Loading...
Item 2 - Addendum PREPARED BY: SEAN MULLIN, AICP Associate Planner Reviewed by: Planning Manager and Community Development Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6874 www.losgatosca.gov TOWN OF LOS GATOS PLANNING COMMISSION REPORT MEETING DATE: 04/24/2019 ITEM NO: 2 ADDENDUM DATE: APRIL 22, 2019 TO: PLANNING COMMISSION FROM: JOEL PAULSON, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: ARCHITECTURE AND SITE APPLICATION S-16-054. PROJECT LOCATION: 248 JARED LANE. PROPERTY OWNER/APPLICANT: SAM PAN. REQUESTING APPROVAL FOR CONSTRUCTION OF A NEW SINGLE-FAMILY RESIDENCE AND REMOVAL OF LARGE PROTECTED TREES ON VACANT PROPERTY ZONED HR-1. APN 532-34-071. REMARKS: Exhibit 31 includes an updated Grading and Excavation Summary table to replace the table included on page 5 of the April 24, 2018 Staff Report. The updated table includes more grading and excavation details on the two versions of the site grading plans presented with the original architectural design. Exhibit 32 includes a Project Information Sheet prepared by the Town’s Engineering Division. Exhibit 33 includes public comments, received between 11:01 a.m., Friday, April 19, 2019, and 11:00 a.m., Monday, April 22, 2019. EXHIBITS: Previously received under separate cover: Addendum to previously adopted Mitigated Negative Declaration Previously received with the April 11, 2018 Staff Report: 1. Location Map 2. Required Findings and Considerations (one page) 3. Recommended Conditions of Approval (16 pages) 4. Site Photos (five pages) 5. Color and Materials Sheet, received August 4, 2017 (one page) 6. Letter of Justification, received February 1, 2018 (15 pages) 7. Consulting Architect Report, dated May 15, 2017 (six pages) PAGE 2 OF 2 SUBJECT: 248 JARED LANE/S-16-054 APRIL 22, 2019 N:\DEV\PC REPORTS\2019\Jared Lane, 248 - PC 04-24-19 - ADD.docx 8. Applicant’s Arborist Report by Ian Geddes, dated August 18, 2016 (29 pages) 9. Consulting Arborist’s Peer Review Report by Walter Levison, dated May 5, 2017 (20 pages) 10. Applicant’s Arborist Addendum by Ian Geddes, dated October 25, 2017 (seven pages) 11. Applicant’s Arborist Addendum by Ian Geddes, dated December 1, 2017 (nine pages) 12. Consulting Arborist’s Peer Review Report by Walter Levison, dated December 1, 2017 (19 pages) 13. Public comments received by 11:00 a.m., Friday, April 6, 2018 14. Development Plans, received March 1, 2018 (33 sheets) Previously received with the September 26, 2018 Staff Report: 15. Revised Required Findings and Considerations (one page) 16. Additional Letter of Justification, received September 4, 2018 (19 pages) 17. Development Plans, received August 29, 2018 (34 sheets) Previously received with the January 9, 2019 Staff Report: 18. Consulting Architect Report, dated November 13, 2018 (eight pages) 19. Letter of Justification – Applicant, received December 20, 2018 (four pages) 20. Letter of Justification – Architect, received December 19, 2018 (two pages) 21. Massing comparison between original and revised project design (five pages) 22. Project Information Sheet by Engineering Division (two pages) 23. Development Plans, received December 20, 2018 (20 sheets) Previously received with the April 24, 2019 Staff Report: 24. Revised Required Findings and Considerations (two pages) 25. Recommended Conditions of Approval (16 pages) 26. Letter of Justification – Architect, received April 18, 2019 (seven pages) 27. Consulting Architect Report, dated February 19, 2019 (10 pages) 28. Summary of applicant’s neighbor outreach efforts (two pages) 29. Development Plans, received April 15, 2019 (24 sheets) 30. Public comments received by 11:00 a.m., Friday, April 19, 2019 Received with this Addendum Report: 31. Updated Grading and Excavation Table (one page) 32. Project Information Sheet prepared by the Engineering Division (two pages) 33. Public comments received between 11:01 a.m., Friday, April 19, 2019, and 11:00 a.m., Monday, April 22, 2019 Distribution: Sam Pan, 1901 Nobili Avenue, Santa Clara, CA 95051