Attachment 1 - Grant Award SummarySummary of Awarded Funds in Grant Programs at State, Regional and County LevelsUpdatedNovember 2019Awarded GrantsYear Project Name Grant Program Awarded Type Project Status2016/17 Bicycle & Pedestrian Master Plan Transportation Development Act Article 3 75,497$ Formulaic Completed2016/17 Bicycle & Pedestrian Master PlanCounty PICH40,000$ Competitive Completed2016/17 SR2SCounty PICH15,000$ Competitive Completed2017 Los Gatos Creek Trail to SR 9 ConnectorOBAG 2343,000$ Formulaic Design2016 Townwide signal modernization (Smart Signals)Vehicle Registration Fee (VRF)500,000$ Competitive Design2017 Los Gatos Smart SignalsMTC IDEA700,000$ Competitive Design2017 Los Gatos Smart SignalsVehicle Registration Fee (VRF)376,400$ Competitive Design2018 Roberts Fisher School FrontageTransportation Fund for Clean Air (TFCA)39,500$ Competitive Completed2018 BHR Bike and Pedestrian ImprovementsRegional Bike Program from TFCA242,000$ Competitive Completed2018 Bicycle and Pedestrian Bridge over Highway 17 Transportation Development Act Article 3 52,995$ Formulaic Feasibility Study2019 Bicycle and Pedestrian Bridge over Highway 17 Transportation Development Act Article 3 34,456$ Formulaic Feasibility Study2018 Shannon Road Complete StreetsVehicle Emissions Reductions Based at Schools 940,100$ Competitive Start in 20202018 Guardrail UpgradeHighway Safety Improvement Program (HSIP)980,100$ Competitive Design RFP released2019 Hwy 9 Interchange & Hwy 17 Efficiency Improvements ‐ Design Measure B5,400,000$ Competitive Design2019 Bicycle and Pedestrian Education & EncouragementMeasure B24,586$ Formulaic Design2019 E. Main St. Speed Table/Raised CrosswalkTransportation Fund for Clean Air (TFCA)86,200$ Competitive Start in 20202019 School bus pilotTransportation Fund for Clean Air (TFCA)174,000$ Competitive In service2019 Winchester Class IV BikewayRegional Bike Program from TFCA293,922$ Competitive Start in 2020Total10,317,756$ Pending and UpcomingYear Project NameGrant ProgramRequested Type Project Status2019 Local Road Safety Plan Highway Safety Improvement Program (HSIP)72,000$ Fund requestStart in 20202020 LG Creek Trail to SR 9 Connector (construction) Measure B 4,000,000$ Competitive N/A2020 BPOC over Highway 17 (final design) Measure B 5,000,000$ Competitive N/A2020 Kennedy sidewalk between LGB and EnglewoodMeasure B800,000$ Competitive N/A2020 Winchester Boulevard Complete Streets Measure B1,100,000$ Competitive Conceptual design2020 Highway 9/Massol Avenue RRFB (construction)Measure B400,000$ Competitive "Shovel ready"Total11,372,000$ Note: Grant amounts requested are preliminary estimates.Not AwardedYear Project Name Grant Program Requested Type2017 Urban Forest Master Plan Cal Fire Urban & Community Forestry Program 160,000$ Competitive 2017 Activate Los Gatos Caltrans Transportation Planning 386,000$ Competitive2018 School ride sharing pilot Transportation Fund for Clean Air (TFCA)120,000$ Competitive2018 E. Main St. Speed Table/Raised CrosswalkAARP Community Challenge77,250$ Competitive2018 LG Creek Trail to SR 9 Connector (construction)Vehicle Emissions Reductions Based at Schools 1,000,000$ Competitive2019 LG Creek Trail to SR 9 Connector (construction)Santa Clara Valley Water District571,000$ CompetitiveATTACHMENT 1