Loading...
Attachment 2CALIFORNIA T ĔĜē Ĕċ L ĔĘ G ĆęĔĘ Capital Improvement Program Budget Fiscal Years 2019/20 — 2023/24 ATTACHMENT 2 Cover Photos: Ken Benjamin and Liv Ames TOWN OF LOS GATOS CALIFORNIA PROPOSED Capital Improvement Program for Fiscal Years July 1, 2019 to June 30, 2024 Town Council Steve Leonardis............................................................ Mayor Marcia Jensen ....................................................... Vice Mayor Marico Sayoc ............................................... Council Member Barbara Spector ........................................... Council Member Rob Rennie .................................................. Council Member Prepared under the direction of: Laurel Prevetti ........................................................................................................... Town Manager Stephen D. Conway ................................................................................................. Finance Director 110 E. Main Street, Los Gatos, CA 95030 www.losgatosca.gov PROPOSED TABLE OF CONTENTS i INTRODUCTION Town Manager’s Message .................................................................................................................... A – 1 FY 2018/19 Completed CIP Projects ..................................................................................................... A – 11 Budget Process Overview ..................................................................................................................... A – 17 FINANCIAL SUMMARIES Program Summaries Streets Program ............................................................................................................................... B – 5 Parks Program .................................................................................................................................. B – 5 Public Facilities Program .................................................................................................................. B – 6 Fund Summaries Total CIP Fund Summary .................................................................................................................. B – 9 Fund 411 - GFAR Fund ..................................................................................................................... B – 10 Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12 Fund 421 – Grants Fund................................................................................................................... B – 14 Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16 Fund 472 – Utility Underground Fund ............................................................................................. B – 18 Fund 481 – Gas Tax Fund ................................................................................................................. B – 20 STREETS PROGRAM Street Reconstruction & Resurfacing Projects Street Repair & Resurfacing ............................................................................................................. C – 6 Almond Grove Street Rehabilitation Project ...................................................................................C – 10 Street Repairs, Maintenance & Safety Projects Traffic Calming Projects ................................................................................................................... C – 16 Curb, Gutter & Sidewalk Maintenance ............................................................................................ C – 18 Retaining Wall Repairs ..................................................................................................................... C – 20 Annual Street Restriping .................................................................................................................. C – 22 Guardrail Replacement Projects ...................................................................................................... C – 24 Massol Intersection Improvements ................................................................................................. C – 26 Street Improvement Projects Los Gatos Boulevard/Shannon Road Improvements ....................................................................... C – 32 Downtown Parking Lots Seal Coat & Restriping. ............................................................................. C – 34 Hernandez Avenue Storm Drain Improvements ............................................................................. C – 36 224 West Main Property Acquisition (Parking Lot 6) ...................................................................... C – 38 PROPOSED TABLE OF CONTENTS ii Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane .............. C – 40 Sidewalk Improvements – Multiple Locations ................................................................................. C – 42 Utility Undergrounding Improvements ........................................................................................... C – 44 Cut – Through Traffic/Wood Road Roundabout .............................................................................. C – 46 Traffic Signal Modernization ............................................................................................................ C – 48 Bicknell Road Storm Drain Improvements ....................................................................................... C – 50 Bicycle & Pedestrian Improvements ................................................................................................ C – 52 Stormwater Master Plan .................................................................................................................. C – 54 Stormwater System – Pollution Prevention Compliance ................................................................ C – 56 Public Arts Gateway ......................................................................................................................... C – 58 Downtown Parking Study ................................................................................................................ C – 60 One-Way Downtown Street Pilot .................................................................................................... C – 62 Annual Storm Drain Improvements ................................................................................................. C – 64 Pilot School Busing ........................................................................................................................... C – 66 ADA Transition Plan ......................................................................................................................... C – 68 Highway 17/9 Interchange and Capacity Improvements ................................................................ C – 70 Downtown Revitalization ................................................................................................................. C – 72 Bridge Projects Quito Road - Bridge Replacement ................................................................................................... C – 78 Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design ....................................................... C – 80 PARKS AND TRAILS PROGRAM Park Improvement Projects Parks Playground Fibar Project ........................................................................................................ D – 6 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping ................................................. D – 8 Town Plaza Turf Repairs................................................................................................................... D – 10 Outdoor Fitness Equipment ............................................................................................................. D – 12 Vegetation Management – Town-wide ........................................................................................... D – 14 Fence Replacement – Shire Court ................................................................................................... D – 16 Trail Improvement Projects Open Space Trail Upgrades .............................................................................................................. D – 22 Forbes Mill Footbridge Improvements ............................................................................................ D – 24 Charter Oaks Trail Repair ................................................................................................................. D – 26 Trailhead Connector Project ............................................................................................................ D – 28 PROPOSED TABLE OF CONTENTS iii PUBLIC FACILITIES PROGRAM Infrastructure Projects Building Replacement at Corporation Yard ...................................................................................... E – 6 Energy Efficiency Upgrades Town-wide ........................................................................................... E – 8 Facilities Assessment ....................................................................................................................... E – 10 Library Carpet Replacement ............................................................................................................ E – 12 Town Beautification ......................................................................................................................... E – 14 ADA Upgrade Public Restrooms – Adult Recreation Building ......................................................... E – 16 ADA Upgrade Staff Restroom – Civic Center ................................................................................... E – 18 Plaza Level Railings – Code Upgrade ............................................................................................... E – 20 Waterproofing – Town-wide ........................................................................................................... E – 22 Sound Mitigation in Library Lobby .................................................................................................. E – 24 Fire Suppression (Halon) for Server Rooms ..................................................................................... E – 26 Police Headquarters Roof Repair .................................................................................................... E – 28 Equipment Projects Information System Upgrade .......................................................................................................... E – 34 Audio / Video System Upgrade ........................................................................................................ E – 36 Town-Wide Document Imaging Project .......................................................................................... E – 38 Engineering Document Archiving .................................................................................................... E – 40 Silicon Valley Regional Interoperability Project (SVRIP) Services ................................................... E – 42 Neighborhood Emergency Preparedness ........................................................................................ E – 44 EOC Communication Upgrades ....................................................................................................... E – 46 IT Disaster Recovery Improvements ................................................................................................ E – 48 Computer Aided Dispatch and Records Management System (CAD/RMS) .................................... E – 50 REFERENCE Glossary .................................................................................................................................................. F – 1 Index....................................................................................................................................................... F – 7 Introduction This Page Intentionally Left Blank A - 1 TOWN OF LOS GATOS CIVIC CENTER 110 E. MAIN STREET LOS GATOS, CA 95030 May 8, 2019 Honorable Mayor and Town Council: I am pleased to submit to you the Proposed Fiscal Year (FY) 2019/20 – 2023/24 Five-Year Capital Improvement Program (CIP) for the Town of Los Gatos. The CIP is a comprehensive five-year capital improvement plan designed to identify projects to develop and maintain the Town’s infrastructure, consistent with the Town Council Core Goal of maintaining the condition and availability of public facilities. Guidance for developing priorities for capital improvement projects is also derived from key plans, including the General Plan and the Council’s Strategic Priorities. This CIP budget message contains: • Town’s Core Goals and Strategic Priorities • CIP Financial Summary - Funding Sources • Proposed FY 2019/20 – 2023/24 CIP Overview • Proposed FY 2019/20 CIP Overview • FY 2018/19 Completed Projects • Budget Process Overview In January 2019, the Town Council established the 2019-21 Strategic Priorities (see page A-2). The Core Goals and Strategic Priorities guide the preparation of both the Capital and Operating Budgets. In terms of capital projects, the Town Council affirmed its interest improving the condition of the Town’s streets, enhancing community vitality through events and other efforts in addition to continuing/completing the ongoing commitments of traffic/transportation, public safety, quality of life, and prosperity. All proposed capital projects are described in this document. The reserves and operating expenditures are discussed in more detail in the Proposed FY 2019/20 Operating Budget. PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 2 PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 3 CIP FINANCIAL SUMMARY – FUNDING SOURCES As in the past, the Town continues to be challenged in its attempts to secure a reliable ongoing source of revenue for the Capital Improvements Program. The proposed five-year CIP reflects $6.0 million in ongoing Gas Tax dedicated sources to help fund the proposed $32 million of planned capital improvements. The balance of CIP funding of $26 million is expected to be funded by one–time appropriations from the General Fund Appropriated Reserve (GFAR), Utility Undergrounding Funds, Traffic Mitigation Funds, Grant Funds, Storm Drain Funds as follows: Ongoing Gas Tax 6,050,270$ GFAR 17,666,444 Utility Undeground Funds 4,555,204 Traffic Mitigation Funds 1,347,551 Grant Funds 1,987,200 Storm Drain Funds 365,000 Total Funding Available 31,971,669$ Funding Sources for the FY 2019/20 - 2023/24 CIP One-Time GAS TAX State Gasoline Tax revenue is distributed to the Town from the State of California and recorded in the Gas Tax Fund. This tax is also known as the “Highway Users Tax” or the “Motor Vehicle Fuel License Tax.” The gasoline tax is an 18-cent per gallon tax on fuel used to propel a motor vehicle or aircraft. Gas Tax revenue is allocated to the Town based on a per gallon of gas purchased within the Town limits and based on population. The estimated Gas Tax revenue totals approximately $1.2 million for FY 2019/20 due to the Road Recovery and Repair Act of 2017 (SB1). These funds can only be used for new construction and reconstruction of Town streets. LOCAL 2010 AND 2016 MEASURE B As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA) assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. This funding source is expected to generate approximately $180,000 annually for Los Gatos, which will be used for street rehabilitation Town-wide. In 2016, Santa Clara County voters approved Measure B, a transportation focused sales tax measure. After several years of legal challenges, the funding from Measure B has begun to flow. The most important element of this measure is ongoing road maintenance funding to the Town of $580,663. Additional funds may be distributed to local projects on a competitive basis. GFAR The primary source of funding for the Town’s capital program is the Town’s General Fund Appropriated Reserve (GFAR). By Council direction, this fund receives transfers from the General Fund’s designated Reserve for Future and Special Projects, which receives most of the Town’s annual revenues above operating expenditures after funding all legally restricted reserves at their required levels, including PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 4 receipt of one-time funds from grants, property sales, and other reserves. Because of the availability of General Fund “one-time” funding sources in recent years, the Council approved a General Fund transfer to the GFAR fund in the amount of $2.7 million for FY 2013/14, an additional “one-time” source allocation of $6.6 million for FY 2014/15, and additional funding of $6.9 million for the Almond Grove Street Rehabilitation project in FY 2016/17, $2.8 million funding in FY 2017/18, $2.4 million transfer in FY 2018/19, and $5.7 million tranfer in FY 2019/20. After these allocations, the Reserve for Future Capital and Special Projects forecasted June 30, 2019 balance is $2.4 million. Sufficient balances are anticipated for the following four years of the Plan to allocate approximately $550,000 from the General Fund Reserve for Capital and Special Projects for FY 2020/21 through FY 2023/24. The other revenue source for GFAR is the Construction Impact Fee and a Refuse Vehicle Road Impact Fee. This Construction impact fee is assessed on construction projects based on the square foot size of the project at a rate of $1.14 per square foot. These fees are intended to recover the damage caused to Town streets by construction traffic. Construction Impact fees generate at least $110,000 annually. Refuse Vehicle Road impact Fee estimated to generate $610,000 for FY 2019/20. The funding from this reserve greatly enhances the Town’s ability to implement the CIP; however, it is not enough to support future annual infrastructure maintenance or construct new facilities. Establishing a reliable, dedicated source of funding for basic capital improvements beyond the use of accumulated reserves remains a long-term need and important goal for the Town. UTILITY UNDERGROUND FUNDS The Utility Undergrounding Fund serves as a funding source for activities generally undertaken in conjunction with street improvement projects. The Town receives approximately $30,000 annually in Utility Undergrounding funding which is derived from a Town construction tax of 18 cents charged for each square foot of building addition or alteration within the Town. Total cash balances currently on hand from the utility undergrounding construction tax are approximately $3.8 million at FY 2018/19 year-end. In addition, the Town may have access to over $3.8 million in Rule 20A funds allocated from a percentage of electric bills. PG&E retains and tracks these monies. The Town has identified a project to underground utilities along Los Gatos Boulevard south of Lark Avenue. These projects rely on PG&E for scheduling and have long lead times. Staff expects a six year project design timeline, and is expecting project construction in FY 2020/21. TRAFFIC MITIGATION FUNDS The traffic impact mitigation fee assures that each new development or expansion of use pays its fair share of the transportation improvements needed to accommodate the cumulative traffic impacts. The fee is paid in full prior to issuance of the building permit for new development or expansion of use. In FY 2013/14, the Town Council approved an increased Traffic Impact Fee, expected to generate $2 million over five years for local transportation improvements. Traffic Mitigation Funds should be used solely for construction of identified traffic and transportation improvement projects. GRANT FUNDS The Town receives grant funds from various sources that help address some of the maintenance and improvement costs associated with Town infrastructure. Grants include federally funded Surface Transportation Program (STP) funds which pay for general roadway capital improvements, and a PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 5 combination of Federal Innovative Deployment to Enhance Arterials (IDEA) grant funds and State Vehicle Registration Fee (VRF) grant funds are contributing to the Traffic Signal Modernization project. In addition, the Town utilizes Community Development Block Grant funds for specific qualifying projects, usually focused on accessibility. Total grant funding for FY 2019/20 is estimated at $1,047,100. The addition of the Transportation and Mobility Manager in last year’s budget has allowed for staff to dedicate more attention to grant funding opporutnities. STORM DRAIN FUNDS The Town also receives funding from its Storm Drain Fund, which relies on an established charge of $0.75 per square foot of impervious surface created by new development. Depending on development activity, this fee produces approximately $100,000 in revenue annually. This fee has not been adjusted for several years and should be evaluated in the future as part of the NPDES storm water permit process and as part of a continuous review of development related fees. The remaining sources are primarily one-time funds from State or Federal government or from special revenue funds that have often fluctuated in tandem with the economy and the state budget. Examples of one-time funds include Valley Transportation Authority/Transportation Fund for Clean Air (VTA/TFCA) funds and State Proposition 42 Gas Tax funds. PROPOSED FY 2019/20 – 2023/24 CIP OVERVIEW The Capital Improvement Program is broadly grouped into the following categories:  Streets Program, which maintains and ensures functional streets, pedestrian, and bike systems.  Parks Program, which repairs or improves parks, park buildings, trails, and urban forestry.  Public Facilities Program, which constructs and repairs public buildings, and purchases equipment. The proposed CIP projects include both new and carry-forward projects from the prior year as part of the multi-year programming of $48 million. Approximately $42.5 million (88.2%) is allocated to the streets, retaining walls, sidewalks, and curbs category; $1.7 million (3.6%) is allocated to parks and trails projects; and $3.9 million (8.2%) is allocated to public facility projects. Allocations are summarized below by type of major improvements within the program categories. Carry-forward from 2018/19 2019/20 Carry-forward and New FY 2019/20 2020/21 2021/22 2022/23 2023/24 Total By Category Total By Program StreetsReconstruct/Resurfacing 4,233,230$ 4,237,770$ 8,471,000$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 20,194,944$ Maintenance & Safety 896,551 2,465,100 3,361,651 435,000 435,000 435,000 435,000 5,101,651 Street Improvements 8,180,526 2,492,524 10,673,050 6,060,331 - - 65,000 16,798,381 Bridges 435,087 - 435,087 - - - - 435,087 42,530,064$ ParksPark Improvements 349,540 260,000 609,540 25,000 - 25,000 - 659,540$ Trail Improvements 701,051 350,000 1,051,051 - - - - 1,051,051 1,710,591$ Public FacilitiesInfrastructure Projects 890,533 1,862,000 2,752,533 35,000 35,000 35,000 35,000 2,892,533$ Equipment Projects 581,324 525,000 1,106,324 - - - - 1,106,324 3,998,856$ TOTALS 16,267,842$ 12,192,394$ 28,460,236$ 9,391,724$ 3,432,517$ 3,457,517$ 3,497,517$ 48,239,511$ Five Year CIP Summary FY 2019/20 - 2023/24 CIP by Program Total funding for street reconstruction and resurfacing for the next five years is planned at $20.1 million with approximately $8.4 million allocated in FY 2019/20 including carryovers. Over the five-year period, PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 6 the CIP proposes $22.3 million for various other street-related infrastructure improvements including street maintenance and resurfacing; curb, gutter and sidewalk maintenance; street intersection improvements; retaining wall reconstruction; crosswalk ramps and safety devices; and storm drain improvements. Total funding for parks and trail improvements for the next five years is planned at $1.7 million with approximately $1.6 million allocated in FY 2019/20 including carryovers. Total funding for public facilities infrastucture improvements and equipment projects for the next five years is planned at $3.9 million with approximately $3.8 million allocated in FY 2019/20 including carryovers. Although the Proposed FY 2019/20-2023/24 CIP is a five-year plan, only the first year of the plan is formally adopted with funds appropriated by the Town Council as part of the budget process. Future year projects are funded with designated cash reserves on hand, supplemented by estimated annual revenues for capital funding purposes such as Gas Tax funds and state transportation funds. The scope and funding estimates may change based on the Town’s fiscal situation and evolving priorities. PROPOSED FY 2019/20 OVERVIEW $28.4 million is being proposed in the first year of the CIP and is comprised of approximately $16.2 million in carryover funds from FY 2018/19 and approximately $12.2 million in new funding. The first year of the five year plan (FY 2019/20) continues funding for the Town Council Strategic Priorities, including basic infrastructure needs. Project completion of the Almond Grove Street Construction is expected in June 2019. Street maintenance remains high Council priority as the Town is making progress to improve its Pavement Condition Index (PCI), a standard rating of street conditions. The PCI reached a recent high rating of 74 in 2008 due to concentrated investments and is now at the level of 69 (2018 survey data). With the new County and State Transportation Funds, the investment in street maintenance of $2,962,517 per year will allow the Town’s PCI to increase to 72 within the next five years. This investment continues to leave a deferred maintenance backlog in excess of $10M. In FY 2015/16, the Council placed several CIP projects on hold and transferred the funding of these projects to the Almond Grove Project. The following projects have been moved to an unfunded needs list: • Parking Lot 4 Repair and Resurfacing • Downtown Parking Sign Enhancements • Montebello Way Island Removal • Oak Meadow Park Upgrades • Civic Center Improvements • Plaza Park Improvements The complete list of the proposed FY 2018/19 carry-forward and proposed projects (categorized by funds and programs) can be found on page A-8. Projects are listed in the Financial Summary section and further described in the project detail pages by category. Below is a summary by category. The total FY 2018/19 CIP is $28.4 million. PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 7 Grant and TotalAwardsEstimated Street Projects 14,399,011$ 3,090,163$ 1,210,054$ 4,241,560$ 22,940,789$ Park Projects 1,242,373 418,218 - - 1,660,591 Public Facilities Projects 3,791,856 67,000 - - 3,858,856 TOTAL OF CARRY-FORWARD & NEW PROJECTS 19,433,240$ 3,575,381$ 1,210,054$ 4,241,560$ 28,460,236$ * Other Funds include Storm Drain Fund, Traffic Mitigation Funds, Utility Underground Funds GFAR Gas Tax Other * Carry-forward & New FY 2019/20 CIP Projects PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 8 GFAR Grants and Gas Tax Other TotalCARRY-FORWARD PROJECTS Awards Streets *Street Repair & Resurfacing 4,759,245$ -$ 1,210,054$ -$ 5,969,299$ *Annual Street Restriping 144,772 - - - 144,772 Almond Grove Street Rehabilitation 2,501,701 - - - 2,501,701 *Traffic Calming Projects 19,499 - - - 19,499 *Curb, Gutter & Sidewalk Maintenance 1,237,113 - - - 1,237,113 *Retaining Wall Repairs 437,124 - - - 437,124 Quito Road - Bridge Replacement 235,087 - - - 235,087 *Guardrail Replacement Projects 93,043 980,100 - - 1,073,143 224 W. Main Street Property Acquisition (Parking Lot 6)1,231,100 - - - 1,231,100 Downtown Parking Lots Seal Coat & Restriping 75,085 - - - 75,085 Hernandez Avenue Storm Drain Improvements - - - - - Los Gatos Blvd/Shannon Improvements - - - 20,000 20,000 Sidewalk Improvements Shannon/LGB/Cherry Blossom 129,896 - - - 129,896 Downtown Parking Study 200,000 - - - 200,000 Sidewalk Improvements - Multiple Locations 60,000 - - - 60,000 Hwy 17 Bicycle & Pedestrian Bridge-Prelim Design - 52,995 - 147,005 200,000 Pilot School Busing Program 63,964 - - - 63,964 *One-Way Downtown Street Pilot 225,686 225,686 Utility Undergrounding Improvements - - - 2,330,000 2,330,000 *Traffic Signal Modernization - 1,775,568 - 563,262 2,338,830 *Bicycle & Pedestrian Improvements 815,822 281,500 - 2,400 1,099,722 Cut-Through Traffic Mitigation 86,296 - - 228,136 314,432 Bicknell Road Storm Drain Improvements - - - 50,758 50,758 Stormwater Master Plan 200,000 - - - 200,000 *Annual Storm Drain Improvement Prj - - - 300,000 300,000 Stormwater System - Pollution Prevention Compliance 298,578 - - - 298,578 Public Art Gateway 25,000 - - - 25,000 Parks Open Space Trail Upgrades 152,000 - - - 152,000 Parks Playground Fibar Project 36,540 - - - 36,540 *Charter Oaks Trail Repair Project 364,891 75,218 - - 440,109 Forbes Mill Footbridge Improvements 71,502 - - - 71,502 Town Plaza Turf Repairs 28,000 - - - 28,000 Creek Trail & Parks Path & Parking Lot Seal & Striping 225,000 - - - 225,000 Outdoor Fitness Equipment 60,000 - - - 60,000 Trailhead Connector 44,440 343,000 - - 387,440 Public Facilities Audio/Video System Upgrade 42,552 - - - 42,552 Information System Upgrade 172,785 - - - 172,785 Town-wide Document Imaging Project 16,990 - - - 16,990 *Building Replacement at Corporation Yard 975,108 - - - 975,108 Library Carpet Replacement 56,500 - - - 56,500 Engineering Document Archiving 11,716 - - - 11,716 Neighborhood Emergency Preparedness (CERT)44,090 - - - 44,090 Facilities Assessment 80,000 - - - 80,000 *Town Beautification 16,886 - - - 16,886 Silicon Valley Regional Interoperability Project (SVRIP) Service 63,601 - - - 63,601 Energy Efficiency Upgrade - Town-wide 697,039 - - - 697,039 IT Disaster Recovery Improvements 200,000 - - - 200,000 EOC Communications Upgrade 29,589 - - - 29,589 Police Headquarters Roof Repair 50,000 50,000 TOTAL OF CARRY-FORWARD PROJECTS (INCLUDES NEW ALLOCATIONS)16,278,240$ 3,508,381$ 1,210,054$ 3,641,560$ 24,638,236$ NEW PROJECTSStreets Downtown Revitalization 1,000,000$ -$ -$ -$ 1,000,000$ Massol Intersection Improvements 450,000 - - - 450,000 ADA Transition Plan 110,000 - - - 110,000 Highway 17/9 Interchange and Capacity Improvements - - - 600,000 600,000 Parks Vegetation Management - Town-wide 200,000 - - - 200,000 Fence Replacement - Shire Court 60,000 - - - 60,000 Public Facilities ADA Upgrade for Public Restrooms - Rec Building 183,000 67,000 - - 250,000 Fire Suppression (Halon) for Server Rooms 200,000 - - - 200,000 Plaza Level Railings - Code Upgrade 30,000 - - - 30,000 Waterproofing Town-wide 75,000 - - - 75,000 ADA Upgrade Staff Restroom - Civic Center 300,000 - - - 300,000 Sound Mitigation in Library Lobby 22,000 - - - 22,000 Computer-Aided Dispatch and Records Management System 525,000 - - - 525,000 TOTAL OF NEW PROJECTS 3,155,000$ 67,000$ -$ 600,000$ 3,822,000$ TOTAL OF CARRY-FORWARD & NEW PROJECTS 19,433,240$ 3,575,381$ 1,210,054$ 4,241,560$ 28,460,236$ * These carry-forward projects include new money for FY 2019/20 in the amount of $8,370,394. Carry-forward & FY 2019/20 CIP Projects PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 9 FY 2018/19 COMPLETED, CONSOLIDATED, OR WITHDRAWN PROJECTS Several projects are expected to be completed by the end of FY 2018/19. The table below outlines the projects, funding sources, and total expenses of the completed projects, which is estimated to be $0.6 million. More details about the completed projects can be found beginning on page A-11. Grant & Traffic Total Awards Mitigation Estimated Street Program Crosswalk Improvements at Santa Cruz/Blossom Hill 14,926$ -$ 50,000$ -$ 64,926$ Stonybrook & Kennedy Sidewalk Improvements 135,293 135,293 LED Streetlights 343,324 343,324 Crosswalk Lighting Upgrade 51,569 50,000 - - 101,569 Jones Road Storm Drain Improvements - - - 18,700 18,700 Hwy 9/University Intersection - 902,827 66,963 - 969,790 Park Program Belgatos Park Restroom Improvements 23,538 - - - 23,538 Park Rehabilitation - Bachman Park 168,392 221,640 - - 390,032 Public Facilities Program Library Teen Door Installation 21,048 - - - 21,048 Civic Center Fountain Modification 20,671 20,671 Police & PPW Interoperability Radio Project 595,680 595,680 Fuel System Enhancements 40,739 40,739 *HVAC - Chiller Repair 31,480 31,480 *Mechanic Bay Heater - *Civic Center Building Energy Efficiency Measures - *Youth Recreation Center HVAC Replacement - *Exterior Lighting Replacement - Civic Center 9,076 9,076 TOTAL OF COMPLETED PROJECTS 1,455,736$ 1,174,467$ 116,963$ 18,700$ 2,765,866$ * Moved to the Energy Efficient Upgrade project ** Other Funds include Storm Drain Fund, Gas Tax Funds, Utility Underground Funds Projects Completed. Consolidated, or Withdrawn in FY 2018/19 GFAR Other ** PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 10 CONCLUSION The challenge of finding a reliable ongoing revenue stream available for capital projects continues to be a Town priority. Recognizing the realities of funding challenges and uncertain local economic trends, the Town’s FY 2019/20 – 2023/24 Capital Improvement Plan continues a strategy of funding the Town’s most urgent capital needs. I wish to thank all of the Departments, in particular Department Directors and members of their management and support staff, for their many hours of work and tireless efforts to present this Capital Improvement Program to the Town Council, as well as the following staff members: Stephen Conway, Finance Director Gitta Ungvari, Finance and Budget Manager Matt Morley, Parks and Public Works Director Lisa Petersen, Assistant Parks and Public Works Director/Town Engineer Mark Gaeta, Accountant Bobby Gonzalez, Senior Administrative Analyst Melissa Ynegas, Administrative Analyst Kenneth Stiles, Administrative Technician Respectfully submitted, Laurel Prevetti Town Manager PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-11 A Park Rehabilitation – Bachman Park G LED Streetlights B Belgatos Park Restroom Improvements H Crosswalk Improvements at Santa Cruz/Blossom Hill C Library Teen Door Installation I Crosswalk Lighting Upgrade D Civic Center Fountain Modification J Highway 9/University Intersection E Stonybrook & Kennedy Sidewalk Improvements K Jones Road Storm Drain Improvements F Fuel System Enhancements L Police & PPW Interoperability Radio Project PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-12 A Park Rehabilitation – Bachman Park Park Rehabilitation – Bachman Park This project included pathway upgrades, lighting upgrades, sidewalk upgrades, landscape improvements, and the replacement of failing retaining walls at Bachman Park. This project was partially grant funded by a Community Development Block Grant. The total project cost was approximately $390,000. C Library Teen Door Installation Library Teen Door Installation This project installed sound mitigating glass doors at the entrance to the teen area of the Library. The total project cost was approximately $21,000. B Belgatos Park Restroom Improvements Belgatos Park Restroom Improvements This project restored minor structural elements, repainted the exterior, and repaired the roof of the restroom at Belgatos Park. The total project cost was approximately $24,000. PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-13 D Civic Center Fountain Modification Civic Center Fountain Modification This project made alterations to the fountain to enable it to function and added safeguards to prevent people and pets from entering the water. The total project cost was approximately $21,000. E Stonybrook & Kennedy Sidewalk Improvements Stonybrook & Kennedy Sidewalk Improvements This project reconstructed the failing wooden sidewalk along Kennedy Road between Stonybrook Road and Longmeadow Drive. The total project cost was approximately $136,000. F Fuel System Enhancements Fuel System Enhancements This project replaced and enhanced the previous fuel system to a new modern system at the Town’s Corporation Yard. The total project cost was approximately $41,000. PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-14 G LED Streetlights LED Streetlights This project has replaced existing streetlights Town-wide with new energy efficient LED streetlights. The total project cost was approximately $343,000. H Crosswalk Improvements at Santa Cruz/Blossom Hill Crosswalk Improvements at Santa Cruz/Blossom Hill This project installed a new crosswalk on the north side of Santa Cruz Avenue at Blossom Hill Road. The total project cost was approximately $65,000. I Crosswalk Lighting Upgrade Crosswalk Lighting Upgrade This project upgraded pedestrian crossing lights at multiple locations throughout Town, including Los Gatos-Almaden Road and Cherry Blossom. The total project cost was approximately $102,000. PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-15 J Highway 9/University Intersection Highway 9/University Intersection This project replaced the old and outdated traffic signal at the Highway 9 and University Avenue intersection with a new traffic signal system. Additionally, dedicated left turn lanes were constructed on University Avenue to improve vehicle traffic flow. Sidewalks were repaired to be in compliance with current codes. Construction associated with this project was completed in FY 2015/16 with project closeout, including processing associated documentation lasting into FY 2018/19. The total project cost was approximately $970,000. K Jones Road Storm Drain Improvements Jones Road Storm Drain Improvements This project installed new storm piping and a drain inlet on Jones Road. The new infrastructure captures the stormwater upstream and channels it into the storm system, relieving the ponding issues that occurred on the street. The total project cost was approximately $19,000. L Police/PPW Interoperability Radio Project Police & PPW Interoperability Radio Project This project updated the existing police radio system to be compatible with the regional interoperability requirements. The project replaced current mobile and portable radios with new digital P25 compliant equipment using a 700 Mhz. spectrum The Parks and Public Works Department staff also uses a similar radio system to communicate with public safety officials and requires it as part of day-day operations. To be compatible with these radio system changes, Park and Public Works Department’s radio system has been updated and the Building Inspectors were added to the system. The total project cost was approximately $596,000 PROPOSED COMPLETED CIP PROJECTS FY 2018/19 A-16 PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 17 BUDGET PROCESS OVERVIEW The Town of Los Gatos adopts an annual Operating and Capital Budget and an annual budget update of the five year Capital Improvement Program (CIP) for the Town of Los Gatos. The budgets contain summary level information for revenue and expenditure appropriations for the fiscal year beginning July 1st and ending June 30th. The budget documents are prepared in accordance with generally accepted accounting principles (GAAP). Budget Purpose The Operating and Capital Summary Budget and the Capital Improvement Program serve as the Town’s financial plan, as well as a policy document, a communications tool, and an operations guide. Developed with an emphasis on long range planning, service delivery, and program management, a fundamental purpose of these documents is to provide a linkage between the services and projects the Town intends to accomplish, and the resources committed to get the work done. The format of the budget facilitates this linkage by clearly identifying the program purpose, key projects, and work plan goals in relation to revenue and expenditures appropriations. CIP Purpose In particular, the CIP is designed to identify projects and funds required to adequately develop and maintain the Town’s infrastructure, which is consistent with the Town Council strategic goal of maintaining the condition and availability of public facilities. The following plans provide additional guidance in developing priorities for capital improvement projects: • General Plan • Street Improvement Program In addition, project prioritization criteria such as health and safety issues, infrastructure or system condition, short term versus long term impacts, and availability of external funding sources are assessed as part of the process that staff uses to rank projects from high to low in preparing the proposed CIP. As it develops and matures in its application, the Town’s Infrastructure Assessment Program will further support the Town’s long-range Capital Improvement Program, focusing attention on the current and future infrastructure needs of the community and balancing the community’s needs with funding requirements and financial resources. Other technology tools used in CIP development include the use of the geographic information system, the traffic monitoring system, electronic files for tracking unfunded projects and replacement schedules, and an asset management program to track work requests. The Town’s capital projects are categorized as follows: The Streets Program provides funding for maintaining a functional street and pedestrian system. Proposed projects are consistent with the General Plan, provide for a safe and efficient traffic flow through intersections while minimizing unnecessary traffic movement and noise through residential neighborhoods, and provide street lighting for traffic safety at intersections and on public streets. Also included are sidewalk and bicycle lane improvements. The Public Facilities Program includes projects for constructing and repairing public buildings and purchasing equipment. Town buildings include the Civic Center, the Library, Adult Recreation Center, Tait Avenue and Forbes Mill properties, and other assets. Although the Town owns the three fire stations PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 18 within Town limits, the Santa Clara County Fire District maintains them under contract. The Parks Program includes projects for parks, park buildings, urban forestry, trails, and urban beautification. Basis of Budgeting and Accounting Developed on a program basis with fund level authority, the Operating and Capital Budgets represent services and functions provided by the Town in alignment with the resources allocated during the fiscal year. The Town’s Governmental Funds consist of the General Fund, Special Revenue Funds, Debt Service Funds, and Capital Project Funds for both the Town and the Successor Agency of the Town of Los Gatos Redevelopment Agency (RDA). RDA debt is continuing to be paid for the Certificate of Participation (COPs) used to finance the Library. Basis of Accounting and Budget refers to the timing factor concept in recognizing transactions. This basis is a key component of the overall financial system because the budget determines the accounting system. For example, if the budget anticipates revenues on a cash basis, the accounting system must record only cash revenues as receipts. If the budget uses an accrual basis, accounting must do likewise. The Town’s budgeting and accounting systems both use a combination of modified accrual and full accrual basis in the accounting and budget systems. Governmental Fund and Successor Agency Fund budgets are developed using the modified accrual basis of accounting. Under this basis, revenues are estimated for the period if they are susceptible to accrual, e.g. amounts can be determined and will be collected within the current period. Principal and interest on general long-term debt are budgeted as expenditures when due, whereas other expenditures are budgeted for liabilities expected to be incurred during the current period. Proprietary Fund budgets are adopted using the full accrual basis of accounting whereby revenue budget projections are developed recognizing revenues expected to be earned during the period, and expenditures are developed for expenses anticipated to be incurred in the fiscal year. The Town maintains one type of proprietary fund: Internal Service Funds. The Town’s Fiduciary Funds are also budgeted under the modified accrual basis. The Town administers five trust funds. Trust funds are subject to trust agreement guidelines. Summary of Budget Development The Town develops its budgets with a team-based approach. Town Management and the Finance Department guide the process through budget development; however, program budgets and workplans are developed with each Department’s Director, Analyst, and Program Manager’s oversight and expertise. This approach allows for hands-on planning and creates a clearer understanding for both management and staff of a program’s goals and functions to be accomplished in the next budget year. The Development Process Typically, both the Operating and Capital Budget and Capital Improvement Program processes begin early in the calendar year with the Town Council and Town Manager’s collaborative development and refinement of initiatives and directives for the upcoming budget year as reflected in the Council adopted strategic priorities. PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 19 In January, the budget preparation process begins officially for staff with a budget kickoff meeting. Budget assumptions, directives, and initiatives developed by Town Council and management are provided to set the Town’s overall objectives and goals. Department staff identifies and analyzes program revenue and expenditure projections in coordination with Finance/Budget staff and Town Management. Town staff also consult with Town Commissions for their input on specific investments. Capital improvement projects are assessed and refined, and CIP funding and appropriation requirements are finalized. Through rounds of budget briefings and revisions, final proposed program budget and work plans are developed by the end of April. Operational and capital workplans are finalized. and the Finance/Budget staff prepares financial summary information. Per the Town Code, the Town Manager submits the entire proposed budget package to the Town Council for its consideration, including Departmental budgets and work plans. CIP Development Process The long term Capital Improvement Program includes projects that have a value of $25,000 or more with a minimum useful life of 5 years at a fixed location. Equipment, operating, and maintenance costs associated with the CIP projects are identified where feasible, and will be included in future operating budgets. Cost estimates for new projects are based on 2017 dollars; however, engineering estimates for carryover projects from the prior year are updated to reflect current industry costs. Under direction from the Town Manager’s Office, the Parks and Public Works Department took the lead in the preparation of the proposed projects for consideration in the FY 2019/20 – 2023/24 Capital Improvement Program. In coordination with other Town Departments, projects were reviewed to ensure that the Town’s priorities are addressed within available resources. In some cases, previously approved projects have been deferred due to reallocation of funding to other priorities and thus have been noted as unfunded projects in each program section of the CIP. The Town Manager’s Office reviews the prioritized list of proposed capital improvement projects and funding sources in conjunction with the preparation of the FY 2018/19 Operating Budget. The Proposed CIP is then presented by the Town Manager to the Town Council. The Proposed CIP is also submitted to the Planning Commission for review to ensure that the proposed projects are consistent with the Town’s General Plan as required by State law (Government Code Section 65401). The Planning Commission reviewed the CIP and found it consistent with the General Plan on April 24, 2019. The CIP is reviewed during this time to determine funding capabilities and project priorities, and to refine project work plans. Although the CIP budget document is prepared separately from the Operating and Capital Budget, CIP program information is incorporated into the Operating and Capital Summary Budget document through the resulting financial appropriations and service level requirements. Budget Adoption During the month of May, the Town Council reviews the proposed Operating and Capital Summary Budget, and the Capital Improvement Program for the five-year period at a public hearing. Notice of the hearing is published in a local newspaper at least ten days prior to the Council’s public hearing date. The public is invited to participate and copies of the proposed budgets are available for review in the Clerk Department, on the Town website, and at the budget hearing. Final Council-directed revisions to the proposed budget are made and the budget documents are resubmitted to the Town Council for final adoption consistent with Los Gatos Town Code Section PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 20 2.30.295(b), which requires the Town Manager to annually prepare and submit a budget to the Town Council. This is accomplished in June at a noticed public hearing. Budget Amendments During the course of the fiscal year, workplan changes and unanticipated needs necessitate adjustments to the adopted budgets. The Town Manager is authorized to transfer appropriations between categories, departments, projects, and programs within a fund in the adopted budget, whereas the Town Council holds the authority for budget increases and decreases, and transfers between funds that may be approved at any Town Council meeting. PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 21 FISCAL YEAR SURPLUS FLOW OF FUNDS PROPOSED CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 22 CAPITAL IMPROVEMENT PROGRAM All Other Funds •Traffic Mitigation •Grant •Storm Drain •Utility Underground New Projects and Multiyear Projects (carryforward) Financial Summaries This Page Intentionally Left Blank PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -1 FINANCIAL SUMMARIES PROGRAM SUMMARIES Streets Program ....................................................................................................................................... B – 5 Parks Program ........................................................................................................................................ B – 5 Public Facilities Program.......................................................................................................................... B – 6 FUND SUMMARIES Total CIP Fund Summary ......................................................................................................................... B – 9 GFAR Fund ............................................................................................................................................... B – 10 Traffic Mitigation Fund ............................................................................................................................ B – 12 Grants and Awards Project Fund ............................................................................................................. B – 14 Storm Basin Funds ................................................................................................................................... B – 16 Utility Underground Fund........................................................................................................................ B – 18 Gas Tax Fund ........................................................................................................................................... B – 20 0 50 100 150 200 250 300 PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -2 PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -3 FINANCIAL SUMMARIES BY PROGRAM PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -4 FY 2019/20 BUDGET BY PROGRAM CATEGORY (Includes Carryforward and FY 2019/20 Budget) Street Reconstruction & Resurfacing 30%Street Maintenance, Repair & Safety 12% Street Improvements 38% Bridges 2% Park Improvements 2% Trail Improvements4% Infrastructure10% Equipment 4% Carryforward & Budget by Program Category FY 2019/20 Category % Streets Program Street Reconstruction 8,471,000$ 30% Maintenance, Repair & Safety Projects 3,361,651 12% Street Improvements 10,673,050 38% Bridges 435,087 2% Streets Program 22,940,789$ 81% Parks and Trails Program Park Improvements 609,540$ 2% Trail Improvements 1,051,051 4% Parks Program 1,660,591$ 6% Public Facilities Program Infrastructure 2,752,533$ 10% Equipment 1,106,324 4% Public Facilities 3,858,856$ 14% TOTAL PROJECT FUNDING 28,460,236$ 100% PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -5 Street Reconstruction & Resurfacing 9901 Street Repair & Resurfacing 7,556,138$ 2,253,975$ 1,731,529$ 4,237,770$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,503,356$ 0003 Almond Grove Street Rehabilitation 8,491,003 3,069,386 2,501,701 - - - - - 14,062,090 Street Maintenance, Repair & Safety 9910 Traffic Calming Projects 57,866 38,787 9,499 10,000 10,000 10,000 10,000 10,000 156,152 9921 Curb, Gutter & Sidewalk Maintenance 1,090,848 172,040 337,113 900,000 300,000 300,000 300,000 300,000 3,700,001 9930 Retaining Wall Repairs 777,984 56,216 337,124 100,000 100,000 100,000 100,000 100,000 1,671,324 9902 Annual Street Restriping 61,106 - 119,772 25,000 25,000 25,000 25,000 25,000 305,878 0120 Guardrail Replacement Projects 130,583 - 93,043 980,100 - - - - 1,203,725 0125 Massol Intersection Improvements - - - 450,000 - - - - 450,000 Street Improvements 0213 Los Gatos Blvd/Shannon Improvements - - 20,000 - - - - - 20,000 0705 Downtown Parking Lots Seal Coat & Restriping 24,915 - 75,085 - - - - - 100,000 0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - - - 65,000 82,180 0704 224 W. Main Street Property Acquisition (Parking Lot 6)3,813 - 1,231,100 - - - - - 1,234,913 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 - 129,896 - 1,059,304 - - - 1,189,304 0221 Sidewalk Improvements - Multiple Locations - - 60,000 - - - - - 60,000 0225 Utility Undergrounding Improvements - - 2,330,000 - 4,436,000 - - - 6,766,000 0229 Cut-Through Traffic/Wood Road Roundabout 381,741 93,736 314,432 - - - - - 789,908 0227 Traffic Signal Modernization 14,999 160,833 2,006,306 332,524 415,027 - - - 2,929,689 0410 Bicknall Avenue Storm Drain Improvements 120,742 - 50,758 - - - - - 171,500 0231 Bicycle & Pedestrian Improvements 102,422 54,356 799,722 300,000 - - - - 1,256,500 0413 Stormwater Master Plan - - 200,000 - - - - - 200,000 2009 Public Art Gateway - - 25,000 - - - - - 25,000 0414 Stormwater System - Pollution Prevention Compliance - 1,422 298,578 - - - - - 300,000 0420 Annual Storm Drain Improvement Prj - - 150,000 150,000 150,000 - - - 450,000 0233 Downtown Parking Study - - 200,000 - - - - - 200,000 0234 One-Way Downtown Street Pilot - 13,000 225,686 - - - - - 238,686 0128 Pilot School Busing Program - 350,216 63,964 - - - - - 414,180 0129 ADA Transition Plan - - - 110,000 - - - - 110,000 0237 Highway 17/9 Interchange and Capacity Improvements - - - 600,000 - - - - 600,000 0235 Downtown Revitalization - - - 1,000,000 - - - - 1,000,000 Bridges 0801 Quito Road - Bridge Replacement 64,594 - 235,087 - - - - - 299,681 0803 Highway 17 Bicycle & Ped Bridge - - 200,000 - - - - - 200,000 Total Streets Projects 18,896,037$ 6,263,967$ 13,745,395$ 9,195,394$ 9,331,724$ 3,397,517$ 3,397,517$ 3,462,517$ 67,690,067$ Expended Through 2017/18 2018/19 Estimated Actuals Estimated Carryfwd to 2019/20 2019/20 Budget Total Budgeted2020/21 Budget STREETS PROGRAM SUMMARY 2021/22 Budget 2022/23 Budget 2023/24 Budget s Park Improvements 4605 Parks Playground Fibar Project 42,500$ -$ 36,540$ -$ 25,000$ -$ 25,000$ -$ 129,040$ 4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - - 225,000 - - - - - 225,000 4202 Town Plaza Turf Repairs - - 28,000 - - - - - 28,000 4006 Outdoor Fitness Equipment - - 60,000 - - - - - 60,000 4508 Vegetation Management - Town-wide - - - 200,000 - - - - 200,000 4509 Fence Replacement - Shire Court - - - 60,000 - - - - 60,000 Trail Improvements 4504 Open Space Trail Upgrades - - 152,000 - - - - - 152,000 4503 Charter Oaks Trail Repair Project - 72,942 90,109 350,000 - - - - 513,051 4507 Forbes Mill Footbridge Improvements 17,119 2,227 71,502 - - - - - 90,848 4505 Trailhead Connector - - 387,440 - - - - - 387,440 Total Parks Projects 59,619$ 75,169$ 1,050,591$ 610,000$ 25,000$ -$ 25,000$ -$ 1,845,379$ PARKS AND TRAILS PROGRAM SUMMARY 2023/24 Budget Total Budgeted2021/22 Budget2019/20 Budget 2020/21 Budget 2022/23 Budget Expended Through 2017/18 2018/19 Estimated Actuals Estimated Carryfwd to 2019/20 PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -6 Infrastructure 2302 Building Replacement at Corporation Yard 16,692$ 149,000$ 108$ 975,000$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ 2008 Energy Efficiency Upgrade - Town-wide - 1,000,000 697,039 - - - - - 1,697,039$ 2001 Facilities Assessment - - 80,000 - - - - - 80,000 2503 Library Carpet Replacement - - 56,500 - - - - - 56,500 2002 Town Beautification - 8,114 6,886 10,000 10,000 10,000 10,000 10,000 65,000 2601 Grant Funding - - - - - - - - - 2117 ADA Upgrade Staff Restroom - Civic Center - - - 300,000 - - - - 300,000 2116 Plaza Level Railings - Code Upgrade - - - 30,000 - - - - 30,000 2010 Waterproofing Town-wide - - - 75,000 - - - - 75,000 2504 Sound Mitigation in Library Lobby - - - 22,000 - - - - 22,000 6004 Fire Suppression (Halon) for Server Rooms - - - 200,000 - - - - 200,000 2601 ADA Upgrade for Public Restrooms - Rec Building - - - 250,000 - - - - 250,000 2118 Police Headquarters Roof Repair - - 50,000 - - - - - 50,000 Equipment 6101 Information System Upgrade 2,590$ 7,794$ 172,785$ -$ -$ -$ -$ -$ 183,169$ 6001 Audio/Video System Upgrade 15,608 - 42,552 - - - - - 58,160$ 6003 Town-wide Document Imaging Project 78,752 - 16,990 - - - - - 95,741 2305 Engineering Document Archiving 8,284 40,000 11,716 - - - - - 60,000 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 393,139 1,888 63,601 - - - - - 458,628 6306 Neighborhood Emergency Preparedness - 5,910 44,090 - - - - - 50,000 6103 EOC Communications Upgrade - 20,411 29,589 - - - - - 50,000 6104 IT Disaster Recovery Improvements - - 200,000 - - - - - 200,000 6301 Computer-Aided Dispatch and Records Management System - - - 525,000 - - - - 525,000 Total Facilities Projects 515,064$ 1,233,117$ 1,471,856$ 2,387,000$ 35,000$ 35,000$ 35,000$ 35,000$ 5,747,037$ Total Streets, Parks and Trails, and Public Facilities Projects 19,470,720$ 7,572,253$ 16,267,842$ 12,192,394$ 9,391,724$ 3,432,517$ 3,457,517$ 3,497,517$ 75,282,483$ 2021/22 Budget 2022/23 Budget 2023/24 Budget Total Budgeted Expended Through 2017/18 2018/19 Estimated Actuals Estimated Carryfwd to 2019/20 2019/20 Budget 2020/21 Budget PUBLIC FACILITIES PROGRAM PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -7 FINANCIAL SUMMARIES BY FUND PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -8 FY 2019/20 PROJECT SUMMARY BY FUND (Includes Carryforward and FY 2019/20 Budget) GFAR 68% Traffic Mitigation Fund6% Grant Funds 13%Storm Drain Funds 1% Utility Underground Fund 8% Gas Tax Fund 4% ` Carryforward & Budget by Fund FY 2019/20 Fund % GFAR 19,383,358$ 68% Traffic Mitigation Fund 1,560,802 5% Grant Funds 3,575,381 13% Storm Drain Funds 350,758 1% Utility Underground Fund 2,330,000 8% Gas Tax Fund 1,210,054 4% Total Budget by Fund 28,410,353$ 100.0% PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -9 Beginning Fund Balance 411 GFAR 4,486,827$ 11,971,035$ 9,398,371$ 1,410,832$ 1,136,216$ 886,600$ 611,984$ 411 Reserved for Parking 1,460,210 154,025 308,050 154,025 154,025 154,025 154,025 411 Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 411 Reserved for Almond Grove 5,571,087 - - - - - - 411 VTA Vehicle Registration Fees 606,936 - - - - - - 471 Traffic Mitigation 260,487 260,487 31,945 31,945 31,945 31,945 31,945 421 Grant Fund (134,111) (134,111) (252,889) (427,627) (427,627) (427,627) (427,627) 461 Storm Basin #1 809,377 809,377 879,827 828,977 829,017 879,985 932,139 462 Storm Basin #2 1,752,774 1,752,774 1,803,014 1,756,784 1,761,464 1,817,092 1,873,937 463 Storm Basin #3 (76,153) (76,153) (74,293) (223,431) (272,001) (270,760) (269,457) 472 Underground Utilities 2,997,984 2,997,984 3,042,294 764,784 53,958 84,228 114,648 481 Gas Tax 703,150 703,150 239,363 239,363 204,854 170,345 135,836 Total Beginning Fund Balance 18,488,568$ 18,488,568$ 15,425,682$ 4,585,652$ 3,521,851$ 3,375,833$ 3,207,429$ Revenues 411 GFAR 6,632,711$ 3,992,225$ 11,659,292$ 2,264,339$ 2,390,463$ 2,390,463$ 2,390,463$ 471 Traffic Mitigation 2,277,362 242,106 1,570,803 425,027 10,000 10,000 10,000 421 Grant Fund 2,568,080 207,903 3,400,643 940,100 - - - 461 Storm Basin #1 49,010 70,450 49,150 50,040 50,968 52,154 53,369 462 Storm Basin #2 50,240 50,240 53,770 54,680 55,628 56,844 58,079 463 Storm Basin #3 1,860 1,860 1,620 1,430 1,241 1,303 1,356 472 Underground Utilities 44,310 44,310 52,490 3,844,378 30,270 30,420 30,570 481 Gas Tax 1,145,428 1,145,428 1,316,054 1,281,545 1,281,545 1,281,545 1,281,545 Total Revenues 12,769,001$ 5,754,522$ 18,103,821$ 8,861,539$ 3,820,115$ 3,822,730$ 3,825,383$ TOTAL SOURCE OF FUNDS 31,257,569$ 24,243,090$ 33,529,503$ 13,447,191$ 7,341,966$ 7,198,562$ 7,032,812$ Capital Program Expenditures 411 GFAR 17,632,081$ 6,147,273$ 19,433,240$ 2,121,339$ 2,222,463$ 2,247,463$ 2,222,463$ 471 Traffic Mitigation 1,370,384 232,106 1,560,803 415,027 - - - 421 Grant Fund 3,047,070 326,681 3,575,381 940,100 - - - 461 Storm Basin #1 50,000 - 100,000 50,000 - - - 462 Storm Basin #2 52,300 - 100,000 50,000 - - - 463 Storm Basin #3 100,758 - 150,758 50,000 - - 65,000 472 Underground Utilities 112,000 - 2,330,000 4,555,204 - - - 481 Gas Tax 1,503,215 1,503,215 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 Total Capital Program Expenditures 23,867,809$ 8,209,275$ 28,460,236$ 9,391,724$ 3,432,517$ 3,457,517$ 3,497,517$ Transfers Out & Other Sources 411 GFAR Designated for Parking 154,025$ 154,025$ 308,050$ 154,025$ 154,025$ 154,025$ 154,025$ 411 GFAR 417,616 417,616 417,616 417,616 417,616 417,616 417,616 411 Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 471 Traffic Mitigation 10,000 10,000 10,000 10,000 10,000 10,000 10,000 481 Gas Tax 106,000 106,000 106,000 106,000 106,000 106,000 106,000 Total Transfers Out & Designated 737,641$ 737,641$ 891,666$ 737,641$ 737,641$ 737,641$ 737,641$ Unrestricted 6,652,119$ 15,296,174$ 4,177,602$ 3,317,826$ 3,171,808$ 3,003,404$ 2,797,654$ TOTAL USE OF FUNDS 31,257,569$ 24,243,090$ 33,529,503$ 13,447,191$ 7,341,966$ 7,198,562$ 7,032,812$ FY 2023/24Carryfwd & FY 2019/20 FY 2020/21 FY 2021/22 FY 2022/23USE of FUNDS Adjusted Budget FY 2018/19 Estimated FY 2018/19 FY 2022/23Estimated FY 2018/19 FY 2023/24 Source and Use Summary Schedule All Capital Improvement Program Funds Adjusted Budget FY 2018/19 Carryfwd & FY 2019/20 FY 2020/21 FY 2021/22SOURCE of FUNDS Note: Adjusted Budget FY 2018/19 includes all Council action through March 31, 2019. PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -10 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDS Beginning Fund Balance Designated for Parking 1,460,210$ 154,025$ 308,050$ 154,025$ 154,025$ 154,025$ 154,025$ Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Reserved for Almond Grove 5,571,087 - - - - - - VTA Vehicle Registration Fees 606,936 - - - - - - Unrestricted 4,486,827 11,971,035 9,398,371 1,410,832 1,136,216 886,600 611,984 Total Beginning Fund Balance 12,175,060$ 12,175,060$ 9,756,421$ 1,614,857$ 1,340,241$ 1,090,625$ 816,009$ RevenuesConstruction Impact Fees 110,000 104,794 110,000 110,000 110,000 110,000 110,000 Refuse Vehicle Road Impact Fee 493,429 287,834 619,553 745,676 871,800 871,800 871,800 School Busing Fare Revenue 20,160 20,880 46,500 - - - - Developers Contributions 78,000 - 78,000 78,000 78,000 78,000 78,000 Cost Sharing - Curbs & Gutters 10,000 47,173 10,000 10,000 10,000 10,000 10,000 Cost Sharing - Traffic Calming 10,000 - 10,000 10,000 10,000 10,000 10,000 Slurry Seal - 11,280 - - - - - Pavement Rehab-Crack & Seal - Measure B Funding 180,000 188,475 180,000 180,000 180,000 180,000 180,000 Other Contributions - City of Campbell 130,000 - - - - - - Other Contributions - City of San Jose - 110,771 - - - - - Misc CIP refund - 28,290 - - - - - Misc Operating Revenue 51,000 - - - - - - In kind for Oak Meadow Park Exercise Equipment 30,000 - 30,000 - - - - 2016 Measure B Funding 1,161,326 - 1,741,989 580,663 580,663 580,663 580,663 Albright Development Fee (9901)182,470 486,461 350,000 - - - - PG&E Financing for Energency Efficiency Upgrades (2008)1,439,995 - 1,439,995 - - - - Operating Transfers In From General Fund 2,335,220 2,335,220 5,557,500 550,000 550,000 550,000 550,000 From Open Space Reserve - - 152,000 - - - - From Library Trust Funds 51,111 21,048 20,755 - - - - From Equipment Replacement - - 525,000 - - - - From IT Fund 300,000 300,000 - - - - - From Facility Maintenance 50,000 50,000 788,000 - - - - Total Revenues 6,632,711$ 3,992,225$ 11,659,292$ 2,264,339$ 2,390,463$ 2,390,463$ 2,390,463$ TOTAL SOURCE OF FUNDS 18,807,771$ 16,167,285$ 21,415,713$ 3,879,196$ 3,730,704$ 3,481,088$ 3,206,472$ USE OF FUNDSTotal Completed Projects 1,284,169$ 379,885$ -$ -$ -$ -$ -$ Carryforward ProjectsOpen Space Trail Upgrades 152,000 - 152,000 - - - - Parks Playground Fibar Project 36,540 - 36,540 25,000 - 25,000 - Forbes Mill Footbridge Improvements 73,729 2,227 71,502 - - - - Charter Oaks Trail Repair Project 15,000 109 364,891 - - - - Creek Trail & Parks Path & Parking Lot Seal & Striping 225,000 - 225,000 - - - - Town Plaza Turf Repairs 28,000 - 28,000 - - - - Outdoor Fitness Equipment 60,000 - 60,000 - - - - Trailhead Connector 44,440 - 44,440 - - - - Building Replacement at Corporation Yard 149,108 149,000 975,108 25,000 25,000 25,000 25,000 Neighborhood Emergency Preparedness 50,000 5,910 44,090 - - - - Library Carpet Replacement 56,500 - 56,500 - - - - Energy Efficiency Upgrade - Town-wide 1,697,039 1,000,000 697,039 - - - - Facilities Assessment 80,000 - 80,000 - - - - Information System Upgrade 180,579 7,794 172,785 - - - - Audio/Video System Upgrade 42,552 - 42,552 - - - - Town-wide Document Imaging Project 16,990 - 16,990 - - - - Engineering Document Archiving 51,716 40,000 11,716 - - - - Town Beautification 15,000 8,114 16,886 10,000 10,000 10,000 10,000 Silicon Valley Regional Interoperability Project (SVRIP) Service 65,489 1,888 63,601 - - - - EOC Communications Upgrade 50,000 20,411 29,589 - - - - IT Disaster Recovery Improvements 200,000 - 200,000 - - - - Street Repair & Resurfacing 2,482,289 750,760 4,759,245 1,626,339 1,752,463 1,752,463 1,752,463 Annual Street Restriping 119,772 - 144,772 25,000 25,000 25,000 25,000 Traffic Calming Projects 48,286 38,787 19,499 10,000 10,000 10,000 10,000 Curb, Gutter & Sidewalk Maintenance 509,153 172,040 1,237,113 300,000 300,000 300,000 300,000 Retaining Wall Repairs 393,340 56,216 437,124 100,000 100,000 100,000 100,000 Quito Road - Bridge Replacement 235,087 - 235,087 - - - - Almond Grove Street Rehabilitation 5,571,087 3,069,386 2,501,701 - - - - Guardrail Replacement Projects 93,043 - 93,043 - - - - Cut-Through Traffic/Wood Road Roundabout 143,676 57,380 86,296 - - - - Downtown Parking Lots Seal Coat & Restriping 75,085 - 75,085 - - - - 224 W. Main Street Property Acquisition (Parking Lot 6)1,231,100 - 1,231,100 - - - - Downtown Parking Study 200,000 - 200,000 - - - - Sidewalk Improvements Shannon/LGB/Cherry Blossom 129,896 - 129,896 - - - - Sidewalk Improvements - Multiple Locations 60,000 - 60,000 - - - - One-Way Downtown Street Pilot 238,686 13,000 225,686 - - - - Pilot School Busing Program 414,180 350,216 63,964 - - - - Bicycle & Pedestrian Improvements 538,550 22,728 815,822 - - - - Stormwater Master Plan 200,000 - 200,000 - - - - Stormwater System - Pollution Prevention Compliance 300,000 1,422 298,578 - - - - Public Art Gateway 25,000 - 25,000 - - - - Police Headquarters Roof Repair 50,000 - 50,000 - - - - New ProjectsVegetation Management - Town-wide - - 200,000 - - - - Fence Replacement - Shire Court - - 60,000 - - - - ADA Upgrade for Public Restrooms - Rec Building - - 183,000 - - - - Fire Suppression (Halon) for Server Rooms - - 200,000 - - - - Plaza Level Railings - Code Upgrade - - 30,000 - - - - Waterproofing Town-wide - - 75,000 - - - - ADA Upgrade Staff Restroom - Civic Center - - 300,000 - - - - Sound Mitigation in Library Lobby - - 22,000 - - - - Computer-Aided Dispatch and Records Management System - - 525,000 - - - - Downtown Revitalization - - 1,000,000 - - - - Massol Intersection Improvements - - 450,000 - - - - ADA Transition Plan - - 110,000 - - - - Total Project Expenditures 17,632,081$ 6,147,273$ 19,433,240$ 2,121,339$ 2,222,463$ 2,247,463$ 2,222,463$ p Operating Transfers Out Transfer to GF 417,616 417,616 417,616 417,616 417,616 417,616 417,616Total Operating Transfers Out 417,616$ 417,616$ 417,616$ 417,616$ 417,616$ 417,616$ 417,616$ Ending Fund BalanceDesignated for Parking 154,025$ 154,025$ 308,050$ 154,025$ 154,025$ 154,025$ 154,025$ q Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Reserved for VTA Vehicle Registration Fees 37,437Unrestricted554,048 9,398,371 1,206,807 1,136,216 886,600 611,984 362,368 Total Ending Fund Balance 758,073$ 9,602,396$ 1,564,857$ 1,340,241$ 1,090,625$ 816,009$ 566,393$ TOTAL USE OF FUNDS 18,807,771$ 16,167,285$ 21,415,713$ 3,879,196$ 3,730,704$ 3,481,088$ 3,206,472$ GENERAL FUND APPROPRIATED RESERVES (GFAR)STATEMENT OF SOURCE AND USE OF FUNDS PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -11 Carryforward Projects 4504 Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ -$ 152,000$ 1605 Parks Playground Fibar Project 42,500 36,540 - 25,000 - 25,000 - 129,040 3104 Charter Oaks Trail Repair Project 109 14,891 350,000 - - - - 365,000 4507 Forbes Mill Footbridge Improvements 19,346 71,502 - - - - - 90,848 4202 Town Plaza Turf Repairs - 28,000 - - - - - 28,000 4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - - 225,000 4006 Outdoor Fitness Equipment - 60,000 - - - - - 60,000 4505 Trailhead Connector - 44,440 - - - - - 44,440 6001 Audio/Video System Upgrade 15,608 42,552 - - - - - 58,160 6101 Information System Upgrade 10,384 172,785 - - - - - 183,169 6003 Town-wide Document Imaging Project 78,752 16,990 - - - - - 95,741 2302 Building Replacement at Corporation Yard 165,692 108 975,000 25,000 25,000 25,000 25,000 1,240,800 2503 Library Carpet Replacement - 56,500 - - - - - 56,500 2305 Engineering Document Archiving 48,284 11,716 - - - - - 60,000 6306 Neighborhood Emergency Preparedness (CERT)5,910 44,090 - - - - - 50,000 2001 Facilities Assessment - 80,000 - - - - - 80,000 2002 Town Beautification 8,114 6,886 10,000 10,000 10,000 10,000 10,000 65,000 6305 Silicon Valley Regional Interoperability Project (SVRIP) Servi 395,027 63,601 - - - - - 458,628 2008 Energy Efficiency Upgrade - Town-wide 1,000,000 697,039 - - - - - 1,697,039 6104 IT Disaster Recovery Improvements - 200,000 - - - - - 200,000 6103 EOC Communications Upgrade 20,411 29,589 - - - - - 50,000 9901 Street Repair & Resurfacing 3,577,468 1,731,529 3,027,716 1,626,339 1,752,463 1,752,463 1,752,463 15,220,441 9902 Annual Street Restriping 61,106 119,772 25,000 25,000 25,000 25,000 25,000 305,878 0003 Almond Grove Street Rehabilitation 11,560,389 2,501,701 - - - - - 14,062,090 9910 Traffic Calming Projects 96,653 9,499 10,000 10,000 10,000 10,000 10,000 156,152 9921 Curb, Gutter & Sidewalk Maintenance 1,262,888 337,113 900,000 300,000 300,000 300,000 300,000 3,700,001 9930 Retaining Wall Repairs 834,200 337,124 100,000 100,000 100,000 100,000 100,000 1,671,324 0801 Quito Road - Bridge Replacement 64,594 235,087 - - - - - 299,681 0120 Guardrail Replacement Projects 130,583 93,043 - - - - - 223,625 0704 224 W. Main Street Property Acquisition (Parking Lot 6)3,813 1,231,100 - - - - - 1,234,913 0705 Downtown Parking Lots Seal Coat & Restriping 24,915 75,085 - - - - - 100,000 0218 Sidewalk Improvements Shannon/LGB/Cherry Blossom 104 129,896 - - - - - 130,000 0233 Downtown Parking Study - 200,000 - - - - - 200,000 0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - - 60,000 0128 Pilot School Busing Program 350,216 63,964 - - - - - 414,180 0234 One-Way Downtown Street Pilot 13,000 117,000 58,804 - - - - 188,804 0231 Bicycle & Pedestrian Improvements 84,178 515,822 300,000 - - - - 900,000 0229 Cut-Through Traffic/Wood Road Roundabout 263,704 86,296 - - - - - 350,000 0413 Stormwater Master Plan - 200,000 - - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance 1,422 298,578 - - - - - 300,000 2009 Public Art Gateway - 25,000 - - - - - 25,000 2118 Police Headquarters Roof Repair - 50,000 - - - - - 50,000 New Projects 4508 Vegetation Management - Town-wide - - 200,000 - - - - 200,000 4509 Fence Replacement - Shire Court - - 60,000 - - - - 60,000 2601 ADA Upgrade for Public Restrooms - Rec Building - - 183,000 - - - - 183,000 6004 Fire Suppression (Halon) for Server Rooms - - 200,000 - - - - 200,000 2116 Plaza Level Railings - Code Upgrade - - 30,000 - - - - 30,000 2010 Waterproofing Town-wide - - 75,000 - - - - 75,000 2117 ADA Upgrade Staff Restroom - Civic Center - - 300,000 - - - - 300,000 2504 Sound Mitigation in Library Lobby - - 22,000 - - - - 22,000 6301 Computer-Aided Dispatch and Records Management System - - 525,000 - - - - 525,000 0235 Downtown Revitalization - - 1,000,000 - - - - 1,000,000 0236 Massol Intersection Improvements - - 450,000 - - - - 450,000 0129 ADA Transition Plan - - 110,000 - - - - 110,000 Total GFAR Projects 20,139,367$ 10,471,838$ 8,911,520$ 2,121,339$ 2,222,463$ 2,247,463$ 2,222,463$ 48,336,454$ 2023/24 Budget Expended Through 2018/19 Estimated Carryfwd to 2019/20 2021/22 Budget GFAR FUND PROJECT SUMMARY 2020/21 Budget 2022/23 Budget2019/20 Budget Total Budgeted PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -12 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDSBeginning Fund BalanceUnrestricted 260,487$ 260,487$ 31,945$ 31,945$ 31,945$ 31,945$ 31,945$ Deferred Traffic Mitigation Total Beginning Fund Balance 260,487$ 260,487$ 260,487$ 31,945$ 31,945$ 31,945$ 31,945$ Revenues Deferred Revenue 2,161,236$ 242,106$ 1,570,803$ 425,027$ 10,000$ 10,000$ 10,000$ In-Lieu Fees 116,126 - - - - - - Total Revenues 2,277,362$ 242,106$ 1,570,803$ 425,027$ 10,000$ 10,000$ 10,000$ TOTAL SOURCE OF FUNDS 2,537,849$ 502,593$ 1,831,290$ 456,972$ 41,945$ 41,945$ 41,945$ USE OF FUNDS Completed Projects Crosswalk Improvements - Santa Cruz/BHR 14,131$ 14,131$ -$ -$ -$ -$ -$ Hwy 9/University Intersection - - - - - - - Blossom Hill/Cherry Blossom Intersection Improve 500,000 - - - - - - Crosswalk Lighting Upgrade 29,192 29,192 - - - - - Monument Control Network Update 10,000 - - - - - - Carryforward ProjectsLos Gatos Blvd/Shannon Improvements 20,000$ -$ 20,000$ -$ -$ -$ -$ Cut-Through Traffic/Wood Road Roundabout 264,491 36,356 228,136 - - - - Hwy 17 Bicycle & Pedestrian Bridge-Prelim Design 147,005 - 147,005 - - - - Bike & Pedestrian Improvements 34,028 31,628 2,400 - - - - Traffic Signal Modernization 351,538 120,800 563,262 415,027 - - - Proposed Projects Highway 17/9 Interchange and Capacity Improve - - 600,000 - - - - Total Project Expenditures 1,370,384$ 232,106$ 1,560,803$ 415,027$ -$ -$ -$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Total Operating Transfers 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Ending Fund BalanceUnrestricted 1,157,465$ 260,487$ 31,945$ 31,945$ 31,945$ 31,945$ 31,945$ Total Ending Fund Balance 1,157,465$ 260,487$ 31,945$ 31,945$ 31,945$ 31,945$ 31,945$ TOTAL USE OF FUNDS 2,537,849$ 502,593$ 1,602,748$ 456,972$ 41,945$ 41,945$ 41,945$ PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -13 Carryforward Projects 0213 Los Gatos Blvd/Shannon Improvements - 20,000 - - - - - 20,000 0803 Hwy 17 Bicycle & Pedestrian Bridge-Prelim Design - 147,005 - - - - - 147,005 0227 Traffic Signal Modernization 125,000 230,738 332,524 415,027 - - - 1,103,289 0231 Bicycle & Pedestrian Improvements 72,600 2,400 - - - - - 75,000 0229 Cut-Through Traffic/Wood Road Roundabout 211,773 228,135 - - - - - 439,908 New Projects0237Highway 17/9 Interchange and Capacity Improvements - - 600,000 - - - - 600,000 Total Traffic Mitigation Projects 409,373$ 628,278$ 932,524$ 415,027$ -$ -$ -$ 2,385,202$ TRAFFIC MITIGATION FUND PROJECTS Expended Through 2018/19 Total Budgeted 2023/24 Budget Estimated Carryfwd to 2019/20 2020/21 Budget 2019/20 Budget 2021/22 Budget 2022/23 Budget PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -14 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDSBeginning Fund Balance Unrestricted (134,111)$ (134,111)$ (252,889)$ (427,627)$ (427,627)$ (427,627)$ (318,413)$ Total Beginning Fund Balance (134,111)$ (134,111)$ (252,889)$ (427,627)$ (427,627)$ (427,627)$ (427,627)$ Revenues Park Rehabilitation - Bachman Park 214,537 207,903 - - - - - Hwy 9/University Intersection 89,135 - 89,135 - - - - Traffic Signal Modernization 1,438,862 - 1,438,862 - - - - Charter Oaks Trail Repair Project 148,051 - 148,051 - - - - Trailhead Connector 343,000 - 343,000 - - - - Pilot School Busing Program - - - - - - - Hwy 17 Bicycle & Pedestrian Bridge-Prelim Design 52,995 - 52,995 - - - - Bike & Ped Improvements (BHR Eat & West)242,000 - 242,000 - - - - Bike & Ped Improvements Roberts Fisher School 39,500 - 39,500 - - - - Guardrail Replacement Projects - - 980,100 - - - - ADA Upgrade for Public Restrooms - Rec Building - - 67,000 - - - - Sidewalk Improvements Shannon/LGB/Cherry Blossom - - - 940,100 - - - Total Revenues 2,568,080$ 207,903$ 3,400,643$ 940,100$ -$ -$ -$ TOTAL SOURCE OF FUNDS 2,433,969$ 73,792$ 3,147,754$ 512,473$ (427,627)$ (427,627)$ (427,627)$ USE OF FUNDSCompleted ProjectsPark Rehabilitation - Bachman Park 206,712$ 213,815$ -$ -$ -$ -$ -$ Hwy 9/University Intersection 199,211 - - - - - - Carryforward ProjectsCharter Oaks Trail Repair Project 148,051$ 72,833$ 75,218$ -$ -$ -$ -$ Trailhead Connector 343,000 - 343,000 - - - - Pilot School Busing Program - - - - - - - Traffic Signal Modernization 1,815,601 40,033 1,775,568 - - - - Highway 17 Bicycle & Ped Bridge 52,995 - 52,995 - - - - Bike & Ped Improvements 281,500 - 281,500 - - - - Guardrail Replacement Projects - - 980,100 - - - - Sidewalk Improvements Shannon/LGB/Cherry Blossom - - - 940,100 - - - Proposed ProjectsADA Upgrade for Public Restrooms - Rec Building -$ -$ 67,000$ -$ -$ -$ -$ Total Expenditures 3,047,070$ 326,681$ 3,575,381$ 940,100$ -$ -$ -$ Ending Fund Balance Unrestricted (613,101)$ (252,889)$ (427,627)$ (427,627)$ (427,627)$ (427,627)$ (427,627)$ Total Ending Fund Balance (613,101)$ (252,889)$ (427,627)$ (427,627)$ (427,627)$ (427,627)$ (427,627)$ TOTAL USE OF FUNDS 2,433,969$ 73,792$ 3,147,754$ 512,473$ (427,627)$ (427,627)$ (427,627)$ GRANT FUND STATEMENT OF SOURCE AND USE OF FUNDS Note: The grants function primarily on a reimbursement basis. PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -15 Carryforward Projects4503Charter Oaks Trail Repair Project 72,833 75,218 - - - - - 148,051 4505 Trailhead Connector - 343,000 - - - - - 343,000 0120 Guardrail Replacement Projects - - 980,100 - - - - 980,100 0218 Sidewalk Improvements Shannon/LGB/Cherry Blossom - - - 940,100 - - - 940,100 0803 Highway 17 Bicycle & Ped Bridge - 52,995 - - - - - 52,995 0227 Traffic Signal Modernization 50,832 1,775,568 - - - - - 1,826,400 0231 Bicycle & Pedestrian Improvements - 281,500 - - - - - 281,500 New Projects2601ADA Upgrade for Public Restrooms - Rec Building - - 67,000 - - - - 67,000 Total Grant Funded Projects 123,665$ 2,528,281$ 1,047,100$ 940,100$ -$ -$ -$ 4,639,146$ 2020/21 Budget 2023/24 Budget Estimated Carryfwd to 2019/20 Expended Through 2018/19 2019/20 Budget GRANT FUNDED PROJECTS 2021/22 Budget 2022/23 Budget Total Budgeted PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -16 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 2,485,998$ 2,485,998$ 2,608,548$ 2,362,331$ 2,318,481$ 2,426,318$ 2,536,619$ Total Beginning Fund Balance 2,485,998$ 2,485,998$ 2,608,548$ 2,362,331$ 2,318,481$ 2,426,318$ 2,536,619$ Revenues Drainage Fees 92,500$ 113,940$ 92,500$ 94,350$ 96,237$ 98,162$ 100,125$ Interest 8,610 8,610 12,040 11,800 11,600 12,140 12,680 Total Revenues 101,110$ 122,550$ 104,540$ 106,150$ 107,837$ 110,302$ 112,805$ TOTAL SOURCE OF FUNDS 2,587,108$ 2,608,548$ 2,713,088$ 2,468,481$ 2,426,318$ 2,536,619$ 2,649,424$ USE OF FUNDS Completed ProjectsJones Road Storm Drain Improvements 2,300$ -$ -$ -$ -$ -$ -$ Carryforward Projects Hernandez Ave Storm Drain Improvements - - - - - - 65,000 Bicknall Avenue Storm Drain Improvements 50,758 - 50,758 - - - - Jones Road Storm Drain Improvements 2,300 - - - - - - Annual Storm Drain Improvement Prj 150,000 - 300,000 150,000 - - - Proposed Projects Total Expenditures 205,358$ -$ 350,758$ 150,000$ -$ -$ 65,000$ Ending Fund Balance Unrestricted 2,381,751$ 2,608,548$ 2,362,331$ 2,318,481$ 2,426,318$ 2,536,619$ 2,584,424$ Total Ending Fund Balance 2,381,751$ 2,608,548$ 2,362,331$ 2,318,481$ 2,426,318$ 2,536,619$ 2,584,424$ TOTAL USE OF FUNDS 2,587,108$ 2,608,548$ 2,713,088$ 2,468,481$ 2,426,318$ 2,536,619$ 2,649,424$ STORM BASIN FUNDSSTATEMENT OF SOURCE AND USE OF FUNDS PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -17 Carryforward Projects 0409 Hernandez Avenue Storm Drain Improvements 17,180$ -$ -$ -$ -$ -$ 65,000$ 82,180$ 0410 Bicknell Road Storm Drain Improvements 120,742 50,758 - - - - - 171,500 0420 Annual Storm Drain Improvement Prj - 150,000 150,000 150,000 - - - 450,000 New ProjectsTotal Storm Basin Funds Projects 137,922$ 200,758$ 150,000$ 150,000$ -$ -$ 65,000$ 703,680$ STORM BASIN FUNDS PROJECTS 2023/24 Budget 2021/22 Budget Expended Through 2018/19 2022/23 Budget Total Budgeted Estimated Carryfwd to 2019/20 2019/20 Budget 2020/21 Budget PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -18 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 2,997,984$ 2,997,984$ 3,042,294$ 764,784$ 53,958$ 84,228$ 114,648$ Total Beginning Fund Balance 2,997,984$ 2,997,984$ 3,042,294$ 764,784$ 53,958$ 84,228$ 114,648$ Revenues Construction Tax 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ Interest 14,310 14,310 22,490 3,820 270 420 570 Balamce from PG&E - - - 3,810,558 - - - Total Revenues 44,310$ 44,310$ 52,490$ 3,844,378$ 30,270$ 30,420$ 30,570$ TOTAL SOURCE OF FUNDS 3,042,294$ 3,042,294$ 3,094,784$ 4,609,162$ 84,228$ 114,648$ 145,218$ USE OF FUNDS Completed Projects Carryforward Projects PG&E Undergrounding 112,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ Sidewalk Improve Shannon/LGB/Cherry Bl - - - 119,204 - - - New Projects Total Expenditures 112,000$ -$ 2,330,000$ 4,555,204$ -$ -$ -$ Operating Transfers Total Operating Transfers -$ -$ -$ -$ -$ -$ -$ Ending Fund Balance Unrestricted 2,930,294 3,042,294 764,784 53,958 84,228 114,648 145,218 Total Ending Fund Balance 2,930,294$ 3,042,294$ 764,784$ 53,958$ 84,228$ 114,648$ 145,218$ TOTAL USE OF FUNDS 3,042,294$ 3,042,294$ 3,094,784$ 4,609,162$ 84,228$ 114,648$ 145,218$ UTILITY UNDERGROUND FUNDSTATEMENT OF SOURCE AND USE OF FUNDS PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -19 Carryforward Projects 0225 Utility Undergrounding Improvements -$ 2,330,000$ -$ 4,436,000$ -$ -$ -$ 6,766,000$ 0218 Sidewalk Improvements Shannon/LGB/Cherry Blossom - - - 119,204 - - - 119,204$ New ProjectsTotal Utility Undergrounding Projects -$ 2,330,000$ -$ 4,555,204$ -$ -$ -$ 6,885,204$ Expended Through 2018/19 Estimated Carryfwd to 2019/20 2019/20 Budget 2020/21 Budget 2023/24 Budget UTILITY UNDERGROUND FUND PROJECTS Total Budgeted 2021/22 Budget 2022/23 Budget PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -20 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2018/19 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 703,150$ 703,150$ 239,363$ 239,363$ 204,854$ 170,345$ 135,836$ Total Beginning Fund Balance 703,150$ 703,150$ 239,363$ 239,363$ 204,854$ 170,345$ 135,836$ Revenues Gas Tax 515,920$ 515,920$ 512,851$ 512,851$ 512,851$ 512,851$ 512,851$ Gas Tas - Traffic Congestion 108,549 108,549 260,987 260,987 260,987 260,987 260,987 Loan Repayment 34,509 34,509 34,509 - - - - Road Maintenance Rehabilitation 485,240 485,240 506,497 506,497 506,497 506,497 506,497 Interest 1,210 1,210 1,210 1,210 1,210 1,210 1,210 Total Revenues 1,145,428$ 1,145,428$ 1,316,054$ 1,281,545$ 1,281,545$ 1,281,545$ 1,281,545$ TOTAL SOURCE OF FUNDS 1,848,578$ 1,848,578$ 1,555,417$ 1,520,908$ 1,486,399$ 1,451,890$ 1,417,381$ USE OF FUNDS Carryforward Projects St Repair & Resurfacing 1,503,215 1,503,215 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 Proposed Projects Total Expenditures 1,503,215$ 1,503,215$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ Total Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ Ending Fund Balance Unrestricted 239,363$ 239,363$ 239,363$ 204,854$ 170,345$ 135,836$ 101,327$ Total Ending Fund Balance 239,363$ 239,363$ 239,363$ 204,854$ 170,345$ 135,836$ 101,327$ TOTAL USE OF FUNDS 1,848,578$ 1,848,578$ 1,555,417$ 1,520,908$ 1,486,399$ 1,451,890$ 1,417,381$ GAS TAX FUND STATEMENT OF SOURCE AND USE OF FUNDS PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -21 Carryforward Projects9901Street Repair & Resurfacing 6,232,645$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,282,915$ New ProjectsTotal Gas Tax Fund Projects 6,232,645$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,282,915$ Total Budgeted Estimated Carryfwd to 2019/20 2019/20 Budget 2020/21 Budget 2021/22 Budget Expended Through 2018/19 2022/23 Budget 2023/24 Budget GAS TAX FUND PROJECTS PROPOSED CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -22 Streets Program This Page Intentionally Left Blank STREETS PROGRAM DIRECTORY PROPOSED C-1 STREET RECONSTRUCTION AND RESURFACING PROJECTS PAGE 9901 Street Repair & Resurfacing C – 6 0003 Almond Grove Street Rehabilitation Project C – 10 STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS 9910 Traffic Calming Projects C – 16 9921 Curb, Gutter & Sidewalk Maintenance C – 18 9930 Retaining Wall Repairs C – 20 9902 Annual Street Restriping C – 22 0120 Guardrail Replacement Projects C – 24 0236 Massol Intersection Improvement C – 26 STREET IMPROVEMENT PROJECTS 0213 Los Gatos Boulevard/Shannon Road Improvements C – 32 0705 Downtown Parking Lots Seal Coat & Restriping C – 34 0409 Hernandez Avenue Storm Drain Improvements C – 36 0704 224 West Main Property Acquisition (Parking Lot 6) C – 38 0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 40 0221 Sidewalk Improvements – Multiple Locations C – 42 0225 Utility Undergrounding Improvements C – 44 0229 Cut – Through Traffic/Wood Road Roundabout C – 46 0227 Traffic Signal Modernization C – 48 0410 Bicknell Road Storm Drain Improvements C – 50 0231 Bicycle & Pedestrian Improvements C – 52 0413 Stormwater Master Plan C – 54 0414 Stormwater System – Pollution Prevention Compliance C – 56 0232 Public Arts Gateway C – 58 0233 Downtown Parking Study C – 60 0234 One-Way Downtown Street Pilot C – 62 0420 Annual Storm Drain Improvements C – 64 0128 Pilot School Busing C – 66 0129 ADA Transition Plan C – 68 0237 Highway 17/9 Interchange and Capacity Improvements C – 70 0235 Downtown Revitalization C – 72 BRIDGE PROJECTS 0801 Quito Road – Bridge Replacement C – 78 0803 Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design C – 80 PROPOSED STREETS PROGRAM C - 2 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 3 PROJECT LOCATIONS A Street Repair & Resurfacing B Almond Grove Street Rehabilitation Project LO S G A T O S - S A R A T O G A R D LOS GATOS BLVDE MAIN STHWY 17HWY 17N SANTA CRUZ AVWINCHESTER BLVDBLOSSOM HILL RDLOS GATOS BLVDHW Y 8 5 KENNED Y R D SHAN N O N R D LAR K A V LOS GATOS-ALMADEN RD UNIVERSITY AVWEDGEWOOD KNOWLES B "A" IS A TOWN-WIDE PROJECT HICKSRD PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 4 PROGRAM SECTION DIRECTORY PAGE 9901 Street Repair & Resurfacing C – 6 0003 Almond Grove Street Rehabilitation Project C – 10 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 5 The Streets Program’s Street Reconstruction & Resurfacing section contains Capital Improvement Program projects that resurface or repave the Town’s streets as the primary scope of work. Projects may also encompass minor components of streetscape or street improvements; however, to be categorized in the Street Reconstruction & Resurfacing section, projects must have pavement rehabilitation as their main purpose. Safety issues, traffic levels, the Pavement Condition Index, available funding sources, project costs, and community impacts are all considerations in prioritizing Street Reconstruction & Resurfacing projects in the five-year Capital Improvement Program. This section contains an annual ongoing street rehabilitation project as well as an identified one-time project. The dedicated ongoing funding sources for street repair are the Gas Tax, which was increased by SB 1, and Proposition 42, which total approximately $1.2 million for FY 2019/20. In addition, Countywide Measure B (Nov 2016) increased the sales tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance. The Los Gatos annual allocation will be $580,633. Additional sources include grant funding, if secured, such as state programs that focus on funding specific street categories or that funds rehabilitation of specific arterial or collector streets. Other than the funds mentioned above, Los Gatos has limited designated funding sources for maintaining the Town’s roadway system. The Town has a Construction Impact Fee (approximately $110,000 annually) and a Refuse Vehicle Road Impact Fee (approximately $610,000 annually). Both of these sources recover costs for additional street and roadway repairs due to the disproportionate amount of wear and tear caused by construction and other heavy vehicles. STREET RECONSTRUCTION & RESURFACING PROJECTS SUMMARY * Total FY 2018/19 Carryforward $4,233,230 Carryforward Projects 9901 Street Repair & Resurfacing 9,810,113$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,503,356$ 0003 Almond Grove Street Rehabilitation 11,560,389 2,501,701 - - - - 14,062,090 New Projects Total Street Reconstruction Projects 21,370,502$ 8,471,000$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 41,565,446$ Expended Through 2018/19 FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM STREET RECONSTRUCTION PROJECTS Total Budgeted 2019/20 Budget & Carryfwd* 2023/24 Budget 2021/22 Budget 2022/23 Budget 2020/21 Budget PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 6 Town Wide Project Name Street Repair & Resurfacing Project Number 811-9901 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This is an ongoing annual project for street rehabilitation throughout Town to enhance vehicle safety and to maintain the Town’s roadway infrastructure. Location This project occurs in various locations including Town-wide arterials, collectors, and neighborhood streets. To meet the SB1 requirements, every year the Council adopts a resolution identifying the streets needing repair. The final streets for the current construction season are identified at the time the specifications are brought forward for Council approval, which generally occurs in the spring. Project Background Street rehabilitation projects are identified and prioritized according to pavement quality reflected by the Pavement Condition Index (PCI), field inspection, traffic level, and safety issues. Every four years, the Town conducts a full assessment on the condition of the streets through a consultant who specializes in the field. This assessment is funded through a grant from the Metropolitan Transportation Commission. The PCI information that results from the survey feeds into a street maintenance software program called StreetSaver. Every jurisdiction in the Bay Area uses the same program and methodology, making it the best practice in the industry. With the PCI information in the StreetSaver database, the program can provide future high-level maintenance programs for the Town. The program emphasizes maintaining streets that have a good (above 70) PCI at that level as ongoing preventive maintenance is more cost efficient than allowing streets to reach lower PCI levels. As with many computer-generated reports, the output requires some validation and adjustment. Staff conducts this element of the work through field observations and consideration of project proximity, all with an eye towards maximizing the value to the Town. The resulting list, sized to the available budget, creates the annual list of streets for this project. Historically, the Town invested approximately $11.7 million from FY 2000/01 to FY 2007/08 to address the backlog of deferred street maintenance. This investment raised the average PCI of Town streets from 64 in 2001 to nearly 74 in 2008. Due to budget challenges that followed, Town streets have been resurfaced by the application of a rubber cape seal or a slurry seal. This method is typically utilized for streets in better condition to provide a seal to the surface below. The solution is cost effective and can provide some limited protection to streets in worse condition, but for a shorter timeframe. TOWN-WIDE PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 7 For the streets with a lower PCI, an asphalt overlay is often the preferred solution with the best return on investment over time. Costs are much higher for this approach. The Town has focused its resources on arterials and collector streets and has used a rubber cape seal and slurry seal. This approach was also the most economical and prudent treatment to resurface several residential neighborhoods. The dedicated ongoing funding sources for street repair are the Gas Tax, which was increased by SB 1, and Proposition 42, which total approximately $1,200,000 for FY 2019/20. In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633. As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA) assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. Eighty percent of the revenues collected by the VTA are returned to the local municipality in which they were generated. The remaining twenty percent is used for regional and County-wide projects. This funding source is expected to generate approximately $180,000 annually for Los Gatos, which will be used for street rehabilitation Town-wide. Other than the annual revenues mentioned above, Los Gatos has limited designated funding sources for maintaining the Town’s roadway system. The Town has a Construction Impact Fee (approximately $110,000 annually) and a Refuse Vehicle Road Impact Fee (approximately $610,000 annually). Both of these sources recover costs for additional street and roadway repairs due to the disproportionate amount of wear and tear caused by construction and other heavy vehicles. Operating Budget Impacts Conducting preventive maintenance on the Town’s roadways extends the life of the streets and reduces the need for extensive reconstruction in the future, reducing staff time spent on road maintenance. Engineering staff time for project design and oversight is addressed in the FY 2019/20 Operating Budget. PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 8 Project Components & Estimated Timeline Fall 2019 Design Prepare plans and specifications Winter 2020 Bid Process Council approves plans and authorizes bidding the project Summer 2020 Construction Council awards the contract and construction process begins Fall 2020 Completion Project completed Senate Bill 1 (2017-2018, Beall) Road Repair and Accountability Act project list: Location Description Scheduled Completion Estimated Useful Life Knowles from Dardanelli to Dell Pollard from Dell to West Parr Placement of rubber cape seal or overlay to maintain pavement surface. These are arterial roads and are critical for transit needs in the Town. Fall 2020 10 - 25 years Winchester from Lark to Santa Cruz Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Fall 2021 10 - 25 years Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road Placement of rubber cape seal or overlay to maintain pavement surface. This is an arterial road and is critical for transit needs in the Town. Fall 2022 10 - 25 years Quito Road from Bicknell to Woodbank Placement of rubber cape seal or overlay to maintain pavement surface. This is a collector road and is critical for transit needs in the Town. Fall 2023 10 - 25 years Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Vehicle License Fee - 2010 Measure B 311,629$ 674,411$ 75,088$ 180,000$ 255,088$ 180,000$ 180,000$ 180,000$ 180,000$ 1,961,128$ VTA Allocation - 2016 Measure B - - 1,161,326 580,663 1,741,989 580,663 580,663 580,663 580,663 4,064,641 Other GFAR 2,515,079 76,349 495,115 2,267,053 2,762,168 865,676 991,800 991,800 991,800 9,194,672 Total GFAR 2,826,708$ 750,760$ 1,731,529$ 3,027,716$ 4,759,245$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 15,220,441$ GAS TAX & PROP 42 Road Maintenance and Rehabilitation Account (RMRA) -$ 520,002$ -$ 506,497$ 506,497$ 506,497$ 506,497$ 506,497$ 506,497$ 3,052,487$ Other Gas Tax & Prop 42 4,729,430 983,213 - 703,557 703,557 703,557 703,557 703,557 703,557 9,230,428 TOTAL GAS TAX & PROP 42 4,729,430$ 1,503,215$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,282,915$ TOTAL SOURCE OF FUNDS 7,556,138$ 2,253,975$ 1,731,529$ 4,237,770$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,503,356$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 2,826,708 750,760 1,731,529 3,027,716 4,759,245 1,626,339 1,752,463 1,752,463 1,752,463 15,220,441 TOTAL GFAR 2,826,708$ 750,760$ 1,731,529$ 3,027,716$ 4,759,245$ 1,626,339$ 1,752,463$ 1,752,463$ 1,752,463$ 15,220,441$ GAS TAX & PROP 42 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 4,729,430 1,503,215 - 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 1,210,054 12,282,915 TOTAL GAS TAX & PROP 42 4,729,430$ 1,503,215$ -$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 1,210,054$ 12,282,915$ TOTAL USE OF FUNDS 7,556,138$ 2,253,975$ 1,731,529$ 4,237,770$ 5,969,299$ 2,836,393$ 2,962,517$ 2,962,517$ 2,962,517$ 27,503,356$ STREET REPAIR & RESURFACING Project 811-9901 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 9 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 10 Project Name Almond Grove Street Rehabilitation Project Number 811-0003 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project provides design and construction for the rehabilitation of street infrastructure in the Almond Grove District. Location This project is located within the former Almond Grove District Redevelopment Area. Project Background The streets in the Almond Grove District have deteriorated over the years and due to funding and maintenance constraints, no repairs or resurfacing activities have been performed. The proposed project to rehabilitate the street infrastructure in this area will not only provide safe and functional streets and sidewalks for the community, but also reduce trip and fall accidents. Due to the scale and magnitude of this project, proposed street rehabilitations will be phased over several years to minimize construction impacts to the community and to reflect project funding as determined by the Town Council. Phase 1 of this project included Bachman Avenue and Broadway Avenue. Construction started in Summer 2016 and was substantially complete in the fall of 2016 with minor project close out work continuing into the spring of 2017. The Almond Grove Phase 2 project addresses the eight additional streets in the project, with project bidding completed in April 2017 and construction beginning in the summer of 2017 and continuing over the next two summer construction seasons. Construction bids for this project were very favorable to the Town. The Council awarded the bid in April 2017 allowing for approximately $2.9M in savings within the project. Operating Budget Impacts This project will use staff time for construction inspection and management. Operating costs associated with this project will be reimbursed from the project budget. Project delivery costs for phase one of this project are included in the CIP project’s total cost, and are estimated at 8% of the construction cost. Project delivery costs for Phase 2 of the project are included in the CIP project’s total cost and are estimated at 12% for this more complex part of the project. PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 11 Project Components & Estimated Timeline Summer 2016 Construction Phase 1 project construction Fall 2016 Completion Phase 1 project completion & closeout Winter 2017 Design Phase 2 Completion of plans and specifications Spring 2017 Bid process Phase 2 Council approves plans and authorizes bidding the project Summer 2017 Construction Phase 2 project construction Summer 2018 Construction Phase 2 project construction Summer 2019 Construction Phase 2 project construction Winter 2020 Project Closeout Phase 2 project closeout Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$ TOTAL SOURCE OF FUNDS 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 8,491,003 3,069,386 2,501,701 - 2,501,701 - - - - 14,062,090 TOTAL GFAR 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$ TOTAL USE OF FUNDS 8,491,003$ 3,069,386$ 2,501,701$ -$ 2,501,701$ -$ -$ -$ -$ 14,062,090$ ALMOND GROVE STREET REHABILITION PROJECT Project 811-0003 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 12 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-13 PROJECT LOCATIONS A Traffic Calming Projects B Curb, Gutter & Sidewalk Maintenance C Retaining Wall Repairs D Annual Street Restriping E Guardrail Replacement Project F Massol Intersection Improvements PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-14 PROGRAM SECTION DIRECTORY PAGE 9910 Traffic Calming Projects C – 16 9921 Curb, Gutter & Sidewalk Maintenance C – 18 9930 Retaining Wall Repairs C – 20 9902 Annual Street Restriping C – 22 0120 Guardrail Replacement Project C – 24 0236 Massol Intersection Improvements C - 26 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-15 The Streets Program’s Street Repair, Maintenance & Safety Projects section contains Capital Improvement Program projects that repair, maintain, or enhance safety features of the Town’s streets and parking lots as the primary scope of work. Projects may also encompass minor components of streetscape or street improvements; however, to be categorized in this section, street repair, maintenance, or safety enhancements must be the project’s main purpose. Safety issues, available funding sources, project costs, and community impacts are all considerations in prioritizing Street Repair, Maintenance & Safety projects in the five-year Capital Improvement Program. This section contains annual ongoing projects as well as one-time projects. GFAR funding is utilized for the Traffic Calming Projects, which are funded at $10,000 annually. The Annual Street Restriping Project is funded at $25,000 per year. The Curb, Gutter, and Sidewalk Maintenance Project is funded at $300,000 per year. The Retaining Wall Repairs Project is typically funded with an ongoing GFAR stream of $100,000 per year. While annual appropriations are planned for these ongoing projects, funding adjustments may occur from year to year to align with changing priorities and schedules. One-time projects are prioritized by safety factors, community impacts, and the availability of grant funding. GFAR funds may also be utilized to fund a portion of grant driven projects as a grant’s local “match requirement.” Los Gatos does not have an ongoing designated funding source for repairing, maintaining, and improving the Town’s roadway system. STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS SUMMARY Carryforward Projects 9910 Traffic Calming Projects 96,653$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$ 9921 Curb, Gutter & Sidewalk Maintenance 1,262,888 1,237,113 300,000 300,000 300,000 300,000 3,700,001 9930 Retaining Wall Repairs 834,200 437,124 100,000 100,000 100,000 100,000 1,671,324 9902 Annual Street Restriping 61,106 144,772 25,000 25,000 25,000 25,000 305,878 0120 Guardrail Replacement Projects 130,583 1,073,143 - - - - 1,203,725 New Projects 0125 Massol Intersection Improvements - 450,000 - - - - 450,000 Total Maintenance & Safety Projects 2,385,429$ 3,361,651$ 435,000$ 435,000$ 435,000$ 435,000$ 7,487,080$ STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS 2022/23 Budget Expended Through 2018/19 FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM Total Budgeted 2023/24 Budget 2020/21 Budget 2021/22 Budget 2019/20 Budget & Carryfwd* * Total FY 2018/19 Carryforward $896,551 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-16 Project Name Traffic Calming Projects Project Number 812-9910 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description In accordance with the Town’s Traffic Calming Policy, this project involves conducting minor traffic studies, developing and implementing traffic improvements, and installing roadway devices to further enhance school pedestrian and roadway safety near high-use crosswalks. Location In FY 2019/20, funds will be used to determine if Massol Avenue between Bean and Nicholson and/or Shannon Road from Los Gatos Boulevard to Short Road meet the criteria to qualify for the Neighborhood Traffic Calming Program (NTCP). If both qualify, the Massol area will be processed first. The process begins with neighborhood meetings for staff to work with residents to develop a temporary traffic calming plan (TTCP). Staff will then poll the residents to determine if the devices should be installed as temporary devices. If a super majority supports the TTCP, staff will have the proposed devices installed. Four to six months after installation, staff will conduct another traffic study in the area to determine the effectiveness of these devices. Upon the completion of this study, staff will poll the residents to determine if the devices should be made permanent. If necessary, funds will be used to remove these devices. Any remaining funds within this project will be used to complete the same process for Shannon Road. Project Background In 2002, the Town implemented a Traffic Calming Policy to address and mitigate neighborhood traffic and pedestrian safety issues, such as speeding and cut-through traffic. This program relies on residents to bring projects forward at the neighborhood level. At the time the Policy was adopted, twelve project areas were under review for traffic calming improvements. To date, 14 projects have been processed, completed, or closed. Traffic calming improvements such as speed bumps, traffic circles, center medians, and bulb-outs were installed where appropriate to slow vehicles or enhance pedestrian safety. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-17 Project Components & Estimated Timeline Summer 2019 Determine if Massol and/or Shannon qualify for Neighborhood Traffic Calming Program Fall 2019 Schedule, notify residents and hold Neighborhood Traffic Calming meeting(s) for Massol Avenue Winter 2020 Additional meeting(s), if needed, poll Massol Avenue residents Spring 2020 Solicits bids and schedule pilot installation for Massol Avenue Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$ TOTAL SOURCE OF FUNDS 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 57,866 38,787 9,499 10,000 19,499 10,000 10,000 10,000 10,000 156,152 TOTAL GFAR 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$ TOTAL USE OF FUNDS 57,866$ 38,787$ 9,499$ 10,000$ 19,499$ 10,000$ 10,000$ 10,000$ 10,000$ 156,152$ TRAFFIC CALMING PROJECTS Project 812-9910 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-18 TOWN-WIDE Project Name Curb, Gutter, & Sidewalk Maintenance Project Number 813-9921 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This is an ongoing annual project for the repair and replacement of hazardous curbs, gutters, and sidewalks throughout Town to enhance pedestrian and bicyclist safety and to improve water runoff infrastructure. Location Curb, gutter, and sidewalk repair projects occur throughout the Town based on priority needs. Project Background Curb, gutter, and sidewalk improvements in public parking lots and rights-of-way have historically been funded by the Town. The intent of this project is to keep pace with the deterioration of sidewalks and curbs. Specific project locations are identified and prioritized based on the level of damage and accompanying potential safety issues. The primary source of damage to sidewalks, curbs and gutters is tree root intrusion. Most of the streets in Town have mature trees in the planter areas between the sidewalks and curbs. These trees were planted many years ago without consideration of root growth and its impacts to the sidewalk, curb, and street. Over time, the tree roots cause cracks and raised concrete, leading to uneven surfaces. Staff develops an annual plan for sidewalk repair based on the level of damage as observed and reported by staff and residents, confirmed by staff inspection. The level of repair and maintenance performed in any given year has been limited by available annual funding. Funds are utilized predominantly to address locations where paving projects create a requirement for curb ramps and curb and gutter repair. In addition to sidewalk, curb and gutter maintenance, this project is used for installing Americans with Disabilities Act (ADA) accessible curb ramps on Town streets as required by federal law following Town street maintenance projects. Title II of the ADA obligates a jurisdiction to provide compliant curb ramps whenever streets are resurfaced from one intersection to another. ADA compliance has required a substantial portion of the annual funding allocation. To address some of the unmet needs, staff has recommended increasing the allocation one-time by $600,000. Operating Budget Impacts Potential trip and fall injuries and lawsuits against the Town should be reduced by eliminating hazardous curb, gutter, and sidewalk conditions. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-19 Project Components & Estimated Timeline Winter 2020 Design Project design & development Spring 2020 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$ TOTAL SOURCE OF FUNDS 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 1,090,848 172,040 337,113 900,000 1,237,113 300,000 300,000 300,000 300,000 3,700,001 TOTAL GFAR 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$ TOTAL USE OF FUNDS 1,090,848$ 172,040$ 337,113$ 900,000$ 1,237,113$ 300,000$ 300,000$ 300,000$ 300,000$ 3,700,001$ CURB, GUTTER & SIDEWALK MAINTENANCE Project 813-9921 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-20 TOWN-WIDE Project Name Retaining Wall Repairs Project Number 815-9930 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description The Retaining Wall Repair and Replacement Program focuses on the repair and/or replacement of retaining walls that have become structurally deficient. Location Retaining wall repair projects are identified throughout the Town and are prioritized in order of repair based on safety issues, roadway impacts, retaining wall damage, and project costs. Project Background Retaining walls are installed to hold a hillside from sliding and are placed alongside a street at strategic locations where hillside erosion is anticipated. If the retaining wall fails, the street subsequently fails; therefore, it is important to maintain the retaining walls as they are an integral part of the hillside roadway system. Some existing retaining walls have reached the end of their serviceable life and require replacement. Hillside locations are prioritized over smaller roadside embankments in accordance with the potential impacts from failures. Retaining walls are visually inspected annually; however, unanticipated weather events can quickly erode a wall’s integrity and cause failure. Town staff continues to monitor and schedule retaining wall installation and replacement as needed. Operating Budget Impacts Once repaired, improved retaining walls reduce ongoing operating costs associated with maintenance and emergency response. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-21 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2020 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$ TOTAL SOURCE OF FUNDS 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 777,984 56,216 337,124 100,000 437,124 100,000 100,000 100,000 100,000 1,671,324 TOTAL GFAR 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$ TOTAL USE OF FUNDS 777,984$ 56,216$ 337,124$ 100,000$ 437,124$ 100,000$ 100,000$ 100,000$ 100,000$ 1,671,324$ RETAINING WALL REPAIRS Project 815-9930 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-22 TOWN-WIDE Project Name Annual Street Restriping Project Number 811-9902 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project is an annual program that restripes a portion of the Town’s streets, ensuring the safety of vehicles and pedestrians. Location Roadway restriping work is done at various locations throughout the Town based on conditions and available funds. Project Background The Town initiated Town-wide striping in FY 2006/07. Due to deferred striping and marking of the Town’s public streets, any striping that had been accomplished previously was done in conjunction with the resurfacing of specific streets in the Town’s annual street paving project. This annual street restriping program installs new striping and marking for center lanes, bicycle lanes, crosswalks, stop sign and signal light markings, and other roadway signage as needed. Roadway stripes wear out due to traffic and weather which creates a safety concern. The goal is to have Town streets that are properly striped for safe operation and use by the public. Under this project, locations that are not scheduled for street repaving will be prioritized for restriping. The restriping of repaved streets will continue to occur in conjunction with paving contracts. Since FY 2007/08, the ongoing annual GFAR appropriation has been $25,000. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as the project is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-23 Project Components & Estimated Timeline Winter 2020 Design Project Design & development Spring 2020 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$ TOTAL SOURCE OF FUNDS 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 61,106 - 119,772 25,000 144,772 25,000 25,000 25,000 25,000 305,878 TOTAL GFAR 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$ TOTAL USE OF FUNDS 61,106$ -$ 119,772$ 25,000$ 144,772$ 25,000$ 25,000$ 25,000$ 25,000$ 305,878$ ANNUAL STREET RESTRIPING Project 811-9902 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-24 Project Name Guardrail Replacement Project Project Number 812-0120 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description The project will construct a new metal beam guardrail, and replace old and damaged guardrails along sections of Town roadways. Location This project will take place in various locations where guardrails are present and are in need of repair. The list of guardrails will be identified and will be brought forward to Council for approval. Project Background There are many roadways throughout Town that are located near hillside areas where guardrails are present. Guardrails are often located on narrow stretches of roadway and protect vehicles and pedestrians from steep hillside embankments. Over the years, due to hillside erosion and years of deferred maintenance, the guardrails have worn out and are in need of repair or replacement. Staff will assess guardrails and determine which ones are in the most need of repair, budget permitting. In FY 2018/19, the Town was awarded $980,100 in grant funds for additional guardrail work throughout the Town. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-25 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 130,583$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 223,625$ GRANTS & AWARDS - - - 980,100 980,100 - - - - 980,100 TOTAL SOURCE OF FUNDS 130,583$ -$ 93,043$ 980,100$ 1,073,143$ -$ -$ -$ -$ 1,203,725$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 130,583 - 93,043 - 93,043 - - - - 223,625 TOTAL GFAR 130,583$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 223,625$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 980,100 980,100 - - - - 980,100 TOTAL GFAR -$ -$ -$ 980,100$ 980,100$ -$ -$ -$ -$ 980,100$ TOTAL USE OF FUNDS 130,583$ -$ 93,043$ 980,100$ 1,073,143$ -$ -$ -$ -$ 1,203,725$ GUARDRAIL REPLACEMENT PROJECTS Project 812-0120 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-26 Project Name Massol Intersection Improvements Project Number 813-0236 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will add intersection safety improvements. Location This project will take place at the intersection of Massol Avenue and Highway 9. Project Background The intersection as Massol Avenue currently has no traffic control, but does have a pedestrian activated flashing beacon that is intended to alert drivers when a pedestrian is crossing. Looking at accident history, this intersection experiences collisions at a higher level than other uncontrolled intersections, including a pedestrian fatality on September 1, 2017. This project will provide green bike lanes approaching the crosswalk from both directions to alert drivers of the changing conditions and help to reduce speeds. In addition, the project will upgrade the existing flashing beacon to a LED rectangular rapidly flashing beacon (RRFB), which are utilized at many of the Town’s other crosswalks. These beacons are much more intense than the existing beacon and would greatly improve the visibility of the crosswalk for drivers. This improvement has the advantage of improving safety while not impacting the flow of traffic. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost, which is approximately 12%. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-27 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid process Project bidding & contract award Winter 2020 Construction Project construction Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 450,000 450,000 - - - - 450,000 TOTAL GFAR -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$ TOTAL USE OF FUNDS -$ -$ -$ 450,000$ 450,000$ -$ -$ -$ -$ 450,000$ MASSOL INTERSECTION IMPROVEMENTS Project 813-0236 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-28 PROPOSED STREETS PROGRAM Street Improvements C-29 PROJECT LOCATIONS A Los Gatos Boulevard/Shannon Road Improvements L Stormwater Master Plan B Downtown Parking Lots Seal Coat & Restriping M Stormwater System – Pollution Prevention Compliance C Hernandez Avenue Storm Drain Improvements N Public Arts Gateway D 224 West Main Property Acquisition (Parking Lot 6) O Downtown Parking Study E Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane Sidewalk Improvements P One-Way Downtown Street Pilot F Sidewalk Improvements – Multiple Locations Q Annual Storm Drain Improvements G Utility Undergrounding Improvements R Pilot School Busing Program H Cut-Through Traffic/Wood Road Roundabout S ADA Transition Plan Update I Traffic Signal Modernization T Highway 17/9 Interchange and Capacity Improvements J Bicknell Road Storm Drain Improvements U Downtown Revitalization K Bicycle & Pedestrian Improvements PROPOSED STREETS PROGRAM Street Improvements C-30 PROGRAM SECTION DIRECTORY PAGE 0213 Los Gatos Boulevard/Shannon Road Improvements C – 32 0705 Downtown Parking Lots Seal Coat & Restriping C – 34 0409 Hernandez Avenue Storm Drain Improvements C – 36 0704 224 West Main Property Acquisition (Parking Lot 6) C – 38 0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 40 0221 Sidewalk Improvements – Multiple Locations C – 42 0225 Utility Undergrounding Improvements C – 44 0229 Cut – Through Traffic/Wood Road Roundabout C – 46 0227 Traffic Signal Modernization C – 48 0410 Bicknell Road Storm Drain Improvements C – 50 0231 Bicycle & Pedestrian Improvements C – 52 0413 Stormwater Master Plan C – 54 0414 Stormwater System – Pollution Prevention Compliance C – 56 2009 Public Arts Gateway C – 58 0233 Downtown Parking Study C – 60 0234 One-Way Downtown Street Pilot C – 62 0420 Annual Storm Drain Improvements C – 64 0128 Pilot School Busing C – 66 0129 ADA Transition Plan C – 68 0237 Highway 17/9 Interchange and Capacity Improvements C – 70 0235 Downtown Revitalization C – 72 PROPOSED STREETS PROGRAM Street Improvements C-31 The Streets Program’s Street Improvements section contains Capital Improvement Program projects that improve a roadway’s function or structure, other than paving, as the primary scope of work. Typical Street Improvements projects include sidewalk, curb, and gutter improvements, storm drain improvements, the undergrounding of utilities, intersection improvements, sidewalk and median ramps, crosswalk improvements, street lighting, and retaining walls. In this CIP, the Street Improvements section contains one-time projects and no ongoing projects. One-time Street Improvements projects are prioritized based on safety needs, traffic levels, available funding sources, project costs, and community impacts. Traffic Mitigation Funds, Storm Drain Funds, and the Utility Underground Fund all provide designated funding revenue through development fee charges for their related project categories. Los Gatos does not have a designated funding source for other street improvements which do not fall into these categories; however, grants, in-lieu fees, CDBG funds, and community benefit funds are utilized when available. STREET IMPROVEMENT PROJECTS SUMMARY * Total FY 2018/19 Carryforward $8,180,526 Unfunded Projects for future consideration • Parking Lot 4 Repair & Waterproofing • Montebello Way Island Removal • Blossom Hill Road & Union Avenue Improvements • Los Gatos-Almaden Road Improvements • Union Avenue Widening and Sidewalks • North Santa Cruz Avenue Curb and Gutter Improvements north of Highway 9 • Sidewalk infill across from Fisher Middle School • Downtown Parking Sign Enhancements Carryforward Projects 0213 Los Gatos Blvd/Shannon Improvements -$ 20,000$ -$ -$ -$ -$ 20,000$ 0705 Downtown Parking Lots Seal Coat & Restriping 24,915 75,085 - - - - 100,000 0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - 65,000 82,180 0704 224 W. Main Street Property Acquisition (Parking Lot 6)3,813 1,231,100 - - - - 1,234,913 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 129,896 1,059,304 - - - 1,189,304 0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - 60,000 0225 Utility Undergrounding Improvements - 2,330,000 4,436,000 - - - 6,766,000 0229 Cut-Through Traffic/Wood Road Roundabout 475,476 314,432 - - - - 789,908 0227 Traffic Signal Modernization 175,832 2,338,830 415,027 - - - 2,929,689 0410 Bicknall Avenue Storm Drain Improvements 120,742 50,758 - - - - 171,500 0231 Bicycle & Pedestrian Improvements 156,778 1,099,722 - - - - 1,256,500 0413 Stormwater Master Plan - 200,000 - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance 1,422 298,578 - - - - 300,000 2009 Public Art Gateway - 25,000 - - - - 25,000 0233 Downtown Parking Study - 200,000 - - - - 200,000 0234 One-Way Downtown Street Pilot 13,000 225,686 - - - - 238,686 0420 Annual Storm Drain Improvement Prj - 300,000 150,000 - - - 450,000 0128 Pilot School Busing Program 350,216 63,964 - - - - 414,180 New Projects 0129 ADA Transition Plan - 110,000 - - - - 110,000 0237 Highway 17/9 Interchange and Capacity Improvements - 600,000 - - - - 600,000 0235 Downtown Revitalization - 1,000,000 - - - - 1,000,000 Total Street Improvement Projects 1,339,479$ 10,673,050$ 6,060,331$ -$ -$ 65,000$ 18,137,860$ 2022/23 Budget 2019/20 Budget & Carryfwd* FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM 2020/21 Budget STREET IMPROVEMENT PROJECTS Total Budgeted 2021/22 Budget 2023/24 Budget Expended Through 2018/19 PROPOSED STREETS PROGRAM Street Improvements C-32 LOS GATOS BLVDBLOSSOM HILL R D SHANNO N R D Project Name Los Gatos Boulevard/Shannon Road Improvements Project Number 813-0213 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will create a new pedestrian signalized crossing and restripe Shannon Road to provide longer turn lanes and improve the overall safety for pedestrians and bicyclists. The project will be coordinated with any potential development of adjacent parcels. Location This project is located at the intersection of Los Gatos Boulevard and Shannon Road. Project Background The intersection of Los Gatos Boulevard and Shannon Road is a heavily used area, especially during the morning and afternoon school and commute hours. To improve the safe operation of this intersection, a new pedestrian push button signal will be installed and also new striping on Shannon Road will provide a longer turn lane onto Los Gatos Boulevard. Should a development project occur at this location, that project will take on this work and the Town funding will revert to the source of funds in future budget cycles Operating Budget Impacts This project will use staff time for design and construction. Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. PROPOSED STREETS PROGRAM Street Improvements C-33 Project Components & Estimated Timeline Fall 2019 Preliminary Design Project design & development Spring 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL SOURCE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 20,000 - 20,000 - - - - 20,000 TOTAL TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL USE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ LOS GATOS BOULEVARD / SHANNON IMPROVEMENTS Project 813-0213 PROPOSED STREETS PROGRAM Street Improvements C-34 HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name Downtown Parking Lots Seal Coat & Restriping Project Number 817-0705 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will resurface downtown parking lots by applying a seal coat and then restriping. Location This project is located at various Town-owned parking lots in downtown Los Gatos. Project Background The public parking lots in downtown Los Gatos are heavily used on a daily basis. In order to keep their surfaces in good condition and prevent long term wear and damage, the parking lots need to be resurfaced and restriped. This project is necessary to prevent possible drainage or broken pavement problems in the future. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-35 Project Components & Estimated Timeline Winter 2020 Preliminary Design Project design & development Spring 2020 Final Design Project bidding & contract award Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 24,915$ -$ 75,085$ -$ 75,085 -$ -$ -$ -$ 100,000$ TOTAL SOURCE OF FUNDS 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 24,915 - 75,085 - 75,085 - - - - 100,000 TOTAL GFAR 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ TOTAL USE OF FUNDS 24,915$ -$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ DOWNTOWN PARKING LOTS SEAL COAT & RESTRIPING Project 817-0705 PROPOSED STREETS PROGRAM Street Improvements C-36 Project Name Hernandez Avenue Storm Drain Improvements Project Number 816-0409 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will improve the Hernandez Avenue storm drain system with the installation of an underground storm drain pipe and sidewalk above. Location The storm drain project is located on the south side of Hernandez Avenue, between Walnut Avenue and Wissahickon Avenue. Project Background Hernandez Avenue is a hillside collector street with an incomplete sidewalk network and storm drain systems alongside the roadway. This street averages over 1,000 vehicles per day, a normal amount for a collector street. At previous neighborhood meetings, residents indicated an interest in having continuous sidewalks, particularly in the area where an open storm drain exists. This project proposes to install an underground storm drain pipe into the existing ditch and put a concrete sidewalk, curb, and gutter system along the roadway to feed runoff water into the storm drain pipe. This street improvement addresses several neighborhood needs, including an improved drainage system, a safer pedestrian area, and an improved appearance of the neighborhood. This project will be funded by the Storm Basin Fund. This project is scheduled for construction in FY 2022/23. Operating Budget Impacts Ongoing operating costs would be significantly reduced as this project would eliminate the need to clean or repair the existing open ditch. Engineering staff time associated with these projects will be charged to the project as it is delivered in FY 2022/23. LO S G A T O S - S A R A T O G A R D HWY 17N SANTA CRUZ AVUNIVERSITY AV PROPOSED STREETS PROGRAM Street Improvements C-37 Project Components & Estimated Timeline Fall 2021 Design Design project, include alternative methods and estimated costs, and determine best outcome Winter 2022 Bid Process Obtain bids from licensed contractors and submit to Council for approval Summer 2023 Construction Construction of storm drains and related street improvements Fall 2023 Completion Project completed Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #3 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL SOURCE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #3 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 17,180 - - - - - - - 65,000 82,180 TOTAL STORM BASIN 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL USE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ HERNANDEZ AVENUE STORM DRAIN IMPROVEMENTS Project 816-0409 PROPOSED STREETS PROGRAM Street Improvements C-38 HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name 224 West Main Property Acquisition (Parking Lot 6) Project Number 817-0704 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project, carried forward from previous years, allocates funding from the GFAR Parking Reserve for the purchase of property (formerly 224 West Main Street) for Parking Lot 6. Location This project is located at Parking Lot 6, which is at 224 West Main Street. Project Background In 2009, the Town purchased a property next to Parking Lot 6 to expand the existing parking lot. This property was purchased by Town Housing/Redevelopment Agency (RDA) funds. Because the State dissolved redevelopment agencies, it is necessary that the Town use an alternative funding source for this purchase if affordable housing is not constructed at this site. Reserve funds for GFAR are identified for this use. Staff is recommending proceeding with the transfer of funds in the FY 2019/20 budget to complete this action. Operating Budget Impacts This project would use staff time for processing of the new property purchase. The staff time for this project is included in the FY 2019/20 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-39 Project Components & Estimated Timeline Fall 2019 Estimated Completion Property purchase and funding completed. Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$ TOTAL SOURCE OF FUNDS 3,813$ -$ 1,231,100$ -$ -$ -$ -$ -$ -$ 1,234,913$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 3,813 - 1,231,100 - 1,231,100 - - - - 1,234,913 TOTAL GFAR 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$ TOTAL USE OF FUNDS 3,813$ -$ 1,231,100$ -$ 1,231,100$ -$ -$ -$ -$ 1,234,913$ 224 WEST MAIN PROPERTY ACQUISITION (PARKING LOT 6)Project 817-0704 PROPOSED STREETS PROGRAM Street Improvements C-40 LOS GATOS BLVDBLOSSOM HILL RD SHANNON R D Project Name Sidewalk Improvements/Shannon/Los Gatos Blvd/Cherry Blossom Lane Project Number 813-0218 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb and gutter along the north side of Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane, completing the pedestrian link between the two roads. Location The project is located on Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane. Project Background Shannon Road is a heavily traveled two-lane roadway, especially when the schools are in session. Shannon Road is used by residents dropping off students at various schools, such as Blossom Hill Elementary, Van Meter Elementary, and Fisher Middle Schools. In addition, many parents walk their children to school along this segment of roadway. Shannon Road currently has intermittent sections of sidewalk on the south side of the roadway between Los Gatos Boulevard and Cherry Blossom Lane. Most pedestrians cross Shannon Road to walk along the south side, while some walk along the unimproved shoulder on the north side. This project will complete the sidewalk segment on the north side of the roadway and reduce congestion at Shannon Road and Cherry Blossom Lane, where a 3-way stop is inundated by crossing students, crossing guards, and vehicle traffic during peak school hours. With the proposed sidewalk, pedestrians will be encouraged to walk along the north side of Shannon Road, thus reducing the number of pedestrians crossing Shannon Road. In June 2018 the Town was awarded federal funding of $940,100 by the Santa Clara Valley Transportation Authority (VTA) in the Vehicle Emissions Reductions Based at Schools (VERBS) Grant Program to support this project. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2018/19 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-41 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2019 Bid process Project bidding & contract award Summer 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ GRANTS & AWARDS - - - - - 940,100 - - - 940,100$ UTILITY UNDERGROUNDING - - - - 119,204 - - - 119,204$ TOTAL SOURCE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ 1,059,304$ -$ -$ -$ 1,189,304$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed $ - USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 104 - 129,896 - 129,896 - - - - 130,000 TOTAL GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - 940,100 - - - 940,100 TOTAL GRANTS & AWARDS -$ -$ -$ -$ -$ 940,100$ -$ -$ -$ 940,100$ UNDERGROUND UTILITIES Salaries and Benfits -$ -$ -$ -$ -$ -$ -$ -$ -$ 940,100$ Services/Supplies/Equipment - - - - - - - - - - Site Acqusition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - 119,204 - - - 119,204 TOTAL UNDERGROUND UTILITIES -$ -$ -$ -$ 119,204$ -$ -$ -$ 119,204$ TOTAL USE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ 1,059,304$ -$ -$ -$ 1,189,304$ SIDEWALK IMPROVEMENTS/SHANNON/LOS GATOS BLVD/CHERRY BLOSSOM LANE Project 813-0218 PROPOSED STREETS PROGRAM Street Improvements C-42 TOWN-WIDE Project Name Sidewalk Improvements – Multiple Locations Project Number 813-0221 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb, and gutter on the north side of Kennedy Road from Ferris Avenue to Los Gatos Boulevard and on the south side of Mitchell Avenue from George Street to Fisher Avenue. Location This project is located in the following areas: Kennedy Road from Ferris Avenue to Los Gatos Boulevard; Mitchell Avenue from George Street to Fisher Avenue; and Los Gatos Boulevard/Shannon Road. Project Background Kennedy Road from Ferris Avenue to Los Gatos Boulevard currently has a shoulder that is heavily utilized by parents and students walking and biking to school in the morning and afternoons. The sidewalk improvements will complete the connection in this residential block. In 2009, the Town completed the sidewalk installation on the north side of Mitchell Avenue from George Street to Fisher Avenue. Then in 2012, sidewalk was constructed on north and south side of Mitchell Avenue between Los Gatos Boulevard and George Street as part of the redevelopment of the former Honda site. This project will complete the last component of the sidewalks in this heavily utilized pedestrian area between Van Meter Elementary and Fisher Middle Schools. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2019/20 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-43 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2019 Bid process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 60,000 - 60,000 - - - - - TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ SIDEWALK IMPROVEMENTS - MULTIPLE LOCATIONS Project 813-0221 PROPOSED STREETS PROGRAM Street Improvements C-44 HWY 17LOS GATOS BLVDLOS GAT O S - ALMADEN RD Project Name Utility Undergrounding Improvements Project Number 813-0225 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will remove utilities from above ground poles and install them underground. Location This project is located on Los Gatos Boulevard between Lark Avenue and Chirco Drive. Project Background Through the State of California’s Public Utilities Commission, Pacific Gas & Electric (PG&E) collects funds from ratepayers to provide for the undergrounding of utilities. These funds grow in reserve called Rule 20A funds, until such time that local jurisdictions identify an area for this project and begin working with PG&E. The funds are limited to use on roadways where traffic is heavy, making Los Gatos Boulevard a viable location. The Town’s allocation of Rule 20A funds has grown to the point where there is now approximately $3.8M available for programming. These funds will never actually come to the Town, but rather PG&E will deliver the project with coordination from Town staff. In addition to the Rule 20A funds, the Town collects developer fees for utility undergrounding. These funds are held by the Town for future projects. Staff has asked PG&E to look at an expanded project scope utilizing some or all of the Town funds as well. This will take full advantage of economies of scale through design and construction. The timeframe for PG&E to deliver Rule 20A projects has been between seven and ten years; however, indications are that this project may begin sooner. Funds have been moved to demonstrate a start of construction in FY 2019/20, with the bulk of the work occurring in FY 2020/21. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $266,000 over the five-year term of the project or 4% of the total project cost. Project costs are significantly lower on this project due to the efficiencies in the project size and a larger proportion of work that will be coordinated by PG&E. PROPOSED STREETS PROGRAM Street Improvements C-45 Project Components & Estimated Timeline Fall 2019 Design Project design & development Summer 2020 Construction Project construction begins Summer 2021 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) UTILITY UNDERGROUNDING -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ TOTAL SOURCE OF FUNDS -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) UTILITY UNDERGORUNDING Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 2,330,000 - 2,330,000 4,436,000 - - - 6,766,000 TOTAL GFAR -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ TOTAL USE OF FUNDS -$ -$ 2,330,000$ -$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ UTILITY UNDERGROUNDING IMPROVEMENTS Project 813-0225 PROPOSED STREETS PROGRAM Street Improvements C-46 Project Name Cut-Through Traffic/Wood Road Roundabout Project Number 813-0229 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will provide infrastructure changes to help mitigate cut-through traffic. Location This project is located at South Santa Cruz Avenue and Wood Road. Project Background This project aims to mitigate cut-through traffic through the use of various measures, some of which have been previously used. In the summer of 2015, staff implemented various measures such as the deployment of portable message signs, messages on Caltrans changeable message signs, signal modifications, and temporary street closures to reduce cut-through traffic. In the summers of 2016 and 2017, this project included signal modifications and synchronization at various intersections, roadway markings and additional signage, as well as costs associated with the temporary closure of south Santa Cruz Avenue at Wood Road and associated data collection. In FY 2019/20, funding will be used to advance the design of a permanent traffic circle at Santa Cruz Avenue at Wood Road, potential street closures, and neighborhood turn restriction signage as needed. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-47 Project Components & Estimated Timeline Winter 2019 Design Coordinate and design project Summer 2020 Construction Install infrastructure and implement projects Fall 2020 Completion Assess Results Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 206,324$ 57,380$ 86,296$ -$ 86,296$ -$ -$ -$ -$ 350,000$ TRAFFIC MITIGATION 175,417 36,356 228,135 - 228,135 - - - - 439,908$ TOTAL SOURCE OF FUNDS 381,741$ 93,736$ 314,431$ -$ 314,431$ -$ -$ -$ -$ 789,908$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 206,324 57,380 86,296 - 86,296 - - - - 350,000 TOTAL GFARS 206,324$ 57,380$ 86,296$ -$ 86,296$ -$ -$ -$ -$ 350,000$ TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 175,417 36,356 228,135 - 228,135 - - - - 439,908 TOTAL TRAFFIC MITIGATIONS 175,417$ 36,356$ 228,135$ -$ 228,135$ -$ -$ -$ -$ 439,908$ TOTAL USE OF FUNDS 381,741$ 93,736$ 314,431$ -$ 314,431$ -$ -$ -$ -$ 789,908$ CUT-THROUGH TRAFFIC / WOOD ROAD ROUNDABOUT Project 813-0229 PROPOSED STREETS PROGRAM Street Improvements C-48 Project Name Traffic Signal Modernization Project Number 813-0227 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will modernize the Town’s traffic signal controllers. Location This project is located Town-wide. Project Background This project will modernize the Town’s traffic signal controllers to allow for greater control by staff, ensure that the current system meets current safety standards, and increase the traffic flow. The Town was awarded several grants through the VTA and the MTC for $1,200,000 of the project budget to complement the Town’s investment of Traffic Impact Mitigation Funds. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-49 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Winter 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATION 4,200$ 120,800$ 230,738$ 332,524$ 563,262$ 415,027$ -$ -$ -$ 1,103,289$ GRANTS & AWARDS 10,799 40,033 1,775,568 - 1,775,568$ - - - - 1,826,400 TOTAL SOURCE OF FUNDS 14,999$ 160,833$ 2,006,306$ 332,524$ 2,338,830$ 415,027$ -$ -$ -$ 2,929,689$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 4,200 120,800 230,738 332,524 563,262 415,027 - - - 1,103,289 TOTAL TRAFFIC MITIGATIONS 4,200$ 120,800$ 230,738$ 332,524$ 563,262$ 415,027$ -$ -$ -$ 1,103,289$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 10,798.58 40,033 1,775,568 - 1,775,568 - - - - 1,826,400 TOTAL GRANTS & AWARDS 10,799$ 40,033$ 1,775,568$ -$ 1,775,568$ -$ -$ -$ -$ 1,826,400$ TOTAL USE OF FUNDS 14,999$ 160,833$ 2,006,306$ 332,524$ 2,338,830$ 415,027$ -$ -$ -$ 2,929,689$ TRAFFIC SIGNAL MODERNIZATION Project 813-0227 PROPOSED STREETS PROGRAM Street Improvements C-50 Project Name Bicknell Road Storm Drain Improvements Project Number 816-0410 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will reroute a Town storm drain line. Location This project is located on Bicknell Road near Montclair. Project Background This project will provide design services for the rerouting of an existing Town storm drain line from private property, after it was determined that the Town does not have a storm drain easement. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2019/20 Operating Budget. QUITO RDBICKNELL RD HWY 9 PROPOSED STREETS PROGRAM Street Improvements C-51 Project Components & Estimated Timeline Fall 2017 Design Project design & development Fall 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #3 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$ TOTAL SOURCE OF FUNDS 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #2 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 120,742 - 50,758 - 50,758 - - - - 171,500 TOTAL STORM BASIN 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$ TOTAL USE OF FUNDS 120,742$ -$ 50,758$ -$ 50,758$ -$ -$ -$ -$ 171,500$ BICKNELL ROAD STORM DRAIN IMPROVEMENTS Project 816-0410 PROPOSED STREETS PROGRAM Street Improvements C-52 Project Name Bicycle & Pedestrian Improvements Project Number 813-0231 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will enhance bicycle and pedestrian safety and mobility throughout the Town. Location This project is located Town-wide. Project Background This project will enhance bicycle and pedestrian safety and mobility Town-wide in the form of multiple projects. As has been done in the previous years, staff will continue to work with Safe Routes to School, Town Commissions, the Town Council, and the general public on prioritizing projects that have been recommended in the Council adopted Bicycle and Pedestrian Master plan. In addition, this money will be used as matching funds for available grants related to Town bicycle and pedestrian projects. In the past the Town received Transportation Fund for Clean Air for bicycle and pedestrian improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-53 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Winter 2019 Construction Project construction Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 61,450$ 22,728$ 515,822$ 300,000$ 815,822$ -$ -$ -$ -$ 900,000$ GRANTS & AWARDS - - 281,500 - 281,500 - - - - 281,500 TRAFFIC MITIIGATION 40,972 31,628 2,400 - 2,400 - - - - 75,000 TOTAL SOURCE OF FUNDS 102,422$ 54,356$ 799,722$ 300,000$ 1,099,722$ -$ -$ -$ -$ 1,256,500$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 61,450 22,728 515,822 300,000 815,822 - - - - 900,000 TOTAL GFAR 61,450$ 22,728$ 515,822$ 300,000$ 815,822$ -$ -$ -$ -$ 900,000$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses - - 281,500 - 281,500 - - - - 281,500 TOTAL GRANTS & AWARDS -$ -$ 281,500$ -$ 281,500$ -$ -$ -$ -$ 281,500$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses 40,972 31,628 2,400 - 2,400 - - - - 75,000 TOTAL TRAFFIC MITIGATION 40,972$ 31,628$ 2,400$ -$ 2,400$ -$ -$ -$ -$ 75,000$ TOTAL USE OF FUNDS 102,422$ 54,356$ 799,722$ 300,000$ 1,099,722$ -$ -$ -$ -$ 1,256,500$ BICYCLE & PEDESTRIAN IMPROVEMENTS Project 813-0231 PROPOSED STREETS PROGRAM Street Improvements C-54 Project Name Stormwater Master Plan Project Number 816-0413 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will develop a Stormwater Master Plan. Location This project is located Town-wide. Project Background The Town of Los Gatos does not currently have an adopted Stormwater Master Plan. This project will develop a Stormwater Collection System Master Plan and provides the Town of Los Gatos with the necessary planning tools and capital improvement projects to address flood management and water quality within the collector portion of the storm drainage system. The Plan will be developed to help the Town meet its overarching environmental and economic goals. The goal of the Stormwater Master Plan is to manage stormwater runoff proactively to protect water quality and to minimize impacts of localized and downstream flooding by identifying infrastructure improvements for the collection, conveyance, and treatment of stormwater runoff within the Town. The Stormwater Master Plan will prioritize storm drain and water quality improvements within the Town and provides an implementation plan for the construction of conveyance and water quality improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-55 Project Components & Estimated Timeline Summer 2019 Design Develop request for proposals Fall 2019 Bid Process Award consultant agreement Winter 2019 Report Conduct study Spring 2020 Completion Finalize report Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$ TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 200,000 - 200,000 - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ STORMWATER MASTER PLAN Project 816-0413 PROPOSED STREETS PROGRAM Street Improvements C-56 Project Name Stormwater System – Pollution Prevention Compliance Project Number 816-0414 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will install improvements, such as trash capture devices, to reduce pollution in the storm water system. Location This project is located Town-wide. Project Background This project will install solutions, such as multiple trash capture devices in storm inlets, throughout the Town to meet the Municipal Regional Permit Provision C.10 trash reduction requirements. The Town has submitted a plan to meet the requirement to reduce trashload impacts to creeks which are 70% by 2017 and 100% by 2022. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-57 Project Components & Estimated Timeline Summer 2019 Design Project design & development Winter 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$ TOTAL SOURCE OF FUNDS -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 1,422 298,578 - 298,578 - - - - 300,000 TOTAL GFAR -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$ TOTAL USE OF FUNDS -$ 1,422$ 298,578$ -$ 298,578$ -$ -$ -$ -$ 300,000$ STORMWATER SYSTEM - POLLUTION PREVENTION COMPLIANCE Project 816-0414 PROPOSED STREETS PROGRAM Street Improvements C-58 Project Name Public Arts Gateway Project Number 821-2009 Department Library Project Manager Library Director: Ryan Baker Description This project will install a public art at a gateway location. Location This project is located on Highway 9 near Alberto Way. Project Background The Arts and Culture Commission identified this project as a way to enhance the appearance of the entrances into Los Gatos. At the January 31, 2017 Priority Setting, Council identified $25,000 for public art and on April 18, 2017 the Arts and Culture Commission proposed the gateway project as the best use of the funds, which Council approved. This project will install the first phase of artwork at Town entrances based on the Town’s Public Art Selection Policy and Procedures. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2019/20 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-59 Project Components & Estimated Timeline Winter 2018 Call for artist Project design & award Fall 2019 Award Select final design & award Summer 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000 TOTAL GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ PUBLIC ARTS GATEWAY PROJECT 821-2009 PROPOSED STREETS PROGRAM Street Improvements C-60 Project Name Downtown Parking Study Project Number 813-0233 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will fund a consultant to examine parking holistically in the downtown and high school areas. Location This project is located downtown and near Los Gatos High School. Project Background The project scope will include the following: • Analyze existing parking capacity. • Provide a recommendation for residential (permit area parking, especially as it is impacted around Los Gatos High School. • Provide recommendations for parking management for time limited parking. • Analyze paid parking. • Provide best practices recommendations for managing employee parking. • Identify the need for additional parking capacity vis-a-vis a parking structure. • Review the impacts of one-way streets on parking capacity. Once complete, this project will inform decision making for project 817-0704 – 224 West Main Street Property Acquisition (Parking Lot 6). Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-61 Project Components & Estimated Timeline Winter 2018 Design Develop request for proposals Winter 2018 Bid Process Award consultant agreement Spring 2019 Report Conduct study Fall 2019 Completion Finalize report Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 200,000 - 200,000 - - - - - Project Construction Expenses - - - - - - - - - 200,000 TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ DOWNTOWN PARKING STUDY Project 813-0233 PROPOSED STREETS PROGRAM Street Improvements C-62 HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name One-Way Downtown Street Pilot Project Number 813-0234 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will fund the implementation of a one-way streets pilot. Location This project is located downtown on North Santa Cruz Avenue and University Avenue. Project Background This project will fund a trial of one-way streets for North Santa Cruz and University Avenues between Highway 9 and Main Street. Operating Budget Impacts This project will use staff time for management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-63 Project Components & Estimated Timeline Spring 2019 Design Project design & development Summer 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR - 13,000 225,686 - 225,686 - - - - 238,686 TOTAL SOURCE OF FUNDS - 13,000 225,686 - 225,686 - - - - 238,686 Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 13,000 225,686 - 225,686 - - - - 13,000 GFAR - 13,000 225,686 - 225,686 - - - - 238,686 TOTAL USE OF FUNDS - 13,000 225,686 - 225,686 - - - - 238,686 ONE-WAY DOWNTOWN STREET PILOT Project 813-0234 PROPOSED STREETS PROGRAM Street Improvements C-64 Project Name Annual Storm Drain Improvement Project Project Number 816-0420 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will install infill storm drain systems that are required to enhance safety and improve infrastructure to accept water runoff. Location This project is located Town-wide. Project Background The Town is responsible for keeping Town roads clear of excessive water and managing storm water running down Town streets. Storm drain improvements in the Town right of ways and parking lots are necessary to manage water drainage issues within these Town locations. The intent of this project is to keep pace with the needs of the Town’s storm drain system to prevent flooding in the Town right of ways. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-65 Project Components & Estimated Timeline Summer 2019 Design Project design & development Winter 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #1 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ STORM BASIN #2 - - 50,000$ 50,000 100,000 50,000 - - - 150,000$ STORM BASIN #3 - - 50,000$ 50,000 100,000 50,000 - - - 150,000$ TOTAL SOURCE OF FUNDS -$ -$ 150,000$ 150,000$ 300,000$ 150,000$ -$ -$ -$ 450,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) STORM BASIN #1 Project Construction Expenses - - 50,000 50,000 100,000 50,000 - - - 150,000$ TOTAL STORM BASIN #1 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ STORM BASIN #2 Project Construction Expenses -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ TOTAL STORM BASIN #2 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ STORM BASIN #3 Project Construction Expenses -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ TOTAL STORM BASIN #3 -$ -$ 50,000$ 50,000$ 100,000$ 50,000$ -$ -$ -$ 150,000$ TOTAL USE OF FUNDS -$ -$ 150,000$ 150,000$ 300,000$ 150,000$ -$ -$ -$ 450,000$ ANNUAL STORM DRAIN IMPROVEMENT PROJECT Project 816-0420 PROPOSED STREETS PROGRAM Street Improvements C-66 Project Name Pilot School Busing Project Number 812-0128 Department Parks & Public Works Project Manager Transportation & Mobility Manager: Ying Smith Description This project will explore congestion relief through piloting school bus service. The pilot school bus service will provide morning and afternoon routes to and from school, with neighborhood-based stops. The Town is contracting with a qualified school bus transportation provider through a RFP process. The service schedule and designated pick up and drop off locations are published. Interested families may purchase an annual pass to reserve a seat. The pilot program will provide two routes for a total of 18 months from January 2019 to June 2020. Location This project is located Town-wide. Project Background The Town of Los Gatos and the school community have been exploring new transit services customized to meet the needs of students traveling to and from schools. The primary areas of interest are corridors with the highest level of traffic congestion. Town staff and a consulting team completed a Congestion Relief School Bus Feasibility Study in 2018. The Town Council, at its June 5, 2018 meeting, authorized staff to proceed with a school bus pilot program. At its September 18, 2018 meeting, the Town Council authorized funding to provide a pilot service consisting of two routes for 18 months of service. The two-route pilot service started on January 7, 2019 and will continue for school year 2019/20 Operating Budget Impacts The pilot program is funded by the Town as well as fare revenue. This project will use staff time for service design. PPW staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-67 Project Components & Estimated Timeline Summer 2018 Design Service plan design, marketing, customer sign up Fall 2018 Bid Process RFP & service contract award, finalize service plan Winter 2019 Service Launch Provide Pilot Service Summer 2020 Completion Completion of 18 months of pilot service Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$ TOTAL SOURCE OF FUNDS -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFARSalaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 350,216 63,964 - 63,964 - - - - 414,180 TOTAL GFAR -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$ TOTAL USE OF FUNDS -$ 350,216$ 63,964$ -$ 63,964$ -$ -$ -$ -$ 414,180$ PILOT SCHOOL BUSING PROGRAM Project 812-0128 PROPOSED STREETS PROGRAM Street Improvements C-68 TOWN-WIDE Project Name ADA Transition Plan Project Number 812-0129 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will update the Town’s ADA Transition Plan as required. Location This project is located Town-wide. Project Background The Americans with Disabilities Act (ADA), enacted on July 26, 1990, provides comprehensive rights to persons with disabilities in different areas including access to public accommodations and transportation. The ADA requires that all public agencies develop a transition plan for eliminating barriers for persons with disabilities. The Town’s ADA Transition Plan has not been updated since 1994, and it is necessary to develop programs that comply with the new standards Operating Budget Impacts This project will use staff time for management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-69 Project Components & Estimated Timeline Fall 2019 Design Develop request for proposals Winter 2020 Bid Process Award consultant agreement Spring 2020 Report Conduct study Summer 2020 Completion Finalize report Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - 110,000 110,000 - - - - 110,000 Project Construction Expenses - - - - - - - - - - TOTAL GRANTS & AWARDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$ TOTAL USE OF FUNDS -$ -$ -$ 110,000$ 110,000$ -$ -$ -$ -$ 110,000$ ADA TRANSITION PLAN Project 812-0129 PROPOSED STREETS PROGRAM Street Improvements C-70 Project Name Highway 17/9 Interchange and Capacity Improvements Project Number 813-0237 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description These funds will be used as a local match necessary to begin a conceptual study for improvements at Highway 9 and Highway 17. Location This project is located on Highway 9 and Highway 17. Project Background The Countywide 2016 Measure B sales tax measure includes investments in the regional transportation infrastructure across nine program areas. The Santa Clara Valley Transportation Authority (VTA) manages the 2016 Measure B program and the VTA Board approves project prioritization and funding. The VTA approved the first set of projects on a two-year budget cycle with a ten-year look ahead at potential projects. Through the process to establish the structure of and projects included in the 2016 Measure B, the Town proposed upgrades to the interchange at Highway 9 and Highway 17 as its major project in the Highway category. In reviewing the project with VTA, an opportunity exists to include two options for modifications to Highway 17 through Los Gatos. The first includes efficiency improvements such as adding auxiliary lanes and realigning existing lanes. Auxiliary lanes might include continuing the on- ramp from Lark Avenue south to the Highway 9 off-ramp, facilitating a smoother transition of traffic. The second is an expanded version that could include the addition of travel lanes on Highway 17 within the existing right of way. VTA approved 2016 Measure B funds to bring the project through preliminary design and environmental review. The allocation of 2016 Measure B funds requires at least a 10 percent contribution from non-2016 Measure B sources. While the Town is pursuing outside funds for the match, this project would set aside Town funds if needed. Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-71 Project Components & Estimated Timeline Summer 2020 Design Project design & development Summer 2021 Design Review Review of Design Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITAGATION -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITAGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 600,000 600,000 - - - - 600,000 TOTAL TRAFFIC MITIGATION -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$ TOTAL USE OF FUNDS -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ 600,000$ HIGHWAY 17/9 INTERCHANGE & CAPACITY IMPROVEMENTS Project 813-0237 PROPOSED STREETS PROGRAM Street Improvements C-72 HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name Downtown Revitalization Project Number 813-0235 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description These funds will be used as initial funding for a larger Downtown revitalization project. Location This project is located downtown. Project Background The Downtown infrastructure has aged and needs updating to continue to attract customers and facilitate maintenance. This initial funding set aside is in preparation for a future project to reinvent the Downtown. Current efforts that include a one-way street pilot on North Sant Cruz Avenue, a comprehensive downtown parking study, and increased attention to maintenance of landscape and hardscape will inform a future streetscape upgrade. Progress and expenditures on this project will occur only following ongoing discussion and direction from the Town Council. Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-73 Project Components & Estimated Timeline Summer 2020 Design Project design & development TBD Future project milestones Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$ . TOTAL SOURCE OF FUNDS -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 1,000,000 1,000,000 - - - - 1,000,000 TOTAL GFAR -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$ TOTAL USE OF FUNDS -$ -$ -$ 1,000,000$ 1,000,000$ -$ -$ -$ -$ 1,000,000$ DOWNTOWN REVITALIZATION Project 813-0235 PROPOSED STREETS PROGRAM Street Improvements C-74 PROPOSED STREETS PROGRAM Bridge Projects C-75 PROJECT LOCATIONS A Quito Road - Bridge Replacement B Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design PROPOSED STREETS PROGRAM Bridge Projects C-76 PROGRAM SECTION DIRECTORY PAGE 0801 Quito Road - Bridge Replacement C – 78 0803 Highway 17 Bicycle & Pedestrian Bridge – Preliminary Design C – 80 PROPOSED STREETS PROGRAM Bridge Projects C-77 The Streets Program’s Bridge Projects section contains Capital Improvement Program projects that repair, replace, or rehabilitate a deficient bridge structure as the primary scope of work. Bridge structure safety falls under the guidance of state and federal regulations, and bridge projects are often driven by available funding from these jurisdictions, such as Caltrans grant programs or the federal Highway Bridge Replacement and Rehabilitation (HBRR) program. Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s bridges, and relies upon grant programs for major bridge improvement projects. BRIDGE PROJECTS SUMMARY Carryforward Projects 0801 Quito Road - Bridge Replacement 64,594$ 235,087$ -$ -$ -$ -$ 299,681$ 0803 Highway 17 Bicycle & Pedestrian Bridge - Preliminary Design - 200,000 - - - - 200,000 Total Bridge Projects 64,594$ 435,087$ -$ -$ -$ -$ 499,681$ BRIDGE PROJECTS 2023/24 Budget FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM 2022/23 Budget 2021/22 Budget 2020/21 Budget 2019/20 Budget & Carryfwd* Expended Through 2018/19 Total Budgeted * Total FY 2018/19 Carryforward $435,087 PROPOSED STREETS PROGRAM Bridge Projects C-78 Project Name Quito Road - Bridge Replacement Project Number 818-0801 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project funds the Town’s portion of the replacement cost for two bridges on Quito Road to improve roadway safety and provide adequate storm water flow capacity in the creek under the bridge. Location The two Quito Road bridges span a tributary of San Tomas Aquino Creek. The bridges are located on Quito Road in the vicinity of Old Adobe Road, approximately 1½ miles north of Highway 9, on the common boundary line between the City of Saratoga and the Town of Los Gatos. Project Background San Tomas Aquino Creek is under the jurisdiction of the Santa Clara Valley Water District (SCVWD), while the replacement of the bridges is the shared responsibility of the City of Saratoga and the Town of Los Gatos. Both bridges are approximately ninety years old and have been classified “structurally deficient” under Caltrans guidelines. In addition, both bridges are not adequate to receive 100-year flood flows. In 2001, the City of Saratoga, the project sponsor, secured partial funding (80%) through the federal Highway Bridge Replacement and Rehabilitation (HBRR) program to replace both bridges with wider span structures that will allow the 100-year design flood flow to pass underneath. Saratoga is the lead agency to oversee the design, environmental, right-of-way acquisition, and construction services for the project. The City of Saratoga, the Town of Los Gatos, and SCVWD agreed to share the duties and responsibilities for the project and the remaining 20% local match funding requirement. After further evaluation of the bridges, it was determined that Quito Road would require reconstruction at each end of the bridge, which in turn requires additional right-of-way acquisitions and environmental reviews under both the State of California (Caltrans) and federal regulations. These changes have made it necessary to redesign this project, significantly increasing the estimated costs. The City of Saratoga has applied for additional funding from Caltrans due to the redesign. As a result of the additional project costs, the local funding match from the City of Saratoga, the Town of Los Gatos, and the SCVWD has increased from $155,000 to $238,000 for each agency. Based on the April 2019 schedule from the City of Saratoga, the construction of these bridges is anticipated to be completed by 2021. Operating Budget Impacts Engineering staff time for coordination of this project with the City of Saratoga is incorporated into the Saratoga Operating Budget. HWY 8 5POLLARD R D QUITO RD PROPOSED STREETS PROGRAM Bridge Projects C-79 Project Components & Estimated Timeline Jan 2001 Grant Funding The City of Saratoga obtained grant funding from the federal HBRR program Oct 2001 Cooperative Agreement Council approved a cooperative agreement with the City of Saratoga and SCVWD for the replacement of the two bridges May 2002 Preliminary Design City of Saratoga started preliminary design 2013 Right of way Right of way acquisition process is ongoing and environmental permitting is underway 2015 Final Design Design completed and project bidding by the City of Saratoga April 2020 Construction Start Begin reconstruction of bridge. Summer 2021 Completion Construction is anticipated to be complete in 2021. Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ TOTAL SOURCE OF FUNDS 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 64,594 - 235,087 - 235,087 - - - - 299,681 TOTAL GFAR 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ TOTAL USE OF FUNDS 64,594$ -$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ QUITO ROAD - BRIDGE REPLACEMENT Project 818-0801 PROPOSED STREETS PROGRAM Bridge Projects C-80 LOS GATOS BLVDHWY 17N SANTA CRUZ AVBLOSSOM HIL L R D SHANNON R DUNIVERSITY AV Project Name Highway 17 Bicycle & Pedestrian Bridge Preliminary Design Project Number 818-0803 Department Parks & Public Works Project Manager Transportation & Mobility Manager: Ying Smith Description This project will fund the conceptual design for a potential bicycle and pedestrian bridge. Location This project is located at Blossom Hill Road or Nino Way over Highway 17. Project Background Crossing Highway 17 in the project vicinity is a barrier for bicyclists and pedestrians. This is a suggested path included in the Safe Routes to School Phase 1 Study. Improvements for Highway 17 crossing have been included in several policy documents. The Bicycle and Pedestrian Master Plan (BPMP) identified the Nino Avenue Bridge over Highway 17 as one of the new bike/pedestrian bridge connections. The Town’s General Plan identified widening the Blossom Hill Road Bridge over Highway 17 for bicyclists and pedestrians. The project is also included in the Traffic Impact Mitigation Fee program and the Town’s submittals to the VTA’s Valley Transportation Plan 2040. Implementing long-term and complex capital projects requires a strategic financing plan. Obtaining the first round of funding at the critical time is the key to initiate the process. Most funding programs either require or prioritize projects that are “shovel ready.” This funding allocation will advance the project to enable greater competition for funding of later phases. In future years, additional funds will be needed for environmental clearance, right-of-way, and final design. It is estimated that additional $800,000 will be required to complete all engineering and design work, over approximately three to five years. The construction cost will be in the $5 to $10 million range. Staff will continue to seek grant funding to complete this project. Completing the first step would enhance the Town’s access to a combination of funds available through competitive opportunities. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Bridge Projects C-81 Project Components & Estimated Timeline Summer 2019 Design Project design & development TBD Future Phases Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 147,005$ -$ 147,005$ -$ -$ -$ -$ 147,005$ GRANTS & AWARDS - - 52,995 - 52,995$ - - - - 52,995 TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 147,005 - 147,005 - - - - - Project Construction Expenses - - - - - - - - - - TOTAL TRAFFIC MITIGATION -$ -$ 147,005$ -$ 147,005$ -$ -$ -$ -$ 147,005$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 52,995 - 52,995 - - - - 52,995 Project Construction Expenses - - - - - - - - - - TOTAL GRANTS & AWARDS -$ -$ -$ -$ 52,995$ -$ -$ -$ -$ -$ TOTAL USE OF FUNDS -$ -$ 147,005$ -$ 200,000$ -$ -$ -$ -$ 147,005$ HIGHWAY 17 BICYCLE AND PEDESTRIAN BRIDGE - PRELIMINARY DESIGN Project 818-0803 PROPOSED STREETS PROGRAM Bridge Projects C-82 Parks Program This Page Intentionally Left Blank PROPOSED PARKS AND TRAILS PROGRAM D-1 PARK PROJECT DIRECTORY 4605 Parks Playground Fibar Project D – 6 4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 8 4202 Town Plaza Turf Repairs D – 10 4006 Outdoor Fitness Equipment D – 12 4508 Vegetation Management – Town-wide D – 14 4509 Fence Replacement – Shire Court D - 16 TRAIL PROJECT DIRECTORY 4504 Open Space Trail Upgrades D – 22 4507 Forbes Mill Footbridge Improvements D – 24 4503 Charter Oaks Trail Repair D – 26 4505 Trailhead Connector Project D –28 PROPOSED PARKS AND TRAILS PROGRAM Park Improvement Projects D-2 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-3 PROJECT LOCATIONS A Parks Playground Fibar Project B Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping C Town Plaza Turf Repairs D Outdoor Fitness Equipment E Vegetation Management – Town-wide F Fence Replacement – Shire Court PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-4 PROGRAM SECTION DIRECTORY PAGE 4605 Parks Playground Fibar Project D – 6 4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 8 4202 Town Plaza Turf Repairs D – 10 4006 Outdoor Fitness Equipment D – 12 4508 Vegetation Management – Town-wide D – 14 4509 Fence Replacement – Shire Court D – 16 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-5 The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and basketball or tennis court resurfacing; and park equipment or facility upgrades. The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. The exception to this is the Parks Fibar replacement project. Because Fibar requires regular replacement and infill, this project is scheduled as a bi-annual project. One-time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available. PARK IMPROVEMENT PROJECTS SUMMARY * Total FY 2018/19 Carryforward $349,540 Unfunded Projects • Oak Meadow Park Upgrades • Civic Center Irrigation System Replacement & Upgrade • Turf Renovations - Various Parks • Oak Meadow Park Fencing Upgrades • Oak Meadow Park Restroom Expansion • Park Rehabilitation – La Rinconada Park • Park Rehabilitation –Live Oak Manor Park • Park Rehabilitation – Blossom Hill Park • Plaza Park Improvements PARKS Carryforward Projects 4605 Parks Playground Fibar Project 42,500$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$ 4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - 225,000 4202 Town Plaza Turf Repairs - 28,000 - - - - 28,000 4006 Outdoor Fitness Equipment - 60,000 - - - - 60,000 New Projects 4508 Vegetation Management - Townwide - 200,000 - - - - 200,000 4509 Fence Replacement - Shire Court - 60,000 - - - - 60,000 Total Park Improvement Projects 42,500$ 609,540$ 25,000$ -$ 25,000$ -$ 702,040$ 2019/20 Budget & Carryfwd*2020/21 Budget 2021/22 Budget 2022/23 Budget FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM PARK AND TRAIL IMPROVEMENT PROJECTS Expended Through 2018/19 2023/24 Budget Total Budgeted PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-6 Project Name Parks Playground Fibar Project Project Number 831-4605 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace fibar material at all Town playgrounds. Location This project will be completed at various parks in Los Gatos. Project Background Several Town parks have playground structures that are heavily used by children and their families. Playground safety codes require that the fibar material be spread under and around playground structures to prevent injury to children. Fibar replacement is required when the material is below a specific depth near the playground structure. Fibar is a wood product that degrades over time based on foot traffic and weather conditions. This material should be replaced on a regular, as needed basis. This is an annual CIP project to improve the safety of the Town’s playgrounds. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2018/19 Operating Budget. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-7 Project Components & Estimated Timeline Summer 2019 Scope Project development Summer 2019 Bid Process Project bidding & contract award Summer 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$ TOTAL SOURCE OF FUNDS 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 42,500 - 36,540 - 36,540 25,000 - 25,000 - 129,040 TOTAL GFAR 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$ TOTAL USE OF FUNDS 42,500$ -$ 36,540$ -$ 36,540$ 25,000$ -$ 25,000$ -$ 129,040$ PARKS PLAYGROUND FIBAR PROJECT Project 831-4605 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-8 H W Y 9 W M A I N S T HWY 17N SANTA CRUZ AVUNIVERSITY AV TOWN-WIDE Project Name Creek Trail & Park Pathway & Parking Lot Seal Coat & Striping Project Number 831-4609 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description The project will resurface and restripe park parking lots, pathways, and sections of the Los Gatos Creek Trail. Location The project is located at Belgatos Park, Blossom Hill Park, Live Oak Manor Park, Oak Meadow Park, and the Los Gatos Creek Trail. Project Background The parking lots located in parks and the Los Gatos Creek Trail are heavily used on a daily basis. In order to keep their surfaces in good condition and prevent long term wear and damage, the parking lots and trails need to be resurfaced and striped. This project is necessary to prevent future damages to existing pavement surfaces in the future. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-9 Project Components & Estimated Timeline Summer 2019 Design Project design & development Summer 2019 Bid Process Project bidding & contract award Summer 2019 Construction Project construction Fall 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$ TOTAL SOURCE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 225,000 - 225,000 - - - - 225,000 TOTAL GFAR -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$ TOTAL USE OF FUNDS -$ -$ 225,000$ -$ 225,000$ -$ -$ -$ -$ 225,000$ CREEK TRAIL, PARKS PATHS & PARKING LOTS SEAL AND STRIPING Project 831-4609 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-10 E MAIN STHWY 17N SANTA CRUZUNIVERSITY AVAV Project Name Town Plaza Turf Repairs Project Number 831-4202 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will renovate the turf at Plaza Park. Location The project is located at Town Plaza Park, at the corner of West Main Street and Santa Cruz Avenue. Project Background Plaza Park, located in the heart of downtown Los Gatos, is a popular park and hosts a variety of community events, such as Jazz on the Plazz and the Farmer’s Market. Because of the amount of high foot traffic at this location, the turf is heavily impacted. This project will remove the existing sod and soil. New soil will be added to the area to enhance root growth and to re-grade the ground to mitigate standing water issues. Additionally, along with the installation of new turf grass, minor changes to the irrigation system will be completed to maximize water coverage. The turf was last replaced around 2010. The project will be completed during a period when there is the least impact on scheduled downtown events. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-11 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$ TOTAL SOURCE OF FUNDS -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 28,000 - 28,000 - - - - 28,000 TOTAL GFAR -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$ TOTAL USE OF FUNDS -$ -$ 28,000$ -$ 28,000$ -$ -$ -$ -$ 28,000$ TOWN PLAZA TURF REPAIRS Project 831-4202 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-12 Project Name Outdoor Fitness Equipment Project Number 831-4006 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will install outdoor fitness equipment. Location The project location is still being determined. Project Background The Town was awarded an outdoor fitness rig after attending a California Parks & Recreation Society conference and competing in a competition. The Town will receive equipment that is valued at $30,000 and Town staff will install the equipment at a location to be determined. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-13 Project Components & Estimated Timeline Summer 2019 Scope Project design & development Summer 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 60,000 - 60,000 - - - - 60,000 TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ OUTDOOR FITNESS EQUIPMENT Project 831-4006 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-14 Project Name Vegetation Management – Town-wide Project Number 832-4508 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project funds an ecological assessment to provide guidance for fuel removal in Town open space and right-of-way and the first year of open space fuel reduction. Location The project location is Town open spaces and rights-of-way. Project Background The FEMA-approved Santa Clara Operational Area Hazard Mitigation Plan lists the wildfire hazard for the Town of Los Gatos as “high.” The funding allows for an ecological assessment to provide guidance for fuel removal in Town open spaces and rights-of-way, and funding for the first year of open space fuel reduction. The Town has applied for a FEMA grant for vegetation management work and a portion of these funds may be used for as a funding match for that grant. Operating Budget Impacts This project will use staff time for coordination of the assessment and fuel reduction. Parks staff time associated with this project will be charged to the project as it is delivered. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-15 Project Components & Estimated Timeline Fall 2019 Scope Project scope development Fall 2019 RFP Process Project RFP for ecological assessment Spring 2020 Bid Process Bid to implement fuel reduction Summer 2020 Implementation First season of fuel reduction Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 200,000 200,000 - - - - 200,000 TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ VEGETATION MANAGEMENT - TOWN-WIDE Project 832-4508 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-16 Project Name Fence Replacement – Shire Court Project Number 832-4509 Department Parks & Public Works Project Manager Parks & Public Works Operations Manager: Steve Souza Description This project will replace a failing wood fence against Town open space on Shire Court. Location This project is located on Shire Court. Project Background The existing 2x4 wood fence on Shire Court is rotting and is an essential safety barrier as it sits above a retaining wall and borders open space. It is at the end of its useful life and it needs replacement. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-17 Project Components & Estimated Timeline Summer 2019 Design Project design & development Summer 2019 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR - - - 60,000 60,000 - - - - 60,000 TOTAL SOURCE OF FUNDS - - - 60,000 60,000 - - - - 60,000 Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses - - - 60,000 60,000 - - - - 60,000 TOTAL GFAR - - - 60,000 60,000 - - - - 60,000 TOTAL USE OF FUNDS - - - 60,000 60,000 - - - - 60,000 FENCE REPLACEMENT - SHIRE COURT Project 832-4509 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-18 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-19 PROJECT LOCATIONS A Open Space Trail Upgrades B Forbes Mill Footbridge Improvements C Charter Oaks Trail Repair D Trailhead Connector Project LO S G A T O S - S A R A T O G A R D LOS GATOS BLVDE MAIN STHWY 17HWY 17N SANTA CRUZ AVWINCHESTER BLVDBLOSSOM HILL RDLOS GATOS BLVDHWY 8 5 KENNED Y R D SHAN N O N R D LAR K A V LOS GATOS-ALMADEN RD UNIVERSITY AVWEDGEWOOD KNOWLES "A" IS A TOWN-WIDE PROJECT B C D PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-20 PROGRAM SECTION DIRECTORY PAGE 4504 Open Space Trail Upgrades D – 22 4507 Forbes Mill Footbridge Improvements D – 24 4503 Charter Oaks Trail Repair D – 26 4505 Trailhead Connector Project D – 28 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-21 The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct, repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction or resurfacing. TRAIL IMPROVEMENT PROJECTS SUMMARY * Total FY 2018/19 Carryforward $701,051 ` Carryforward Projects 4504 Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ 152,000$ 4507 Forbes Mill Footbridge Improvements 19,346 71,502 - - - - 90,848 4503 Charter Oaks Trail Repair Project 72,942 440,109 - - - - 513,051 4505 Trailhead Connector - 387,440 - - - - 387,440 New Projects Total Trail Improvement Projects 92,288$ 1,051,051$ -$ -$ -$ -$ 1,143,339$ 2020/21 Budget 2023/24 Budget 2019/20 Budget & Carryfwd* FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM 2021/22 Budget Expended Through 2018/19 2022/23 Budget TRAIL IMPROVEMENT PROJECTS Total Budgeted PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-22 Project Name Open Space Trail Upgrades Project Number 832-4504 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair and replace old damaged retaining walls, fences, and embankments along the trails in the Town’s open spaces. Location This project is located at Santa Rosa Open Space, Heintz Open Space, and Belgatos Park. Project Background The Town has a number of open space preserves that are under its jurisdiction. There are several public trail networks that traverse the open space preserves in the hillsides. The aging process has deteriorated a number of retaining walls and embankments along some trail sections. Without proper repair and replacement, the possibility of failure of the trails will increase greatly. This project will repair and replace several retaining walls that are supporting the trails and their embankments. In addition, this project will improve the drainage system around the retaining walls to prevent further erosion of the trails. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. . TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-23 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Winter 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Open Space Reserve Fund -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ TOTAL SOURCE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 152,000 - 152,000 - - - - 152,000 TOTAL GFAR -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ TOTAL USE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ OPEN SPACE TRAIL UPGRADES Project 832-4504 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-24 Project Name Forbes Mill Footbridge Improvements Project Number 832-4507 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description The project will provide pathway lighting across the 400-foot span of the pedestrian bridge and installation of additional art panels. Location The project is located on the pedestrian bridge between Forbes Mill and Old Town across Highway 17. Project Background Forbes Mill footbridge is a heavily used pathway crossing Highway 17 between the Main Street businesses, Civic Center, and high school on the east side of the freeway, and the downtown on the west. The interior walls of the walkway are decorated with murals painted by students over the past decades. The pathway structure once had a lighting system, but fell into disrepair several years ago and was removed. This left the pathway dark in the evening, which has prompted concerns from residents. The installation of footbridge improvements in 2018 included solar LED lighting for the pathway. Staff is currently monitoring this install to ensure the lights meet long-term needs. This project will also install additional art panels to occupy the remaining space. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-25 Project Components & Estimated Timeline Fall 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Summer 2019 Completion Project completion and monitoring Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$ TOTAL SOURCE OF FUNDS 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 17,119 2,227 71,502 - 71,502 - - - - 90,848 TOTAL GFAR 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$ TOTAL USE OF FUNDS 17,119$ 2,227$ 71,502$ -$ 71,502$ -$ -$ -$ -$ 90,848$ FORBES MILL FOOTBRIDGE IMPROVEMENTS Project 832-4507 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-26 HWY 17WINCHESTER BLVDLOS GATOS BLVDHWY 8 5 LAR K A V KNOWLES Project Name Charter Oaks Trail Repair Project Number 832-4503 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair the storm damage on the Los Gatos Creek Trail near Charter Oaks, which includes damage to the fencing and asphalt pathway. Location This project is located on the Los Gatos Creek Trail near Charter Oaks. Project Background The existing trail is adjacent to Los Gatos Creek and was damaged by flooding during the winter storms of 2017. The impacts of the storm included damage to the fencing and to the asphalt concrete pathway. The trail is well used by the public and the damage has negatively impacted trail users by making the trail more difficult to use. Funds for this project will be provided by FEMA. Subsequent to the trail repair work, this project will further evaluate improvements along the trail from Lark Avenue towards Highway 85 utilizing Community Benefit funds in the amount of $350,000 from the Albright project. This project scope will be determined through community outreach efforts for construction in FY 2019/20. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-27 Project Components & Estimated Timeline Summer 2019 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Fall 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 109$ 14,891$ 350,000$ 364,891$ -$ -$ -$ -$ 365,000$ GRANTS - 72,833 75,218 - 75,218 - - - - 148,051$ TOTAL SOURCE OF FUNDS -$ 72,942$ 90,109$ 350,000$ 440,109$ -$ -$ -$ -$ 513,051$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 109 14,891 350,000 364,891 - - - - 365,000 TOTAL GFAR -$ 109$ 14,891$ 350,000$ 364,891$ -$ -$ -$ -$ 365,000$ GRANTS &AWARDS Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 72,833 75,218 - 75,218 - - - - 148,051 TOTAL GRANTS &AWARDS -$ 72,833$ 75,218$ -$ 75,218$ -$ -$ -$ -$ 148,051$ TOTAL USE OF FUNDS -$ 72,942$ 90,109$ 350,000$ 440,109$ -$ -$ -$ -$ 513,051$ CHARTER OAKS TRAIL REPAIR PROJECT Project 832-4503 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-28 H W Y 9 HWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name Trailhead Connector Project Project Number 832-4505 Department Parks & Public Works Project Manager Asst. Director Lisa Petersen Description This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail to Highway 9. Location This project is located on the Los Gatos Creek Trail near Highway 9. Project Background This project will fund the design and construction of a trailhead connection for Los Gatos Creek Trail to Highway 9. The project is an identified priority within Measure B and the Bicycle and Pedestrian Plan. The Council approved the staff recommendation for the next steps on this project in June 2017. Caltrans approved the Authorization to Proceed with Preliminary Engineering, also known as E-76 approval, on December 13, 2018. In February 2019 the Town issued a Request for Proposal for the preliminary engineering and environmental clearance phase, which will take approximately 12 months. If funding for construction is secured, the project can go into construction in 2020/21 at the earliest. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-29 Project Components & Estimated Timeline Summer 2018 Design Project design & development Winter 2020 Bid Process Project bidding & contract award Pending Construction Project construction Pending Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 44,440$ -$ 44,440$ -$ -$ -$ -$ 44,440$ GRANTS & AWARDS - - 343,000 - 343,000 - - - - 343,000$ TOTAL SOURCE OF FUNDS -$ -$ 387,440$ -$ 387,440$ -$ -$ -$ -$ 387,440$ ` 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 44,440 - 44,440 - - - - 44,440 TOTAL GFAR - - 44,440 - 44,440 - - - - 44,440 GRANTS &AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 343,000 - 343,000 - - - - 343,000 TOTAL GRANTS &AWARDS -$ -$ 343,000$ -$ 343,000$ -$ -$ -$ -$ 343,000$ TOTAL USE OF FUNDS -$ -$ 387,440$ -$ 387,440$ -$ -$ -$ -$ 387,440$ TRAILHEAD CONNECTOR Project 832-4505 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-30 Public Facilities Program This Page Intentionally Left Blank PUBLIC FACILITIES DIRECTORY PROPOSED E -1 TOWN INFRASTRUCTURE PROJECT DIRECTORY 2302 Building Replacement at Corporation Yard E – 6 2008 Energy Efficiency Upgrades Town-wide E – 8 2001 Facilities Assessment E – 10 2503 Library Carpet Replacement E – 12 2002 Town Beautification E – 14 2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 16 2117 ADA Upgrade Staff Restroom – Civic Center E – 18 2116 Plaza Level Railings – Code Upgrade E – 20 2010 Waterproofing – Town-wide E – 22 2504 Sound Mitigation in Library Lobby E – 24 6004 Fire Suppression (Halon) for Server Rooms E – 26 2118 Police Headquarters Roof Repair E – 28 EQUIPMENT PROJECT DIRECTORY 6101 Information System Upgrade E – 34 6001 Audio/Video System Upgrade E – 36 6003 Town-Wide Document Imaging Project E – 38 2305 Engineering Document Archiving E – 40 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42 6306 Neighborhood Emergency Preparedness E – 44 6103 EOC Communication Upgrade E – 46 6104 IT Disaster Recovery Improvements E – 48 6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 50 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 2 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 3 PROJECT LOCATIONS A Building Replacement at Corporation Yard G ADA Upgrade Staff Restroom – Civic Center B Energy Efficiency Upgrades Town-wide H Plaza Level Railing - Code Upgrade C Facilities Assessment I Waterproofing Town-wide D Library Carpet Replacement J Sound Mitigation in Library Lobby E Town Beautification K Fire Suppression (Halon) for Server Room F ADA Upgrade Public Restrooms – Adult Recreation Building L Police Headquarters Roof Repair PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 4 PROGRAM SECTION DIRECTORY PAGE 2302 Building Replacement at Corporation Yard E – 6 2008 Energy Efficiency Upgrades Town-wide E – 8 2001 Facilities Assessment E – 10 2503 Library Carpet Replacement E – 12 2002 Town Beautification E – 14 2601 ADA Upgrade Public Restrooms – Adult Recreation Building E – 16 2117 ADA Upgrade Staff Restroom – Civic Center E – 18 2116 Plaza Level Railing – Code Upgrade E – 20 2010 Waterproofing – Town-wide E – 22 2504 Sound Mitigation in Library Lobby E – 24 6004 Fire Suppression (Halon) for Server Room E - 26 2118 Police Headquarters Roof Repair E – 28 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 5 The Town Infrastructure & Facilities Projects section contains Capital Improvement Program projects that maintain or improve the Town’s public buildings and structures to keep them in a clean, safe, and functional condition. Town-owned buildings include the Civic Center, Library, Police Operations Center, Parks & Public Works Building, Corporation Yard and associated structures, and the following buildings leased to other agencies: the Los Gatos-Saratoga Community Education and Recreation headquarters building and the Adult Recreation Center (formerly the Neighborhood Center). Other Town facilities include the Venue, Tait Avenue, and Forbes Mill. Town Infrastructure and Facilities Projects are prioritized in consideration of the user needs, federal and state mandates, federal and state grant restrictions, and local community standards. The Community Development Department assumes responsibility for evaluating the overall conformance to the General Plan and the status of environmental assessment. The Parks & Public Works Department assumes responsibility for project design, planning, and construction. This section contains annual ongoing improvement projects as well as identified one-time projects. One-time infrastructure and facilities projects are prioritized based on health and safety issues, infrastructure impacts, available funding sources, project costs, and community needs. Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s public facilities; however, grants, CDBG funds, and donations are pursued and utilized when available. TOWN INFRASTRUCTURE & FACILITIES PROJECTS SUMMARY *Total FY 2018/19 Carryforward $890,533 Unfunded Projects • Civic Center Improvements • Deferred maintenance at Town-owned, leased properties • Deferred improvements to Town-owned properties Carryforward Projects 2302 Building Replacement at Corporation Yard 165,692$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ 2008 Energy Efficiency Upgrade - Town-wide 1,000,000 697,039 - - - - 1,697,039 2001 Facilities Assessment - 80,000 - - - - 80,000 2503 Library Carpet Replacement - 56,500 - - - - 56,500 2002 Town Beautification 8,114 16,886 10,000 10,000 10,000 10,000 65,000 2118 Police Headquarters Roof Repair - 50,000 - - - - 50,000 New Projects 6004 Fire Suppression (Halon) for Server Rooms - 200,000 - - - - 200,000 2117 ADA Upgrade Staff Restroom - Civic Center - 300,000 - - - - 300,000 2116 Plaza Level Railings - Code Upgrade - 30,000 - - - - 30,000 2601 ADA Upgrade for Public Restrooms- Rec Building - 250,000 - - - - 250,000 2010 Waterproofing Town-wide - 75,000 - - - - 75,000 2504 Sound Mitigation in Library Lobby - 22,000 - - - - 22,000 Total Infrastructure / Facility Projects 1,173,806$ 2,752,533$ 35,000$ 35,000$ 35,000$ 35,000$ 4,066,339$ 2021/22 Budget TOWN INFRASTRUCTURE & FACILITIES PROJECTS Total Budgeted 2022/23 Budget Expended Through 2018/19 2019/20 Budget & Carryfwd* FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM 2023/24 Budget 2020/21 Budget PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 6 Project Name Building Replacement at Corporation Yard* Project Number 821-2302 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin *This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. A portion of these funds ($200,000) for this project was transferred to provide funding for the Almond Grove Street Reconstruction project. Description This project will replace an old building at the Parks and Public Works Department (PPW) Corporation Yard that is used for office space and evidence storage. Location This project is located at the PPW Corporation Yard, which is located at 41 Miles Avenue. Project Background The maintenance lead staff has been using a small portable building located at the north side of the PPW Corporation Yard for their office facility. This building has deteriorated over the years and is becoming more difficult to maintain because of its aging infrastructure. The existing building has several problems including a leaky roof and windows, a poor heating and cooling (HVAC) system, and lacks a restroom facility in the building. This building is also used partially by the Police Department as their evidence storage facility. Evidence must be stored and kept at a certain room temperature, which requires an updated HVAC system. To save costs, this project will relocate staffing to another building and reconstruct the existing building for storage only. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 7 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2019 Bid Process Project bidding & contract award Winter 2020 Construction Project construction Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ TOTAL SOURCE OF FUNDS 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 16,692 149,000 108 975,000 975,108 25,000 25,000 25,000 25,000 1,240,800 TOTAL GFAR 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ TOTAL USE OF FUNDS 16,692$ 149,000$ 108$ 975,000$ 975,108$ 25,000$ 25,000$ 25,000$ 25,000$ 1,240,800$ BUILDING REPLACEMENT AT CORPORATION YARD Project 821-2302 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 8 Project Name Energy Efficiency Upgrades Town-wide Project Number 821-2008 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will perform various energy efficiency upgrades throughout Town-owned facilities. Location This project location is Town-wide. Project Background This project will complete various improvements in Town-owned facilities, which will improve energy efficiency, resulting in cost savings over the long term. Once these improvements are completed, it can lead to cost savings on utility and operating expenses. Many of the existing fixtures and equipment throughout Town-owned facilities are outdated. Although these items are functional, they are not the most energy efficient option at the current time. The budget for this project includes the energy audit that was completed in FY 18/19 and the installation of energy-saving devices in Town facilities. This project has absorbed past capital projects, including HVAC Chiller Repair (2115), Mechanic Bay Heater (2307), Youth Recreation Center HVAC Replacement (2205), Civic Center Building Energy Efficiency Measures (2110), and Civic Center Exterior Light Replacement (2112). Operating Budget Impacts This project will result in significant operating budget savings from reduced utility usage. The savings will pay for the project costs over time in the form of additional charges on the utility bills. Project delivery costs for this project are included in the CIP project’s total cost. TOWN-WIDE PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 9 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$ TOTAL SOURCE OF FUNDS -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 1,000,000 697,039 - 697,039 - - - - 1,697,039 TOTAL GFAR -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$ TOTAL USE OF FUNDS -$ 1,000,000$ 697,039$ -$ 697,039$ -$ -$ -$ -$ 1,697,039$ ENERGY EFFICIENCY - TOWN-WIDE Project 821-2008 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 10 TOWN-WIDE Project Name Facilities Assessment Project Number 821-2001 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will fund a consultant to assess the condition of Town facilities. Location This project location is Town-wide. Project Background This project will assess the condition of Town facilities to determine current condition of equipment and building systems to assess priorities for repair versus replacements and to predict capital expenditures needed year by year for life-cycle scheduled work and replacement. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 11 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2020 RFP Process Project RFP & contract award Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 80,000$ TOTAL SOURCE OF FUNDS -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ 80,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 80,000 - 80,000 - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ -$ TOTAL USE OF FUNDS -$ -$ 80,000$ -$ 80,000$ -$ -$ -$ -$ -$ FACILITIES ASSESSMENT Project 821-2001 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 12 Project Name Library Carpet Replacement Project Number 821-2503 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will replace large sections of the carpet squares in the children’s area that have started to fail. Location This project location is inside the library at 100 Villa Avenue. Project Background The carpet in the children’s area of the library is starting to mat, lift, and stain from extensive foot traffic, spilled food, and other accidents. This area of the library is where the young kids play, listen to stories, and congregate for different activities on the carpet. Recent replacements of the furniture upholstery have been completed due to stains and failure, and this project will help complete the restoration of the space back to a high service level. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2018/19 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 13 Project Components & Estimated Timeline Winter 2019 Design Project design & development Spring 2020 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR - - 56,500 - 56,500 - - - - 56,500 TOTAL SOURCE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - 56,500 - 56,500 - - - - 56,500 Project Construction Expenses - - - - - - - - - - TOTAL GFAR -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$ TOTAL USE OF FUNDS -$ -$ 56,500$ -$ 56,500$ -$ -$ -$ -$ 56,500$ LIBRARY CARPET REPLACEMENT Project 821-2503 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 14 TOWN-WIDE Project Name Town Beautification Project Number 821-2002 Department Parks & Public Works Project Manager Environmental Specialist: Marina Chislett Description This project funds Town-wide beautification projects on an annual, as-needed basis. Location This project location is Town-wide. Project Background The Town Beautification Program was established to provide improvements to enhance the Town’s beauty, particularly along public streets, sidewalks, and other Town property. One example is the Town’s Outside the Box Program which enhances the character of the community by adding artwork to utility boxes that are often targeted by graffiti vandals. Selected artwork contains environmental sustainability messages that include: alternative transportation, clean energy, clean creeks, community sustainability, and healthy lifestyles. In FY 2018/19 four utility boxes were added to bring the total to 21, and another four are planned in FY 2019/20. Operating Budget Impacts The project will use staff time for program management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 15 Project Components & Estimated Timeline Winter 2019 Design Project design & development Summer 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$ TOTAL SOURCE OF FUNDS -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 8,114 6,886 10,000 16,886 10,000 10,000 10,000 10,000 65,000 TOTAL GFAR -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$ TOTAL USE OF FUNDS -$ 8,114$ 6,886$ 10,000$ 16,886$ 10,000$ 10,000$ 10,000$ 10,000$ 65,000$ TOWN BEAUTIFICATION PROJECTS Project 821-2002 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 16 Project Name ADA Upgrade Public Restrooms – Adult Recreation Building Project Number 821-2601 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will make ADA-compliant upgrades to the public restrooms at the Recreation Building. Location This project location is at the Adult Recreation Center at 208 E. Main Street. Project Background The upstairs restrooms are beyond their useful life and are very small and non-ADA compliance. The building serves seniors and having an accessible building is essential. This project shows the use of Community Development Block Grant (CDBG) funds as a supplemental funding source. The CDBG Entitlement Program provides grants on a formula basis to develop viable urban communities by providing a suitable living environment, among other goals. The grant program has specific requirements, and this is one of the few Town projects that meets the CDBG requirements. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/2020 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 17 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2020 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Adjusted 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Facilities -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 183,000$ GRANTS - - - - 67,000$ 67,000$ - - - - 67,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ -$ 250,000$ 250,000$ -$ -$ -$ -$ 250,000$ Prior Yrs Actuals 2018/19 Adjusted 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - - Consultant Services - - - - - - - - - - - Project Construction Expenses - - - - 183,000 183,000 - - - - 183,000 TOTAL GFAR -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 183,000$ GRANTS & AWARDS Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - 67,000 67,000 - - - - 67,000 TOTAL GRANTS & AWARDS - - - - 67,000 67,000 - - - - 67,000 TOTAL USE OF FUNDS -$ -$ -$ -$ 183,000$ 183,000$ -$ -$ -$ -$ 250,000$ ADA UPGRADE FOR PUBLIC RESTROOMS - ADULT RECREATION BUILDING PROJECT 821-2601 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 18 Project Name ADA Upgrade Staff Restroom – Civic Center Project Number 821-2117 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will make ADA-compliant upgrades to the staff restrooms at the Civic Center Location This project is located at the Civic Center, which is at 110 E. Main Street. Project Background The Building Inspectors have moved out of their previous space in the lower level of the Civic Center. The restrooms adjacent to this space are small non-ADA compliant restrooms. This project will upgrade the restrooms taking advantage of the available space to meet additional area requirements. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 19 Project Components & Estimated Timeline Winter 2019 Design Project design & development Spring 2020 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR - Transfer from Facilities -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 300,000 300,000 - - - - 300,000 TOTAL GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL USE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ ADA UPGRADE STAFF RESTROOMS - CIVIC CENTER Project 821-2117 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 20 Project Name Plaza Level Railings – Code Upgrade Project Number 821-2116 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will adjust the railings around the upper deck of the Civic Center to be code compliant. Location This project location is on the deck of Town Hall. Project Background The railings around the upper deck of the Civic Center have wide gaps that create a safety hazard with a risk of children falling through the gaps. This project will adjust the railings to be code compliant. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 21 Project Components & Estimated Timeline Fall 2019 Design Project design & development Winter 2020 Bid Process Project bidding & contract award Spring 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Facilities -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 30,000 30,000 - - - - 30,000 TOTAL GFAR -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$ TOTAL USE OF FUNDS -$ -$ -$ 30,000$ 30,000$ -$ -$ -$ -$ 30,000$ PLAZA LEVEL RAILINGS - CODE UPGRADE Project 821-2116 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 22 TOWN-WIDE Project Name Waterproofing -Town-wide Project Number 821-2010 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will waterproof a balcony and a roof at two Town facilities. Location The project is located at the Adult Recreation Center (208 E. Main Street) and the PPW Corporation Yard at 41 Miles Avenue. Project Background The roof of the engineering building at the PPW Corporation Yard is starting to show signs of age and potential leakage as it approaches its end of serviceable life. Recent HVAC improvements added new penetrations through this aging membrane, including relocation of a large HVAC unit in the center of the roof. The new roof will upgrade the membrane to a single ply cool roof which will also improve the building's energy conservation. At the Adult Recreation Center, the rear balcony for the two manager offices upstairs cantilevers over the activity room below. During heavy rainstorms, water leaks from under the thresholds upstairs into the middle of the room below. The membrane needs to be replaced which entails significant reconstruction of the sliding doors, siding, and balcony deck. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 23 Project Components & Estimated Timeline Winter 2019 Design Project design & development Spring 2020 Bid Process Project bidding & contract award Summer 2020 Construction Project construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Facilities -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 75,000 75,000 - - - - 75,000 TOTAL GFAR -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$ TOTAL USE OF FUNDS -$ -$ -$ 75,000$ 75,000$ -$ -$ -$ -$ 75,000$ WATERPROOFING - TOWN-WIDE Project 821-2010 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 24 Project Name Sound Mitigation in Library Lobby Project Number 821-2504 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will install sound baffling to the low ceiling in the Library Lobby. Location This project location is inside the library at 100 Villa Avenue. Project Background This is the second phase of sound reduction in the library following successful installation of doors to the teen area in phase one. This project will install sound baffling to the ceiling in the library lobby to help diffuse noise. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 25 Project Components & Estimated Timeline Winter 2019 Design Project design & development Spring 2019 Bid Process Project bidding & contract award Summer 2019 Construction Project construction Fall 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Library Trust -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 22,000 22,000 - - - - 22,000 TOTAL GFAR -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$ TOTAL USE OF FUNDS -$ -$ -$ 22,000$ 22,000$ -$ -$ -$ -$ 22,000$ SOUND MITAGATION IN LIBRARY LOBBY Project 821-2504 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 26 TOWN-WIDE Project Name Fire Suppression (Halon) for Server Rooms Project Number 841-6004 Department Parks & Public Works Project Manager Jim Harbin Description This project will install fire suppression systems that are specific for server rooms. Location This project is located at the Civic Center (110 East Main Street) and the Town of Los Gatos Police Operations Building (15900 Los Gatos Boulevard.) Project Background Basic fire suppression systems use water-based sprinklers to protect infrastructure. Server rooms require different fire suppression to avoid damaging equipment in case the fire suppression is triggered. This project will install non-destructive gas suppression systems at main server rooms at essential facilities. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 27 Project Components & Estimated Timeline Winter 2019 Bid process Project bidding & contract award Spring 2020 Construction Project Construction Summer 2020 Completion Project completion FIRE SUPPRESSION (HALON) FOR SERVER ROOMS Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR - Transfer from Facilities -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 200,000 200,000 - - - - 200,000 TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Project 841-6004 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 28 Project Name Police Headquarters Roof Repair Project Number 821-2118 Department Parks & Public Works Project Manager Jim Harbin Description This project will replace the Police Headquarters roof with a new membrane. Location This project is located at the Police Headquarters building (110 East Main Street). Project Background The roof for the Police Headquarters wing of the civic center has reached the end of its useful life. The roof has a history of water leaks and since the removal of the HVAC system over the old dispatch center, the leaks have increased. This project will replace the roof with a new roof membrane to match the museum wing roof completed in 2017. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 29 Project Components & Estimated Timeline Winter 2019 Bid process Project bidding & contract award Spring 2020 Construction Project Construction Summer 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Facilities -$ -$ 50,000$ -$ 50,000$ -$ -$ -$ -$ 50,000$ TOTAL SOURCE OF FUNDS - - 50,000 - 50,000 - - - - 50,000 Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 50,000 - 50,000 - - - - 50,000 TOTAL GFAR - - 50,000 - 50,000 - - - - 50,000 TOTAL USE OF FUNDS - - 50,000 - 50,000 - - - - 50,000 POLICE HEADQUARTERS ROOF REPAIR 821-2118 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 30 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 31 PROJECT LOCATIONS A Information System Upgrade B Audio/Video System Upgrade C Town-Wide Document Imaging Project D Engineering Document Archiving E Silicon Valley Regional Interoperability Project (SVRIP) Service F Neighborhood Emergency Preparedness G EOC Communication Upgrade H IT Disaster Recovery Improvements I Computer-Aided Dispatch and Records Management System (CAD/RMS) PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 32 PROGRAM SECTION DIRECTORY PAGE 6101 Information System Upgrade E – 34 6001 Audio/Video System Upgrade E – 36 6003 Town-Wide Document Imaging Project E – 38 2305 Engineering Document Archiving E – 40 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 42 6306 Neighborhood Emergency Preparedness E – 44 6103 EOC Communication Upgrade E – 46 6104 IT Disaster Recovery Improvements E – 48 6301 Computer-Aided Dispatch and Records Management System (CAD/RMS) E – 50 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 33 The Equipment Projects section contains Capital Improvement Program projects that provide new equipment; or replace, improve, or upgrade existing Town equipment. This section does not have ongoing equipment programs; all projects are considered one-time projects. One-time equipment capital improvement projects are prioritized based on service level considerations, available funding sources, project costs, and community impacts. Los Gatos does not have a designated funding source for new equipment or the replacement or upgrading of existing equipment; however, grants are pursued and utilized when available. EQUIPMENT PROJECTS SUMMARY Total FY 2018/19 Carryforward $581,324 Carryforward Projects 6101 Information System Upgrade 10,384$ 172,785$ -$ -$ -$ -$ 183,169$ 6001 Audio/Video System Upgrade 15,608 42,552 - - - - 58,160 6003 Town-wide Document Imaging Project 78,752 16,990 - - - - 95,741 2305 Engineering Document Archiving 48,284 11,716 - - - - 60,000 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 395,027 63,601 - - - - 458,628 6306 Neighborhood Emergency Preparedness 5,910 44,090 - - - - 50,000 6103 EOC Communications Upgrade 20,411 29,589 - - - - 50,000 6104 IT Disaster Recovery Improvements - 200,000 - - - - 200,000 New Projects 6301 Computer-Aided Dispatch and Records Management System - 525,000 - - - - 525,000 Total Equipment Projects 574,375$ 1,106,324$ -$ -$ -$ -$ 1,680,698$ 2019/20 Budget & Carryfwd* FY 2019/20 - 2023/24 CAPITAL IMPROVEMENT PROGRAM Total Budgeted 2020/21 Budget 2021/22 Budget 2022/23 Budget 2023/24 Budget EQUIPMENT PROJECT SUMMARY BY PROGRAM Expended Through 2018/19 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 34 Project Name Information System Upgrade Project Number 841-6101 Department Finance Project Manager Finance Director: Stephen Conway Description This project upgrades the Town’s existing financial/human resources information database, enhancing its reporting system and providing future web-based online services. This project will be coordinated with the upgrade of the Town’s existing permit tracking system. Location The project will enhance the information systems used by the Finance, Human Resources, and Building Departments. Purchased computer hardware will be located in the IT Department, 110 E. Main Street. Project Background In FY 2008/09, staff completed a significant portion of a multi-year financial information system upgrade. This project involved the conversion of General Ledgers, Payroll, Budget, and Human Resources modules, followed by the implementation of the Cashiering and Business License modules. Planned for FY 2019/20 required system upgrade, cloud hosting, online-timesheet management, completion of the fixed asset module, and continuation of electronic commerce, including online permitting and business license applications. Operating Budget Impacts The remaining project balance is estimated to be $172,785. It is anticipated that the maintenance costs for the Finance/Human Resources information system would be approximately $40,000 annually, which has been incorporated into the FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 35 Project Components & Estimated Timeline Summer 2019 System Implementation Upgrade and test data migration and functionality of financial/human resources information database Fall 2020 System Implementation Develop and test fixed assets, electronic commerce, and electronic timesheet functions. Summer 2020 Implement data migration Fall 2020 System Implementation Implementation of electronic commerce, and electronic timesheet functions. Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from MIS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$ TOTAL SOURCE OF FUNDS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services 2,590 7,794 172,785 - 172,785 - - - - 183,169 Project Construction Expenses - - - - - - - - - - TOTAL GFAR 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$ TOTAL USE OF FUNDS 2,590$ 7,794$ 172,785$ -$ 172,785$ -$ -$ -$ -$ 183,169$ INFORMATION SYSTEM UPGRADE Project 841-6101 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 36 Project Name Audio/Video System Upgrade Project Number 841-6001 Department Town Manager Project Manager IT Manager: Chris Gjerde Description This project provides for the replacement and/or upgrade of Council Chamber video, audio/visual, and other applicable equipment used for televised and non-televised public meetings. Location The video production system is located in the audio/video equipment room at the Civic Center, 110 E. Main Street, and involves various electronic equipment required to cablecast public meetings and make presentations. Project Background In FY 2008/09, the audio/visual equipment located in the Town Council Chambers was upgraded to meet the needs at that time. The maintenance of the video production equipment is now the responsibility of KCAT, who receives Public, Educational, and Governmental (PEG) fees, provided by local cable operators for this purpose. The remaining funds in this project will be used to replace and/or upgrade the Town’s A/V equipment in the Council Chambers, as needed. Staff will also explore the availability of additional audio/visual meeting management enhancements. Operating Budget Impacts This Audio/Video System Upgrade project is funded in the GFAR Fund. It is unknown at this time which replacements or upgrades will be required during FY 2019/20. Staff oversight of this project will be included in the FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 37 Project Components & Estimated Timeline Fiscal Year 18/19 Monitoring As needed. Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$ TOTAL SOURCE OF FUNDS 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment 15,608 - 42,552 - 42,552 - - - - 58,160 Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$ TOTAL USE OF FUNDS 15,608$ -$ 42,552$ -$ 42,552$ -$ -$ -$ -$ 58,160$ AUDIO / VIDEO SYSTEM UPGRADE Project 841-6001 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 38 Project Name Town-Wide Document Imaging Project Project Number 841-6003 Department Community Development/Police Project Manager Community Development Director: Joel Paulson Description This is the continuation of the first phase of a Town-wide project to convert existing microfiche and paper files to electronic storage and provide desktop access. Location Town of Los Gatos Civic Center complex (110 E. Main Street). Project Background The Community Development Department has an immediate need to provide electronic storage and retrieval of many archived documents. The electronic retrieval system will allow immediate access to all building and planning files for members of the Community Development Department via desktop access. Following implementation, priorities will be identified to expand document imaging to other departments, subject to available funding. Operating Budget Impacts The Community Development Department collects permit fees, a portion of which will be used to offset some costs for document storage. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 39 Project Components & Estimated Timeline FY 2019/20 Production Continue document conversion of Building and Planning Division files. Prior Yrs Actuals 2018/19 Adjusted 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from MIS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$ TOTAL SOURCE OF FUNDS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$ Prior Yrs Actuals 2018/19 Adjusted 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 78,752 16,990 - 16,990 - 16,990 - - - - 95,741 TOTAL GFAR 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$ TOTAL USE OF FUNDS 78,752$ 16,990$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 95,741$ TOWN-WIDE DOCUMENT IMAGING PROJECT Project 841-6003 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 40 HWY 9 E MAIN STHWY 17N SANTA CRUZ AVUNIVERSITY AV Project Name Engineering Document Archiving Project Number 821-2305 Department Parks & Public Works Project Manager Assistant PPW Director: Lisa Petersen Description This project will scan and archive all engineering record documents such as as-builts, federal and state funded capital improvement projects, and recorded documents, all of which are currently stored in paper format. Location This project is located at the Engineering Services office (41 Miles Avenue). Project Background Currently, most files are kept in a hard copy format in the Engineering Services office. These hard copies have become damaged due to age and need to be preserved through archiving to maintain pertinent records. By digitally archiving these documents, searching through records becomes much more efficient. It is anticipated that this project will be implemented over four fiscal years, starting in FY 2014/15 and completion estimated in FY 2019/20. Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 41 Project Components & Estimated Timeline Summer 2015 Design Project development Fall 2015 Bid process Project bidding & contract award Summer 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 8,284 40,000 11,716 - 11,716 - - - - 60,000 TOTAL GFAR 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS 8,284$ 40,000$ 11,716$ -$ 11,716$ -$ -$ -$ -$ 60,000$ ENGINEERING DOCUMENT ARCHIVING Project 821-2305 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 42 Project Name Silicon Valley Regional Interoperability Project (SVRIP) Service Project Number 841-6305 Department Police Project Manager Captain D’Antonio Description This project will update the existing police radio system infrastructure to be compatible with the regional interoperability requirements. Location Town of Los Gatos Civic Center Complex, 110 E Main Street and the Town of Los Gatos Police Operations Building, 15900 Los Gatos Boulevard. Project Background The Silicon Valley Radio Interoperability Authority (SVRIA) in conjunction with the City Managers Association and the County Chiefs Association is moving towards a program for regional interoperability of public safety communications for police, fire services, and public works across all jurisdictions. The Police Department, in conjunction with other public safety agencies within Santa Clara County, will be contributing to radio system infrastructure for a period of three years to allow for interoperability of public safety communications regionally. Operating Budget Impacts Staff oversight of this SVRIP project will be included in the Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 43 Project Components & Estimated Timeline Summer 2015 Design Project development Winter 2016 Bid process Project bidding & contract award Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$ TOTAL SOURCE OF FUNDS 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 393,139 1,888 63,601 - 63,601 - - - - 458,628 TOTAL GFAR 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$ TOTAL USE OF FUNDS 393,139$ 1,888$ 63,601$ -$ 63,601$ -$ -$ -$ -$ 458,628$ SILICON VALLEY REGIONAL INTEROPERABILITY PROJECT (SVRIP) SERVICE Project 841-6305 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 44 TOWN-WIDE Project Name Neighborhood Emergency Preparedness Project Number 841-6306 Department Town Manager Office/PD Project Manager Captain D’Antonio Description This project upgrades and adds Neighborhood Incident Command Posts (NICPs) for deployment in the Town’s Community Emergency Response Team (CERT) neighborhood sectors. Location The project will enhance and deploy additional NICPs throughout the Town’s thirteen geographic CERT neighborhoods. Project Background The Town has identified thirteen distinct CERT geographic neighborhoods. CERT is a critical element of the Towns ability to adequately address any large-scale disaster. CERT members go through extensive training in order to facilitate and provide emergency response capabilities in their immediate neighborhoods. For CERT teams to function effectively they require prepositioned NICPs within their CERT geographic area. The NICPs store critical medical, safety, communication and other necessary equipment to adequately address the immediate needs of a neighborhood in an emergency. The Town currently has seven NICPs in various states of preparedness. Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 45 Project Components & Estimated Timeline Summer 2018 Design Project development Fall 2018 Procurement Procurement of Equipment and Installation Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$ TOTAL SOURCE OF FUNDS -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 5,910 44,090 - 44,090 - - - - 50,000 TOTAL GFAR - 5,910 44,090 - 44,090 - - - - 50,000 TOTAL USE OF FUNDS -$ 5,910$ 44,090$ -$ 44,090$ -$ -$ -$ -$ 50,000$ NEIGHBORHOOD EMERGENCY PREPAREDNESS Project 841-6306 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 46 TOWN-WIDE Project Name EOC Communications Upgrade Project Number 841-6103 Department Town Manager Office/IT/PD Project Manager Assistant Town Manager, Arn Andrews Description This project upgrades identified deficiencies in the Town’s Emergency Operations Center (EOC) communication capabilities. Location The project will enhance the communication systems within the EOC to create better interoperability between Town staff, Public Safety and citizen volunteers in the event of an emergency. Project Background The recent wildfire disasters in California and lessons learned from prior Town emergency preparedness exercises continue to identify a lack of adequate communications as a major flaw in emergency responses. Without robust EOC communication capabilities the situational awareness necessary to adequately assess, and respond to, an operational area in the event of an emergency is severely compromised. Staff is seeking to create multiple seamless communication channels between the Town EOC, County EOC, Town Public Safety staff, Town PPW staff, Town CDD staff and CERT volunteers. Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 47 Project Components & Estimated Timeline Summer 2018 Design Project development Fall 2018 Procurement Procurement of equipment and installation Spring 2019 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 50,000$ TOTAL SOURCE OF FUNDS -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 50,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 20,411 29,589 - 29,589 - - - - 20,411 TOTAL GFAR -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 20,411$ TOTAL USE OF FUNDS -$ 20,411$ 29,589$ -$ 29,589$ -$ -$ -$ -$ 20,411$ EOC COMMUNICATION UPGRADE Project 841-6103 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 48 TOWN-WIDE Project Name IT Disaster Recovery Improvements Project Number 841-6104 Department IT Project Manager IT Manager: Chris Gjerde Description This project upgrades the Town’s existing Information Technology infrastructure including windows servers, storage, and network switches. Location The project will enhance the IT systems used by all Town departments at all locations. Purchased computer hardware will be located at 110 E. Main Street and 15900 Los Gatos Boulevard Project Background Annually staff evaluates and replaces older servers and network infrastructure to ensure reliable operation. In FY 2017/18, staff began an IT disaster recovery inventory, identifying many areas to improve our disaster preparedness posture and increasing efficiencies with more modern infrastructure design. These improvements to IT infrastructure require more than a simple staggered replacement of a small percentage of servers. Improvements include Hypervisor Server Clusters and Replication, redundant Storage Area Networks, and Public Cloud DR Data Center Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the FY 2019/20 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 49 Project Components & Estimated Timeline Summer 2019 Design Project development Fall 2019 Procurement Procurement of equipment and installation Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from MIS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 200,000 - 200,000 - - - - 200,000 TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ IT DISASTER RECOVERY IMPROVEMENTS Project 841-6104 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 50 Project Name Computer-Aided Dispatch and Records Management System (CAD/RMS) Project Number 841-6301 Department Police Project Manager Captain D’Antonio Description This project upgrades the Police Departments current Computer Aided Dispatch and Records Management System (CAD/RMS). Location This project is located at Police Administration Building. Project Background The Los Gatos Monte Sereno Police Department has an immediate need to replace its Computer Aided Dispatch and Records Management System (CAD/RMS). The Los Gatos Monte Sereno Police Department and the City of Sunnyvale have been in a cost sharing agreement since October 2016, and the Town needs an independent system. The Department seeks an integrated solution that offers the capability to comply with existing and upcoming mandates, capture ongoing statistical data, accurately measure performance, better equip first responders with relevant information, reduce report writing time, enhance internal cross-training, and be technologically progressive. Enhancements will give CAD/RMS terminal access to sworn and non-sworn support personnel, including physical access at two sites and mobile access in 14 vehicles. Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 51 Project Components & Estimated Timeline Spring 2019 Bid process Project bidding & contract award Fall 2019 Procurement Procurement of equipment and installation Spring 2020 Completion Project completion Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project SOURCE OF FUNDS to 2019/20 (with Carryfwd) GFAR Transfer from Equipment Replacement -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$ Prior Yrs Actuals 2018/19 Estimated Estimated Carryfwd 2019/20 New Funding 2019/20 Budget 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed 2023/24 Proposed Total Project USE OF FUNDS to 2019/20 (with Carryfwd) GFAR ` Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 525,000 525,000 - - - - 525,000 TOTAL GFAR -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$ TOTAL USE OF FUNDS -$ -$ -$ 525,000$ 525,000$ -$ -$ -$ -$ 525,000$ COMPUTER-AIDED DISPATCH AND RECORDS MANAGEMENT SYSTEM Project 841-6301 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E- 52 Reference This Page Intentionally Left Blank PROPOSED REFERENCE SECTION Glossary of Terms F -1 Accrual Basis Accounting - Under this accounting method, transactions are recognized when they occur, regardless of the timing of related cash receipts and disbursements. Adoption - Formal action by the Town Council which sets the spending limits for the fiscal year. The Town's budget is adopted by Council resolution. Appropriation - An authorization made by the Town Council that permits officials to incur obligations against and to make expenditures of government resources. Appropriations are typically granted for a one-year period. Audit - Prepared by an independent Certified Public Accountant (CPA), the primary objective of an audit is to determine if the Town's Financial Statements present fairly the Town's financial position and results of operations in conformity with generally accepted accounting principles. In conjunction with its performance of an audit, it is customary for an independent auditor to issue a Management Letter stating the adequacy of the Town's internal controls as well as recommending improvements to the Town's financial management practices. Bonds - A bond is a written promise to pay a specified sum of money (called the face value or principal amount) at a specified date or dates in the future (called the maturity date) together with period interest at a specified rate. Bonds are typically used to finance capital facilities. Budget - As the Town's financial operating plan for the fiscal year, the budget displays the estimated expenditures (costs) for providing services and the estimated sources of revenue (income) to pay for them. Once the Town Council adopts the budget, the total becomes the maximum spending limit. Los Gatos' budget encompasses a single fiscal year (July 1 through June 30). Budget Amendment - The Council has the sole responsibility for adopting the Town's budget, and may amend or supplement the budget at any time after adoption. The Town Manager has the authority to approve administrative adjustments to the budget as outlined in the Financial and Administrative Policies set by Council. Budget Document - The official financial spending and resource plan submitted by the Town Manager and adopted by the Town Council explaining the approved budget to the public and Town Council. Budget Message - Included in the opening section of the budget, the Budget Message provides the Council and the public with a general summary of the most important aspects of the budget, comparative data from previous fiscal years, goals and objectives, and the views and recommendations of the Town Manager. Budget Overview - This section provides an overview of the changes adopted in the budget. Additionally, the significant impacts of budgetary changes are outlined along with dollar amounts (increase/decrease). Budget Policies - General and specific guidelines adopted by the Council that govern the financial plan's preparation and administration. PROPOSED REFERENCE SECTION Glossary of Terms F -2 Capital or Community Improvements - Capital or community improvements are major construction, acquisition, or maintenance/repair projects. Typical examples of major construction would include new street improvements, park development, and public buildings. Acquisition includes land for parks and open space. Major maintenance/repairs may include street resurfacing or modifications to public buildings. Capital Improvement Program (CIP) - The plan or schedule of expenditures for major construction of roads, sidewalks, Town facilities, and/or park improvements and for the purchase of equipment. The Town of Los Gatos' CIP follows a five-year schedule. Although the Town adopts the CIP budget in a process which is separate from the adoption of the budget, the budget incorporates the first year of the five-year CIP. Capital Projects Fund - In governmental accounting, a fund that accounts for financial resources to be used for the acquisition or construction of capital facilities. The total cost of a capital project is accumulated in a single expenditures account which accumulates until the project is completed, at which time the fund ceases to exist. Capital Outlay - Expenditures which result in the acquisition of or additions to fixed assets. Examples include land, buildings, machinery, equipment, and construction projects. Capital Assets – See “Fixed Assets.” Cash Basis Accounting - A basis of accounting under which transactions are recognized only when cash is received or disbursed. CDBG (Community Development Block Grant) - Federal grant funds distributed from the U.S. Department of Housing and Urban Development that are passed through to the Town. The Town primarily uses these funds for housing rehabilitation, public improvements, and local social programs. Construction Tax - A construction tax is imposed upon the construction of any building, portion of a building, or a mobile home lot. Construction by definition means either new construction or enlargement. The taxes imposed are based upon a set rate per square foot as follows: a) Capital Improvement Tax - $0.18 for each square foot of building addition or alteration b) Underground Utility Tax - $0.18 for each square foot of building addition or alteration c) Park Fund Tax - $0.04 for each square foot of building addition or alteration Contingency - A budgetary reserve set aside for emergencies or unforeseen expenditures not otherwise budgeted. Contingent Liabilities - Items which may become liabilities of the Town but are undetermined at a given date, such as pending lawsuits, unsettled disputed claims, unfilled purchase orders, and uncompleted contracts. Contract Services - Services provided to the Town from the private sector or other public agencies. PROPOSED REFERENCE SECTION Glossary of Terms F -3 Contributed Capital - Resources which are extremely restricted for the acquisition or construction of capital assets. This category includes, but is not limited to, capital grants, residual equity transfers in, and contributions from developers. Cost Allocation - A fair and equitable methodology for identifying and distributing direct and indirect cost from a service provider to the service consumer. In the Town’s case, the general fund is the service provider and the external funds are the service consumer. Deficit - The excess of liabilities over assets. Department - A major organizational unit of the Town that has been assigned overall management responsibility for an operation or a group of related operations within a functional area. Developer Fees and Permits - Fees that are charged for various development-related services or permits based upon actual cost to the Town for providing the service or permit. Documentary Transfer Tax - Imposed on the transfer of real property, exclusive of any lien or encumbrance. The Town receives 50% of such revenue collected by Santa Clara County. Encumbrance - Commitment against an approved budget for unperformed (executory) contract for goods or services. Encumbrances cease when the obligation is paid or otherwise terminated. A purchase order is a common encumbrance. Expenditure - The outflow of funds paid or to be paid for an asset obtained or goods and services obtained. An encumbrance is not an expenditure; an encumbrance reserves funds to be expended. Fiscal Year - A 12-month period to which the annual operating budget applies and at the end of which the Town determines its financial position and results of its operations. The Town’s fiscal year runs from July 1 to June 30. Five-Year Financial Forecast - Estimates of future revenues and expenditures to help predict the future financial condition of the community. Fixed Assets - Assets which are intended to be held or used for a long term, such as land, buildings, improvements other than buildings, machinery and equipment. Fund - An independent fiscal and accounting entity with a self-balancing set of accounts in which financial transactions relating to revenues, expenditures, assets, and liabilities are recorded. Funds other than the General Fund typically have a unique funding source and purpose. Establishing funds enables the Town to account for the use of restricted revenue sources and carry on specific activities or pursue specific objectives. Fund Accounting - System used by non-profit organizations, particularly governments. Since there is no profit motive, accountability is measured instead of profitability. The main purpose is stewardship of financial resources received and expended in compliance with legal requirements. PROPOSED REFERENCE SECTION Glossary of Terms F -4 Fund Balance - Also known as financial position, fund balance is the excess of current assets over current liabilities, and represents the cumulative effect of revenues and other financing sources over expenditure and other financing uses. GAAP - (Generally Accepted Accounting Principles) - Uniform standards for financial accounting and reporting. They govern the form and content of the basic financial statements of the Town. Gas Tax Fund - The Gas Tax Fund is used to account for revenues and expenditures apportioned under the Streets and Highways Code of the State of California. Expenditures may be made for any street- related purpose in the Town’s system of streets. General Fund - In governmental accounting, fund used to account for all assets and liabilities of a non- profit entity, except those particularly assigned for other purposes in another more specialized fund. The General Fund is the primary operating fund of the Town. General Government – Includes offices and departments to support the Town Council, Town Clerk, Town Manager, Town Attorney, Town Treasurer, Human Resoures, Finance, Community Development, Police, Parks and Public Works, and Library functions. General Liability Self Insurance Fund - The General Liability Self Insurance Fund is used to provide the Town with liability and property insurance. Coverage is provided through the Town’s participation in a joint powers agreement through the Association of Bay Area Governments (ABAG). Grant - External contribution, and/or gift of cash, or other asset typically from another governmental entity to be used or expended for a specific purpose, activity, or facility. An example is Community Development Block grant funding from the federal government. Housing Set-Aside Fund – This fund is used to account for the Redevelopment Agency’s 20% set-aside property tax increment revenues and the associated expenditures to be used for increasing or improving low and moderate income housing. Improvements - Buildings, structures, or attachments to land such as sidewalks, trees, drives, tunnels, drains, and sewers. Intergovernmental Revenue - Revenue received from other governmental agencies and municipalities, such as grants from the state or federal government. Inter-Fund Transfers - When the Town moves money between its various funds, it makes an inter-fund transfer, referred to as “transfers in” and “transfers-out.” In aggregate, transfers in and out offset each other for the fiscal year. Levy - (Verb) To impose taxes, special assessments, or service charges for the support of governmental activities. (Noun) The total amount of taxes, special assessments, or service charges imposed by Santa Clara County levying property taxes. Licenses and Permits - Revenues earned by the issuance of licenses or permits levied in accordance with the benefits conferred by the license or permit. PROPOSED REFERENCE SECTION Glossary of Terms F -5 Lighting and Landscape Fund - The Town has formed six landscape and lighting district funds established by written consent of the property owners owning all of the property within the boundaries of the district. Objective - A statement of specific direction, purpose, or intent based on the needs of the community and the goals established for a specific program or service level. Ordinance - A formal legislative enactment by the Town Council. It has the full force and effect of law within Town boundaries unless pre-empted by a higher form of law. An Ordinance has a higher legal standing than a Resolution and is typically codified in a Town's municipal code. Operating Budget - The operating budget is the primary means by which most of the financing of acquisition, spending, and service delivery activities of a government are controlled. The use of annual operating budgets is required by law. Personnel - Town staff. Program - As subdivisions of departments, programs are budgetary or organizational units of government with limited sets of work responsibilities within their respective departments. Programs also serve to increase budgetary accountability. Los Gatos' budget is compiled on a program basis. Property Tax – A tax Imposed on real property (land and permanently attached improvements). The tax is based upon the assessed value of such property. The tax rate may not exceed 1% of assessed value. Reserve - An account used to indicate that a portion of fund equity is designated, undesignated, or legally restricted for a specific purpose. Resolution - A special order of the Town Council, which has a lower legal standing than an ordinance. Resources - Total amounts available for appropriation including estimated revenues, inter-fund transfers, and beginning fund balances. Revenue - Sources of income which the Town receives during a fiscal year. Examples of revenue include taxes, intergovernmental grants, charges for services, resources forwarded from the prior year, operating transfers for other funds, and other financing sources such as the proceeds derived from the sales of fixed assets. Revenue Estimate - A formal estimate of how much revenue will be earned from a specific revenue source for some future period; typically, a fiscal year. Road Impact Fees - Pursuant to Article III of Chapter 15 of the Town Code, the Town collects road impact fees to finance road construction and maintenance projects throughout the town. Article IX of Chapter 15 authorizes the establishment of special fund accounts known as Road Impact #1, Road Impact #2, and Road Impact #3, into which all such fees are deposited. Because the road systems generally follow drainage patterns, the existing drainage basin map boundaries are used to track and expend funds for road construction and maintenance. PROPOSED REFERENCE SECTION Glossary of Terms F -6 The amount of each fee collected is based on an estimate of the weight of the loads to be hauled to or from the project and the weight of heavy vehicles to be used in connection with the project. The fee is collected for Building Permits, Grading and Landscape Permits, Improvement Contracts, and Encroachment Permits. Money collected from such fees is to be used solely for design, construction, and repair of Town streets and installation of sidewalk curb cut ramps when such a requirement is triggered by the level of work as provided by the Americans with Disabilities Act, within the prescribed area. Projects will be brought forward on an as-needed basis. SA Trust Fund – Fund used to account for the proceeds of notes, and other forms of indebtedness, and the expenditure of these funds to pay the debt, administrative services and projects with the specified boundaries of the Successor Agency of the Town of Los Gatos Redevelopment Agency. Sales Tax – 1% of taxable sales is returned to the Town by the State Board of Equalization on a monthly direct deposit basis. Under the “Triple Flip” agreement, 0.25% of the 1% is now received in association with property tax, but remains sales tax in substance. Special Revenue Fund - In governmental accounting, a fund used to account for the proceeds of a special revenue source (other than special assessments, expandable trusts, or for major capital projects) that are legally restricted to expenditure for a specified purpose. Service Charge - Charges for specific services rendered. Services and Supplies - Expenditures for services and supplies which are directly related to a department's primary service activities. State Gas Tax Funds - Portions of the tax rate per gallon levied by the State of California on all gasoline purchases are allocated to cities throughout the state. These funds are restricted to expenditures for transit and street-related purposes. Supplemental Appropriation - An appropriation approved by the Council after the initial budget is adopted. Taxes - Compulsory charges levied by the Town, county, or state governments for the purpose of financing services performed for the community’s benefit. Town Code - A legal compilation of Town Council-approved ordinances currently in effect. The code defines Town policy with respect to areas such as planning, etc. Transfers In/Out - Money transferred from one Town fund to another. Differs from revenues and expenses - see definition of these terms, above. PROPOSED REFERENCE SECTION Index F -7 Financial Summaries – by Fund Total CIP Fund Summary .................................................................................................................. B – 9 Fund 411 - GFAR Fund ..................................................................................................................... B – 10 Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12 Fund 421 – Grants Fund................................................................................................................... B – 14 Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16 Fund 472 – Utility Underground Fund ............................................................................................. B – 18 Fund 481 – Gas Tax Fund ................................................................................................................. B – 20 Financial Summaries – by Program Streets Program ............................................................................................................................... B – 5 Parks Program .................................................................................................................................. B – 5 Public Facilities Program .................................................................................................................. B – 6 Glossary .................................................................................................................................................. F – 1 FY 2018/19 Completed CIP Projects ..................................................................................................... A – 11 Parks Program - Park Improvement Projects Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping ................................................ D – 8 Fence Replacement – Shire Court ................................................................................................... D – 16 Outdoor Fitness Equipment ............................................................................................................ D – 12 Park Playground Fibar Project ......................................................................................................... D – 6 Town Plaza Turf Repairs .................................................................................................................. D – 10 Vegetation Management – Town-wide .......................................................................................... D – 14 Parks Program – Trail Improvement Projects Charter Oaks Trail Repair ................................................................................................................. D – 26 Forbes Mill Footbridge Improvements ............................................................................................ D – 24 Open Space Trail Upgrades .............................................................................................................. D – 22 Trailhead Connector Project ............................................................................................................ D – 28 Public Facilities Program – Equipment Projects Audio/Video System Upgrade ......................................................................................................... E – 34 Computer-aided Dispatch and records Management Systems (CAD/RMS) .................................... E – 50 Engineering Document Archiving .................................................................................................... E – 40 EOC Communication Upgrade ......................................................................................................... E – 46 Information System Upgrade .......................................................................................................... E – 34 IT Disaster Recovery Improvements ................................................................................................ E – 48 Neighborhood Emergency Preparedness ........................................................................................ E – 44 Silicon Valley Radio Interoperability Project (SVRIP) Services ......................................................... E – 42 Town-Wide Document Imaging Project .......................................................................................... E – 38 Public Facilities Program – Infrastructure Projects ADA Upgrade Public Restrooms – Adult Recreation Building ......................................................... E – 16 PROPOSED REFERENCE SECTION Index F -8 ADA Upgrade Staff Restroom – Civic Center ................................................................................... E – 18 Building Replacement at Corporation Yard ...................................................................................... E – 6 Energy Efficiency Upgrades Town-wide ........................................................................................... E – 8 Facilities Assessment ....................................................................................................................... E – 10 Fire Suppression (Halon) for Server Room ...................................................................................... E – 26 Library Carpet Replacement ............................................................................................................ E – 12 Plaza Level Railings – Code Upgrade ............................................................................................... E – 20 Police Headquarters Roof Repair ..................................................................................................... E – 28 Sound Mitigation Library Lobby ....................................................................................................... E – 24 Town Beautification ......................................................................................................................... E – 14 Waterproofing – Town-wide ........................................................................................................... E – 22 Streets Program - Bridge Projects Highway 17/9 Interchange and Capacity Improvements ................................................................ C – 80 Quito Road - Bridge Replacement ................................................................................................... C – 78 Street Program - Street Improvement Projects 224 West Main Property Acquisition (Parking Lot 6) ...................................................................... C – 38 ADA Transition Plan ........................................................................................................................ C – 68 Annual Storm Drain Improvements ................................................................................................ C – 64 Bicknell Road Storm Drain Improvements ....................................................................................... C – 50 Bicycle & Pedestrian Improvements ................................................................................................ C – 52 Cut-Through Traffic/Wood Road Roundabout ................................................................................ C – 46 Downtown Parking Lots Seal Coat & Restriping .............................................................................. C – 34 Downtown Parking Study ................................................................................................................ C – 60 Downtown Revitalization ................................................................................................................. C – 72 Hernandez Avenue Storm Drain Improvements ............................................................................. C – 36 Highway 17/9 Interchange and Capacity Improvements. ............................................................... C – 70 Los Gatos Boulevard/Shannon Road Improvements ....................................................................... C – 32 One-Way Downtown Street Pilot .................................................................................................... C – 62 Pilot School Busing ........................................................................................................................... C – 66 Public Arts Gateway ......................................................................................................................... C – 58 Sidewalk Improvements – Multiple Locations ................................................................................. C – 42 Sidewalk Improvements/Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane ................... C – 40 Stormwater Master Plan .................................................................................................................. C – 54 Stormwater System – Pollution Prevention Compliance ................................................................ C – 56 Traffic Signal Modernization ............................................................................................................ C – 48 Utility Undergrounding Improvements ........................................................................................... C – 44 Streets Program - Street Reconstruction & Resurfacing Projects Almond Grove Street Rehabilitation Project …………………………………………………………………………… .C – 10 PROPOSED REFERENCE SECTION Index F -9 Street Repair & Resurfacing………………………………………………………………………………………………………..C – 6 Streets Program - Street Repairs, Maintenance & Safety Projects Annual Street Restriping .................................................................................................................. C – 22 Curb, Gutter & Sidewalk Maintenance ............................................................................................ C – 18 Guardrail Replacement Projects ...................................................................................................... C – 24 Massol Intersection Improvements ................................................................................................. C – 26 Retaining Wall Repairs ..................................................................................................................... C – 20 Traffic Calming Projects ................................................................................................................... C – 16 Town Manager’s Message .................................................................................................................... A – 1 PROPOSED REFERENCE SECTION Index F -10 This Page Intentionally Left Blank