 100,000$ 2,362,777$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 1,422,178 4,113 436,486 100,000 536,486 100,000 100,000 100,000 100,000 2,362,777
TOTAL GFAR 1,422,178$ 4,113$ 436,486$ 100,000$ 536,486$ 100,000$ 100,000$ 100,000$ 100,000$ 2,362,777$
TOTAL USE OF FUNDS 1,422,178$ 4,113$ 436,486$ 100,000$ 536,486$ 100,000$ 100,000$ 100,000$ 100,000$ 2,362,777$
RETAINING WALL REPAIRS Project 815-9930
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 18
Project Name Annual Street Restriping Project Number 811-9902
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project is an annual program that restripes a portion of the Town’s streets, ensuring the safety of
vehicles and pedestrians.
Location Roadway restriping work is done at various locations throughout the Town based on conditions and
available funds.
Project
Background
The Town initiated Town-wide striping in FY 2006/07. Due to deferred striping and marking of the
Town’s public streets, any striping that had been accomplished previously was done in conjunction with
the resurfacing of specific streets in the Town’s annual street paving project.
This annual street restriping program installs new striping and marking for center lanes, bicycle lanes,
crosswalks, stop sign and signal light markings, and other roadway signage as needed. Roadway stripes
wear out due to traffic and weather which creates a safety concern. The goal is to have Town streets
that are properly striped for safe operation and use by the public.
Under this project, locations that are not scheduled for street repaving will be prioritized for restriping.
The restriping of repaved streets will continue to occur in conjunction with paving contracts.
Since FY 2007/08, the ongoing annual GFAR appropriation has been $25,000.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as the project is
delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 19
Project
Components &
Estimated Timeline
Winter 2021 Design Project Design & development
Spring 2021 Bid Process Project bidding & contract award
Summer 2021 Construction Project construction
Fall 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 180,228$ -$ 144,772$ 25,000$ 169,772$ 25,000$ 25,000$ 25,000$ 25,000$ 450,000$
TOTAL SOURCE OF FUNDS 180,228$ -$ 144,772$ 25,000$ 169,772$ 25,000$ 25,000$ 25,000$ 25,000$ 450,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 180,228 - 144,772 25,000 169,772 25,000 25,000 25,000 25,000 450,000
TOTAL GFAR 180,228$ -$ 144,772$ 25,000$ 169,772$ 25,000$ 25,000$ 25,000$ 25,000$ 450,000$
TOTAL USE OF FUNDS 180,228$ -$ 144,772$ 25,000$ 169,772$ 25,000$ 25,000$ 25,000$ 25,000$ 450,000$
ANNUAL STREET RESTRIPING Project 811-9902
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 20
Project Name
Guardrail Replacement Project Project Number 812-0120
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description The project will construct a new metal beam guardrail and replace old and damaged guardrails along
sections of Town roadways.
Location This project will take place in various locations where guardrails are present and are in need of repair.
The list of guardrails will be identified and will be brought forward to Council for approval.
Project
Background
There are many roadways throughout Town that are located near hillside areas where guardrails are
present. Guardrails are often located on narrow stretches of roadway and protect vehicles and
pedestrians from steep hillside embankments. Over the years, due to hillside erosion and years of
deferred maintenance, the guardrails have worn out and are in need of repair or replacement. Staff will
assess guardrails and determine which ones are in the most need of repair, budget permitting.
In FY 2018/19, the Town was awarded $980,100 in grant funds for additional guardrail work throughout
the Town, which is being carried forward to FY 2020/21.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as they are identified
and delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 21
Project Components
& Estimated Timeline
Winter 2020 Design Project design & development
Fall 2020 Bid Process Project bidding & contract award
Winter 2021 Construction Project construction
Spring 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 136,986$ 205$ 92,809$ -$ 92,809$ -$ -$ -$ -$ 230,000$
GRANTS & AWARDS - - 980,100 - 980,100 - - - - 980,100
TOTAL SOURCE OF FUNDS 136,986$ 205$ 1,072,909$ -$ 1,072,909$ -$ -$ -$ -$ 1,210,100$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 136,986 205 92,809 - 92,809 - - - - 230,000
TOTAL GFAR 136,986$ 205$ 92,809$ -$ 92,809$ -$ -$ -$ -$ 230,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 980,100 - 980,100 - - - - 980,100
TOTAL GFAR -$ -$ 980,100$ -$ 980,100$ -$ -$ -$ -$ 980,100$
TOTAL USE OF FUNDS 136,986$ 205$ 1,072,909$ -$ 1,072,909$ -$ -$ -$ -$ 1,210,100$
Project 812-0120GUARDRAIL REPLACEMENT PROJECTS
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 22
Project Name Massol Intersection Improvements
Project Number 813-0236
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will add intersection safety improvements.
Location This project will take place at the intersection of Massol Avenue and Highway 9.
Project
Background
The intersection as Massol Avenue currently has no traffic control but does have a pedestrian activated
flashing beacon that is intended to alert drivers when a pedestrian is crossing. Looking at accident
history, this intersection experiences collisions at a higher level than other uncontrolled intersections,
including a pedestrian fatality on September 1, 2017.
This project will provide green bike lanes approaching the crosswalk from both directions to alert drivers of the changing conditions and help to reduce speeds. In addition, the project will upgrade the
existing flashing beacon to a LED rectangular rapidly flashing beacon (RRFB), which are utilized at many
of the Town’s other crosswalks. These beacons are much more intense than the existing beacon and
would greatly improve the visibility of the crosswalk for drivers. This improvement has the advantage
of improving safety while not impacting the flow of traffic.
Operating
Budget Impacts
There will be no Operating Budget impact as a result of this project. Project delivery costs for this
project are included in the CIP project’s total cost, which is approximately 12%.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 23
Project
Components &
Estimated Timeline
Fall 2019 Design Project design & development
Spring 2020 Bid process Project bidding & contract award
Summer 2020 Construction Project construction
Winter 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 31,250$ 35,583$ 383,167$ -$ 383,167$ -$ -$ -$ -$ 450,000$
TOTAL SOURCE OF FUNDS 31,250$ 35,583$ 383,167$ -$ 383,167$ -$ -$ -$ -$ 450,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 31,250 35,583 383,167 - 383,167 - - - - 450,000
TOTAL GFAR 31,250$ 35,583$ 383,167$ -$ 383,167$ -$ -$ -$ -$ 450,000$
TOTAL USE OF FUNDS 31,250$ 35,583$ 383,167$ -$ 383,167$ -$ -$ -$ -$ 450,000$
MASSOL INTERSECTION IMPROVEMENTS Project 813-0236
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 24
Project Name Shannon Road Repair
Project Number 811-0008
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will repair the roadway on Shannon Road.
Location This project will take place on Shannon Road between Santa Rosa Drive and Diduca Way.
Project
Background
This portion of Shannon road has experienced long-term pavement cracking and settlement issues
related to the downslope portion of approximately 1,300 linear feet of the paved road along Shannon
Road between Santa Rosa Drive and Diduca Way. The section of the road was recently annexed into
the Town of Los Gatos from unincorporated Santa Clara County. Routine maintenance undertaken by
the County had typically consisted of sealing of asphalt pavement cracks and placement of additional
asphalt concrete along the settling portions of the roadway to relevel the driving surface. There is
reportedly up to 12 feet of asphalt along the outer edge of the road in some locations. Approximately
two years ago, measures were undertaken by the County to stabilize the problematic areas of the
roadway by injecting polyurethane foam below the outer half of the road embankment within the areas
of historic settlement and cracking. The road was annexed to the Town from the County shortly after
the completion of this repair. Despite the foam injection work, the road embankment has continued
to move downslope and significant pavement distress has re-developed. The settlement has caused
some of the injection pipes that were left following injection to protrude up through the pavement
surface.
Operating
Budget Impacts
Engineering staff time associated with this project will be charged to the project as they are identified
and delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 25
Project
Components &
Estimated Timeline
Fall 2020 Design Project design & development
Fall 2020 Bid process Project bidding & contract award
Spring 2021 Construction Project construction
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 1,500,000$ 1,500,000$ -$ -$ -$ -$ 1,500,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 1,500,000$ 1,500,000$ -$ -$ -$ -$ 1,500,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 1,500,000 1,500,000 - - - - -
TOTAL GFAR -$ -$ -$ 1,500,000$ 1,500,000$ -$ -$ -$ -$ 1,500,000$
TOTAL USE OF FUNDS -$ -$ -$ 1,500,000$ 1,500,000$ -$ -$ -$ -$ 1,500,000$
SHANNON ROAD REPAIR Project 811-0008
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 26
Project Name Roadside Fire Fuel Reduction
Project Number 812-0130
Department Parks & Public Works Project Manager PPW Superintendent: Jim Harbin
Description This project will perform brush/vegetation management work along hillside roadways.
Location This project will take place on hillside roadways in Town.
Project
Background
The Town will award a contract to perform brush/vegetation management work along hillside
roadways to reduce the fuel risk in Town. These roadways are critical as ingress and egress routes in
the Town, essential for both resident evacuation and emergency first responders. Fuel reduction will
provide enhanced safety on these routes this project will benefit approximately 1,300 structures and
will involve 11 miles of roadside clearing.
Operating
Budget Impacts
Staff time associated with this project will be charged to the project as they are identified and delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 27
Project
Components &
Estimated Timeline
Fall 2020 Design Project design & development
Fall 2020 Bid process Project bidding & contract award
Spring 2021 Construction Project construction
Spring 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 250,000 250,000 - - - - 250,000
TOTAL GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL USE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
ROADSIDE FIRE FUEL REDUCTION Project 812-0130
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 28
Project Name Parking Lot 4 Repair & Waterproofing
Project Number 817-0708
Department Parks & Public Works Project Manager PPW Superintendent: Jim Harbin
Description This project will remove and replace sections of concrete, waterproof the upper deck, and rework the
planters of Parking Lot 4.
Location This project is located at Parking Lot 4 which is located on Railroad Way between Elm Street and
Gray’s Lane
Project
Background
Parking Lot 4, which includes an underground parking garage, was constructed nearly 25 years ago and
there have not been any major infrastructure improvements to this facility since then. The concrete
deck has deteriorated to the point that has caused water leaking from the upper section to the
underground garage below. This project will replace sections of concrete, waterproof the upper deck,
and rehabilitate the planting areas.
Operating
Budget Impacts
Staff time associated with this project will be charged to the project as they are identified and delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 29
Project
Components &
Estimated Timeline
Summer 2019 Design Project design & development
Spring 2020 Bid process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 250,000 250,000 - - - - 250,000
TOTAL GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL USE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
PARKING LOT 4 REPAIR & WATERPROOFING Project 817-0708
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C - 30
PROPOSED STREETS PROGRAM
Street Improvements
C - 31
PROJECT LOCATIONS
A Downtown Parking Lots Seal Coat & Restriping M Annual Storm Drain Improvements
B Hernandez Avenue Storm Drain Improvements N Pilot School Busing Program
C Shannon Road Class 1 Multi-use Path O ADA Transition Plan Update
D Sidewalk Improvements – Multiple Locations P Highway 17/9 Interchange and Capacity Improvements
E Utility Undergrounding Improvements Q Downtown Streetscape Revitalization
F Traffic Signal Modernization R E. Main Street Speed Table/Raised Crosswalk
G Bicknell Road Storm Drain Improvements S Local Road Safety Plan
H Bicycle & Pedestrian Improvements T Blossom Hill Road Traffic Study
I Stormwater Master Plan U Winchester Class IV Bikeway
J Stormwater System – Pollution Prevention Compliance V VMT Mitigation Program
K Public Arts Gateway W Kennedy Sidewalk – LGB to Englewood
L Parking Program Implementation X Winchester Boulevard Complete Streets Final Design
PROPOSED STREETS PROGRAM
Street Improvements
C - 32
PROGRAM SECTION DIRECTORY PAGE
0705 Downtown Parking Lots Seal Coat & Restriping C – 34
0409 Hernandez Avenue Storm Drain Improvements C – 36
0218 Shannon Road Class 1 Multi-Use Path C – 38
0221 Sidewalk Improvements – Multiple Locations C – 40
0225 Utility Undergrounding Improvements C – 42
0227 Traffic Signal Modernization C – 44
0410 Bicknell Road Storm Drain Improvements C – 46
0231 Bicycle & Pedestrian Improvements C – 48
0413 Stormwater Master Plan C – 50
0414 Stormwater System – Pollution Prevention Compliance C – 52
2009 Public Arts Gateway C – 54
0242 Parking Program Implementation C – 56
0420 Annual Storm Drain Improvements C – 58
0128 Pilot School Busing C – 60
0129 ADA Transition Plan C – 62
0237 Highway 17/9 Interchange and Capacity Improvements C – 64
0235 Downtown Streetscape Revitalization C – 66
0131 E. Main Street Speed Table/Raised Crosswalk C – 68
0132 Local Road Safety Plan C – 70
0239 Blossom Hill Road Traffic Study C – 72
0240 Winchester Class IV Bikeway C - 74
0133 VMT Mitigation Program C – 76
0241 Kennedy Sidewalk – LGB to Englewood C - 78
0238 Winchester Boulevard Complete Streets Final Design C – 80
PROPOSED STREETS PROGRAM
Street Improvements
C - 33
The Streets Program’s Street Improvements section contains Capital Improvement Program projects that improve a roadway’s
function or structure, other than paving, as the primary scope of work. Typical Street Improvements projects include sidewalk,
curb, and gutter improvements, storm drain improvements, the undergrounding of utilities, intersection improvements,
sidewalk and median ramps, crosswalk improvements, street lighting, and retaining walls.
In this CIP, the Street Improvements section contains one-time projects and no ongoing projects. One-time Street
Improvements projects are prioritized based on safety needs, traffic levels, available funding sources, project costs, and
community impacts.
Traffic Mitigation Funds, Storm Drain Funds, and the Utility Underground Fund all provide designated funding revenue
through development fee charges for their related project categories. Los Gatos does not have a designated funding source
for other street improvements which do not fall into these categories; however, grants, in-lieu fees, CDBG funds, and
community benefit funds are utilized when available.
STREET IMPROVEMENT PROJECTS SUMMARY
* Total FY 2019/20 Carryforward $8,870,133
Unfunded Projects for future consideration
• Montebello Way Island Removal
• Blossom Hill Road & Union Avenue Improvements
• Los Gatos-Almaden Road Improvements
• Union Avenue Widening and Sidewalks
• North Santa Cruz Avenue Curb and Gutter Improvements north of Highway 9
• Sidewalk infill across from Fisher Middle School
• Downtown Parking Sign Enhancements
Carryforward Projects
0705 Downtown Parking Lots Seal Coat & Restriping 47,415$ 52,585$ -$ -$ -$ -$ 100,000$
0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - 65,000 82,180
0218 Shannon Road Class 1 Multi-use Path 69,104 1,120,200 - - - - 1,189,304
0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - 60,000
0225 Utility Undergrounding Improvements - 6,766,000 - - - - 6,766,000
0227 Traffic Signal Modernization 181,982 2,747,707 - - - - 2,929,689
0410 Bicknall Avenue Storm Drain Improvements 160,932 60,258 - - - - 221,190
0420 Annual Storm Drain Improvements 29,700 420,300 - - - - 450,000
0231 Bicycle & Pedestrian Improvements 540,783 305,745 - - - - 846,527 0413 Stormwater Master Plan 20,000 180,000 - - - - 200,000
0414 Stormwater System - Pollution Prevention Compliance 1,422 298,578 - - - - 300,000
2009 Public Art Gateway 4,500 25,004 - - - - 29,504
0128 Pilot School Busing Program 372,718 442,056 87,000 - - - 901,774
0129 ADA Transition Plan - 110,000 - - - - 110,000
0237 Highway 17/9 Interchange and Capacity Improvements - 600,000 - - - - 600,000
0235 Downtown Streetscape Revitalization - 1,972,384 - - - - 1,972,384
0238 Winchester Boulevard Complete Streets (Final Design)200,053 79,948 1,459,250 - - - 1,739,250
New Projects ``0131 E. Main St. Speed Table/Raised Crosswalk - 169,200 - - - - 169,200 0132 Local Road Safety Plan - 100,000 - - - - 100,000 0239 Blossom Hill Road Traffic Study - 125,000 - - - - 125,000
0240 Winchester Class IV Bikeway - 982,455 - - - - 982,455
0133 VMT Mitigation Program - 250,000 - - - - 250,000
0241 Kennedy Sidewalk - LGB to Englewood - - - 1,162,390 - - 1,162,390
0242 Parking Program Implementation - 198,500 - - - - 198,500
Total Street Improvement Projects 1,645,788$ 17,065,919$ 1,546,250$ 1,162,390$ -$ 65,000$ 21,485,347$
2024/25
Budget
Expended Through
2019/20
2022/23
Budget
2021/22
Budget
STREET IMPROVEMENT PROJECTS
Total
Budgeted
2023/24
Budget
2020/21 Budget &
Carryfwd*
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
PROPOSED STREETS PROGRAM
Street Improvements
C - 34
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Downtown Parking Lots Seal Coat &
Restriping
Project Number 817-0705
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will resurface downtown parking lots by applying a seal coat and then restriping.
Location This project is located at various Town-owned parking lots in downtown Los Gatos.
Project
Background
The public parking lots in downtown Los Gatos are heavily used on a daily basis. In order to keep their
surfaces in good condition and prevent long term wear and damage, the parking lots need to be
resurfaced and restriped. This project is necessary to prevent possible drainage or broken pavement
problems in the future.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 35
Project
Components &
Estimated Timeline
Winter 2020 Preliminary Design Project design & development.
Spring 2020 Final Design Project bidding & contract award.
Summer 2020 Completion Project completion.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 24,915$ 22,500$ 52,585$ -$ 52,585 -$ -$ -$ -$ 100,000$
TOTAL SOURCE OF FUNDS 24,915$ 22,500$ 52,585$ -$ 52,585$ -$ -$ -$ -$ 100,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 24,915 22,500 52,585 - 52,585 - - - - 100,000
TOTAL GFAR 24,915$ 22,500$ 52,585$ -$ 52,585$ -$ -$ -$ -$ 100,000$
TOTAL USE OF FUNDS 24,915$ 22,500$ 52,585$ -$ 52,585$ -$ -$ -$ -$ 100,000$
DOWNTOWN PARKING LOTS SEAL COAT & RESTRIPING Project 817-0705
PROPOSED STREETS PROGRAM
Street Improvements
C - 36
Project Name Hernandez Avenue Storm Drain
Improvements
Project Number 816-0409
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will improve the Hernandez Avenue storm drain system with the installation of an
underground storm drain pipe and sidewalk above.
Location The storm drain project is located on the south side of Hernandez Avenue, between Walnut Avenue
and Wissahickon Avenue.
Project
Background
Hernandez Avenue is a hillside collector street with an incomplete sidewalk network and storm drain
systems alongside the roadway. This street averages over 1,000 vehicles per day, a normal amount
for a collector street. At previous neighborhood meetings, residents indicated an interest in having
continuous sidewalks, particularly in the area where an open storm drain exists.
This project proposes to install an underground storm drain pipe into the existing ditch and put a
concrete sidewalk, curb, and gutter system along the roadway to feed runoff water into the storm
drain pipe. This street improvement addresses several neighborhood needs, including an improved
drainage system, a safer pedestrian area, and an improved appearance of the neighborhood.
This project will be funded by the Storm Basin Fund. This project is scheduled for construction in FY
2022/23.
Operating
Budget Impacts
Ongoing operating costs would be significantly reduced as this project would eliminate the need to
clean or repair the existing open ditch. Engineering staff time associated with these projects will be
charged to the project as it is delivered in FY 2022/23.
LO
S
G
A
T
O
S
-
S
A
R
A
T
O
G
A
R
D
HWY 17N SANTA CRUZ AVUNIVERSITY AV
PROPOSED STREETS PROGRAM
Street Improvements
C - 37
Project
Components &
Estimated Timeline
Fall 2021 Design Design project, include alternative methods and estimated
costs, and determine best outcome.
Winter 2022 Bid Process Obtain bids from licensed contractors and submit to Council
for approval.
Summer 2023 Construction Construction of storm drains and related street
improvements.
Fall 2023 Completion Project completed.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #3 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
TOTAL SOURCE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #3
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 17,180 - - - - - - - 65,000 82,180
TOTAL STORM BASIN 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
TOTAL USE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
HERNANDEZ AVENUE STORM DRAIN IMPROVEMENTS Project 816-0409
PROPOSED STREETS PROGRAM
Street Improvements
C - 38 LOS GATOS BLVDBLOSSOM HILL RD
SHANNON R
D
Project Name Shannon Road Class 1 Multi-Use Path Project Number 813-0218
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will construct a Class I multi-use path on one side of Shannon Road between Los Gatos Blvd.
and Cherry Blossom Lane. The project will demolish approximately 500 feet of existing sidewalk, fill in
approximately 860 feet of sidewalk gap, construct a Class I multi-use path approximately 1360’ length x
10’ width with a 3’ buffer between the path and the travel lane, install new ADA curb ramps, and complete
sharrows on Shannon Road within the project limits. The work scope also includes new curb and gutter
and utility underground work. These are necessary items to upgrade the street.
Location The project is located on Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane.
Project Background Shannon Road is a heavily traveled two-lane roadway, especially when the schools are in session. Shannon
Road is used by residents dropping off students at various schools, such as Blossom Hill Elementary, Van
Meter Elementary, and Fisher Middle Schools. In addition, many parents walk their children to school
along this segment of roadway.
Shannon Road currently has intermittent sections of sidewalk on the south side of the roadway between
Los Gatos Boulevard and Cherry Blossom Lane. Most pedestrians cross Shannon Road to walk along the
south side, while some walk along the unimproved shoulder on the north side. This project will complete
the sidewalk segment on the north side of the roadway and reduce congestion at Shannon Road and
Cherry Blossom Lane, where a 3-way stop is inundated by crossing students, crossing guards, and vehicle
traffic during peak school hours.
In June 2018 the Town was awarded federal funding of $940,100 by the Santa Clara Valley Transportation
Authority (VTA) in the Vehicle Emissions Reductions Based at Schools (VERBS) Grant Program to support
this project. Grants are awarded on a reimbursement basis. Although the Town was informed of the award in 2018, the funding will be recognized in the year it is received and will be shifted to the current
year as the project progresses.
Operating
Budget Impacts
Engineering staff time for design and construction of this project will be addressed in the FY 2020/21
Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C - 39
Project Components &
Estimated Timeline
Fall 2021 Design Project design & development
Winter 2022 Bid process Project bidding & contract award
Summer 2022 Construction Project construction
Fall 2022 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 104 20,000 109,896 - 109,896 - - - - 130,000$
GRANTS & AWARDS - - - 940,100 940,100 - - - - 940,100$ UTILITY UNDERGROUNDING - 49,000 70,204 - 70,204 - - - - 119,204$
TOTAL SOURCE OF FUNDS 104$ 69,000$ 180,100$ 940,100$ 1,120,200$ -$ -$ -$ -$ 1,189,304$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed $ -
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 104 20,000 109,896 - 109,896 - - - - 130,000
TOTAL GFAR 104$ 20,000$ 109,896$ -$ 109,896$ -$ -$ -$ -$ 130,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 940,100 940,100 - - - - 940,100
TOTAL GRANTS & AWARDS -$ -$ -$ 940,100$ 940,100$ -$ -$ -$ -$ 940,100$
UNDERGROUND UTILITIES
Salaries and Benfits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acqusition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 49,000 70,204 - 70,204 - - - - 119,204$
TOTAL UNDERGROUND UTILITIES -$ 49,000$ 70,204$ -$ 70,204$ -$ -$ -$ -$ 119,204$
TOTAL USE OF FUNDS 104$ 69,000$ 180,100$ 940,100$ 1,120,200$ -$ -$ -$ -$ 1,189,304$
SHANNON ROAD CLASS 1 MULTI-USE PATH Project 813-0218
PROPOSED STREETS PROGRAM
Street Improvements
C - 40
TOWN-WIDE
Project Name Sidewalk Improvements – Multiple
Locations
Project Number 813-0221
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will construct sidewalk, curb, and gutter on the north side of Kennedy Road from Ferris
Avenue to Los Gatos Boulevard and on the south side of Mitchell Avenue from George Street to Fisher
Avenue.
Location This project is located in the following areas: Kennedy Road from Ferris Avenue to Los Gatos Boulevard; Mitchell Avenue from George Street to Fisher Avenue; and Los Gatos Boulevard/Shannon Road.
Project
Background
Kennedy Road from Ferris Avenue to Los Gatos Boulevard currently has a shoulder that is heavily
utilized by parents and students walking and biking to school in the morning and afternoons. The
sidewalk improvements will complete the connection in this residential block.
In 2009, the Town completed the sidewalk installation on the north side of Mitchell Avenue from
George Street to Fisher Avenue. Then in 2012, sidewalk was constructed on north and south side of
Mitchell Avenue between Los Gatos Boulevard and George Street as part of the redevelopment of the
former Honda site. This project will complete the last component of the sidewalks in this heavily
utilized pedestrian area between Van Meter Elementary and Fisher Middle Schools.
Operating
Budget Impacts
Engineering staff time for design and construction of this project will be addressed in the FY 2019/20
Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C - 41
Project
Components & Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2019 Bid process Project bidding & contact award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 60,000 - 60,000 - - - - -
TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
SIDEWALK IMPROVEMENTS - MULTIPLE LOCATIONS Project 813-0221
PROPOSED STREETS PROGRAM
Street Improvements
C - 42 HWY 17LOS GATOS BLVDLOS GAT
O
S
-
ALMADEN RD
Project Name Utility Undergrounding Improvements
Project Number 813-0225
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will remove utilities from above ground poles and install them underground.
Location This project is located on Los Gatos Boulevard between Lark Avenue and Chirco Drive.
Project
Background
Through the State of California’s Public Utilities Commission, Pacific Gas & Electric (PG&E) collects funds
from ratepayers to provide for the undergrounding of utilities. These funds grow in reserve called Rule
20A funds, until such time that local jurisdictions identify an area for this project and begin working
with PG&E. The funds are limited to use on roadways where traffic is heavy, making Los Gatos
Boulevard a viable location.
The Town’s allocation of Rule 20A funds has grown to the point where there is now approximately
$3.8M available for programming. These funds will never actually come to the Town, but rather PG&E
will deliver the project with coordination from Town staff.
In addition to the Rule 20A funds, the Town collects developer fees for utility undergrounding. These
funds are held by the Town for future projects. Staff has asked PG&E to look at an expanded project
scope utilizing some or all of the Town funds as well. This will take full advantage of economies of scale
through design and construction.
The timeframe for PG&E to deliver Rule 20A projects has been between seven and ten years; however,
indications are that this project may begin sooner, depending upon other PG&E priorities, such as fire
safety make identifying firm dates difficult.
Operating
Budget Impacts
There will be no Operating Budget impact as a result of this project. Project delivery costs for this
project are included in the CIP project’s total cost. Project delivery costs are estimated at $266,000
over the five-year term of the project or 4% of the total project cost. Project costs are significantly lower on this project due to the efficiencies in the project size and a larger proportion of work that will
be coordinated by PG&E.
PROPOSED STREETS PROGRAM
Street Improvements
C - 43
Project
Components &
Estimated Timeline
Winter 2020 Design Project design & development
Fall 2020 Construction Project construction begins
Spring 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
UTILITY UNDERGROUNDING -$ -$ 2,330,000$ 4,436,000$ 6,766,000$ -$ -$ -$ -$ 6,766,000$
TOTAL SOURCE OF FUNDS -$ -$ 2,330,000$ 4,436,000$ 6,766,000$ -$ -$ -$ -$ 6,766,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
UTILITY UNDERGORUNDING
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 2,330,000 4,436,000 6,766,000 - - - - 6,766,000
TOTAL GFAR -$ -$ 2,330,000$ 4,436,000$ 6,766,000$ -$ -$ -$ -$ 6,766,000$
TOTAL USE OF FUNDS -$ -$ 2,330,000$ 4,436,000$ 6,766,000$ -$ -$ -$ -$ 6,766,000$
UTILITY UNDERGROUNDING IMPROVEMENTS Project 813-0225
PROPOSED STREETS PROGRAM
Street Improvements
C - 44
Project Name Traffic Signal Modernization
Project Number 813-0227
Department Parks & Public Works Project Manager Transportation and Mobility
Manager: Ying Smith
Description This project will modernize the Town’s traffic signal controllers.
Location This project is located Town-wide.
Project
Background
This project will modernize the Town’s traffic signal controllers to allow for greater control depending
on traffic conditions, ensure that the current system meets current safety standards, and increase the
traffic flow. The Town was awarded several grants through the VTA and the MTC to complement the
Town’s investment of Traffic Impact Mitigation Funds.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 45
Project
Components &
Estimated Timeline
Summer 2018 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Fall 2020 Construction Project construction
Spring 2021 Completion Project completion
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
TRAFFIC MITIGATION 22,594$ 102,406$ 563,262$ 415,027$ 978,289$ -$ -$ -$ -$ 1,103,289$
GRANTS & AWARDS 41,381 15,601 1,769,418 - 1,769,418$ - - - - 1,826,400
TOTAL SOURCE OF FUNDS 63,975$ 118,007$ 2,332,680$ 415,027$ 2,747,707$ -$ -$ -$ -$ 2,929,689$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
TRAFFIC MITIGATIONS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 22,594 102,406 563,262 415,027 978,289 - - - - 1,103,289
TOTAL TRAFFIC MITIGATIONS 22,594$ 102,406$ 563,262$ 415,027$ 978,289$ -$ -$ -$ -$ 1,103,289$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 41,380.58 15,601 1,769,418 - 1,769,418 - - - - 1,826,400
TOTAL GRANTS & AWARDS 41,381$ 15,601$ 1,769,418$ -$ 1,769,418$ -$ -$ -$ -$ 1,826,400$
TOTAL USE OF FUNDS 63,975$ 118,007$ 2,332,680$ 415,027$ 2,747,707$ -$ -$ -$ -$ 2,929,689$
TRAFFIC SIGNAL MODERNIZATION Project 813-0227
PROPOSED STREETS PROGRAM
Street Improvements
C - 46
Project Name Bicknell Road Storm Drain Improvements
Project Number 816-0410
Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen
Description This project will reroute a Town storm drain line.
Location This project is located on Bicknell Road near Montclair.
Project
Background
This project will provide design services for the rerouting of an existing Town storm drain line from
private property, after it was determined that the Town does not have a storm drain easement.
This project has provided challenges due to right-of-way constraints and connection to the adjacent
creek. Over this fiscal year, staff will monitor the project for performance and identify any additional
adjustments necessary.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the Department’s FY 2020/21 Operating Budget.
QUITO RDBICKNELL RD
HWY 9
PROPOSED STREETS PROGRAM
Street Improvements
C - 47
Project
Components &
Estimated Timeline
Fall 2019 Design Project design & development
Fall 2019 Construction Project construction
Winter 2020 Monitoring Monitoring and adjustment
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #3 145,432$ 15,500$ 35,258$ 25,000$ 60,258$ -$ -$ -$ -$ 221,190$
TOTAL SOURCE OF FUNDS 145,432$ 15,500$ 35,258$ 25,000$ 60,258$ -$ -$ -$ -$ 221,190$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #2
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 145,432 15,500 35,258 25,000 60,258 - - - - 221,190
TOTAL STORM BASIN 145,432$ 15,500$ 35,258$ 25,000$ 60,258$ -$ -$ -$ -$ 221,190$
TOTAL USE OF FUNDS 145,432$ 15,500$ 35,258$ 25,000$ 60,258$ -$ -$ -$ -$ 221,190$
BICKNELL ROAD STORM DRAIN IMPROVEMENTS Project 816-0410
PROPOSED STREETS PROGRAM
Street Improvements
C - 48
Project Name Bicycle & Pedestrian Improvements
Project Number 813-0231
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will enhance bicycle and pedestrian safety and mobility throughout the Town.
Location This project is located Town-wide.
Project
Background
This project will enhance bicycle and pedestrian safety and mobility Town-wide in the form of multiple
projects. As has been done in the previous years, staff will continue to work with Safe Routes to School,
Town Commissions, the Town Council, and the general public on prioritizing projects that have been
recommended in the Council adopted Bicycle and Pedestrian Master Plan. In addition, this money will
be used as matching funds for available grants related to Town bicycle and pedestrian projects.
In the past the Town received Transportation Fund for Clean Air Grants for bicycle and pedestrian
improvements.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 49
Project
Components &
Estimated Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Winter 2019 Construction Project construction
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 95,694$ 122,211$ 272,095$ -$ 272,095$ -$ -$ -$ -$ 490,000$
GRANTS & AWARDS 112,627 168,900 - - - - - - - 281,527
TRAFFIC MITIIGATION 40,972 378 33,650 - 33,650 - - - - 75,000
TOTAL SOURCE OF FUNDS 249,293$ 291,489$ 305,745$ -$ 305,745$ -$ -$ -$ -$ 846,527$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 95,694 122,211 272,095 - 272,095 - - - - 490,000
TOTAL GFAR 95,694$ 122,211$ 272,095$ -$ 272,095$ -$ -$ -$ -$ 490,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses 112,627 168,900 - - - - - - - 281,527
TOTAL GRANTS & AWARDS 112,627$ 168,900$ -$ -$ -$ -$ -$ -$ -$ 281,527$
TRAFFIC MITIGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses 40,972 378 33,650 - 33,650 - - - - 75,000
TOTAL TRAFFIC MITIGATION 40,972$ 378$ 33,650$ -$ 33,650$ -$ -$ -$ -$ 75,000$
TOTAL USE OF FUNDS 249,293$ 291,489$ 305,745$ -$ 305,745$ -$ -$ -$ -$ 846,527$
BICYCLE & PEDESTRIAN IMPROVEMENTS Project 813-0231
PROPOSED STREETS PROGRAM
Street Improvements
C - 50
Project Name Stormwater Master Plan
Project Number 816-0413
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will develop a Stormwater Master Plan.
Location This project is located Town-wide.
Project
Background
The Town of Los Gatos does not currently have an adopted Stormwater Master Plan. This project will
develop a Stormwater Collection System Master Plan and provides the Town of Los Gatos with the
necessary planning tools and capital improvement projects to address flood management and water
quality within the collector portion of the storm drainage system.
The Plan will be developed to help the Town meet its overarching environmental and economic goals.
The goal of the Stormwater Master Plan is to manage stormwater runoff proactively to protect water
quality and to minimize impacts of localized and downstream flooding by identifying infrastructure
improvements for the collection, conveyance, and treatment of stormwater runoff within the Town.
The Stormwater Master Plan will prioritize storm drain and water quality improvements within the
Town and provides an implementation plan for the construction of conveyance and water quality
improvements.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 51
Project
Components &
Estimated Timeline
Summer 2019 Design Develop request for proposals
Fall 2019 Bid Process Award consultant agreement
Spring 2020 Report Conduct study
Fall 2020 Completion Finalize report
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 3,060$ 16,940$ 180,000$ -$ 180,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS 3,060$ 16,940$ 180,000$ -$ 180,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 3,060 16,940 180,000 - 180,000 - - - - 200,000$
TOTAL GFAR 3,060$ 16,940$ 180,000$ -$ 180,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS 3,060$ 16,940$ 180,000$ -$ 180,000$ -$ -$ -$ -$ 200,000$
STORMWATER MASTER PLAN Project 816-0413
PROPOSED STREETS PROGRAM
Street Improvements
C - 52
Project Name Stormwater System – Pollution Prevention
Compliance
Project Number 816-0414
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will install improvements, such as trash capture devices, to reduce pollution in the storm
water system.
Location This project is located Town-wide.
Project
Background
This project will install solutions, such as multiple trash capture devices in storm inlets, throughout the
Town to meet the Municipal Regional Permit Provision C.10 trash reduction requirements. The Town
has submitted a plan to meet the requirement to reduce trashload impacts to creeks which are 70% by
2017 and 100% by 2022.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 53
Project
Components &
Estimated Timeline
Fall 2020 Design Project design & development
Winter 2021 Bid Process Project bidding & contact award
Spring 2021 Construction Project construction
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 1,422$ -$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
TOTAL SOURCE OF FUNDS 1,422$ -$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 1,422 - 298,578 - 298,578 - - - - 300,000
TOTAL GFAR 1,422$ -$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
TOTAL USE OF FUNDS 1,422$ -$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
STORMWATER SYSTEM - POLLUTION PREVENTION COMPLIANCE Project 816-0414
PROPOSED STREETS PROGRAM
Street Improvements
C - 54
Project Name Public Arts Gateway
Project Number 821-2009
Department Library Project Manager Library Director: Ryan Baker
Description This project will install a public art at a gateway location.
Location This project is located on Highway 9 near Alberto Way.
Project
Background
The Arts and Culture Commission identified this project as a way to enhance the appearance of the
entrances into Los Gatos. At the January 31, 2017 Priority Setting, Council identified $25,000 for public art and on April 18, 2017 the Arts and Culture Commission proposed the gateway project as the best
use of the funds, which Council approved. This project will install the first phase of artwork at Town
entrances based on the Town’s Public Art Selection Policy and Procedures.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the Department’s FY 2020/21 Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C - 55
Project
Components &
Estimated Timeline
Winter 2018 Call for artist Project design & award
Fall 2019 Award Select final design & award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ 4,500$ 20,500$ 4,504$ 25,004$ -$ -$ -$ -$ 29,504$
TOTAL SOURCE OF FUNDS -$ 4,500$ 20,500$ 4,504$ 25,004$ -$ -$ -$ -$ 29,504$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 4,500 20,500 4,504 25,004 - - - - 29,504
TOTAL GFAR -$ 4,500$ 20,500$ 4,504$ 25,004$ -$ -$ -$ -$ 29,504$
TOTAL USE OF FUNDS -$ 4,500$ 20,500$ 4,504$ 25,004$ -$ -$ -$ -$ 29,504$
PUBLIC ARTS GATEWAY PROJECT Project 821-2009
PROPOSED STREETS PROGRAM
Street Improvements
C - 56
Project Name Parking Program Implementation
Project Number 813-0242
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project consists of the phased implementation of the recommendations found in the
Comprehensive Parking Study that concluded in early 2020. First phases may include an employee
permit program and a design for enhanced signage.
Location This project is located downtown and nearby neighborhoods.
Project
Background
In 2019 the Town conducted a Parking Study to identify the needs for parking in Los Gatos. The Parking
Study provided a series of recommendations that should be implemented over time. The
recommendations include adjustments to time limits, permitting programs, wayfinding or signage
enhancements, and other ideas that ensure the existing inventory is utilized effectively. Later stages
of the program may look at supply enhancements based on ongoing analysis.
Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 57
Project
Components &
Estimated Timeline
Fall 2020 Employee
Permit Program
Implement employee permit program
Spring 2021 Signage design Design signage
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 198,500$ 198,500$ -$ -$ -$ -$ 198,500$
TOTAL SOURCE OF FUNDS -$ -$ -$ 198,500$ 198,500$ -$ -$ -$ -$ 198,500$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 198,500 198,500 - - - - 198,500
TOTAL GFAR -$ -$ -$ 198,500$ 198,500$ -$ -$ -$ -$ 198,500$
TOTAL USE OF FUNDS -$ -$ -$ 198,500$ 198,500$ -$ -$ -$ -$ 198,500$
PARKING PROGRAM IMPLEMENTATION Project 813-0242
PROPOSED STREETS PROGRAM
Street Improvements
C - 58
Project Name Annual Storm Drain Improvement Project
Project Number 816-0420
Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen
Description This project will install infill storm drain systems that are required to enhance safety and improve
infrastructure to accept water runoff.
Location This project is located Town-wide.
Project
Background
The Town is responsible for keeping Town roads clear of excessive water and managing storm water
running down Town streets. Storm drain improvements in the Town right of ways and parking lots are
necessary to manage water drainage issues within these Town locations. The intent of this project is
to keep pace with the needs of the Town’s storm drain system to prevent flooding in the Town right of
ways.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 59
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Spring 2021 Construction Project construction
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #1 -$ -$ 100,000$ 50,000$ 150,000$ -$ -$ -$ -$ 150,000$
STORM BASIN #2 -$ -$ 100,000$ 50,000$ 150,000$ -$ -$ -$ -$ 150,000$
STORM BASIN #3 29,700$ -$ 70,300$ 50,000$ 120,300$ -$ -$ -$ -$ 150,000$
TOTAL SOURCE OF FUNDS 29,700$ -$ 270,300$ 150,000$ 420,300$ -$ -$ -$ -$ 450,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
STORM BASIN #1
Project Construction Expenses - - 100,000 50,000 150,000 - - - - 150,000$
TOTAL STORM BASIN #1 -$ -$ 100,000$ 50,000$ 150,000$ -$ -$ -$ -$ 150,000$
STORM BASIN #2
Project Construction Expenses -$ -$ 100,000$ 50,000$ 150,000$ -$ -$ -$ -$ 150,000$
TOTAL STORM BASIN #2 -$ -$ 100,000$ 50,000$ 150,000$ -$ -$ -$ -$ 150,000$
STORM BASIN #3
Project Construction Expenses 29,700$ -$ 70,300$ 50,000$ 120,300$ -$ -$ -$ -$ 150,000$
TOTAL STORM BASIN #3 29,700$ -$ 70,300$ 50,000$ 120,300$ -$ -$ -$ -$ 150,000$
TOTAL USE OF FUNDS 29,700$ -$ 270,300$ 150,000$ 420,300$ -$ -$ -$ -$ 450,000$
ANNUAL STORM DRAIN IMPROVEMENT PROJECT Project 816-0420
PROPOSED STREETS PROGRAM
Street Improvements
C - 60
Project Name Pilot School Busing
Project Number 812-0128
Department Parks & Public Works Project Manager Transportation & Mobility
Manager: Ying Smith
Description This project explores congestion relief through piloting school bus service. The pilot school bus service
provides morning and afternoon routes to and from school with neighborhood-based stops.
The Town is contracting with a qualified school bus transportation provider through a RFP process. The
service schedule and designated pick up and drop off locations are published. Interested families may
purchase an annual pass to reserve a seat. The pilot program will provide two routes for a total of 2 ½
years from January 2019 to June 2021.
Location This project is located Town-wide.
Project
Background
The Town of Los Gatos and the school community have been exploring new transit services customized
to meet the needs of students traveling to and from schools. The primary areas of interest are corridors
with the highest level of traffic congestion. Town staff and a consulting team completed a Congestion
Relief School Bus Feasibility Study in 2018. The Town Council, at its June 5, 2018 meeting, authorized
staff to proceed with a school bus pilot program. At its September 18, 2018 meeting, the Town Council
authorized funding to provide a pilot service consisting of two routes for 18 months of service. At its
March 3, 2020 meeting, Town Council directed staff to continue the School Bus Pilot Program for an
additional year and to return to Council with options to transition the service to a different model.
The two-route pilot service started on January 7, 2019 and will continue for school year 2020/21.
Operating
Budget Impacts
The pilot program is funded by the Town as well as fare revenue. This project will use staff time for
service design. PPW staff time associated with these projects will be charged to the project as it is
delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C - 61
Project Components &
Estimated Timeline
Summer 2018 Design Service plan design, marketing, customer sign up
Fall 2018 Bid Process RFP & service contract award, finalize service plan
Winter 2019 Service Launch Provide Pilot Service
Summer 2021 Completion Completion of 2 and ½ years of pilot service
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 148,683$ 224,035$ 42,056$ 313,000$ 355,056$ -$ -$ -$ -$ 727,774$
GRANTS & AWARDS -$ -$ -$ 87,000$ 87,000$ 87,000$ -$ -$ -$ 174,000$
TOTAL SOURCE OF FUNDS 148,683$ 224,035$ 42,056$ 400,000$ 442,056$ 87,000$ -$ -$ -$ 901,774$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 148,683 224,035 42,056 313,000 355,056 - - - - 727,774
TOTAL GFAR 148,683$ 224,035$ 42,056$ 313,000$ 355,056$ -$ -$ -$ -$ 727,774$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 87,000 87,000 87,000 - - - 174,000
TOTAL GRANTS & AWARDS -$ -$ -$ 87,000$ 87,000$ 87,000$ -$ -$ -$ 174,000$
TOTAL USE OF FUNDS 148,683$ 224,035$ 42,056$ 400,000$ 442,056$ 87,000$ -$ -$ -$ 901,774$
PILOT SCHOOL BUSING Project 812-0128
PROPOSED STREETS PROGRAM
Street Improvements
C - 62
TOWN-WIDE
Project Name ADA Transition Plan Project Number 812-0129
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will update the Town’s ADA Transition Plan as required.
Location This project is located Town-wide.
Project
Background
The Americans with Disabilities Act (ADA), enacted on July 26, 1990, provides comprehensive rights to
persons with disabilities in different areas including access to public accommodations and
transportation. The ADA requires that all public agencies develop a transition plan for eliminating
barriers for persons with disabilities. The Town’s ADA Transition Plan has not been updated since 1994,
and it is necessary to develop programs that comply with the new standards
Operating
Budget Impacts
This project will use staff time for management. Engineering staff time associated with these projects
will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 63
Project Components &
Estimated Timeline
Summer 2020 Design Develop request for proposals
Fall 2020 Bid Process Award consultant agreement
Winter 2021 Report Conduct study
Spring 2021 Completion Finalize report
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$
TOTAL SOURCE OF FUNDS -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 110,000 - 110,000 - - - - 110,000
TOTAL GRANTS & AWARDS -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$
TOTAL USE OF FUNDS -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$
ADA TRANSITION PLAN Project 812-0129
PROPOSED STREETS PROGRAM
Street Improvements
C - 64
Project Name Highway 17/9 Interchange and Capacity
Improvements
Project Number 813-0237
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description These funds will be used as a local match necessary to begin a conceptual study for improvements at
Highway 9 and Highway 17.
Location This project is located on Highway 9 and Highway 17.
Project
Background
The Countywide 2016 Measure B sales tax measure includes investments in the regional transportation
infrastructure across nine program areas. The Santa Clara Valley Transportation Authority (VTA)
manages the 2016 Measure B program and the VTA Board approves project prioritization and funding.
The VTA approved the first set of projects on a two-year budget cycle with a ten-year look ahead at
potential projects.
Through the process to establish the structure of and projects included in the 2016 Measure B, the
Town proposed upgrades to the interchange at Highway 9 and Highway 17 as its major project in the
Highway category. In reviewing the project with VTA, an opportunity exists to include two options for
modifications to Highway 17 through Los Gatos. The first includes efficiency improvements such as
adding auxiliary lanes and realigning existing lanes. Auxiliary lanes might include continuing the on-
ramp from Lark Avenue south to the Highway 9 off-ramp, facilitating a smoother transition of traffic.
The second is an expanded version that could include the addition of travel lanes on Highway 17 within
the existing right of way. VTA approved 2016 Measure B funds to bring the project through preliminary
design and environmental review. The allocation of 2016 Measure B funds requires at least a 10 percent
contribution from non-2016 Measure B sources. While the Town is pursuing outside funds for the
match, this project would set aside Town funds if needed.
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 65
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Summer 2021 Design Review Review of Design
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
TRAFFIC MITAGATION -$ -$ 600,000$ -$ 600,000$ -$ -$ -$ -$ 600,000$
TOTAL SOURCE OF FUNDS -$ -$ 600,000$ -$ 600,000$ -$ -$ -$ -$ 600,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
TRAFFIC MITAGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 600,000 - 600,000 - - - - 600,000
TOTAL TRAFFIC MITIGATION -$ -$ 600,000$ -$ 600,000$ -$ -$ -$ -$ 600,000$
TOTAL USE OF FUNDS -$ -$ 600,000$ -$ 600,000$ -$ -$ -$ -$ 600,000$
HIGHWAY 17/9 INTERCHANGE & CAPACITY IMPROVEMENTS Project 813-0237
PROPOSED STREETS PROGRAM
Street Improvements
C - 66
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Downtown Streetscape Revitalization
Project Number 813-0235
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description These funds will be used as initial funding for a larger Downtown Streetscape Revitalization project.
Location This project is located downtown.
Project
Background
The Downtown Streetscape infrastructure has aged and needs updating to continue to attract
customers and facilitate maintenance. This initial funding set aside is in preparation for a future project
to reinvent the Downtown. Past efforts that inform this project include a one-way street pilot on North
Santa Cruz Avenue and a Comprehensive Downtown Parking Study. In addition, the Town’s Operating
Budget provides for increased attention to the maintenance of landscape and hardscape. Progress and
expenditures on this project will occur only following ongoing discussion and direction from the Town
Council.
Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 67
Project Components &
Estimated Timeline
Summer 2020 Design Project design & development
TBD Future project milestones
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 1,972,384$ -$ 1,972,384$ -$ -$ -$ -$ 1,972,384$ .
TOTAL SOURCE OF FUNDS -$ -$ 1,972,384$ -$ 1,972,384$ -$ -$ -$ -$ 1,972,384$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 1,972,384 - 1,972,384 - - - - 1,972,384
TOTAL GFAR -$ -$ 1,972,384$ -$ 1,972,384$ -$ -$ -$ -$ 1,972,384$
TOTAL USE OF FUNDS -$ -$ 1,972,384$ -$ 1,972,384$ -$ -$ -$ -$ 1,972,384$
DOWNTOWN STREETSCAPE REVITALIZATION Project 813-0235
PROPOSED STREETS PROGRAM
Street Improvements
C - 68
Project Name E. Main Street Speed Table/Raised
Crosswalk
Project Number 812-0131
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description The project will install two speed tables, raised crosswalks, and bulb outs on East Main Street in front
of Los Gatos High School.
Location East Main Street in front of Los Gatos High School, between High School Court and Chicago Avenue.
Project
Background
The East Main Street Speed Table/Raised Crosswalk project includes installing two speed tables on East
Main Street in front of Los Gatos High School, combined with raised crosswalks and the construction
of bulb outs at all three crosswalks.
The Town received a Transportation Fund for Clean Air (TFCA) grant in the amount of $86,200 from the
Santa Clara Valley Transportation Authority (VTA) for the construction of this project.
Operating
Budget Impacts
Engineering staff time for design and construction of this project will be addressed in the FY 2020/21
Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C - 69
Project
Components &
Estimated Timeline
Summer 2020 Design Project plans & specifications
Winter 2021 Bid Process Council approves plans & authorizes bidding the project
Summer 2021 Construction Council awards the contract & construction process begins
Fall 2021 Completion Project completed
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 83,000$ 83,000$ -$ -$ -$ -$ 83,000$
GRANTS & AWARDS - - - 86,200 86,200 - - - - 86,200
TOTAL SOURCE OF FUNDS -$ -$ -$ 169,200$ 169,200$ -$ -$ -$ -$ 169,200$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 83,000 83,000 - - - - 83,000
TOTAL GFAR -$ -$ -$ 83,000$ 83,000$ -$ -$ -$ -$ 83,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 86,200 86,200 - - - - 86,200
TOTAL GRANTS & AWARDS -$ -$ -$ 86,200$ 86,200$ -$ -$ -$ -$ 86,200$
TOTAL USE OF FUNDS -$ -$ -$ 169,200$ 169,200$ -$ -$ -$ -$ 169,200$
E. MAIN ST. SPEED TABLE/RAISED CROSSWALK Project 812-0131
PROPOSED STREETS PROGRAM
Street Improvements
C - 70
TOWN-WIDE
Project Name Local Road Safety Plan
Project Number 812-0132
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description This project will prepare a Local Road Safety Plan for the Town.
Location This project is located Town-wide.
Project
Background
A Local Road Safety Plan (LRSP) is a new initiative in the State’s Highway Safety Improvement Program
(HSIP). Preparing a LRSP is an opportunity for jurisdictions to address unique local roadway safety needs
while contributing to the success of the Strategic Highway Safety Plan. The process of preparing an
LRSP creates a framework to systematically identify and analyze safety problems and recommend
safety improvements. Preparing an LRSP facilitates the development of local agency partnerships and
collaboration, resulting in a prioritized list of improvements and actions that can demonstrate a defined
need and contribute to the statewide plan. The LRSP offers a proactive approach to addressing safety
needs and demonstrates agency responsiveness to safety challenges. In the future Highway Safety
Improvement Program (HSIP) Calls-for-Projects, an LRSP (or its equivalent) will be preferred or required
for an agency to be eligible to apply for federal HSIP funds. The Town has received HSIP grants in the
past for this Plan. Completing a LRSP will ensure the Town’s eligibility to apply and receive future HSIP
funds.
The Town was awarded a HSIP grant for completing the LRSP in an amount of $72,000, the maximum
grant amount allowed per agency. A minimum of 10% local match is required. Staff is recommending
a higher match amount of $28,000 to have sufficient funds to prepare a high-quality product with
extensive community engagement.
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 71
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Fall 2020 RFP & Selection
Process
Council authorizes issuing RFP Proposal evaluation and vendor
selection. Council awards the contract and study begins.
Winter 2020 Study Study, analysis and community engagement.
Summer 2021 Completion Project completed.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$
GRANTS & AWARDS - - - 72,000 72,000 - - - - 72,000
TOTAL SOURCE OF FUNDS -$ -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 28,000 28,000 - - - - 28,000
TOTAL GFAR -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 72,000 72,000 - - - - 72,000
TOTAL GRANTS & AWARDS -$ -$ -$ 72,000$ 72,000$ -$ -$ -$ -$ 72,000$
TOTAL USE OF FUNDS -$ -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
LOCAL ROAD SAFETY PLAN Project 812-0132
PROPOSED STREETS PROGRAM
Street Improvements
C - 72
Project Name Blossom Hill Road Traffic Study
Project Number 813-0239
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description These funds will be used to conduct a safety study on Blossom Hill Road.
Location This project is located on Blossom Hill Road from Camelia Terrace to Hillbrook Drive.
Project
Background
This project would conduct a safety study on Blossom Hill Road focusing on the areas from Camelia
Terrace to Hillbrook Drive. The study would identify opportunities for improvements to the corridor to
benefit multi-modal transportation, provide traffic calming, and increase safety. The study would
include information on potential impacts to surrounding streets, especially residential streets, that may
occur as a result of changes to Blossom Hill Road.
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 73
Project Components &
Estimated Timeline
Summer 2020 RFP Process Conduct Request for Proposals process.
Fall 2020 Study Study and analysis.
Fall 2020 Completion Study result brought to Council for consideration.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 125,000$ 125,000$ -$ -$ -$ -$ 125,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 125,000$ 125,000$ -$ -$ -$ -$ 125,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 125,000 125,000 - - - - 125,000
TOTAL GFAR -$ -$ -$ 125,000$ 125,000$ -$ -$ -$ -$ 125,000$
TOTAL USE OF FUNDS -$ -$ -$ 125,000$ 125,000$ -$ -$ -$ -$ 125,000$
BLOSSOM HILL ROAD TRAFFIC STUDY Project 813-0239
PROPOSED STREETS PROGRAM
Street Improvements
C - 74
Project Name Winchester Class IV Bikeway
Project Number 813-0240
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description The project will install Class IV protected bike lines on Winchester Boulevard.
Location This project is located on Winchester Boulevard between Blossom Hill Road and Albright Way.
Project
Background
Winchester Boulevard is a major arterial street parallel to Highway 17, which borders both the Town
of Los Gatos and the City of Monte Sereno. The Los Gatos Bicycle and Pedestrian Master Plan (BPMP)
identifies the construction of Class IV bike lanes along Winchester Boulevard as an important
improvement project for the Town. On January 29,2020, the Town was awarded a grant award of
$293,900 from the Transportation Fund for Clean Air (TFCA) Regional Fund for the Winchester
Boulevard Class IV Protected Bike Lanes Project. The TFCA funds will be applied to the construction
phase.
Operating
Budget Impacts
This project will use staff time for design and construction of this project. Engineering staff time
associated with this project will be changed to the project as delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 75
Project Components &
Estimated Timeline
Summer 2020 Design and Bid Prepare plans & specifications. Council approves plans &
authorizes bidding the project. Council awards the project.
Summer 2021 Construction Construction process begins.
Fall 2021 Completion Project completed.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 688,555$ 688,555$ -$ -$ -$ -$ 688,555$
GRANTS & AWARDS - - - 293,900 293,900 - - - - 293,900
TOTAL SOURCE OF FUNDS -$ -$ -$ 982,455$ 982,455$ -$ -$ -$ -$ 982,455$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 688,555 688,555 - - - - 688,555
TOTAL GFAR -$ -$ -$ 688,555$ 688,555$ -$ -$ -$ -$ 688,555$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 293,900 293,900 - - - - 293,900
TOTAL GRANTS & AWARDS -$ -$ -$ 293,900$ 293,900$ -$ -$ -$ -$ 293,900$
TOTAL USE OF FUNDS -$ -$ -$ 982,455$ 982,455$ -$ -$ -$ -$ 982,455$
WINCHESTER CLASS IV BIKEWAY Project 813-0240
PROPOSED STREETS PROGRAM
Street Improvements
C - 76
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name VMT Mitigation Program
Project Number 812-0133
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description This project will fund a required nexus study to establish a Vehicle Miles Travelled fee program.
Location This project is located Town-wide.
Project
Background
Staff is working a Transportation Analysis Policy and Guidelines in compliance with state law and the
CEQA Guidelines. The Town will need to establish a robust VMT reduction program to lower VMT
Town-wide. Based on other jurisdictions’ experience and considering the local setting, the most
effective and feasible actions will likely include bike and pedestrian improvements, Transportation
Demand Management actions, parking and policy changes, shuttles, and financial incentives. The final
policy and guidelines are expected to be adopted by the Town Council in June 2020, with follow up
work on local policies through the 2020 calendar year.
It is anticipated that the new Transportation Analysis Policy and Guidelines will make it necessary for
the Town to establish a new VMT Mitigation program. The current Traffic Impact Mitigation Fee is based on roadway capacity analysis. The transition to VMT as a metric will necessitate different
mitigation measures to address impacts from driving. A nexus study will be required to establish a
mitigation fee program.
Operating
Budget Impacts
This project will use staff time for management of this project. Engineering staff time associated with
this project will be changed to the project as delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 77
Project
Components &
Estimated Timeline
Summer 2020 Design Develop scope and RFP.
Winter 2020 RFP & Selection
Process
Council authorizes issuing RFP. Proposal evaluation and vendor
selection. Council awards the contract and study begins.
Spring 2021 Study Study, analysis, and community engagement.
Fall 2021 Completion Study and recommendations completed. Council adopts the VMT Mitigation Program and Fee.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 250,000 250,000 - - - - 250,000
TOTAL GFAR -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
TOTAL USE OF FUNDS -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
VMT MITIGATION PROGRAM AND FEE NEXUS STUDY Project 812-0133
PROPOSED STREETS PROGRAM
Street Improvements
C - 78
Project Name Kennedy Sidewalk – LGB to Englewood
Project Number 813-0241
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description The project will install sidewalks and Class II bike lanes on Kennedy Road.
Location This project location is Kennedy Road Between Los Gatos Boulevard and Englewood Avenue.
Project
Background
The Kennedy Road Sidewalk improvement project will provide safe connections to Los Gatos
Boulevard, a destination point in Town for employment. The project is in a residential neighborhood
that will provide benefits to Louise Van Meter Elementary School, R.J. Fisher Middle School, and Los
Gatos High School. The project location is in close proximity to the Los Gatos and Fillmer stop on the
VTA Route 27 providing access to further destinations within the Town and Blossom Hill Road.
Staff submitted a Measure B grant application to seek funding for the final design and construction of
this project. The local match amount is included in this project budget. The project schedule is
contingent upon Measure B award.
Operating Budget Impacts This project will use staff time for design and management. Engineering staff time associated with this
project will be changed to the project as delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 79
Project
Components &
Estimated Timeline
Fall 2020 Design Prepare plans & specifications.
Spring 2021 Bid Process Council approves plans authorizes bidding the project.
Summer 2021 Construction Council awards the contract and construction process begins.
Fall 2021 Completion Project completed.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ -$ -$ -$ 356,700$ -$ -$ 356,700$
GRANTS & AWARDS - - - - - - 805,690 - - 805,690
TOTAL SOURCE OF FUNDS -$ -$ -$ -$ -$ -$ 1,162,390$ -$ -$ 1,162,390$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - - 356,700 - - 356,700
TOTAL GFAR -$ -$ -$ -$ -$ -$ 356,700$ -$ -$ 356,700$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - - 805,690 - - 805,690
TOTAL GRANTS & AWARDS -$ -$ -$ -$ -$ -$ 805,690$ -$ -$ 805,690$
TOTAL USE OF FUNDS -$ -$ -$ -$ -$ -$ 1,162,390$ -$ -$ 1,162,390$
KENNEDY SIDEWALK BETWEEN LGB AND ENGELWOOD Project 813-0241
PROPOSED STREETS PROGRAM
Street Improvements
C - 80
Project Name Winchester Boulevard Complete Streets Final Design
Project Number 813-0238
Department Parks & Public Works Project Manager Transportation & Mobility
Manager: Ying Smith
Description This project will fund the conceptual engineering and final design for Complete Streets improvements
on Winchester Boulevard.
Location This project location is Winchester Boulevard between Blossom Hill Road and Knowles Drive (Town
limits).
Project
Background
Winchester Boulevard is a major arterial street parallel to Highway 17, which borders both the Town
of Los Gatos and the City of Monte Sereno. The Los Gatos Bicycle and Pedestrian Master Plan (BPMP)
identifies the construction of Class IV bike lanes along Winchester Boulevard as an improvement
project. The construction of Winchester Class IV Bikeway is included as a separate project (813-0240).
Complete Streets treatments will likely include enhanced bike lanes, pedestrian crossing, sidewalk
improvements, pedestrian refuse islands, landscaped medians, intersection modifications, and
stormwater retention.
In December 2019, the Town selected Kimley-Horn and Associates, Inc. as the consultant to complete
engineering design. The conceptual engineering work is expected to be completed by the end of 2020.
The Final Design for the Winchester Boulevard Complete Streets improvements is one of the five
candidate projects submitted to the Measure B Bicycle and Pedestrian Competitive Grant Program.
The local funds included in this project’s budget is the estimated local match amount. In future years,
additional funds will be needed for construction. Staff will continue to seek grant funding to complete
this project.
Operating
Budget Impacts
Engineering staff time for the design, construction inspection, and management will be charged to the
project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C - 81
Project
Components &
Estimated Timeline
Fall 2020 Conceptual
Design
Complete Conceptual design
Fall 2021 Final Design Complete right-of-way certificate and final design (pending
funding)
TBD Construction Begin and complete construction
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ 200,053$ 79,948$ -$ 79,948$ 463,250$ -$ -$ -$ 743,250$
GRANTS & AWARDS - - - - - 996,000 - - - 996,000
TOTAL SOURCE OF FUNDS -$ 200,053$ 79,948$ -$ 79,948$ 1,459,250$ -$ -$ -$ 1,739,250$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 200,053 79,948 - 79,948 463,250 - - - 743,250
TOTAL GFAR -$ 200,053$ 79,948$ -$ 79,948$ 463,250$ -$ -$ -$ 743,250$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consul;tant Services - - - - - - - - - -
Project Construction Expenses - - - - - 996,000 - - - 996,000
TOTAL GRANTS & AWARDS -$ -$ -$ -$ 996,000$ -$ -$ -$ 996,000$
TOTAL USE OF FUNDS -$ 200,053$ 79,948$ -$ 79,948$ 1,459,250$ -$ -$ -$ 1,739,250$
WINCHESTER BOULEVARD COMPLETE STREETS Project 813-0238
PROPOSED STREETS PROGRAM
Street Improvements
C - 82
PROPOSED STREETS PROGRAM
Bridge Projects
C - 83
PROJECT LOCATIONS
A Quito Road - Bridge Replacement
B Highway 17 Bicycle & Pedestrian Bridge – Design
PROPOSED STREETS PROGRAM
Bridge Projects
C - 84
PROGRAM SECTION DIRECTORY PAGE
0801 Quito Road - Bridge Replacement C – 86
0803 Highway 17 Bicycle & Pedestrian Bridge - Design C – 88
PROPOSED STREETS PROGRAM
Bridge Projects
C - 85
The Streets Program’s Bridge Projects section contains Capital Improvement Program projects that repair, replace, or
rehabilitate a deficient bridge structure as the primary scope of work.
Bridge structure safety falls under the guidance of state and federal regulations, and bridge projects are often driven by
available funding from these jurisdictions, such as Caltrans grant programs or the federal Highway Bridge Replacement and
Rehabilitation (HBRR) program. Los Gatos does not have a designated funding source for repairing, maintaining, and
improving the Town’s bridges, and relies upon grant programs for major bridge improvement projects.
BRIDGE PROJECTS SUMMARY
Carryforward Projects
0801 Quito Road - Bridge Replacement 64,594$ 285,087$ -$ -$ -$ -$ 349,681$
0803 Hwy 17 Bicycle & Pedestrian Bridge-Design 234,000 - 5,430,303 - - - 5,664,303
Total Bridge Projects 298,594$ 285,087$ 5,430,303$ -$ -$ -$ 6,013,984$
Expended Through
2019/20
Total
Budgeted
2023/24
Budget
2022/23
Budget
2021/22
Budget
2020/21 Budget &
Carryfwd*
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
BRIDGE PROJECTS
2024/25
Budget
* Total FY 2019/20 Carryforward $235,087
PROPOSED STREETS PROGRAM
Bridge Projects
C - 86
Project Name Quito Road - Bridge Replacement Project Number 818-0801
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project funds the Town’s portion of the replacement cost for two bridges on Quito Road to
improve roadway safety and provide adequate storm water flow capacity in the creek under the
bridge.
Location The two Quito Road bridges span a tributary of San Tomas Aquino Creek. The bridges are located on
Quito Road in the vicinity of Old Adobe Road, approximately 1½ miles north of Highway 9, on the
common boundary line between the City of Saratoga and the Town of Los Gatos.
Project
Background
San Tomas Aquino Creek is under the jurisdiction of the Santa Clara Valley Water District (SCVWD),
while the replacement of the bridges is the shared responsibility of the City of Saratoga and the Town
of Los Gatos. Both bridges are approximately ninety years old and have been classified “structurally
deficient” under Caltrans guidelines. In addition, both bridges are not adequate to receive 100-year
flood flows.
In 2001, the City of Saratoga, the project sponsor, secured partial funding (80%) through the federal
Highway Bridge Replacement and Rehabilitation (HBRR) program to replace both bridges with wider
span structures that will allow the 100-year design flood flow to pass underneath. Saratoga is the lead agency to oversee the design, environmental, right-of-way acquisition, and construction services
for the project. The City of Saratoga, the Town of Los Gatos, and SCVWD agreed to share the duties
and responsibilities for the project and the remaining 20% local match funding requirement.
After further evaluation of the bridges, it was determined that Quito Road would require
reconstruction at each end of the bridge, which in turn requires additional right-of-way acquisitions
and environmental reviews under both the State of California (Caltrans) and federal regulations.
These changes have made it necessary to redesign this project, significantly increasing the estimated
costs. The City of Saratoga has applied for additional funding from Caltrans due to the redesign. As a
result of the additional project costs, the local funding match from the City of Saratoga, the Town of
Los Gatos, and the SCVWD has increased from $155,000 to $238,000 for each agency. Based on the
April 2019 schedule from the City of Saratoga, the construction of these bridges is anticipated to be
completed by 2021.
Operating
Budget Impacts
Engineering staff time for coordination of this project with the City of Saratoga is incorporated into
the Saratoga Operating Budget.
HWY
8
5POLLARD R
D
QUITO RD
PROPOSED STREETS PROGRAM
Bridge Projects
C - 87
Project
Components &
Estimated
Timeline
Jan 2001 Grant Funding The City of Saratoga obtained grant funding from the federal
HBRR program.
Oct 2001 Cooperative
Agreement
Council approved a cooperative agreement with the City of
Saratoga and SCVWD for the replacement of the two bridges.
May 2002 Preliminary Design City of Saratoga started preliminary design.
2013 Right of way Right of way acquisition process is ongoing and environmental
permitting is underway.
2015 Final Design Design completed and project bidding by the City of Saratoga.
April 2020 Construction Start Begin reconstruction of bridge.
Summer
2021
Completion Construction is anticipated to be complete in 2021.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 64,594$ -$ 235,087$ 50,000$ 285,087$ -$ -$ -$ -$ 349,681$
TOTAL SOURCE OF FUNDS 64,594$ -$ 235,087$ 50,000$ 285,087$ -$ -$ -$ -$ 349,681$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 64,594 - 235,087 50,000 285,087 - - - - 349,681
TOTAL GFAR 64,594$ -$ 235,087$ 50,000$ 285,087$ -$ -$ -$ -$ 349,681$
TOTAL USE OF FUNDS 64,594$ -$ 235,087$ 50,000$ 285,087$ -$ -$ -$ -$ 349,681$
QUITO ROAD - BRIDGE REPLACEMENT Project 818-0801
PROPOSED STREETS PROGRAM
Bridge Projects
C - 88 LOS GATOS BLVDHWY 17N SANTA CRUZ AVBLOSSOM HIL
L
R
D
SHANNON
R
DUNIVERSITY AV
Project Name Highway 17 Bicycle & Pedestrian Bridge -
Design
Project Number 818-0803
Department Parks & Public Works Project Manager Transportation & Mobility
Manager: Ying Smith
Description This project will fund the preliminary design, environmental clearance, and final design for potential
bicycle and pedestrian bridge over Highway 17.
Location This project is located at Blossom Hill Road or Nino Way over Highway 17.
Project
Background
Highway 17 presents a barrier for bicyclists and pedestrians wanting to cross from one side of Los
Gatos to the other. Current crossings are largely vehicle focused and often uncomfortable for other
transportation modes. This is a suggested path included in the Safe Routes to School Phase 1 Study.
In September 2019, the Town selected BKF Engineers as the consultant and officially kicked off the
project. The feasibility analysis and conceptual engineering work is expected to be completed by the
end of 2020. At its March 3, 2020 meeting, the Town Council approved the project’s Purpose and
Need and authorized proceeding with design alternatives for a separate bicycle and pedestrian
overcrossing.
The Final Design phase will include environmental clearance, right-of-way, and final design, estimated
to be approximately $3.7 million. Staff submitted a Measure B grant application to seek funding for
the final design of this project. The local match amount is included in this project’s budget. The
project schedule is contingent upon the Measure B award.
In future years, additional funds will be needed for construction. The construction cost will be in the
$20 to $30 million range. Staff will continue to seek grant funding to complete this project.
Operating
Budget Impacts
This project will use staff time for project management. Staff time associated with these projects will
be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Bridge Projects
C - 89
Project
Components &
Estimated
Timeline
Spring 2020 Preliminary
Design
Project design & development
Spring 2023 Environmental
Clearance and
Final Design
Complete environmental clearance and final design
TBD Construction Complete construction
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ -$ -$ -$ 946,210$ -$ -$ -$ 946,210$
TRAFFIC MITIGATION - 147,005 - - - - - - - 147,005
GRANTS & AWARDS - 86,995 - - - 4,484,093 - - - 4,571,088
TOTAL SOURCE OF FUNDS -$ 234,000$ -$ -$ -$ 5,430,303$ -$ -$ -$ 5,664,303$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFARSalaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - 946,210 - - - 946,210
TOTAL GFAR -$ -$ -$ -$ -$ 946,210$ -$ -$ -$ 946,210$
TRAFFIC MITIGATIONSalaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 147,005 - - - - - - - 147,005
TOTAL TRAFFIC MITIGATION -$ 147,005$ -$ -$ -$ -$ -$ -$ -$ 147,005$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 86,995 - - - 4,484,093 - - - 4,571,088
TOTAL GRANTS & AWARDS -$ 86,995$ -$ -$ -$ 4,484,093$ -$ -$ -$ 4,571,088$
TOTAL USE OF FUNDS -$ 234,000$ -$ -$ -$ 5,430,303$ -$ -$ -$ 5,664,303$
HIGHWAY 17 BICYCLE AND PEDESTRIAN BRIDGE - DESIGN Project 818-0803
PROPOSED STREETS PROGRAM
Bridge Projects
C - 90
Parks Program
This Page Intentionally Left Blank
PROPOSED PARKS AND TRAILS PROGRAM
D - 1
PARK PROJECT DIRECTORY
4605 Parks Playground Fibar Project D – 6
4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 8
4202 Town Plaza Turf Repairs D – 10
4006 Outdoor Fitness Equipment D – 12
4508 Vegetation Management – Town-wide D – 14
TRAIL PROJECT DIRECTORY
4504 Open Space Trail Upgrades D – 20
4507 Forbes Mill Footbridge Improvements D – 22
4503 Charter Oaks Trail Repair D – 24
4505 Trailhead Connector Project D – 26
PROPOSED PARKS AND TRAILS PROGRAM
Park Improvement Projects
D - 2
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 3
PROJECT LOCATIONS
A Parks Playground Fibar Project
B Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping
C Town Plaza Turf Repairs
D Outdoor Fitness Equipment – Balzer Field
E Vegetation Management – Town-wide
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 4
PROGRAM SECTION DIRECTORY PAGE
4605 Parks Playground Fibar Project D – 6
4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat & Striping D – 8
4202 Town Plaza Turf Repairs D – 10
4006 Outdoor Fitness Equipment D – 12
4508 Vegetation Management – Town-wide D – 14
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 5
The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or
improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and
basketball or tennis court resurfacing; and park equipment or facility upgrades.
The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. The
exception to this is the Parks Fibar replacement project. Because Fibar requires regular replacement and infill, this project is
scheduled as a bi-annual project. One-time park improvement projects are prioritized based on health and safety issues,
available funding sources, infrastructure impacts, project costs, and community impacts.
Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program budget;
however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition
to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available.
PARK IMPROVEMENT PROJECTS SUMMARY
* Total FY 2019/20 Carryforward $850,247
Unfunded Projects
• Oak Meadow Park Upgrades
• Civic Center Irrigation System Replacement & Upgrade
• Turf Renovations - Various Parks
• Oak Meadow Park Fencing Upgrades
• Oak Meadow Park Restroom Expansion
• Park Rehabilitation – La Rinconada Park
• Park Rehabilitation – Live Oak Manor Park
• Park Rehabilitation – Blossom Hill Park
• Plaza Park Improvements
PARKS
Carryforward Projects
4605 Parks Playground Fibar Project 63,460$ 61,540$ -$ 25,000$ -$ 25,000$ 175,000$
4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - 225,000
4202 Town Plaza Turf Repairs 8,116 28,000 - - - - 36,116
4006 Outdoor Fitness Equipment - 60,000 - - - - 60,000
4508 Vegetation Management - Town-wide - 500,707 - - - - 500,707
New Projects
Total Park Improvement Projects 71,575$ 875,247$ -$ 25,000$ -$ 25,000$ 996,823$
2020/21 Budget &
Carryfwd*
2021/22
Budget
2022/23
Budget
2023/24
Budget
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
PARK IMPROVEMENT PROJECTS
Expended Through
2019/20
2024/25
Budget
Total
Budgeted
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 6
Project Name Parks Playground Fibar Project Project Number 831-4605
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description This project will replace fibar material at all Town playgrounds.
Location This project will be completed at various parks in Los Gatos.
Project
Background
Several Town parks have playground structures that are heavily used by children and their families.
Playground safety codes require that the fibar material be spread under and around playground
structures to prevent injury to children.
Fibar replacement is required when the material is below a specific depth near the playground
structure. Fibar is a wood product that degrades over time based on foot traffic and weather
conditions. This material should be replaced on a regular, as needed basis. This is an annual CIP project
to improve the safety of the Town’s playgrounds.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the Parks and Public Works Department’s FY 2020/21 Operating Budget.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 7
Project
Components &
Estimated Timeline
Summer 2019 Scope Project development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 63,460$ -$ 36,540$ 25,000$ 61,540$ -$ 25,000$ -$ 25,000$ 175,000$
TOTAL SOURCE OF FUNDS 63,460$ -$ 36,540$ 25,000$ 61,540$ -$ 25,000$ -$ 25,000$ 175,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 63,460 - 36,540 25,000 61,540 - 25,000 - 25,000 175,000
TOTAL GFAR 63,460$ -$ 36,540$ 25,000$ 61,540$ -$ 25,000$ -$ 25,000$ 175,000$
TOTAL USE OF FUNDS 63,460$ -$ 36,540$ 25,000$ 61,540$ -$ 25,000$ -$ 25,000$ 175,000$
PARKS PLAYGROUND FIBAR PROJECT Project 831-4605
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 8
H
W
Y
9
W M
A
I
N
S
T HWY 17N SANTA CRUZ AVUNIVERSITY AV
TOWN-WIDE
Project Name Creek Trail & Park Pathway & Parking Lot
Seal Coat & Striping
Project Number 831-4609
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description The project will resurface and restripe park parking lots, pathways, and sections of the Los Gatos Creek
Trail.
Location The project is located at Belgatos Park, Blossom Hill Park, Live Oak Manor Park, Oak Meadow Park, and
the Los Gatos Creek Trail.
Project
Background
The parking lots located in parks and the Los Gatos Creek Trail are heavily used on a daily basis. In
order to keep their surfaces in good condition and prevent long term wear and damage, the parking
lots and trails need to be resurfaced and striped. This project is necessary to prevent future damages
to existing pavement surfaces in the future.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 9
Project
Components &
Estimated Timeline
Summer 2019 Design Project design & development
Summer 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
TOTAL SOURCE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 225,000 - 225,000 - - - - 225,000
TOTAL GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
TOTAL USE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
CREEK TRAIL, PARKS PATHS & PARKING LOTS SEAL AND STRIPING Project 831-4609
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 10
E MAIN STHWY 17N SANTA CRUZUNIVERSITY AVAV
Project Name Town Plaza Turf Repairs
Project Number 831-4202
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description This project will renovate the turf at Plaza Park.
Location The project is located at Town Plaza Park, at the corner of West Main Street and Santa Cruz Avenue.
Project
Background
Plaza Park, located in the heart of downtown Los Gatos, is a popular park and hosts a variety of
community events, such as Jazz on the Plazz and the Farmer’s Market. Because of the amount of high
foot traffic at this location, the turf is heavily impacted. This project will remove the existing sod and
soil. New soil will be added to the area to enhance root growth and to re-grade the ground to mitigate
standing water issues. Additionally, along with the installation of new turf grass, minor changes to the
irrigation system will be completed to maximize water coverage. The turf was last replaced around 2010.
The project will be completed during a period when there is the least impact on scheduled downtown
events.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 11
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Fall 2020 Bid Process Project bidding & contract award
Spring 2021 Construction Project construction
Spring 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 8,116$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 36,116$
TOTAL SOURCE OF FUNDS 8,116$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 36,116$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 8,116 - 28,000 - 28,000 - - - - 36,116
TOTAL GFAR 8,116$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 36,116$
TOTAL USE OF FUNDS 8,116$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 36,116$
TOWN PLAZA TURF REPAIRS Project 831-4202
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 12
Project Name Outdoor Fitness Equipment
Project Number 831-4006
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description This project will install outdoor fitness equipment.
Location This project is located at the Balzer Field parking area.
Project
Background
The Town was awarded an outdoor fitness rig after attending a California Parks & Recreation Society
conference and participating in a competition. The Town has received equipment that is valued at
$30,000 and Town staff will install the equipment at the Balzer Field Parking Lot.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 13
Project
Components &
Estimated Timeline
Summer 2019 Scope Project design & development
Summer 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 60,000 - 60,000 - - - - 60,000
TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
OUTDOOR FITNESS EQUIPMENT Project 831-4006
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 14
Project Name Vegetation Management – Town-wide
Project Number 832-4508
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description This project funds an ecological assessment to provide guidance for fuel removal in Town open space
and right-of-way and the first year of open space fuel reduction.
Location The project location is Town open spaces and rights-of-way.
Project
Background
The FEMA-approved Santa Clara Operational Area Hazard Mitigation Plan lists the wildfire hazard for
the Town of Los Gatos as “high.” The funding allows for an ecological assessment to provide guidance
for fuel removal in Town open spaces and rights-of-way, and funding for the first year of open space
fuel reduction. The Town has applied for a FEMA grant for vegetation management work and a portion
of these funds may be used for as a funding match for that grant.
Operating
Budget Impacts
This project will use staff time for coordination of the assessment and fuel reduction. Parks staff time
associated with this project will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 15
Project
Components &
Estimated Timeline
Fall 2019 Scope Project scope development
Winter 2020 RFP Process Project RFP for ecological assessment
Summer 2020 Bid Process Bid to implement fuel reduction
Fall 2020 Implementation First season of fuel reduction
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 500,707$ -$ 500,707$ -$ -$ -$ -$ 500,707$
TOTAL SOURCE OF FUNDS -$ -$ 500,707$ -$ 500,707$ -$ -$ -$ -$ 500,707$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 500,707 - 500,707 - - - - 500,707
TOTAL GFAR -$ -$ 500,707$ -$ 500,707$ -$ -$ -$ -$ 500,707$
TOTAL USE OF FUNDS -$ -$ 500,707$ -$ 500,707$ -$ -$ -$ -$ 500,707$
VEGETATION MANAGEMENT - TOWN-WIDE Project 832-4508
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D - 16
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 17
PROJECT LOCATIONS
A Open Space Trail Upgrades
B Forbes Mill Footbridge Improvements
C Charter Oaks Trail Repair
D Trailhead Connector Project
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 18
PROGRAM SECTION DIRECTORY PAGE
4504 Open Space Trail Upgrades D – 20
4507 Forbes Mill Footbridge Improvements D – 22
4503 Charter Oaks Trail Repair D – 24
4505 Trailhead Connector Project D – 26
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 19
The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct,
repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction
or resurfacing.
TRAIL IMPROVEMENT PROJECTS SUMMARY
* Total FY 2019/20 Carryforward $683,812
`
Carryforward Projects
4504 Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ 152,000$ 4507 Forbes Mill Footbridge Improvements 30,603 61,224 - - - - 91,828
4503 Charter Oaks Trail Repair Project 72,942 440,109 - - - - 513,051
4505 Trailhead Connector 486,961 30,479 3,262,500 - - - 3,779,940
New Projects
Total Trail Improvement Projects 590,506$ 683,812$ 3,262,500$ -$ -$ -$ 4,536,819$
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
2022/23
Budget
Expended Through
2019/20
2023/24
Budget
TRAIL IMPROVEMENT PROJECTS
Total
Budgeted
2020/21 Budget &
Carryfwd*
2021/22
Budget
2024/25
Budget
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 20
Project Name Open Space Trail Upgrades Project Number 832-4504
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description This project will repair and replace old damaged retaining walls, fences, and embankments along the
trails in the Town’s open spaces.
Location This project is located at Santa Rosa Open Space, Heintz Open Space, and Belgatos Park.
Project
Background
The Town has a number of open space preserves that are under its jurisdiction. There are several public
trail networks that traverse the open space preserves in the hillsides. The aging process has
deteriorated a number of retaining walls and embankments along some trail sections. Without proper
repair and replacement, the possibility of failure of the trails will increase greatly. This project will
repair and replace several retaining walls that are supporting the trails and their embankments. In
addition, this project will improve the drainage system around the retaining walls to prevent further
erosion of the trails. This project will also address two bridges at Belgatos Park.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 21
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Spring 2021 Bid Process Project bidding & contract award
Summer 2021 Construction Project construction
Winter 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Open Space Reserve Fund -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
TOTAL SOURCE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 152,000 - 152,000 - - - - 152,000
TOTAL GFAR -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
TOTAL USE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
OPEN SPACE TRAIL UPGRADES Project 832-4504
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 22
Project Name Forbes Mill Footbridge Improvements
Project Number 832-4507
Department Parks & Public Works Project Manager Superintendent: Jim Harbin
Description The project will provide pathway lighting across the 400-foot span of the pedestrian bridge and
installation of additional art panels.
Location The project is located on the pedestrian bridge between Forbes Mill and Old Town across Highway
17.
Project Background
Forbes Mill footbridge is a heavily used pathway crossing Highway 17 between the Main Street
businesses, Civic Center, and high school on the east side of the freeway, and the downtown on the
west. The interior walls of the walkway are decorated with murals painted by students over the past
decades. The pathway structure once had a lighting system but fell into disrepair several years ago and
was removed. This left the pathway dark in the evening, which has prompted concerns from residents.
The installation of footbridge improvements in 2018 included solar LED lighting for the pathway. Staff
is currently monitoring this install to ensure the lights meet long-term needs.
This project will also install additional art panels to occupy the remaining space.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
HWY 9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 23
Project
Components &
Estimated Timeline
Fall 2018 Design Project design & development
Fall 2018 Bid Process Project bidding & contract award
Winter 2019 Construction Project construction
Summer 2020 Completion Project completion and monitoring
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 27,397$ 3,207$ 61,224$ -$ 61,224$ -$ -$ -$ -$ 91,828$
TOTAL SOURCE OF FUNDS 27,397$ 3,207$ 61,224$ -$ 61,224$ -$ -$ -$ -$ 91,828$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 27,397 3,207 61,224 - 61,224 - - - - 91,828
TOTAL GFAR 27,397$ 3,207$ 61,224$ -$ 61,224$ -$ -$ -$ -$ 91,828$
TOTAL USE OF FUNDS 27,397$ 3,207$ 61,224$ -$ 61,224$ -$ -$ -$ -$ 91,828$
FORBES MILL FOOTBRIDGE IMPROVEMENTS Project 832-4507
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 24 HWY 17WINCHESTER BLVDLOS GATOS BLVDHWY
8
5
LAR
K
A
V
KNOWLES
Project Name Charter Oaks Trail Repair Project Number 832-4503
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description This project will repair the storm damage on the Los Gatos Creek Trail near Charter Oaks, which includes
damage to the fencing and asphalt pathway.
Location This project is located on the Los Gatos Creek Trail near Charter Oaks.
Project
Background
The existing trail is adjacent to Los Gatos Creek and was damaged by flooding during the winter storms
of 2017. The impacts of the storm included damage to the fencing and to the asphalt concrete
pathway. The trail is well used by the public and the damage has negatively impacted trail users by
making the trail more difficult to use. Funds for this project will be provided by FEMA.
Subsequent to the trail repair work, this project will further evaluate improvements along the trail from
Lark Avenue towards Highway 85 utilizing Community Benefit funds in the amount of $350,000 from
the Albright project. This project scope will be determined through community outreach efforts for construction in FY 2020/21.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 25
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2021 Construction Project construction
Fall 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 109$ -$ 364,891$ -$ 364,891$ -$ -$ -$ -$ 365,000$
GRANTS 72,833 - 75,218 - 75,218 - - - - 148,051$
TOTAL SOURCE OF FUNDS 72,942$ -$ 440,109$ -$ 440,109$ -$ -$ -$ -$ 513,051$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 109 - 364,891 - 364,891 - - - - 365,000
TOTAL GFAR 109$ -$ 364,891$ -$ 364,891$ -$ -$ -$ -$ 365,000$
GRANTS &AWARDS
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 72,833 - 75,218 - 75,218 - - - - 148,051
TOTAL GRANTS &AWARDS 72,833$ -$ 75,218$ -$ 75,218$ -$ -$ -$ -$ 148,051$
TOTAL USE OF FUNDS 72,942$ -$ 440,109$ -$ 440,109$ -$ -$ -$ -$ 513,051$
CHARTER OAKS TRAIL REPAIR Project 832-4503
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 26
H
W
Y
9 HWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Trailhead Connector Project Project Number 832-4505
Department Parks & Public Works Project Manager PPW Assistant Director/Town
Engineer: Lisa Petersen
Description This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail to
Highway 9.
Location This project is located on the Los Gatos Creek Trail near Highway 9.
Project
Background
This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail to
Highway 9. The project is an identified priority within Measure B and the Bicycle and Pedestrian Plan.
The Council approved the staff recommendation for the next steps on this project in June 2017.
Caltrans approved the Authorization to Proceed with Preliminary Engineering, also known as E-76
approval, on December 13, 2018. In February 2019 the Town issued a Request for Proposal for the preliminary engineering and environmental clearance phase, which will take approximately 12 months.
If funding for construction is secured, the project would begin construction in 2020/21 at the earliest.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 27
Project
Components &
Estimated Timeline
Fall 2020 Design Project design & development
Pending Bid Process Project bidding & contract award
Pending Construction Project construction
Pending Completion Project completion
Prior Yrs
Actuals
2019/20
Adjusted
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 214$ 174,226$ 143,747$ 30,479$ -$ 30,479$ -$ -$ -$ -$ 174,440$
GRANTS & AWARDS - 343,000 343,000 - - - 3,262,500 - - - 3,605,500$
TOTAL SOURCE OF FUNDS 214$ 517,226$ 486,747$ 30,479$ -$ 30,479$ 3,262,500$ -$ -$ -$ 3,779,940$
`2019/20 Adjusted 2019/20 Estimated Estimated Carryfwd 2020/21 New Funding 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 214 174,226 143,747 30,479 - 30,479 - - - - 174,440
TOTAL GFAR 214 174,226 143,747 30,479 - 30,479 - - - - 174,440
GRANTS &AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - - -
Consultant Services - - - - - - - - - - -
Project Construction Expenses - 343,000 343,000 - - - 3,262,500 - - - 3,605,500
TOTAL GRANTS &AWARDS -$ 343,000$ 343,000$ -$ -$ -$ 3,262,500$ -$ -$ -$ 3,605,500$
TOTAL USE OF FUNDS 214$ 517,226$ 486,747$ 30,479$ -$ 30,479$ 3,262,500$ -$ -$ -$ 3,779,940$
TRAILHEAD CONNECTOR PROJECT Project 832-4505
PROPOSED PARKS & TRAILS PROGRAM
Trail Improvement Projects
D - 28
Public Facilities Program
This Page Intentionally Left Blank
PUBLIC FACILITIES DIRECTORY PROPOSED
E - 1
TOWN INFRASTRUCTURE PROJECT DIRECTORY
2302 Building Replacement at Corporation Yard E – 6
2001 Facilities Assessment E – 8
2503 Library Carpet Replacement E – 10
2002 Town Beautification E – 12
2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 14
2117 ADA Restrooms and HR Offices E – 16
2116 Plaza Level Railings – Code Upgrade E – 18
2010 Waterproofing – Town-wide E – 20
2504 Sound Mitigation in Library Lobby E – 22
6004 Fire Suppression (Halon) for Server Rooms E – 24
2118 Police Headquarters Roof Repair E – 26
2206 Adult Recreation Center – Floor Repair E – 28
EQUIPMENT PROJECT DIRECTORY
6101 Information System Upgrade E – 34
6001 Audio/Video System Upgrade E – 36
6003 Town-Wide Document Imaging Project E – 38
2305 Engineering Document Archiving E – 40
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42
6103 EOC Communication Upgrade E – 44
6104 IT Disaster Recovery Improvements E – 46
6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 48
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 2
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 3
PROJECT LOCATIONS
A Building Replacement at Corporation Yard G Plaza Level Railing - Code Upgrade
B Facilities Assessment H Waterproofing Town-wide
C Library Carpet Replacement I Sound Mitigation in Library Lobby
D Town Beautification J Fire Suppression (Halon) for Server Room
E ADA Upgrade Public Restrooms – Adult Recreation
Building K Police Headquarters Roof Repair
F ADA Upgrade Staff Restroom – Civic Center L Adult Recreation Center – Floor Repair
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 4
PROGRAM SECTION DIRECTORY PAGE
2302 Building Replacement at Corporation Yard E – 6
2001 Facilities Assessment E – 8
2503 Library Carpet Replacement E – 10
2002 Town Beautification E – 12
2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 14
2117 ADA Restrooms and HR Offices E – 16
2116 Plaza Level Railing – Code Upgrade E – 18
2010 Waterproofing – Town-wide E – 20
2504 Sound Mitigation in Library Lobby E – 22
6004 Fire Suppression (Halon) for Server Rooms E – 24
2118 Police Headquarters Roof Repair E - 26
2206 Adult Recreation Center – Floor Repair E – 28
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 5
The Town Infrastructure & Facilities Projects section contains Capital Improvement Program projects that maintain or improve
the Town’s public buildings and structures to keep them in a clean, safe, and functional condition. Town-owned buildings
include the Civic Center, Library, Police Operations Center, Parks & Public Works Building, Corporation Yard and associated
structures, and the following buildings leased to other agencies: the Los Gatos-Saratoga Community Education and Recreation
headquarters building and the Adult Recreation Center (formerly the Neighborhood Center). Other Town facilities include
the Venue, Tait Avenue, and Forbes Mill.
Town Infrastructure and Facilities Projects are prioritized in consideration of the user needs, federal and state mandates,
federal and state grant restrictions, and local community standards. The Community Development Department assumes
responsibility for evaluating the overall conformance to the General Plan and the status of environmental assessment. The
Parks & Public Works Department assumes responsibility for project design, planning, and construction.
This section contains annual ongoing improvement projects as well as identified one-time projects. One-time infrastructure
and facilities projects are prioritized based on health and safety issues, infrastructure impacts, available funding sources,
project costs, and community needs.
Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s public facilities;
however, grants, CDBG funds, and donations are pursued and utilized when available.
TOWN INFRASTRUCTURE & FACILITIES PROJECTS SUMMARY
*Total FY 2019/20 Carryforward $1,975,285 Unfunded Projects
• Civic Center Improvements
• Deferred maintenance at Town-owned, leased properties
• Deferred improvements to Town-owned properties
Carryforward Projects
2302 Building Replacement at Corporation Yard 188,187$ 977,613$ 25,000$ 25,000$ 25,000$ 25,000$ 1,265,800$
2001 Facilities Assessment 24,142 80,000 - - - - 104,142
2503 Library Carpet Replacement - 56,500 - - - - 56,500
2002 Town Beautification 102,702 16,924 10,000 10,000 10,000 10,000 159,625
2601 ADA Upgrade Public Restrooms - Adult Recreation Building 51,882 250,000 - - - - 301,882
2504 Sound Mitigation in Library Lobby - 22,000 - - - - 22,000
2118 Police Headquarters Roof Repair 47,752 2,248 - - - - 50,000
2117 ADA Restrooms and HR Offices - 450,000 - - - - 450,000
6004 Fire Suppression (Halon) for Server Rooms - 200,000 - - - - 200,000
2116 Plaza Level Railings - Code Upgrade - 30,000 - - - - 30,000
2010 Waterproofing Town-wide - 75,000 - - - - 75,000
New Projects
2206 Adult Recreation - Floor Repair - 100,000 - - - - 100,000 - -
Total Infrastructure / Facility Projects 414,665$ 2,260,285$ 35,000$ 35,000$ 35,000$ 35,000$ 2,814,950$
2022/23
Budget
TOWN INFRASTRUCTURE & FACILITIES PROJECTS
Total
Budgeted
2023/24
Budget
Expended Through
2019/20
2020/21 Budget &
Carryfwd*
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
2024/25
Budget
2021/22
Budget
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 6
Project Name
Building Replacement at Corporation Yard*
Project Number 821-2302
Department
Parks & Public Works Project Manager Facilities Manager: Dan Keller
*This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. A portion of these funds
($200,000) for this project was transferred to provide funding for the Almond Grove Street Reconstruction project.
Description This project will replace an old building at the Parks and Public Works Department (PPW) Corporation
Yard that is used for office space and evidence storage.
Location This project is located at the PPW Corporation Yard (41 Miles Avenue).
Project
Background
The maintenance lead staff has been using a small portable building located at the north side of the
PPW Corporation Yard for their office facility. This building has deteriorated over the years and is
becoming more difficult to maintain because of its aging infrastructure. The existing building has
several problems including a leaky roof and windows, a poor heating and cooling (HVAC) system, and
lacks a restroom facility in the building. This building is also used partially by the Police Department as
their evidence storage facility. Evidence must be stored and kept at a certain room temperature, which
requires an updated HVAC system. To save costs, this project will relocate staffing to another building
and reconstruct the existing building for storage only.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 7
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Fall 2020 Bid Process Project bidding & contract award
Winter 2021 Construction Project construction
Spring 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 75,942$ 112,245$ 952,613$ 25,000$ 977,613$ 25,000$ 25,000$ 25,000$ 25,000$ 1,265,800$
TOTAL SOURCE OF FUNDS 75,942$ 112,245$ 952,613$ 25,000$ 977,613$ 25,000$ 25,000$ 25,000$ 25,000$ 1,265,800$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 75,942 112,245 952,613 25,000 977,613 25,000 25,000 25,000 25,000 1,265,800
TOTAL GFAR 75,942$ 112,245$ 952,613$ 25,000$ 977,613$ 25,000$ 25,000$ 25,000$ 25,000$ 1,265,800$
BUILDING REPLACEMENT AT CORPORATION YARD Project 821-2302
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 8
TOWN-WIDE
Project Name Facilities Assessment
Project Number 821-2001
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will fund a consultant to assess the condition of Town facilities.
Location This project location is Town-wide.
Project
Background
This project will assess the condition of Town facilities to determine current condition of equipment
and building systems to assess priorities for repair versus replacements and to predict capital
expenditures needed year by year for life-cycle scheduled work and replacement.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 9
Project
Components &
Estimated Timeline
Winter 2020 Design Project design & development
Spring 2020 RFP Process Project RFP & contract award
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 24,142$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 104,142$
TOTAL SOURCE OF FUNDS 24,142$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 104,142$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 80,000 - 80,000 - - - - 80,000
Project Construction Expenses 24,142 - - - - - - - - 24,142
TOTAL GFAR 24,142$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 104,142$
TOTAL USE OF FUNDS 24,142$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 104,142$
FACILITIES ASSESSMENT Project 821-2001
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 10
Project Name Library Carpet Replacement
Project Number 821-2503
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will replace large sections of the carpet squares in the children’s area that have started to
fail.
Location This project location is inside the Library at 100 Villa Avenue.
Project Background
The carpet in the children’s area of the Library is starting to mat, lift, and stain from extensive foot
traffic, spilled food, and other accidents. This area of the Library is where the young kids play, listen to
stories, and congregate for different activities on the carpet. Replacements of the furniture upholstery
have occurred due to stains and failure, and this project will help complete the restoration of the space
back to a high service level.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 11
Project
Components &
Estimated Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR - - 56,500 - 56,500 - - - - 56,500
TOTAL SOURCE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 56,500 - 56,500 - - - - 56,500
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
TOTAL USE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
LIBRARY CARPET REPLACEMENT Project 821-2503
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 12
TOWN-WIDE
Project Name Town Beautification
Project Number 821-2002
Department Parks & Public Works Project Manager Environmental Specialist:
Marina Chislett
Description This project funds Town-wide beautification projects on an annual, as-needed basis.
Location This project location is Town-wide.
Project
Background
The Town Beautification Program was established to provide improvements to enhance the Town’s
beauty, particularly along public streets, sidewalks, and other Town property.
One example is the Town’s Outside the Box Program which enhances the character of the community
by adding artwork to utility boxes that are often targeted by graffiti vandals. Selected artwork contains
environmental sustainability messages that include: alternative transportation, clean energy, clean
creeks, community sustainability, and healthy lifestyles. In FY 2019/20 four utility boxes will be added
to bring the total to 25, and another four are planned in FY 2020/21.
Operating
Budget Impacts
The project will use staff time for program management and inspection. The staff time for this project
will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 13
Project
Components &
Estimated Timeline
Winter 2019 Artist
Recruitment
Project noticing
Summer 2020 Design Project submittals and development
Summer 2020 Installation Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 94,240$ 8,462$ 6,924$ 10,000$ 16,924$ 10,000$ 10,000$ 10,000$ 10,000$ 159,625$
TOTAL SOURCE OF FUNDS 94,240$ 8,462$ 6,924$ 10,000$ 16,924$ 10,000$ 10,000$ 10,000$ 10,000$ 159,625$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 94,240 8,462 6,924 10,000 16,924 10,000 10,000 10,000 10,000 159,625
TOTAL GFAR 94,240$ 8,462$ 6,924$ 10,000$ 16,924$ 10,000$ 10,000$ 10,000$ 10,000$ 159,625$
TOTAL USE OF FUNDS 94,240$ 8,462$ 6,924$ 10,000$ 16,924$ 10,000$ 10,000$ 10,000$ 10,000$ 159,625$
TOWN BEAUTIFICATION PROJECTS Project 821-2002
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 14
Project Name ADA Upgrade Public Restrooms – Adult
Recreation Building
Project Number 821-2601
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will make ADA-compliant upgrades to the public restrooms at the Recreation Building.
Location This project location is at the Adult Recreation Center at 208 E. Main Street.
Project
Background
The upstairs restrooms are beyond their useful life and are very small and non-ADA compliance. The
building serves seniors and having an accessible building is essential.
This project shows the use of Community Development Block Grant (CDBG) funds as a supplemental
funding source. The CDBG Entitlement Program provides grants on a formula basis to develop viable
urban communities by providing a suitable living environment, among other goals. The grant program
has specific requirements, and this is one of the few Town projects that meets the CDBG requirements.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/2021 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 15
Project
Components &
Estimated Timeline
Summer 2020 Design Project design & development
Fall 2020 Bid Process Project bidding & contract award
Spring 2021 Construction Project construction
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ 183,000$ -$ 183,000$ -$ -$ -$ -$ 183,000$
GRANTS 51,882 - 67,000$ -$ 67,000$ - - - - 118,882$
TOTAL SOURCE OF FUNDS 51,882$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 301,882$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 183,000 - 183,000 - - - - 183,000
TOTAL GFAR -$ -$ 183,000$ -$ 183,000$ -$ -$ -$ -$ 183,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses 51,882 - 67,000 - 67,000 - - - - 118,882
TOTAL GRANTS & AWARDS 51,882 - 67,000 - 67,000 - - - - 118,882
TOTAL USE OF FUNDS 51,882$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 301,882$
ADA UPGRADE PUBLIC RESTROOMS - ADULT RECREATION BUILDING PROJECT 821-2601
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 16
Project Name ADA Restrooms and HR Offices
Project Number 821-2117
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will make ADA-compliant upgrades to the staff restrooms at the Civic Center and modify
the HR offices.
Location This project is located at the Civic Center (110 E. Main Street).
Project
Background
The Building Inspectors have moved out of their previous space in the lower level of the Civic Center.
The restrooms adjacent to this space are small non-ADA compliant restrooms. This project will upgrade
the restrooms taking advantage of the available space to meet additional area requirements. In
addition, this project will remodel the HR offices in the Civic Center.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 17
Project
Components &
Estimated Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -
Transfer from Facilities -$ -$ 300,000$ 150,000$ 450,000$ -$ -$ -$ -$ 450,000$
TOTAL SOURCE OF FUNDS -$ -$ 300,000$ 150,000$ 450,000$ -$ -$ -$ -$ 450,000$
Prior Yrs Actuals 2019/20 Estimated Estimated Carryfwd 2020/21 New 2020/21 Budget 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed 2024/25 Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 300,000 150,000 450,000 - - - - 450,000
TOTAL GFAR -$ -$ 300,000$ 150,000$ 450,000$ -$ -$ -$ -$ 450,000$
TOTAL USE OF FUNDS -$ -$ 300,000$ 150,000$ 450,000$ -$ -$ -$ -$ 450,000$
ADA RESTROOMS AND HR OFFICES Project 821-2117
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 18
Project Name Plaza Level Railings – Code Upgrade
Project Number 821-2116
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will adjust the railings around the upper deck of the Civic Center to be code compliant.
Location This project location is on the deck of Town Hall (110 E. Main Street).
Project
Background
The railings around the upper deck of the Civic Center have wide gaps that create a safety hazard with
a risk of children falling through the gaps. This project will adjust the railings to be code compliant.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 19
Project
Components &
Estimated Timeline
Fall 2019 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$
TOTAL SOURCE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 30,000 - 30,000 - - - - 30,000
TOTAL GFAR -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$
TOTAL USE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$
PLAZA LEVEL RAILINGS - CODE UPGRADE Project 821-2116
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 20
TOWN-WIDE
Project Name Waterproofing -Town-wide
Project Number 821-2010
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will waterproof a balcony and a roof at two Town facilities.
Location The project is located at the Adult Recreation Center (208 E. Main Street) and the PPW Corporation
Yard at 41 Miles Avenue.
Project
Background
The roof of the engineering building at the PPW Corporation Yard is starting to show signs of age and
potential leakage as it approaches its end of serviceable life. Recent HVAC improvements added new
penetrations through this aging membrane, including relocation of a large HVAC unit in the center of
the roof. The new roof will upgrade the membrane to a single ply cool roof which will also improve the
building's energy conservation.
At the Adult Recreation Center, the rear balcony for the two manager offices upstairs cantilevers over
the activity room below. During heavy rainstorms, water leaks from under the thresholds upstairs into
the middle of the room below. The membrane needs to be replaced which entails significant
reconstruction of the sliding doors, siding, and balcony deck.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 21
Project
Components &
Estimated Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$
TOTAL SOURCE OF FUNDS -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 75,000 - 75,000 - - - - 75,000
TOTAL GFAR -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$
TOTAL USE OF FUNDS -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$
WATERPROOFING - TOWN-WIDE Project 821-2010
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 22
Project Name Sound Mitigation in Library Lobby
Project Number 821-2504
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will install sound baffling to the low ceiling in the Library lobby.
Location This project location is inside the Library at 100 Villa Avenue.
Project
Background
This is the second phase of sound reduction in the Library following successful installation of doors to
the teen area in phase one. This project will install sound baffling to the ceiling in the Library lobby to
help diffuse noise.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 23
Project
Components &
Estimated Timeline
Winter 2020 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Library Trust -$ -$ 22,000$ -$ 22,000$ -$ -$ -$ -$ 22,000$
TOTAL SOURCE OF FUNDS -$ -$ 22,000$ -$ 22,000$ -$ -$ -$ -$ 22,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 22,000 - 22,000 - - - - 22,000
TOTAL GFAR -$ -$ 22,000$ -$ 22,000$ -$ -$ -$ -$ 22,000$
TOTAL USE OF FUNDS -$ -$ 22,000$ -$ 22,000$ -$ -$ -$ -$ 22,000$
SOUND MITAGATION IN LIBRARY LOBBY Project 821-2504
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 24
TOWN-WIDE
Project Name Fire Suppression (Halon) for Server
Rooms
Project Number 841-6004
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will install fire suppression systems that are specific for server rooms.
Location This project is located at the Civic Center (110 East Main Street) and the Town of Los Gatos Police
Operations Building (15900 Los Gatos Boulevard).
Project
Background
Basic fire suppression systems use water-based sprinklers to protect infrastructure. Server rooms
require different fire suppression to avoid damaging equipment in case the fire suppression is
triggered. This project will install non-destructive gas suppression systems at main server rooms at
essential facilities.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/2021 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 25
Project
Components &
Estimated Timeline
Spring 2020 Bid process Project bidding & contract award
Summer 2020 Construction Project Construction
Fall 2020 Completion Project completion
FIRE SUPPRESSION (HALON) FOR SERVER ROOMS
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -
Transfer from Facilities -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 200,000 - 200,000 - - - - 200,000
TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
Project 841-6004
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 26
Project Name Police Headquarters Roof Repair Project Number 821-2118
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will replace the Police Headquarters roof with a new membrane.
Location This project is located at the Police Headquarters building (110 East Main Street).
Project
Background
The roof for the Police Headquarters wing of the civic center has reached the end of its useful life. The
roof has a history of water leaks and since the removal of the HVAC system over the old dispatch center,
the leaks have increased. This project will replace the roof with a new roof membrane to match the
museum wing roof completed in 2017.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 27
Project
Components &
Estimated Timeline
Winter 2019 Bid process Project bidding & contract award
Spring 2020 Construction Project Construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Facilities -$ 47,752$ 2,248$ -$ 2,248$ -$ -$ -$ -$ 50,000$
TOTAL SOURCE OF FUNDS - 47,752 2,248 - 2,248 - - - - 50,000
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 47,752 2,248 - 2,248 - - - - 50,000
TOTAL GFAR - 47,752 2,248 - 2,248 - - - - 50,000
TOTAL USE OF FUNDS - 47,752 2,248 - 2,248 - - - - 50,000
POLICE HEADQUARTERS ROOF REPAIR 821-2118
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 28
Project Name Adult Recreation Center – Floor
Repair
Project Number 821-2206
Department Parks & Public Works Project Manager Facilities Manager: Dan Keller
Description This project will replace the flooring in the multi-purpose room at the Adult Recreation Center.
Location This project will take place at the Adult Recreation Center (208 East Main Street).
Project
Background
The floor at the Adult Recreation Center has reached the end of its useful life. This project will replace
the floor.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 29
Project
Components &
Estimated Timeline
Winter 2020 Bid process Project bidding & contract award
Spring 2021 Construction Project Construction
Summer 2021 Completion Project completion
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
TOTAL SOURCE OF FUNDS -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses - - 100,000 100,000 - - - - 100,000
TOTAL GFAR -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
TOTAL USE OF FUNDS -$ -$ 100,000$ 100,000$ -$ -$ -$ -$ 100,000$
ADULT RECREATION CENTER - FLOOR REPAIR 821-2206
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E - 30
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 31
PROJECT LOCATIONS
A Information System Upgrade
B Audio/Video System Upgrade
C Town-Wide Document Imaging Project
D Engineering Document Archiving
E
Silicon Valley Regional Interoperability Project (SVRIP)
Service
F EOC Communication Upgrade
G IT Disaster Recovery Improvements
H
Computer-Aided Dispatch and Records Management
System (CAD/RMS)
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 32
PROGRAM SECTION DIRECTORY PAGE
6101 Information System Upgrade E – 34
6001 Audio/Video System Upgrade E – 36
6003 Town-Wide Document Imaging Project E – 38
2305 Engineering Document Archiving E – 40
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42
6103 EOC Communication Upgrade E – 44
6104 IT Disaster Recovery Improvements E – 46
6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 48
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 33
The Equipment Projects section contains Capital Improvement Program projects that provide new equipment; or replace,
improve, or upgrade existing Town equipment.
This section does not have ongoing equipment programs; all projects are considered one-time projects. One-time equipment
capital improvement projects are prioritized based on service level considerations, available funding sources, project costs,
and community impacts.
Los Gatos does not have a designated funding source for new equipment or the replacement or upgrading of existing
equipment; however, grants are pursued and utilized when available.
EQUIPMENT PROJECTS SUMMARY
Total FY 2019/20 Carryforward $921,291
Carryforward Projects
6101 Information System Upgrade 292,528$ 77,026$ -$ -$ -$ -$ 369,554$
6001 Audio/Video System Upgrade 68,048 42,552 - - - - 110,600
6003 Town-wide Document Imaging Project 198,011 16,990 - - - - 215,000
2305 Engineering Document Archiving 48,284 11,716 - - - - 60,000
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 395,661 62,967 - - - - 458,628
6103 EOC Communications Upgrade 20,618 29,382 - - - - 50,000
6104 IT Disaster Recovery Improvements 30,155 169,845 - - - - 200,000
6301 Computer-Aided Dispatch and Records Management System 24,476 510,814 - - - - 535,290 New Projects
Total Equipment Projects 1,077,781$ 921,291$ -$ -$ -$ -$ 1,999,072$
2020/21 Budget &
Carryfwd*
FY 2020/21 - 2024/25 CAPITAL IMPROVEMENT PROGRAM
Total
Budgeted
2021/22
Budget
2022/23
Budget
2023/24
Budget
2024/25
Budget
EQUIPMENT PROJECT SUMMARY BY PROGRAM
Expended Through
2019/20
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 34
Project Name Information System Upgrade Project Number 841-6101
Department Finance Project Manager Finance Director: Stephen
Conway
Description This project upgrades the Town’s existing financial/human resources information database, enhancing
its reporting system and providing future web-based online services. This project will be coordinated
with the upgrade of the Town’s existing permit tracking system.
Location The project will enhance the information systems used by the Finance, Human Resources, and Building
Departments. Purchased computer hardware will be located in the IT Department, 110 E. Main Street.
Project
Background
In FY 2008/09, staff completed a significant portion of a multi-year financial information system
upgrade. This project involved the conversion of General Ledgers, Payroll, Budget, and Human
Resources modules, followed by the implementation of the Cashiering and Business License modules.
Planned for FY 2020/21 required system upgrade, cloud hosting, online-timesheet management,
completion of the fixed asset module, and continuation of electronic commerce, including online
permitting and business license applications.
Operating
Budget Impacts
The remaining project balance is estimated to be $77,026. It is anticipated that the maintenance costs
for the Finance/Human Resources information system would be approximately $40,000 annually,
which has been incorporated into the FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 35
Project
Components &
Estimated Timeline
Spring 2020 System
Implementation
Upgrade and test data migration and functionality of
financial/human resources information database.
Fall 2020 System
Implementation
Develop and test fixed assets, electronic commerce and
electronic timesheet functions.
Summer 2020 Implement data migration
Fall 2020 System
Implementation
Implementation of electronic commerce and electronic
timesheet functions.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total ProjectSOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from MIS 188,975$ 103,553$ 77,026$ -$ 77,026$ -$ -$ -$ -$ 369,554$
TOTAL SOURCE OF FUNDS 188,975$ 103,553$ 77,026$ -$ 77,026$ -$ -$ -$ -$ 369,554$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services 188,975 103,553 77,026 - 77,026 - - - - 369,554
Project Construction Expenses - - - - - - - - - - TOTAL GFAR 188,975$ 103,553$ 77,026$ -$ 77,026$ -$ -$ -$ -$ 369,554$
TOTAL USE OF FUNDS 188,975$ 103,553$ 77,026$ -$ 77,026$ -$ -$ -$ -$ 369,554$
INFORMATION SYSTEM UPGRADE Project 841-6101
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 36
Project Name Audio/Video System Upgrade Project Number 841-6001
Department Town Manager Project Manager IT Manager: Chris Gjerde
Description This project provides for the replacement and/or upgrade of Council Chamber video, audio/visual, and
other applicable equipment used for televised and non-televised public meetings.
Location The video production system is located in the audio/video equipment room at the Civic Center, 110 E.
Main Street, and involves various electronic equipment required to cablecast public meetings and
make presentations.
Project Background In FY 2008/09, the audio/visual equipment located in the Town Council Chambers was upgraded to
meet the needs at that time. The maintenance of the video production equipment is now the
responsibility of KCAT, who receives Public, Educational, and Governmental (PEG) fees, provided by
local cable operators for this purpose. The remaining funds in this project will be used to replace and/or
upgrade the Town’s A/V equipment in the Council Chambers, as needed. Staff will also explore the
availability of additional audio/visual meeting management enhancements.
Operating
Budget Impacts
This Audio/Video System Upgrade project is funded in the GFAR Fund. It is unknown at this time which
replacements or upgrades will be required during FY 2020/21. Staff oversight of this project will be
included in the FY 2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 37
Project
Components &
Estimated
Timeline
Fiscal Year
2020/21
Monitoring
As needed.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 68,048$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 110,600$
TOTAL SOURCE OF FUNDS 68,048$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 110,600$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment 68,048 - 42,552 - 42,552 - - - - 110,600
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR 68,048$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 110,600$
TOTAL USE OF FUNDS 68,048$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 110,600$
AUDIO / VIDEO SYSTEM UPGRADE Project 841-6001
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 38
Project Name Town-Wide Document Imaging Project Project Number 841-6003
Department Community Development/Police Project Manager Community Development
Director: Joel Paulson
Description This is the continuation of the first phase of a Town-wide project to convert existing microfiche and
paper files to electronic storage and provide desktop access.
Location Town of Los Gatos Civic Center complex (110 E. Main Street).
Project
Background
The Community Development Department has an immediate need to provide electronic storage and
retrieval of many archived documents. The electronic retrieval system will allow immediate access to
all building and planning files for members of the Community Development Department via desktop
access. Following implementation, priorities will be identified to expand document imaging to other
departments, subject to available funding.
Operating
Budget Impacts
The Community Development Department collects permit fees, a portion of which will be used to offset
some costs for document storage.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 39
Project
Components &
Estimated Timeline
FY 2020/21 Production Continue document conversion of Building and Planning
Division files.
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from MIS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$
TOTAL SOURCE OF FUNDS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 198,011 - 16,990 - 16,990 - - - - 215,000
TOTAL GFAR 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$
TOTAL USE OF FUNDS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$
TOWN-WIDE DOCUMENT IMAGING PROJECT Project 841-6003
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 40
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Engineering Document Archiving
Project Number 821-2305
Department Parks & Public Works Project Manager Assistant PPW Director: Lisa
Petersen
Description This project will scan and archive all engineering record documents such as as-builts, federal and state
funded capital improvement projects, and recorded documents, all of which are currently stored in
paper format.
Location This project is located at the Engineering Services office (41 Miles Avenue).
Project Background Currently, most files are kept in a hard copy format in the Engineering Services office. These hard
copies have become damaged due to age and need to be preserved through archiving to maintain
pertinent records. By digitally archiving these documents, searching through records becomes much
more efficient. It is anticipated that this project will be implemented over several fiscal years, starting
in FY 2014/15 and completion estimated in FY 2020/21.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the
Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 41
Project
Components &
Estimated Timeline
Summer 2015 Design Project development
Fall 2015 Bid process Project bidding & contract award
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 8,284 40,000 11,716 - 11,716 - - - - 60,000
TOTAL GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
ENGINEERING DOCUMENT ARCHIVING Project 821-2305
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 42
Project Name Silicon Valley Regional Interoperability
Project (SVRIP) Service
Project Number 841-6305
Department Police Project Manager Captain D’Antonio
Description This project will update the existing police radio system infrastructure to be compatible with the
regional interoperability requirements.
Location Town of Los Gatos Civic Center Complex (110 E Main Street) and the Town of Los Gatos Police
Operations Building (15900 Los Gatos Boulevard).
Project Background The Silicon Valley Radio Interoperability Authority (SVRIA) in conjunction with the City Managers
Association and the County Chiefs Association is moving towards a program for regional
interoperability of public safety communications for police, fire services, and public works across all
jurisdictions. The Police Department, in conjunction with other public safety agencies within Santa
Clara County, will be contributing to radio system infrastructure for a period of three years to allow for
interoperability of public safety communications regionally.
Operating
Budget Impacts
Staff oversight of this SVRIP project will be included in the Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 43
Project
Components & Estimated Timeline
Summer 2015 Design Project development
Winter 2016 Bid process Project bidding & contract award
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 395,176$ 486$ 62,967$ -$ 62,967$ -$ -$ -$ -$ 458,628$
TOTAL SOURCE OF FUNDS 395,176$ 486$ 62,967$ -$ 62,967$ -$ -$ -$ -$ 458,628$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 395,176 486 62,967 - 62,967 - - - - 458,628
TOTAL GFAR 395,176$ 486$ 62,967$ -$ 62,967$ -$ -$ -$ -$ 458,628$
TOTAL USE OF FUNDS 395,176$ 486$ 62,967$ -$ 62,967$ -$ -$ -$ -$ 458,628$
SILICON VALLEY REGIONAL INTEROPERABILITY PROJECT (SVRIP) SERVICE Project 841-6305
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 44
TOWN-WIDE
Project Name EOC Communications Upgrade Project Number 841-6103
Department Town Manager Office/IT/PD Project Manager Assistant Town Manager, Arn
Andrews
Description This project upgrades identified deficiencies in the Town’s Emergency Operations Center (EOC)
communication capabilities.
Location The project will enhance the communication systems within the EOC to create better interoperability
between Town staff, Public Safety and citizen volunteers in the event of an emergency.
Project
Background
The recent wildfire disasters in California and lessons learned from prior Town emergency
preparedness exercises continue to identify a lack of adequate communications as a major flaw in
emergency responses. Without robust EOC communication capabilities the situational awareness
necessary to adequately assess, and respond to, an operational area in the event of an emergency is severely compromised. Staff is seeking to create multiple seamless communication channels between
the Town EOC, County EOC, Town Public Safety staff, Town PPW staff, Town CDD staff, and CERT
volunteers.
Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the FY
2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 45
Project
Components &
Estimated Timeline
Summer 2018 Design Project development
Fall 2018 Procurement Procurement of equipment and installation
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR 19,618$ 1,000$ 29,382$ -$ 29,382$ -$ -$ -$ -$ 50,000$
TOTAL SOURCE OF FUNDS 19,618$ 1,000$ 29,382$ -$ 29,382$ -$ -$ -$ -$ 50,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 19,618 1,000 29,382 - 29,382 - - - - 50,000$
TOTAL GFAR 19,618$ 1,000$ 29,382$ -$ 29,382$ -$ -$ -$ -$ 50,000$
TOTAL USE OF FUNDS 19,618$ 1,000$ 29,382$ -$ 29,382$ -$ -$ -$ -$ 50,000$
EOC COMMUNICATION UPGRADE Project 841-6103
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 46
TOWN-WIDE
Project Name IT Disaster Recovery Improvements Project Number 841-6104
Department IT Project Manager IT Manager: Chris Gjerde
Description This project upgrades the Town’s existing Information Technology infrastructure including windows
servers, storage, and network switches.
Location The project will enhance the IT systems used by all Town departments at all locations. Purchased
computer hardware will be located at 110 E. Main Street and 15900 Los Gatos Boulevard
Project
Background
Annually staff evaluates and replaces older servers and network infrastructure to ensure reliable
operation. In FY 2017/18, staff began an IT disaster recovery inventory, identifying many areas to
improve our disaster preparedness posture and increasing efficiencies with more modern
infrastructure design. These improvements to IT infrastructure require more than a simple staggered
replacement of a small percentage of servers. Improvements include Hypervisor Server Clusters and
Replication, redundant Storage Area Networks, and Public Cloud DR Data Center.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the FY
2020/21 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 47
Project
Components &
Estimated Timeline
Summer 2019 Design Project development
Fall 2019 Procurement Procurement of equipment and installation
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed Total Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from MIS 7,942$ 22,213$ 169,845$ -$ 169,845$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS 7,942$ 22,213$ 169,845$ -$ 169,845$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 7,942 22,213 169,845 - 169,845 - - - - 200,000
TOTAL GFAR 7,942$ 22,213$ 169,845$ -$ 169,845$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS 7,942$ 22,213$ 169,845$ -$ 169,845$ -$ -$ -$ -$ 200,000$
IT DISASTER RECOVERY IMPROVEMENTS Project 841-6104
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 48
Project Name Computer-Aided Dispatch and Records
Management System (CAD/RMS)
Project Number 841-6301
Department Police Project Manager Captain D’Antonio
Description This project upgrades the Police Departments current Computer Aided Dispatch and Records
Management System (CAD/RMS).
Location This project is located at Police Administration Building.
Project Background The Los Gatos Monte Sereno Police Department has an immediate need to replace its Computer Aided
Dispatch and Records Management System (CAD/RMS). The Los Gatos Monte Sereno Police
Department and the City of Sunnyvale have been in a cost sharing agreement since October 2016, and
the Town needs an independent system.
The Department seeks an integrated solution that offers the capability to comply with existing and
upcoming mandates, capture ongoing statistical data, accurately measure performance, better equip
first responders with relevant information, reduce report writing time, enhance internal cross-training,
and be technologically progressive. Enhancements will give CAD/RMS terminal access to sworn and
non-sworn support personnel, including physical access at two sites and mobile access in 14 vehicles.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the
Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 49
Project
Components &
Estimated Timeline
Spring 2019 Bid process Project bidding & contract award
Fall 2019 Procurement Procurement of equipment and installation
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
SOURCE OF FUNDS to 2020/21 (with Carryfwd)
GFAR
Transfer from Equipment Replacement 10,290$ 14,186$ 510,814$ -$ 510,814$ -$ -$ -$ -$ 535,290$
TOTAL SOURCE OF FUNDS 10,290$ 14,186$ 510,814$ -$ 510,814$ -$ -$ -$ -$ 535,290$
Prior Yrs
Actuals
2019/20
Estimated
Estimated
Carryfwd
2020/21
New Funding
2020/21
Budget
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
2024/25
Proposed
Total
Project
USE OF FUNDS to 2020/21 (with Carryfwd)
GFAR `
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 10,290 14,186 510,814 - 510,814 - - - - 535,290
TOTAL GFAR 10,290$ 14,186$ 510,814$ -$ 510,814$ -$ -$ -$ -$ 535,290$
TOTAL USE OF FUNDS 10,290$ 14,186$ 510,814$ -$ 510,814$ -$ -$ -$ -$ 535,290$
COMPUTER-AIDED DISPATCH AND RECORDS MANAGEMENT SYSTEM Project 841-6301
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E - 50
Reference
This Page Intentionally Left Blank
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 1
Accrual Basis Accounting - Under this accounting method, transactions are recognized when they occur,
regardless of the timing of related cash receipts and disbursements.
Adoption - Formal action by the Town Council which sets the spending limits for the fiscal year. The
Town's budget is adopted by Council resolution.
Appropriation - An authorization made by the Town Council that permits officials to incur obligations
against and to make expenditures of government resources. Appropriations are typically granted for a
one-year period.
Audit - Prepared by an independent Certified Public Accountant (CPA), the primary objective of an audit
is to determine if the Town's Financial Statements present fairly the Town's financial position and results
of operations in conformity with generally accepted accounting principles. In conjunction with its
performance of an audit, it is customary for an independent auditor to issue a Management Letter
stating the adequacy of the Town's internal controls as well as recommending improvements to the
Town's financial management practices.
Bonds - A bond is a written promise to pay a specified sum of money (called the face value or principal
amount) at a specified date or dates in the future (called the maturity date) together with period
interest at a specified rate. Bonds are typically used to finance capital facilities.
Budget - As the Town's financial operating plan for the fiscal year, the budget displays the estimated
expenditures (costs) for providing services and the estimated sources of revenue (income) to pay for
them. Once the Town Council adopts the budget, the total becomes the maximum spending limit. Los
Gatos' budget encompasses a single fiscal year (July 1 through June 30).
Budget Amendment - The Council has the sole responsibility for adopting the Town's budget and may
amend or supplement the budget at any time after adoption. The Town Manager has the authority to
approve administrative adjustments to the budget as outlined in the Financial and Administrative
Policies set by Council.
Budget Document - The official financial spending and resource plan submitted by the Town Manager
and adopted by the Town Council explaining the approved budget to the public and Town Council.
Budget Message - Included in the opening section of the budget, the Budget Message provides the
Council and the public with a general summary of the most important aspects of the budget,
comparative data from previous fiscal years, goals and objectives, and the views and recommendations
of the Town Manager.
Budget Overview - This section provides an overview of the changes adopted in the budget.
Additionally, the significant impacts of budgetary changes are outlined along with dollar amounts
(increase/decrease).
Budget Policies - General and specific guidelines adopted by the Council that govern the financial plan's
preparation and administration.
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 2
Capital or Community Improvements - Capital or community improvements are major construction,
acquisition, or maintenance/repair projects. Typical examples of major construction would include new
street improvements, park development, and public buildings. Acquisition includes land for parks and
open space. Major maintenance/repairs may include street resurfacing or modifications to public
buildings.
Capital Improvement Program (CIP) - The plan or schedule of expenditures for major construction of
roads, sidewalks, Town facilities, and/or park improvements and for the purchase of equipment. The
Town of Los Gatos' CIP follows a five-year schedule. Although the Town adopts the CIP budget in a
process which is separate from the adoption of the budget, the budget incorporates the first year of the
five-year CIP.
Capital Projects Fund - In governmental accounting, a fund that accounts for financial resources to be
used for the acquisition or construction of capital facilities. The total cost of a capital project is
accumulated in a single expenditures account which accumulates until the project is completed, at
which time the fund ceases to exist.
Capital Outlay - Expenditures which result in the acquisition of or additions to fixed assets. Examples
include land, buildings, machinery, equipment, and construction projects.
Capital Assets – See “Fixed Assets.”
Cash Basis Accounting - A basis of accounting under which transactions are recognized only when cash
is received or disbursed.
CDBG (Community Development Block Grant) - Federal grant funds distributed from the U.S.
Department of Housing and Urban Development that are passed through to the Town. The Town
primarily uses these funds for housing rehabilitation, public improvements, and local social programs.
Construction Tax - A construction tax is imposed upon the construction of any building, portion of a
building, or a mobile home lot. Construction by definition means either new construction or
enlargement. The taxes imposed are based upon a set rate per square foot as follows:
a) Capital Improvement Tax - $0.18 for each square foot of building addition or alteration
b) Underground Utility Tax - $0.18 for each square foot of building addition or alteration
c) Park Fund Tax - $0.04 for each square foot of building addition or alteration
Contingency - A budgetary reserve set aside for emergencies or unforeseen expenditures not otherwise
budgeted.
Contingent Liabilities - Items which may become liabilities of the Town but are undetermined at a given
date, such as pending lawsuits, unsettled disputed claims, unfilled purchase orders, and uncompleted
contracts.
Contract Services - Services provided to the Town from the private sector or other public agencies.
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 3
Contributed Capital - Resources which are extremely restricted for the acquisition or construction of
capital assets. This category includes, but is not limited to, capital grants, residual equity transfers in,
and contributions from developers.
Cost Allocation - A fair and equitable methodology for identifying and distributing direct and indirect
cost from a service provider to the service consumer. In the Town’s case, the general fund is the service
provider and the external funds are the service consumer.
Deficit - The excess of liabilities over assets.
Department - A major organizational unit of the Town that has been assigned overall management
responsibility for an operation or a group of related operations within a functional area.
Developer Fees and Permits - Fees that are charged for various development-related services or permits
based upon actual cost to the Town for providing the service or permit.
Documentary Transfer Tax - Imposed on the transfer of real property, exclusive of any lien or
encumbrance. The Town receives 50% of such revenue collected by Santa Clara County.
Encumbrance - Commitment against an approved budget for unperformed (executory) contract for
goods or services. Encumbrances cease when the obligation is paid or otherwise terminated. A
purchase order is a common encumbrance.
Expenditure - The outflow of funds paid or to be paid for an asset obtained or goods and services
obtained. An encumbrance is not an expenditure; an encumbrance reserves funds to be expended.
Fiscal Year - A 12-month period to which the annual operating budget applies and at the end of which
the Town determines its financial position and results of its operations. The Town’s fiscal year runs from
July 1 to June 30.
Five-Year Financial Forecast - Estimates of future revenues and expenditures to help predict the future
financial condition of the community.
Fixed Assets - Assets which are intended to be held or used for a long term, such as land, buildings,
improvements other than buildings, machinery and equipment.
Fund - An independent fiscal and accounting entity with a self-balancing set of accounts in which
financial transactions relating to revenues, expenditures, assets, and liabilities are recorded. Funds
other than the General Fund typically have a unique funding source and purpose. Establishing funds
enables the Town to account for the use of restricted revenue sources and carry on specific activities or
pursue specific objectives.
Fund Accounting - System used by non-profit organizations, particularly governments. Since there is no
profit motive, accountability is measured instead of profitability. The main purpose is stewardship of
financial resources received and expended in compliance with legal requirements.
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 4
Fund Balance - Also known as financial position, fund balance is the excess of current assets over
current liabilities and represents the cumulative effect of revenues and other financing sources over
expenditure and other financing uses.
GAAP - (Generally Accepted Accounting Principles) - Uniform standards for financial accounting and
reporting. They govern the form and content of the basic financial statements of the Town.
Gas Tax Fund - The Gas Tax Fund is used to account for revenues and expenditures apportioned under
the Streets and Highways Code of the State of California. Expenditures may be made for any street-
related purpose in the Town’s system of streets.
General Fund - In governmental accounting, fund used to account for all assets and liabilities of a non-
profit entity, except those particularly assigned for other purposes in another more specialized fund. The
General Fund is the primary operating fund of the Town.
General Government – Includes offices and departments to support the Town Council, Town Clerk,
Town Manager, Town Attorney, Town Treasurer, Human Resources, Finance, Community Development,
Police, Parks and Public Works, and Library functions.
General Liability Self Insurance Fund - The General Liability Self Insurance Fund is used to provide the
Town with liability and property insurance. Coverage is provided through the Town’s participation in a
joint powers agreement through the Association of Bay Area Governments (ABAG).
Grant - External contribution, and/or gift of cash, or other asset typically from another governmental
entity to be used or expended for a specific purpose, activity, or facility. An example is Community
Development Block grant funding from the federal government.
Housing Set-Aside Fund – This fund is used to account for the Redevelopment Agency’s 20% set-aside
property tax increment revenues and the associated expenditures to be used for increasing or improving
low and moderate income housing.
Improvements - Buildings, structures, or attachments to land such as sidewalks, trees, drives, tunnels,
drains, and sewers.
Intergovernmental Revenue - Revenue received from other governmental agencies and municipalities,
such as grants from the state or federal government.
Inter-Fund Transfers - When the Town moves money between its various funds, it makes an inter-fund
transfer, referred to as “transfers in” and “transfers-out.” In aggregate, transfers in and out offset each
other for the fiscal year.
Levy - (Verb) To impose taxes, special assessments, or service charges for the support of governmental
activities. (Noun) The total amount of taxes, special assessments, or service charges imposed by Santa
Clara County levying property taxes.
Licenses and Permits - Revenues earned by the issuance of licenses or permits levied in accordance with
the benefits conferred by the license or permit.
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 5
Lighting and Landscape Fund - The Town has formed six landscape and lighting district funds established
by written consent of the property owners owning all of the property within the boundaries of the
district.
Objective - A statement of specific direction, purpose, or intent based on the needs of the community
and the goals established for a specific program or service level.
Ordinance - A formal legislative enactment by the Town Council. It has the full force and effect of law
within Town boundaries unless pre-empted by a higher form of law. An Ordinance has a higher legal
standing than a Resolution and is typically codified in a Town's municipal code.
Operating Budget - The operating budget is the primary means by which most of the financing of
acquisition, spending, and service delivery activities of a government are controlled. The use of annual
operating budgets is required by law.
Personnel - Town staff.
Program - As subdivisions of departments, programs are budgetary or organizational units of
government with limited sets of work responsibilities within their respective departments. Programs
also serve to increase budgetary accountability. Los Gatos' budget is compiled on a program basis.
Property Tax – A tax Imposed on real property (land and permanently attached improvements). The tax
is based upon the assessed value of such property. The tax rate may not exceed 1% of assessed value.
Reserve - An account used to indicate that a portion of fund equity is designated, undesignated, or
legally restricted for a specific purpose.
Resolution - A special order of the Town Council, which has a lower legal standing than an ordinance.
Resources - Total amounts available for appropriation including estimated revenues, inter-fund
transfers, and beginning fund balances.
Revenue - Sources of income which the Town receives during a fiscal year. Examples of revenue include
taxes, intergovernmental grants, charges for services, resources forwarded from the prior year,
operating transfers for other funds, and other financing sources such as the proceeds derived from the
sales of fixed assets.
Revenue Estimate - A formal estimate of how much revenue will be earned from a specific revenue
source for some future period; typically, a fiscal year.
Road Impact Fees - Pursuant to Article III of Chapter 15 of the Town Code, the Town collects road
impact fees to finance road construction and maintenance projects throughout the town. Article IX of
Chapter 15 authorizes the establishment of special fund accounts known as Road Impact #1, Road
Impact #2, and Road Impact #3, into which all such fees are deposited. Because the road systems
generally follow drainage patterns, the existing drainage basin map boundaries are used to track and
expend funds for road construction and maintenance.
PROPOSED REFERENCE SECTION
Glossary of Terms
F - 6
The amount of each fee collected is based on an estimate of the weight of the loads to be hauled to or
from the project and the weight of heavy vehicles to be used in connection with the project. The fee is
collected for Building Permits, Grading and Landscape Permits, Improvement Contracts, and
Encroachment Permits. Money collected from such fees is to be used solely for design, construction,
and repair of Town streets and installation of sidewalk curb cut ramps when such a requirement is
triggered by the level of work as provided by the Americans with Disabilities Act, within the prescribed
area. Projects will be brought forward on an as-needed basis.
SA Trust Fund – Fund used to account for the proceeds of notes, and other forms of indebtedness, and
the expenditure of these funds to pay the debt, administrative services and projects with the specified
boundaries of the Successor Agency of the Town of Los Gatos Redevelopment Agency.
Sales Tax – 1% of taxable sales is returned to the Town by the State Board of Equalization on a monthly
direct deposit basis. Under the “Triple Flip” agreement, 0.25% of the 1% is now received in association
with property tax but remains sales tax in substance.
Special Revenue Fund - In governmental accounting, a fund used to account for the proceeds of a
special revenue source (other than special assessments, expandable trusts, or for major capital projects)
that are legally restricted to expenditure for a specified purpose.
Service Charge - Charges for specific services rendered.
Services and Supplies - Expenditures for services and supplies which are directly related to a
department's primary service activities.
State Gas Tax Funds - Portions of the tax rate per gallon levied by the State of California on all gasoline
purchases are allocated to cities throughout the state. These funds are restricted to expenditures for
transit and street-related purposes.
Supplemental Appropriation - An appropriation approved by the Council after the initial budget is
adopted.
Taxes - Compulsory charges levied by the Town, county, or state governments for the purpose of
financing services performed for the community’s benefit.
Town Code - A legal compilation of Town Council-approved ordinances currently in effect. The code
defines Town policy with respect to areas such as planning, etc.
Transfers In/Out - Money transferred from one Town fund to another. Differs from revenues and
expenses - see definition of these terms, above.
PROPOSED REFERENCE SECTION
Index
F - 7
Financial Summaries – by Fund
Total CIP Fund Summary .................................................................................................................. B – 9
Fund 411 - GFAR Fund ..................................................................................................................... B – 10
Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12
Fund 421 – Grants Fund................................................................................................................... B – 14
Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16
Fund 472 – Utility Underground Fund ............................................................................................. B – 18
Fund 481 – Gas Tax Fund ................................................................................................................. B – 20
Financial Summaries – by Program
Streets Program ............................................................................................................................... B – 5
Parks Program .................................................................................................................................. B – 5
Public Facilities Program .................................................................................................................. B – 6
Glossary .................................................................................................................................................. F – 1
FY 2019/20 Completed oo Withdrawn CIP Projects .............................................................................. A – 9
Parks Program - Park Improvement Projects
Creek Trail & Parks Pathway & Parking Lot Seal Coat & Striping ................................................... D – 8
Outdoor Fitness Equipment ............................................................................................................. D – 12
Parks Playground Fibar Project ........................................................................................................ D – 6
Town Plaza Turf Repairs .................................................................................................................. D – 10
Vegetation Management – Town-wide .......................................................................................... D – 14
Parks Program – Trail Improvement Projects
Charter Oaks Trail Repair ................................................................................................................. D – 24
Forbes Mill Footbridge Improvements ............................................................................................ D – 22
Open Space Trail Upgrades .............................................................................................................. D – 20
Trailhead Connector Project ............................................................................................................ D – 26
Public Facilities Program – Equipment Projects
Audio/Video System Upgrade ......................................................................................................... E – 36
Computer-aided Dispatch and records Management Systems (CAD/RMS) .................................... E – 48
Engineering Document Archiving .................................................................................................... E – 40
EOC Communication Upgrade ......................................................................................................... E – 44
Information System Upgrade .......................................................................................................... E – 34
IT Disaster Recovery Improvements ................................................................................................ E – 46
Silicon Valley Radio Interoperability Project (SVRIP) Services ......................................................... E – 42
Town-Wide Document Imaging Project .......................................................................................... E – 38
Public Facilities Program – Infrastructure Projects
ADA Upgrade Public Restrooms – Adult Recreation Building ......................................................... E – 14
ADA Restrooms and HR Offices ....................................................................................................... E – 16
Adult Recreation Center – Floor Repair ........................................................................................... E – 28
PROPOSED REFERENCE SECTION
Index
F - 8
Building Replacement at Corporation Yard ...................................................................................... E – 6
Facilities Assessment. ....................................................................................................................... E – 8
Fire Suppression (Halon) for Server Rooms ..................................................................................... E – 24
Library Carpet Replacement ............................................................................................................ E – 10
Plaza Level Railings – Code Upgrade ............................................................................................... E – 18
Police Headquarters Roof Repair ..................................................................................................... E – 26
Sound Mitigation Library Lobby ....................................................................................................... E – 22
Town Beautification ......................................................................................................................... E – 12
Waterproofing – Town-wide ........................................................................................................... E – 20
Streets Program - Bridge Projects
Highway 17 Bicycle & Pedestrian Bridge – Design .......................................................................... C – 88
Quito Road - Bridge Replacement ................................................................................................... C – 86
Street Program - Street Improvement Projects
ADA Transition Plan ........................................................................................................................ C – 62
Annual Storm Drain Improvement Project ..................................................................................... C – 58
Bicknell Road Storm Drain Improvements ....................................................................................... C – 46
Bicycle & Pedestrian Improvements ................................................................................................ C – 48
Blossom Hill Road Traffic Study ....................................................................................................... C – 72
Downtown Parking Lots Seal Coat & Restriping .............................................................................. C – 34
Downtown Streetscape Revitalization ............................................................................................. C – 66
E. Main Street Speed Table/Raised Crosswalk ................................................................................ C – 68
Hernandez Avenue Storm Drain Improvements ............................................................................. C – 36
Highway 17/9 Interchange and Capacity Improvements. ............................................................... C – 64
Kennedy Sidewalk – LGB to Englewood........................................................................................... C – 78
Local Road Safety Plan ..................................................................................................................... C – 70
Parking Program Implementation ................................................................................................... C – 56
Pilot School Busing ........................................................................................................................... C – 60
Public Arts Gateway ......................................................................................................................... C – 54
Shannon Road Class 1 Multi-Use Path ............................................................................................. C – 38
Sidewalk Improvements – Multiple Locations ................................................................................. C – 40
Stormwater Master Plan .................................................................................................................. C – 50
Stormwater System – Pollution Prevention Compliance ................................................................ C – 52
Traffic Signal Modernization ............................................................................................................ C – 44
Utility Undergrounding Improvements ........................................................................................... C – 42
VMT Mitigation Program ................................................................................................................. C – 76
Winchester Boulevard Complete Streets Final Design .................................................................... C – 80
Winchester Class IV Bikeway ........................................................................................................... C – 74
PROPOSED REFERENCE SECTION
Index
F - 9
Streets Program - Street Reconstruction & Resurfacing Projects
Street Repair & Resurfacing ............................................................................................................. C – 6
Streets Program - Street Repairs, Maintenance & Safety Projects
Annual Street Restriping .................................................................................................................. C – 18
Curb, Gutter & Sidewalk Maintenance ............................................................................................ C – 14
Guardrail Replacement Projects ...................................................................................................... C – 20
Massol Intersection Improvements ................................................................................................. C – 22
Parking Lot 4 Repair & Waterproofing ............................................................................................ C – 28
Retaining Wall Repairs ..................................................................................................................... C – 16
Roadside Fire Fuel Reduction .......................................................................................................... C – 26
Shannon Road Repair ...................................................................................................................... C – 24
Traffic Calming Project ..................................................................................................................... C – 12
Town Manager’s Message .................................................................................................................... A – 1
PROPOSED REFERENCE SECTION
Index
F - 10
This Page Intentionally Left Blank