Loading...
Attachment 3 - City of San Jose Reach CodesSummary of San José’s Natural Gas Infrastructure Prohibition and Reach Code Ordinances Natural Gas Infrastructure Prohibition Requirements Reach Code Requirements1 Occupancy Type Requirements Supplementing Reach Code All-Electric Building Requirements Mixed Fuel Building Requirements Single-family2, Detached Accessory Dwelling Unit (ADU), and Low-rise Multi-family Requires all-electric building3 Not applicable to low-rise hotels/motels. Efficiency: To Code Electric Vehicle Charging Infrastructure (EVCI): Single-family: 1 EV Ready; Detached ADU: 1 EV Ready (if space is required by Code); Low-rise Multi-family: 10% EVSE, 20% EV Ready, 70% EV Capable Efficiency4: EDR = min. 10 point reduction; electrification-ready EVCI: Same as All-Electric High-rise Multi-family and Hotel/Motel Not applicable. Efficiency5: To Code EVCI: High-rise Multi-family: 10% EVSE, 20% EV Ready, 70% EV Capable; Hotel/Motel: 10% EVSE, 0% EV Ready, 50% EV Capable Efficiency5: 6%; electrification-ready EVCI: Same as All-Electric Other Non-residential Not applicable. Efficiency5: To Code EVCI: 10% EVSE, 0% EV Ready, 40% EV Capable Efficiency5: Office & Retail: 14%; Industrial/ Manufacturing: 0%; All other non-residential occupancies: 6%; all electrification-ready EVCI: Same as All-Electric 1.Solar-readiness required for all buildings 2.By Building Energy Code definition, “single -family” includes one - and two-dwelling units (including townhomes) 3.Hardship exemption may be requested 4.Applies to mixed-fuel low-rise hotels/motels and only applies to other occupancy types if they request and are approved for an exemption from the natural gas infrastructure prohibition 5.Efficiency for non-residential occupancies refers to an energy performance requirement or a compliance margin (%) above the 2019 Building Energy Code. ATTACHMENT 3 This Page Intentionally Left Blank