Loading...
05 Staff Report - CTS PREPARED BY: Lisa Petersen Assistant Director of Parks and Public Works / Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Director of Parks and Public Works 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 05/19/2020 ITEM NO: 5 DATE: May 14, 2020 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Authorize the Town Manager to Amend the Agreement for Consultant Services with Construction Testing Services (CTS) for Materials Testing Services for the Annual Street Repair and Resurfacing Projects (19-811-9901) in an Amount Not to Exceed $94,000 RECOMMENDATION: Authorize the Town Manager to amend an Agreement for Consultant Services with Construction Testing Services (CTS) for materials testing services for the Annual Street Repair and Resurfacing Projects (19-811-9901) in an amount not to exceed $94,000. BACKGROUND: The Town’s adopted FY 2019/20 Capital Improvement Program (CIP) Budget designates funding for the Town’s Street Repair and Resurfacing Program. This is a recurring annual project for street rehabilitation activities throughout the Town to enhance safety for all travel modes and maintain the roadway infrastructure in Los Gatos. It is important for the Town to complete the annual street maintenance projects each year to prevent Town streets from falling into more expensive repair categories. The Town annually hires a materials testing consultant to monitor compliance of construction materials for the Annual Street Repair and Resurfacing projects (Asphalt Overlay and Slurry Seal/Rubber Cape Seal) and the Annual Curb, Gutter, and Sidewalk project. A consultant from the Town’s On-Call Materials Testing Services list submits a quote to perform the work and a final cost is negotiated with the Town. PAGE 2 OF 3 SUBJECT: Authorize the Town Manager to Amend the Agreement for Consultant Services with Construction Testing Services for Materials Testing Services for the Annual Street Repair and Resurfacing Projects 19-811-9901 in an Amount Not to Exceed $94,000 DATE: May 14, 2020 DISCUSSION: The Town initially prepared an agreement with CTS to perform testing for the Annual Curb, Gutter, and Sidewalk project and Annual Street Repair and Resurfacing (Slurry Seal/Rubber Cape Seal) project in the amount of $46,532. Further testing is required for the third related project occurring this summer, the asphalt overlay project. Additional quotes were requested and negotiated with CTS to perform additional materials testing. CTS has already performed materials testing for the Annual Curb, Gutter, and Sidewalk project. If the Town Council approves the additional funding for the contract with CTS, it is anticipated that the work would begin immediately with the start of the asphalt overlay and slurry seal/ rubber cape seal projects. CONCLUSION: Authorize the Town Manager to amend the Agreement for Consultant Services with Construction Testing Services for materials testing services for the Annual Street Repair and Resurfacing Projects (19-811-9901) in an amount not to exceed $94,000. COORDINATION: This project has been coordinated with the Finance Department. FISCAL IMPACT: The fiscal table below highlights the actual bids received for the upcoming slurry seal and overlay projects. The projects have sufficient funding for the agreement with Construction Testing Services (CTS) for materials testing services. PAGE 3 OF 3 SUBJECT: Authorize the Town Manager to Amend the Agreement for Consultant Services with Construction Testing Services for Materials Testing Services for the Annual Street Repair and Resurfacing Projects 19-811-9901 in an Amount Not to Exceed $94,000 DATE: May 14, 2020 FISCAL IMPACT (continued): Street Repair & Resurfacing Project 811-9901 Budget Costs GFAR $3,681,401 Gas Tax $1,064,292 Prior Reimbursements $64,865 Anticipated Reimbursement - Monte Sereno $47,000 Anticipated Reimbursement - WVSD & SJW $130,000 Total Budget $4,987,558 Overlay $1,484,264 Slurry Seal $1,880,515 10% Contingency $336,478 Construction Testing Services (CTS) $94,000 Contract Inspection $50,000 Total Expenditures $3,845,256 Remaining Balance $1,142,302 Staff Costs Operating Budget (Full time with benefits) $292,000 Total $292,000 ENVIRONMENTAL ASSESSMENT: This is not a project defined under CEQA, and no further action is required. Attachment: 1. Amendment to the Agreement