Attachments A and B
Resolution No. 2019 -
Attachment A
Re: Request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2019/20
Transportation Development Act Article 3 Pedestrian/Bicycle Project Funding
Findings
Page 1 of 1
1. That the TOWN OF LOS GATOS is not legally impeded from submitting a request to the Metropolitan
Transportation Commission for the allocation of Transportation Development Act (TDA) Article 3 funds, nor is
the TOWN OF LOS GATOS legally impeded from undertaking the project(s) described in “Attachment B” of this
resolution.
2. That the TOWN OF LOS GATOS has committed adequate staffing resources to complete the project(s)
described in Attachment B.
3. A review of the project(s) described in Attachment B has resulted in the consideration of all pertinent matters,
including those related to environmental and right-of-way permits and clearances, attendant to the successful
completion of the project(s).
4. Issues attendant to securing environmental and right-of-way permits and clearances for the projects described
in Attachment B have been reviewed and will be concluded in a manner and on a schedule that will not
jeopardize the deadline for the use of the TDA funds being requested.
5. That the project(s) described in Attachment B comply with the requirements of the California Environmental
Quality Act (CEQA, Public Resources Code Sections 21000 et seq.).
6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the sources of funding
other than TDA are assured and adequate for completion of the project(s).
7. That the project(s) described in Attachment B are for capital construction and/or design engineering; and/or for
the maintenance of a Class I bikeway which is closed to motorized traffic; and/or for the purposes of restriping
Class II bicycle lanes; and/or for the development or support of a bicycle safety education program; and/or for
the development of a comprehensive bicycle and/or pedestrian facilities plan, and an allocation of TDA Article 3
funding for such a plan has not been received by the TOWN OF LOS GATOS within the prior five fiscal years.
8. That the project(s) described in Attachment B is included in a locally approved bicycle, pedestrian, transit,
multimodal, complete streets, or other relevant plan.
9. That any project described in Attachment B that is a bikeway meets the mandatory minimum safety design
criteria published in Chapter 1000 of the California Highway Design Manual.
10. That the project(s) described in Attachment B will be completed before the funds expire.
11. That the TOWN OF LOS GATOS agrees to maintain, or provide for the maintenance of, the project(s) and
facilities described in Attachment B, for the benefit of and use by the public.
Resolution No. 2019 -
Attachment B
TDA Article 3 Project Application Form
Fiscal Year of this Claim: 2019/20 Applicant: Town of Los Gatos
Contact person: Ying Smith, Transportation and Mobility Manager
Mailing Address: Parks & Public Works, 41 Miles Avenue, Los Gatos CA 95030
E-Mail Address: YSmith@LosGatosCA.gov Telephone: 408.827.3550
Secondary Contact (in event primary not available) Matt Morley
E-Mail Address: MMorley@losgatosca.gov Telephone: 408.399.5774
Short Title Description of Project: Nino or Blossom Hill Road Bicycle and Pedestrian Bridge over Highway 17
Amount of claim: $34,456
Functional Description of Project:
Crossing Highway 17 at this location is a barrier for bicyclists and pedestrians. This is a suggested path for SR2S. There is a high volume of
bicycle and pedestrian traffic for school students to cross to get to Fisher Middle School. The current BHR bridge doesn’t have sufficient width
to accommodate a separated bike lane or Class I path, which is needed to accommodate the existing and future demand. The Town is
interested in considering either Nino or BHR as alignment options, not both.
Financial Plan:
List the project elements for which TDA funding is being requested (e.g., planning, engineering, construction, contingency). Use the table
below to show the project budget for the phase being funded or total project. Include prior and proposed future funding of th e project.
Planning funds may only be used for comprehensive bicycle and pedestrian plans. Project level planning is not an eligible use of TDA
Article 3.
Project Elements: The requested funds will be used in Design, Engineering, Environmental and ROW. This phase will prepare the project to
be “shovel ready”. This phase is scalable. The Town may use a lesser amount to partially fund this phase and pursue additional funds in the
future to complete the entire engineering phase.
Funding Source All Prior FYs Application FY Next FY Following FYs Totals
TDA Article 3 $52,995 $34,456 $87,451
list all other sources:
1. TLG TIF $147,005 $147,005
Totals $234,456
Project Eligibility: YES?/NO?
A. Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is
anticipated). Identified in the Town Council adopted BPMP
No
May 7, 2019
B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. FY18/19 Yes
C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California
Highway Design Manual? (Available on the internet via: http://www.dot.ca.gov).
Yes
D. Has the project been reviewed by a Bicycle Advisory Committee (BAC)? (If "NO," provide an explanation). Enter date the
project was reviewed by the BAC: The project is identified in the Los Gatos - Monte Sereno Bicycle and Pedestrian Master
Plan (BPMP) adopted by the Town Council in March 2017. The LG BPAC supported and endorsed the Plan and this project.
Yes
E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been
evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that
include construction).
N/A
F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and
year)
Yes
G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such
maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name:
)
Yes