Loading...
Staff Report Annual Concrete Project PREPARED BY: Lisa Petersen Assistant Director of Parks and Public Works / Town Engineer Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● (408) 354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 10/15/2019 ITEM NO: 5 DATE: October 8, 2019 TO: Mayor and Town Council FROM: Laurel Prevetti, Town Manager SUBJECT: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project (19-811-9901), and Authorize the Following Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project (19-813-9921): a. Approve the Plans and Specifications; b. Authorize the Town Manager to Advertise the Project for Bid; c. Authorize the Town Manager to Award and Execute a Construction Agreement in an Amount not to Exceed $1,237,841, Including Contingencies and Change Orders; d. Authorize Staff to Execute Future Change Orders in an Amount not to Exceed Ten Percent of the Contract Award Amount; and e. Authorize an Expenditure Budget Transfer of $310,257 from the Annual Street Repair and Resurfacing Project (19-811-9901) to the Annual Curb, Gutter, and Sidewalk Maintenance Project (19-813-9921). RECOMMENDATION: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project (19- 811-9901), and Authorize the Following Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project (19-813-9921): a. Approve the Plans and Specifications; b. Authorize the Town Manager to Advertise the Project for Bid; c. Authorize the Town Manager to Award and Execute a Construction Agreement in an Amount not to Exceed $1,237,841, Including Contingencies and Change Orders; d. Authorize Staff to Execute Future Change Orders in an Amount not to Exceed Ten Percent of the Contract Award Amount; and e. Authorize an Expenditure Budget Transfer of $310,257 from the Annual Street Repair and Resurfacing Project (19-811-9901) to the Annual Curb, Gutter, and Sidewalk Maintenance Project (19-813-9921). PAGE 2 OF 5 SUBJECT: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project, and Approve Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project. DATE: October 8, 2019 BACKGROUND: The adopted FY 2019/20-2023/24 Capital Improvement Program (CIP) Budget designates funding for two projects, Street Repair and Resurfacing (project 19 -811-9901) and curb, gutter, sidewalk, and curb ramp replacement and construction (project 19-813-9921). These two projects are synergistic and consistent with the Town’s goals to improve public safety and to improve the quality of Town streets. Street reconstruction, asphalt overlay, or rubber cape seal treatments all trigger the requirement for curb ramp upgrades in compliance with the Americans with Disabilities Act (ADA). The only major street resurfacing treatment that does not trigger the federal upgrade requirement is slurry seal. Curb ramps required for the Town’s Annual Street Repair program are typically bid as part of the Annual Curb, Gutter and Sidewalk Maintenance project to allow for more competitive pricing with similar concrete services. Recently, the number of ramps that need upgrading for the annual street repair project absorb most of the project budget for the Annual Curb, Gutter, and Sidewalk Maintenance Project, leaving only a few additional maintenance dollars for other areas in Town as discussed later in this report. DISCUSSION: Recommended FY 2019/20 Annual Street Repair and Resurfacing Project Street List Streets are assessed by their need, with streets in varied condition receiving differing levels of treatment. Several streets in the program are ready for an asphalt overlay, a more signif icant treatment. These streets include two streets that the Town Council approved as Senate Bill 1 (SB1) funded streets (Attachment 1) on April 16, 2019. The work associated with these two streets will exhaust the remaining SB1 funding: • Knowles Avenue from Dardanelli to Dell • Pollard Avenue from Knowles to West Parr Staff recommends the addition of Industrial Way from Andrews to Blossom Hill Road as an asphalt overlay. This street will be included in the overlay part of the project with funds coming from other sources than SB1. This year’s annual street maintenance project will also provide a heavier focus on preventive maintenance through slurry seals with streets identified by the Town’s pavement maintenance program, Streetsaver. Slurry seals are the first line of defense against pavement deterioration, providing a new wearing surface in the form of a thin asphalt-sand emulsion over the existing roadway. This year, 84 residential street sections were identified by the Streetsaver program PAGE 3 OF 5 SUBJECT: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project, and Approve Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project. DATE: October 8, 2019 DISCUSSION (continued): and confirmed by Town Engineering staff as appropriate for slurry seal treatment (Attachment 2). The proposed slurry seal program aligns with the concept of keeping streets in good condition and not letting them fall to a condition that is more costly to repair. The best management practices developed from years of pavement analysis and pavement maintenance programs are based on the principle that it costs less to maintain roads that are in good condition than those in worse condition categories. Staff is also recommending placement of a rubber cape seal on University Avenue from Main Street to Blossom Hill Road. A rubber cape seal is a rubber chip seal covered by a slurry seal and is an appropriate treatment for streets that are exhibiting distress c racking and/or have fallen out of the “good” condition category. Should Council approve the project street list, staff would move forward with project design work. It is anticipated staff would return to Council in early 2020 for approval of the plans an d specifications and authorization to bid the project. Annual Curb, Gutter and Sidewalk Maintenance Project This year’s Annual Curb, Gutter and Sidewalk Maintenance Project will address replacement of broken and lifted sidewalk, curb, and gutter, as well as the installation of ADA ramps. Most of the proposed ADA ramp work included in the project is related to the Town’s proposed street repair work for next year. Some additional ramp work was included to address resident complaints and several heavily used non-compliant ramps on Main Street near the downtown. The proposed project also addresses the repair of curb, gutter, and sidewalk throughout Town. Repairs are generally at locations where tree roots have uplifted curb and sidewalk creating drainage and safety concerns with the majority of projects generated through resident complaints or claims from tripping hazards. This year’s project will complete 49 concrete repairs to address these needs. The project was able to add the large number of repair locations because of the increased project budget provided by Council through the FY 2019/20 budget process. In some of these locations where trees, other than nuisance trees, need to be removed to complete the repair, staff has coordinated with the adjacent resident(s) for concurrence. PAGE 4 OF 5 SUBJECT: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project, and Approve Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project. DATE: October 8, 2019 DISCUSSION (continued): The base bid engineer’s estimate for this project is $1,051,369 including a 10% contingency and project delivery costs, all within the project budget. The costs to upgrade ramps on University Avenue, in alignment with federal ADA law, exceeded the project budget and have been included as an additive alternate bid item. The base bid plus the additive alternate cost for the University Avenue ramps is $1,361,625, including a 10% contingency and project delivery costs. This additive cost would exceed the budget if the project bids equal the engineer’s estimate. The ramps are required on University Avenue because this street is recommended for a rubber cape seal. Staff is requesting a budget transfer from the Annual Street Repair and Resurfacing project of up to $310,257 to cover the cost of the ramps. Due to the timing for bidding occurring early in the bidding cycle, staff is anticipating competitive bids, which may reduce the amount of money needed for this budget transfer. Once bids are received, only the amount necessary to complete the work will be transferred and the action will be documented at the Mid-Year Budget Review. The project plans and specifications for the Annual Curb, Gutter, Sidewalk and Ramp project can be viewed on the Town website at https://www.losgatosca.gov/108/Capital-Improvement- Program. CONCLUSION: Approval of the recommendations will allow staff to begin design on the street maintenance project and allow the annual concrete maintenance project to move forward for bidding and award. This concrete maintenance project will be constructed in advance of this year’s pavement maintenance work to meet the associated ADA requirements triggered by that project. The concrete maintenance project will be bid in the fall with construction occurring in the winter and spring in an attempt to get better contractor pricing. COORDINATION: This project has been coordinated with the Finance Department. PAGE 5 OF 5 SUBJECT: Approve the Street List for the FY 2019/20 Annual Street Repair and Resurfacing Project, and Approve Actions for the Annual Curb, Gutter, and Sidewalk Maintenance Project. DATE: October 8, 2019 FISCAL IMPACT: Curb, Gutter & Sidewalk Maintenance Project 813-9921 Budget Costs GFAR $ 1,063,677 Requested Budget Transfer $ 310,257 Total Budget $ 1,373,934 FY 19/20 Prior Commitments $ 4,571 Project Construction (Including Contingencies) $ 1,237,841 Staff Costs $ 108,784 Project Delivery Costs $ 15,000 Total Expenditures $ 1,366,196 Remaining Balance $ 7,738 Staff costs are tracked for all projects. Tracking of staff costs allows for accountability in the costs of projects, recovery of costs from grant funded projects, and identification of future staffing needs. This project utilizes a combination of full-time budgeted staff and part time staff that support fluctuating workloads. The costs for part -time staff will be directly associated with this project while full-time staff are accounted for in the Department’s operating budget. Staff Costs Costs Operating Budget (Full time with benefits) $ 93,784 Unbudgeted (Temporary staff with no benefits) $ 15,000 Total $ 108,784 ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA and is Categorically Exempt [Section 15301(c) Existing streets, sidewalks, trails and similar facilities]. A Notice of Exemption has been filed. Attachment: 1. Council Approved SB1 Street List (Resolution 2019-016) 2. Proposed Street List RESOLUTION 2019 -016 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2019/20 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our Town are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the Town must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the Town, will receive an estimated $541,006 in RMRA funding in Fiscal Year 2019/20 from SB 1; and WHEREAS, this is the third year in which the Town is receiving SB 1 funding and will enable the Town to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the Town used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high - priority and cost - effective projects that also meet the communities' priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the Town maintain and rehabilitate 2 roads this year and similar projects into the future; and Iof3 Resolution 2019 -016 April 16, 2019 WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the Town's streets and roads are in a fair condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a good condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co- benefits statewide. NOW, THEREFORE, BE IT RESOLVED: The Fiscal Year 2019/20 list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues include: Location Description Scheduled Estimated Completion Useful Life Knowles from Dardanelli to Dell Placement of rubber cape seal or overlay Fall 2020 10 - 25 years Pollard from Knowles to West to maintain pavement surface. These are Parr arterial roads and are critical for transit needs in the Town. Winchester from Lark to Blossom Placement of rubber cape seal or overlay Fall 2021 10 - 25 years Hill to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Union Avenue from Blossom Hill Placement of rubber cape seal or overlay Fall 2022 10 - 25 years Road to Los Gatos - Almaden Road to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Quito Road from Bicknell to Placement of rubber cape seal or overlay Fall 2023 10 - 25 years Woodbank to maintain pavement surface. This is a collector road and is critical for transit needs in the Town. 2of3 Resolution 2019 -016 April 16, 2019 PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 16th day of April of 2019 by the following vote: COUNCIL MEMBERS: AYES: Marcia Jensen, Rob Rennie, Marico Sayoc, Barbara Spector, Mayor Steven Leonardis NAYS: None. ABSENT: None. ABSTAIN: None. MAYOR OF THE TODtlN- LOS GATOS, CALLIIFO NIA Q DATE: t TOWN CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA DATE: 4' 119 -1 al TOS 3of3 Resolution 2019 -016 April 16, 2019 Street From To Type Bicknell Rd. Verona Ct. Montclair Rd. Slurry Seal Capistrano Pl. More Ave. End Slurry Seal La Montagne Ct. Wimbledon Dr. End Slurry Seal Lora Dr. Wedgewood Ave. End Slurry Seal Mistletoe Rd. Old Adobe Rd. End Slurry Seal Montclair Rd. E. Quito Rd. (Town Limit) Old Adobe Rd. Slurry Seal Montclair Rd. More Ave. Bicknell Rd. Slurry Seal Monteclair Ct. Montclaire Rd. End Slurry Seal Mulberry Dr. Wedgewood Ave. End Slurry Seal Old Adobe Rd. Bicknell Rd. Quito Rd Slurry Seal Old Adobe Wy. Old Adobe Rd. End Slurry Seal Plaza La Posada Old Adobe Rd. End Slurry Seal Prince St. Newville Dr. Roxbury Ln. Slurry Seal Rinconada Oaks Ct. Old Adobe Rd. End Slurry Seal Roxbury Ln. More Ave. Wedgewood Ave. Slurry Seal Smith Creek Dr. Bicknell Rd. End Slurry Seal Vallecitos Wy. Via De Tesoros End Slurry Seal Verona Ct. Bicknell Rd. End Slurry Seal Via La Posada Plaza La Posada Via De Terores Slurry Seal Via Teresa Bicknell Rd. End Slurry Seal Wimbeldon Dr. Wedgewood Ave. Winchester Blvd. Slurry Seal Alley 3 (Bt. Massol & Tait) Bean Ave. Nicholson Ave. Slurry Seal Alley 4 (Bt. Massol & Tait) Nicholson Ave. Bachman Ave. Slurry Seal Alley 5 (Bt. Tait & Wilder) Bean Ave. Nicholson Ave. Slurry Seal Alley 6 (Bt. Tait & Wilder) Nicholson Ave. Bachman Ave. Slurry Seal Apricot Ln. Hernandez Ave. Bachman Ave. Slurry Seal Bachman Ave. N. Santa Cruz Ave. University Ave. Slurry Seal Bentley Ave. University Ave. Edelen Ave. Slurry Seal Broadway Extension W. Main St. Private drive Slurry Seal Chestnut Ave. Overlook Rd. Hernandez Ave. Slurry Seal Elm St. N. Santa Cruz Ave. University Ave. Slurry Seal Ellenwood Ave. Hernandez Ave. W. Ellenwood Ave. Slurry Seal Ellenwood Ave. City Limits Glen Ridge Ave. Slurry Seal Fairview Ave. Pennsylvania Ave. Fairview Plaza Slurry Seal Fairview Plaza Fairway Ave. End Slurry Seal Glen Ridge Ave. Pennsylvania Ave. Hernandez Ave. Slurry Seal Grays Ln. N. Santa Cruz Ave. University Ave. Slurry Seal Hernandez Ave. City Limits Glen Ridge Ave. Slurry Seal Laurel Ave. Manzanita Ave. Wissahickon Ave. Slurry Seal Lyndon Ave. W. Main St. End Slurry Seal Madrone Ave. Overlook Rd. Town Limit Slurry Seal W. Main St. Broadway Bayview Ave. Slurry Seal Overlook Rd. Madrone Ave. Wissahickon Ave. Slurry Seal Palm Ave. Hernandez Ave. Pennsylvania Ave. Slurry Seal Pennsylvania Ave. Wissahickon Ave. Bayview Ave. Slurry Seal Peralta Ave. Hernandez Ave. Pennsylvania Ave. Slurry Seal Royce St. N. Santa Cruz Ave. University Ave. Slurry Seal N. Santa Cruz Ave. W. Main St. Hwy 9 Slurry Seal Victory Ln. W. Main St. Bean Ave. Slurry Seal Victory Ln. Bean Ave. Nicholson Ave. Slurry Seal Town of Los Gatos #19-811-9901 Annual Street Repair and Resurfacing Streets List Page 1 of 2 Street From To Type Victory Ln. Nicholson Ave. Bachman Ave. Slurry Seal Walnut Ave. Hernandez Ave. Pennsylvania Ave. Slurry Seal Wissahickon Ave. Laurel Ave. Hernandez Ave. Slurry Seal Albert Ct. Albert Dr. End Slurry Seal Andre Ct. Los Gatos Blvd. End Slurry Seal Bella Vista Ct. Bella Vista Ave. End Slurry Seal Caldwell Ave. Los Gatos Blvd. Bella Vista Ave. Slurry Seal Cardinal Ln. Robin Way End Slurry Seal Cerro Chico Harding Ave. (East) Harding Ave. (West) Slurry Seal Ferris Ave. Kennedy Rd. End Slurry Seal Fillmer Ave. Los Gatos Blvd. Vista Del Campo Slurry Seal Gem Ave. Kennedy Rd. Fillmer Ave. Slurry Seal George St. Roberts Rd. Mitchell Ave. Slurry Seal Harding Ave. Los Gatos Blvd. Cerro Chico (East) Slurry Seal Harding Ave. Cerro Chico (East) Vista Del Monte (East) Slurry Seal Karen Ct Marchmont Dr. End Slurry Seal Loma St. County Limit Ferris Ave. Slurry Seal Mitchell Ave. Fisher Ave. Los Gatos Blvd. Slurry Seal Marchmont Ct. Marchmont Dr. End Slurry Seal Nino Wy. Nino Ave. End Slurry Seal Olde Dr. Clover Wy. Pole #50311 Slurry Seal Pinta Ct. S. Kennedy Rd. End Slurry Seal Robin Way Cardinal End Slurry Seal Rosalie Ct Marchmont Dr. End Slurry Seal Spencer Ave. Los Gatos Blvd. Ferris Ave. Slurry Seal Stonybrook Dr Kennedy Rd. Cardinal Slurry Seal Twin Oaks Dr Longmeadow Dr. End Slurry Seal Via Santa Maria Kennedy Rd. Pinta Ct. Slurry Seal Vista Del Campo Harding Ave. (East) Vista Del Monte Slurry Seal Vista Del Mar Vista Del Monte Spreckles Ave. Slurry Seal Vista Del Prado Vista Del Mar End Slurry Seal Vista De Sierra Vista Del Monte Vista Del Monte Slurry Seal Worcester Loop Worcester Ln. Worcester Loop Slurry Seal Worcester Ln. Vista Del Monte End Slurry Seal University Ave. W. Main St. Hwy 9 Rubber Cape Seal University Ave. Hwy 9 Blossom Hill Rd. Rubber Cape Seal Industrial Wy. Andrews St. Blossom Hill Rd. Overlay Knowles Ave. Dell Ave. Pollard Rd. Overlay Pollard Rd. Knowles Ave. W. Parr Ave. Overlay Page 2 of 2