Loading...
Addendum PREPARED BY: MATT MORLEY Parks and Public Works Director Reviewed by: Town Manager and Assistant Town Manager 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 03/19/2019 ITEM NO: 7 ADDENDUM DATE: MARCH 18, 2019 TO: MAYOR AND TOWN COUNCIL FROM: LAUREL PREVETTI, TOWN MANAGER SUBJECT: SUPPORT THE 2016 MEASURE B PROJECT FOR IMPROVEMENTS AT HIGHWAY 9 AND HIGHWAY 17 INCLUDING DESIGN OPTIONS FOR EFFICIENCIES ON HIGHWAY 17 AND FOR ADDITIONAL TRAVEL LANES ON HIGHWAY 17 AND DIRECT STAFF TO PROCESS A GENERAL PLAN 2020 AMENDMENT ALLOWING FOR THE PROJECT REMARKS: After distribution of the staff report, a Councilmember requested documentation depicting the existing highway 17 right of way and diagrams depicting potential auxiliary lanes and realignment of existing lanes as contained in the staff report. The attachments to this addendum depict high level conceptual ideas. Attachment 1 demonstrates the efficiency concept utilizing auxiliary lanes to provide smoother transitions at on and off ramps. Attachment 2 shows more significant work that utilizes extra travel lanes, auxiliary lanes, and a new interchange at Highway 9. Both exhibits demonstrate preliminarily that the work can be completed within the existing right-of-way. Attachments received with this addendum: 1. Route 17 Auxiliary Lanes Exhibit 2. Route 17 Added Thru Lanes Exhibit