Item 3 - Exhibit 01 - Town of Los Gatos Draft Proposed CIP for Fiscal Years 2019-2020 to 2023-2024Fiscal Years 2019/20 – 2023/24
Capital Improvement Program Projects
EXHIBIT 1
This page left intentionally blank
Streets Program
STREETS PROGRAM DIRECTORY PROPOSED
C-1
STREET RECONSTRUCTION AND RESURFACING PROJECTS PAGE
9901 Street Repair & Resurfacing C – 6
0003 Almond Grove Street Rehabilitation Project C – 10
STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS
9910 Traffic Calming Projects C – 16
9921 Curb, Gutter & Sidewalk Maintenance C – 18
9930 Retaining Wall Repairs C – 20
9902 Annual Street Restriping C – 22
0120 Guardrail Replacement Projects C – 24
0236 Massol Intersection Improvement C – 26
STREET IMPROVEMENT PROJECTS
0213 Los Gatos Boulevard/Shannon Road Improvements C – 32
0705 Downtown Parking Lots Seal Coat & Restriping C – 34
0409 Hernandez Avenue Storm Drain Improvements C – 36
0704 224 West Main Property Acquisition (Parking Lot 6) C – 38
0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 40
0221 Sidewalk Improvements – Multiple Locations C – 42
0225 Utility Undergrounding Improvements C – 44
0229 Cut – Through Traffic/Wood Road Roundabout C – 46
0227 Traffic Signal Modernization C – 48
0410 Bicknell Road Storm Drain Improvements C – 50
0231 Bicycle & Pedestrian Improvements C – 52
0413 Stormwater Master Plan C – 54
0414 Stormwater System – Pollution Prevention Compliance C – 56
0232 Public Arts Gateway C – 58
0233 Downtown Parking Study C – 60
0234 One-Way Downtown Street Pilot C – 62
0420 Annual Storm Drain Improvements C – 64
0128 Pilot School Busing C – 66
0129 ADA Transition Plan C – 68
0237 Highway 17/9 Interchange and Capacity Improvements C – 70
0235 Downtown Revitalization C – 72
BRIDGE PROJECTS
0801 Quito Road – Bridge Replacement C – 78
0803 Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design C – 80
PROPOSED STREETS PROGRAM
C - 2
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 3
PROJECT LOCATIONS
A Street Repair & Resurfacing
B Almond Grove Street Rehabilitation Project
LO
S
G
A
T
O
S
-
S
A
R
A
T
O
G
A
R
D
LOS GATOS BLVDE MAIN STHWY 17HWY 17N SANTA CRUZ AVWINCHESTER BLVDBLOSSOM HILL RDLOS GATOS BLVDHW
Y
8
5
KENNE
D
Y
R
D
SHA
N
N
O
N
R
D
LA
R
K
A
V
LOS GATOS-ALMADEN RD
UNIVERSITY AVWEDGEWOOD
KNOWLES
B
"A" IS A TOWN-WIDE PROJECT HICKSRD
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 4
PROGRAM SECTION DIRECTORY PAGE
9901 Street Repair & Resurfacing C – 6
0003 Almond Grove Street Rehabilitation Project C – 10
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 5
The Streets Program’s Street Reconstruction & Resurfacing section contains Capital Improvement Program projects that
resurface or repave the Town’s streets as the primary scope of work. Projects may also encompass minor components of
streetscape or street improvements; however, to be categorized in the Street Reconstruction & Resurfacing section,
projects must have pavement rehabilitation as their main purpose. Safety issues, traffic levels, the Pavement Condition
Index, available funding sources, project costs, and community impacts are all considerations in prioritizing Street
Reconstruction & Resurfacing projects in the five-year Capital Improvement Program.
This section contains an annual ongoing street rehabilitation project as well as an identified one-time project. The
dedicated ongoing funding sources for street repair are the Gas Tax, which was increased by SB 1, and Proposition 42,
which total approximately $1.2 million for FY 2019/20. In addition, Countywide Measure B (Nov 2016) increased the sales
tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of
funds for roadway maintenance. The Los Gatos annual allocation will be $580,633. Additional sources include grant
funding, if secured, such as state programs that focus on funding specific street categories or that funds rehabilitation of
specific arterial or collector streets.
Other than the funds mentioned above, Los Gatos has limited designated funding sources for maintaining the Town’s
roadway system. The Town has a Construction Impact Fee (approximately $110,000 annually) and a Refuse Vehicle Road
Impact Fee (approximately $610,000 annually). Both of these sources recover costs for additional street and roadway
repairs due to the disproportionate amount of wear and tear caused by construction and other heavy vehicles.
STREET RECONSTRUCTION & RESURFACING PROJECTS SUMMARY
* Total FY 2018/19 Carryforward $4,233,230
Carryforward Projects
9901 Street Repair & Resurfacing 9,882,879$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,576,122$
0003 Almond Grove Street Rehabilitation 11,560,389 2,501,701 - - - - 14,062,090
New Projects
Total Street Reconstruction Projects 21,443,268$ 8,471,000$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 41,638,212$
2022/23
Budget
2020/21
Budget
2021/22
Budget
Expended Through
2018/19
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
STREET RECONSTRUCTION PROJECTS
Total
Budgeted
2019/20 Budget &
Carryfwd*
2023/24
Budget
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 6
Town Wide
Project Name Street Repair & Resurfacing Project Number 811-9901
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description
This is an ongoing annual project for street rehabilitation throughout Town to enhance vehicle safety
and to maintain the Town’s roadway infrastructure.
Location This project occurs in various locations including Town-wide arterials, collectors, and neighborhood
streets. To meet the SB1 requirements, every year the Council adopts a resolution identifying the
streets needing repair. The final streets for the current construction season are identified at the time
the specifications are brought forward for Council approval, which generally occurs in the spring.
Project
Background
Street rehabilitation projects are identified and prioritized according to pavement quality reflected by
the Pavement Condition Index (PCI), field inspection, traffic level, and safety issues. Every four years,
the Town conducts a full assessment on the condition of the streets through a consultant who
specializes in the field. This assessment is funded through a grant from the Metropolitan
Transportation Commission. The PCI information that results from the survey feeds into a street
maintenance software program called StreetSaver. Every jurisdiction in the Bay Area uses the same
program and methodology, making it the best practice in the industry.
With the PCI information in the StreetSaver database, the program can provide future high-level
maintenance programs for the Town. The program emphasizes maintaining streets that have a good
(above 70) PCI at that level as ongoing preventive maintenance is more cost efficient than allowing
streets to reach lower PCI levels. As with many computer-generated reports, the output requires
some validation and adjustment. Staff conducts this element of the work through field observations
and consideration of project proximity, all with an eye towards maximizing the value to the Town.
The resulting list, sized to the available budget, creates the annual list of streets for this project.
Historically, the Town invested approximately $11.7 million from FY 2000/01 to FY 2007/08 to
address the backlog of deferred street maintenance. This investment raised the average PCI of Town
streets from 64 in 2001 to nearly 74 in 2008. Due to budget challenges that followed, Town streets
have been resurfaced by the application of a rubber cape seal or a slurry seal. This method is
typically utilized for streets in better condition to provide a seal to the surface below. The solution is
cost effective and can provide some limited protection to streets in worse condition, but for a shorter
timeframe.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 7
For the streets with a lower PCI, an asphalt overlay is often the preferred solution with the best
return on investment over time. Costs are much higher for this approach.
The Town has focused its resources on arterials and collector streets and has used a rubber cape seal
and slurry seal. This approach was also the most economical and prudent treatment to resurface
several residential neighborhoods.
The dedicated ongoing funding sources for street repair are the Gas Tax, which was increased by SB 1,
and Proposition 42, which total approximately $1,200,000 for FY 2019/20.
In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½
cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic
distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633.
As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA)
assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. Eighty percent of
the revenues collected by the VTA are returned to the local municipality in which they were
generated. The remaining twenty percent is used for regional and County-wide projects. This
funding source is expected to generate approximately $180,000 annually for Los Gatos, which will be
used for street rehabilitation Town-wide.
Other than the annual revenues mentioned above, Los Gatos has limited designated funding sources
for maintaining the Town’s roadway system. The Town has a Construction Impact Fee (approximately
$110,000 annually) and a Refuse Vehicle Road Impact Fee (approximately $610,000 annually). Both
of these sources recover costs for additional street and roadway repairs due to the disproportionate
amount of wear and tear caused by construction and other heavy vehicles.
Operating
Budget Impacts
Conducting preventive maintenance on the Town’s roadways extends the life of the streets and
reduces the need for extensive reconstruction in the future, reducing staff time spent on road
maintenance. Engineering staff time for project design and oversight is addressed in the FY 2019/20
Operating Budget.
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 8
Project
Components &
Estimated
Timeline
Fall 2019 Design Prepare plans and specifications
Winter 2020 Bid Process Council approves plans and authorizes bidding the project
Summer 2020 Construction Council awards the contract and construction process begins
Fall 2020 Completion Project completed
Senate Bill 1 (2017-2018, Beall) Road Repair and Accountability Act project list:
Location Description Scheduled
Completion
Estimated
Useful Life
Knowles from Dardanelli to Dell
Pollard from Dell to West Parr
Placement of rubber cape seal or overlay to
maintain pavement surface. These are arterial
roads and are critical for transit needs in the
Town.
Fall 2020 10 - 25
years
Winchester from Lark to Santa Cruz Placement of rubber cape seal or overlay to
maintain pavement surface. This is an arterial
road and is critical for transit needs in the
Town.
Fall 2021 10 - 25
years
Union Avenue from Blossom Hill Road
to Los Gatos-Almaden Road
Placement of rubber cape seal or overlay to
maintain pavement surface. This is an arterial
road and is critical for transit needs in the
Town.
Fall 2022 10 - 25
years
Quito Road from Bicknell to Woodbank Placement of rubber cape seal or overlay to
maintain pavement surface. This is a collector
road and is critical for transit needs in the
Town.
Fall 2023 10 - 25
years
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Vehicle License Fee - 2010 Measure B 311,629$ 674,411$ 75,088$ 180,000$ 255,088$ 180,000$ 180,000$ 180,000$ 180,000$ 1,961,128$
VTA Allocation - 2016 Measure B - - 1,161,326 580,663 1,741,989 580,663 580,663 580,663 580,663 4,064,641
Other GFAR 2,515,079 76,349 495,115 2,267,053 2,762,168 865,676 991,800 991,800 991,800 9,194,672
Total GFAR 2,826,708$ 750,760$ 1,731,529$ 3,027,716$ 4,759,245$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 15,220,441$
GAS TAX & PROP 42
Road Maintenance and Rehabilitation Account (RMRA) -$ 520,002$ -$ 506,497$ 506,497$ 506,497$ 506,497$ 506,497$ 506,497$ 3,052,487$
Other Gas Tax & Prop 42 4,729,430 1,055,979 - 703,557 703,557 703,557 703,557 703,557 703,557 9,303,194
TOTAL GAS TAX & PROP 42 4,729,430$ 1,575,981$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,355,681$
TOTAL SOURCE OF FUNDS 7,556,138$ 2,326,741$ 1,731,529$ 4,237,770$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,576,122$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 2,826,708 750,760 1,731,529 3,027,716 4,759,245 1,626,339 1,752,463 1,752,463 1,752,463 15,220,441
TOTAL GFAR 2,826,708$ 750,760$ 1,731,529$ 3,027,716$ 4,759,245$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 15,220,441$
GAS TAX & PROP 42
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 4,729,430 1,575,981 - 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 12,355,681
TOTAL GAS TAX & PROP 42 4,729,430$ 1,575,981$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,355,681$
TOTAL USE OF FUNDS 7,556,138$ 2,326,741$ 1,731,529$ 4,237,770$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,576,122$
STREET REPAIR & RESURFACING Project 811-9901
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 9
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 10
Project Name Almond Grove Street Rehabilitation
Project Number 811-0003
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project provides design and construction for the rehabilitation of street infrastructure in the
Almond Grove District.
Location This project is located within the former Almond Grove District Redevelopment Area.
Project
Background
The streets in the Almond Grove District have deteriorated over the years and due to funding and
maintenance constraints, no repairs or resurfacing activities have been performed. The proposed
project to rehabilitate the street infrastructure in this area will not only provide safe and functional
streets and sidewalks for the community, but also reduce trip and fall accidents. Due to the scale and
magnitude of this project, proposed street rehabilitations will be phased over several years to
minimize construction impacts to the community and to reflect project funding as determined by the
Town Council.
Phase 1 of this project included Bachman Avenue and Broadway Avenue. Construction started in
Summer 2016 and was substantially complete in the fall of 2016 with minor project close out work
continuing into the spring of 2017. The Almond Grove Phase 2 project addresses the eight additional
streets in the project, with project bidding completed in April 2017 and construction beginning in the
summer of 2017 and continuing over the next two summer construction seasons. Construction bids
for this project were very favorable to the Town. The Council awarded the bid in April 2017 allowing
for approximately $2.9M in savings within the project.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Operating costs
associated with this project will be reimbursed from the project budget. Project delivery costs for
phase one of this project are included in the CIP project’s total cost, and are estimated at 8% of the
construction cost. Project delivery costs for Phase 2 of the project are included in the CIP project’s
total cost and are estimated at 12% for this more complex part of the project.
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 11
Project
Components &
Estimated
Timeline
Summer 2016 Construction Phase 1 project construction
Fall 2016 Completion Phase 1 project completion & closeout
Winter 2017 Design Phase 2 Completion of plans and specifications
Spring 2017 Bid process Phase 2 Council approves plans and authorizes bidding the
project
Summer 2017 Construction Phase 2 project construction
Summer 2018 Construction Phase 2 project construction
Summer 2019 Construction Phase 2 project construction
Winter 2020 Project Closeout Phase 2 project closeout
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$
TOTAL SOURCE OF FUNDS 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 8,491,003 3,069,386 2,501,701 - 2,501,701 - - - - 14,062,090
TOTAL GFAR 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$
TOTAL USE OF FUNDS 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$
ALMOND GROVE STREET REHABILITION PROJECT Project 811-0003
PROPOSED STREETS PROGRAM
Street Reconstruction & Resurfacing
C - 12
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-13
PROJECT LOCATIONS
A Traffic Calming Projects
B Curb, Gutter & Sidewalk Maintenance
C Retaining Wall Repairs
D Annual Street Restriping
E Guardrail Replacement Project
F Massol Intersection Improvements
PAGE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-14
PROGRAM SECTION DIRECTORY
9910 Traffic Calming Projects C – 16
9921 Curb, Gutter & Sidewalk Maintenance C – 18
9930 Retaining Wall Repairs C – 20
9902 Annual Street Restriping C – 22
0120 Guardrail Replacement Project C – 24
0236 Massol Intersection Improvements C - 26
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-15
The Streets Program’s Street Repair, Maintenance & Safety Projects section contains Capital Improvement Program projects
that repair, maintain, or enhance safety features of the Town’s streets and parking lots as the primary scope of work.
Projects may also encompass minor components of streetscape or street improvements; however, to be categorized in this
section, street repair, maintenance, or safety enhancements must be the project’s main purpose. Safety issues, available
funding sources, project costs, and community impacts are all considerations in prioritizing Street Repair, Maintenance &
Safety projects in the five-year Capital Improvement Program.
This section contains annual ongoing projects as well as one-time projects. GFAR funding is utilized for the Traffic Calming
Projects, which are funded at $10,000 annually. The Annual Street Restriping Project is funded at $25,000 per year. The
Curb, Gutter, and Sidewalk Maintenance Project is funded at $300,000 per year. The Retaining Wall Repairs Project is
typically funded with an ongoing GFAR stream of $100,000 per year. While annual appropriations are planned for these
ongoing projects, funding adjustments may occur from year to year to align with changing priorities and schedules.
One-time projects are prioritized by safety factors, community impacts, and the availability of grant funding. GFAR funds
may also be utilized to fund a portion of grant driven projects as a grant’s local “match requirement.”
Los Gatos does not have an ongoing designated funding source for repairing, maintaining, and improving the Town’s
roadway system.
STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS SUMMARY
Carryforward Projects
9910 Traffic Calming Projects 96,653$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$
9921 Curb, Gutter & Sidewalk Maintenance 1,262,888 1,237,113 300,000 300,000 300,000 300,000 3,700,001
9930 Retaining Wall Repairs 834,200 437,124 100,000 100,000 100,000 100,000 1,671,324
9902 Annual Street Restriping 61,106 144,772 25,000 25,000 25,000 25,000 305,878
0120 Guardrail Replacement Projects 130,583 1,073,143 - - - - 1,203,725
New Projects
0125 Massol Intersection Improvements - 450,000 - - - - 450,000
Total Maintenance & Safety Projects 2,385,429$ 3,361,651$ 435,000$ 435,000$ 435,000$ 435,000$ 7,487,080$
STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS
2022/23
Budget
Expended Through
2018/19
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
Total
Budgeted
2023/24
Budget
2020/21
Budget
2021/22
Budget
2019/20 Budget &
Carryfwd*
* Total FY 2018/19 Carryforward $896,551
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-16
Project Name Traffic Calming Projects Project Number 812-9910
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description In accordance with the Town’s Traffic Calming Policy, this project involves conducting minor traffic
studies, developing and implementing traffic improvements, and installing roadway devices to further
enhance school pedestrian and roadway safety near high-use crosswalks.
Location In FY 2019/20, funds will be used to determine if Massol Avenue between Bean and Nicholson and/or
Shannon Road from Los Gatos Boulevard to Short Road meet the criteria to qualify for the
Neighborhood Traffic Calming Program (NTCP). If both qualify, the Massol area will be processed first.
The process begins with neighborhood meetings for staff to work with residents to develop a
temporary traffic calming plan (TTCP). Staff will then poll the residents to determine if the devices
should be installed as temporary devices. If a super majority supports the TTCP, staff will have the
proposed devices installed. Four to six months after installation, staff will conduct another traffic
study in the area to determine the effectiveness of these devices. Upon the completion of this study,
staff will poll the residents to determine if the devices should be made permanent. If necessary, funds
will be used to remove these devices. Any remaining funds within this project will be used to
complete the same process for Shannon Road.
Project
Background
In 2002, the Town implemented a Traffic Calming Policy to address and mitigate neighborhood traffic
and pedestrian safety issues, such as speeding and cut-through traffic. This program relies on
residents to bring projects forward at the neighborhood level. At the time the Policy was adopted,
twelve project areas were under review for traffic calming improvements. To date, 14 projects have
been processed, completed, or closed. Traffic calming improvements such as speed bumps, traffic
circles, center medians, and bulb-outs were installed where appropriate to slow vehicles or enhance
pedestrian safety.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as they are
identified and delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-17
Project
Components &
Estimated Timeline
Summer 2019 Determine if Massol and/or Shannon qualify for Neighborhood Traffic Calming
Program
Fall 2019 Schedule, notify residents and hold Neighborhood Traffic Calming meeting(s)
for Massol Avenue
Winter 2020 Additional meeting(s), if needed, poll Massol Avenue residents
Spring 2020 Solicits bids and schedule pilot installation for Massol Avenue
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$
TOTAL SOURCE OF FUNDS 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 57,866 38,787 9,499 10,000 19,499 10,000 10,000 10,000 10,000 156,152
TOTAL GFAR 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$
TOTAL USE OF FUNDS 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$
TRAFFIC CALMING PROJECTS Project 812-9910
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-18
TOWN-WIDE
Project Name Curb, Gutter, & Sidewalk Maintenance Project Number 813-9921
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This is an ongoing annual project for the repair and replacement of hazardous curbs, gutters, and
sidewalks throughout Town to enhance pedestrian and bicyclist safety and to improve water runoff
infrastructure.
Location Curb, gutter, and sidewalk repair projects occur throughout the Town based on priority needs.
Project
Background
Curb, gutter, and sidewalk improvements in public parking lots and rights-of-way have historically
been funded by the Town. The intent of this project is to keep pace with the deterioration of
sidewalks and curbs. Specific project locations are identified and prioritized based on the level of
damage and accompanying potential safety issues.
The primary source of damage to sidewalks, curbs and gutters is tree root intrusion. Most of the
streets in Town have mature trees in the planter areas between the sidewalks and curbs. These trees
were planted many years ago without consideration of root growth and its impacts to the sidewalk,
curb, and street. Over time, the tree roots cause cracks and raised concrete, leading to uneven
surfaces. Staff develops an annual plan for sidewalk repair based on the level of damage as observed
and reported by staff and residents, confirmed by staff inspection. The level of repair and
maintenance performed in any given year has been limited by available annual funding. Funds are
utilized predominantly to address locations where paving projects create a requirement for curb
ramps and curb and gutter repair.
In addition to sidewalk, curb and gutter maintenance, this project is used for installing Americans
with Disabilities Act (ADA) accessible curb ramps on Town streets as required by federal law following
Town street maintenance projects. Title II of the ADA obligates a jurisdiction to provide compliant
curb ramps whenever streets are resurfaced from one intersection to another. ADA compliance has
required a substantial portion of the annual funding allocation. To address some of the unmet needs,
staff has recommended increasing the allocation one-time by $600,000.
Operating
Budget Impacts
Potential trip and fall injuries and lawsuits against the Town should be reduced by eliminating
hazardous curb, gutter, and sidewalk conditions. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-19
Project
Components &
Estimated Timeline
Winter 2020 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$
TOTAL SOURCE OF FUNDS 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 1,090,848 172,040 337,113 900,000 1,237,113 300,000 300,000 300,000 300,000 3,700,001
TOTAL GFAR 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$
TOTAL USE OF FUNDS 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$
CURB, GUTTER & SIDEWALK MAINTENANCE Project 813-9921
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-20
TOWN-WIDE
Project Name Retaining Wall Repairs Project Number 815-9930
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description The Retaining Wall Repair and Replacement Program focuses on the repair and/or replacement of
retaining walls that have become structurally deficient.
Location Retaining wall repair projects are identified throughout the Town and are prioritized in order of repair
based on safety issues, roadway impacts, retaining wall damage, and project costs.
Project
Background
Retaining walls are installed to hold a hillside from sliding and are placed alongside a street at
strategic locations where hillside erosion is anticipated. If the retaining wall fails, the street
subsequently fails; therefore, it is important to maintain the retaining walls as they are an integral
part of the hillside roadway system. Some existing retaining walls have reached the end of their
serviceable life and require replacement. Hillside locations are prioritized over smaller roadside
embankments in accordance with the potential impacts from failures.
Retaining walls are visually inspected annually; however, unanticipated weather events can quickly
erode a wall’s integrity and cause failure. Town staff continues to monitor and schedule retaining wall
installation and replacement as needed.
Operating
Budget Impacts
Once repaired, improved retaining walls reduce ongoing operating costs associated with maintenance
and emergency response. Engineering staff time associated with these projects will be charged to the
project as it is delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-21
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$
TOTAL SOURCE OF FUNDS 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 777,984 56,216 337,124 100,000 437,124 100,000 100,000 100,000 100,000 1,671,324
TOTAL GFAR 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$
TOTAL USE OF FUNDS 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$
RETAINING WALL REPAIRS Project 815-9930
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-22
TOWN-WIDE
Project Name Annual Street Restriping Project Number 811-9902
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project is an annual program that restripes a portion of the Town’s streets, ensuring the safety of
vehicles and pedestrians.
Location Roadway restriping work is done at various locations throughout the Town based on conditions and
available funds.
Project
Background
The Town initiated Town-wide striping in FY 2006/07. Due to deferred striping and marking of the
Town’s public streets, any striping that had been accomplished previously was done in conjunction
with the resurfacing of specific streets in the Town’s annual street paving project.
This annual street restriping program installs new striping and marking for center lanes, bicycle lanes,
crosswalks, stop sign and signal light markings, and other roadway signage as needed. Roadway
stripes wear out due to traffic and weather which creates a safety concern. The goal is to have Town
streets that are properly striped for safe operation and use by the public.
Under this project, locations that are not scheduled for street repaving will be prioritized for
restriping. The restriping of repaved streets will continue to occur in conjunction with paving
contracts.
Since FY 2007/08, the ongoing annual GFAR appropriation has been $25,000.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as the project is
delivered.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-23
Project
Components &
Estimated
Timeline
Winter 2020 Design Project Design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$
TOTAL SOURCE OF FUNDS 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 61,106 - 119,772 25,000 144,772 25,000 25,000 25,000 25,000 305,878
TOTAL GFAR 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$
TOTAL USE OF FUNDS 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$
ANNUAL STREET RESTRIPING Project 811-9902
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-24
Project Name
Guardrail Replacement Project Project Number 812-0120
Department
Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description The project will construct a new metal beam guardrail, and replace old and damaged guardrails along
sections of Town roadways.
Location This project will take place in various locations where guardrails are present and are in need of repair.
The list of guardrails will be identified and will be brought forward to Council for approval.
Project
Background
There are many roadways throughout Town that are located near hillside areas where guardrails are
present. Guardrails are often located on narrow stretches of roadway and protect vehicles and
pedestrians from steep hillside embankments. Over the years, due to hillside erosion and years of
deferred maintenance, the guardrails have worn out and are in need of repair or replacement. Staff
will assess guardrails and determine which ones are in the most need of repair, budget permitting.
In FY 2018/19, the Town was awarded $980,100 in grant funds for additional guardrail work
throughout the Town.
Operating
Budget Impacts
Engineering staff time associated with these projects will be charged to the project as they are
identified and delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-25
Project
Components &
Estimated Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 130,583$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 223,625$
GRANTS & AWARDS - - - 980,100 980,100 - - - - 980,100
TOTAL SOURCE OF FUNDS 130,583$ -$ 93,043$ 980,100$ 1,073,143$ -$ -$ -$ -$ 1,203,725$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 130,583 - 93,043 - 93,043 - - - - 223,625
TOTAL GFAR 130,583$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 223,625$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 980,100 980,100 - - - - 980,100
TOTAL GFAR -$ -$ -$ 980,100$ 980,100$ -$ -$ -$ -$ 980,100$
TOTAL USE OF FUNDS 130,583$ -$ 93,043$ 980,100$ 1,073,143$ -$ -$ -$ -$ 1,203,725$
GUARDRAIL REPLACEMENT PROJECTS Project 812-0120
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-26
Project Name Massol Intersection Improvements
Project Number 813-0236
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will add intersection safety improvements.
Location This project will take place at the intersection of Massol Avenue and Highway 9.
Project
Background
The intersection as Massol Avenue currently has no traffic control, but does have a pedestrian
activated flashing beacon that is intended to alert drivers when a pedestrian is crossing. Looking at
accident history, this intersection experiences collisions at a higher level than other uncontrolled
intersections, including a pedestrian fatality on September 1, 2017.
This project will provide green bike lanes approaching the crosswalk from both directions to alert
drivers of the changing conditions and help to reduce speeds. In addition, the project will upgrade the
existing flashing beacon to a LED rectangular rapidly flashing beacon (RRFB), which are utilized at
many of the Town’s other crosswalks. These beacons are much more intense than the existing
beacon and would greatly improve the visibility of the crosswalk for drivers. This improvement has
the advantage of improving safety while not impacting the flow of traffic.
Operating
Budget Impacts
There will be no Operating Budget impact as a result of this project. Project delivery costs for this
project are included in the CIP project’s total cost, which is approximately 12%.
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-27
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid process Project bidding & contract award
Winter 2020 Construction Project construction
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 450,000 450,000 - - - - 450,000
TOTAL GFAR -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$
TOTAL USE OF FUNDS -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$
MASSOL INTERSECTION IMPROVEMENTS Project 813-0236
PROPOSED STREETS PROGRAM
Street Repairs, Maintenance & Safety Projects
C-28
PROPOSED STREETS PROGRAM
Street Improvements
C-29
PROJECT LOCATIONS
A Los Gatos Boulevard/Shannon Road Improvements L Stormwater Master Plan
B Downtown Parking Lots Seal Coat & Restriping M Stormwater System – Pollution Prevention Compliance
C Hernandez Avenue Storm Drain Improvements N Public Arts Gateway
D 224 West Main Property Acquisition (Parking Lot 6) O Downtown Parking Study
E Shannon Road/Los Gatos Boulevard/Cherry Blossom
Lane Sidewalk Improvements P One-Way Downtown Street Pilot
F Sidewalk Improvements – Multiple Locations Q Annual Storm Drain Improvements
G Utility Undergrounding Improvements R Pilot School Busing Program
H Cut-Through Traffic/Wood Road Roundabout S ADA Transition Plan Update
I Traffic Signal Modernization T Highway 17/9 Interchange and Capacity Improvements
J Bicknell Road Storm Drain Improvements U Downtown Revitalization
K Bicycle & Pedestrian Improvements
PROPOSED STREETS PROGRAM
Street Improvements
C-30
PROGRAM SECTION DIRECTORY PAGE
0213 Los Gatos Boulevard/Shannon Road Improvements C – 32
0705 Downtown Parking Lots Seal Coat & Restriping C – 34
0409 Hernandez Avenue Storm Drain Improvements C – 36
0704 224 West Main Property Acquisition (Parking Lot 6) C – 38
0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 40
0221 Sidewalk Improvements – Multiple Locations C – 42
0225 Utility Undergrounding Improvements C – 44
0229 Cut – Through Traffic/Wood Road Roundabout C – 46
0227 Traffic Signal Modernization C – 48
0410 Bicknell Road Storm Drain Improvements C – 50
0231 Bicycle & Pedestrian Improvements C – 52
0413 Stormwater Master Plan C – 54
0414 Stormwater System – Pollution Prevention Compliance C – 56
0232 Public Arts Gateway C – 58
0233 Downtown Parking Study C – 60
0234 One-Way Downtown Street Pilot C – 62
0420 Annual Storm Drain Improvements C – 64
0128 Pilot School Busing C – 66
0129 ADA Transition Plan C – 68
0237 Highway 17/9 Interchange and Capacity Improvements C – 70
0235 Downtown Revitalization C – 72
PROPOSED STREETS PROGRAM
Street Improvements
C-31
The Streets Program’s Street Improvements section contains Capital Improvement Program projects that improve a
roadway’s function or structure, other than paving, as the primary scope of work. Typical Street Improvements projects
include sidewalk, curb, and gutter improvements, storm drain improvements, the undergrounding of utilities, intersection
improvements, sidewalk and median ramps, crosswalk improvements, street lighting, and retaining walls.
In this CIP, the Street Improvements section contains one-time projects and no ongoing projects. One-time Street
Improvements projects are prioritized based on safety needs, traffic levels, available funding sources, project costs, and
community impacts.
Traffic Mitigation Funds, Storm Drain Funds, and the Utility Underground Fund all provide designated funding revenue
through development fee charges for their related project categories. Los Gatos does not have a designated funding source
for other street improvements which do not fall into these categories; however, grants, in-lieu fees, CDBG funds, and
community benefit funds are utilized when available.
STREET IMPROVEMENT PROJECTS SUMMARY
* Total FY 2018/19 Carryforward $8,071,840
Unfunded Projects for future consideration
• Parking Lot 4 Repair & Waterproofing
• Montebello Way Island Removal
• Blossom Hill Road & Union Avenue Improvements
• Los Gatos-Almaden Road Improvements
• Union Avenue Widening and Sidewalks
• North Santa Cruz Avenue Curb and Gutter Improvements north of Highway 9
• Sidewalk infill across from Fisher Middle School
Carryforward Projects
0213 Los Gatos Blvd/Shannon Improvements -$ 20,000$ -$ -$ -$ -$ 20,000$
0705 Downtown Parking Lots Seal Coat & Restriping 24,915 75,085 - - - - 100,000
0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - 65,000 82,180
0704 224 W. Main Street Property Acquisition (Parking Lot 6)3,813 1,231,100 - - - - 1,234,913
0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 129,896 1,059,304 - - - 1,189,304
0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - 60,000
0225 Utility Undergrounding Improvements - 2,330,000 4,436,000 - - - 6,766,000
0229 Cut-Through Traffic/Wood Road Roundabout 475,477 314,431 - - - - 789,908
0227 Traffic Signal Modernization 175,832 2,338,830 415,027 - - - 2,929,689
0410 Bicknall Avenue Storm Drain Improvements 120,742 50,758 - - - - 171,500
0231 Bicycle & Pedestrian Improvements 156,778 1,099,722 - - - - 1,256,500
0413 Stormwater Master Plan - 200,000 - - - - 200,000
0414 Stormwater System - Pollution Prevention Compliance 1,422 298,578 - - - - 300,000
0232 Public Art Gateway - 25,000 - - - - 25,000
0233 Downtown Parking Study - 200,000 - - - - 200,000
0234 One-Way Downtown Street Pilot 13,000 175,804 - - - - 188,804
0420 Annual Storm Drain Improvement Prj - 300,000 150,000 - - - 450,000
0128 Pilot School Busing Program 350,216 63,964 - - - - 414,180
New Projects
0129 ADA Transition Plan - 110,000 - - - - 110,000
0237 Highway 17/9 Interchange and Capacity Improvements - 600,000 - - - - 600,000
0235 Dowtown Revitalization - 1,000,000 - - - - 1,000,000 -
Total Street Improvement Projects 1,339,479$ 10,623,168$ 6,060,331$ -$ -$ 65,000$ 18,087,978$
2023/24
Budget
Expended Through
2018/19
2021/22
Budget
2020/21
Budget
STREET IMPROVEMENT PROJECTS
Total
Budgeted
2022/23
Budget
2019/20 Budget &
Carryfwd*
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
PROPOSED STREETS PROGRAM
Street Improvements
C-32 LOS GATOS BLVDBLOSSOM HILL
R
D
SHANN
O
N
R
D
Project Name Los Gatos Boulevard/Shannon Road
Improvements
Project Number 813-0213
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will create a new pedestrian signalized crossing and restripe Shannon Road to provide
longer turn lanes and improve the overall safety for pedestrians and bicyclists. The project will be
coordinated with any potential development of adjacent parcels.
Location This project is located at the intersection of Los Gatos Boulevard and Shannon Road.
Project
Background
The intersection of Los Gatos Boulevard and Shannon Road is a heavily used area, especially during
the morning and afternoon school and commute hours. To improve the safe operation of this
intersection, a new pedestrian push button signal will be installed and also new striping on Shannon
Road will provide a longer turn lane onto Los Gatos Boulevard. Should a development project occur
at this location, that project will take on this work and the Town funding will revert to the source of
funds in future budget cycles
Operating
Budget Impacts
This project will use staff time for design and construction. Engineering staff time associated with
these projects will be charged to the project as they are identified and delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-33
Project
Components &
Estimated
Timeline
Fall 2019 Preliminary Design Project design & development
Spring 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$
TOTAL SOURCE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 20,000 - 20,000 - - - - 20,000
TOTAL TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$
TOTAL USE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$
LOS GATOS BOULEVARD / SHANNON IMPROVEMENTS Project 813-0213
PROPOSED STREETS PROGRAM
Street Improvements
C-34
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Downtown Parking Lots Seal Coat &
Restriping
Project Number 817-0705
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will resurface downtown parking lots by applying a seal coat and then restriping.
Location This project is located at various Town-owned parking lots in downtown Los Gatos.
Project
Background
The public parking lots in downtown Los Gatos are heavily used on a daily basis. In order to keep
their surfaces in good condition and prevent long term wear and damage, the parking lots need to be
resurfaced and restriped. This project is necessary to prevent possible drainage or broken pavement
problems in the future.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-35
Project
Components &
Estimated
Timeline
Winter 2020 Preliminary Design Project design & development
Spring 2020 Final Design Project bidding & contract award
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 24,915$ -$ 75,085$ -$ 75,085 -$ -$ -$ -$ 100,000$
TOTAL SOURCE OF FUNDS 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 24,915 - 75,085 - 75,085 - - - - 100,000
TOTAL GFAR 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$
TOTAL USE OF FUNDS 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$
DOWNTOWN PARKING LOTS SEAL COAT & RESTRIPING Project 817-0705
PROPOSED STREETS PROGRAM
Street Improvements
C-36
Project Name Hernandez Avenue Storm Drain
Improvements
Project Number 816-0409
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will improve the Hernandez Avenue storm drain system with the installation of an
underground storm drain pipe and sidewalk above.
Location The storm drain project is located on the south side of Hernandez Avenue, between Walnut Avenue
and Wissahickon Avenue.
Project
Background
Hernandez Avenue is a hillside collector street with an incomplete sidewalk network and storm drain
systems alongside the roadway. This street averages over 1,000 vehicles per day, a normal amount
for a collector street. At previous neighborhood meetings, residents indicated an interest in having
continuous sidewalks, particularly in the area where an open storm drain exists.
This project proposes to install an underground storm drain pipe into the existing ditch and put a
concrete sidewalk, curb, and gutter system along the roadway to feed runoff water into the storm
drain pipe. This street improvement addresses several neighborhood needs, including an improved
drainage system, a safer pedestrian area, and an improved appearance of the neighborhood.
This project will be funded by the Storm Basin Fund. This project is scheduled for construction in FY
2022/23.
Operating
Budget Impacts
Ongoing operating costs would be significantly reduced as this project would eliminate the need to
clean or repair the existing open ditch. Engineering staff time associated with these projects will be
charged to the project as it is delivered in FY 2022/23.
L
O
S
G
A
T
O
S
-
S
A
R
A
T
O
G
A
R
D
HWY 17N SANTA CRUZ AVUNIVERSITY AV
PROPOSED STREETS PROGRAM
Street Improvements
C-37
Project
Components &
Estimated
Timeline
Fall 2021 Design Design project, include alternative methods and estimated
costs, and determine best outcome
Winter 2022 Bid Process Obtain bids from licensed contractors and submit to Council
for approval
Summer 2023 Construction Construction of storm drains and related street
improvements
Fall 2023 Completion Project completed
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #3 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
TOTAL SOURCE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #3
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 17,180 - - - - - - - 65,000 82,180
TOTAL STORM BASIN 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
TOTAL USE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$
HERNANDEZ AVENUE STORM DRAIN IMPROVEMENTS Project 816-0409
PROPOSED STREETS PROGRAM
Street Improvements
C-38
HWY 9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name 224 West Main Property Acquisition
(Parking Lot 6)
Project Number 817-0704
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project, carried forward from previous years, allocates funding from the GFAR Parking Reserve
for the purchase of property (formerly 224 West Main Street) for Parking Lot 6.
Location This project is located at Parking Lot 6, which is at 224 West Main Street.
Project
Background
In 2009, the Town purchased a property next to Parking Lot 6 to expand the existing parking lot. This
property was purchased by Town Housing/Redevelopment Agency (RDA) funds. Because the State
dissolved redevelopment agencies, it is necessary that the Town use an alternative funding source for
this purchase if affordable housing is not constructed at this site. Reserve funds for GFAR are
identified for this use. Staff is recommending proceeding with the transfer of funds in the FY 2019/20
budget to complete this action.
Operating
Budget Impacts
This project would use staff time for processing of the new property purchase. The staff time for this
project is included in the FY 2019/20 Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C-39
Project
Components &
Estimated
Timeline
Fall 2019 Estimated
Completion
Property purchase and funding completed.
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$
TOTAL SOURCE OF FUNDS 3,813$ -$ 1,231,100$ -$ -$ -$ -$ -$ -$ 1,234,913$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 3,813 - 1,231,100 - 1,231,100 - - - - 1,234,913
TOTAL GFAR 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$
TOTAL USE OF FUNDS 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$
224 WEST MAIN PROPERTY ACQUISITION (PARKING LOT 6)Project 817-0704
PROPOSED STREETS PROGRAM
Street Improvements
C-40 LOS GATOS BLVDBLOSSOM HILL RD
SHANNON
R
D
Project Name Sidewalk Improvements/Shannon/Los
Gatos Blvd/Cherry Blossom Lane
Project Number 813-0218
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will construct sidewalk, curb and gutter along the north side of Shannon Road between
Los Gatos Boulevard and Cherry Blossom Lane, completing the pedestrian link between the two
roads.
Location The project is located on Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane.
Project
Background
Shannon Road is a heavily traveled two-lane roadway, especially when the schools are in session.
Shannon Road is used by residents dropping off students at various schools, such as Blossom Hill
Elementary, Van Meter Elementary, and Fisher Middle Schools. In addition, many parents walk their
children to school along this segment of roadway.
Shannon Road currently has intermittent sections of sidewalk on the south side of the roadway
between Los Gatos Boulevard and Cherry Blossom Lane. Most pedestrians cross Shannon Road to
walk along the south side, while some walk along the unimproved shoulder on the north side. This
project will complete the sidewalk segment on the north side of the roadway and reduce congestion
at Shannon Road and Cherry Blossom Lane, where a 3-way stop is inundated by crossing students,
crossing guards, and vehicle traffic during peak school hours. With the proposed sidewalk,
pedestrians will be encouraged to walk along the north side of Shannon Road, thus reducing the
number of pedestrians crossing Shannon Road.
In June 2018 the Town was awarded federal funding of $940,100 by the Santa Clara Valley
Transportation Authority (VTA) in the Vehicle Emissions Reductions Based at Schools (VERBS) Grant
Program to support this project.
Operating
Budget Impacts
Engineering staff time for design and construction of this project will be addressed in the FY 2018/19
Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C-41
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2019 Bid process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$
GRANTS & AWARDS - - - - - 940,100 - - - 940,100$
UTILITY UNDERGROUNDING - - - - 119,204 - - - 119,204$
TOTAL SOURCE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ 1,059,304$ -$ -$ -$ 1,189,304$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed $ -
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 104 - 129,896 - 129,896 - - - - 130,000
TOTAL GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - 940,100 - - - 940,100
TOTAL GRANTS & AWARDS -$ -$ -$ -$ -$ 940,100$ -$ -$ -$ 940,100$
UNDERGROUND UTILITIES
Salaries and Benfits -$ -$ -$ -$ -$ -$ -$ -$ -$ 940,100$
Services/Supplies/Equipment - - - - - - - - - -
Site Acqusition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - 119,204 - - - 119,204
TOTAL UNDERGROUND UTILITIES -$ -$ -$ -$ 119,204$ -$ -$ -$ 119,204$
TOTAL USE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ 1,059,304$ -$ -$ -$ 1,189,304$
SIDEWALK IMPROVEMENTS/SHANNON/LOS GATOS BLVD/CHERRY BLOSSOM LANE Project 813-0218
PROPOSED STREETS PROGRAM
Street Improvements
C-42
TOWN-WIDE
Project Name Sidewalk Improvements – Multiple
Locations
Project Number 813-0221
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will construct sidewalk, curb, and gutter on the north side of Kennedy Road from Ferris
Avenue to Los Gatos Boulevard and on the south side of Mitchell Avenue from George Street to
Fisher Avenue.
Location This project is located in the following areas: Kennedy Road from Ferris Avenue to Los Gatos
Boulevard; Mitchell Avenue from George Street to Fisher Avenue; and Los Gatos Boulevard/Shannon
Road.
Project
Background
Kennedy Road from Ferris Avenue to Los Gatos Boulevard currently has a shoulder that is heavily
utilized by parents and students walking and biking to school in the morning and afternoons. The
sidewalk improvements will complete the connection in this residential block.
In 2009, the Town completed the sidewalk installation on the north side of Mitchell Avenue from
George Street to Fisher Avenue. Then in 2012, sidewalk was constructed on north and south side of
Mitchell Avenue between Los Gatos Boulevard and George Street as part of the redevelopment of the
former Honda site. This project will complete the last component of the sidewalks in this heavily
utilized pedestrian area between Van Meter Elementary and Fisher Middle Schools.
Operating
Budget Impacts
Engineering staff time for design and construction of this project will be addressed in the FY 2019/20
Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C-43
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2019 Bid process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 60,000 - 60,000 - - - - -
TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
SIDEWALK IMPROVEMENTS - MULTIPLE LOCATIONS Project 813-0221
PROPOSED STREETS PROGRAM
Street Improvements
C-44 HWY 17LOS GATOS BLVDLOS GA
T
O
S-
ALMADEN RD
Project Name Utility Undergrounding Improvements
Project Number 813-0225
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will remove utilities from above ground poles and install them underground.
Location This project is located on Los Gatos Boulevard between Lark Avenue and Chirco Drive.
Project
Background
Through the State of California’s Public Utilities Commission, Pacific Gas & Electric (PG&E) collects
funds from ratepayers to provide for the undergrounding of utilities. These funds grow in reserve
called Rule 20A funds, until such time that local jurisdictions identify an area for this project and
begin working with PG&E. The funds are limited to use on roadways where traffic is heavy, making
Los Gatos Boulevard a viable location.
The Town’s allocation of Rule 20A funds has grown to the point where there is now approximately
$3.8M available for programming. These funds will never actually come to the Town, but rather
PG&E will deliver the project with coordination from Town staff.
In addition to the Rule 20A funds, the Town collects developer fees for utility undergrounding. These
funds are held by the Town for future projects. Staff has asked PG&E to look at an expanded project
scope utilizing some or all of the Town funds as well. This will take full advantage of economies of
scale through design and construction.
The timeframe for PG&E to deliver Rule 20A projects has been between seven and ten years;
however, indications are that this project may begin sooner. Funds have been moved to demonstrate
a start of construction in FY 2019/20, with the bulk of the work occurring in FY 2020/21.
Operating
Budget Impacts
There will be no Operating Budget impact as a result of this project. Project delivery costs for this
project are included in the CIP project’s total cost. Project delivery costs are estimated at $266,000
over the five-year term of the project or 4% of the total project cost. Project costs are significantly
lower on this project due to the efficiencies in the project size and a larger proportion of work that
will be coordinated by PG&E.
PROPOSED STREETS PROGRAM
Street Improvements
C-45
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Summer 2020 Construction Project construction begins
Summer 2021 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
UTILITY UNDERGROUNDING -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$
TOTAL SOURCE OF FUNDS -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
UTILITY UNDERGORUNDING
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 2,330,000 - 2,330,000 4,436,000 - - - 6,766,000
TOTAL GFAR -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$
TOTAL USE OF FUNDS -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$
UTILITY UNDERGROUNDING IMPROVEMENTS Project 813-0225
PROPOSED STREETS PROGRAM
Street Improvements
C-46
Project Name Cut-Through Traffic/Wood Road
Roundabout
Project Number 813-0229
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will provide infrastructure changes to help mitigate cut-through traffic.
Location This project is located at South Santa Cruz Avenue and Wood Road.
Project
Background
This project aims to mitigate cut-through traffic through the use of various measures, some of which
have been previously used. In the summer of 2015, staff implemented various measures such as the
deployment of portable message signs, messages on Caltrans changeable message signs, signal
modifications, and temporary street closures to reduce cut-through traffic. In the summers of 2016
and 2017, this project included signal modifications and synchronization at various intersections,
roadway markings and additional signage, as well as costs associated with the temporary closure of
south Santa Cruz Avenue at Wood Road and associated data collection.
In FY 2019/20, funding will be used to advance the design of a permanent traffic circle at Santa Cruz
Avenue at Wood Road, potential street closures, and neighborhood turn restriction signage as
needed.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-47
Project
Components &
Estimated
Timeline
Winter 2019 Design Coordinate and design project
Summer 2020 Construction Install infrastructure and implement projects
Fall 2020 Completion Assess Results
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 206,324$ 57,380$ 86,296$ -$ 86,296$ -$ -$ -$ -$ 350,000$
TRAFFIC MITIGATION 175,417 36,356 228,135 - 228,135 - - - - 439,908$
TOTAL SOURCE OF FUNDS 381,741$ 93,736$ 314,431$ -$ 314,431$ -$ -$ -$ -$ 789,908$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 206,324 57,380 86,296 - 86,296 - - - - 350,000
TOTAL GFARS 206,324$ 57,380$ 86,296$ -$ 86,296$ -$ -$ -$ -$ 350,000$
TRAFFIC MITIGATIONS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 175,417 36,356 228,135 - 228,135 - - - - 439,908
TOTAL TRAFFIC MITIGATIONS 175,417$ 36,356$ 228,135$ -$ 228,135$ -$ -$ -$ -$ 439,908$
TOTAL USE OF FUNDS 381,741$ 93,736$ 314,431$ -$ 314,431$ -$ -$ -$ -$ 789,908$
CUT-THROUGH TRAFFIC / WOOD ROAD ROUNDABOUT Project 813-0229
PROPOSED STREETS PROGRAM
Street Improvements
C-48
Project Name Traffic Signal Modernization
Project Number 813-0227
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will modernize the Town’s traffic signal controllers.
Location This project is located Town-wide.
Project
Background
This project will modernize the Town’s traffic signal controllers to allow for greater control by staff,
ensure that the current system meets current safety standards, and increase the traffic flow. The
Town was awarded several grants through the VTA and the MTC for $1,200,000 of the project budget
to complement the Town’s investment of Traffic Impact Mitigation Funds.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-49
Project
Components &
Estimated
Timeline
Summer 2018 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Winter 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATION 4,200$ 120,800$ 230,738$ 332,524$ 563,262$ 415,027$ -$ -$ -$ 1,103,289$
GRANTS & AWARDS 10,799 40,033 1,775,568 - 1,775,568$ - - - - 1,826,400
TOTAL SOURCE OF FUNDS 14,999$ 160,833$ 2,006,306$ 332,524$ 2,338,830$ 415,027$ -$ -$ -$ 2,929,689$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATIONS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 4,200 120,800 230,738 332,524 563,262 415,027 - - - 1,103,289
TOTAL TRAFFIC MITIGATIONS 4,200$ 120,800$ 230,738$ 332,524$ 563,262$ 415,027$ -$ -$ -$ 1,103,289$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 10,798.58 40,033 1,775,568 - 1,775,568 - - - - 1,826,400
TOTAL GRANTS & AWARDS 10,799$ 40,033$ 1,775,568$ -$ 1,775,568$ -$ -$ -$ -$ 1,826,400$
TOTAL USE OF FUNDS 14,999$ 160,833$ 2,006,306$ 332,524$ 2,338,830$ 415,027$ -$ -$ -$ 2,929,689$
TRAFFIC SIGNAL MODERNIZATION Project 813-0227
PROPOSED STREETS PROGRAM
Street Improvements
C-50
Project Name Bicknell Road Storm Drain Improvements
Project Number 816-0410
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will reroute a Town storm drain line.
Location This project is located on Bicknell Road near Montclair.
Project
Background
This project will provide design services for the rerouting of an existing Town storm drain line from
private property, after it was determined that the Town does not have a storm drain easement.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the Department’s FY 2019/20 Operating Budget.
QUITO RDBICKNELL RD
HWY 9
PROPOSED STREETS PROGRAM
Street Improvements
C-51
Project
Components &
Estimated
Timeline
Fall 2017 Design Project design & development
Fall 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #3 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$
TOTAL SOURCE OF FUNDS 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #2
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 120,742 - 50,758 - 50,758 - - - - 171,500
TOTAL STORM BASIN 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$
TOTAL USE OF FUNDS 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$
BICKNELL ROAD STORM DRAIN IMPROVEMENTS Project 816-0410
PROPOSED STREETS PROGRAM
Street Improvements
C-52
Project Name Bicycle & Pedestrian Improvements
Project Number 813-0231
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will enhance bicycle and pedestrian safety and mobility throughout the Town.
Location This project is located Town-wide.
Project
Background
This project will enhance bicycle and pedestrian safety and mobility Town-wide in the form of
multiple projects. As has been done in the previous years, staff will continue to work with Safe
Routes to School, Town Commissions, the Town Council, and the general public on prioritizing
projects that have been recommended in the Council adopted Bicycle and Pedestrian Master plan. In
addition, this money will be used as matching funds for available grants related to Town bicycle and
pedestrian projects.
In the past the Town received Transportation Fund for Clean Air for bicycle and pedestrian
improvements.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-53
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Winter 2019 Construction Project construction
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 61,450$ 22,728$ 515,822$ 300,000$ 815,822$ -$ -$ -$ -$ 900,000$
GRANTS & AWARDS - - 281,500 - 281,500 - - - - 281,500
TRAFFIC MITIIGATION 40,972 31,628 2,400 - 2,400 - - - - 75,000
TOTAL SOURCE OF FUNDS 102,422$ 54,356$ 799,722$ 300,000$ 1,099,722$ -$ -$ -$ -$ 1,256,500$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 61,450 22,728 515,822 300,000 815,822 - - - - 900,000
TOTAL GFAR 61,450$ 22,728$ 515,822$ 300,000$ 815,822$ -$ -$ -$ -$ 900,000$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses - - 281,500 - 281,500 - - - - 281,500
TOTAL GRANTS & AWARDS -$ -$ 281,500$ -$ 281,500$ -$ -$ -$ -$ 281,500$
TRAFFIC MITIGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses 40,972 31,628 2,400 - 2,400 - - - - 75,000
TOTAL TRAFFIC MITIGATION 40,972$ 31,628$ 2,400$ -$ 2,400$ -$ -$ -$ -$ 75,000$
TOTAL USE OF FUNDS 102,422$ 54,356$ 799,722$ 300,000$ 1,099,722$ -$ -$ -$ -$ 1,256,500$
BICYCLE & PEDESTRIAN IMPROVEMENTS Project 813-0231
PROPOSED STREETS PROGRAM
Street Improvements
C-54
Project Name Stormwater Master Plan
Project Number 816-0413
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will develop a Stormwater Master Plan.
Location This project is located Town-wide.
Project
Background
The Town of Los Gatos does not currently have an adopted Stormwater Master Plan. This project will
develop a Stormwater Collection System Master Plan and provides the Town of Los Gatos with the
necessary planning tools and capital improvement projects to address flood management and water
quality within the collector portion of the storm drainage system.
The Plan will be developed to help the Town meet its overarching environmental and economic goals.
The goal of the Stormwater Master Plan is to manage stormwater runoff proactively to protect water
quality and to minimize impacts of localized and downstream flooding by identifying infrastructure
improvements for the collection, conveyance, and treatment of stormwater runoff within the Town.
The Stormwater Master Plan will prioritize storm drain and water quality improvements within the
Town and provides an implementation plan for the construction of conveyance and water quality
improvements.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-55
Project
Components &
Estimated
Timeline
Summer 2019 Design Develop request for proposals
Fall 2019 Bid Process Award consultant agreement
Winter 2019 Report Conduct study
Spring 2020 Completion Finalize report
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$
TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 200,000 - 200,000 - - - - -
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
STORMWATER MASTER PLAN Project 816-0413
PROPOSED STREETS PROGRAM
Street Improvements
C-56
Project Name Stormwater System – Pollution Prevention
Compliance
Project Number 816-0414
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will install improvements, such as trash capture devices, to reduce pollution in the storm
water system.
Location This project is located Town-wide.
Project
Background
This project will install solutions, such as multiple trash capture devices in storm inlets, throughout
the Town to meet the Municipal Regional Permit Provision C.10 trash reduction requirements. The
Town has submitted a plan to meet the requirement to reduce trashload impacts to creeks which are
70% by 2017 and 100% by 2022.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-57
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Winter 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
TOTAL SOURCE OF FUNDS -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 1,422 298,578 - 298,578 - - - - 300,000
TOTAL GFAR -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
TOTAL USE OF FUNDS -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$
STORMWATER SYSTEM - POLLUTION PREVENTION COMPLIANCE Project 816-0414
PROPOSED STREETS PROGRAM
Street Improvements
C-58
Project Name Public Arts Gateway
Project Number 821-2009
Department Library Project Manager Library Director: Ryan Baker
Description This project will install a public art at a gateway location.
Location This project is located on Highway 9 near Alberto Way.
Project
Background
The Arts and Culture Commission identified this project as a way to enhance the appearance of the
entrances into Los Gatos. At the January 31, 2017 Priority Setting, Council identified $25,000 for
public art and on April 18, 2017 the Arts and Culture Commission proposed the gateway project as
the best use of the funds, which Council approved. This project will install the first phase of artwork
at Town entrances based on the Town’s Public Art Selection Policy and Procedures.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the Department’s FY 2019/20 Operating Budget.
PROPOSED STREETS PROGRAM
Street Improvements
C-59
Project
Components &
Estimated
Timeline
Winter 2018 Call for artist Project design & award
Fall 2019 Award Select final design & award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$
TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000
TOTAL GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$
TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$
PUBLIC ARTS GATEWAY PROJECT 813-0232
PROPOSED STREETS PROGRAM
Street Improvements
C-60
Project Name Downtown Parking Study
Project Number 813-0233
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will fund a consultant to examine parking holistically in the downtown and high school
areas.
Location This project is located downtown and near Los Gatos High School.
Project
Background
The project scope will include the following:
• Analyze existing parking capacity.
• Provide a recommendation for residential (permit area parking, especially as it is impacted
around Los Gatos High School.
• Provide recommendations for parking management for time limited parking.
• Analyze paid parking.
• Provide best practices recommendations for managing employee parking.
• Identify the need for additional parking capacity vis-a-vis a parking structure.
• Review the impacts of one-way streets on parking capacity.
Once complete, this project will inform decision making for project 817-0704 – 224 West Main Street
Property Acquisition (Parking Lot 6).
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-61
Project
Components &
Estimated
Timeline
Winter 2018 Design Develop request for proposals
Winter 2018 Bid Process Award consultant agreement
Spring 2019 Report Conduct study
Fall 2019 Completion Finalize report
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 200,000 - 200,000 - - - - -
Project Construction Expenses - - - - - - - - - 200,000
TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
DOWNTOWN PARKING STUDY Project 813-0233
PROPOSED STREETS PROGRAM
Street Improvements
C-62
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name One-Way Downtown Street Pilot
Project Number 813-0234
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description This project will fund the implementation of a one-way streets pilot.
Location This project is located downtown on North Santa Cruz Avenue and University Avenue.
Project
Background
This project will fund a trial of one-way streets for North Santa Cruz and University Avenues between
Highway 9 and Main Street.
Operating
Budget Impacts
This project will use staff time for management. Engineering staff time associated with these projects
will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-63
Project
Components &
Estimated
Timeline
Spring 2019 Design Project design & development
Summer 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR - 13,000 117,000 58,804 175,804 - - - - 188,804
TOTAL SOURCE OF FUNDS - 13,000 117,000 58,804 175,804 - - - - 188,804
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 13,000 117,000 58,804 175,804 - - - - 71,804
GFAR - 13,000 117,000 58,804 175,804 - - - - 188,804
TOTAL USE OF FUNDS - 13,000 117,000 58,804 175,804 - - - - 188,804
ONE-WAY DOWNTOWN STREET PILOT Project 813-0234
PROPOSED STREETS PROGRAM
Street Improvements
C-64
Project Name Annual Storm Drain Improvement Project
Project Number 816-0414
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will install infill storm drain systems that are required to enhance safety and improve
infrastructure to accept water runoff.
Location This project is located Town-wide.
Project
Background
The Town is responsible for keeping Town roads clear of excessive water and managing storm water
running down Town streets. Storm drain improvements in the Town right of ways and parking lots
are necessary to manage water drainage issues within these Town locations. The intent of this
project is to keep pace with the needs of the Town’s storm drain system to prevent flooding in the
Town right of ways.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-65
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Winter 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #1 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
STORM BASIN #2 - - 50,000$ 50,000 100,000 50,000 - - - 150,000$
STORM BASIN #3 - - 50,000$ 50,000 100,000 50,000 - - - 150,000$
TOTAL SOURCE OF FUNDS -$ -$ 150,000$ 150,000$ 300,000$ 150,000$ -$ -$ -$ 450,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
STORM BASIN #1
Project Construction Expenses - - 50,000 50,000 100,000 50,000 - - - 150,000$
TOTAL STORM BASIN #1 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
STORM BASIN #2
Project Construction Expenses -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
TOTAL STORM BASIN #2 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
STORM BASIN #3
Project Construction Expenses -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
TOTAL STORM BASIN #3 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$
TOTAL USE OF FUNDS -$ -$ 150,000$ 150,000$ 300,000$ 150,000$ -$ -$ -$ 450,000$
ANNUAL STORM DRAIN IMPROVEMENT PROJECT Project 816-0420
PROPOSED STREETS PROGRAM
Street Improvements
C-66
Project Name Pilot School Busing Program
Project Number 812-0128
Department Parks & Public Works Project Manager Transportation & Mobility
Manager: Ying Smith
Description This project will explore congestion relief through piloting school bus service. The pilot school bus
service will provide morning and afternoon routes to and from school, with neighborhood-based
stops.
The Town is contracting with a qualified school bus transportation provider through a RFP
process. The service schedule and designated pick up and drop off locations are published.
Interested families may purchase an annual pass to reserve a seat. The pilot program will provide two
routes for a total of 18 months from January 2019 to June 2020.
Location This project is located Town-wide.
Project
Background
The Town of Los Gatos and the school community have been exploring new transit services
customized to meet the needs of students traveling to and from schools. The primary areas of
interest are corridors with the highest level of traffic congestion. Town staff and a consulting
team completed a Congestion Relief School Bus Feasibility Study in 2018. The Town Council, at its
June 5, 2018 meeting, authorized staff to proceed with a school bus pilot program. At its September
18, 2018 meeting, the Town Council authorized funding to provide a pilot service consisting of two
routes for 18 months of service.
The two-route pilot service started on January 7, 2019 and will continue for school year 2019/20
Operating
Budget Impacts
The pilot program is funded by the Town as well as fare revenue. This project will use staff time for
service design. PPW staff time associated with these projects will be charged to the project as it is
delivered.
TOWN-WIDE
PROPOSED STREETS PROGRAM
Street Improvements
C-67
Project
Components &
Estimated
Timeline
Summer 2018 Design Service plan design, marketing, customer sign up
Fall 2018 Bid Process RFP & service contract award, finalize service plan
Winter 2019 Service Launch Provide Pilot Service
Summer 2020 Completion Completion of 18 months of pilot service
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$
TOTAL SOURCE OF FUNDS -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 350,216 63,964 - 63,964 - - - - 414,180
TOTAL GFAR -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$
TOTAL USE OF FUNDS -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$
PILOT SCHOOL BUSING PROGRAM Project 812-0128
PROPOSED STREETS PROGRAM
Street Improvements
C-68
TOWN-WIDE
Project Name ADA Transition Plan Update
Project Number 812-0129
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description This project will update the Town’s ADA Transition Plan as required.
Location This project is located Town-wide.
Project
Background
The Americans with Disabilities Act (ADA), enacted on July 26, 1990, provides comprehensive rights to
persons with disabilities in different areas including access to public accommodations and
transportation. The ADA requires that all public agencies develop a transition plan for eliminating
barriers for persons with disabilities. The Town’s ADA Transition Plan has not been updated since
1994, and it is necessary to develop programs that comply with the new standards
Operating
Budget Impacts
This project will use staff time for management. Engineering staff time associated with these projects
will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-69
Project
Components &
Estimated
Timeline
Fall 2019 Design Develop request for proposals
Winter 2020 Bid Process Award consultant agreement
Spring 2020 Report Conduct study
Summer 2020 Completion Finalize report
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - 110,000 110,000 - - - - 110,000
Project Construction Expenses - - - - - - - - - -
TOTAL GRANTS & AWARDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$
TOTAL USE OF FUNDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$
ADA TRANSITION PLAN Project 812-0129
PROPOSED STREETS PROGRAM
Street Improvements
C-70
Project Name Highway 17/9 Interchange and Capacity
Improvements Feasibility Study
Project Number 813-0237
Department Parks & Public Works Project Manager Assistant Director/Town
Engineer: Lisa Petersen
Description These funds will be used as a local match necessary to begin a conceptual study for improvements at
Highway 9 and Highway 17.
Location This project is located on Highway 9 and Highway 17.
Project
Background
The Countywide 2016 Measure B sales tax measure includes investments in the regional
transportation infrastructure across nine program areas. The Santa Clara Valley Transportation
Authority (VTA) manages the 2016 Measure B program and the VTA Board approves project
prioritization and funding. The VTA approved the first set of projects on a two-year budget cycle with
a ten-year look ahead at potential projects.
Through the process to establish the structure of and projects included in the 2016 Measure B, the
Town proposed upgrades to the interchange at Highway 9 and Highway 17 as its major project in the
Highway category. In reviewing the project with VTA, an opportunity exists to include two options for
modifications to Highway 17 through Los Gatos. The first includes efficiency improvements such as
adding auxiliary lanes and realigning existing lanes. Auxiliary lanes might include continuing the on-
ramp from Lark Avenue south to the Highway 9 off-ramp, facilitating a smoother transition of traffic.
The second is an expanded version that could include the addition of travel lanes on Highway 17
within the existing right of way. VTA approved 2016 Measure B funds to bring the project through
preliminary design and environmental review. The allocation of 2016 Measure B funds requires at
least a 10 percent contribution from non-2016 Measure B sources. While the Town is pursuing
outside funds for the match, this project would set aside Town funds if needed.
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-71
Project
Components &
Estimated
Timeline
Summer 2020 Design Project design & development
Summer 2021 Design Review Review of Design
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITAGATION -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITAGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 600,000 600,000 - - - - 600,000
TOTAL TRAFFIC MITIGATION -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$
TOTAL USE OF FUNDS -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$
HIGHWAY 17/9 INTERCHANGE & CAPACITY IMPROVEMENTS Project 813-0237
PROPOSED STREETS PROGRAM
Street Improvements
C-72
HWY
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Downtown Revitalization
Project Number 813-0235
Department Parks & Public Works Project Manager PPW Director: Matt Morley
Description These funds will be used as initial funding for a larger Downtown revitalization project.
Location This project is located downtown.
Project
Background
The Downtown infrastructure has aged and needs updating to continue to attract customers and
facilitate maintenance. This initial funding set aside is in preparation for a future project to reinvent
the Downtown. Current efforts that include a one-way street pilot on North Sant Cruz Avenue, a
comprehensive downtown parking study, and increased attention to maintenance of landscape and
hardscape will inform a future streetscape upgrade. Progress and expenditures on this project will
occur only following ongoing discussion and direction from the Town Council.
Operating
Budget Impacts
This project will use staff time for project management. Engineering staff time associated with these
projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Street Improvements
C-73
Project
Components &
Estimated
Timeline
Summer 2020 Design Project design & development
TBD Future project milestones
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$ .
TOTAL SOURCE OF FUNDS -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 1,000,000 1,000,000 - - - - 1,000,000
TOTAL GFAR -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$
TOTAL USE OF FUNDS -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$
DOWNTOWN REVITALIZATION Project 813-0235
PROPOSED STREETS PROGRAM
Street Improvements
C-74
PROPOSED STREETS PROGRAM
Bridge Projects
C-75
PROJECT LOCATIONS
A Quito Road - Bridge Replacement
B Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design
PROPOSED STREETS PROGRAM
Bridge Projects
C-76
PROGRAM SECTION DIRECTORY PAGE
0801 Quito Road - Bridge Replacement C – 80
0803 Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design C – 68
PROPOSED STREETS PROGRAM
Bridge Projects
C-77
The Streets Program’s Bridge Projects section contains Capital Improvement Program projects that repair, replace, or
rehabilitate a deficient bridge structure as the primary scope of work.
Bridge structure safety falls under the guidance of state and federal regulations, and bridge projects are often driven by
available funding from these jurisdictions, such as Caltrans grant programs or the federal Highway Bridge Replacement and
Rehabilitation (HBRR) program. Los Gatos does not have a designated funding source for repairing, maintaining, and
improving the Town’s bridges, and relies upon grant programs for major bridge improvement projects.
BRIDGE PROJECTS SUMMARY
Carryforward Projects
0801 Quito Road - Bridge Replacement 64,594$ 235,087$ -$ -$ -$ -$ 299,681$
0803 Highway 17 Bicycle & Pedestrian Bridge - Preliminary Design - 200,000 - - - - 200,000
Total Bridge Projects 64,594$ 435,087$ -$ -$ -$ -$ 499,681$
BRIDGE PROJECTS
2023/24
Budget
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
2022/23
Budget
2021/22
Budget
2020/21
Budget
2019/20 Budget &
Carryfwd*
Expended Through
2018/19
Total
Budgeted
* Total FY 2018/19 Carryforward $435,087
PROPOSED STREETS PROGRAM
Bridge Projects
C-78
Project Name Quito Road - Bridge Replacement Project Number 818-0801
Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen
Description This project funds the Town’s portion of the replacement cost for two bridges on Quito Road to
improve roadway safety and provide adequate storm water flow capacity in the creek under the
bridge.
Location The two Quito Road bridges span a tributary of San Tomas Aquino Creek. The bridges are located on
Quito Road in the vicinity of Old Adobe Road, approximately 1½ miles north of Highway 9, on the
common boundary line between the City of Saratoga and the Town of Los Gatos.
Project
Background
San Tomas Aquino Creek is under the jurisdiction of the Santa Clara Valley Water District (SCVWD),
while the replacement of the bridges is the shared responsibility of the City of Saratoga and the Town
of Los Gatos. Both bridges are approximately ninety years old and have been classified “structurally
deficient” under Caltrans guidelines. In addition, both bridges are not adequate to receive 100-year
flood flows.
In 2001, the City of Saratoga, the project sponsor, secured partial funding (80%) through the federal
Highway Bridge Replacement and Rehabilitation (HBRR) program to replace both bridges with wider
span structures that will allow the 100-year design flood flow to pass underneath. Saratoga is the
lead agency to oversee the design, environmental, right-of-way acquisition, and construction services
for the project. The City of Saratoga, the Town of Los Gatos, and SCVWD agreed to share the duties
and responsibilities for the project and the remaining 20% local match funding requirement.
After further evaluation of the bridges, it was determined that Quito Road would require
reconstruction at each end of the bridge, which in turn requires additional right-of-way acquisitions
and environmental reviews under both the State of California (Caltrans) and federal regulations.
These changes have made it necessary to redesign this project, significantly increasing the estimated
costs. The City of Saratoga has applied for additional funding from Caltrans due to the redesign. As a
result of the additional project costs, the local funding match from the City of Saratoga, the Town of
Los Gatos, and the SCVWD has increased from $155,000 to $238,000 for each agency. Based on the
April 2019 schedule from the City of Saratoga, the construction of these bridges is anticipated to be
completed by 2021.
Operating
Budget Impacts
Engineering staff time for coordination of this project with the City of Saratoga is incorporated into
the Saratoga Operating Budget.
HW
Y
8
5
POLLARD
R
D
QUITO RD
PROPOSED STREETS PROGRAM
Bridge Projects
C-79
Project
Components &
Estimated
Timeline
Jan 2001 Grant Funding The City of Saratoga obtained grant funding from the federal
HBRR program
Oct 2001 Cooperative
Agreement
Council approved a cooperative agreement with the City of
Saratoga and SCVWD for the replacement of the two bridges
May 2002 Preliminary Design City of Saratoga started preliminary design
2013 Right of way Right of way acquisition process is ongoing and environmental
permitting is underway
2015 Final Design Design completed and project bidding by the City of Saratoga
April 2020 Construction Start Begin reconstruction of bridge.
Summer
2021
Completion Construction is anticipated to be complete in 2021.
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$
TOTAL SOURCE OF FUNDS 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 64,594 - 235,087 - 235,087 - - - - 299,681
TOTAL GFAR 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$
TOTAL USE OF FUNDS 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$
QUITO ROAD - BRIDGE REPLACEMENT Project 818-0801
PROPOSED STREETS PROGRAM
Bridge Projects
C-80 LOS GATOS BLVDHWY 17N SANTA CRUZ AVBLOSSOM HI
L
L
R
D
SHANNO
N
R
D
UNIVERSITY AV
Project Name Highway 17 Bicycle & Pedestrian Bridge
Preliminary Design
Project Number 818-0803
Department Parks & Public Works Project Manager Transportation & Mobility
Manager: Ying Smith
Description This project will fund the conceptual design for a potential bicycle and pedestrian bridge.
Location This project is located at Blossom Hill Road or Nino Way over Highway 17.
Project
Background
Crossing Highway 17 in the project vicinity is a barrier for bicyclists and pedestrians. This is a
suggested path included in the Safe Routes to School Phase 1 Study. Improvements for Highway 17
crossing have been included in several policy documents. The Bicycle and Pedestrian Master Plan
(BPMP) identified the Nino Avenue Bridge over Highway 17 as one of the new bike/pedestrian bridge
connections. The Town’s General Plan identified widening the Blossom Hill Road Bridge over Highway
17 for bicyclists and pedestrians. The project is also included in the Traffic Impact Mitigation Fee
program and the Town’s submittals to the VTA’s Valley Transportation Plan 2040.
Implementing long-term and complex capital projects requires a strategic financing plan. Obtaining
the first round of funding at the critical time is the key to initiate the process. Most funding programs
either require or prioritize projects that are “shovel ready.” This funding allocation will advance the
project to enable greater competition for funding of later phases.
In future years, additional funds will be needed for environmental clearance, right-of-way, and final
design. It is estimated that additional $800,000 will be required to complete all engineering and
design work, over approximately three to five years. The construction cost will be in the $5 to $10
million range. Staff will continue to seek grant funding to complete this project. Completing the first
step would enhance the Town’s access to a combination of funds available through competitive
opportunities.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED STREETS PROGRAM
Bridge Projects
C-81
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
TBD Future Phases
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATION -$ -$ 147,005$ -$ 147,005$ -$ -$ -$ -$ 147,005$
GRANTS & AWARDS - - 52,995 - 52,995$ - - - - 52,995
TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
USE OF FUNDS to 2019/20 (with Carryfwd)
TRAFFIC MITIGATION
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 147,005 - 147,005 - - - - -
Project Construction Expenses - - - - - - - - - -
TOTAL TRAFFIC MITIGATION -$ -$ 147,005$ -$ 147,005$ -$ -$ -$ -$ 147,005$
GRANTS & AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 52,995 - 52,995 - - - - 52,995
Project Construction Expenses - - - - - - - - - -
TOTAL GRANTS & AWARDS -$ -$ -$ -$ 52,995$ -$ -$ -$ -$ -$
TOTAL USE OF FUNDS -$ -$ 147,005$ -$ 200,000$ -$ -$ -$ -$ 147,005$
HIGHWAY 17 BICYCLE AND PEDESTRIAN BRIDGE - PRELIMINARY DESIGN Project 818-0803
PROPOSED STREETS PROGRAM
Bridge Projects
C-82
Parks Program
PROPOSED PARKS AND TRAILS PROGRAM
D-1
PARK PROJECT DIRECTORY
4605 Parks Playground Fibar Project D – 6
4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 8
4202 Town Plaza Turf Repairs D – 10
4006 Outdoor Fitness Equipment D – 12
4508 Vegetation Management – Town-wide D – 14
4509 Fence Replacement – Shire Court D - 18
TRAIL PROJECT DIRECTORY
4504 Open Space Trail Upgrades D – 22
4507 Forbes Mill Footbridge Improvements D – 24
4503 Charter Oaks Trail Repair D – 26
4505 Trailhead Connector Project D – 28
PROPOSED PARKS AND TRAILS PROGRAM
Park Improvement Projects
D-2
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-3
PROJECT LOCATIONS
A Parks Playground Fibar Project
B Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping
C Town Plaza Turf Repairs
D Outdoor Fitness Equipment
E Vegetation Management – Town-wide
F Fence Replacement – Shire Court
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-4
PROGRAM SECTION DIRECTORY PAGE
4605 Parks Playground Fibar Project D – 6
4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 8
4202 Town Plaza Turf Repairs D – 10
4006 Outdoor Fitness Equipment D – 12
4508 Vegetation Management – Town-wide D – 14
4509 Fence Replacement – Shire Court D – 16
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-5
The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or
improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and
basketball or tennis court resurfacing; and park equipment or facility upgrades.
The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects.
The exception to this is the Parks Fibar replacement project. Because Fibar requires regular replacement and infill, this
project is scheduled as a bi-annual project. One-time park improvement projects are prioritized based on health and safety
issues, available funding sources, infrastructure impacts, project costs, and community impacts.
Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program
budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program.
In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when
available.
PARK IMPROVEMENT PROJECTS SUMMARY
* Total FY 2018/19 Carryforward $349,540
Unfunded Projects
• Oak Meadow Park Upgrades
• Worcester Park
• Civic Center Irrigation System Replacement & Upgrade
• Turf Renovations - Various Parks
• Oak Meadow Park Fencing Upgrades
• Oak Meadow Park Restroom Expansion
• Park Rehabilitation – La Rinconada Park
• Park Rehabilitation –Live Oak Manor Park
• Park Rehabilitation – Blossom Hill Park
PARKS
Carryforward Projects
4605 Parks Playground Fibar Project 42,500$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$
4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - 225,000
4202 Town Plaza Turf Repairs - 28,000 - - - - 28,000
4006 Outdoor Fitness Equipment - 60,000 - - - - 60,000
New Projects
4508 Vegetation Management - Townwide - 200,000 - - - - 200,000
4509 Fence Replacement - Shire Court - 60,000 - - - - 60,000
Total Park Improvement Projects 42,500$ 609,540$ 25,000$ -$ 25,000$ -$ 702,040$
2019/20 Budget &
Carryfwd*
2020/21
Budget
2021/22
Budget
2022/23
Budget
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
PARK AND TRAIL IMPROVEMENT PROJECTS
Expended Through
2018/19
2023/24
Budget
Total
Budgeted
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-6
Project Name Parks Playground Fibar Project Project Number 831-4605
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project will replace fibar material at all Town playgrounds.
Location This project will be completed at various parks in Los Gatos.
Project
Background
Several Town parks have playground structures that are heavily used by children and their families.
Playground safety codes require that the fibar material be spread under and around playground
structures to prevent injury to children.
Fibar replacement is required when the material is below a specific depth near the playground
structure. Fibar is a wood product that degrades over time based on foot traffic and weather
conditions. This material should be replaced on a regular, as needed basis. This is an annual CIP
project to improve the safety of the Town’s playgrounds.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. The staff time for this
project is included in the department’s FY 2018/19 Operating Budget.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-7
Project
Components &
Estimated
Timeline
Summer 2019 Scope Project development
Summer 2019 Bid Process Project bidding & contract award
Summer 2019 Construction Project construction
Summer 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$
TOTAL SOURCE OF FUNDS 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 42,500 - 36,540 - 36,540 25,000 - 25,000 - 129,040
TOTAL GFAR 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$
TOTAL USE OF FUNDS 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$
PARKS PLAYGROUND FIBAR PROJECT Project 831-4605
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-8
H
W
Y
9
W
M
A
I
N
S
T HWY 17N SANTA CRUZ AVUNIVERSITY AV
TOWN-WIDE
Project Name Creek Trail & Park Pathway & Parking Lot
Seal Coat & Striping
Project Number 831-4609
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description The project will resurface and restripe park parking lots, pathways, and sections of the Los Gatos
Creek Trail.
Location The project is located at Belgatos Park, Blossom Hill Park, Live Oak Manor Park, Oak Meadow Park,
and the Los Gatos Creek Trail.
Project
Background
The parking lots located in parks and the Los Gatos Creek Trail are heavily used on a daily basis. In
order to keep their surfaces in good condition and prevent long term wear and damage, the parking
lots and trails need to be resurfaced and striped. This project is necessary to prevent future damages
to existing pavement surfaces in the future.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-9
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Summer 2019 Bid Process Project bidding & contract award
Summer 2019 Construction Project construction
Fall 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
TOTAL SOURCE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 225,000 - 225,000 - - - - 225,000
TOTAL GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
TOTAL USE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$
CREEK TRAIL, PARKS PATHS & PARKING LOTS SEAL AND STRIPING Project 831-4609
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-10
E MAIN STHWY 17N SANTA CRUZUNIVERSITY AVAV
Project Name Town Plaza Turf Repairs
Project Number 831-4202
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project will renovate the turf at Plaza Park.
Location The project is located at Town Plaza Park, at the corner of West Main Street and Santa Cruz Avenue.
Project
Background
Plaza Park, located in the heart of downtown Los Gatos, is a popular park and hosts a variety of
community events, such as Jazz on the Plazz and the Farmer’s Market. Because of the amount of high
foot traffic at this location, the turf is heavily impacted. This project will remove the existing sod and
soil. New soil will be added to the area to enhance root growth and to re-grade the ground to
mitigate standing water issues. Additionally, along with the installation of new turf grass, minor
changes to the irrigation system will be completed to maximize water coverage. The turf was last
replaced around 2010.
The project will be completed during a period when there is the least impact on scheduled downtown
events.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-11
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$
TOTAL SOURCE OF FUNDS -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 28,000 - 28,000 - - - - 28,000
TOTAL GFAR -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$
TOTAL USE OF FUNDS -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$
TOWN PLAZA TURF REPAIRS Project 831-4202
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-12
Project Name Outdoor Fitness Equipment
Project Number 831-4006
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project will install outdoor fitness equipment.
Location The project location is still being determined.
Project
Background
The Town was awarded an outdoor fitness rig after attending a California Parks & Recreation Society
conference and competing in a competition. The Town will receive equipment that is valued at
$30,000 and Town staff will install the equipment at a location to be determined.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-13
Project
Components &
Estimated
Timeline
Summer 2019 Scope Project design & development
Summer 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 60,000 - 60,000 - - - - 60,000
TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$
OUTDOOR FITNESS EQUIPMENT Project 831-4006
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-14
Project Name Vegetation Management – Town-wide
Project Number 832-4508
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project funds an ecological assessment to provide guidance for fuel removal in Town open space
and right-of-way and the first year of open space fuel reduction.
Location The project location is Town open spaces and rights-of-way.
Project
Background
The FEMA-approved Santa Clara Operational Area Hazard Mitigation Plan lists the wildfire hazard for
the Town of Los Gatos as “high.” The funding allows for an ecological assessment to provide guidance
for fuel removal in Town open spaces and rights-of-way, and funding for the first year of open space
fuel reduction. The Town has applied for a FEMA grant for vegetation management work and a
portion of these funds may be used for as a funding match for that grant.
Operating
Budget Impacts
This project will use staff time for coordination of the assessment and fuel reduction. Parks staff time
associated with this project will be charged to the project as it is delivered.
TOWN-WIDE
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-15
Project
Components &
Estimated
Timeline
Fall 2019 Scope Project scope development
Fall 2019 RFP Process Project RFP for ecological assessment
Spring 2020 Bid Process Bid to implement fuel reduction
Summer 2020 Implementation First season of fuel reduction
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 200,000 200,000 - - - - 200,000
TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
VEGETATION MANAGEMENT - TOWN-WIDE Project 832-4508
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-16
Project Name Fence Replacement – Shire Court
Project Number 831-4509
Department Parks & Public Works Project Manager Parks & Public Works
Operations Manager: Steve
Souza
Description This project will replace a failing wood fence against Town open space on Shire Court.
Location This project is located on Shire Court.
Project
Background
The existing 2x4 wood fence on Shire Court is rotting and is an essential safety barrier as it sits above
a retaining wall and borders open space. It is at the end of its useful life and it needs replacement.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-17
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Summer 2019 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR - - - 60,000 60,000 - - - - 60,000
TOTAL SOURCE OF FUNDS - - - 60,000 60,000 - - - - 60,000
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - -
Consultant Services - - - - - - - - -
Project Construction Expenses - - - 60,000 60,000 - - - - 60,000
TOTAL GFAR - - - 60,000 60,000 - - - - 60,000
TOTAL USE OF FUNDS - - - 60,000 60,000 - - - - 60,000
FENCE REPLACEMENT - SHIRE COURT Project 831-4509
PROPOSED PARKS & TRAILS PROGRAM
Park Improvement Projects
D-18
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-19
PROJECT LOCATIONS
A Open Space Trail Upgrades
B Forbes Mill Footbridge Improvements
C Charter Oaks Trail Repair
D Trailhead Connector Project
LO
S
G
A
T
O
S
-
S
A
R
A
T
O
G
A
R
D
LOS GATOS BLVDE MAIN STHWY 17HWY 17N SANTA CRUZ AVWINCHESTER BLVDBLOSSOM HILL RDLOS GATOS BLVDHW
Y
8
5
KENNE
D
Y
R
D
SHA
N
N
O
N
R
D
LA
R
K
A
V
LOS GATOS-ALMADEN RD
UNIVERSITY AVWEDGEWOOD
KNOWLES
"A" IS A TOWN-WIDE PROJECT
B
C
D
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-20
PROGRAM SECTION DIRECTORY PAGE
4504 Open Space Trail Upgrades D – 22
4507 Forbes Mill Footbridge Improvements D – 24
4503 Charter Oaks Trail Repair D – 26
4505 Trailhead Connector Project D – 28
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-21
The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct,
repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway
construction or resurfacing.
TRAIL IMPROVEMENT PROJECTS SUMMARY
* Total FY 2018/19 Carryforward $701,051
`
Carryforward Projects
4504 Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ 152,000$
4507 Forbes Mill Footbridge Improvements 19,346 71,502 - - - - 90,848
4503 Charter Oaks Trail Repair Project 72,942 440,109 - - - - 513,051
4505 Trailhead Connector - 387,440 - - - - 387,440
New Projects
Total Trail Improvement Projects 92,288$ 1,051,051$ -$ -$ -$ -$ 1,143,339$
2020/21
Budget
2023/24
Budget
2019/20 Budget &
Carryfwd*
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
2021/22
Budget
Expended Through
2018/19
2022/23
Budget
TRAIL IMPROVEMENT PROJECTS
Total
Budgeted
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-22
Project Name Open Space Trail Upgrades Project Number 832-4504
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project will repair and replace old damaged retaining walls, fences, and embankments along the
trails in the Town’s open spaces.
Location This project is located at Santa Rosa Open Space, Heintz Open Space, and Belgatos Park.
Project
Background
The Town has a number of open space preserves that are under its jurisdiction. There are several
public trail networks that traverse the open space preserves in the hillsides. The aging process has
deteriorated a number of retaining walls and embankments along some trail sections. Without
proper repair and replacement, the possibility of failure of the trails will increase greatly. This project
will repair and replace several retaining walls that are supporting the trails and their embankments.
In addition, this project will improve the drainage system around the retaining walls to prevent
further erosion of the trails.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
.
TOWN-WIDE
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-23
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Winter 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Open Space Reserve Fund -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
TOTAL SOURCE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 152,000 - 152,000 - - - - 152,000
TOTAL GFAR -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
TOTAL USE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$
OPEN SPACE TRAIL UPGRADES Project 832-4504
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-24
Project Name Forbes Mill Footbridge Improvements
Project Number 832-4507
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description The project will provide pathway lighting across the 400-foot span of the pedestrian bridge and
installation of additional art panels.
Location The project is located on the pedestrian bridge between Forbes Mill and Old Town across Highway
17.
Project
Background
Forbes Mill footbridge is a heavily used pathway crossing Highway 17 between the Main Street
businesses, Civic Center, and high school on the east side of the freeway, and the downtown on the
west. The interior walls of the walkway are decorated with murals painted by students over the past
decades. The pathway structure once had a lighting system, but fell into disrepair several years ago
and was removed. This left the pathway dark in the evening, which has prompted concerns from
residents.
The installation of footbridge improvements in 2018 included solar LED lighting for the pathway.
Staff is currently monitoring this install to ensure the lights meet long-term needs.
This project will also install additional art panels to occupy the remaining space.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
HWY 9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-25
Project
Components &
Estimated
Timeline
Fall 2018 Design Project design & development
Fall 2018 Bid Process Project bidding & contract award
Winter 2018 Construction Project construction
Summer 2019 Completion Project completion and monitoring
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$
TOTAL SOURCE OF FUNDS 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 17,119 2,227 71,502 - 71,502 - - - - 90,848
TOTAL GFAR 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$
TOTAL USE OF FUNDS 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$
FORBES MILL FOOTBRIDGE IMPROVEMENTS Project 832-4507
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-26 HWY 17WINCHESTER BLVDLOS GATOS BLVDHW
Y
8
5
LA
R
K
A
V
KNOWLES
Project Name Charter Oaks Trail Repair Project Project Number 832-4503
Department Parks & Public Works Project Manager Superintendent: Steve Regan
Description This project will repair the storm damage on the Los Gatos Creek Trail near Charter Oaks, which
includes damage to the fencing and asphalt pathway.
Location This project is located on the Los Gatos Creek Trail near Charter Oaks.
Project
Background
The existing trail is adjacent to Los Gatos Creek and was damaged by flooding during the winter
storms of 2017. The impacts of the storm included damage to the fencing and to the asphalt
concrete pathway. The trail is well used by the public and the damage has negatively impacted trail
users by making the trail more difficult to use. Funds for this project will be provided by FEMA.
Subsequent to the trail repair work, this project will further evaluate improvements along the trail
from Lark Avenue towards Highway 85 utilizing Community Benefit funds in the amount of $350,000
from the Albright project. This project scope will be determined through community outreach efforts
for construction in FY 2019/20.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-27
Project
Components &
Estimated
Timeline
Summer 2019 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Fall 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 109$ 14,891$ 350,000$ 364,891$ -$ -$ -$ -$ 365,000$
GRANTS - 72,833 75,218 - 75,218 - - - - 148,051$
TOTAL SOURCE OF FUNDS -$ 72,942$ 90,109$ 350,000$ 440,109$ -$ -$ -$ -$ 513,051$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 109 14,891 350,000 364,891 - - - - 365,000
TOTAL GFAR -$ 109$ 14,891$ 350,000$ 364,891$ -$ -$ -$ -$ 365,000$
GRANTS &AWARDS
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 72,833 75,218 - 75,218 - - - - 148,051
TOTAL GRANTS &AWARDS -$ 72,833$ 75,218$ -$ 75,218$ -$ -$ -$ -$ 148,051$
TOTAL USE OF FUNDS -$ 72,942$ 90,109$ 350,000$ 440,109$ -$ -$ -$ -$ 513,051$
CHARTER OAKS TRAIL REPAIR PROJECT Project 832-4503
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-28
H
W
Y
9 HWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Trailhead Connector Project Project Number 832-4505
Department Parks & Public Works Project Manager Asst. Director Lisa Petersen
Description This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail
to Highway 9.
Location This project is located on the Los Gatos Creek Trail near Highway 9.
Project
Background
This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail
to Highway 9. The project is an identified priority within Measure B and the Bicycle and Pedestrian
Plan. The Council approved the staff recommendation for the next steps on this project in June
2017.
Caltrans approved the Authorization to Proceed with Preliminary Engineering, also known as E-76
approval, on December 13, 2018. In February 2019 the Town issued a Request for Proposal for the
preliminary engineering and environmental clearance phase, which will take approximately 12
months. If funding for construction is secured, the project can go into construction in 2020/21 at the
earliest.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-29
Project
Components &
Estimated
Timeline
Summer 2018 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Pending Construction Project construction
Pending Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 44,440$ -$ 44,440$ -$ -$ -$ -$ 44,440$
GRANTS & AWARDS - - 343,000 - 343,000 - - - - 343,000$
TOTAL SOURCE OF FUNDS -$ -$ 387,440$ -$ 387,440$ -$ -$ -$ -$ 387,440$
`
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 44,440 - 44,440 - - - - 44,440
TOTAL GFAR - - 44,440 - 44,440 - - - - 44,440
GRANTS &AWARDS
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 343,000 - 343,000 - - - - 343,000
TOTAL GRANTS &AWARDS -$ -$ 343,000$ -$ 343,000$ -$ -$ -$ -$ 343,000$
TOTAL USE OF FUNDS -$ -$ 387,440$ -$ 387,440$ -$ -$ -$ -$ 387,440$
TRAILHEAD CONNECTOR Project 831-4505
PARKS & TRAILS PROGRAM
Trail Improvement Projects
D-30
Public Facilities Program
PUBLIC FACILITIES DIRECTORY PROPOSED
E -1
TOWN INFRASTRUCTURE PROJECT DIRECTORY
2302 Building Replacement at Corporation Yard E – 6
2008 Energy Efficiency Upgrades Town-wide E – 8
2001 Facilities Assessment E – 10
2503 Library Carpet Replacement E – 12
2002 Town Beautification E – 14
2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 16
2117 ADA Upgrade Staff Restroom – Civic Center E – 18
2116 Plaza Level Railing – Code Upgrade E – 20
2010 Waterproofing – Town-wide E – 22
2504 Sound Mitigation in Library Lobby E – 24
6004 Fire Suppression (Halon) for Server Room E – 26
EQUIPMENT PROJECT DIRECTORY
6101 Information System Upgrade E – 32
6001 Audio/Video System Upgrade E – 36
6003 Town-Wide Document Imaging Project E – 38
2305 Engineering Document Archiving E – 40
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42
6306 Neighborhood Emergency Preparedness E – 44
6103 EOC Communication Upgrade E – 46
6104 IT Disaster Recovery Improvements E – 48
6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 50
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 2
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 3
PROJECT LOCATIONS
A Building Replacement at Corporation Yard G ADA Upgrade Staff Restroom – Civic Center
B Energy Efficiency Upgrades Town-wide H Plaza Level Railing - Code Upgrade
C Facilities Assessment I Waterproofing Town-wide
D Library Carpet Replacement J Sound Mitigation in Library Lobby
E Town Beautification K Fire Suppression (Halon) for Server Room
F ADA Upgrade Public Restrooms – Adult Recreation
Building
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 4
PROGRAM SECTION DIRECTORY PAGE
2302 Building Replacement at Corporation Yard E – 6
2008 Energy Efficiency Upgrades Town-wide E – 8
2001 Facilities Assessment E – 10
2503 Library Carpet Replacement E – 12
2002 Town Beautification E – 14
2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 16
2117 ADA Upgrade Staff Restroom – Civic Center E – 18
2116 Plaza Level Railing – Code Upgrade E – 20
2010 Waterproofing – Town-wide E – 22
2504 Sound Mitigation in Library Lobby E – 24
6004 Fire Suppression (Halon) for Server Room E - 26
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 5
The Town Infrastructure & Facilities Projects section contains Capital Improvement Program projects that maintain or
improve the Town’s public buildings and structures to keep them in a clean, safe, and functional condition. Town-owned
buildings include the Civic Center, Library, Police Operations Center, Parks & Public Works Building, Corporation Yard and
associated structures, and the following buildings leased to other agencies: the Los Gatos-Saratoga Community Education
and Recreation headquarters building and the Adult Recreation Center (formerly the Neighborhood Center). Other Town
facilities include the Venue, Tait Avenue, and Forbes Mill.
Town Infrastructure and Facilities Projects are prioritized in consideration of the user needs, federal and state mandates,
federal and state grant restrictions, and local community standards. The Community Development Department assumes
responsibility for evaluating the overall conformance to the General Plan and the status of environmental assessment. The
Parks & Public Works Department assumes responsibility for project design, planning, and construction.
This section contains annual ongoing improvement projects as well as identified one-time projects. One-time infrastructure
and facilities projects are prioritized based on health and safety issues, infrastructure impacts, available funding sources,
project costs, and community needs.
Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s public facilities;
however, grants, CDBG funds, and donations are pursued and utilized when available.
TOWN INFRASTRUCTURE & FACILITIES PROJECTS SUMMARY
*Total FY 2018/19 Carryforward $840,533
Unfunded Projects
• Civic Center Improvements
• Deferred maintenance at Town-owned, leased properties
• Deferred improvements to Town-owned properties
Carryforward Projects
2302 Building Replacement at Corporation Yard 165,692$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$
2008 Energy Efficiency Upgrade - Town-wide 1,000,000 697,039 - - - - 1,697,039
2001 Facilities Assessment - 80,000 - - - - 80,000
2503 Library Carpet Replacement - 56,500 - - - - 56,500
2002 Town Beautification 8,114 16,886 10,000 10,000 10,000 10,000 65,000
New Projects
6004 Fire Suppression(Halon) for Server Rooms - 200,000 - - - - 200,000
2601 ADA Upgrade for Public Restrooms - Rec Building - 250,000 - - - - 250,000
2117 ADA Upgrade Staff Restroom - Civic Center - 300,000 - - - - 300,000
2116 Plaza Level Railings - Code Upgrade - 30,000 - - - - 30,000
2010 Waterproofing Townwide - 75,000 - - - - 75,000
2504 Sound Mitigation in Libray Lobby - 22,000 - - - - 22,000
Total Infrastructure / Facility Projects 1,173,806$ 2,702,533$ 35,000$ 35,000$ 35,000$ 35,000$ 4,016,339$
2021/22
Budget
TOWN INFRASTRUCTURE & FACILITIES PROJECTS
Total
Budgeted
2022/23
Budget
Expended Through
2018/19
2019/20 Budget &
Carryfwd*
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
2023/24
Budget
2020/21
Budget
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 6
Project Name
Building Replacement at Corporation Yard*
Project Number 821-2302
Department
Parks & Public Works Project Manager Facilities Manager: Jim Harbin
*This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. A portion of these funds
($200,000) for this project was transferred to provide funding for the Almond Grove Street Reconstruction project.
Description This project will replace an old building at the Parks and Public Works Department (PPW) Corporation
Yard that is used for office space and evidence storage.
Location This project is located at the PPW Corporation Yard, which is located at 41 Miles Avenue.
Project
Background
The maintenance lead staff has been using a small portable building located at the north side of the
PPW Corporation Yard for their office facility. This building has deteriorated over the years and is
becoming more difficult to maintain because of its aging infrastructure. The existing building has
several problems including a leaky roof and windows, a poor heating and cooling (HVAC) system, and
lacks a restroom facility in the building. This building is also used partially by the Police Department
as their evidence storage facility. Evidence must be stored and kept at a certain room temperature,
which requires an updated HVAC system. To save costs, this project will relocate staffing to another
building and reconstruct the existing building for storage only.
Operating
Budget Impacts
This project will use staff time for construction inspection and management. Engineering staff time
associated with these projects will be charged to the project as it is delivered.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 7
Project
Components &
Estimated
Timeline
Summer 2018 Design Project design & development
Fall 2019 Bid Process Project bidding & contract award
Winter 2020 Construction Project construction
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$
TOTAL SOURCE OF FUNDS 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 16,692 149,000 108 975,000 975,108 25,000 25,000 25,000 25,000 1,240,800
TOTAL GFAR 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$
TOTAL USE OF FUNDS 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$
BUILDING REPLACEMENT AT CORPORATION YARD Project 821-2302
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 8
Project Name Energy Efficiency Upgrades Town-wide
Project Number 821-2008
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will perform various energy efficiency upgrades throughout Town-owned facilities.
Location This project location is Town-wide.
Project
Background
This project will complete various improvements in Town-owned facilities, which will improve energy
efficiency, resulting in cost savings over the long term. Once these improvements are completed, it
can lead to cost savings on utility and operating expenses. Many of the existing fixtures and
equipment throughout Town-owned facilities are outdated. Although these items are functional,
they are not the most energy efficient option at the current time.
The budget for this project includes the energy audit that was completed in FY 18/19 and the
installation of energy-saving devices in Town facilities. This project has absorbed past capital
projects, including HVAC Chiller Repair (2115), Mechanic Bay Heater (2307), Youth Recreation Center
HVAC Replacement (2205), Civic Center Building Energy Efficiency Measures (2110), and Civic Center
Exterior Light Replacement (2112).
Operating
Budget Impacts
This project will result in significant operating budget savings from reduced utility usage. The savings
will pay for the project costs over time in the form of additional charges on the utility bills. Project
delivery costs for this project are included in the CIP project’s total cost.
TOWN-WIDE
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 9
Project
Components &
Estimated
Timeline
Summer 2018 Design Project design & development
Fall 2018 Bid Process Project bidding & contract award
Winter 2018 Construction Project construction
Summer 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$
TOTAL SOURCE OF FUNDS -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 1,000,000 697,039 - 697,039 - - - - 1,697,039
TOTAL GFAR -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$
TOTAL USE OF FUNDS -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$
ENERGY EFFICIENCY - TOWN-WIDE Project 821-2008
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 10
TOWN-WIDE
Project Name Facilities Assessment
Project Number 821-2001
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will fund a consultant to assess the condition of Town facilities.
Location This project location is Town-wide.
Project
Background
This project will assess the condition of Town facilities to determine current condition of equipment
and building systems to assess priorities for repair versus replacements and to predict capital
expenditures needed year by year for life-cycle scheduled work and replacement.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 11
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2020 RFP Process Project RFP & contract award
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 80,000$
TOTAL SOURCE OF FUNDS -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 80,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 80,000 - 80,000 - - - - -
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ -$
TOTAL USE OF FUNDS -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ -$
FACILITIES ASSESSMENT Project 821-2001
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 12
Project Name Library Carpet Replacement
Project Number 821-2503
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will replace large sections of the carpet squares in the children’s area that have started to
fail.
Location This project location is inside the library at 100 Villa Avenue.
Project
Background
The carpet in the children’s area of the library is starting to mat, lift, and stain from extensive foot
traffic, spilled food, and other accidents. This area of the library is where the young kids play, listen to
stories, and congregate for different activities on the carpet. Recent replacements of the furniture
upholstery have been completed due to stains and failure, and this project will help complete the
restoration of the space back to a high service level.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2018/19 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 13
Project
Components &
Estimated
Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR - - 56,500 - 56,500 - - - - 56,500
TOTAL SOURCE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - 56,500 - 56,500 - - - - 56,500
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
TOTAL USE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$
LIBRARY CARPET REPLACEMENT Project 821-2503
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 14
TOWN-WIDE
Project Name Town Beautification
Project Number 821-2002
Department Parks & Public Works Project Manager Environmental Specialist:
Marina Chislett
Description This project funds Town-wide beautification projects on an annual, as-needed basis.
Location This project location is Town-wide.
Project
Background
The Town Beautification Program was established to provide improvements to enhance the Town’s
beauty, particularly along public streets, sidewalks, and other Town property.
One example is the Town’s Outside the Box Program which enhances the character of the community
by adding artwork to utility boxes that are often targeted by graffiti vandals. Selected artwork
contains environmental sustainability messages that include: alternative transportation, clean energy,
clean creeks, community sustainability, and healthy lifestyles. In FY 2018/19 four utility boxes were
added to bring the total to 21, and another four are planned in FY 2019/20.
Operating
Budget Impacts
The project will use staff time for program management and inspection. The staff time for this project
will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 15
Project
Components &
Estimated
Timeline
Winter 2019 Design Project design & development
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$
TOTAL SOURCE OF FUNDS -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 8,114 6,886 10,000 16,886 10,000 10,000 10,000 10,000 65,000
TOTAL GFAR -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$
TOTAL USE OF FUNDS -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$
TOWN BEAUTIFICATION PROJECTS Project 821-2002
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 16
Project Name ADA Upgrade Public Restrooms – Adult
Recreation Building
Project Number 821-2601
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will make ADA-compliant upgrades to the public restrooms at the Recreation Building.
Location This project location is at the Adult Recreation Center at 208 E. Main Street.
Project
Background
The upstairs restrooms are beyond their useful life and are very small and non-ADA compliance. The
building serves seniors and having an accessible building is essential.
This project shows the use of Community Development Block Grant (CDBG) funds as a supplemental
funding source. The CDBG Entitlement Program provides grants on a formula basis to develop viable
urban communities by providing a suitable living environment, among other goals. The grant
program has specific requirements, and this is one of the few Town projects that meets the CDBG
requirements.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/2020 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 17
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Adjusted
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 183,000$
GRANTS - - - - 67,000$ 67,000$ - - - - 67,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$
Prior Yrs
Actuals
2018/19
Adjusted
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - - -
Consultant Services - - - - - - - - - - -
Project Construction Expenses - - - - 183,000 183,000 - - - - 183,000
TOTAL GFAR -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 183,000$
GRANTS & AWARDS
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - 67,000 67,000 - - - - 67,000
TOTAL GRANTS & AWARDS - - - - 67,000 67,000 - - - - 67,000
TOTAL USE OF FUNDS -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 250,000$
ADA UPGRADE FOR PUBLIC RESTROOMS - ADULT RECREATION BUILDING PROJECT 821-2601
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 18
Project Name ADA Upgrade Staff Restroom – Civic Center
Project Number 821-2117
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will make ADA-compliant upgrades to the staff restrooms at the Civic Center
Location This project is located at the Civic Center, which is at 110 E. Main Street.
Project
Background
The Building Inspectors have moved out of their previous space in the lower level of the Civic Center.
The restrooms adjacent to this space are small non-ADA compliant restrooms. This project will
upgrade the restrooms taking advantage of the available space to meet additional area requirements.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 19
Project
Components &
Estimated
Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -
Transfer from Facilities -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 300,000 300,000 - - - - 300,000
TOTAL GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$
TOTAL USE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$
ADA UPGRADE STAFF RESTROOMS - CIVIC CENTER Project 821-2117
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 20
Project Name Plaza Level Railings – Code Upgrade
Project Number 821-2116
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will adjust the railings around the upper deck of the Civic Center to be code compliant.
Location This project location is on the deck of Town Hall.
Project
Background
The railings around the upper deck of the Civic Center have wide gaps that create a safety hazard
with a risk of children falling through the gaps. This project will adjust the railings to be code
compliant.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 21
Project
Components &
Estimated
Timeline
Fall 2019 Design Project design & development
Winter 2020 Bid Process Project bidding & contract award
Spring 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 30,000 30,000 - - - - 30,000
TOTAL GFAR -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$
TOTAL USE OF FUNDS -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$
PLAZA LEVEL RAILINGS - CODE UPGRADE Project 821-2116
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 22
TOWN-WIDE
Project Name Waterproofing -Town-wide
Project Number 821-2010
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will waterproof a balcony and a roof at two Town facilities.
Location The project is located at the Adult Recreation Center (208 E. Main Street) and the PPW Corporation
Yard at 41 Miles Avenue.
Project
Background
The roof of the engineering building at the PPW Corporation Yard is starting to show signs of age and
potential leakage as it approaches its end of serviceable life. Recent HVAC improvements added new
penetrations through this aging membrane, including relocation of a large HVAC unit in the center of
the roof. The new roof will upgrade the membrane to a single ply cool roof which will also improve
the building's energy conservation.
At the Adult Recreation Center, the rear balcony for the two manager offices upstairs cantilevers over
the activity room below. During heavy rainstorms, water leaks from under the thresholds upstairs
into the middle of the room below. The membrane needs to be replaced which entails significant
reconstruction of the sliding doors, siding, and balcony deck.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 23
Project
Components &
Estimated
Timeline
Winter 2019 Design Project design & development
Spring 2020 Bid Process Project bidding & contract award
Summer 2020 Construction Project construction
Summer 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from Facilities -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 75,000 75,000 - - - - 75,000
TOTAL GFAR -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$
TOTAL USE OF FUNDS -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$
WATERPROOFING - TOWN-WIDE Project 821-2010
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 24
Project Name Sound Mitigation in Library Lobby
Project Number 821-2504
Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin
Description This project will install sound baffling to the low ceiling in the Library Lobby.
Location This project location is inside the library at 100 Villa Avenue.
Project
Background
This is the second phase of sound reduction in the library following successful installation of doors to
the teen area in phase one. This project will install sound baffling to the ceiling in the library lobby to
help diffuse noise.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 25
Project
Components &
Estimated
Timeline
Winter 2019 Design Project design & development
Spring 2019 Bid Process Project bidding & contract award
Summer 2019 Construction Project construction
Fall 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from Library Trust -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 22,000 22,000 - - - - 22,000
TOTAL GFAR -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$
TOTAL USE OF FUNDS -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$
SOUND MITAGATION IN LIBRARY LOBBY Project 821-2504
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 26
TOWN-WIDE
Project Name Fire Suppression (Halon) for Server
Rooms
Project Number 841-6004
Department Parks & Public Works Project Manager Jim Harbin
Description This project will install fire suppression systems that are specific for server rooms.
Location This project is located at the Civic Center (110 East Main Street) and the Town of Los Gatos Police
Operations Building (15900 Los Gatos Boulevard.)
Project
Background
Basic fire suppression systems use water-based sprinklers to protect infrastructure. Server rooms
require different fire suppression to avoid damaging equipment in case the fire suppression is
triggered. This project will install non-destructive gas suppression systems at main server rooms at
essential facilities.
Operating
Budget Impacts
The project will use staff time for construction management and inspection. The staff time for this
project will be included in the department’s FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 27
Project
Components &
Estimated
Timeline
Winter 2019 Bid process Project bidding & contract award
Spring 2020 Construction Project Construction
Summer 2020 Completion Project completion
FIRE SUPPRESSION (HALON) FOR SERVER ROOMS
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -
Transfer from Facilities -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 200,000 200,000 - - - - 200,000
TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$
Project 841-6004
PROPOSED PUBLIC FACILITIES PROGRAM
Town Infrastructure & Facilities Projects
E- 28
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 29
PROJECT LOCATIONS
A Information System Upgrade
B Audio/Video System Upgrade
C Town-Wide Document Imaging Project
D Engineering Document Archiving
E
Silicon Valley Regional Interoperability Project (SVRIP)
Service
F Neighborhood Emergency Preparedness
G EOC Communication Upgrade
H IT Disaster Recovery Improvements
I
Computer-Aided Dispatch and Records Management
System (CAD/RMS)
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 30
PROGRAM SECTION DIRECTORY PAGE
6101 Information System Upgrade E – 32
6001 Audio/Video System Upgrade E – 36
6003 Town-Wide Document Imaging Project E – 38
2305 Engineering Document Archiving E – 40
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42
6306 Neighborhood Emergency Preparedness E – 44
6103 EOC Communication Upgrade E – 46
6104 IT Disaster Recovery Improvements E – 48
6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 50
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 31
The Equipment Projects section contains Capital Improvement Program projects that provide new equipment; or replace,
improve, or upgrade existing Town equipment.
This section does not have ongoing equipment programs; all projects are considered one-time projects. One-time
equipment capital improvement projects are prioritized based on service level considerations, available funding sources,
project costs, and community impacts.
Los Gatos does not have a designated funding source for new equipment or the replacement or upgrading of existing
equipment; however, grants are pursued and utilized when available.
EQUIPMENT PROJECTS SUMMARY
Carryforward Projects
6101 Information System Upgrade 10,384$ 172,785$ -$ -$ -$ -$ 183,169$
6001 Audio/Video System Upgrade 15,608 42,552 - - - - 58,160
6003 Town-wide Document Imaging Project 78,752 16,990 - - - - 95,741
2305 Engineering Document Archiving 48,284 11,716 - - - - 60,000
6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 395,027 63,601 - - - - 458,628
6306 Neighborhood Emergency Preparedness 5,910 44,090 - - - - 50,000
6103 EOC Communications Upgrade 20,411 29,589 - - - - 50,000
6104 IT Disaster Recovery Improvements - 200,000 - - - - 200,000 New Projects
6301 Computer-Aided Dispatch and Records Management System - 525,000 - - - - 525,000
Total Equipment Projects 574,375$ 1,106,324$ -$ -$ -$ -$ 1,680,698$
2019/20 Budget &
Carryfwd*
FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM
Total
Budgeted
2020/21
Budget
2021/22
Budget
2022/23
Budget
2023/24
Budget
EQUIPMENT PROJECT SUMMARY BY PROGRAM
Expended Through
2018/19
Total FY 2018/19 Carryforward $581,324
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 32
Project Name Information System Upgrade Project Number 841-6101
Department Finance Project Manager Finance Director: Stephen
Conway
Description This project upgrades the Town’s existing financial/human resources information database,
enhancing its reporting system and providing future web-based online services. This project will be
coordinated with the upgrade of the Town’s existing permit tracking system.
Location The project will enhance the information systems used by the Finance, Human Resources, and
Building Departments. Purchased computer hardware will be located in the IT Department, 110 E.
Main Street.
Project
Background
In FY 2008/09, staff completed a significant portion of a multi-year financial information system
upgrade. This project involved the conversion of General Ledgers, Payroll, Budget, and Human
Resources modules, followed by the implementation of the Cashiering and Business License modules.
Planned for FY 2019/20 required system upgrade, cloud hosting, online-timesheet management,
completion of the fixed asset module, and continuation of electronic commerce, including online
permitting and business license applications.
Operating
Budget Impacts
The remaining project balance is estimated to be $172,785. It is anticipated that the maintenance
costs for the Finance/Human Resources information system would be approximately $40,000
annually, which has been incorporated into the FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 33
Project
Components &
Estimated
Timeline
Summer 2019 System
Implementation
Upgrade and test data migration and functionality of
financial/human resources information database
Fall 2020 System
Implementation
Develop and test fixed assets, electronic commerce, and
electronic timesheet functions.
Summer 2020 Implement data migration
Fall 2020 System
Implementation
Implementation of electronic commerce, and electronic
timesheet functions.
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from MIS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$
TOTAL SOURCE OF FUNDS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services 2,590 7,794 172,785 - 172,785 - - - - 183,169
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$
TOTAL USE OF FUNDS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$
INFORMATION SYSTEM UPGRADE Project 841-6101
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 34
Project Name Audio/Video System Upgrade Project Number 841-6001
Department Town Manager Project Manager IT Manager: Chris Gjerde
Description This project provides for the replacement and/or upgrade of Council Chamber video, audio/visual,
and other applicable equipment used for televised and non-televised public meetings.
Location The video production system is located in the audio/video equipment room at the Civic Center, 110 E.
Main Street, and involves various electronic equipment required to cablecast public meetings and
make presentations.
Project
Background
In FY 2008/09, the audio/visual equipment located in the Town Council Chambers was upgraded to
meet the needs at that time. The maintenance of the video production equipment is now the
responsibility of KCAT, who receives Public, Educational, and Governmental (PEG) fees, provided by
local cable operators for this purpose. The remaining funds in this project will be used to replace
and/or upgrade the Town’s A/V equipment in the Council Chambers, as needed. Staff will also
explore the availability of additional audio/visual meeting management enhancements.
Operating
Budget Impacts
This Audio/Video System Upgrade project is funded in the GFAR Fund. It is unknown at this time
which replacements or upgrades will be required during FY 2019/20. Staff oversight of this project
will be included in the FY 2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 35
Project
Components &
Estimated
Timeline
Fiscal Year
18/19
Monitoring
As needed.
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$
TOTAL SOURCE OF FUNDS 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment 15,608 - 42,552 - 42,552 - - - - 58,160
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - - - - - - - -
TOTAL GFAR 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$
TOTAL USE OF FUNDS 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$
AUDIO / VIDEO SYSTEM UPGRADE Project 841-6001
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 36
Project Name Town-Wide Document Imaging Project Project Number 841-6003
Department Community Development/Police Project Manager Community Development
Director: Joel Paulson
Description This is the continuation of the first phase of a Town-wide project to convert existing microfiche and
paper files to electronic storage and provide desktop access.
Location Town of Los Gatos Civic Center complex (110 E. Main Street).
Project
Background
The Community Development Department has an immediate need to provide electronic storage and
retrieval of many archived documents. The electronic retrieval system will allow immediate access to
all building and planning files for members of the Community Development Department via desktop
access. Following implementation, priorities will be identified to expand document imaging to other
departments, subject to available funding.
Operating
Budget Impacts
The Community Development Department collects permit fees, a portion of which will be used to
offset some costs for document storage.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 37
Project
Components &
Estimated
Timeline
FY 2019/20 Production Continue document conversion of Building and Planning
Division files.
Prior Yrs
Actuals
2018/19
Adjusted
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from MIS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$
TOTAL SOURCE OF FUNDS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$
Prior Yrs
Actuals
2018/19
Adjusted
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 78,752 16,990 - 16,990 - 16,990 - - - - 95,741
TOTAL GFAR 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$
TOTAL USE OF FUNDS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$
TOWN-WIDE DOCUMENT IMAGING PROJECT Project 841-6003
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 38
HW
Y
9
E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV
Project Name Engineering Document Archiving
Project Number 821-2305
Department Parks & Public Works Project Manager Assistant PPW Director: Lisa
Petersen
Description This project will scan and archive all engineering record documents such as as-builts, federal and
state funded capital improvement projects, and recorded documents, all of which are currently
stored in paper format.
Location This project is located at the Engineering Services office (41 Miles Avenue).
Project
Background
Currently, most files are kept in a hard copy format in the Engineering Services office. These hard
copies have become damaged due to age and need to be preserved through archiving to maintain
pertinent records. By digitally archiving these documents, searching through records becomes much
more efficient. It is anticipated that this project will be implemented over four fiscal years, starting in
FY 2014/15 and completion estimated in FY 2019/20.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the
Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 39
Project
Components &
Estimated
Timeline
Summer 2015 Design Project development
Fall 2015 Bid process Project bidding & contract award
Summer 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
TOTAL SOURCE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 8,284 40,000 11,716 - 11,716 - - - - 60,000
TOTAL GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
TOTAL USE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$
ENGINEERING DOCUMENT ARCHIVING Project 821-2305
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 40
Project Name Silicon Valley Regional Interoperability
Project (SVRIP) Service
Project Number 841-6305
Department Police Project Manager Captain D’Antonio
Description This project will update the existing police radio system infrastructure to be compatible with the
regional interoperability requirements.
Location Town of Los Gatos Civic Center Complex, 110 E Main Street and the Town of Los Gatos Police
Operations Building, 15900 Los Gatos Boulevard.
Project
Background
The Silicon Valley Radio Interoperability Authority (SVRIA) in conjunction with the City Managers
Association and the County Chiefs Association is moving towards a program for regional
interoperability of public safety communications for police, fire services, and public works across all
jurisdictions. The Police Department, in conjunction with other public safety agencies within Santa
Clara County, will be contributing to radio system infrastructure for a period of three years to allow
for interoperability of public safety communications regionally.
Operating
Budget Impacts
Staff oversight of this SVRIP project will be included in the Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 41
Project
Components &
Estimated
Timeline
Summer 2015 Design Project development
Winter 2016 Bid process Project bidding & contract award
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$
TOTAL SOURCE OF FUNDS 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses 393,139 1,888 63,601 - 63,601 - - - - 458,628
TOTAL GFAR 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$
TOTAL USE OF FUNDS 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$
SILICON VALLEY REGIONAL INTEROPERABILITY PROJECT (SVRIP) SERVICE Project 841-6305
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 42
TOWN-WIDE
Project Name Neighborhood Emergency Preparedness Project Number 841-6306
Department Town Manager Office/PD Project Manager Captain D’Antonio
Description This project upgrades and adds Neighborhood Incident Command Posts (NICPs) for deployment in the
Town’s Community Emergency Response Team (CERT) neighborhood sectors.
Location The project will enhance and deploy additional NICPs throughout the Town’s thirteen geographic
CERT neighborhoods.
Project
Background
The Town has identified thirteen distinct CERT geographic neighborhoods. CERT is a critical element
of the Towns ability to adequately address any large-scale disaster. CERT members go through
extensive training in order to facilitate and provide emergency response capabilities in their
immediate neighborhoods. For CERT teams to function effectively they require prepositioned NICPs
within their CERT geographic area. The NICPs store critical medical, safety, communication and other
necessary equipment to adequately address the immediate needs of a neighborhood in an
emergency. The Town currently has seven NICPs in various states of preparedness.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the
Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 43
Project
Components &
Estimated
Timeline
Summer 2018 Design Project development
Fall 2018 Procurement Procurement of Equipment and Installation
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$
TOTAL SOURCE OF FUNDS -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 5,910 44,090 - 44,090 - - - - 50,000
TOTAL GFAR - 5,910 44,090 - 44,090 - - - - 50,000
TOTAL USE OF FUNDS -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$
NEIGHBORHOOD EMERGENCY PREPAREDNESS Project 841-6306
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 44
TOWN-WIDE
Project Name EOC Communications Upgrade Project Number 841-6103
Department Town Manager Office/IT/PD Project Manager Assistant Town Manager, Arn
Andrews
Description This project upgrades identified deficiencies in the Town’s Emergency Operations Center (EOC)
communication capabilities.
Location The project will enhance the communication systems within the EOC to create better interoperability
between Town staff, Public Safety and citizen volunteers in the event of an emergency.
Project
Background
The recent wildfire disasters in California and lessons learned from prior Town emergency
preparedness exercises continue to identify a lack of adequate communications as a major flaw in
emergency responses. Without robust EOC communication capabilities the situational awareness
necessary to adequately assess, and respond to, an operational area in the event of an emergency is
severely compromised. Staff is seeking to create multiple seamless communication channels between
the Town EOC, County EOC, Town Public Safety staff, Town PPW staff, Town CDD staff and CERT
volunteers.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the FY
2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 45
Project
Components &
Estimated
Timeline
Summer 2018 Design Project development
Fall 2018 Procurement Procurement of equipment and installation
Spring 2019 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 50,000$
TOTAL SOURCE OF FUNDS -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 50,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - 20,411 29,589 - 29,589 - - - - 20,411
TOTAL GFAR -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 20,411$
TOTAL USE OF FUNDS -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 20,411$
EOC COMMUNICATION UPGRADE Project 841-6103
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 46
TOWN-WIDE
Project Name IT Disaster Recovery Improvements Project Number 841-6104
Department IT Project Manager IT Manager: Chris Gjerde
Description This project upgrades the Town’s existing Information Technology infrastructure including windows
servers, storage, and network switches.
Location The project will enhance the IT systems used by all Town departments at all locations. Purchased
computer hardware will be located at 110 E. Main Street and 15900 Los Gatos Boulevard
Project
Background
Annually staff evaluates and replaces older servers and network infrastructure to ensure reliable
operation. In FY 2017/18, staff began an IT disaster recovery inventory, identifying many areas to
improve our disaster preparedness posture and increasing efficiencies with more modern
infrastructure design. These improvements to IT infrastructure require more than a simple staggered
replacement of a small percentage of servers. Improvements include Hypervisor Server Clusters and
Replication, redundant Storage Area Networks, and Public Cloud DR Data Center
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the FY
2019/20 Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 47
Project
Components &
Estimated
Timeline
Summer 2019 Design Project development
Fall 2019 Procurement Procurement of equipment and installation
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed Total Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from MIS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - 200,000 - 200,000 - - - - 200,000
TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$
IT DISASTER RECOVERY IMPROVEMENTS Project 841-6104
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 48
Project Name Computer-Aided Dispatch and Records
Management System (CAD/RMS)
Project Number 841-6301
Department Police Project Manager Captain D’Antonio
Description This project upgrades the Police Departments current Computer Aided Dispatch and Records
Management System (CAD/RMS).
Location This project is located at Police Administration Building.
Project
Background
The Los Gatos Monte Sereno Police Department has an immediate need to replace its Computer
Aided Dispatch and Records Management System (CAD/RMS). The Los Gatos Monte Sereno Police
Department and the City of Sunnyvale have been in a cost sharing agreement since October 2016,
and the Town needs an independent system.
The Department seeks an integrated solution that offers the capability to comply with existing and
upcoming mandates, capture ongoing statistical data, accurately measure performance, better equip
first responders with relevant information, reduce report writing time, enhance internal cross-
training, and be technologically progressive. Enhancements will give CAD/RMS terminal access to
sworn and non-sworn support personnel, including physical access at two sites and mobile access in
14 vehicles.
Operating
Budget Impacts
This project will use staff time for management. The staff time for this project is included in the
Operating Budget.
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 49
Project
Components &
Estimated
Timeline
Spring 2019 Bid process Project bidding & contract award
Fall 2019 Procurement Procurement of equipment and installation
Spring 2020 Completion Project completion
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
SOURCE OF FUNDS to 2019/20 (with Carryfwd)
GFAR
Transfer from Equipment Replacement -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$
TOTAL SOURCE OF FUNDS -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$
Prior Yrs
Actuals
2018/19
Estimated
Estimated
Carryfwd
2019/20
New Funding
2019/20
Budget
2020/21
Proposed
2021/22
Proposed
2022/23
Proposed
2023/24
Proposed
Total
Project
USE OF FUNDS to 2019/20 (with Carryfwd)
GFAR `
Salaries and Benefits - - - - - - - - - -
Services/Supplies/Equipment - - - - - - - - - -
Site Acquisition & Preparation - - - - - - - - - -
Consultant Services - - - - - - - - - -
Project Construction Expenses - - - 525,000 525,000 - - - - 525,000
TOTAL GFAR -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$
TOTAL USE OF FUNDS -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$
COMPUTER-AIDED DISPATCH AND RECORDS MANAGEMENT SYSTEM Project 841-6301
PROPOSED PUBLIC FACILITIES PROGRAM
Equipment Projects
E- 50