401-409 Alberto Wy - Staff Report and Exhibits 31- 35LP ACQY J S ITI ONS REAL ESTATE DEVELOPMENT March 17, 2017 Ms. Jennifer Armer, Associate Planner Town of Los Gatos Community Development Department 110 E. Main Street Los Gatos, CA 95031 Phone: (408) 354-6872 Email : jarmer@losgatosca.gov RE: Response Letter to Planning Commission from Public Hearing on August 24, 2016 . 405 Alberto Way Architecture and Site Application S-15-056 Condit ional Use Permit Application U-15-009 APN 529-23-018 Thank you for recommending approval of LP Acquisition's above-referenced project to the Planning Commission at its hearing on August 24, 2016. In anticipation of the continued Planning Commission Public Hearing scheduled for March 22nd, this response letter describes the architectural changes between the Original Plan Set (a/k/a 401-405 Alberto Way) submitted on July 13, 2016 and the Revised Plan Set (a/k/a 405 Alberto Way) submitted on March 9, 2017, and responds to the Planning Commissioner's direction from the August 24, 2016 Public Hearing. SUMMARY OF ARCHITECTURAL CHANGES: Since the August 24, 2016 Planning Commission meeting, LP Acquisitions has been meeting with the neighbors and interested parties, and we initiated a comprehensive effort to redesign our Project in response to both the Town and neighborhood comments and concerns. Based on the feedback we received from the Planning Commission and the neighborhood, we revised the architecture to incorporate the following key design modifications: We combined the former two (2), two-story buildings into a single, two-s tory build ing thereby resulting in a 9,000 square foot reduction in floor area, and a reduction in overall heights by 5.5 feet on the north side and 6.0 feet on the south side of the new building when compared to the previous two buildings. Other changes include: • To illustrate the reduction in the building massing and size, the original design was 1,614,290 cubic feet ("cf") and the proposed redesign is 1,207,665 cf. Therefore, we reduced the building size by 25%. 535 Middlefield Road, Suite 190 , Menlo Park , CA 94025 1 650 .326.1600 EXHIBIT 3 1 APPLICANT RESPONSE LEITER • We relocated the office building to the rear of the site, against the setback lines on Saratoga-Los Gatos Rd. {Route 9) and the on-ramp to Highway 17 . This accomplishes two very important goals : 1) allows for significantly more open space on the Alberto Way frontage to the building, which is utilized for additional surface parking and amenity space, and 2) enhance the views of the existing trees and mountains behind the building, when viewed from the properties on the other side of Alberto Way. • We shifted the building by an additional10 feet away from the north property line, in response to concerns from the Las Casitas neighbors which borders the Applicant's property to the north. The reduced building size, along with a reduced par.king ratio of 4 spaces per 1,000 square feet of building area, results in a 58-space reduction in the overall parking count from 390 parking spaces to 332 parking spaces. In response to the Town and neighborhood concerns regarding the former design's lack of surface parking, we increased the surface parking count from 7 to 42 parking spaces. The overall parking reduction also results in a significant reduction in size of the underground parking garage (which we retained) thereby accommodating all construction staging on site, instead of in the street. We replaced the proposed building foundation with a concrete superstructure in order to significantly reduce the building height by 5.5 feet on the north side and 6.0 feet on the south side. Consequently, the revised building footprint preserves the views of the existing trees and mountains behind the building, when viewed from the properties on the other side of Alberto Way. We also eliminated the tower elements in response to the Planning Commission and neighbors' concerns that the elements were too prominent, and we eliminated the second-floor exterior balcony on the north {Las Casitas) side of the building. All second-floor exterior balconies now face Alberto Way thereby enhancing the design hierarchy of the building to create more definition between the ground and second floor design elements. LP Acquisitions retained the Missipn style architecture which maintains the small-town flavor of other, nearby commercial developments in Los Gatos and resembles the massing and scale of the other existing buildings in the immediate neighborhood . Lastly, and in response to both the Town and neighbor concerns with respect to traffic and safety on Alberto Way, and consistent with the Town's Complete Street Ordinance, we are proposing to dedicate a portion of the site for the purpose of widening and straightening Alberto Way, allowing for the addition of both a bike lane in front of the property and an extended right turn lane onto Saratoga-Los Gatos Road {Route 9). We have identified locations for detached sidewalk improvements on both the Alberto Way and Saratoga-Los Gatos Road {Route 9) street frontages, and are proposing to install new curb, ramps and crosswalk at the Saratoga-Los Gatos Road {Route 9) to the Highway 17 on ramp . We have addressed the Town's and neighbors' concerns regarding the project through the design modifications summarized above and further discussed in ARC TEC's letter dated March 2 APPLICANT RESPONSE LETIER 16, 2017 . The proposed modifications described above are feasible and represent minor revisions and clarifications to the overall project description that will not add significant new information to the Town of Los Gatos 401-409 Alberto Way Draft and Final Environmental Impact Report (EIR). This information will not require recirculation of the EIR because the proposed modifications will further lessen impacts that the Town previously found to be less than-significant. Further the changes incorporated into the Project would not involve a new significant environmental impact, a substantial increase in the severity of a prior environmental impact, or a feasible mitigation measure or alternative that we declined to adopt and that will clearly lessen any project impacts. No information provided in our submittal indicates that the Draft EIR was inadequate or conclusory or that the public was deprived of a meaningful opportunity to review and comment on the EIR . SUMMARY OF PLANNING COMMISSIONER DIRECTIONS TO THE APPLICANT FROM THE AUGUST 24, 2016 PUBLIC HEARING: The following summarizes key comments from the Planning Commission followed by ou r response to the comment referred to as, the "Applicant Response ." Thomas O'Donnell (Chair) 1. Requested a 1/3 reduction in the size of the building. APPLICANT RESPONSE: The Applicant's proposed redesign of the office project reduces the size and mass of the building by combining the two former buildings into a single building (a/k/a 405 Alberto Way). The smaller single building redesign provides Jess floor area and would result in further setting back the building to the rear setback allowed by the Town. Also, we reduced the building's overall heights by 5.5 feet on the north side and 6.0 feet on the south side, and we eliminated the tower elements. Consequently, the overall size of the building expressed in cubic feet has resulted in a 25% reduction. Additionally, the following facts support our redesigned office project: 1) the current Class A office vacancy rate in Los Gatos is at or near 0% (see attached exhibit "Colliers Los Gatos Office Class A Snapshot"); therefore, there is an enormous demand for more Class A office in Los Gatos; 2) Due to the high pri ce of land and construction costs, it is not financially feasible for LP Acquisitions to develop an office project of less than 83,000 square feet on this site. For example, the parking structure costs alone exceed $12 million dollars. When coupled with the land price, the land acquisition cost and the parking structure together result in a development cost of $615 per square foot. This cost does not include other development costs associated with grading and excavation, and on-site and off-site infrastructure. Lenders typically expect a 12% annual lease payment on total costs for the lender's own risk calculations in order to decide whether to invest in a commercial office project. W ith a 12% annual lease payment, the rent would need to be $6.15 triple net lease (NNN). In the Los Gatos office market, rents are closer to $4.50 NNN which would result in a return below 9%. With a return below 9% and the development costs associated 3 APPLICANT RESPONSE LETIER with this project for an 83,000 square foot building the revised Project is barely at the threshold of feasibility. Any further reductions in project size compromise the likelihood that LP Acquisitions will be able to secure a lender for this project. Accordingly, LP Acquisitions found that the 83,000 square foot building is the smallest sized building that feasibly could be developed and still meet the basic project objectives, while incorporating the design changes requested by the Planning Commission and the public. D. Michael Kane (Vice Chair) 1. The new office project should be similar (in architectural style) with surrounding neighborhood per Community Design Element ("CD"), Section 1.4 APPLICANT RESPONSE: As there is no prevalent commercial architectural style in the immediate surrounding neighborhood as discussed at the August 24th Planning Commission meeting, we redesigned the proposed project to promote the small-town atmosphere "feel and image", and so that the building complements the existing commercial centers consistent with the maintenance and design of a small -town Class A office center. Specifically, the project vernacular is of a mission-style architecture and the building incorporates various design elements of the Hotel Los Gatos and Palo Alto Medical Foundation building located on Los Gatos Boulevard. The Town's Architectural Consultant approved the proposed architectural style as in keeping with the Town's Commercial Design Guidelines. 2. Develop traffic safety measures: a. For vehicles turning from Alberto Way onto Saratoga-Los Gatos Road (Route 9) westbound -cars are driving too fast down the hill under existing conditions. APPLICANT RESPONSE : LP Acquisitions is proposing to incorporate the Town's Complete Street Program into the Project circulation system. For example, the Project Includes detached sidewalk along Saratoga-Los Gatos Road (Route 9) in order to create a buffer between pedestrians and vehicles exiting onto the Hwy 17 onramp. The sidewalk will lead to an ADA compliant ramp that will allow pedestrians to cross the Hwy 17 onramp with the use of a striped crosswalk as shown on Sheets A1.01 and C2.0 of the March 9, 2017 Revised Plan Set submittal package. To address the existing conditions, the Town could consider installing a speed feedback sign on the hill. b. Look into installing traffic calming measures on Alberto Way. APPLCIANT RESPONSE: After the August 24, 2016 Planning Commission Hearing, the LP Acquisitions project team met with Public Works and Planning on September 2, 2016 to explore various options for traffic calming measures on Alberto Way and Saratoga-Los Gatos Road (Route 9). Per the Town's Public Works Department, LP Acquisitions would need to comply with the Town's Traffic Calming Policy. Traffic calming is 4 APPLICANT RESPONSE LEDER initiated by submitting a petition signed by 50% of the Alberto Way Residences in accordance with the Town's Traffic Calming Policy. Further discussion with the Town's Public Works would be required if the neighborhood were to request further traffic calming improvements in the area. Kendra Burch (Commissioner) 1. Reduce the size of the building. APPLICANT RESPONSE: See Applicant Response under Thomas O'Donnell and Matthew Hudes . Matthew Hudes (Commissioner) 1. Explore a more visible pedestrian crossing at the Hwy 17 Northbound on-ramp working with Staff and CaiTrans. APPLICANT RESPONSE: LP Acquisitions will implement the Town's Complete Street Program as summarized above . The Applicant will install a detached sidewalk along Saratoga-Los Gatos Road (Route 9) in order to create a buffer between pedestrians and vehicles entering onto the Hwy 17 onramp . The sidewalk will lead to an ADA compliant ramp that will allow pedestrians to cross the Hwy 17 onramp with the use of a striped crosswalk. To address existing pedestrian safety concerns, the Town could consider installing flashing beacons at the cross walk to make it more visible, which would be consistent with CaiTrans' suggestion in its June 13, 2016 letter that beacons be installed at this location. Presumably, then, CaiTrans would be inclined to approve the beacons and the Applicant would be happy to install these flashing beacons as part of its offsite improvement plan at this cross walk. 2. Explore with Staff the possibility of straightening and widening Alberto Way to allow ingress/egress of emergency vehicles and a bike lane, as well as implement the Town's Complete Street Program . APPLICANT RESPONSE: LP Acquisitions will implement the Town's Complete Street Program. The Applicant has proposed a land dedication along the Alberto Way frontage in order to facilitate this request. The revised design has moved a majority of the existing curb and gutter into the proposed land dedication as well as the excess ROW (back 5 feet) in order to have a wider and straighter roadway section. This widening will allow Alberto Way to incorporate a bicycle lane and a longer right turn lane which leads onto Saratoga-Los Gatos Road (Route 9). Additionally, the wider road will improve the visibility between pedestrians and vehicles. 3 . Reduce the massing and size of Building 401 (Eastern fa9ade) and articulate the top floor in a way similar to the existing buildings and move Building 401 more to the rear of the property. APPLICANT RESPONSE: The revised design combines the two former buildings into a single building (a/k/a 405 Alberto Way). The new building is entirely 5 APPLICANT RESPONSE lETIER repositioned to the rear setback and the southern end of the new building is over 60 feet further away from Alberto Way than the former 401 building. We eliminated the second-floor exterior balcony on the north (las Casitas) side of the building. As a result, all second -floor exterior balconies now face Alberto Way which breaks up the building massing by accentuating the first floor and moves the second floor further away from Alberto Way. Furthermore, through the use of a concrete structure, lP Acquisitions reduced the floor-to-floor heights and we reduced the mansard roof height thereby resulting in an overall building height reduction of 5.5 feet on the north side and by 6.0 feet on the south side of the property. We eliminated both tower elements which has significantly reduced the height in these specific roof areas by 13.6 feet on the north side and 12 feet on the south side. This allows for views of the existing trees in the CaiTrans right-of-way and distant mountains to be visible from the properties across Alberto Way. Melanie Hanssen (Commissioner) 1. Reduce the size of the buildings. APPLICANT RESPONSE: See Applicant Response above under Thomas O'Donnell and Matthew Hudes. 2. Requests that the Residents and Applicant work together. APPLICANT RESPONSE: The Alberto Way residents, as part of the various Homeowner Associations appointed John Mittelstet to be our Point of Contact ("POC"). lP Acquisitions initiated contact with Mr. Mittelstet and has been providing him regular updates. The first set of new drawings was delivered to him on January 18, 2017 and two Neighborhood Outreach meetings were held on January 30, 2017. See attached exhibit "Summary of January 30, 2017 Neighborhood Outreach Meetings". Additionally, Mr. Mittelstet has arranged a following-up Neighborhood Outreach Meeting with lP Acquisitions and the neighbors for March 20, 2017 in order to educate the neighbors on the latest revisions in the March 9, 2017 Revised Plan Set. 3. Preserve the Small-Town Character per CD Introduction and General Plan lU 1.2 . APPLICANT RESPONSE : The proposed project has been designed so that it complements the small-town atmosphere and image; and it preserves and promotes existing commercial centers consistent with the maintenance and design of a small-town Class A office center. Specifically, this project incorporated various design elements from the Hotel los Gatos and Palo Alto Medical Foundation office building located on los Gatos Boulevard. 4. Ensure the land use is consistent with the neighborhood per General Plan LU1.4 and lU1.8. APPLICANT RESPONSE: The proposed project has been designed in conformance with the Town of los Gatos Zoning requirements. Proposed site coverage, height limitations and parking requirements all meet the Town zoning requirements. lP Acquisitions proposed a project that complies with the applicable General Plan and Zoning requirements. We have not requested any 6 APPLICANT RESPONSE LETIER special considerations, variances, exceptions or amendments as part of this application. The overall building size expressed in cubic feet is now 25% small which promotes the design of a small -town scale. Charles Erekson (Former Commissioner) 1. Wants a new proposal that addresses the following : i. Significant reduction in scale and size of the building. Applicant to decide what is appropriate. APPLICANT RESPONSE: See Applicant Response above under Thomas O'Donnell and Matthew Hudes. ii. Move Building 405 further away from the Las Casitas HOA neighborhood which borders the Applicant's property on the north. ARCHITECT RESPONSE: The northern side of the redesigned building has been repositioned to be 10 feet further away from the Las Casitas property line. Per the revised design, the northern side of the building will now sit more than 25 feet from the property boundary (15 feet setback+ the additional10 feet recently incorporated into the Revised Plan Set). As noted above, the Applicant also removed the second-floor exterior balcony on this side per the neighbor's request. iii. Maintain underground parking structure. iv. APPLICANT RESPONSE: The underground parking structure has been retained . The reduced building size, along with a reduced parking ratio of 4 spaces per 1,000 square feet of building area, allows the OVERALL parking count to be reduced from 390 parking spaces down to 332 parking spaces (a reduction of 58 OVERALL parking spaces). As a result, the footprint of the underground parking structure has been dramatically reduced in size and its overall parking count has been significantly decreased by a total of 93 parking spaces from the former 383 garage parking spaces down to 290 garage parking spaces. In response to the Town and neighborhood concerns regarding the former design's lack of surface parking, the Applicant increased the surface parking count from 7 to 42 parking spaces. Additionally, the parking reduction creates a significant reduction in size of the underground parking garage, which will now allow for all construction staging to occur on site and it reduces the amount of export off-haul during excavation . See attached exhibits "Revised Project Construction Details for 405 Alberto Way" and "Revised Project Construction Export Details for 405 Alberto Way". v. Re-examine safety measures and widen the street. Work with Staff to implement traffic calming measures on Alberto Way. APPLICANT RESPONSE: See Applicant response above under D. Michael Kane and Matthew Hudes. The Applicant has straightened and widened Alberto Way by over 5 feet. The Applicant will continue to work with the Town on potential traffic calming measures. Further discussion with the Town's Public Works is required . 7 APPLICANT RESPONSE LETIER vi. Incorporate architectural styles that are consistent with the Neighborhood. Mediterranean architecture doesn't fit the character of the neighborhood. APPLICANT RESPONSE: See Applicant Response above under D. Michael Kane . Please feel free to contact me if you have any questions. Thank you for your as sistance . Sincerely, Shane Arters Principal & COO 8 Direct Qu arter Date Vacant 04-16 Jan-17 0 Dec-16 0 Nov-16 0 03-16 Oct-16 0 Sep-16 0 Aug-16 2.298 02·16 Jul-16 2,298 Jun-16 2.298 May-16 2.298 01-1 6 Apr-16 2.298 Mar-16 2,496 Feb-16 5.892 04-15 Jan-16 9,339 Quarter Date 04-16 Jan -17 Dec-1 6 Nov -16 03-16 Oet-16 Sep-16 Aug -16 02-16 Jul-16 Jun-16 May-16 01-16 Apr-16 Mar-16 Feb-16 04-15 Jan-16 Avail able Space Total Sublease Direct Sublease Available Vacant Occupied Occ upied Space 0 0 0 0 0 0 2.137 2,137 0 0 2.137 2.137 0 0 2,137 2.137 0 0 0 0 0 15.000 0 17.298 0 15.000 0 17,296 0 15,000 0 17.298 0 15,000 0 17,298 0 0 0 2.298 0 0 0 2.496 0 0 0 5,892 0 0 0 9.339 Los Gatos Office Cl ass A Absorption Gross Net Date Ran!!• Absorption Absorption 12/1116 to 111/1 7 2.557 0 11/1116 to 12/1 /16 0 0 10/1/16 to 1111/16 0 0 9/1/16 to 10/1116 0 0 811116 to 9/1/16 17.298 2,296 7/1/16 to 6/1116 0 0 6/1/16 to 7/1/16 0 0 511/16 to 6/1/16 0 0 4/1/16 to 511116 0 0 3/1116 to 4/1/16 239 198 2/1/16 to 3/1116 3.396 3.396 1/1116 to 2/1 /16 0 0 1211/15 to 1/1/16 6.613 6.813 Los Gatos Office Class A Weighted Av erage Asking Rents Weighted Quarter Date Rentln FS 04-16 Jan -17 $0.00 Dec-16 $3.95 Nov-16 $3.95 03-16 Oct-16 S3.95 Sep-16 $0.00 Au g-16 $3.60 02-1 6 Jul-16 $3.60 Jun-16 $3.60 May-16 $3.60 01-16 Apr-16 $3.95 Mar-16 $3.95 Feb-16 $3.95 Q<:-15 Jan-16 $3.59 Total Available Buildi ng Sp ace Rate Base 0.00% 655.340 0.33% 655,340 0.33% 655,340 0.33% 655,340 0.00% 655,340 2.64% 655.340 2.64% 655,340 2.64% 655.340 2.64% 655.340 0.35% 655.340 0.38% 655.340 0.90% 655,340 1.43% 655,340 Gross Net Absorption Absorption Quarter Quarter 2.557 0 17.298 2.298 0 3.635 3,59 4 6.813 6.813 Total Available Space Rate 3.00%' i =~-=-----=~1--·-------\ O.OO'k ------~-·--~ Jan-16 Feb-16 Mar-16 Apr-16 May-18 Jun-16 Jul-16 AU\)·1 6 Sep-16 Oet-16 Nov·16 Oec-16 Jan-17 ~Gross Absorption ~Net Absorption 20 .000 • 18,000 f 16.000 t----------- 14.000 1------------------- 10.000 . ---- 8.000 6,000 . 4.000 2.000 I -. -t- Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Deo-16 Jan-17 54.50 - S4.00 53.50 • $3.00 . S2.50 1 I --~ S2.00 ~ S1 .50 ! S1.00 --------- 50.50 ~.00 -------------~ Weighted Average Asking Rents Jan-16 Feb-16 Mar-1 6 Apr-16 May-16 Jun-16 Jul-1~ Aug-16 Sop-16 Ocl·16 Nov-16 Oec-16 Jan-17 Cotuers lntemaUOn:tlls pleased to be abte to pmvide the above lnfonnation and In so doing believes lis vartdlty. However, we cannolgU3t'antee its eccuracyor tak.e responsibility ror Its use. LP ACQ!JISIT I ONS REAL ESTATE DEVELOPMENT Summary of January 30, 2017 Neighborhood Outreach Meetings Neighborhood Outreach Table of Contents 1. January 30} 2017} 4:30 pmJ Open House outreach at Los Gatos Commons 2. January 30} 2017, 6 pm, Open House outreach at Los Gatos Commons *The above Community Outreach Meetings are in addition to 14 other Neighborhood Meetings we held with Alberto Way residents since September 2015. In total, LP Acquisitions has held 16 Neighborhood Meetings which Planning has received copies of such with every resubmitta1. Please see the July 13 , 2016 resubmittal for documentation of the other 14 meetings. 535 Middlefield Road, Suite 190, Menlo Park, CA 94025 1 650.326.1600 Questions and Feedback from the January 30, 2017, 4:30pm Open House: Question or Comment: • What is the new size of the project? • Why didn't we reduce the size by 33% as requested by the Planning Commission on August 24th, 2016? • How many parking spaces were removed • How many more parking spaces are at-grade • How many parking spaces are in the garage • How many parking spaces is the Project removing from Alberto Way • Is the Project frontage now straighter • Are there three dedicated lanes for traffic • Is there now a bike lane • Do we now meet the Complete Streets Guidelines • Are we improving the frontage to Alberto and LG/S • Can we build a bridge over the 17 North onramp • Can you provide traffic safety ideas on Alberto • How much did the left turn lane from LG/S extend • Are the buildings as high now as prior Applicant Response: 83,000 sf Class A vacancy is at or near 0% and economically unfeasible 60 spaces 40 spaces now (7 spaces in the prior design) 290 spaces 8 spaces Yes Yes, at the intersection, 1lane inbound, two lanes out Yes, dedicated and striped Yes Yes No Yes, but public works owns the road and solutions 100 feet No, the height was reduced by 6.5 feet on the north side and 7.5 feet on the south side 535 Middlefield Road, Suite 190, Menlo Park, CA 94025 1 650.326.1600 • Is the building leased yet • What type of tenant will we look for • Is the building further back on the site • Did we move the building back from Las Casitas • How did we reduce building massing • How does this help • Was more stone added to the ground floor • Are the windows different now • Are the Western foothill views better now • Concern about emergency access during construction • Is the parking garage smaller now than prior • Will this lead to faster excavation and off-haul No, but several parties are interested in leasing Various class "A " tenants which are allowed within the current zoning code Yes, substantially, 60 feet further away from Alberto Way Yes , another 10 feet. We also removed the znd floor deck area We added balconies in the front fa~ade of the building The massing is now on the ground floor Yes, substantially more stone Yes, the redesign has the ground floor windows inset by 24 to 36 inches to emphasize the massing Yes , in addition to the height reduction mentioned above we eliminated the tower elements too Our redesign now allows full access to the site for all Construction deliveries and concrete pouring Yes, quite a bit Yes, approximately 2 calendar weeks faster than prior • Will we have flag-men in the streets coordinating traffic Yes 535 Middlefie ld Road, Suite 190, Menlo Park, CA 94025 1 650.326.1600 Questions and Feedback from the January -30, 2017, 6 p m Ope n House Question or Comment: • Did you consider reducing the project size • Is there open space now for the project • Is it available to the public • Is there a path around the building • Is parking allowed in the at-grade spaces by neighbors • Will the employees arrive at the site at the same time • Will the employees leave the site at the same time • How do we know this about traffic patterns • Is the bike lane safe for bikes • Are the three new lanes for traffic marked in paint Applicant Response: Yes, we ran the financial pro-forma and the current. size of 83 ,000 square feet is what works Yes , on the north side, there is a large green space Not at this time, it is part of the Project set-back Yes Not at this time No, they are scattered thr oughout the day No, they leave at varying times The Town traffic consultant report in the EIR The bike lane was designed using the Town code Yes 535 Middlefield Road, Suite 190, Menlo Park, CA 94025 I 650 .326.1600 PLE>t.5E ~lf:.ttvl . -I ~13() /17 -.. , .... ---,_ .,.,, ''-"'"' losr;rrms G/JJM()A/5 (;~z) Name Address v IJ' r '* Email v Phone 5;-ff~uy ~y,.+~ /5 ~Is-sh,t-te.yryt~-n wot3~~ ~~;-.:l.:l-2 b. P crHY/ J _;_ \J ;-s f) ./ Lj ?:::> fLEEL3~~ Yctl-tco.roVV1 LIC>?S--g-q 1 -oc~o /lf~ o {JA._ A£.~~tA 6 ~d--:l c ~~).)~c. {0. / c~.A ~_J 1 tJ ,;( J-/,_ 3 A OJ _'>" ~ r1 C1"tl '2 1 ,__, N_ ,w td& ( ~a j-:J I if-P . L ~-{) ft1o_,_ It /o '2---- 1·-·v~v ,_j,lA...DJ.JA 1q__., R-rv I #-t'k~T ..<_ ~/ B~ I ~ ~ f ·/ci:u ~iJ r.u.r~~~dc~r J c_B'l Lnrvdt VlG Geor-o.e-_ I 2..31 . s1\7Q Ill Vte-JJ~tar~ J3R 6ct M 6CA _wual6 :7. _-=? B ~~.-~~ !!if 0~ hv JJ_,A--I;<_ c; JeAVft /r:v~ ;s-r '711~~/Z ..£...I :2 'i() c _[!,·r-~P D . ,.. S.Nt~r:>v A ;( Dg f7'Z...ru /lb"v ~"' t Jo D eh er c202/ ~~~~~~--~\,}.~~ ~&-~ _\ ~~'\ \ ~"" -'\_\~~'s~~~ ~ ~~~ ~y. \.._~~ ":\~~~~ "\-Y ~~~~~ ~~ ~~,\-~ \ ~--\ ~~~l ~~-{ ~~~-~~'<v-- f!o 5 e.,;nart-t ffliYl.e.r I \ \ /.-s-Lfc .~ ~rfvt #a /'J-/'e 'r I~Lf£ • ~II .,. . ~ . !~ ~ ~~~ ~ I I &·n ( ? 4~g-Lfr'J1..-o 1\~:t 1\)J~) 1/0}[ Ljf ~ .w-=#E rt btL "ki Co J) 'L t=· ,.4-S ·t= . -' 13rr I r7 -r ' L I>$ '-'~-ro s Co mdftJ/CIS. ( 2 ~ .2-) Name Address v !JtT ~~a Email Phone I V; !/:( Lt:= ]) ~4.-/f./'~~{(. , ·7"~' -f.. '(02....... /-/4 /ZoLu /5/ .-£) e'L< V jt.tf I 1-1 k -If ;z.,r, L:' I ? .> 84 ~..tlc?U i1't t4 i?f I.A..-B ;(~c) su. iot ,f2o_.u. rl r1 diUJ , 1!11 A ei,J ;:;; " 'fO'tJ -tl-/2. ·J>2 7 ~~ 11/M ... , C-0 ,n :Jl M ~tl\ L fc ~ ifil, ·r IV1 ( 4 ~ ~ 1\ lh.<·..,, ""-;..,! JI MIN~"(,.> £.~,t""..tt-~o.....A -(~,, .......,_ {,) t> ·(..Z..l · UJ7'• f' cJa._.,._ e.. m ~ ~ b">--!d. JJ.;;).~'-/ Wa ........ .~u ... f2d,. :;]~~·~ yog. ~?~-~()( (J ~tYI r1Li ... D;d.( M c~nrJa L f-< lr" D -...) tA'd v.·tL( II\ iJtt~ hll ~ AZu7 ~-'\\~lorY e.. ·., iUl G l 1 -' 4.zo AI(~£AD ~l7 ./·va..~({)u_..) J<..-l't A-\?'t<.).o (VO-L-t c z 1 z_, ~b.e.A L..Jcas A 20..:1 C { M\ Ji.~n.;_,~ _,(\ tl --OJ:rk 1 ... v ,.6 \()tx 1 Cl .L't-W.GJ~f9J ritJ rvrr. (Q~ h 'r17l1 i ~~., If I . L1--2_o/ -\...... , ~/JJ/c,?ile!J 1 Jl-~1..1 \ Ti!Jrae Felori A >Jot; 00tCf~ P X C09&...9{g~ 40B-#0-8~c. ~I jl;; tl~ ,t:::j;) ' /f-.1 j//1( k66"Jt~~~ ~ ,ph/c~ io.:Y'-'1;;. .J:Pf i z... -~ !o.P-JS't-Fl/ ~ :SttJJ m (-rnf_ ~ Tf. r B I J.._~ --:J¢1 1 IT G) (' J'J7l1Cif sT /){:j -v '- .. Name : c:J~V\~ SUP tf _ Email: Addre ss:l...t'U) t}{ ~ *-t<)( \.. G Phon e: ------- Nam e: __ __:_f-_{;_,_'\"_/L_11_€-:-. -~-C_~"--------Email: Address: ----lF:.......:l~__:_d;::_~b=----::i~:_(J _,_l)i;c..c._o)_LQ-"" . .:....} -"<a'-"'t.~<...'_1 e=-. _s _____ _ Phon e:--------- Nam e: (-::. ....... .~. <:... ~-tc:.-::_x._~-~ Email:---------------- Address: c.t· .). <-A\ b -"-( ·! ,, \.;~ ~ ·U: ,)._L Name: f\...J · ck~ ~ 1{.c II <- Addre ss: ij J .o A\ b---< I ~ L ~c-.{j-~ Lf Nome: S be t€ (2 .\ i 16 vJZ !(..t-: Email: Ema il : Phone:--------- lv -1...\:..-~-= R .o ll e... £'j''J'\c,, t ~ Phone :--------- 1 I I Address: --('7 u At.:..\o.e ( ·l--v l.i':· 0-{.\,.1 ·~A i-{,..r"'\ ';\-"e.\\'-(, I 'Jc~ (~.'IA2.o d 1.CS;'t . 0e-.* Phon e: ________ _ Name: l/ltt--".!C/[) I e ,tp·:.-:1,1'7C") Email:---------------- Address: 1 _74 (c d'::Sfr:: ,-je lr. J 'S 0r:,-,ffJ<_; Phone:--------- Nome J"e. . .SH C · w,~ 0;1;~ Address : l ~'j /vlC{__s; ,·(. C:~0r>\" ~ Email: .S>~=-C SG@ (;Tf) tJe_C cf r-. ..., ."> r t ltcJ 7 . . r . ~ 0 ~. ) \..... Phone :~ r ..J C ] ·-\:J~C:IG Name: !ft b ffv ·'" L- Address: 'f 7..-0 .4 I b.~--fv [A).:.-..1 I Email: bob b<' J~~k?y ~~-/ CcfX Phone: Lfa (( a r;_t.. 2 [( C Name:---------------Email:---------------- Address:----------------------Phone: ----------- N a me:----------------Emai l:---------------- Address:---------------------Ph o ne :--------- N ame : Emai l : --------------------------- Addre ss:---------------------Phone: ---------- Name:-----------------Email:--------------- Address:------------------Phone:--------- 1-.lam e: -----------------Email:---------------- Addre ss :------------------------Phon€: -------- LP ACQY I S I T I ONS REAL ESTATE DEVELOPME N T Agenda for March 20, 2017 Neighborhood Outreach Meetings Neighborhood Outreach Table of Contents 1 . March 20, 2017, 4:30pm, Open House outreach at Los Gatos Commons 2. March 20, 2017, 6:30pm, Open House outreach at Los Gatos Commons *The above Community Outreach Meetings are in addition to 16 other Neighborhood Meetings w e held with Alberto Way residents since September 2015. In total, LP Acquisitions has held 18 Neighborhood Meetings which Planning has received copies of such with every resubmittal. Please see the July 13 ,2016 resubmittal for documentation of the other 14 meetings. 535 M idd lefield Road, Su ite 190, Menlo Park, CA 94025 I 650.3 26.1600 40 5 Alb erto Way, Los Gatos, Ca. Update d & Revised Site and Building Plans-Marc h 9, 2017 Summary of Planning Commission & Neighbor Comments to Applicant on August 2 4, 2016 PC & Neighbor Comments Buildings are too large Buildings are too massive South building too close to Alberto Way North building too close to residential neighbor Buildings are too tall north side Buildings lack neighborhood style and "small town" feel Building massing is inappropriate Western foothill view corridor blocked Tower roof elements too tall 7 surface parking stalls are inappropriate Revision in New Plans Building size reduced from 92,000 sf to 83,000 s f Buildings combined into one building and moved to rear setback Building pushed back an additional 60 feet from Alberto Way Building repositioned 10 feet further aw ay from Las Casitas neighbor Building reduced in height by 5.5 feet on south side and the 6.0 fee t on the Building redesigned to articulate neighborhood roof-lines and to emulate prominent architectural character in buildings like Palo Alto Medical, Hotel Los Gatos, 100 LG Sar Rd Building & Entry redesigned to showcase first floor massing in both coloring and materials Redesigned the building by moving the building back on the site, reduced the height by 6.0 fee t, decrea sing the foo thill view areas blocked in the prior design Tower roof elements eliminated and provided vi sual prominence to the building entry Site redesigned to allow for 42 surface p arking spaces 535 Middlefield Road, Suite 190, Menlo Park, CA 94025 1 650.326 .1600 Parking should be reduced Concern with construction staging in street Traffic safety measures on Alberto Way & Rt. 9 North fa<;:ing balcony was intrusive to neighbor Reduced off-haul trips during excavation timeline New on-site parking supply reduced by 58 spaces from 390 stalls to 332 stalls Reduced parking garage footprint below ground allows all staging to be on site. This is a benefit for pedestrians, automobiles and emergency vehicle access and safety Widened and straightened Alberto Way to provide easier access for emergency vehicles and a new bike lane. Both streets to comply with the Complete Street Ordinance Removed the balcony facing north toward Las Casitas neighbor. All balconies are facing only east towards Alberto Way Build ing repositioned to allow construction staging on site as well as a reduction in the off- haul from 8 weeks down to 6 weeks 535 Middlefield Road , Suite 190, Menlo Park, CA 94025 I 650.326 .1 600 LP ACQ!J ISITlO NS REAL ESTAT E DFVELOPM ENT Revised Project Construction Details for 405 Alberto Way Updated and Revised February 27, 2017 General Construction Timeline : • Project construction will occur in a single phase with construction commencing in early spring 2018. • All construction staging to occur on site. • The construction timeframe is 14-16 months including all pha ses from the start of demolition to the completion of all site work. • Strict Safety measures will be implemented (i.e. minimum of 2 flagmen positioned on Alberto Way during grading and construction, and weekly Community Meetings open to all r es idents) will ensure rapid ingress/egress of emergency vehicles on Alberto Way and open communication of all Construction processes to residents. Site Grading: • The project will require excavation and shoring to accommodate a 2-story underground parking structure. • See attached export details and route map of dump-truck travel. • The General Contractor will implement Dust Control Measures which meet the Town standards. • Estimated timeline for excavation, grading and shoring is 3 months. Underground Garage Const r uction : • This phase will include digging footings, preparing the pad , installing drainage and undergrounding, and waterproofing. • Thi s phase will also include installation of rebar and structural materials to accommodate the concrete floors and sides of the parking structure . • The top of the parking structure will be the foundation of the building. • Our General Contractor will work closely with our Structural, Civil and Geotechnical eng ineers to incorporate the highest construction standards to meet building codes . • Estimated t ime line for this phase is 4 months. Core & Shell Building Con struction : • Thi s phase will include structural, flooring, skin and roof. • All connections to public utilities. • Estimated timeline for this phase is 6-8 months. Site Work : • On -site finished hardscap e, concrete sidewalks and paving . • Land scape including all trees and plants. • Outside meeting area arbors. • Estimated timeline is 1 month. Offsite Work : • Thi s work will be done during the Core & Shell work noted above. • Estimated timeline for completion is concurrent with Core & Shell. Completion of Construction • This project is estimated to be completed by Spring/ Summer 2019 . LP ACQ!JISITIONS REAL ESTATE DEVELOPMENT Updated: February 27, 2017 Revised Project Construction Export Details for 405 Alberto Way: Based on the original design submitted to the Town on July 13 , 2016, this project required a total of 69,700 cubic yards of cut; thus, resulting in 6,970 truck trips or 8 weeks of off haul . With the new design of this project, this project will now require a total of 53,451 cubic yards of cut and all construction staging can occur on site. One large dump truck can carry 10 cubic yards or 11 cubic yards (with a small diaper trailer); therefore, 4 ,859 to 5,345 truck trips would be generated. Based on construction industry standards, 200 loads a day would take 24-27 work days plus a few more days for the potential of slow production. Therefore, it is reasonable to expect that the total export of 53,451 cubic yards would take 27-30 work days, M-F or 5.5 to 6 weeks. This results in a reduction ·of over 2 weeks of off haul. See attached haul routes. 535 Middlefield Road. Suite 190, Menlo Park, CA 94025 1 650.326.1600 .. ··,\·.:·. Lw· t,;o \ , •.. :;_,1·;-· Go glt 1~.-~s ~·: c~·~~u 1·-:::.c-::n~ !H aul Rou te o ut o f th e Si~e) r. ' lJ I• I'JI ' ; '·'',..···" / •.:?:• (..,c, g lr 1 ··~ r. .. · ·: r "'", I -:·.(\';1 j ~­ '· ;:. 0 February 22, 201 7 Ms. Jennifer Armer Community Development Department Town of Los Gatos 110 E. Main Street Los Gatos, CA 95031 RE: 405 Alberto Way Dear Jennifer: ARCHITECfURE PLANNING URBAN DESIGN I reviewed the new drawings, and have previously visited the site. My comments are as follows: NEIGHBORHOOD CONTEXT The site is located at the corner of A lberto Way and Los Gatos-Saratoga Road, and is currently occupied by three office buildings with office space located both below and above grade level. Photographs of the site and surrounding build - ings are shown on the following page. 700 LARKSPUR LAN DING C I RCLE. SU ITE 199. LARK SPUR . CA. 94939 EXHIBiT 3 2 TEL: 41.'i.331.3795 CDGPL AN@PACB Eli .. N ET fxisting site building at the Alberto Way Corner New one-story retail buil ding across Alberto Way AcljclcC'nl residential development immediately north or the site Acljclcenl residential development immC'ciidl ely north of the site 405 Albeno Way Design Review Comments February 22, 20 17 Page 2 [xisting building at 1 he center of the site Corner at new one-story retail building across Alberto Way Existing landscaping along the north edge of the site across Alberto Way CANNON DESIGN G RO U P 700 LARKSPU R LANDING CI RC LE . SU ITE 199 . LARKSPUR . CA . 94939 405 Alberco Way Design Review Commems February 22 , 201 7 Page 3 CONC ERNS AND RECOMME NDATION S The applicant h as revised their design approach following direction from the Planning Commission at its p ubli c hear- ing o n A ugu st 24'h of last year . The P lanning Commission direction includ ed inc r easing the project's conforman ce with General Plan Policy LU -1.8 (designing in keeping with the small-town ch aracter of Los Gatos), lessening the impact on the adja ce nt neighborhood and increasing the design's conformance with the Town's Commercial Design Guidelines, especially Section 1.4 Community Expectations. The applicant's proposed changes include the following: • A reduction in the overall gross building area. • A consolidation of th e original two building s into a single structure. • A reduction in the str ucture's overall building heigh t by live feet . • E limin ation of th e tower elements. • A d ecrease in the size of second story windows. • An increa se d setback from the n orth property lin e. • An incre ase d se tback of th e building from Alberto Way near the Los Gatos-Saratoga Road intersection . • An increase o f surface parking spaces along th e full leng th of the Albe rto Way frontage. A comparison of the previous and current site plans and A lberto Way eleva tio ns are shown below. Previous Site Plan Currently Proposed Site Plan Currently Proposed Alberto Way E levation CANNON DESIGN G ROUP 700 LARKSPUR LANDING CIRCLE. SU ITE 199 . LARKSPUR . CA . 94939 405 Al berto Way Design Review Comments February 22 , 2017 Page 4 In preparing the current design approach, the applicant has largely retained many of the previous elevation forms and de tails while incorporating the changes outlined above. I do believe it is rather difficult to achieve a desired small -town Los Gatos sc ale and ap pearan ce when starting with a large building and making small changes to it. A sati s factory so lu- tion might be more easily ac hi evable by starting the design with the goal of creating multiple structures with small scale modules and details set within a landscaped site framework. While the ch anges noted above have reduced several asp ects of th e project's perceived size, it is still in m an y ways reads as a single large building. T h ese include the fo ll owing. 1. T h e project seems to read as on e large office b uilding witho u t a b r ea kdown in scale related to the neighborh ood or th e Los Gatos exis ting small town scale. 2. The building elements appear very m u ch as boxes with some mansard roof attaclunents -an approach sp ecifically disco uraged on page 8 of the guideline s within the Community Expectations sec ti o n (n ext to last b ullet point). 3. The d es ign does not have the "Careful attention to architectural ... detail similar to the Town's r esi d ential architec- ture" (C ommunity Expectations page 7). Reads as bo xes wi th add-on elements which is not consistent with the Commercial Guidelines Flat wall taller than side masses is not working well as a linking feature That said , I unde rstand the applicant's desire to provide Class A office space with large fl oor pl ates to accommodate a range of tenant size. Sh o uld s taff and the P lanning Commission choose to acce pt th e applicant's chose n site plan and flo or plate direction, I do have a few recommendatio n s, as shown below and o n the foll owing p age, to assist in reducing the visual m ass and sc ale of th e building . Larger, partial elevatio n s are shown on the following page fo r m ore detail. RECOMMENDED ALBERTO WAY ELEVATION CHANGES CANNON DES IGN GROU P 700 LARK SPUR LANDING C I RCLE . SU IT E 199 . LARKSPUR. CA . 94939 405 Alben o Way Des ign Rev iew Comments February 22, 20 17 Page 5 Majo r change elem ents shown o n th e elevation recommendations include th e following: 1. Providing more visual variety and break up in sc ale for the building located clo ses t to Alberto Way. Providing first and second flo or recesses and roof breaks to reduce the boxiness of the str ucture and break up the current single bulk mass of the stru cture. Increasing the man sard roof h eight for the p ortion of th e building closest to the intersection. Increasing the amount o f projection for the eleva tion po p o uts at the fir st floor. Providing more of a wall plane offset where the two-story front wall transitions to a o ne-s tory wall. 2. Reducing the visual mass of the central link of th e setback portion of the building. Lowering the h eight o f the current 5'-6" parap e t . Adding a significant projecting cornice canopy to match the adjacent mansard roof eave lines. Adding brackets at the cornice can opy to add architec tural d etail . U tilizing a coole r wall color fo r th e set back wall to di stinguish it from the other wall s and r educ e the feeling of one large building. P roviding so m e subtle enhancement to the vis u al prominence of th e m ain building en try. 3. Adding more a rchitectural detail. Shown o n the s tudy a re two diffe rent typ es of trelli s can opies. There is alwa ys a tendency to d o unifo rm trellises, but in seeking a less formal approach to relate to th e smaller scale of the reside n - tial d evelo pment, I believe th at increased va riety would be m ore success ful . Increasing amount of projection would be desirable More wall plane offset here would be desirable Type 1 trellis canopies 1 maybe wood Use for larger 1st and 2nd floor windows Climbing vines would be desirable ALBERTO WAY ELEVATION RECOMMENDATIONS: LEFT HALF ALBERTO WAY ELEVATION RECOMMENDATIONS: RIGHT HALF CA NON DE SIGN GROUP 700 LAR KSPUR LANDING C I RC LE . SU ITE 199 . LAR KSP UR . CA. 949 39 405 Alberto Way Design Review Comments February 22, 20 17 Page 6 I would also note that the placement of surface parking along t he e ntire Alberto Way frontage is not consistent with the Commercial Design G uidelines. However, given the concerns expressed about th e loss of available multi-use parking at this site, I do beli eve that su rface parking in t hi s location could be useful and acce ptable. Jennifer, please let me know if you have any questions, or if there are other issues that I did not address. Sin ce rel y, CANNON DESIGN GROUP Larry L. Cannon CAN N ON DE SIG N G RO UP 700 LA RK SPU R LANDI NG C IR CL E . SU ITE 199 . LA RK SPUR . CA . 94 939 March 16, 2017 Ms. Jennifer T .C. Armer, AICP Associate Planner Town of Los Gatos Community Development Department 11 0 E. Main Street, Los Gatos CA 95030 Phone : (408) 399-5706 Email: ja rm e r@lo sgatosca .gov Reference: LP Acquisitions ARC TEC Inc. Job No. 153948.02 405 Alberto Way -Project Redesign Architecture and Site Application S-15-056 Conditional Use Perm it Application U-15-009 APN 529-23-018 Cannon Design Group Comments on Redesign, 02-22-17 Dear Jennifer, Attached please find revised plans which address Cannon Design Group 's comments dated February 22, 2017, on the redesign package for 405 Alberto Way, referenced above . In addition to the attached revised plans , we have prepared the following responses to COG 's specific comments , starting on page 5 of the comment letter: Mr. Canon 's comments are noted regarding the challenges of designing a Class A office building with a small-town Los Gatos scale and appearance. In order to achieve the applicant's objectives in a manner consistent with the Town of Los Gatos General Plan policies and the Town 's Commercial Design Guidelines , the revised project incorporates many design elements to further reduce the Project's massing , scale and elevation compared to the surround ing neighborhood as further discussed in the Applicant responses, below. Major change elements shown on the elevation recommendations include the following : 1. Providing more visual variety and break up in scale for the building located clo sest to Alberto Way. Prov iding first and second floor recesses and roof breaks to reduce the bo xines s of the structure and break up the current s ingle bulk mass of the structure . Applicant response: While we agree with and have implemented COG's suggested design revisions, breaking up the fa~de at this location would be inconsistent with the 11th bullet in Community Expectations Design Guideline 1.4 because it would not maintain a "unity of design treatment with all sides of the structure related to the design of the primary fa~ade." Further, it would disrupt the continuous balcony at the second floor and make the fac;ade look too busy. In addition, the suggested recess in the building will compete with, and thus diminish, the effect of the other recessed areas, especially those at either side of the revised main entry feature. U C J EC Arizona 2960 E. No rthern Avenue Build ing C Phoenix, AZ 85028 602.953.2355 t 602.953.2988 f California 99 Almaden Boulevard Suite 840 San Jose , CA 95113 408.496 .0676 t 408 .49 6.112 1 f www. arctecinc. com EXHIBIT 3 3 Ms . Jennifer T.C. Armer, AICP M arch 16, 2017 ARC TEC Inc. Job No. 153948.02 In c reasing the mansard roof he ight f or th e portion of t he b uilding clos est to t he intersection. Applicant response: ARC TEC increased the mansard roof height on the left side of the building closest to the intersection by 1 '-6 ", from 29'-0" to 30'-6". We agree that COG 's recommendation helps create more differential in the massing of the building. Furthermore, increasing the height of the mansard at this location does not adversely impact the views of the trees and hills in the distance for the residential neighbors, as this occurs at only the far left side of the building, across the street from non-residential commercial development. Inc reasing the amount of projection for the elevation pop outs at the first f loor. Applicant response: ARC TEC incorporated COG's recommendation into the first floor elevation and i ncreased the elevation pop outs at the first floor by 8". The amount of increase is the maximum we can achieve without impacting the zoning and code required widths of the pedestrian walkway and parking lot. The revision is consistent with Section 1.5.2 of the Commercial Design Guidelines which encourage a richness of architectural fac;ade depth and style. Prov iding more of a wall pl ane offset w here the tw o-st ory f ront wa ll trans itions to a o ne-sto ry w all. Applicant response: ARC TEC incorporated COG's recommendation into the revised design and increased the wall plane offset by 8 inches. The revision is consistent with Section 1.5.2 of the Commercial Design Guidelines which encour age a richness of architectural fac;ade depth and style. 2. Redu cing the visual m ass of the central link of the setback po rtion of the bui ldi ng . Lowering the height of th e c urrent 5'-6" para pet. Applicant response: ARC TEC incorporated COG 's recommendation and reduced the parapet height at the flat center portion of the front fac;ade by 2 '-6", from 30 '-0 " to 27'-6". We may r equire a roof scr een located back from this fac;ade in order to conceal roof mounted mechanical equipment, but this screen will be located away from the front face. The actual design of the roof screen will be finalized during the detailed design phase of the project, once the mechanical system for the building is determined. Adding a s ig ni fica nt pr ojecti ng co rn ice ca nopy to match th e adj acent man sard roof eave lin es . Applicant response: ARC TEC added the recommended projecting cornice canopy to the flat center portion of the front fac;ade and at the raised main entry feature. Adding brackets at th e co rni ce ca nopy to add architectural detail. Applicant response: ARC TEC incorporated COG 's recommendation and added the suggested support brackets to the new projecting cornice canopy that has been added to the flat center portion of the front fac;ade. Utilizing a cooler wa ll co lor for the set bac k wa ll to d istinguish it from the other walls and reduce the f eel ing of one la rge buildi ng . Applicant response: In response to this comment, ARC TEC is proposing to use slightly cooler warm colors at the recessed wall areas in order to help distinguish the different planes on the front fac;ade . In additi on, we propose adding limestone trim to further distinguish and dress up the front fac;ade of the building. Providing som e s ubtle enh ance ment to the v is ual pro m in ence of th e main bu il ding entry . Applicant response: ARC TEC incorporated COG 's recommendati on and increased the height of the main entry feature from one-story to two-stories and also made it taller than the adjacent flat center portion of the front fac;ade (29'-0 " Ms. Jennifer T .C . Armer, AICP March 16, 2017 ARC TEC Inc. Job No. 153948.02 verses 27'-6" at the adjacent flat center portion of the front fa~ade). The entry feature now includes a prominent canopy over the main entry doors. 3 . Add i ng more architectural detail. Shown on the study are two different types of trell is canopies . There is always a tendency to do uniform trellises, but in seeking a less formal approach to relate to the smaller scale of the residential development, I believe that increased variety wou ld be more successful. Applicant response: To address COG's recommendation to increase trellis variety, ARC TEC added solar shades at the second story punched window openings on the far left and far right sides of the front fa~ade. We also added bronze colored metal trellises to the recessed window openings at the first floor, as COG suggested to add articulation at the windows thereby improving visual interest and further differentiating among the various elements of the front fa~ade . Please feel free to contact me with any additional comments or questions you may have. Sincerely, ARC TEC Inc. \.b~<.~ Daniel S . Kirby , AlA , LEED GA Principal This Page Intentionally Left Blank March 17, 201 7 Ms. Jennifer Armer Community Development Department Town of Los Gatos 110 E. Main Street Los Gatos, CA 9503 1 RE: 405 Alberto Way Dear Jennifer: ARCHITECTIJRE PLANNING URBAN DESIGN I reviewed the revi sed project about a month ago and made a number of recommendations. The applicant ha s imple- mented some of the recommendations, but not all . My comments on the new drawings provided las t week are as fol- lows: NEIGHBORHOOD CONTEXT The si te is located at the corner of Alberto Way and Los Gatos-S aratoga Road, and is currently occupied by three office buildings with office space located both below and above grade level. Photographs of the si te and surrounding build- ings are s ho wn o n the follo\ving p age. 700 LARKSPUR LA D ING C IRCLE . SU il E 1 99 . LA RK SPU R . CA . q4939 EXHIBIT 3 4 TEL : 4 1 5.331 .3795 CDGPLAN@ P,\CBE LL. ET Fxisting site building at the Alberto Way Corner Ne\\ one-story retail building across Alberto Way Adja< Pnl residential d evelopment immediately north of 1 he site Adja(ent residential development immediately north oft he site 405 Alberto Way Design Re view Com ments March 17, 2017 Page 2 Existing building at 1 he center of the site Corner at new one story retail building across Alberto Way Existing landscaping along the north edge of the site Adjacent across Alberto Way t immediately CAN NON DESI GN GROUP 700 LARKSPUR LANDING CIR CLE . SUITE 199 . LARKSPUR . CA . 94939 40 5 Al beno Way D esign Review Com ments M arc h 17,20 17 Page 3 SIGNIFICANT CHANGES MADE TO THE PREVIOUS DESIGN APPROACH REVIEWED BY THE PLANNING COMMISSION The applicant has revised their design approach following clirec tion from the Planning C ommission at its public h ear- ing on A ug u st 24'h of la st year. The Planning Commission directio n included increa sing the project's conformance with General Plan Policy LU-1.8 (designing in kee ping with the sm all-town character of Los Gatos), le ssening the impact o n the adjacent n eighbo rhood and inc reasing the design's confo rmance with the Town's Comme rcial Design G uidelines, especially Sectio n 1.4 Community E xpectations. The applic ant's pro posed changes r eviewed in February included the following: • A reduc ti o n in the overall gross building area. • A consolidatio n of the original two buildings into a single s tructure. • A reduc ti o n in the s tructure's o verall building height by fi ve fee t . • E limination o f the tower elem ents. • A decrease in the size of second story windows. • A n inc reased setb ack from th e north prope rty line. • An increased se tback of the building from Alberto Way n ea r the Los Gatos-S aratoga R o ad intersection. • An increase o f surface parking spaces al o n g the full length of the A lberto Wa y fro ntage. A comparison o f the previ ous and c urrent site pl an s is shown below: Previous Site Plan Currently Proposed Site Plan FEBRUARY CONCERNS AND RECOMMENDATIONS In prep aring the current d esign approach , the a pplicant h as largel y re t ained m an y of the previous elevatio n forms and d etails while inco rp o rating the changes outlined above. I s ta ted in the Fe bruary review le tter that I b elieved it m ay b e r athe r cliffi cult to achieve a desired sm all -town Los Gatos scale and appearance wh en s tarting with a large building and m aking small ch an ges to it. A satis factory solutio n might b e m ore easily achievable by starting the d es ign with th e goal o f creating multiple st ru ctures with sm all er sca le m o dules and de tail s set \vith.in a landscap ed site fram ewo rk . While the ch an ges n o t ed ab ove have reduced sever al asp ects o f the project's p erceive d size , the project that I reviewed in February still in m an y ways r ead as a single la rge building. Con cern s included th e foll owing. 1. The pro ject seem ed to read as one large office building without a breakdown in scal e r elated to the n eighborhoo d o r d1 e Los Gatos exis ting sm all town scale .. 2. The building elements appear ed very much as boxes with some m an sard r o of attachments -an approach sp ecifi - call y cli scouraged on page 8 of the guidelin es \vithin the Comnumi(y Expectations secti o n (n ext to las t bullet p o int). 3 . The d esign cli d n o t h ave the "Care ful attentio n to ar chitectur al ... d etail sinlilar to th e Town's r esidential arch itec- ture" (Community E xpectations p age 7). CANNON DES IC CROU P 700 l ARKSPUR l AN DI NG CIRC LE . SUITE 199. l ARKSPU R . CA . 94939 405 Alberto Way Design Review Comments March 17, 2017 Page 4 Flat wall taller than side masses Reads as boxes with add-on elements which is not consistent with the Commercial n Guidelines is not working well as a linking feature Ide ntified Febr uary Concern s T hat said, I did acknowledge that I understood the applicant's desire to provide Class A office space with large floor plates to accommodate a range of tenant size. I noted that should staff and th e Planning Commission choose to accept th e applicant's chosen si te plan and floor plate direction, I did have a few recommendations, as shown below and on the following page, to assis t in reducing the visual mass and scale of the building. Larger, partial elevations are shown on the following page for more detail. Ma jor change elements sh own o n the elevation recommendations included the following: 1. Providing more visual variety and break up in scale for th e building located closest to Alberto Way. Providing fir st and second floor recesses and roof breaks to r educe the boxiness o f the structure and break up the current single bulk mass of the struc ture. Increasing the mansard roof height for the portion of the building closest to the inter section. Inc rea sing the amount of projection for the elevation pop outs at the first floor. Providing more of a wall plane offset wh ere the two-story front wall transitions to a o ne-story wall. 2. Reducing the visual m ass of the central link of the setback portion of the building. Lowering th e h eight of the current 5'-6" parapet. Adding a significant projecting cornice canopy to match the adjacent mansard roof eave lines. Adding brackets at the cornice canopy to add architectural detail. Utilizing a cooler wall color for th e set back wall to distinguish it from the oth er walls and reduce the feeling of one large building. Providing some subtle enhan cement to the visual prominence of the main building entry. 3. Adding more architectural detail. Sh own on the study are two different types of trelli s canopies. There is always a tendency to do uniform trellises, but in seeking a less formal approach to relate to the smaller scale of the residen - tial development, I believe that increased variety would be more successful. FEBRUARY RECOMMENDED ALBERTO WAY ELEVATION CHANGES CANNON DES IGN GROUP 700 LARKSPUR LANDING CIRCLE . SUITE 199 . LARKSPUR. CA . 94939 405 Alberto Way Des ign Review Comments March 17,2017 Page 5 I did also note that the placement of surface parking along th e entire Alberto Way frontage was n ot consistent with the Commercial Design Guidelines. However, given the concerns expressed abo ut the loss of ava ilabl e multi-use parking at this site, I stated that I believed tha t surface parking in this lo cation could b e u seful and acceptab le. Type 1 trellis canopies 1 maybe wood Use for larger 1st and 2nd floor wi ndows Climbi ng vines would be desirable FEBRUARY ALBERTO WAY ELEVATION RECOMMENDATIONS: LEFT HALF Currently proposed parapet top ---------------------!---···············-·····t·.:.:_··..:;··..:.:..·_--_ FEBRUARY ALBERTO WAY ELEVATION RECOMMENDATIONS : RIGHT HALF CANNON DES IGN GROU P 700 LAR KSP UR LANDI NG CIRCL E . SU ITE 1 99 . LARKS PUR . CA. 94939 405 Alberto Way Design Revi ew Comments March 17,201 7 Page 6 REVISED CURRENT DESIGN CONCERNS AND ISSUES The original design r eviewed b y the Planning Commission in August, the previous d es ign that I reviewed in February and the currently p roposed design are shown in the Alberto Way sketches and eleva tions bel ow. Reviewed by the Planning Commission in Augu~t Reviewed by CDC in February Currently Proposed Alberto Way Elevation CANNON DESIGN GROUP 700 LARKSPUR LANDING C IR CLE . SU ITE 199 . LA RKSP U R . CA . 94939 405 Alberto Way Design Review Comments March 17,2017 Page 7 The additional changes to the design in re sponse to the recommendations contained in the February review and recom- m endation s letter include the following: • The mansard roof height at the portion of the building closest to the Alberto Way /Los Gatos-Saratoga Road inter- sec ti o n was increased in height, but not as much as shown on the recommendations illu stration. • The ground floor pop outs and wall plane offset adjacent to A lberto Way were both increased 8 inch es in depth. • Som e trellis and sunshade elements were added, but only on the Alberto Way elevation. • The central building link parapet was lowered . • The color of the central building link was modified. • A projecting cornice canopy with brackets was added to the central building link. One change made that I feel was counter productive to a decrease in the building scale is the increased height of the building entry element. I feel that the lower entry originally proposed with the minor changes recommended in the Feb- ruary review letter would be more in the spirit of the Planning Commission's direction to the applicant. I am also w1 sure whedter the trellises and canopies that have been added will be significant enough to add sufficient smaller sca le detail e lements to the facad e. It would be h elpful for the appli cant to provide photo examples showing the proposed m aterial s and construction of these elements. RECOMMENDATIONS The Planning Commission will need to determine if the changes SUI11ffiarized above are sufficient to sa tisfy their direc- tion to the applicant which I unders tood to include the following : • The Planning Commiuion gm1e specific direction to the applicant to significantlY reduce the size of the building in height, mass and floor area. • The Planning Commission gave specific directio n to the applicant to revise the proposed design to be more in keeping with the neighbor- hood and small town character. Specific s1rggestions included: 1. Moving proposed 405 building awqy fro m the residential neighbors 2. Reducing the scale (height, mass and length) of th e Alberto IV" try fa fade of tbe 401 building, with additional second floor arlicula- tion 3. Not blocking the view of mountains from neighbors +. Change s!J•Ie of proposed buildings to be more similar to neighborhood architectural style 5. In creased co1ljormance with Commercial D esign Guitklines, specificalb•: Section 1.4 Community Expectations: a. Careful allention to architectural and landscape details similar to the Towns residential structures. b. The sensitive inteiface of commercial development with atfjacent restdential neighborhoods. c. S cafe mrd character appropriate to the setting. 6. Increased conformam-e with Gmeral Plan Policies: a. Polic)' LU-1.8: Commercial developmmt of a'!Y ()pe (office, retail, research and tkvelopment, etc.) shall be designed in keeping with the small-town character of Los Gatos. b. Policy LU-6.5: The type, density, and intensifY of new land use shall be co nsistent with that of the immediate neighborhood. Should the Planning Commission condude that the changes meet their concerns, I would sugge st that they consider the followin g changes made in the February r eview letter. • Increase the roof height more at the building portion closet to the Alb erto Way /Los Gatos-Sara toga Road intersec- tion. • Add additional building articulation to the wall and roof articulation as or sinlliar to the recommendation made in February. • Lower the height of the entry element and conform to the he ight and continuous cornice canopy recommendations in d1e February review letter. • Direct staff to review the material and sca le of the proposed trellis and sunshade canopy elements. • Withhold approval for the color of the central link until s taff has viewed and evaluated the color choices as painted as sa mple swatches on the completed building walls. CANNO DESIGN GROUP 700 LARKSPUR LANDING CIRCLE . SU ITE 199 . LARKSPUR . CA . 94939 405 Alberto Way Design Review Comments March 17,201 7 Page 8 Jennifer, please let me know if you h ave any questions, or if there are other issues that I did not address. Sincerely, CANNON DESIGN GROUP Larry L. Cannon CANNON DE SIG N GROUP 700 LAR KSP U R LANDING CIRCLE . SUITE 199 . LAR KSPU R . CA. 94939 -...~ ~~XAGON T ~ANS~O~TATION (ONSULTANTS, I N<. April 5, 2017 Mr. Randy Lamb Lamb Partners 535 Middlefield Road , Suite 190 Menlo Park, CA 94025 l~EC!E~VE D ArF< OB 7n 11 Subject: Response to Traffic Comments on 401-409 Alberto Way Traffic Study Dear Mr. Lamb , Hexagon Transportation Consultants, Inc. completed a Traffic Impact Analysis (TIA) for the proposed office development project located at 401-409 Alberto Way in Los Gatos , California. During the August 1 01h and 241h Planning Commission hearings, the Planning Commissioners and the public provided comments on the final TIA dated August 2, 2016. This letter provides Hexagon's responses to the Commissioners and public comments . Response to Planning Commissioner Comments Trip Generation The Planning Commission asked about the source of trip generation estimates and was interested to hear whether trends in office employee density might render the nationwide ITE estimates inaccurate for Los Gatos and/or Silicon Valley . Commissioners stated hearing anecdotal stories about Silicon Valley employers filling buildings with more people than in the past. Hexagon has heard such stories, but we are not aware of any published studies of employee densities in office buildings or any other technical data prepared by traffic engineers that lend support to such anecdotal information . Traffic engineers complete trip generation studies by counting vehicles in and out of driveways at peak times and comparing the counts to the office building size in square feet. Scores of such studies are aggregated to develop a mathematical relationship between the building size and the trip generation. It has been Hexagon 's observation that the number of employees in a building is rarely known so this information is not used as a measurement. Also, while an employee census might be determined (the number of employees assigned to work in the building), the actual number of employees working on any given day is typically difficult to determine. Moreover, the mode of transportation in and out of the site (e.g., number of vehicles versus pedestrians) may be unknown for any given day. The ITE data reveal that there is a very strong correlation between the size of an office building, in square feet, and the number of trips generated . Trip generation research is published by the Institute of Transportation Engineers (ITE) in the Trip Generation Manual. Per the Town and VTA guidelines (VTA guidelines: http ://www.vta.org/cmp/tia-guidelines, Town of Los Gatos guidelines: http ://www.losgatosca.gov/DocumentCenter/View/857 ), project trip generation estimates should use either trip rates published by the Institute of Transportation Engineers (ITE) or rates developed from local data . The project TIA used ITErates in accordance with the Town of Los Gatos guidelines . £XIDBIT 3 5 4 North Seco n d Street, Suite 400 ·San Jose, California 95113 ·phone 408 .97 1.6100 ·fax 408.971.6102 • www.hextrans.com jii"" 4iiliiill Mr. Randy Lamb April 5, 2017 Page 2 of 8 For an office project of 92,000 s.f., ITE 's fitted curve equation calculates trip generation rates of 1.94 and 1.96 trips per 1,000 s.f. during the AM and PM peak hours , respectively. Hexagon also conducted trip generation counts at three existing office buildings in Los Gatos in 2016. The resulting rates were found to be 1.32 and 1.63 trips per 1,000 s.f. during the AM and PM peak hours, respectively (see Table 1 ). This indicates that office buildings in Los Gatos generate trips about at the same rate as, or less than, other office buildings included in the ITE Trip Generation manual. Table 1 Los Gatos Office Trip Generation Counts . . AM Peak Hour PM Peak Hour · ----------------------------------------Trips Total Peak Trips Total Peak Surveyed Sites 1 Size Unit Trips In Out Trips Rate Trips In Out Trips Rate 4 75 Alberto Way 30.22 ksf 37 3 40 4 37 41 16795 Lark Avenue 22.40 ksf 19 12 31 4 33 37 975 University Avenue 15.00 ksf 16 2 18 0 32 32 Total 67,62 ksf 72 17 89 8 102 110 Average Surveyed Rates 1 .32 1 .63 Average ITE Rates 2 1.56 1.49 ~ 1 . Trip generation surveys were co nducted in March 20 16. 2. Average ITE trip rates for general office building based on ITE's Trip Generation, 9th Edition for land us e code 710. The Planning Commission also asked about trip generation comparisons to the Netflix campus. At the time of this letter, the new Netflix campus at Albright Way is not fully constructed or fully occupied , and it would be difficult to determine the trip generation rates until the project is completed and occupied . The original Netflix campus at 100 Winchester Circle is still fully occupied. Hexagon conducted trip generation counts at 100-150 Winchester Circle (Netflix and Roku buildings) in February 2017. The resulting rates were found to be 1 .9 and 1.83 trips per 1,000 s.f. during the AM and PM peak hours, respectively (see Table 2). The trip rates counted at the Netflix offices are almost identical to the ITErates, which were used in the Alberto Way traffic study . Thus, the counted rates in Los Gatos were lower than the ITErates used in the traffic study. The rates used to estimate the project trip generation for 401-409 Alberto Way are the trip rates calculated using ITE's fitted curve equation. Another question was how ITE office trip generation rates have changed over the years. The current version of the manual is dated 2012. Hexagon consults the ITE manuals dating to 1997. During that 15-year time span, the office trip generation rates have not changed. Mr. Randy Lamb April 5, 2017 Page 3 of 8 Table 2 100-150 Winchester Cir Trip Generation Counts • ' ~ 1 o '.t '..f.. • " ' 'Ill: ' ' ~ .-. • ·~ '" '4 f • • ' ' .., I .0. .. • ~ • ',. • ~ .~ I ' ,.; > ~,.. ·~ '-..,.. , I · · AM Pealt'Hour · PM Peak Hour ----------------------------------------. Trips · Total Peak · Trips Total Peak Location 1 , ·Size ·unit Trips In Out · Trips ~· Rate · Trips In 'Out Trips · 'Rate · '... ! •• 0 • .__. 1f • ' o • ' j " I , • ' tT I '( .J l ' . I > • 0 ··•' • 100-150 Winchester Cir Note s : 163.03 ksf Surveyed Rates Rates Used in TIA 223 87 1. Trip generation counts were conducted in February 2017 . Overall Traffic Co nditio n s 310 1.90 1 .94 114 185 299 1.83 1 .96 The TIA studied five signalized intersections, two of which are Congestion Management Program (CMP) intersections . The traffic analysis at the two CMP intersections used the CMP database per VT A guidelines . Results show that all intersections operate at LOS D or better under all scenarios, which is considered "acceptable" by Town and VTA standards. The analysis showed that the project would not cause a degradation of LOS from base conditions and would generate an insignificant intersection impact per Town LOS criteria. During the AM peak hour, westbound Los Gatos-Saratoga Road experiences congestion mainly because of the lane drop from two to one lane west of Santa Cruz Avenue. Resulting queues do not extend to Alberto Way. During the peak 15-minute school drop-off period , eastbound Los Gatos-Saratoga Road also experiences congestion between Los Gatos Boulevard and Alberto Way, but queues rarely extend westward past Alberto Way. Project traffic mainly would flow in the counter-commute direction on eastbound Los Gatos-Saratoga Road and would not add to the congestion on westbound Los Gatos-Saratoga Road . Project traffic on eastbound Los Gatos- Saratoga Road would turn left into Alberto Way and would not add to the eastbound queue on Los Gatos-Saratoga Road at Los Gatos Boulevard. The proposed project would lengthen the left-turn pocket on eastbound Los Gatos-Saratoga Road turning into Alberto Way from 150 feet to 250 feet. As indicated in the traffic study, the 95th percentile queue at the eastbound left-turn pocket on Los Gatos-Saratoga Road turning into Alberto Way would be 200 feet with the addition of project traffic. The lengthened turn-pocket would accommodate the 95th percentile queue with the addition of project traffic and allow project traffic to turn out of the eastbound through lane earlier. The proposed project would also re-stripe southbound Alberto Way at the intersection to improve vehicular flow and reduce queuing on Alberto Way. In addition, the project would install signal interconnect between the Alberto Way intersection and the Los Gatos Blvd intersection to improve vehicular flow along Los-Gatos Saratoga Road . These improvements (which were not needed as mitigation for the project less- than-significant traffic impacts), would themselves not result in any new significant secondary traffic impacts . jiiJ"' 4iiiiliiil Mr. Randy Lamb AprilS, 2017 Page 4 of 8 Pedestrians and Bikes at the Highway 17 Interchange The Planning Commission expressed concern about the comfort and safety of pedestrians that would walk from the site to downtown Los Gatos. They were particularly concerned about the crosswalk across the Highway 17 northbound on-ramp. Commissioners asked whether an enhanced crosswalk with flashing beacon could be added there. The project voluntarily proposes to rebuild the sidewalk fronting the project site along westbound Los Gatos-Saratoga Road to create a detached sidewalk that complies with the Town's Complete Streets Program . The detached sidewalk would provide additional separation between vehicles and pedestrians. Subject to Caltrans approval, the project also could install flashing beacons at the crosswalk , as requested by the Planning Commission which was consistent with Caltrans' suggestion in its comment letter dated June 13, 2016 . The project voluntarily proposes to widen westbound Los Gatos-Saratoga Road between Alberto Way and the Highway 17 northbound on -ramp, which would provide room for the installation of a future bike lane on westbound Los Gatos-Saratoga Road . Complete Streets Improvements on Alberto Way Commissioners asked for the Town 's complete streets improvements on Alberto Way. "Complete Streets" refers to the accommodation of all travel modes. Alberto Way already has sidewalks. The project proposes to rebuild the sidewalk along its frontage in order to provide a detached sidewalk , which minimizes pedestrian exposu re to traffic and enhances pedestrian safety. The detached sidewalk would improve pedestrian comfort by moving pedestrians farther from traffic . Alberto Way currently lacks bike lanes. At a community meeting for the proposed project, neighbors expressed interest in installing bike lanes along Alberto Way. In response to the Commissioners' request for complete streets improvements and neighbor interests, the proposed project voluntarily proposes to widen Alberto Way along the proposed project frontage and install a bike lane on southbound Alberto Way approximately 210 feet long . In addition , there currently is no safe place for bikes wishing to turn left from Alberto Way to eastbound Los Gatos-Saratoga Road to position themselves. The proposed project voluntarily proposes the installation of a bike box at the intersection. The proposed bicycle improvements along Alberto Way and the proposed street widening along Los Gatos-Saratoga Road fronting the project site are all in conformance with the Town 's complete streets improvements. Parking on Alberto Way Commissioners were concerned about the removal of parking on Alberto Way. Eight on-street pa rking spaces are proposed to be removed as part of the project: five on the project side of the street and three on the opposite side of the street. The five spaces on the project s ide of the street would be removed to provide room for a striped right turn lane at the Alberto Way/Los Gatos- Saratoga Road intersection and to provide adequate sight distance at the southern driveway. Under existing conditions there is a driveway at that location, and its sight distance is restricted because of the on-street parking . Removing the on-street parking at that location as part of the project would provide improved sight distance. Some residents in the neighborhood requested that these spaces be removed to increase sight distance. Jl"" ~ Mr. Randy Lamb AprilS, 2017 Page 5 of 8 At a community meeting for the proposed project, neighbors ex pressed concern about visibility and about difficulty turn ing right at the signal from Alberto Way to Los Gatos-Saratoga Road . Under current conditions cars turning right from Alberto Way on to Los Gatos-Saratoga Road must wait for a green light if there is a car in front waiting to turn left. The proj ect voluntarily proposes to restripe Alberto Way which would provide one outbound left-turn (and through) lane and one dedicated right turn lane. Cars would then be able to turn right on a red light, which would improve vehicular flow and reduce queuing along Alberto Way. With the proposed development the southerly driveway is proposed to be placed at approximately 220 feet from the intersection . With the proposed dedication and widening , additional right turn lane and bike lane , the on-street parking along the project frontage would have to be modified o r removed . The distance between the two proposed project driveways is approximately 100 feet. This segment of 1 00-foot roadway is within the area of centerline transit ion from one lane to two lanes in the southbound direction. With the transition and to improve visibility , it is recommended parking be restricted between the two driveways . Hexagon studied the use of the on-street parking spaces and found that they were almost fully utilized at night but not during the day. It appears that the spaces are being used by patro ns of the Grill 57 restaurant. According to Town staff, the restaurant has sufficient parking spaces on-site to meet the Town requirements . Speed on Hig hway 9 Commissioners were concerned about the speed of traffic traveling westbound on Los Gatos- Saratoga Road , downhill toward the Highway 17 northbound on -ramp under existing conditions. Speed measurements on that portion of Los Gatos-Saratoga Road are not available . However, field observations indicate that under existing conditions motorists wishing to go north on Highway 17 and seeing a green light at Alberto Way are rushing down the hill. Motorists are able to clearly see the signal at Alberto Way from the top of the hill. Hexagon did not observe any vehicles running through a red light at Alberto Way. I As a speed control measure to address ex isting traffic speeds , a s peed feedback sign could be added halfway between Los Gatos Boulevard and Alberto Way. From the e x isting stop bar location, it is difficult for motorists to see up the hill on Los Gatos-Saratoga Road . Th ey must proceed with caution forward to see enough to make a right turn on red . To address the e xisting conditions, the Town could consider moving the stop bar on Alberto Way farther out to improve visibility. Respo nse to Pub li c Comments Mr. Bob Burke submitted a comment letter regarding the traffic study conducted by Hex ag o n Transportation Consultants, Inc. Mr. Burke raised many of the same issues he previously raised prior to the August 1 01h and August 241h Plannin g Commission meetings. Below are Hexagon's respon ses to the main is sues rai sed by Mr. Burke . Tri p Ge ne rat ion Pl eas e see above response to the same c omme nt raised by the Planning Commission . jiiJ"" 4illllli Mr. Randy Lamb April 5, 2017 Page 6 of 8 Inte rs e c tio n Traffi c Co unts Intersection traffic counts were collected in 2015 while schools were in session at all five study intersections during the AM peak hour, and at three intersections (Alberto Way and Los Gatos- Saratoga Road, Los Gatos Boulevard and Los Gatos-Saratoga Road, and Los Gatos Boulevard and Kennedy Road/Caldwell Avenue) during the PM peak hour. The intersections on Los Gatos- Saratoga Road at University Avenue and at Santa Cruz Avenue are designated Congestion Management Program (CMP) intersections by VT A and are required to use counts in the CMP database. Intersection counts were all counted at the intersections as vehicles advance past the stop bars. On roadway segments where intersection counts are collected at both ends of the segments and there are minimal mid-segment driveways, the total inbound volumes derived from the intersection counts at one end of the segment are very similar to the total inbound volumes derived from the intersection counts at the other end of the segment (see Table 3). Table 3 Existing Intersection Volume Checks Peak Entering Volume Exiting Volume ~ Segment Hour Location Volume Location Volume Volume %of Entering Los Gatos-Saratoga Rd EB AM Alberto PM Way Los Gatos-Saratoga Rd WB AM Los Gatos PM Blw 824 851 949 820 Los Gatos Blw Alberto Way 841 8 54 963 825 17 3 14 5 2% 0% 1% 1% Hexagon conducted new traffic counts at all five study intersections in October 2016, while schools were in session. As shown on Table 4, there were minimal fluctuations in traffic volumes between the 2015 counts used for the study and the newly collected 2016 counts. The only intersection that had relatively larger fluctuations was the Santa Cruz Avenue and Los Gatos- Saratoga Road intersection, but the 2016 volumes were lower than the 2015 volumes used in the study and so this fluctuation does not change any of the conclusions regarding the project 's traffic impacts. Table 4 Intersection Volume Comparison Peak Intersection Volume Difference ---------------------------------------Intersection Hour 2015 Count 2016 Count Volume %of 2015 Count Santa Cruz Ave & Los Gatos-Saratoga Rd AM 3 154 2862 -292 -9% PM 3291 2939 -352 -11 % University Ave & Los Gatos-Saratoga Rd AM 3021 2920 -101 -3% PM 3102 3176 74 2% Alberto Way & Los Gatos-Saratoga Rd AM 1976 1910 -66 -3% PM 1863 1862 -1 0% Los Gatos Blw & Los Gatos-Saratoga Rd AM 2454 2380 -74 -3% PM 2351 2468 117 5% Los Gatos Blvd & Kenne dy Rd /Caldwell Ave AM 1771 166 9 -102 -6% PM 1860 1913 5 3 3% Mr. Randy Lamb April 5, 2017 Page 7 of 8 Freeway Ramp Analysis The traffic study analyzed four ramps at the SR 17/SR 9 interchange . The studied ramps are listed below: • Northbound SR 17 on-ramp from westbound SR 9 • Southbound SR 17 on-ramp from westbound SR 9 • Northbound SR 17 off-ramp to eastbound SR 9 • Southbound SR 17 off-ramp to eastbound SR 9 There are eight ramps at the SR 17/SR 9 interchange. The four ramps identified above were studied because the project is expected to generate traffic on these ramps . The remaining four ramps at this interchange were not studied because they do not provide access to the project site and are not expected to receive project generated traffic. Freeway ramp volumes typically are obtained from Caltrans . These volumes are used for the purpose of conducting freeway ramp analysis . Since none of the study ramps were metered at the time of the study, the ramp volumes were used to conduct a volume-to-capacity analysis to determine the ramps ' ability to accommodate the traffic demand. The traffic study determined that with the project traffic , all ramps would continue to operate with sufficient capacity. Additional peak-hour freeway ramp counts were conducted in October 2016, while schools were in session. These counts were shown to be significantly lower than the counts Hexagon previously received from Caltrans (see Table 5). The new counts i ndicate that the ramp analysis done in the project TIA was conservative in that it was based on higher volume . These new counts show continuity in the volume along Los Gatos-Saratoga Road , which was a concern in Mr. Burke's analysis. As shown in Table 6, all ramps would continue to operate with sufficient capacity with the addition of project traffic. During field observations , Hexagon observed that only the southbound off-ramp from Highway 17 onto westbound Los Gatos-Saratoga Road experienced congestion during the AM peak hour. The congestion is due to downstream merging on westbound Los Gatos-Saratoga Road west of Santa Cruz Avenue . The project would not add traffic to th is ramp . Other ramps operated well during both the AM and PM peak hours. jiiii"" 4iiiiilllil Mr. Randy Lamb April 5, 2017 Page 8 of 8 Table 5 Study Freeway Ramp Count Comparison Ramp Volume SR 17/Los Gatos-Saratoga Rd Ramps Peak Hour Caltrans Hexagon Dtfference NB on-ramp from WB Los Gatos-Saratoga Rd AM 1153 502 -651 PM 1017 409 -608 SB on-ramp from WB Los Gatos-Saratoga Rd AM 104 120 16 PM 379 172 -207 NB off-ramp to EB Los Gatos-Saratoga Rd AM 379 217 -162 PM 125 126 1 SB off-ramp to EB Los Gatos -Saratoga Rd AM 1103 432 -671 PM 758 337 -421 Notes : 1. Caltrans ramp volumes were obtained from Caltrans staff on September 17,2015. Ramp volumes were dated August 2013 . 2 . Hexagon ramp volumes were obtained from tube counts conducted in October 2016. Table 6 Ramp Analysis with New Counts ~~ Peak ProJect Interchange Ramp Type Hour Capacity 1 Votume' VIC Trops Volume VIC NB on-ramp from WB Los Gatos -Saratoga Rd Diagonal AM 900 502 0.56 3 505 0.56 PM 900 409 0.45 32 441 0.49 SR 17 & Los Gatos-SB on-ramp from WB Los Gatos-saratoga Rd Loop AM 900 120 0.13 1 121 0.13 Saratoga Rd PM 900 172 0 .19 11 183 0.2 NB off-ramp to EB Lo s Gatos-Saratoga Rd Diagonal AM 2000 217 0.11 13 230 0.12 PM 2000 126 0.06 0 126 0.06 SB off-rnmp to EB Los Gatos-Saratoga Rd Loop AM 1800 432 0 .24 39 471 0.26 PM 1800 337 0.19 0 337 0.19 ~ 1. Ramp capacities were obtained from the Highway Capacity Manual 2000, and considered the free-flow spee d , and the number of lanes on the ramp . As a conservative approach, the two on-ramps are assumed to be metered during both peak hours . 2. Ra mp lo<llumes were obtained from tube counts conducted in October 2016 . All of this data further confirms the TIA conclusions and the analysis contained in the Final EIR. If you have any questions, please do not hesitate to call. Sincerely, HEXAGON TRANSPORTATION CONSULTANTS, INC. Gary K. Black President