Loading...
Attachment 2CALIFORNIA T ĔĜē Ĕċ L ĔĘ G ĆęĔĘ Capital Improvement Program Budget Fiscal Years 2017/18—2021/22 ATTACHMENT 1 Cover Photos: Ravon TOWN OF LOS GATOS CALIFORNIA Proposed Capital Improvement Program for Fiscal Years July 1, 2017 to June 30, 2022 Town Council Marico Sayoc ............................................................... Mayor Rob Rennie ........................................................... Vice Mayor Marcia Jensen .............................................. Council Member Steve Leonardis............................................ Council Member Barbara Spector ........................................... Council Member Prepared under the direction of: Laurel Prevetti ........................................................................................................... Town Manager Stephen D. Conway ................................................................................................. Finance Director 110 E. Main Street, Los Gatos, CA 95030 www.losgatosca.gov TABLE OF CONTENTS i INTRODUCTION Town Manager’s Message .................................................................................................................... A – 1 Budget Process Overview ..................................................................................................................... A – 11 FY 2016/17 Completed CIP Projects ..................................................................................................... A – 15 FINANCIAL SUMMARIES Program Summaries Streets Program ............................................................................................................................... B – 5 Parks Program .................................................................................................................................. B – 6 Public Facilities Program .................................................................................................................. B – 6 Fund Summaries Total CIP Fund Summary .................................................................................................................. B – 9 Fund 411 - GFAR Fund ..................................................................................................................... B – 10 Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12 Fund 421 – Grants Fund................................................................................................................... B – 14 Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16 Fund 472 – Utility Underground Fund ............................................................................................. B – 18 Fund 481 – Gas Tax Fund ................................................................................................................. B – 20 STREETS PROGRAM Street Reconstruction & Resurfacing Projects Street Repair & Resurfacing ............................................................................................................. C – 6 Almond Grove Street Rehabilitation Project ...................................................................................C – 10 Street Repairs, Maintenance & Safety Projects Traffic Calming Projects ................................................................................................................... C – 16 Curb, Gutter & Sidewalk Maintenance ............................................................................................ C – 18 Retaining Wall Repairs ..................................................................................................................... C – 20 Annual Street Restriping .................................................................................................................. C – 22 Public Access Infrastructure Improvement Projects ....................................................................... C – 24 Guardrail Replacement Projects ...................................................................................................... C – 26 Electrical Panel Replacement on Pageant Way ............................................................................... C – 28 Crosswalk Improvements at Santa Cruz Ave/Blossom Hill Rd ......................................................... C – 30 Crosswalk Lighting Upgrades ........................................................................................................... C – 32 TABLE OF CONTENTS ii Street Improvement Projects Highway 9 University Avenue Intersection Improvements ............................................................. C – 38 Los Gatos Boulevard/Shannon Road Improvements. ..................................................................... C – 40 Monument Control Network Update .............................................................................................. C – 42 Downtown Parking Lots Seal Coat & Restriping .............................................................................. C – 44 Hernandez Avenue Storm Drain Improvements ............................................................................. C – 46 Blossom Hill Road/Cherry Blossom Lane Intersection Improvements ............................................ C – 48 224 West Main Property Acquisition (Parking Lot 6) ...................................................................... C – 50 Sidewalk Improvements/Shannon Road/Los Gatos Boulevard/Cherry Blossom ............................ C – 52 Stonybrook Road & Kennedy Road Sidewalk Improvements .......................................................... C – 54 Sidewalk Improvements – Multiple Locations ................................................................................. C – 56 LED Streetlights ................................................................................................................................ C – 58 Pageant Way Parking Lot Reconstruction ....................................................................................... C – 60 Utility Undergrounding Improvements ........................................................................................... C – 62 Bicycle & Pedestrian Master Plan .................................................................................................... C – 64 Cut-Through Traffic Mitigation ........................................................................................................ C – 66 Traffic Signal Modernization ............................................................................................................ C – 68 Bicknell Road Storm Drain Improvements ....................................................................................... C – 70 Bicycle & Pedestrian Improvements ................................................................................................ C – 72 Stormwater Master Plan .................................................................................................................. C – 74 Stormwater System – Pollution Prevention Compliance ................................................................ C – 76 Public Arts Gateway Project ............................................................................................................ C – 78 Bridge Projects Quito Road - Bridge Replacement ................................................................................................... C – 84 PARKS AND TRAILS PROGRAM Park Improvement Projects Parks Playground Fibar Project ........................................................................................................ D – 6 Park Rehabilitation – Bachman Park ................................................................................................ D – 8 Blossom Hill Park – Little League Backstop ..................................................................................... D – 10 Tennis Courts Resurfacing – Various Town Parks ............................................................................ D – 12 Forbes Mill Footbridge Improvements ............................................................................................ D – 14 Belgatos Park Restroom Improvements .......................................................................................... D – 16 Trail Improvement Projects Open Space Trail Upgrades .............................................................................................................. D – 22 TABLE OF CONTENTS iii PUBLIC FACILITIES PROGRAM Infrastructure Projects Building Replacement at Corporation Yard ...................................................................................... E – 6 Civic Center Building Energy Efficiency Measures ............................................................................ E – 8 Fuel System Enhancements ............................................................................................................. E – 10 Energy Efficiency Upgrades Town-wide .......................................................................................... E – 12 Exterior Lighting Replacement – Civic Center ................................................................................. E – 14 Civic Center – Fountain Modification .............................................................................................. E – 16 HVAC – Chiller Repair ....................................................................................................................... E – 18 Equipment Projects Information System Upgrade .......................................................................................................... E – 24 Audio / Video System Upgrade ........................................................................................................ E – 26 Town-Wide Document Imaging Project .......................................................................................... E – 28 Tiburon CAD/RMS Upgrade ............................................................................................................. E – 30 Engineering Document Archiving .................................................................................................... E – 32 Police & PPW Interoperability Radio Project ................................................................................... E – 34 Silicon Valley Regional Interoperability Project (SVRIP) ................................................................. E – 36 REFERENCE Glossary .................................................................................................................................................. F – 1 Index....................................................................................................................................................... F – 7 A - 1 TOWN OF LOS GATOS CIVIC CENTER 110 E. MAIN STREET LOS GATOS, CA 95030 May 4, 2017 Honorable Mayor and Town Council: I am pleased to submit to you the Proposed Fiscal Year (FY) 2017/18 - 2021/22 Five-Year Capital Improvement Program (CIP) for the Town of Los Gatos. The CIP is a comprehensive five-year capital improvement plan designed to identify projects to develop and maintain the Town’s infrastructure, consistent with the Town Council Core Goal of maintaining the condition and availability of public facilities. Guidance for developing priorities for capital improvement projects is also derived from key plans, including the General Plan and the Council’s Strategic Priorities. This CIP budget message contains: • Town’s Core Goals and Strategic Priorities • CIP Financial Summary - Funding Sources • Proposed FY 2017/18 - 2021/22 CIP Overview • Proposed FY 2017/18 CIP Overview • FY 2016/17 Completed Projects In January 2017, the Town Council reaffirmed its Core Goals and established the 2017-2019 Strategic Priorities (see page A-3). The Core Goals and Strategic Priorities guide the preparation of both the Capital and Operating Budgets. As part of this process, the Council identified the use of $2.6 million of FY 15/16 savings (General Fund Strategy Reserve) for capital project priorities and operating needs. In terms of capital projects, the Town Council affirmed its interest in completing the Phase II of the Almond Grove streets, investing in bicycle and pedestrian improvements, addressing cut-through traffic, and improving the condition of the Town’s streets. In addition, the Council identified new projects for public art, Forbes Mill Footbridge lighting, and trash capture devices to comply with pollution prevention requirements. These projects are all included in the Proposed CIP. A significant amount of the funding for the Almond Grove Street Rehabilitation project was created from reserves, other capital projects, and year end savings in FY 2015/16. Due to the favorable construction bid, the project has $2.9 million excess funds. Staff recommends to combine the excess balance ($2.9 million) with the Strategy Reserve ($2.6 million) to replenish or add to some of the reserves ($3 million), and meet Town’s other capital ($1.9 million) and operating needs ($0.66 million). All proposed CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 2 capital projects are described in this document. The reserves and operating expenditures are discussed in more detail in the Proposed FY 2017/18 Operating Budget. General Fund Use - One Time 446,595$ Traffic & Mobility Manager 217,808 Capital Projects 1,864,419 Budget Stabilization & Catastrophic Reserve 663,882 CalPERS/OPEB Reserve 1,000,000 General Fund Capital Reserve 703,496 Facilities Fund 300,000 Equipment Replacement Fund 300,000 Total Use 5,496,200$ Proposed Use of Funds CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 3 CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 4 CIP FINANCIAL SUMMARY – FUNDING SOURCES As in the past, the Town continues to be challenged in its attempts to secure a reliable ongoing source of revenue for the Capital Improvements Program. The proposed five-year CIP reflects only $5.75 million in ongoing Gas Tax dedicated sources to help fund the proposed $45.2 million of planned capital improvements. The balance of CIP funding of $39.5 million is expected to be funded by one–time appropriations from the General Fund Appropriated Reserves (GFAR), Utility Undergrounds Funds, Traffic Mitigation Funds, Grant Funds, Storm Drain Funds as follows: Ongoing Gas Tax 5,751,290$ GFAR 29,333,148 Utility Undeground Funds 6,766,000 Traffic Mitigation Funds 2,257,418 Grant Funds 919,443 Storm Drain Funds 215,000 Total Funding Available 45,242,299$ Funding Sources for the FY 2017/18 - 2021/22 CIP One-Time GAS TAX State Gasoline Tax revenue, the only ongoing revenue source for capital improvements, is distributed to the Town from the State of California and recorded in the Gas Tax Fund. This tax is also known as the “Highway Users Tax” or the “Motor Vehicle Fuel License Tax.” The gasoline tax is an 18-cent per gallon tax on fuel used to propel a motor vehicle or aircraft. Gas Tax revenue is allocated to the Town based on a per gallon of gas purchased within the Town limits and based on population. The estimated Gas Tax revenue totals approximately $780,000 for FY 2017/18 and are expected to increase annually to $1,100,000 beginning FY 2018/19 due to the recently enacted Road Recovery and Repair Act of 2017 (SB1). These funds can only be used for new construction and reconstruction of Town streets. GFAR The primary source of funding for the Town’s capital program is the Town’s General Fund Appropriated Reserves (GFAR). By Council direction, this fund receives transfers from the General Fund’s designated Reserve for Future and Special Projects, which receives most of the Town’s annual revenues above operating expenditures after funding all legally restricted reserves at their required levels, including receipt of one-time funds from grants, property, and other reserves. Because of the availability of General Fund “one-time” funding sources in recent years, the Council approved a General Fund transfer to the GFAR fund in the amount of $2.7 million for FY 2013/14, an additional “one-time” source allocation of $6.6 million for FY 2014/15, and additional funding of $6.9 million for the Almond Grove Street Rehabilitation project in FY 2016/17. After these allocations, the Reserve for Future Capital and Special Projects forecasted June 30, 2017 balance is $3.1 million. Sufficient balances are anticipated for the following five years of the Plan to allocate approximately $400,000 from the General Fund Reserve for Capital and Special Projects for FY 2017/18 through FY 2021/22. CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 5 As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA) assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. This funding source is expected to generate approximately $190,000 annually for Los Gatos, which will be used for street rehabilitation Town-wide. In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633. The other revenue source for GFAR is the Construction Impact Fee and a Refuse Vehicle Road Impact Fee. This Construction impact fee is assessed on construction projects based on the square foot size of the project at a rate of $1.14 per square foot. These fees are intended to recover the damage caused to Town streets by construction traffic. Construction Impact fees generate at least $110,000 annually. Refuse Vehicle Road impact Fee estimated to generate $370,000 for FY 2017/18. The funding from this reserve greatly enhances the Town’s ability to implement the CIP; however, it is not enough to support future annual infrastructure maintenance or construct new facilities. Establishing a reliable, dedicated source of funding for basic capital improvements beyond the use of accumulated reserves remains a long-term need and important goal for the Town. UTILITY UNDERGROUND FUNDS The Utility Undergrounding Fund serves as a funding source for activities generally undertaken in conjunction with street improvement projects. The Town receives approximately $30,000 annually in Utility Undergrounding funding which is derived from a Town construction tax of 18 cents charged for each square foot of building addition or alteration within the Town. Total cash balances currently on hand from the utility undergrounding construction tax are approximately $2.8 million at FY 2016/17 year-end. In addition, the Town may have access to over $3.8 million in Rule 20A funds allocated from a percentage of electric bills. PG&E retains and tracks these monies. The Town has identified a project to underground utilities along Los Gatos Boulevard south of Lark Avenue. These projects rely on PG&E for scheduling and have long lead times. Staff expects a six year project design timeline, and is expecting project construction in FY 2021/22. TRAFFIC MITIGATION FUNDS The traffic impact mitigation fee assures that each new development or expansion of use pays its fair share of the transportation improvements needed to accommodate the cumulative traffic impacts. The fee is paid in full prior to issuance of the building permit for new development or expansion of use. In FY 2013/14, the Town Council approved an increased Traffic Impact Fee, expected to generate $2 million over five years for local transportation improvements. Traffic Mitigation Funds should be used solely for construction of identified traffic and transportation improvement projects. GRANT FUNDS The Town receives several grants from various sources that help address some of the maintenance and improvement costs associated with Town streets. Grants include federally funded Surface Transporation Program (STP) funds which pay for general roadway capital improvements, Community Development Block Grant (CDBG) funds, which pay for improvements that benefit the persons with disabilities and/or seniors, and Highway Safety Improvement Program funds, which are being used to complete the Highway 9 and University project. Total grant funding for FY 2017/18 is estimated at $250,000. CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 6 STORM DRAIN FUNDS The Town also receives funding from its Storm Drain Fund, which relies on an established charge of $0.75 per square foot of impervious surface created by new development. Depending on development activity, this fee produces approximately $100,000 in revenue annually. This fee has not been adjusted for several years and should be evaluated in the future as part of the NPDES storm water permit process and as part of a continuous review of development related fees. The remaining sources are primarily one-time funds from State or Federal government or from special revenue funds that have often fluctuated in tandem with the economy and the state budget. Examples of one-time funds include Valley Transportation Authority/Transportation Fund for Clean Air (VTA/TFCA) funds and State Proposition 42 Gas Tax funds. PROPOSED FY 2017/18 – 2021/22 CIP OVERVIEW The Capital Improvement Program is broadly grouped into the following categories:  Streets Program, which maintains and ensures functional streets, pedestrian, and bike systems.  Parks Program, which repairs or improves parks, park buildings, trails, and urban forestry.  Public Facilities Program, which constructs and repairs public buildings, and purchases equipment. The proposed CIP projects include both new and carry-forward projects from the prior year as part of the multi-year programming of $45.2 million. Approximately $42.8 million (95%) is allocated to the streets, retaining walls, sidewalks, and curbs category; $0.9 million (2%) is allocated to parks and trails projects; and $1.5 million (3%) is allocated to public facility projects. Allocations are summarized below by type of major improvements within the program categories. Carry-forward from 2016/17 2017/18 Carry-forward and New FY 2017/18 2018/19 2019/20 2020/21 2021/22 Total By Category Total By Program Streets Reconstruct/Resurfacing 13,294,149$ 2,390,633$ 15,684,782$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 25,407,434$ Maintenance & Safety 1,453,019 385,000 1,838,019 385,000 385,000 385,000 385,000 3,378,019 Street Improvements 4,479,631 967,000 5,446,631 694,869 634,895 457,027 6,593,000 13,826,421 Bridges 235,087 - 235,087 - - - - 235,087 42,846,962$ Parks Park Improvements 545,146 70,000 615,146 25,000 - 25,000 - 665,146$ Trail Improvements 250,000 - 250,000 - - - - 250,000 915,146$ Public Facilities Infrastructure Projects 308,135 50,000 358,135 50,000 25,000 25,000 50,000 508,135$ Equipment Projects 819,180 152,876 972,056 - - - - 972,056 1,480,191$ TOTALS 21,384,348$ 4,015,509$ 25,399,857$ 3,605,532$ 3,495,558$ 3,302,690$ 9,438,663$ 45,242,299$ Five Year CIP Summary FY 2017/18 - 2021/21 CIP by Program Total funding for street reconstruction and resurfacing for the next five years is planned at $25.4 million with approximately $15.7 million allocated in FY 2017/18 including carryovers. Over the five-year period, the CIP proposes $17.4 million for various other street-related infrastructure improvements including street maintenance and resurfacing; curb, gutter and sidewalk maintenance; street intersection improvements; retaining wall reconstruction; crosswalk ramps and safety devices; and storm drain improvements. Total funding for parks and trail improvements for the next five years is planned at $0.9 million with approximately $0.85 million allocated in FY 2017/18 including carryovers. CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 7 Total funding for public facilities infrastucture improvements and equipment projects for the next five years is planned at $1.5 million with approximately $1.3 million allocated in FY 2017/18 including carryovers. Although the Proposed FY 2017/18-2021/22 CIP is a five-year plan, only the first year of the plan is formally adopted with funds appropriated by the Town Council as part of the budget process. Future year projects are funded with designated cash reserves on hand, supplemented by estimated annual revenues for capital funding purposes such as Gas Tax funds and state transportation funds. The scope and funding estimates may change based on the Town’s fiscal situation and evolving priorities. PROPOSED FY 2017/18 CIP OVERVIEW $25.4 million is being proposed in the first year of the CIP and is comprised of approximately $21.4 million in carryover funds from FY 2016/17 and approximately $4.0 million in new funding. The first year of the five year plan, FY 2017/18, continues funding for the Town Council Strategic Priorities, including basic infrastructure needs. The first phase of the Almond Grove project, the reconstruction of Broadway and Bachman Avenues, was completed in the fall of 2016. The Almond Grove Phase 2 project includes the remaining eight streets. Construction is anticipated to begin in the summer of 2017 and continue over the next two summer seasons. Due to the favorable construction bid, the project has $2.9 million excess funds. As it was mentioned earlier, this excess has been combined with FY 2015/16 savings and is recommended for appropriation as discussed on page A-2. The CIP also continues ongoing funding in areas that require consistent investments to ensure the stability of existing infrastructure, such as retaining walls, sidewalk repair, and street maintenance. The latter item, street maintenance, warrants particular attention as the Town Pavement Condition Index (PCI), a standard rating of street conditions, has fallen in recent years. The PCI reached a recent high rating of 74 in 2008 due to concentrated investments and is now at the level of 65 (2017 data). With the new State Transportation Funds, other funding, and combining this project with the Town’s Maintenance Crack Sealing Project, the investment in street maintenance will rise from $1,075,000 to $2,450,000 per year. This new investment level will allow the Town’s PCI to increase to a 67 or 68 within the next five years. In FY 2015/16, the Council placed several CIP projects on hold and transferred the funding of these projects to the Almond Grove Project. The following projects have been moved to an unfunded needs list: • Parking Lot 4 Repair and Resurfacing • Downtown Parking Sign Enhancements • Montebello Way Island Removal • Oak Meadow Park Upgrades • Los Gatos Creek Trail Improvements – Charter Oaks • Worchester Park Improvements • Civic Center Improvements • Plaza Park Improvements CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 8 The complete list of the proposed FY 2017/18 carry-forward and proposed projects (categorized by funds and programs) can be found on page A-9. Projects are listed in the Financial Summary section and further described in the project detail pages by category. Below is a summary by category. The total FY 2017/18 CIP is $25.4 million. Grant and Total Awards Estimated Street Projects 19,855,159$ 744,443$ 1,271,290$ 1,333,628$ 23,204,520$ Park Projects 865,146 - - - 865,146 Public Facilities Projects 1,330,191 - - - 1,330,191 TOTAL OF CARRY-FORWARD & NEW PROJECTS 22,050,496$ 744,443$ 1,271,290$ 1,333,628$ 25,399,857$ GFAR Gas Tax Other * Carry-forward & New FY 2017/18 CIP Projects CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 9 GFAR Grants and Gas Tax Other Total CARRY-FORWARD PROJECTS Awards Streets Street Repair & Resurfacing 3,475,319$ -$ 1,271,290$ -$ 4,746,609$ * Almond Grove Street Rehabilitation Project 10,938,173 - - - 10,938,173 Traffic Calming Projects 42,941 - - - 42,941 * Curb, Gutter & Sidewalk Maintenance 866,078 - - - 866,078 * Retaining Wall Repairs 349,710 - - - 349,710 * Annual Street Restriping 94,772 - - - 94,772 * Public Access Infrastructure Improvement Projects - 140,000 - - 140,000 Guardrail Replacement Projects 93,043 - - 93,043 Electrical Panel Replacement on Pageant Way 45,000 - - - 45,000 Crosswalk Improvements - Santa Cruz/Blossom Hill 60,000 - - 50,000 110,000 Crosswalk Lighting Upgrade 53,809 - - 42,666 96,476 Hwy 9/University Intersection - 199,235 - - 199,235 Los Gatos Blvd/Shannon Improvements - - 20,000 20,000 Monument Control Network Update 20,000 - - 10,000 30,000 Downtown Parking Lots Seal Coat & Restriping 100,000 - - - 100,000 Hernandez Avenue Storm Drain Improvements - - - - - Blossom Hill Rd/Cherry Blossom Ln Intersection Improvements - - - 500,000 500,000 224 W. Main Street Property Acquisition (Parking Lot 6)1,196,000 - - - 1,196,000 Shannon/LGB/Cherry Blossom Sidewalk Improvements 129,896 - - - 129,896 Stonybrook & Kennedy Sidewalk Improvements 561,042 - - - 561,042 Sidewalk Improvements - Multiple Locations 60,000 - - - 60,000 LED Streetlights 504,235 - - - 504,235 Pageant Way Parking Lot Reconstruction 161,596 - - - 161,596 Utility Undergrounding Improvements - - - 112,000 112,000 * Bicycle & Pedestrian Master Plan 43,457 80,208 - - 123,665 Cut-Through Traffic Mitigation 300,000 - - 271,092 571,092 Traffic Signal Modernization - 325,000 - 177,869 502,869 * Bicknall Avenue Storm Drain Improvements - - - 150,000 150,000 * Quito Road - Bridge Replacement 235,087 - - - 235,087 - Parks Open Space Trail Upgrades 250,000 - - - 250,000 Parks Playground Fibar Project 32,501 - - - 32,501 Park Rehabilitation - Bachman Park 325,000 - - - 325,000 Blossom Hill Park Little League Backstop 10,185 - - - 10,185 Tennis Courts Repairs - Various Town Parks 139,428 - - - 139,428 Forbes Mill Footbridge Improvements 83,033 - - - 83,033 * - Public Facilities Building Replacement at Corporation Yard 25,000 - - - 25,000 * Civic Center Building Energy Efficiency Measures 25,000 - - - 25,000 Fuel System Enhancement 75,000 - - - 75,000 Energy Efficiency Upgrade - Town-wide 50,000 - - - 50,000 * Exterior Lighting Replacement - Civic Center 25,000 - - - 25,000 Civic Center Fountain Modification 33,135 - - - 33,135 HVAC - Chiller Repair 125,000 - - - 125,000 Information System Upgrade 72,785 - - - 72,785 Audio/Video System Upgrade 58,160 - - - 58,160 Town-wide Document Imaging Project 16,990 - - - 16,990 Tiburon CAD/RMS Upgrade - - - - - Engineering Document Archiving 51,716 - - - 51,716 Police & PPW Interoperability Radio Project 584,087 - - - 584,087 Silicon Valley Regional Interoperability Project (SVRIP) Service 188,317 - - - 188,317 * TOTAL OF CARRY-FORWARD PROJECTS (INCLUDES NEW ALLOCATIONS)21,500,496$ 744,443$ 1,271,290$ 1,333,628$ 24,849,857$ NEW PROJECTS Streets Bicycle & Pedestrian Improvements 300,000 - - - 300,000 Stormwater Master Plan 200,000 - - - 200,000 Stormwater System - Pollution Prevention Compliance - - - - - Public Arts Gateway Project 25,000 - - - 25,000 Parks Belgatos Park Restroom Improvements 25,000 - - - 25,000 Public Facilities - - - - - TOTAL OF NEW PROJECTS 550,000$ -$ -$ -$ 550,000$ TOTAL OF CARRY-FORWARD & NEW PROJECTS 22,050,496$ 744,443$ 1,271,290$ 1,333,628$ 25,399,857$ * These carry-forward projects include new money for FY 2017/18 in the amount of $3,160,509. Carry-forward & FY 2017/18 CIP Projects CAPITAL IMPROVEMENT PROGRAM Introduction Section A - 10 FY 2016/17 COMPLETED PROJECTS Several projects are expected to be completed by the end of FY 2016/17. The table below outlines the projects, funding source, and total expense of the completed projects, which is estimated to be $2.8 million. More details about the completed projects can be found beginning on page A-15. Grant & Traffic Total Awards Mitigation Estimated Street Program Hillside Road Repair & Resurfacing 247,924$ -$ -$ -$ 247,924$ Green Bike Lanes 45,933 - - - 45,933 Winchester/Lark Intersection - - - 548,807 548,807 Traffic Around Schools 85,907 85,907 Park Program Blossom Hill Park Restroom Building Upgrades 40,000 - - - 40,000 Public Facilities Program Old Library Re-use Project 1,129,709 - - - 1,129,709 Former Library Roof Improvements 67,264 67,264 HVAC Upgrades - Old Library 643,379 643,379 Civic Center Imp (Noise)25,000 25,000 TOTAL OF COMPLETED PROJECTS 2,285,116$ -$ -$ 548,807$ 2,833,923$ * Other Funds include Storm Drain Fund, Gas Tax Funds, Utility Underground Funds Projects Completed in FY 2016/17 GFAR Other * CONCLUSION The challenge of finding a reliable ongoing revenue stream available for capital projects continues to be a Town priority. Recognizing the realities of funding challenges and uncertain local economic trends, the Town’s FY 2017/18 – 2021/22 Capital Improvement Plan continues a strategy of funding the Town’s most urgent capital needs. I wish to thank all of the Departments, in particular Department Directors and members of their management and support staff, for their many hours of work and tireless efforts to present this Capital Improvement Program to the Town Council, as well as the following staff members: Stephen Conway, Finance Director Gitta Ungvari, Finance & Budget Manager Matt Morley, Parks & Public Works Director Lisa Petersen, Town Engineer Mark Gaeta, Accountant Bobby Gonzalez, Administrative Analyst Melissa Ynegas, Administrative Analyst Respectfully submitted, Laurel Prevetti Town Manager A - 11 BUDGET PROCESS OVERVIEW he Town of Los Gatos adopts an annual Operating and Capital Budget and an annual budget update of the five year Capital Improvement Program (CIP) for the Town of Los Gatos. The budgets contain summary level information for revenue and expenditure appropriations for the fiscal year beginning July 1st and ending June 30th. The budget documents are prepared in accordance with generally accepted accounting principles (GAAP). Budget Purpose The Operating and Capital Summary Budget and the Capital Improvement Program serve as the Town’s financial plan, as well as a policy document, a communications tool, and an operations guide. Developed with an emphasis on long range planning, service delivery, and program management, a fundamental purpose of these documents is to provide a linkage between the services and projects the Town intends to accomplish, and the resources committed to get the work done. The format of the budget facilitates this linkage by clearly identifying the program purpose, key projects, and work plan goals in relation to revenue and expenditures appropriations. CIP Purpose In particular, the CIP is designed to identify projects and funds required to adequately develop and maintain the Town’s infrastructure, which is consistent with the Town Council strategic goal of maintaining the condition and availability of public facilities. The following plans provide additional guidance in developing priorities for capital improvement projects: • General Plan • Street Improvement Program In addition, project prioritization criteria such as health and safety issues, infrastructure or system condition, short term versus long term impacts and availability of external funding sources are assessed as part of the process that staff uses to rank projects from high to low in preparing the proposed CIP. As it develops and matures in its application, the Town’s Infrastructure Assessment Program will further support the Town’s long range Capital Improvement Program, focusing attention on the current and future infrastructure needs of the community and balancing the community’s needs with funding requirements and financial resources. Other technology tools used in CIP development include the use of the geographic information system, the traffic monitoring system, electronic files for tracking unfunded projects and replacement schedules, and an asset management program to track work requests. The Town’s capital projects are categorized as follows: The Streets Program provides funding for maintaining a functional street and pedestrian system. Proposed projects are consistent with the General Plan, provide for a safe and efficient traffic flow through intersections while minimizing unnecessary traffic movement and noise through residential neighborhoods, and provide street lighting for traffic safety at intersections and on public streets. Also included are sidewalk improvements. The Public Facilities Program includes projects for constructing and repairing public buildings and purchasing equipment. Town buildings include the Civic Center, the Library, Adult Recreation Center, Tait Avenue and Forbes Mill properties, and other assets. Although the Town owns the three fire stations within Town limits, the Santa Clara County Fire District maintains them under contract. The Parks Program includes projects for parks, park buildings, urban forestry, and urban beautification. Basis of Budgeting and Accounting Developed on a program basis with fund level authority, the Operating and Capital Budgets represent services and functions provided by T CAPITAL IMPROVEMENT PROGROM Introduction Section A - 12 the Town in alignment with the resources allocated during the fiscal year. The Town’s Governmental Funds consist of the General Fund, Special Revenue Funds, Debt Service Funds, and Capital Project Funds for both the Town and the Successor Agency of the Town of Los Gatos Redevelopment Agency (RDA). RDA debt is continuing to be paid for the Certificate of Participation (COPs) used to finance the Library. Basis of Accounting and Budget refers to the timing factor concept in recognizing transactions. This basis is a key component of the overall financial system because the budget determines the accounting system. For example, if the budget anticipates revenues on a cash basis, the accounting system must record only cash revenues as receipts. If the budget uses an accrual basis, accounting must do likewise. The Town’s budgeting and accounting systems both use a combination of modified accrual and full accrual basis in the accounting and budget systems. Governmental Fund and Successor Agency Fund budgets are developed using the modified accrual basis of accounting. Under this basis, revenues are estimated for the period if they are susceptible to accrual, e.g. amounts can be determined and will be collected within the current period. Principal and interest on general long-term debt are budgeted as expenditures when due, whereas other expenditures are budgeted for liabilities expected to be incurred during the current period. Proprietary Fund budgets are adopted using the full accrual basis of accounting whereby revenue budget projections are developed recognizing revenues expected to be earned during the period, and expenditures are developed for expenses anticipated to be incurred in the fiscal year. The Town maintains one type of proprietary fund: Internal Service Funds. The Town’s Fiduciary Funds are also budgeted under the modified accrual basis. The Town administers four trust funds and one agency fund. Trust funds are subject to trust agreement guidelines, and the Agency Fund is held in a purely custodial capacity involving only the receipt, temporary investment, and remittance of resources. Summary of Budget Development The Town develops its budgets with a team- based budgeting approach. Town Management and the Finance Department guide the process through budget development; however, program budgets and workplans are developed with each Department’s Director, Analyst, and Program Manager’s oversight and expertise. This approach allows for hands-on planning and creates a clearer understanding for both management and staff of a program’s goals and functions to be accomplished in the next budget year. The Development Process Typically both the Operating and Capital Budget and Capital Improvement Program processes begin early in the calendar year with the Town Council and Town Manager’s collaborative development and refinement of initiatives and directives for the upcoming budget year as reflected in the Council adopted strategic goals. In January, the budget preparation process begins officially for staff with a budget kickoff meeting. Budget assumptions, directives, and initiatives developed by Town Council and management are provided to set the Town’s overall objectives and goals. Department staff identify and analyze program revenue and expenditure projections in coordination with Finance/Budget staff and Town Management. Town staff also consult with Town Commissions for their input on specific investments. Capital improvement projects are assessed and refined, and CIP funding and appropriation requirements are finalized. Through rounds of budget briefings and revisions, final proposed program budget and CAPITAL IMPROVEMENT PROGROM Introduction Section A - 13 work plans are developed by the end of April. Operational and capital workplans are finalized. and the Finance/Budget staff prepares financial summary information. Per the Town Code, the Town Manager submits the entire proposed budget package to the Town Council for its consideration, including Departmental budgets and work plans. CIP Development Process The long term Capital Improvement Program includes projects that have a value of $25,000 or more with a minimum useful life of 5 years at a fixed location. Equipment, operating, and maintenance costs associated with the CIP projects are identified where feasible, and will be included in future operating budgets. Cost estimates for new projects are based on 2017 dollars; however, engineering estimates for carryover projects from the prior year are updated to reflect current industry costs. Under direction from the Town Manager’s Office, the Parks and Public Works Department took the lead in the preparation of the proposed projects for consideration in the FY 2017/18 – 2021/22 Capital Improvement Program. In coordination with other Town Departments, projects were reviewed to ensure that the Town’s priorities are addressed within available resources. In some cases, previously approved projects have been deferred due to reallocation of funding to other priorities and thus have been noted as unfunded projects in each program section of the CIP. The Town Manager’s Office reviews the prioritized list of proposed capital improvement projects and funding sources in conjunction with the preparation of the FY 2017/18 Operating Budget. The Proposed CIP is then presented by the Town Manager to the Town Council. The Proposed CIP is also submitted to the Planning Commission for review to ensure that the proposed projects are consistent with the Town’s General Plan. The Planning Commission reviewed the CIP and found it consistent with the General Plan on April 26, 2017. The CIP is reviewed during this time to determine funding capabilities and project priorities, and to refine project work plans. Although the CIP budget document is prepared separately from the Operating and Capital Budget, CIP program information is incorporated into the Operating and Capital Summary Budget document through the resulting financial appropriations and service level requirements. Budget Adoption During the month of May, the Town Council reviews the proposed Operating and Capital Summary Budget, and the Capital Improvement Program for the five-year period at a public hearing. Notice of the hearing is published in a local newspaper at least ten days prior to the Council’s public hearing date. The public is invited to participate and copies of the proposed budgets are available for review in the Clerk Department, on the Town website, and at the budget hearing. Under requirements established in Section 65401 of the State Government Code, the Town’s Planning Commission also reviews the proposed Capital Improvement Program and reports back to the Town Council as to the conformity of the CIP with the Town’s Adopted General Plan. Final Council-directed revisions to the proposed budget are made and the budget documents are resubmitted to the Town Council for final adoption, again in a publicized public hearing in June prior to the beginning of the fiscal year (July 1st). Section 2.30.295(b) of the Los Gatos Town Code requires the Town Manager to annually prepare and submit a budget to the Town Council. This is accomplished in June, when the final proposed budget is formally submitted to the Town Council in the subsequent public hearing. CAPITAL IMPROVEMENT PROGROM Introduction Section A - 14 Budget Amendments During the course of the fiscal year, workplan changes and unanticipated needs necessitate adjustments to the adopted budgets. The Town Manager is authorized to transfer appropriations between categories, departments, projects, and programs within a fund in the adopted budget, whereas the Town Council holds the authority for budget increases and decreases, and transfers between funds. CAPITAL IMPROVEMENT PROGROM Introduction Section A –14 PROPOSED COMPLETED CIP PROJECTS FY 2016/17 A-15 A Old Library Re – Use Project B HVAC Upgrades – Old Library C Former Library Building Roof Improvements D Blossom Hill Park Restroom Rehabilitation E Green Bike Lanes F Winchester Boulevard/Lark Avenue Intersection Improvements G Traffic Around Schools H Hillside Road Repair & Resurfacing L O S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V UN I V E R S I T Y A V WEDGEWOO D POLLARD R D D KNOWLES A, B, CE H F "G" IS A TOWN-WIDE PROJECT PROPOSED COMPLETED CIP PROJECTS FY 2016/17 A-16 A Old Library Re-Use Project Old Library Re–Use Project This project renovated the old Library building by installing a new public elevator, upgrading restrooms to meet public access infrastructure improvements compliance, and making other tenant improvements. The total project cost was approximately $1,100,000 C Former Library Building Roof Improvements Former Library Building Roof Improvements This project replaced the roofing over the former library at the Civic Center. The total project cost was approximately $67,000. B HVAC Upgrades – Old Library HVAC Upgrades – Old Library This project renovated the old Library building by replacing the Heating, Ventilation and Air Conditioning system (HVAC). The total project cost was approximately $643,000. PROPOSED COMPLETED CIP PROJECTS FY 2016/17 A-17 D Blossom Hill Park Restroom Rehabilitation Blossom Hill Park Restroom Rehabilitation The restroom rehabilitation project at Blossom Hill Park addressed the deteriorating state of the exterior support columns, replaced the failed program storage entrance, and repainted as necessary. The total project cost was approximately $40,000. E Green Bike Lanes Green Bike Lanes This project added green bike lanes near Los Gatos High School as recommended by the Youth Commission. The total project cost was approximately $46,000. E Winchester Boulevard/Lark Avenue Intersection Improvements Winchester Boulevard/Lark Avenue Intersection Improvements This project added a northbound receiving lane on Winchester Boulevard from Lark Avenue to Wimbledon Drive. In addition, the project reconfigured traffic lanes on westbound Lark Avenue to provide a double right turn onto Winchester Boulevard, and modified the traffic signal system at the intersection of Winchester Boulevard and Lark Avenue. The total project cost was approximately $550,000. PROPOSED COMPLETED CIP PROJECTS FY 2016/17 A-18 F Traffic Around Schools Traffic Around Schools This project conducted a study that evaluated and made recommendations specific to reducing vehicular traffic around schools. The study has provided actionable items to guide future investments by the schools and the Town. The total project cost was approximately $86,000. G Hillside Road Repair & Resurfacing Hillside Road Repair & Resurfacing This project provided asphalt surface treatments to Shannon Road from Los Gatos Boulevard to Hicks Road. The project was largely grant funded through a One Bay Area Grant (OBAG). The project was completed in the previous fiscal year with project close out completed in 2017. The total project cost was approximately $250,000. CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -1 0 50 100 150 200 250 300 FINANCIAL SUMMARIES PROGRAM SUMMARIES Streets Program ....................................................................................................................................... B – 5 Parks Program ........................................................................................................................................ B – 6 Public Facilities Program.......................................................................................................................... B – 6 FUND SUMMARIES Total CIP Fund Summary ......................................................................................................................... B – 9 GFAR Fund ............................................................................................................................................... B – 10 Traffic Mitigation Fund ............................................................................................................................ B – 12 Grants and Awards Project Fund ............................................................................................................. B – 14 Storm Basin Funds ................................................................................................................................... B – 16 Utility Underground Fund........................................................................................................................ B – 18 Gas Tax Fund ........................................................................................................................................... B – 20 CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -2 CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -3 FINANCIAL SUMMARIES BY PROGRAM CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -4 FY 2017/18 BUDGET BY PROGRAM CATEGORY (Includes Carryforward and FY 2017/18 Budget) Carryforward & Budget by Program Category FY 2017/18 Category % Streets Program Street Reconstruction 15,684,782$ 62% Maintenance, Repair & Safety Projects 1,838,019 7% Street Improvements 5,446,631 21% Bridges 235,087 1% Streets Program 23,204,520$ 91% Parks and Trails Program Park Improvements 615,146$ 2% Trail Improvements 250,000 1% Parks Program 865,146$ 3% Public Facilities Program Infrastructure 358,135$ 1% Equipment 972,056 4% Public Facilities 1,330,191$ 5% TOTAL PROJECT FUNDING 25,399,857$ 100% CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -5 Street Reconstruction & Resurfacing 9901 Street Repair & Resurfacing 8,584,874$ 1,539,963$ 2,355,976$ 2,390,633$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 24,594,098$ 0003 Almond Grove Street Rehabilitation 503,971 2,750,444 10,938,173 - - - - - 14,192,588 - Street Maintenance, Repair & Safety 9910 Traffic Calming Projects 132,059 - 32,941 10,000 10,000 10,000 10,000 10,000 215,000 9921 Curb, Gutter & Sidewalk Maintenance 1,748,366 50 616,078 250,000 250,000 250,000 250,000 250,000 3,614,494 9930 Retaining Wall Repairs 1,220,978 92,089 249,710 100,000 100,000 100,000 100,000 100,000 2,062,777 9902 Annual Street Restriping 180,228 - 69,772 25,000 25,000 25,000 25,000 25,000 375,000 2102 Public Access Infrastructure Improvement Projects - - 140,000 - - - - - 140,000 0120 Guardrail Replacement Projects 136,958 - 93,043 - - - - - 230,000 0122 Electrical Panel Replacement on Pageant Way - - 45,000 - - - - - 45,000 0125 Crosswalk Improvements - Santa Cruz/Blossom Hill - - 110,000 - - - - - 110,000 0126 Crosswalk Lighting Upgrade 85,760 7,565 96,476 - - - - - 189,800 Street Improvements 0202 Hwy 9/University Intersection 969,495 - 199,235 - - - - - 1,168,730 0213 Los Gatos Blvd/Shannon Improvements - - 20,000 - - - - - 20,000 0214 Monument Control Network Update - - 30,000 - - - - - 30,000 0705 Downtown Parking Lots Seal Coat & Restriping - - 100,000 - - - - - 100,000 0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - - - 65,000 82,180 0212 Blossom Hill Rd/Cherry Blossom Ln Intersection - - 500,000 - - - - - 500,000 0704 224 W. Main Street Property Acquisition (Parking Lot 6)4,000 - 1,196,000 - - - - - 1,200,000 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 - 129,896 - - - - - 130,000 0219 Stonybrook & Kennedy Sidewalk Improvements 18,884 74 561,042 - - - - - 580,000 0221 Sidewalk Improvements - Multiple Locations - - 60,000 - - - - - 60,000 0224 LED Streetlights - 413 504,235 - - - - - 504,648 0707 Pageant Way Parking Lot Reconstruction 16,368 29,000 161,596 - - - - - 206,964 0225 Utility Undergrounding Improvements - - 70,000 42,000 42,000 42,000 42,000 6,528,000 6,766,000 0226 Bicycle & Pedestrian Master Plan 72,434 66,097 123,665 - - - - - 262,196 0229 Cut-Through Traffic Mitigation 13,695 145,213 571,092 - - - - - 730,000 0227 Traffic Signal Modernization - - 252,869 250,000 352,869 592,895 415,027 - 1,863,659 0410 Bicknall Avenue Storm Drain Improvements - 21,500 - 150,000 - - - - 171,500 0231 Bicycle & Pedestrian Improvements - - - 300,000 - - - - 300,000 0413 Stormwater Master Plan - - - 200,000 - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance - - - - 300,000 - - - 300,000 0232 Public Arts Gateway Project - - - 25,000 - - - - 25,000 Bridges 0801 Quito Road - Bridge Replacement 64,594 - 235,087 - - - - - 299,681 Total Streets Projects 13,769,948$ 4,652,407$ 19,461,887$ 3,742,633$ 3,530,532$ 3,470,558$ 3,252,690$ 9,388,663$ 61,269,316$ Expended Through 2015/16 2016/17 Estimated Actuals Estimated Carryfwd to 2017/18 2017/18 Budget Total Budgeted 2018/19 Budget STREETS PROGRAM SUMMARY 2019/20 Budget 2020/21 Budget 2021/22 Budget CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -6 Park Improvements 4605 Parks Playground Fibar Project 42,500$ -$ 32,501$ -$ 25,000$ -$ 25,000$ -$ 125,000$ 3104 Park Rehabilitation - Bachman Park - - 325,000 - - - - - 325,000 3407 Blossom Hill Park Little League Backstop - 99,815 10,185 - - - - - 110,000 4608 Tennis Courts Repairs - Various Town Parks - 572 139,428 - - - - - 140,000 4507 Forbes Mill Footbridge Improvements - 7,815 38,033 45,000 - - - - 90,848 3303 Belgatos Park Restroom Improvements - - - 25,000 - - - - 25,000 Trail Improvements 4504 Open Space Trail Upgrades - - 250,000 - - - - - 250,000 Total Parks Projects 42,500$ 108,202$ 795,146$ 70,000$ 25,000$ -$ 25,000$ -$ 1,065,848$ 2017/18 Budget 2018/19 Budget 2020/21 Budget Expended Through 2015/16 2016/17 Estimated Actuals Estimated Carryfwd to 2017/18 PARKS AND TRAILS PROGRAM SUMMARY 2021/22 Budget Total Budgeted 2019/20 Budget Infrastructure 2302 Building Replacement at Corporation Yard 12,146$ 4,571$ -$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 166,717$ 2110 Civic Center Building Energy Efficiency Measures - - 25,000 - - - - - 25,000 2304 Fuel System Enhancement - - 75,000 - - - - - 75,000 2008 Energy Efficiency Upgrade - Town-wide - - 25,000 25,000 25,000 - - - 75,000 2112 Exterior Lighting Replacement - Civic Center - - 25,000 - - - - - 25,000 2113 Civic Center Fountain Modification - - 33,135 - - - - - 33,135 2115 HVAC - Chiller Repair - - 125,000 - - - - - 125,000 Equipment 6101 Information System Upgrade 394,421$ 7,794$ 72,785$ -$ -$ -$ -$ -$ 475,000$ 6001 Audio/Video System Upgrade 52,440 - 58,160 - - - - - 110,600 6003 Town-wide Document Imaging Project 198,011 - 16,990 - - - - - 215,000 6302 Tiburon CAD/RMS Upgrade 28,000 42,000 - - - - - - 70,000 2305 Engineering Document Archiving 1,126 7,158 51,716 - - - - - 60,000 2402 Police & PPW Interoperability Radio Project - 11,593 584,087 - - - - - 595,680 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 129,600 140,711 35,441 152,876 - - - - 458,628 Total Facilities Projects 815,743$ 213,827$ 1,127,315$ 202,876$ 50,000$ 25,000$ 25,000$ 50,000$ 2,509,761$ Total Streets, Parks and Trails, and Public Facilities Projects 14,628,191$ 4,974,435$ 21,384,348$ 4,015,509$ 3,605,532$ 3,495,558$ 3,302,690$ 9,438,663$ 64,844,925$ 2019/20 Budget 2020/21 Budget 2021/22 Budget Total Budgeted Expended Through 2015/16 2016/17 Estimated Actuals Estimated Carryfwd to 2017/18 2017/18 Budget 2018/19 Budget PUBLIC FACILITIES PROGRAM CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -7 FINANCIAL SUMMARIES BY FUND CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -8 FY 2017/18 PROJECT SUMMARY BY FUND (Includes Carryforward and FY 2017/18 Budget) ` Carryforward & Budget by Fund FY 2017/18 Fund % GFAR 22,050,496$ 86.8% Traffic Mitigation Fund 1,071,628 4.2% Grant Funds 744,443 2.9% Storm Drain Funds 150,000 0.6% Utility Underground Fund 112,000 0.4% Gas Tax Fund 1,271,290 5.0% Total Budget by Fund 25,399,857$ 100.0% CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -9 Beginning Fund Balance 411 GFAR 13,278,575$ 13,278,575$ 11,271,323$ 1,001,346$ 375,159$ 218,972$ 157,785$ 411 Reserved for Parking 1,460,210 164,210 164,210 164,210 164,210 164,210 164,210 411 Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 471 Traffic Mitigation 207,207 207,207 207,207 207,207 207,207 207,207 207,207 421 Grant Fund (379,946) (379,946) (379,586) (325,368) (325,368) (325,368) (318,413) 461 Storm Basin #1 721,198 721,198 769,808 818,658 868,648 919,806 972,160 462 Storm Basin #2 949,644 949,644 999,394 1,049,394 1,100,544 1,152,862 1,206,377 463 Storm Basin #3 (2,788) (2,788) (21,798) (169,408) (167,708) (165,947) (164,124) 472 Underground Utilities 2,881,501 2,881,501 2,925,911 2,858,191 2,860,481 2,862,781 6,675,649 481 Gas Tax 1,651,113 1,651,113 711,043 216,210 223,253 230,336 241,549 Total Beginning Fund Balance 20,816,714$ 19,520,714$ 16,697,512$ 5,870,440$ 5,356,426$ 5,314,859$ 9,192,400$ Revenues 411 GFAR 10,307,945$ 1,859,716$ 12,295,944$ 1,862,092$ 1,982,092$ 2,102,092$ 2,222,092$ 471 Traffic Mitigation 1,470,887 155,213 1,081,628 187,869 602,895 425,027 10,000 421 Grant Fund 549,021 360 798,661 175,000 - - - 461 Storm Basin #1 49,000 48,610 48,850 49,990 51,158 52,354 53,569 462 Storm Basin #2 53,380 49,750 50,000 51,150 52,318 53,514 54,739 463 Storm Basin #3 1,500 2,490 2,390 1,700 1,761 1,823 1,886 472 Underground Utilities 50,000 44,410 44,280 44,290 44,300 3,854,868 63,380 481 Gas Tax 631,843 612,544 882,457 1,253,043 1,253,083 1,217,213 1,217,273 Total Revenues 13,113,576$ 2,773,093$ 15,204,210$ 3,625,134$ 3,987,607$ 7,706,891$ 3,622,940$ TOTAL SOURCE OF FUNDS 33,930,290$ 22,293,807$ 31,901,721$ 9,495,574$ 9,344,033$ 13,021,751$ 12,815,340$ Capital Program Expenditures 411 GFAR 23,090,812$ 3,764,968$ 22,050,496$ 2,070,663$ 1,720,663$ 1,745,663$ 1,745,663$ 471 Traffic Mitigation 1,533,034 145,213 1,071,628 177,869 592,895 415,027 - 421 Grant Fund 494,443 - 744,443 175,000 - - - 461 Storm Basin #1 - - - - - - - 462 Storm Basin #2 - - - - - - - 463 Storm Basin #3 21,500 21,500 150,000 - - - 65,000 472 Underground Utilities 70,000 - 112,000 42,000 42,000 42,000 6,528,000 481 Gas Tax 1,937,905 1,446,615 1,271,290 1,140,000 1,140,000 1,100,000 1,100,000 Total Capital Projects Expenditures 27,147,693$ 5,378,296$ 25,399,857$ 3,605,532$ 3,495,558$ 3,302,690$ 9,438,663$ Transfers Out & Other Sources 411 GFAR Designated for Parking 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 411 GFAR 199,808 102,000 515,424 417,616 417,616 417,616 417,616 411 Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 471 Traffic Mitigation 10,000 10,000 10,000 10,000 10,000 10,000 10,000 481 Gas Tax 106,000 106,000 106,000 106,000 106,000 106,000 106,000 Total Transfers Out & Designated 530,018$ 432,210$ 845,634$ 747,826$ 747,826$ 747,826$ 747,826$ Unrestricted 6,252,579$ 16,483,302$ 5,656,230$ 5,142,216$ 5,100,649$ 8,971,235$ 2,628,851$ TOTAL USE OF FUNDS 33,930,290$ 22,293,807$ 31,901,721$ 9,495,574$ 9,344,033$ 13,021,751$ 12,815,340$ FY 2022/23Carryfwd & FY 2017/18 FY 2018/19 FY 2019/20 FY 2021/21USE of FUNDS Adjusted Budget FY 2016/17 Estimated FY 2016/17 FY 2021/21Estimated FY 2016/17 FY 2022/23 Source and Use Summary Schedule All Capital Improvement Program Funds Adjusted Budget FY 2016/17 Carryfwd & FY 2017/18 FY 2018/19 FY 2019/20SOURCE of FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -10 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Designated for Parking 1,460,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Unrestricted 13,278,575 13,278,575 11,271,323 1,001,346 375,159 218,972 157,785 Total Beginning Fund Balance 14,788,785$ 13,492,785$ 11,485,533$ 1,215,556$ 589,369$ 433,182$ 371,995$ Revenues Use of Reserves - Parking 1,296,000$ -$ 1,296,000$ -$ -$ -$ -$ Construction Impact Fees 80,000 100,000 110,000 110,000 110,000 110,000 110,000 Refuse Vehicle Road Impact Fee 348,000 348,429 373,429 493,429 613,429 733,429 853,429 Zayo Contract( Conduit) - for Streets Repairs 350,000 350,000 - - - - - Utility Permit 25,000 25,000 - - - - - Slurry Seal - 5,005 - - - - - Forbes Mill Footbridge - 9,781 - - - - - Old Library Reuse - 55,000 - - - - - Developers Contributions 78,000 - 78,000 78,000 78,000 78,000 78,000 Cost Sharing - Curbs & Gutters 17,193 32,304 10,000 10,000 10,000 10,000 10,000 Cost Sharing - Traffic Calming 20,000 - 10,000 10,000 10,000 10,000 10,000 Traffic Around Schools - 16,070 - - - - - PG&E Rebate for LED 62,720 - 62,720 - - - - Little League Contribution to BHP Backstop 25,000 25,000 - - - - - Measure B Funding 489,079 189,947 479,132 180,000 180,000 180,000 180,000 2016 Measure B Funding - - 580,663 580,663 580,663 580,663 580,663 Monte Sereno Contribution (Bicycle/Ped Master Plan)7,500 7,500 - - - - - Equipment Replacement Transfer In 295,680 295,680 - - - - - Almond Grove Transfer In 6,563,773 - 6,563,773 - - - - Strategic Priority Transfer In - - 2,082,227 - - - - Operating Transfers In 650,000 400,000 650,000 400,000 400,000 400,000 400,000 Total Revenues 10,307,945$ 1,859,716$ 12,295,944$ 1,862,092$ 1,982,092$ 2,102,092$ 2,222,092$ TOTAL SOURCE OF FUNDS 25,096,730$ 15,352,501$ 23,781,477$ 3,077,648$ 2,571,461$ 2,535,274$ 2,594,087$ USE OF FUNDS Total Completed Projects 477,288$ 403,860$ -$ -$ -$ -$ -$ Carryforward Projects Open Space Trail Upgrades 250,000 - 250,000 - - - - Parks Playground Fibar Project 32,501 - 32,501 25,000 - 25,000 - Park Rehabilitation - Bachman Park 325,000 - 325,000 - - - - Forbes Mill Footbridge Improvements 45,848 7,815 83,033 - - - - Blossom Hill Park Little League Backstop 110,000 99,815 10,185 - - - - Tennis Courts Repairs - Various Town Parks 140,000 572 139,428 - - - - Audio/Video System Upgrade 58,160 - 58,160 - - - - Information System Upgrade 80,579 7,794 72,785 - - - - Tiburon CAD/RMS Upgrade 42,000 42,000 - - - - - Town-wide Document Imaging Project 16,990 - 16,990 - - - - Building Replacement at Corporation Yard - 4,571 25,000 25,000 25,000 25,000 50,000 Fuel System Enhancement 75,000 - 75,000 - - - - Police & PPW Interoperability Radio Project 595,680 11,593 584,087 - - - - Engineering Document Archiving 58,874 7,158 51,716 - - - - Civic Center Building Energy Efficiency Measures 25,000 - 25,000 - - - - Silicon Valley Regional Interoperability Project (SVRIP) Service 176,152 140,711 188,317 - - - - Energy Efficiency Upgrade - Town-wide 25,000 - 50,000 25,000 - - - Exterior Lighting Replacement - Civic Center 25,000 - 25,000 - - - - Civic Center Fountain Modification 33,135 - 33,135 - - - - HVAC - Chiller Repair 125,000 - 125,000 - - - - Street Repair & Resurfacing 1,958,035 93,349 3,475,319 1,310,663 1,310,663 1,310,663 1,310,663 Annual Street Restriping 69,772 - 94,772 25,000 25,000 25,000 25,000 Traffic Calming Projects 32,941 - 42,941 10,000 10,000 10,000 10,000 Curb, Gutter & Sidewalk Maintenance 616,128 50 866,078 250,000 250,000 250,000 250,000 Retaining Wall Repairs 341,799 92,089 349,710 100,000 100,000 100,000 100,000 Quito Road - Bridge Replacement 235,087 - 235,087 - - - - Almond Grove Street Rehabilitation 13,688,617 2,750,444 10,938,173 - - - - Guardrail Replacement Projects 93,043 - 93,043 - - - - Electrical Panel Replacement on Pageant Way 45,000 - 45,000 - - - - 224 W. Main Street Property Acquisition (Parking Lot 6)1,196,000 - 1,196,000 - - - - Downtown Parking Lots Seal Coat & Restriping 100,000 - 100,000 - - - - Monument Control Network Update 20,000 - 20,000 - - - - Shannon/LGB/Cherry Blossom Sidewalk Improvements 129,896 - 129,896 - - - - Stonybrook & Kennedy Sidewalk Improvements 561,116 74 561,042 - - - - Sidewalk Improvements - Multiple Locations 60,000 - 60,000 - - - - Crosswalk Lighting Upgrade 61,374 7,565 53,809 - - - - Crosswalk Improvements at Santa Cruz/Blossom Hill 60,000 - 60,000 - - - - Pageant Way Parking Lot Reconstruction 190,596 29,000 161,596 - - - - LED Streetlights 504,648 413 504,235 - - - - Bicycle & Pedestrian Master Plan 109,554 66,097 43,457 - - - - Cut-Through Traffic Mitigation 300,000 - 300,000 - - - - New Projects Belgatos Park Restroom Improvements - - 25,000 - - - - Bicycle & Pedestrian Improvements - - 300,000 - - - - Stormwater Master Plan - - 200,000 - - - - Stormwater System - Pollution Prevention Compliance - - - 300,000 - - - Public Arts Gateway Project - - 25,000 - - - - Total Project Expenditures 23,090,812$ 3,764,968$ 22,050,496$ 2,070,663$ 1,720,663$ 1,745,663$ 1,745,663$ Operating Transfers Out Transfer to GF 199,808$ 102,000$ 515,424$ 417,616$ 417,616$ 417,616$ 417,616$ Total Operating Transfers Out 199,808$ 102,000$ 515,424$ 417,616$ 417,616$ 417,616$ 417,616$ Ending Fund Balance Designated for Parking 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ 164,210$ Reserved for Comcast PEG 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Unrestricted 1,591,900 11,271,323 1,001,346 375,159 218,972 157,785 216,598 Total Ending Fund Balance 1,806,110$ 11,485,533$ 1,215,556$ 589,369$ 433,182$ 371,995$ 430,808$ TOTAL USE OF FUNDS 25,096,730$ 15,352,501$ 23,781,477$ 3,077,648$ 2,571,461$ 2,535,274$ 2,594,087$ GENERAL FUND APPROPRIATED RESERVES (GFAR) STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -11 Carryforward Projects 4504 Open Space Trail Upgrades -$ 250,000$ -$ -$ -$ -$ -$ 250,000$ 1605 Parks Playground Fibar Project 42,500 32,501 - 25,000 - 25,000 - 125,000 3104 Park Rehabilitation - Bachman Park - 325,000 - - - - - 325,000 3407 Blossom Hill Park Little League Backstop 99,815 10,185 - - - - - 110,000 4608 Tennis Courts Repairs - Various Town Parks 572 139,428 - - - - - 140,000 4507 Forbes Mill Footbridge Improvements 7,815 38,033 45,000 - - - - 90,848 6001 Audio/Video System Upgrade 52,440 58,160 - - - - - 110,600 6101 Information System Upgrade 402,215 72,785 - - - - - 475,000 6003 Town-wide Document Imaging Project 198,011 16,990 - - - - - 215,000 6302 Tiburon CAD/RMS Upgrade 70,000 - - - - - - 70,000 2302 Building Replacement at Corporation Yard 16,717 - 25,000 25,000 25,000 25,000 50,000 166,717 2304 Fuel System Enhancement - 75,000 - - - - - 75,000 6003 Police & PPW Interoperability Radio Project 11,593 584,087 - - - - - 595,680 2305 Engineering Document Archiving 8,284 51,716 - - - - - 60,000 2110 Civic Center Building Energy Efficiency Measures - 25,000 - - - - - 25,000 6305 Silicon Valley Regional Interoperability Project (SVRIP) 270,311 35,441 152,876 - - - - 458,628 2306 Energy Efficiency Upgrade - Town-wide - 25,000 25,000 25,000 - - - 75,000 2112 Exterior Lighting Replacement - Civic Center - 25,000 - - - - - 25,000 2113 Civic Center Fountain Modification - 33,135 - - - - - 33,135 2115 HVAC - Chiller Repair - 125,000 - - - - - 125,000 9901 Street Repair & Resurfacing 3,971,478 1,864,686 1,610,633 1,310,663 1,310,663 1,310,663 1,310,663 12,689,449 9902 Annual Street Restriping 180,228 69,772 25,000 25,000 25,000 25,000 25,000 375,000 0003 Almond Grove Street Rehabilitation 3,254,415 10,938,173 - - - - - 14,192,588 9910 Traffic Calming Projects 132,059 32,941 10,000 10,000 10,000 10,000 10,000 215,000 9921 Curb, Gutter & Sidewalk Maintenance 1,748,416 616,078 250,000 250,000 250,000 250,000 250,000 3,614,494 0122 Electrical Panel Replacement on Pageant Way - 45,000 - - - - - 45,000 9930 Retaining Wall Repairs 1,313,067 249,710 100,000 100,000 100,000 100,000 100,000 2,062,777 0801 Quito Road - Bridge Replacement 64,594 235,087 - - - - - 299,681 0120 Guardrail Replacement Projects 136,958 93,043 - - - - - 230,000 0704 224 W. Main Street Property Acquisition (Parking Lot 6)4,000 1,196,000 - - - - - 1,200,000 0705 Downtown Parking Lots Seal Coat & Restriping - 100,000 - - - - - 100,000 0214 Monument Control Network Update - 20,000 - - - - - 20,000 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 129,896 - - - - - 130,000 0219 Stonybrook & Kennedy Sidewalk Improvements 18,958 561,042 - - - - - 580,000 0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - - 60,000 0125 Crosswalk Improvements - Santa Cruz/Blossom Hill - 60,000 - - - - - 60,000 0126 Crosswalk Lighting Upgrade 36,261 53,809 - - - - - 90,070 0707 Pageant Way Parking Lot Reconstruction 45,368 161,596 - - - - - 206,964 0224 LED Streetlights 413 504,235 - - - - - 504,648 0226 Bicycle & Pedestrian Master Plan 98,891 43,457 - - - - - 142,348 0229 Cut-Through Traffic Mitigation - 300,000 - - - - - 300,000 New Projects 3303 Belgatos Park Restroom Improvements - - 25,000 - - - - 25,000 0231 Bicycle & Pedestrian Improvements -$ -$ 300,000$ -$ -$ -$ -$ 300,000$ 0413 Stormwater Master Plan - - 200,000 - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance - - - 300,000 - - - 300,000 0232 Public Arts Gateway Project - - 25,000 - - - - 25,000 - Total GFAR Projects 12,185,481$ 19,256,987$ 2,793,509$ 2,070,663$ 1,720,663$ 1,745,663$ 1,745,663$ 41,518,629$ 2018/19 Budget 2020/21 Budget 2017/18 Budget Total Budgeted Expended Through 2016/17 Estimated Carryfwd to 2017/18 2019/20 Budget GFAR FUND PROJECT SUMMARY 2021/22 Budget CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -12 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ Deferred Traffic Mitigation Total Beginning Fund Balance 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ Revenues Deferred Revenue 1,470,887$ 155,213$ 1,081,628$ 187,869$ 602,895$ 425,027$ 10,000$ In-Lieu Fees Total Revenues 1,470,887$ 155,213$ 1,081,628$ 187,869$ 602,895$ 425,027$ 10,000$ TOTAL SOURCE OF FUNDS 1,678,093$ 362,419$ 1,288,834$ 395,075$ 810,102$ 632,233$ 217,207$ USE OF FUNDS Completed Projects Total Completed Projects 316,193$ -$ -$ -$ -$ -$ -$ Carryforward Projects Blossom Hill Rd/Cherry Blossom Ln Intersection 500,000 - 500,000 - - - - Los Gatos Blvd/Shannon Improvements 20,000 - 20,000 - - - - Monument Control Network Update 10,000 - 10,000 - - - - Crosswalk Add - Santa Cruz Ave 50,000 - 50,000 - - - - Crosswalk Lighting Upgrade 42,666 - 42,666 - - - - Cut-Through Traffic Mitigation 416,305 145,213 271,092 - - - - Traffic Signal Modernization 177,869 - 177,869 177,869 592,895 415,027 - Proposed Projects Traffic Signal Modernization - - - - Total Project Expenditures 1,533,034$ 145,213$ 1,071,628$ 177,869$ 592,895$ 415,027$ -$ Operating Transfers 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Total Operating Transfers 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ Ending Fund Balance Unrestricted 135,060$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ Deferred Traffic Mitigation Total Ending Fund Balance 135,060$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ 207,207$ TOTAL USE OF FUNDS 1,678,093$ 362,419$ 1,288,834$ 395,075$ 810,102$ 632,233$ 217,207$ TRAFFIC MITIGATION FUND STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -13 Carryforward Projects 0212 Blossom Hill Rd/Cherry Blossom Ln Intersection -$ 500,000$ -$ -$ -$ -$ -$ 500,000$ 0213 Los Gatos Blvd/Shannon Improvements - 20,000 - - - - - 20,000 0214 Monument Control Network Update - 10,000 - - - - - 10,000 0202 Hwy 9/University Intersection 66,693 - - - - - - 66,693 0125 Crosswalk Add - Santa Cruz Ave - 50,000 - - - - - 50,000 0126 Crosswalk Lighting Upgrade 57,064 42,666 - - - - - 99,730 0227 Traffic Signal Modernization - 177,869 - 177,869 592,895 415,027 - 1,363,659 0229 Cut-Through Traffic Mitigation 158,908 271,092 - - - - - 430,000 New Projects -$ -$ -$ -$ -$ -$ -$ - Total Traffic Mitigation Projects 282,664$ 1,071,628$ -$ 177,869$ 592,895$ 415,027$ -$ 2,540,082$ 2021/22 Budget Estimated Carryfwd to 2017/18 2018/19 Budget 2017/18 Budget 2019/20 Budget 2020/21 Budget Total Budgeted TRAFFIC MITIGATION FUND PROJECTS Expended Through 2016/17 CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -14 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Unrestricted (379,946)$ (379,946)$ (379,586)$ (325,368)$ (325,368)$ (325,368)$ (318,413)$ Total Beginning Fund Balance (379,946)$ (379,946)$ (379,586)$ (325,368)$ (325,368)$ (325,368)$ (325,368)$ Revenues Public Access Infrastructure Improvement Projects 140,000$ -$ 140,000$ -$ -$ -$ -$ Hwy 9/University Intersection 253,813 - 253,813 - - - - Traffic Signal Modernization 75,000 - 325,000 175,000 - - - Bicycle & Pedestrian Master Plan 80,208 360 79,848 - - - - Bicycle & Pedestrian Master Plan Total Revenues 549,021$ 360$ 798,661$ 175,000$ -$ -$ -$ TOTAL SOURCE OF FUNDS 169,075$ (379,586)$ 419,075$ (150,368)$ (325,368)$ (325,368)$ (325,368)$ USE OF FUNDS Completed Projects Total Completed Projects -$ -$ -$ -$ -$ -$ -$ Carryforward Projects Hwy 9/University Intersection 199,235 - 199,235 - - - - Public Access Infrastructure Improvement Projects 140,000 - 140,000 - - - - Traffic Signal Modernization 75,000 - 325,000 175,000 - - - Bicycle & Pedestrian Master Plan 80,208 - 80,208 - - - - Proposed Projects Total Expenditures 494,443$ -$ 744,443$ 175,000$ -$ -$ -$ Ending Fund Balance Unrestricted (325,368)$ (379,586)$ (325,368)$ (325,368)$ (325,368)$ (325,368)$ (325,368)$ Total Ending Fund Balance (325,368)$ (379,586)$ (325,368)$ (325,368)$ (325,368)$ (325,368)$ (325,368)$ TOTAL USE OF FUNDS 169,075$ (379,586)$ 419,075$ (150,368)$ (325,368)$ (325,368)$ (325,368)$ GRANT FUND STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -15 Carryforward Projects 2102 Public Access Infrastructure Improvement -$ 140,000$ -$ -$ -$ -$ -$ 140,000$ 0202 Hwy 9/University Intersection 902,802 199,235 - - - - - 1,102,038 0226 Bicycle & Pedestrian Master Plan 39,640 80,208 - - - - - 119,848 0227 Traffic Signal Modernization - 75,000 250,000 175,000 - - - 500,000 New Projects -$ -$ -$ -$ -$ -$ -$ - Total Grant Funded Projects 942,443$ 494,443$ 250,000$ 175,000$ -$ -$ -$ 1,861,886$ 2018/19 Budget 2021/22 Budget Estimated Carryfwd to 2017/18 Expended Through 2016/17 2017/18 Budget GRANT FUNDED PROJECTS 2019/20 Budget 2020/21 Budget Total Budgeted CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -16 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 1,668,054$ 1,668,054$ 1,747,404$ 1,698,644$ 1,801,484$ 1,906,721$ 2,014,413$ Total Beginning Fund Balance 1,668,054$ 1,668,054$ 1,747,404$ 1,698,644$ 1,801,484$ 1,906,721$ 2,014,413$ Revenues Drainage Fees 92,500$ 92,500$ 92,500$ 94,350$ 96,237$ 98,162$ 100,125$ Interest 11,380 8,350 8,740 8,490 9,000 9,530 10,070 Total Revenues 103,880$ 100,850$ 101,240$ 102,840$ 105,237$ 107,692$ 110,195$ TOTAL SOURCE OF FUNDS 1,771,934$ 1,768,904$ 1,848,644$ 1,801,484$ 1,906,721$ 2,014,413$ 2,124,608$ USE OF FUNDS Completed Projects Total Completed Projects -$ -$ -$ -$ -$ -$ -$ Carryforward Projects Hernandez Ave Storm Drain Improvements - - - - - - 65,000 Bicknall Avenue Strom Drain Improvement 21,500 21,500 150,000 - - - - Proposed Projects - - - - - - - Total Expenditures 21,500$ 21,500$ 150,000$ -$ -$ -$ 65,000$ Ending Fund Balance Unrestricted 1,750,434$ 1,747,404$ 1,698,644$ 1,801,484$ 1,906,721$ 2,014,413$ 2,059,608$ Total Ending Fund Balance 1,750,434$ 1,747,404$ 1,698,644$ 1,801,484$ 1,906,721$ 2,014,413$ 2,059,608$ TOTAL USE OF FUNDS 1,771,934$ 1,768,904$ 1,848,644$ 1,801,484$ 1,906,721$ 2,014,413$ 2,124,608$ STORM BASIN FUNDS STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -17 Carryforward Projects 0409 Hernandez Avenue Storm Drain Improvements 17,180$ -$ -$ -$ -$ -$ 65,000$ 82,180$ 0410 Bicknall Avenue Strom Drain Improvement 21,500 - 150,000 - - - - 171,500 New Projects -$ -$ -$ -$ -$ -$ -$ -$ Total Storm Basin Funds Projects 38,680$ -$ 150,000$ -$ -$ -$ 65,000$ 253,680$ Total Budgeted Estimated Carryfwd to 2017/18 2017/18 Budget 2018/19 Budget 2020/21 Budget 2021/22 Budget 2019/20 Budget Expended Through 2016/17 STORM BASIN FUNDS PROJECTS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -18 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 2,881,501$ 2,881,501$ 2,925,911$ 2,858,191$ 2,860,481$ 2,862,781$ 6,675,649$ Total Beginning Fund Balance 2,881,501$ 2,881,501$ 2,925,911$ 2,858,191$ 2,860,481$ 2,862,781$ 6,675,649$ Revenues Construction Tax 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ 30,000$ Interest 20,000 14,410 14,280 14,290 14,300 14,310 33,380 Balamce from PG&E - - - - - 3,810,558 - Total Revenues 50,000$ 44,410$ 44,280$ 44,290$ 44,300$ 3,854,868$ 63,380$ TOTAL SOURCE OF FUNDS 2,931,501$ 2,925,911$ 2,970,191$ 2,902,481$ 2,904,781$ 6,717,649$ 6,739,029$ USE OF FUNDS Completed Projects Total Completed Projects -$ -$ -$ -$ -$ -$ -$ Carryforward Projects PG&E Undergrounding 70,000 - 112,000 42,000 42,000 42,000 6,528,000 New Projects Total Expenditures 70,000$ -$ 112,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ Operating Transfers Total Operating Transfers -$ -$ -$ -$ -$ -$ -$ Ending Fund Balance Unrestricted 2,861,501 2,925,911 2,858,191 2,860,481 2,862,781 6,675,649 211,029 Total Ending Fund Balance 2,861,501$ 2,925,911$ 2,858,191$ 2,860,481$ 2,862,781$ 6,675,649$ 211,029$ TOTAL USE OF FUNDS 2,931,501$ 2,925,911$ 2,970,191$ 2,902,481$ 2,904,781$ 6,717,649$ 6,739,029$ UTILITY UNDERGROUND FUND STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -19 Carryforward Projects 0225 Utility Undergrounding Improvements -$ 70,000$ 42,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ New Projects -$ -$ -$ -$ -$ -$ -$ -$ Total Utility Undergrounding Projects -$ 70,000$ 42,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ 2020/21 Budget UTILITY UNDEGROUNDING FUND PROJECTS Total Budgeted 2019/20 Budget 2021/22 Budget Expended Through 2016/17 Estimated Carryfwd to 2017/18 2017/18 Budget 2018/19 Budget CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -20 Adjusted Budget Estimated Budget & Carryfwd Proposed Proposed Proposed Proposed 2016/17 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 SOURCE OF FUNDS Beginning Fund Balance Unrestricted 1,651,113$ 1,651,113$ 711,043$ 216,210$ 223,253$ 230,336$ 241,549$ Total Beginning Fund Balance 1,651,113$ 1,651,113$ 711,043$ 216,210$ 223,253$ 230,336$ 241,549$ Revenues Prop 42 - Traffic Congestion Relief -$ -$ -$ -$ -$ -$ -$ Gas Tax 558,893$ 530,590$ 755,734$ 1,113,778$ 1,113,778$ 1,077,878$ 1,077,878$ Gas Tas - Traffic Congestion 71,950 73,694 125,623 138,185 138,185 138,185 138,185 Interest 1,000 8,260 1,100 1,080 1,120 1,150 1,210 Total Revenues 631,843$ 612,544$ 882,457$ 1,253,043$ 1,253,083$ 1,217,213$ 1,217,273$ TOTAL SOURCE OF FUNDS 2,282,956$ 2,263,657$ 1,593,500$ 1,469,253$ 1,476,336$ 1,447,549$ 1,458,822$ USE OF FUNDS Carryforward Projects St Repair & Resurfacing 1,937,905 1,446,615 1,271,290 1,140,000 1,140,000 1,100,000 1,100,000 Proposed Projects Total Expenditures 1,937,905$ 1,446,615$ 1,271,290$ 1,140,000$ 1,140,000$ 1,100,000$ 1,100,000$ Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ Total Operating Transfers 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ 106,000$ Ending Fund Balance Unrestricted 239,052$ 711,043$ 216,210$ 223,253$ 230,336$ 241,549$ 252,822$ Total Ending Fund Balance 239,052$ 711,043$ 216,210$ 223,253$ 230,336$ 241,549$ 252,822$ TOTAL USE OF FUNDS 2,282,956$ 2,263,657$ 1,593,500$ 1,469,253$ 1,476,336$ 1,447,549$ 1,458,822$ GAS TAX FUND STATEMENT OF SOURCE AND USE OF FUNDS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -21 Carryforward Projects 9901 Street Repair & Resurfacing 6,153,359$ 491,290$ 780,000$ 1,140,000$ 1,140,000$ 1,100,000$ 1,100,000$ 11,904,649$ New Projects -$ -$ -$ -$ -$ -$ -$ -$ Total Gas Tax Fund Projects 6,153,359$ 491,290$ 780,000$ 1,140,000$ 1,140,000$ 1,100,000$ 1,100,000$ 11,904,649$ Total Budgeted Estimated Carryfwd to 2017/18 2017/18 Budget 2018/19 Budget 2019/20 Budget Expended Through 2016/17 2020/21 Budget 2021/22 Budget GAS TAX FUND PROJECTS CAPITAL IMPROVEMENT PROGRAM Financial Summaries B -22 STREETS PROGRAM DIRECTORY PROPOSED C-1 STREET RECONSTRUCTION AND RESURFACING PROJECTS PAGE 9901 Street Repair & Resurfacing C – 6 0003 Almond Grove Street Rehabilitation Project C – 10 STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS 9910 Traffic Calming Projects C – 16 9921 Curb, Gutter & Sidewalk Maintenance C – 18 9930 Retaining Wall Repairs C – 20 9902 Annual Street Restriping C – 22 2102 Public Access Infrastructure Improvement Projects C – 24 0120 Guardrail Replacement Projects C – 26 0122 Electrical Panel Replacement on Pageant Way C – 28 0125 Crosswalk Improvements at Santa Cruz Avenue/Blossom Hill Road C – 30 0126 Crosswalk Lighting Upgrade C – 32 STREET IMPROVEMENT PROJECTS 0202 Highway 9/University Avenue Intersection Improvements C – 38 0213 Los Gatos Boulevard/Shannon Road Improvements C – 40 0214 Monument Control Network Update C – 42 0705 Downtown Parking Lots Seal Coat & Restriping C – 44 0409 Hernandez Avenue Storm Drain Improvements C – 46 0212 Blossom Hill Road/Cherry Blossom Lane Intersection Improvements C – 48 0704 224 West Main Property Acquisition (Parking Lot 6) C – 50 0218 Sidewalk Improvements/Shannon/Los Gatos Blvd/Cherry Blossom C – 52 0219 Stonybrook Road & Kennedy Road Sidewalk Improvements C – 54 0221 Sidewalk Improvements – Multiple Locations C – 56 0224 LED Streetlights C – 58 0707 Pageant Way Parking Lot Reconstruction C – 60 0225 Utility Undergrounding Improvements C – 62 0226 Bicycle & Pedestrian Master Plan C – 64 0229 Cut – Through Traffic Mitigation C – 66 0230 Traffic Signal Modernization C – 68 0410 Bicknell Road Storm Drain Improvements C – 70 0231 Bicycle & Pedestrian Improvements C – 72 0413 Stormwater Master Plan C – 74 0414 Stormwater System – Pollution Prevention Compliance C – 76 0232 Public Arts Gateway Project C – 78 BRIDGE PROJECTS 0801 Quito Road – Bridge Replacement C – 84 PROPOSED STREETS PROGRAM C - 2 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 3 PROJECT LOCATIONS A Street Repair & Resurfacing B Almond Grove Street Rehabilitation Project LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES B "A" IS A TOWN-WIDE PROJECT HIC K S RD PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 4 PROGRAM SECTION DIRECTORY PAGE 9901 Street Repair & Resurfacing C – 6 0003 Almond Grove Street Rehabilitation Project C – 10 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 5 The Streets Program’s Street Reconstruction & Resurfacing section contains Capital Improvement Program projects that resurface or repave the Town’s streets as the primary scope of work. Projects may also encompass minor components of streetscape or street improvements; however, to be categorized in the Street Reconstruction & Resurfacing section, projects must have pavement rehabilitation as their main purpose. Safety issues, traffic levels, the Pavement Condition Index, available funding sources, project costs, and community impacts are all considerations in prioritizing Street Reconstruction & Resurfacing projects in the five-year Capital Improvement Program. This section contains an annual ongoing street rehabilitation project as well as an identified one-time project. The dedicated ongoing funding sources for street repair are the Gas Tax and Proposition 42 funds which total approximately $780,000 for FY 2017/18 and are expected to increase annually to $1,100,000 beginning FY 2018/19 due to the recently enacted Road Recovery and Repair Act of 2017. (SB1). In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633. Additional sources include grant funding, if secured, such as state programs that focus on funding specific street categories or that funds rehabilitation of specific arterial or collector streets. In addition to the annual Gas Tax and future State revenues, Los Gatos has limited designated funding sources for maintaining the Town’s roadway system. The Town has a Construction Impact Fee, which is expected to generate approximately $110,000 annually and a Refuse Vehicle Road Impact Fee for additional street and roadway repairs due to the disproportionate amount of wear and tear caused by construction and other heavy vehicles (estimated $370,000). STREET RECONSTRUCTION & RESURFACING PROJECTS SUMMARY * Total FY 2016/17 Carryforward $16,190,349 Carryforward Projects 9901 Street Repair & Resurfacing 10,124,837$ 4,746,609$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 24,594,098$ 0003 Almond Grove Street Rehabilitation 3,254,415 10,938,173 - - - - 14,192,588 New Projects Total Street Reconstruction Projects 13,379,252$ 15,684,782$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 38,786,686$ STREET PROJECT SUMMARY BY PROGRAM 2020/21 Budget 2018/19 Budget 2019/20 Budget STREET RECONSTRUCTION PROJECTS Total Budgeted 2017/18 Budget & Carryfwd* 2021/22 Budget Expended Through 2016/17 FY 2017/18- 2021/22 CAPITAL IMPROVEMENT PROGRAM PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 6 Town Wide Project Name Street Repair & Resurfacing Project Number 811-9901 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This is an ongoing annual project for street rehabilitation throughout Town to enhance vehicle safety and to maintain the Town’s roadway infrastructure. Location This project occurs in various locations including Town-wide arterials, collectors, and neighborhood streets. The list of streets will be identified at the time the specifications are brought forward for Council approval, which generally occurs in the spring. Project Background Street rehabilitation projects are identified and prioritized according to pavement quality reflected by the Pavement Condition Index (PCI), field inspection, traffic level, and safety issues. Every four years, the Town conducts a full assessment on the condition of the streets through a consultant who specializes in the field. This assessment is funded through a grant from the Metropolitan Transportation Commission. The PCI information that results from the survey feeds into a street maintenance software program called StreetSaver. Every jurisdiction in the Bay Area uses the same program and methodology, making it the best practice in the industry. With the PCI information in the StreetSaver database, the program can provide future high level maintenance programs for the Town. The program emphasizes maintaining streets that have a good (above 70) PCI at that level as ongoing preventive maintenance is more cost efficient than allowing streets to reach lower PCI levels. As with many computer generated programs, the output requires some validation and adjustment. Staff conducts this element of the work through field observations and consideration of project proximity, all with an eye towards maximizing the value to the Town. The resulting list, sized to the available budget, creates the annual list of streets for this project. Historically, the Town invested approximately $11.7 million from FY 2000/01 to FY 2007/08 to address the backlog of deferred street maintenance. This investment raised the average PCI of Town streets from 64 in 2001 to nearly 74 in 2008. Due to budget challenges that followed, Town streets have been resurfaced by the application of a rubber cape seal or a slurry seal. This method is typically utilized for streets in better condition to provide a seal to the surface below. The solution is cost effective and can provide some limited protection to streets in worse condition, but for a shorter timeframe. For the streets with a lower PCI, an asphalt overlay is often the preferred solution with the best TOWN-WIDE PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 7 return on investment over time. Costs are much higher for this solution. Given the small amount of asphalt overlay work performed, and decreased funding from FY 2008/09 to FY 2015/16 of $9.9 million, the Town’s PCI dropped from 74 to 69 between 2008 and 2010, and has further decreased to its current level of 66. To mitigate this decline, the Town has focused its resources on arterials and collector streets, and has used a rubber cape seal and slurry seal approach to slow the decline of the PCI rating. This approach was the most economical and prudent treatment to resurface several residential neighborhoods. The dedicated ongoing funding sources for street repair are the Gas Tax and Proposition 42 funds which total approximately $780,000 for FY 2017/18 and increasing to $1,100,000 annually starting in FY 2018/19 per year due to the recently enacted by the Road Repair and Accountability Act of 2017: the 12 cent gasoline excise tax, 20 cent diesel fuel excise tax, and transportation improvement fees (vehicle registration taxes). In addition, the Act provides for the payment of transportation loans to be repaid over three years. In November 2016, voters passed Countywide Measure B. This Measure increased the sales tax by ½ cent for 30 years to fund transportation related projects. One part of 2016 Measure B is a formulaic distribution of funds for roadway maintenance. The Los Gatos annual allocation is $580,633. As part of a voter-approved measure from 2010, the Santa Clara Valley Transportation Agency (VTA) assesses a $10 per vehicle registration surcharge to repair and rehabilitate streets. Eighty percent of the revenues collected by the VTA are returned to the local municipality in which they were generated. The remaining twenty percent is used for regional and County-wide projects. This funding source is expected to generate approximately $190,000 annually for Los Gatos, which will be used for street rehabilitation Town-wide. Other than the annual revenues mentioned above, Los Gatos has limited designated funding sources for maintaining the Town’s roadway system. The Town has a Construction Impact Fee, which is expected to generate approximately $110,000 annually and a Refuse Vehicle Road Impact Fee for additional street and roadway repairs due to the disproportionate amount of wear and tear caused by construction and other heavy vehicles (estimated $370,000). Operating Budget Impacts Conducting preventive maintenance on the Town’s roadways extends the life of the streets and reduces the need for extensive reconstruction in the future, reducing staff time spent on road maintenance. Engineering staff time for project design and oversight is addressed in the FY 2017/18 Operating Budget. PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 8 Project Components & Estimated Timeline Winter 2017 Design Prepare plans and specifications Spring 2018 Bid Process Council approves plans and authorizes bidding the project Summer 2018 Construction Council awards the contract and construction process begins Fall 2018 Completion Project completed Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 3,878,129$ 93,349$ 1,864,686$ 1,610,633$ 3,475,319$ 1,310,663$ 1,310,663$ 1,310,663$ 1,310,663$ 12,689,449$ GAS TAX & PROP 42 4,706,744$ 1,446,615$ 491,290$ 780,000$ 1,271,290$ 1,140,000$ 1,140,000$ 1,100,000$ 1,100,000$ 11,904,649 TOTAL SOURCE OF FUNDS 8,584,874$ 1,539,963$ 2,355,976$ 2,390,633$ 4,746,609$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 24,594,098$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 3,878,129 93,349 1,864,686 1,610,633 3,475,319 1,310,663 1,310,663 1,310,663 1,310,663 12,689,449 TOTAL GFAR 3,878,129$ 93,349$ 1,864,686$ 1,610,633$ 3,475,319$ 1,310,663$ 1,310,663$ 1,310,663$ 1,310,663$ 12,689,449$ GAS TAX & PROP 42 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 4,706,744 1,446,615 491,290 780,000 1,271,290 1,140,000 1,140,000 1,100,000 1,100,000 11,904,649 TOTAL GAS TAX & PROP 42 4,706,744$ 1,446,615$ 491,290$ 780,000$ 1,271,290$ 1,140,000$ 1,140,000$ 1,100,000$ 1,100,000$ 11,904,649$ TOTAL USE OF FUNDS 8,584,874$ 1,539,963$ 2,355,976$ 2,390,633$ 4,746,609$ 2,450,663$ 2,450,663$ 2,410,663$ 2,410,663$ 24,594,098$ STREET REPAIR & RESURFACING Project 811-9901 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 9 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 10 Project Name Almond Grove Street Rehabilitation Project Number 811-0003 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project provides design and construction for the rehabilitation of street infrastructure in the Almond Grove District. Location This project is located within the former Almond Grove District Redevelopment Area. Project Background The streets in the Almond Grove District have deteriorated over the years and due to funding and maintenance constraints, no repairs or resurfacing activities have been performed. The proposed project to rehabilitate the street infrastructure in this area will not only provide safe and functional streets and sidewalks for the community, but also reduce trip and fall accidents. Due to the scale and magnitude of this project, proposed street rehabilitations will be phased over several years to minimize construction impacts to the community and to reflect project funding as determined by the Town Council. Phase 1 of this project includes Bachman Avenue and Broadway Avenue. Construction started in Summer 2016 and was substantially complete in the fall of 2016 with minor project close out work continuing into the spring of 2017. The Almond Grove Phase 2 project will address the eight additional streets in the project, with project bidding completed in April 2017 and construction anticipated to begin in the summer of 2017 and continuing over the next two summer construction seasons. Construction bids for this project were very favorable to the Town. The Council awarded the bid in April 2017 allowing for approximately $2.9M in savings within the project. The Council will determine the appropriate use for the savings through the FY 2017/18 budget process. Operating Budget Impacts This project will use staff time for construction inspection and management. Operating costs associated with this project will be reimbursed from the project budget. Project delivery costs for phase one of this project are included in the CIP project’s total cost, and are estimated at 8% of the construction cost. Project delivery costs for Phase 2 of the project are included in the CIP project’s total cost and are estimated at 12% for this more complex part of the project. PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 11 Project Components & Estimated Timeline Summer 2016 Construction Phase 1 project construction Fall 2016 Completion Phase 1 project completion & closeout Winter 2017 Design Phase 2 Completion of plans and specifications Spring 2017 Bid process Phase 2 Council approves plans and authorizes bidding the project Summer 2017 Construction Phase 2 project construction Summer 2018 Construction Phase 2 project construction Summer 2019 Construction Phase 2 project construction Winter 2020 Project Closeout Phase 2 project closeout Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 503,971$ 2,750,444$ 10,938,173$ -$ 10,938,173$ -$ -$ -$ -$ 14,192,588$ TOTAL SOURCE OF FUNDS 503,971$ 2,750,444$ 10,938,173$ -$ 10,938,173$ -$ -$ -$ -$ 14,192,588$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 503,971 2,750,444 10,938,173 - 10,938,173 - - - - 14,192,588 TOTAL GFAR 503,971$ 2,750,444$ 10,938,173$ -$ 10,938,173$ -$ -$ -$ -$ 14,192,588$ TOTAL USE OF FUNDS 503,971$ 2,750,444$ 10,938,173$ -$ 10,938,173$ -$ -$ -$ -$ 14,192,588$ ALMOND GROVE STREET REHABILITION PROJECT Project 811-0003 PROPOSED STREETS PROGRAM Street Reconstruction & Resurfacing C - 12 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-13 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES "A", "B", "C", "D", AND "F" ARE TOWN-WIDE PROJECTS HIC K S RDG E H, I PROJECT LOCATIONS A Traffic Calming Projects B Curb, Gutter & Sidewalk Maintenance C Retaining Wall Repairs D Annual Street Restriping E Public Access Infrastructure Improvement Projects F Guardrail Replacement Project G Electrical Panel Replacement on Pageant Way H Crosswalk Improvements – Santa Cruz/Blossom Hill I Crosswalk Lighting Upgrades PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-14 PROGRAM SECTION DIRECTORY PAGE 9910 Traffic Calming Projects C – 16 9921 Curb, Gutter & Sidewalk Maintenance C – 18 9930 Retaining Wall Repairs C – 20 9902 Annual Street Restriping C – 22 2102 Public Access Infrastructure Improvement Projects C – 24 0120 Guardrail Replacement Project C – 26 0122 Electrical Panel Replacement on Pageant Way C – 28 0125 Crosswalk Improvements - Santa Cruz Avenue/Blossom Hill Road C – 30 0126 Crosswalk Lighting Upgrades C – 32 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-15 The Streets Program’s Street Repair, Maintenance & Safety Projects section contains Capital Improvement Program projects that repair, maintain, or enhance safety features of the Town’s streets and parking lots as the primary scope of work. Projects may also encompass minor components of streetscape or street improvements; however, to be categorized in this section, street repair, maintenance, or safety enhancements must be the project’s main purpose. Safety issues, available funding sources, project costs, and community impacts are all considerations in prioritizing Street Repair, Maintenance & Safety projects in the five-year Capital Improvement Program. This section contains annual ongoing projects as well as one-time projects. GFAR funding is utilized for the Traffic Calming Projects, which are funded at $10,000 annually. The Annual Street Restriping Project is funded at $25,000 per year. The Curb, Gutter, and Sidewalk Maintenance Project is funded at $250,000 per year. The Retaining Wall Repairs Project is typically funded with an ongoing GFAR stream of $100,000 per year. While annual appropriations are planned for these ongoing projects, funding adjustments may occur from year to year to align with changing priorities and schedules. One-time projects are prioritized by safety factors, community impacts, and the availability of grant funding. GFAR funds may also be utilized to fund a portion of grant driven projects as a grant’s local “match requirement.” Los Gatos does not have an ongoing designated funding source for repairing, maintaining, and improving the Town’s roadway system. STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS SUMMARY Carryforward Projects 9910 Traffic Calming Projects 132,059$ 42,941$ 10,000$ 10,000$ 10,000$ 10,000$ 215,000$ 9921 Curb, Gutter & Sidewalk Maintenance 1,748,416 866,078 250,000 250,000 250,000 250,000 3,614,494 9930 Retaining Wall Repairs 1,313,067 349,710 100,000 100,000 100,000 100,000 2,062,777 9902 Annual Street Restriping 180,228 94,772 25,000 25,000 25,000 25,000 375,000 2102 Public Access Infrastructure Improvement Projects - 140,000 - - - - 140,000 0120 Guardrail Replacement Projects 136,958 93,043 - - - - 230,000 0122 Electrical Panel Replacement on Pageant Way - 45,000 - - - - 45,000 0125 Crosswalk Add - Santa Cruz Ave - 110,000 - - - - 110,000 0126 Crosswalk Lighting Upgrade 93,324 96,476 - - - - 189,800 New Projects Total Maintenance & Safety Projects 3,604,052$ 1,838,019$ 385,000$ 385,000$ 385,000$ 385,000$ 6,982,072$ Total Budgeted 2021/22 Budget STREET REPAIRS, MAINTENANCE & SAFETY PROJECTS 2020/21 Budget Expended Through 2016/17 2018/19 Budget 2019/20 Budget 2017/18 Budget & Carryfwd* * Total FY 2016/17 Carryforward $1,453,019 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-16 Project Name Traffic Calming Projects Project Number 812-9910 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description In accordance with the Town’s Traffic Calming Policy, this project involves conducting minor traffic studies, developing and implementing traffic improvements, and installing roadway devices to further enhance school pedestrian and roadway safety near high-use crosswalks. Location In FY 2017/18, funds will be used to install temporary devices on Wedgewood Avenue. Four to six months after installation, staff will conduct another traffic study in the area to determine the effectiveness of these devices. Upon the completion of this study, staff will poll the residents to determine if the devices should be made permanent. If necessary, funds will be used to remove these devices. Staff has one additional project request for College Avenue and will follow the adopted process for analyzing this location over the course of the next budget cycle. Any remaining funds within this project will accumulate until the next project is brought forward Project Background In 2002, the Town implemented a Traffic Calming policy to address and mitigate neighborhood traffic and pedestrian safety issues, such as speeding and cut-through traffic. This program relies on residents to bring projects forward at the neighborhood level. At the time the policy was adopted, twelve project areas were under review for traffic calming improvements. To date, all twelve have been processed, completed, or closed. Traffic calming improvements such as speed bumps, traffic circles, center medians, and bulb-outs were installed where appropriate to slow vehicles or enhance pedestrian safety. The last project completed was on Alpine Avenue. The installation of the Alpine traffic calming measures were accepted by the Council as permanent in May 2015. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-17 Project Components & Estimated Timeline Fall 2017 Install Traffic Calming Devices on Wedgewood Fall 2017 Monitor and conduct follow up traffic study for Wedgewood Fall 2017 Conclude pilot installation on Wedgewood Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 132,059$ -$ 32,941$ 10,000$ 42,941$ 10,000$ 10,000$ 10,000$ 10,000$ 215,000$ TOTAL SOURCE OF FUNDS 132,059$ -$ 32,941$ 10,000$ 42,941$ 10,000$ 10,000$ 10,000$ 10,000$ 215,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 132,059 - 32,941 10,000 42,941 10,000 10,000 10,000 10,000 215,000 TOTAL GFAR 132,059$ -$ 32,941$ 10,000$ 42,941$ 10,000$ 10,000$ 10,000$ 10,000$ 215,000$ TOTAL USE OF FUNDS 132,059$ -$ 32,941$ 10,000$ 42,941$ 10,000$ 10,000$ 10,000$ 10,000$ 215,000$ TRAFFIC CALMING PROJECTS Project 812-9910 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-18 TOWN-WIDE Project Name Curb, Gutter, & Sidewalk Maintenance Project Number 813-9921 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This is an ongoing annual project for the repair and replacement of hazardous curbs, gutters, and sidewalks throughout Town to enhance pedestrian and bicyclist safety and to improve water runoff infrastructure. Location Curb, gutter, and sidewalk repair projects occur throughout the Town based on priority needs. Project Background Curb, gutter, and sidewalk improvements in public parking lots and rights-of-way have historically been funded by the Town. The intent of this project is to keep pace with the deterioration of sidewalks and curbs. Specific project locations are identified and prioritized based on the level of damage and accompanying potential safety issues. The primary source of damage to sidewalks, curbs and gutters is tree root intrusion. Most of the streets in Town have mature trees in the planter areas between the sidewalks and curbs. These trees were planted many years ago without consideration of root growth and its impacts to the sidewalk, curb, and street. Over time, the tree roots cause cracks and raised concrete, leading to uneven surfaces. Staff develops an annual plan for sidewalk repair based on the level of damage as observed and reported by staff and residents, confirmed by staff inspection. The level of repair and maintenance performed in any given year has been limited by available annual funding. Funds are utilized predominantly to address locations where paving projects create a requirement for curb ramps and curb and gutter repair. The annual sidewalk program as presented in this CIP is funded by GFAR. Operating Budget Impacts Potential trip and fall injuries and lawsuits against the Town will be reduced by eliminating hazardous curb, gutter, and sidewalk conditions. Engineering staff time associated with these projects will be charged to the project as it is delivered. . PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-19 Project Components & Estimated Timeline Winter 2017 Design Project design & development Spring 2018 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Summer2018 Completion Project completion Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 1,748,366$ 616,128$ 616,078$ 250,000$ 866,078$ 250,000$ 250,000$ 250,000$ 250,000$ 3,614,494$ TOTAL SOURCE OF FUNDS 1,748,366$ 616,128$ 616,078$ 250,000$ 866,078$ 250,000$ 250,000$ 250,000$ 250,000$ 3,614,494$ Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 1,748,366 616,128 616,078 250,000 866,078 250,000 250,000 250,000 250,000 3,614,494 TOTAL GFAR 1,748,366$ 616,128$ 616,078$ 250,000$ 866,078$ 250,000$ 250,000$ 250,000$ 250,000$ 3,614,494$ TOTAL USE OF FUNDS 1,748,366$ 616,128$ 616,078$ 250,000$ 866,078$ 250,000$ 250,000$ 250,000$ 250,000$ 3,614,494$ CURB, GUTTER & SIDEWALK MAINTENANCE Project 813-9921 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-20 TOWN-WIDE Project Name Retaining Wall Repairs Project Number 815-9930 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description The Retaining Wall Repair and Replacement Program focuses on the repair and/or replacement of retaining walls that have become structurally deficient. Location Retaining wall repair projects are identified throughout the Town and are prioritized in order of repair based on safety issues, roadway impacts, retaining wall damage, and project costs. Project Background Retaining walls are installed to hold a hillside from sliding and are placed alongside a street at strategic locations where hillside erosion is anticipated. If the retaining wall fails, the street subsequently fails; therefore, it is important to maintain the retaining walls as they are an integral part of the hillside roadway system. Some existing retaining walls have reached the end of their serviceable life and require replacement. Hillside locations are prioritized over smaller roadside embankments in accordance with the potential impacts from failures. Retaining walls are visually inspected annually; however, unanticipated weather events can quickly erode a wall’s integrity and cause failure. Town staff continues to monitor and schedule retaining wall installation and replacement as needed. Currently, staff is repairing the upper and lower retaining walls on Hernandez Avenue. Operating Budget Impacts Once repaired, improved retaining walls reduce ongoing operating costs associated with maintenance and emergency response. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-21 Project Components & Estimated Timeline Spring 2017 Design Project design & development Summer 2017 Bid Process Project bidding & contract award Summer 2017 Construction Project construction Fall 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 1,220,978$ 92,089$ 249,710$ 100,000$ 349,710$ 100,000$ 100,000$ 100,000$ 100,000$ 2,062,777$ TOTAL SOURCE OF FUNDS 1,220,978$ 92,089$ 249,710$ 100,000$ 349,710$ 100,000$ 100,000$ 100,000$ 100,000$ 2,062,777$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 1,220,978 92,089 249,710 100,000 349,710 100,000 100,000 100,000 100,000 2,062,777 TOTAL GFAR 1,220,978$ 92,089$ 249,710$ 100,000$ 349,710$ 100,000$ 100,000$ 100,000$ 100,000$ 2,062,777$ TOTAL USE OF FUNDS 1,220,978$ 92,089$ 249,710$ 100,000$ 349,710$ 100,000$ 100,000$ 100,000$ 100,000$ 2,062,777$ RETAINING WALL REPAIRS Project 815-9930 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-22 TOWN-WIDE Project Name Annual Street Restriping Project Number 811-9902 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project is an annual program that restripes a portion of the Town’s streets, ensuring the safety of vehicles and pedestrians. Location Roadway restriping work is done at various locations throughout the Town based on conditions and available funds. Project Background The Town initiated Town-wide striping in FY 2006/07. Due to deferred striping and marking of the Town’s public streets, any striping that had been accomplished previously was done in conjunction with the resurfacing of specific streets in the Town’s annual street paving project. This annual street restriping program installs new striping and marking for center lanes, bicycle lanes, crosswalks, stop sign and signal light markings, and other roadway signage as needed. Roadway stripes wear out due to traffic and weather, and create a potential safety concern. The goal is to have Town streets that are properly striped for safe operation and use by the public. Under this project, locations that are not scheduled for street repaving will be prioritized for restriping. The restriping of repaved streets will continue to occur in conjunction with paving contracts. Since FY 2007/08, the ongoing annual GFAR appropriation has been $25,000. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as the project is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-23 Project Components & Estimated Timeline Winter 2017 Design Project Design & development Spring 2018 Bid Process Project bidding & contract award Summer 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 180,228$ -$ 69,772$ 25,000$ 94,772$ 25,000$ 25,000$ 25,000$ 25,000$ 375,000$ TOTAL SOURCE OF FUNDS 180,228$ -$ 69,772$ 25,000$ 94,772$ 25,000$ 25,000$ 25,000$ 25,000$ 375,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 180,228 - 69,772 25,000 94,772 25,000 25,000 25,000 25,000 375,000 TOTAL GFAR 180,228$ -$ 69,772$ 25,000$ 94,772$ 25,000$ 25,000$ 25,000$ 25,000$ 375,000$ TOTAL USE OF FUNDS 180,228$ -$ 69,772$ 25,000$ 94,772$ 25,000$ 25,000$ 25,000$ 25,000$ 375,000$ ANNUAL STREET RESTRIPING Project 811-9902 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-24 Project Name Public Access Infrastructure Improvement Projects Project Number 821-2102 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project acts as a placeholder for the Community Development Block Grant (CDBG) funding program. Undesignated funding is allocated to this project fund until transferred to an approved capital project. Location Currently staff is awaiting the award of FY 2017/18 CDBG funds. Project Background The CDBG program is funded through the federal government and seeks to improve the quality of life for low income residents, the elderly, and person with disabilities. One component of the CDBG program is to allocate funding towards projects that improve access to public facilities for individuals with physical disabilities. In the past, the Town’s CDBG projects have included automatic entrance/exit doors, sidewalk ramps and cut-outs for curbs and medians, and Town park pathway improvements. Santa Clara County manages the CDBG program and provides an allocation for participating cities, including Los Gatos. Public access infrastructure improvement projects are funded through grants administered by the CDBG program. The County will begin implementation of a new process for allocation of these funds following the FY 2016/17. The new allocation will require jurisdictions to apply for and receive funding, which will result in potentially larger allocations but likely with less frequency for each eligible jurisdiction. Currently, due to the change in process, staff is awaiting the award of CDBG funds, and has submitted projects related to Bachman Park and Senior Center Improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-25 Project Components & Estimated Timeline Winter 2017 Design Project design and development Spring 2018 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GRANTS & AWARDS -$ -$ 140,000$ -$ 140,000$ -$ -$ -$ -$ 140,000$ TOTAL SOURCE OF FUNDS -$ -$ 140,000$ -$ 140,000$ -$ -$ -$ -$ 140,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 140,000 - 140,000 - - - - - TOTAL GRANTS & AWARDS -$ -$ 140,000$ -$ 140,000$ -$ -$ -$ -$ 140,000$ TOTAL USE OF FUNDS -$ -$ 140,000$ -$ 140,000$ -$ -$ -$ -$ 140,000$ PUBLIC ACCESS INFRASTRUCTURE IMPROVEMENT PROJECTS Project 821-2102 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-26 Project Name Guardrail Replacement Project Project Number 812-0120 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description The project will construct a new metal beam guardrail and replace old and damaged guardrails along sections of Town roadway. Location This project will take place in various locations where guardrails are present and are in need of repair. The list of guardrails will be identified and will be brought forward to Council for approval. Project Background There are many roadways throughout Town that are located near hillside areas where guardrails are present. Over the years, due to hillside erosion and years of deferred maintenance, the guardrails have worn out and are need of repair or replacement. Guardrails are often located on narrow stretches of roadway, and protect vehicles and pedestrians from steep hillside embankments. Staff will assess guardrails and determine which ones are in the most need of repair, budget permitting. Operating Budget Impacts Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-27 Project Components & Estimated Timeline Summer 2016 Design Project design & development Fall 2016 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Spring 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 136,958$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 230,000$ TOTAL SOURCE OF FUNDS 136,958$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 230,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 136,958 - 93,043 - 93,043 - - - - 230,000 TOTAL GFAR 136,958$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 230,000$ TOTAL USE OF FUNDS 136,958$ -$ 93,043$ -$ 93,043$ -$ -$ -$ -$ 230,000$ GUARDRAIL REPLACEMENT PROJECTS Project 812-0120 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-28 HWY 9 E MA I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Electrical Panel Replacement on Pageant Way Project Number 812-0122 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will replace an old electric panel that services the tree and street lights along Main Street. Location This project is located on Pageant Way next to the old Library parking lot. Project Background Over the past several years, the Town has upgraded and replaced multiple outdated electric panels that service street light posts and tree lights in the downtown area. This project began in 2003 as part of the downtown streetscape project. Since then, all electric panels along Santa Cruz Avenue and Plaza Park have been replaced to bring these panels to current electric codes. The last old electric panel that is in need of replacement is the panel located on Pageant Way, which services the tree and street lights along Main Street. Replacement of this panel will complete the electric panel upgrades in the downtown area. Operating Budget Impacts Engineering staff time associated with this project will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-29 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bidding Project bidding & contract award Winter 2017 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 45,000$ -$ 45,000$ -$ -$ -$ -$ 45,000$ TOTAL SOURCE OF FUNDS -$ -$ 45,000$ -$ 45,000$ -$ -$ -$ -$ 45,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 45,000 - 45,000 - - - - 45,000 TOTAL GFAR -$ -$ 45,000$ -$ 45,000$ -$ -$ -$ -$ 45,000$ TOTAL USE OF FUNDS -$ -$ 45,000$ -$ 45,000$ -$ -$ -$ -$ 45,000$ ELECTRICAL PANEL REPLACEMENT ON PAGEANT WAY Project 812-0122 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-30 LO S G A T O S B L V D HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V BLOSSO M H I L L R D Project Name Crosswalk Improvements at Santa Cruz Avenue/Blossom Hill Road Project Number 812-0125 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will install a new crosswalk on the north side of Santa Cruz Avenue at Blossom Hill Road. Location This project is located on Santa Cruz Avenue at Blossom Hill Road. Project Background The intersection at Santa Cruz Avenue and Blossom Hill Road is a well-traveled pedestrian corridor. There is an existing crosswalk on the South side of Santa Cruz Ave. that provides limited crossing access and adding a crosswalk on the North side of Santa Cruz Ave. will enhance crossing access for pedestrians and bicyclists. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost, which is approximately 12%. PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-31 Project Components & Estimated Timeline Fall 2017 Design Project design & development Winter 2017 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TRAFFIC MITIGATION - - 50,000 - 50,000 - - - - 50,000$ TOTAL SOURCE OF FUNDS -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 60,000 - 60,000 - - - - 60,000 TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 50,000 - 50,000 - - - - 50,000 TOTAL TRAFFIC MITIGATIONS -$ -$ 50,000$ -$ 50,000$ -$ -$ -$ -$ 50,000$ TOTAL USE OF FUNDS -$ -$ 110,000$ -$ 110,000$ -$ -$ -$ -$ 110,000$ CROSSWALK IMPROVEMENTS SANTA CRUZ /BLOSSOM HILL 812-0125 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-32 Project Name Crosswalk Lighting Upgrades Project Number 812-0126 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will upgrade pedestrian crossing lights at multiple locations throughout Town. Location This project will take place at various locations in Town. Project Background Safety improvements are needed at key streets to ensure public safety and safe walking pathways for students and pedestrians. Staff identified areas that have moderate to high levels of pedestrian traffic that are near major roadways that lack safe crosswalk areas. Work has been completed at Massol Avenue and Highyway 9, Blossom Hill Road and Hillbrook Road, and Pollard Road and Abbott Avenue. The remaining locations area Blossom Hill Road and Santa Cruz Avenue, and Los Gatos- Almaden Road and Cherry Blossom. The projects are anticipated to be completed in the latter part of FY 2017/18. As part of these crosswalk lighting upgrades, more enhanced signage with lighting will be installed, as well as concrete median islands, where applicable. For streets with multiple vehicle lanes, the concrete median islands allow pedestrian a safe area mid-way through the street so that crossing is more safe and achievable in high traffic areas. The former Intersection Safety & Traffic Flow Improvements Project (813-0220) has now been combined with the Crosswalk Lighting Upgrade Project as the project vicinity and outcomes for safety overlap significantly. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost, which is approximately 12%. TOWN-WIDE PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-33 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bid process Project bidding & contract award Winter 2018 Construction Project construction Spring2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 28,696$ 7,565$ 53,809$ -$ 53,809$ -$ -$ -$ -$ 90,070$ TRAFFIC MITIGATION 57,064 - 42,666 - 42,666 - - - - 99,730$ TOTAL SOURCE OF FUNDS 85,760$ 7,565$ 96,476$ -$ 96,476$ -$ -$ -$ -$ 189,800$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 28,696$ 7,565$ 53,809$ - 53,809 - - - - 90,070 TOTAL GFAR 28,696$ 7,565$ 53,809$ -$ 53,809$ -$ -$ -$ -$ 90,070$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 57,064 - 42,666 - 42,666 - - - - 99,730 TOTAL TRAFFIC MITIGATIONS 57,064$ -$ 42,666$ -$ 42,666$ -$ -$ -$ -$ 99,730$ TOTAL USE OF FUNDS 85,760$ 7,565$ 96,476$ -$ 96,476$ -$ -$ -$ -$ 189,800$ CROSSWALK LIGHTING UPGRADE 812--0126 PROPOSED STREETS PROGRAM Street Repairs, Maintenance & Safety Projects C-34 PROPOSED STREETS PROGRAM Street Improvements C-35 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES A L HIC K S RD B "C", "J", "K", "N", "O", "P", "T" AND "U" ARE TOWN-WIDE PROJECTS D F F H I G M Q QU I T O R D BICKNELL RD PROJECT LOCATIONS A Highway 9/University Avenue Intersection Improvements K LED Streetlights B Los Gatos Boulevard/Shannon Road Improvements L Pageant Way Parking Lot Reconstruction C Monument Control Network Update M Utility Undergrounding Improvements D Downtown Parking Lots Seal Coat & Restriping N Bicycle & Pedestrian Master Plan E Hernandez Avenue Storm Drain Improvements O Cut-Through Traffic Mitigation F Blossom Hill Road/Cherry Blossom Lane Intersection Improvements P Traffic Signal Modernization G 224 West Main Property Acquisition (Parking Lot 6) Q Bicknell Road Storm Drain Improvements H Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane Sidewalk Improvements R Bicycle & Pedestrian Improvements I Stonybrook Road/Kennedy Road Sidewalk Improvements S Stormwater Master Plan J Sidewalk Improvements – Multiple Locations T Stormwater System – Pollution Prevention Compliance U Public Arts Gateway Project PROPOSED STREETS PROGRAM Street Improvements C-36 PROGRAM SECTION DIRECTORY PAGE 0202 Highway 9/University Avenue Intersection Improvements C – 38 0213 Los Gatos Boulevard/Shannon Road Improvements C – 40 0214 Monument Control Network Update C – 42 0705 Downtown Parking Lots Seal Coat & Restriping C – 44 0409 Hernandez Avenue Storm Drain Improvements C – 46 0212 Blossom Hill Road/Cherry Blossom Lane Intersection Improvements C – 48 0704 224 West Main Property Acquisition (Parking Lot 6) C – 50 0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 52 0219 Stonybrook Road & Kennedy Road Sidewalk Improvements C – 54 0221 Sidewalk Improvements – Multiple Locations C – 56 0224 LED Street Lights C – 58 0707 Pageant Way Parking Lot Reconstruction C – 60 0225 Utility Undergrounding Improvements C – 62 0226 Bicycle & Pedestrian Master Plan C – 64 0229 Cut – Through Traffic Mitigation C – 66 0227 Traffic Signal Modernization C – 68 0410 Bicknell Road Storm Drain Improvements C – 70 0231 Bicycle & Pedestrian Improvements C – 72 0413 Stormwater Master Plan C – 74 0414 Stormwater System – Pollution Prevention Compliance C – 76 0232 Public Arts Gateway Project C – 78 PROPOSED STREETS PROGRAM Street Improvements C-37 The Streets Program’s Street Improvements section contains Capital Improvement Program projects that improve a roadway’s function or structure, other than paving, as the primary scope of work. Typical Street Improvements projects include sidewalk, curb, and gutter improvements, storm drain improvements, the undergrounding of utilities, intersection improvements, sidewalk and median ramps, crosswalk improvements, street lighting, and retaining walls. In this CIP, the Street Improvements section contains one-time projects and no ongoing projects. One-time Street Improvements projects are prioritized based on safety needs, traffic levels, available funding sources, project costs, and community impacts. Traffic Mitigation Funds, Storm Drain Funds, and the Utility Underground Fund all provide designated funding revenue through development fee charges for their related project categories. Los Gatos does not have a designated funding source for other street improvements which do not fall into these categories; however, grants, in-lieu fees, CDBG funds, and community benefit funds are utilized when available. STREET IMPROVEMENT PROJECTS SUMMARY * Total FY 2016/17 Carryforward $4,349,631 Unfunded Projects for future consideration • Parking Lot 4 Repair & Waterproofing • Downtown Parking Sign Enhancements • Montebello Way Island Removal • Blossom Hill Road & Union Avenue Improvements • Los Gatos-Almaden Road Improvements • Union Avenue Widening and Sidewalks • Local Bikeway Improvements • Blossom Hill Road Bridge Widening at Highway 17 Carryforward Projects 0202 Hwy 9/University Intersection 969,495$ 199,235$ -$ -$ -$ -$ 1,168,730$ 0213 Los Gatos Blvd/Shannon Improvements - 20,000 - - - - 20,000 0214 Monument Control Network Update - 30,000 - - - - 30,000 0705 Downtown Parking Lots Seal Coat & Restriping - 100,000 - - - - 100,000 0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - 65,000 82,180 0212 Blossom Hill Rd/Cherry Blossom Ln Intersection Improvements - 500,000 - - - - 500,000 0704 224 W. Main Street Property Acquisition (Parking Lot 6)4,000 1,196,000 - - - - 1,200,000 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 129,896 - - - - 130,000 0219 Stonybrook & Kennedy Sidewalk Improvements 18,958 561,042 - - - - 580,000 0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - 60,000 0224 LED Streetlights 413 504,235 - - - - 504,648 0707 Pageant Way Parking Lot Reconstruction 45,368 161,596 - - - - 206,964 0225 Utility Undergrounding Improvements - 112,000 42,000 42,000 42,000 6,528,000 6,766,000 0226 Bicycle & Pedestrian Master Plan 138,531 123,665 - - - - 262,196 0229 Cut-Through Traffic Mitigation 158,908 571,092 - - - - 730,000 0227 Traffic Signal Modernization - 502,869 352,869 592,895 415,027 - 1,863,659 0410 Bicknall Avenue Strom Drain Improvement 21,500 150,000 - - - - 171,500 New Projects 0231 Bicycle & Pedestrian Improvements - 300,000 - - - - 300,000 0413 Stormwater Master Plan - 200,000 - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance - - 300,000 - - - 300,000 0232 Public Arts Gateway Project - 25,000 - - - - 25,000 - Total Street Improvement Projects 1,374,457$ 5,446,631$ 694,869$ 634,895$ 457,027$ 6,593,000$ 15,200,877$ 2018/19 Budget STREET IMPROVEMENT PROJECTS 2021/22 Budget Expended Through 2016/17 2020/21 Budget 2017/18 Budget & Carryfwd* 2019/20 Budget FY 2017/18- 2021/22 CAPITAL IMPROVEMENT PROGRAM Total Budgeted PROPOSED STREETS PROGRAM Street Improvements C-38 Project Name Highway 9/University Avenue Intersection Improvements Project Number 813-0202 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project replaced the old and outdated traffic signal at the Highway 9 and University Avenue intersection with a new traffic signal system. Additionally, dedicated left turn lanes were constructed on University Avenue to improve vehicle traffic flow. Sidewalks were repaired to be in compliance with current codes. Construction associated with this project was completed in FY 2015/16 with project closeout, including processing associated documentation lasting into FY 2017/18. Location The project is located at the intersection of Highway 9 and University Avenue. Project Background The lack of an updated traffic signal system and dedicated left turn lanes has impacted vehicle traffic flow, causing vehicle and pedestrian safety and capacity issues. To address these issues, a new traffic signal system, including dedicated left turn lanes, were installed. The sidewalks located at this intersection were also improved to comply with current codes. The project intersection is located in the Caltrans right-of-way and due to state budget challenges, funding has been limited for the past several years. However, the Town secured a grant through the Highway Safety Implementation Program (HSIP). The project was funded through this grant and revenue from development projects in the immediate area. Although all of the work has been done for some time, project closeout has been delayed on this project as staff has struggled with obtaining and providing information to Caltrans for grant documentation. Operating Budget Impacts This project will use staff time grant management. The staff time for this project is included in the Department’s FY 2017/18 Operating Budget. HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED STREETS PROGRAM Street Improvements C-39 Project Components & Estimated Timeline Winter 2014 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION 66,693$ -$ 199,235$ -$ 199,235$ -$ -$ -$ -$ 265,928$ GRANTS & AWARDS 902,802 - - - - - - - - 902,802 TOTAL SOURCE OF FUNDS 969,495$ -$ 199,235$ -$ 199,235$ -$ -$ -$ -$ 1,168,730$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 66,693 - 199,235 - 199,235 - - - - 66,693 TOTAL TRAFFIC MITIGATION 66,693$ -$ 199,235$ -$ 199,235$ -$ -$ -$ -$ 265,928$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 902,802 - - - - - - - - 902,802 TOTAL GRANTS & AWARDS 902,802$ -$ -$ -$ -$ -$ -$ -$ -$ 902,802$ TOTAL USE OF FUNDS 969,495$ -$ 199,235$ -$ 199,235$ -$ -$ -$ -$ 1,168,730$ HIGHWAY 9 / UNIVERSITY AVENUE INTERSECTION IMPROVEMENTS Project 813-0202 PROPOSED STREETS PROGRAM Street Improvements C-40 LO S G A T O S B L V D BLOSSOM HILL R D SHANN O N R D Project Name Los Gatos Boulevard/Shannon Road Improvements Project Number 813-0213 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will create a new pedestrian signalized crossing and restripe Shannon Road to provide longer turn lanes and improve the overall safety for pedestrians and bicyclists. The project will be coordinated with any potential development of adjacent parcels. Location This project is located at the intersection of Los Gatos Boulevard and Shannon Road. Project Background The intersection of Los Gatos Boulevard and Shannon Road is a heavily used area, especially during the morning and afternoon school and commute hours. In order to improve the safe operation of this intersection, a new pedestrian push button signal will be installed and also new striping on Shannon Road will provide a longer turn lane onto Los Gatos Boulevard. Should a development project occur at this location, that project will take on this work and the Town funding will revert to the GFAR in future budget cycles Operating Budget Impacts This project will use staff time for design and construction. Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. PROPOSED STREETS PROGRAM Street Improvements C-41 Project Components & Estimated Timeline Fall 2017 Preliminary Design Project design & development Spring 2018 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL SOURCE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 20,000 - 20,000 - - - - 20,000 TOTAL TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL USE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ LOS GATOS BOULEVARD / SHANNON IMPROVEMENTS Project 813-0213 PROPOSED STREETS PROGRAM Street Improvements C-42 Project Name Monument Control Network Update Project Number 813-0214 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will provide ongoing update of the existing Town-wide survey monument control network in phases. Location This project is located Town-wide. Project Background In 2002, the Town undertook a project to establish a survey monument network for Los Gatos, which has been used by surveyors and engineers for the last 10 years. Due to new development projects, and changes to the Town’s infrastructure, such as new streets, the survey monument network is outdated. The survey monuments are a planning resource when considering new development projects or when designing or providing engineering specifications for projects. This project will provide a verification of the location of the Town monuments per the original survey. This survey document will enable staff to detect any variations of location of any monuments that have been affected by earth movements. Operating Budget Impacts This project will use staff time for design and management. This project is tentatively scheduled to begin in FY 2017/18. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-43 Project Components & Estimated Timeline Fall 2017 Design Phase I project development Winter 2017 Bid process Phase I project bidding & contract award Summer 2018 Completion Phase I project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TRAFFIC MITIGATION - - 10,000 - 10,000 - - - - 10,000 TOTAL SOURCE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 20,000 - 20,000 - - - - - TOTAL GFAR -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 10,000 - 10,000 - - - - - TOTAL TRAFFIC MITIGATION -$ -$ 10,000$ -$ 10,000$ -$ -$ -$ -$ 10,000$ TOTAL USE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$ MONUMENT CONTROL NETWORK UPDATE Project 813-0214 PROPOSED STREETS PROGRAM Street Improvements C-44 HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Downtown Parking Lots Seal Coat & Restriping Project Number 817-0705 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will resurface downtown parking lots by applying a seal coat and then restriping. Location This project is located at various Town-owned parking lots in downtown Los Gatos. Project Background The public parking lots in downtown Los Gatos are heavily used on a daily basis. In order to keep their surfaces in good condition and prevent long term wear and damage, the parking lots need to be resurfaced and restriped. This project is necessary to prevent possible drainage or broken pavement problems in the future. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-45 Project Components & Estimated Timeline Winter 2017 Preliminary Design Project design & development Spring 2018 Final Design Project bidding & contract award Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 100,000$ -$ 100,000$ -$ -$ -$ -$ 100,000$ TOTAL SOURCE OF FUNDS -$ -$ 100,000$ -$ 100,000$ -$ -$ -$ -$ 100,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 100,000 - 100,000 - - - - 100,000 TOTAL GFAR -$ -$ 100,000$ -$ 100,000$ -$ -$ -$ -$ 100,000$ TOTAL USE OF FUNDS -$ -$ 100,000$ -$ 100,000$ -$ -$ -$ -$ 100,000$ DOWNTOWN PARKING LOTS SEAL COAT & RESTRIPING Project 817-0705 PROPOSED STREETS PROGRAM Street Improvements C-46 Project Name Hernandez Avenue Storm Drain Improvements Project Number 816-0409 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will improve the Hernandez Avenue storm drain system with the installation of an underground storm drain pipe and sidewalk above. Location The storm drain project is located on the south side of Hernandez Avenue, between Walnut Avenue and Wissahickon Avenue. Project Background Hernandez Avenue is a hillside collector street with an incomplete sidewalk network and storm drain systems alongside the roadway. This street averages over 1,000 vehicles per day, a normal amount for a collector street. At previous neighborhood meetings, residents indicated an interest in having continuous sidewalks, particularly in the area where an open storm drain exists. This project proposes to install an underground storm drain pipe into the existing ditch and put a concrete sidewalk, curb, and gutter system along the roadway to feed runoff water into the storm drain pipe. This street improvement addresses several neighborhood needs, including an improved drainage system, a safer pedestrian area, and an improved appearance of the neighborhood. This project will be funded by the Storm Basin Fund. This project is scheduled for FY 2019/20. Operating Budget Impacts Ongoing operating costs would be significantly reduced as this project would eliminate the need to clean or repair the existing open ditch. Engineering staff time associated with these projects will be charged to the project as it is delivered in FY 2021/22. L O S G A T O S - S A R A T O G A R D HWY 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED STREETS PROGRAM Street Improvements C-47 Project Components & Estimated Timeline Fall 2020 Design Design project, include alternative methods and estimated costs, and determine best outcome Winter 2021 Bid Process Obtain bids from licensed contractors and submit to Council for approval Summer 2021 Construction Construction of storm drains and related street improvements Fall 2021 Completion Project completed Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) STORM BASIN #3 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL SOURCE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) STORM BASIN #3 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 17,180 - - - - - - - 65,000 82,180 TOTAL STORM BASIN 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL USE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ HERNANDEZ AVENUE STORM DRAIN IMPROVEMENTS Project 816-0409 PROPOSED STREETS PROGRAM Street Improvements C-48 LO S G A T O S B L V D BLOSSOM HILL RD SHANNO N R D Project Name Blossom Hill Road/Cherry Blossom Lane Intersection Improvements Project Number 813-0212 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will install a new traffic signal and reconfigure this intersection to improve flow of vehicle, bicycle, and pedestrian traffic. Location This project is located at the intersection of Blossom Hill Road and Cherry Blossom Lane. Project Background In 2011, the Town conducted safety improvements on Blossom Hill Road from Cherry Blossom Lane to Camino del Cerro. This project was funded by Town Traffic Mitigation funds along with funding received from the State of California’s Safe Routes to School grant. The improvements from the first phase of the project included: reconfiguration of the crosswalks at Blossom Hill Road and Cherry Blossom Lane, widening of Blossom Hill Road from Cherry Blossom Lane to Camino del Cerro, construction of bicycle lanes on a section of Blossom Hill Road, construction of sidewalks on a section of Blossom Hill Road, and construction of a lighted crosswalk across Blossom Hill Road. The final phase of this project will replace the existing traffic signal system at the intersection of Blossom Hill Road and Cherry Blossom Lane. Additionally, this project will reconfigure this intersection to improve its operations for vehicles, pedestrians, and bicyclists. Operating Budget Impacts This project was recommended within the study of traffic around schools and is consistent with the Town’s Bicycle and Pedestrian Master Plan. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-49 Project Components & Estimated Timeline Fall 2017 Design Project design & development Winter 2017 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ TOTAL SOURCE OF FUNDS -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 500,000 - 500,000 - - - - 500,000 TOTAL TRAFFIC MITIGATION -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ TOTAL USE OF FUNDS -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ BLOSSOM HILL ROAD / CHERRY BLOSSOM LANE INTERSECTION IMPROVEMENTS Project 813-0212 PROPOSED STREETS PROGRAM Street Improvements C-50 HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name 224 West Main Property Acquisition (Parking Lot 6) Project Number 817-0704 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project, carried forward from previous years, allocates funding from the GFAR Parking Reserve for the purchase of property (formerly 224 West Main Street) for Parking Lot 6. Location This project is located at Parking Lot 6, which is at 224 West Main Street. Project Background In 2009, the Town purchased a property next to Parking Lot 6 to expand the existing parking lot. This property was purchased by Town Housing/Redevelopment Agency (RDA) funds. Because the State dissolved redevelopment agencies, it is necessary that the Town use an alternative funding source for this purchase if affordable housing is not constructed at this site. Reserve funds for GFAR are identified for this use. The Town is also pursuing the construction of a parking garage at this location, including a residential component with the required affordable units. Should that project move forward, these funds could be re-appropriated to the future parking garage project. Operating Budget Impacts This project would use staff time for processing of the new property purchase. The staff time for this project is included in the FY 2017/18 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-51 Project Components & Estimated Timeline Summer 2017 Estimated Completion Property purchase and funding completed. Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 4,000$ -$ 1,196,000$ -$ 1,196,000$ -$ -$ -$ -$ 1,200,000$ TOTAL SOURCE OF FUNDS 4,000$ -$ 1,196,000$ -$ -$ -$ -$ -$ -$ 1,200,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 4,000 - 1,196,000 - 1,196,000 - - - - 1,200,000 TOTAL GFAR 4,000$ -$ 1,196,000$ -$ 1,196,000$ -$ -$ -$ -$ 1,200,000$ TOTAL USE OF FUNDS 4,000$ -$ 1,196,000$ -$ 1,196,000$ -$ -$ -$ -$ 1,200,000$ 224 WEST MAIN PROPERTY ACQUISITION (PARKING LOT 6)Project 817-0704 PROPOSED STREETS PROGRAM Street Improvements C-52 LOS G A T O S B L V D BLOSSOM HILL RD SHANNON R D Project Name Sidewalk Improvements/Shannon/Los Gatos Blvd/Cherry Blossom Lane Project Number 813-0218 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb and gutter along the north side of Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane, completing the pedestrian link between the two roads. Location The project is located on Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane. Project Background Shannon Road is a heavily traveled two-lane roadway, especially when the schools are in session. Shannon Road is used by residents dropping off students at various schools, such as Blossom Hill Elementary, Van Meter Elementary, and Fisher Middle Schools. In addition, many parents walk their children to school along this segment of roadway. Shannon Road currently has intermittent sections of sidewalk on the south side of the roadway between Los Gatos Boulevard and Cherry Blossom Lane. Most pedestrians cross Shannon Road to walk along the south side, while some walk along the unimproved shoulder on the north side. This project will complete the sidewalk segment on the north side of the roadway and reduce congestion at Shannon Road and Cherry Blossom Lane, where a 3-way stop is inundated by crossing students, crossing guards, and vehicle traffic during peak school hours. With the proposed sidewalk, pedestrians will be encouraged to walk along the north side of Shannon Road, thus reducing the number of pedestrians crossing Shannon Road. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2017/18 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-53 Project Components & Estimated Timeline Fall 2017 Design Project design & development Winter 2017 Bid process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 104$ -$ 129,896$ -$ -$ -$ -$ -$ -$ 130,000$ TOTAL SOURCE OF FUNDS 104$ -$ 129,896$ -$ -$ -$ -$ -$ -$ 130,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed $ - USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 104 - 129,896 - 129,896 - - - - 130,000 TOTAL GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ TOTAL USE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ SIDEWALK IMPROVEMENTS/SHANNON/ LOS GATOS BLVD/CHERRY BLOSSOM LANE Project 813-0218 PROPOSED STREETS PROGRAM Street Improvements C-54 LO S G A T O S B L V D KENNE D Y R D SHANNO N R D Project Name Stonybrook & Kennedy Road Sidewalk Improvements Project Number 813-0219 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will remove a failing wooden sidewalk along Kennedy Road between Stonybrook Road and Longmeadow Drive and replace with new concrete sidewalk, retaining wall, curb, gutter, drainage improvements, and ADA ramps. Location This project is located on Kennedy Road between Stonybrook Road and Longmeadow Drive. Project Background The existing elevated wooden sidewalk was constructed a number of years ago. Over time, the wooden deck has deteriorated with age and has been damaged by termites. The improvements will be made to remove the existing walkway and replace with a concrete sidewalk. The walkway is adjacent to a drainage course and will require a retaining wall element in order for the sidewalk to match the elevation of Kennedy Road. The design of the project began in Winter 2015, and construction is anticipated to follow in FY 2017/18. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with this project will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-55 Project Components & Estimated Timeline Fall 2015 Design Project design & development Spring 2017 Bid process Project bidding & contract award Spring 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 18,884$ 561,116$ 561,042$ -$ 561,042$ -$ -$ -$ -$ 580,000$ TOTAL SOURCE OF FUNDS 18,884$ 561,116$ 561,042$ -$ 561,042$ -$ -$ -$ -$ 580,000$ Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 18,884 561,116 561,042 - 561,042 - - - - 580,000 TOTAL GFAR 18,884$ 561,116$ 561,042$ -$ 561,042$ -$ -$ -$ -$ 580,000$ TOTAL USE OF FUNDS 18,884$ 561,116$ 561,042$ -$ 561,042$ -$ -$ -$ -$ 580,000$ STONYBROOK & KENNEDY SIDEWALK IMPROVEMETNS Project 813-0219 PROPOSED STREETS PROGRAM Street Improvements C-56 TOWN-WIDE Project Name Sidewalk Improvements – Multiple Locations Project Number 813-0221 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb, and gutter on the north side of Kennedy Road from Ferris Avenue to Los Gatos Boulevard and on the south side of Mitchell Avenue from George Street to Fisher Avenue. This project will also upgrade the traffic signal at Los Gatos Boulevard and Shannon Road by adding a right turn lane on westbound Shannon Road and signal indication for vehicles and pedestrians. Location This project is located in the following areas: Kennedy Road from Ferris Avenue to Los Gatos Boulevard; Mitchell Avenue from George Street to Fisher Avenue; and Los Gatos Boulevard/Shannon Road. Project Background Kennedy Road from Ferris Avenue to Los Gatos Boulevard currently has a shoulder that is heavily utilized by parents and students walking and biking to school in the morning and afternoons. The sidewalk improvements will complete the connection in this residential block. In 2009, the Town completed the sidewalk installation on the north side of Mitchell Avenue from George Street to Fisher Avenue. Then in 2012, sidewalk was constructed on north and south side of Mitchell Avenue between Los Gatos Boulevard and George Street as part of the redevelopment of the former Honda site. This project will complete the last component of the sidewalks in this heavily utilized pedestrian area between Van Meter Elementary and Fisher Middle Schools. This project will also upgrade the intersection of Los Gatos Boulevard/Shannon Road by adding a right lane and additional signal indication for vehicles and pedestrians for the westbound approach. This will increase the capacity of the intersection. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2017/18 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-57 Project Components & Estimated Timeline Fall 2017 Design Project design & development Winter 2017 Bid process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 60,000 - 60,000 - - - - - TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ SIDEWALK IMPROVEMENTS - MULTIPLE LOCATIONS Project 813-0221 PROPOSED STREETS PROGRAM Street Improvements C-58 Project Name LED Streetlights Project Number 813-0224 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project is underway to replace existing streetlights with new energy efficient LED streetlights. Location This project is located Town-wide for all Town-owned streetlights. Project Background The existing Town streetlights are low pressure sodium lights. These bulbs are not energy efficient and are costly to repair and maintain. LED streetlights have become a proven technology with demonstrable savings in both operations and maintenance costs. LED streetlights are now the Town standard and are being used throughout the Town as new development occurs. This project is replacing old existing streetlight heads with new LED heads. LED streetlights have three main benefits over traditional low pressure sodium lights. First, LED lights can appear brighter, creating an increased sense of security. Additionally, LED streetlights are far more energy efficient versus the traditional streetlight bulb. Lastly, LED lights last longer, decreasing the costs for replacement. LED streetlights are more expensive to purchase, however, these costs will be recouped in the form of energy savings within less than four years. Generally, any energy efficiency projects with savings under a seven-year timeframe are highly desirable projects to implement. Operating Budget Impacts This project will result in electricity savings, which is projected at $413,000 over the span of this five year CIP. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $43,050 or approximately 11% of the total project cost. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-59 Project Components & Estimated Timeline Summer 2015 Design Project design & development Summer 2016 Bid process Project bidding & contract award Summer 2017 Construction Project construction Fall 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ 413$ 504,235$ -$ 504,235$ -$ -$ -$ -$ 504,648$ TOTAL SOURCE OF FUNDS -$ 413$ 504,235$ -$ 504,235$ -$ -$ -$ -$ 504,648$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 413 504,235 - 504,235 - - - - 504,648 TOTAL GFAR -$ 413$ 504,235$ -$ 504,235$ -$ -$ -$ -$ 504,648$ TOTAL USE OF FUNDS -$ 413$ 504,235$ -$ 504,235$ -$ -$ -$ -$ 504,648$ LED STREET LIGHTS Project 813-0224 PROPOSED STREETS PROGRAM Street Improvements C-60 Project Name Pageant Way Parking Lot Reconstruction Project Number 817-0707 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will design and reconstruct the existing parking lot on Pageant Way. Location This project is located on Pageant Way adjacent to Town Hall. Project Background The asphalt pavement in this parking lot has failed, leading to uneven surfaces and creating tripping hazards. Citizens park in this lot to visit Town Hall, the Library, NUMU, and Friends bookstore. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $18,550 or approximately 11% of the total project cost. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-61 Project Components & Estimated Timeline Fall 2016 Design Project design & development Winter 2016 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 16,368$ 29,000$ 161,596$ -$ 161,596$ -$ -$ -$ -$ 206,964$ TOTAL SOURCE OF FUNDS 16,368$ 29,000$ 161,596$ -$ 161,596$ -$ -$ -$ -$ 206,964$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 16,368 29,000 161,596 - 161,596 - - - - 206,964 TOTAL GFAR 16,368$ 29,000$ 161,596$ -$ 161,596$ -$ -$ -$ -$ 206,964$ TOTAL USE OF FUNDS 16,368$ 29,000$ 161,596$ -$ 161,596$ -$ -$ -$ -$ 206,964$ PAGEANT WAY PARKING LOT RECONSTRUCTION Project 817-0707 PROPOSED STREETS PROGRAM Street Improvements C-62 HW Y 1 7 LO S G A T O S B L V D LOS GA T O S - ALMADEN R D Project Name Utility Undergrounding Improvements Project Number 813-0225 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will remove utilities from above ground poles and install them underground. Location This project is located on Los Gatos Boulevard between Lark Avenue and Chirco Drive. Project Background Through the State of California’s Public Utilities Commission, Pacific Gas & Electric (PG&E) collects funds from ratepayers to provide for the undergrounding of utilities. These funds grow in reserve called Rule 20A funds, until such time that local jurisdictions identify an area for this project and begin working with PG&E. The funds are limited to use on roadways where traffic is heavy, making Los Gatos Boulevard a viable location. The Town’s allocation of Rule 20A funds has grown to the point where there is now approximately $3.8M available for programming. These funds will never actually come to the Town, but rather PG&E will deliver the project with coordination from Town staff. In addition to the Rule 20A funds, the Town collects developer fees for utility undergrounding. These funds are held by the Town for future projects. Staff has asked PG&E to look at an expanded project scope utilizing some or all of the Town funds as well. This will take full advantage of economies of scale through design and construction. The timeframe for PG&E to deliver Rule 20A projects is between seven and ten years. The project will be tracked in the five year CIP to continue to show it as a priority. Funds shown in FY 2019/20 will likely move to the fifth year of each subsequent five year plan until such time as PG&E conveys a schedule within the five year window. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $266,000 over the five year term of the project or 4% of the total project cost. Project costs are significantly lower on this project due to the efficiencies in the project size and a larger proportion of work that will be coordinated by PG&E. PROPOSED STREETS PROGRAM Street Improvements C-63 Project Components & Estimated Timeline Fall 2016 Design Project design & development Summer 2020 Construction Project construction Summer 2021 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) UTILITY UNDERGROUNDING -$ -$ 70,000$ 42,000$ 112,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ TOTAL SOURCE OF FUNDS -$ -$ 70,000$ 42,000$ 112,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) UTILITY UNDERGORUNDING Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 70,000 42,000 112,000 42,000 42,000 42,000 6,528,000 6,766,000 TOTAL GFAR -$ -$ 70,000$ 42,000$ 112,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ TOTAL USE OF FUNDS -$ -$ 70,000$ 42,000$ 112,000$ 42,000$ 42,000$ 42,000$ 6,528,000$ 6,766,000$ UTILITY UNDERGROUNDING IMPROVEMENTS Project 813-0225 PROPOSED STREETS PROGRAM Street Improvements C-64 Project Name Bicycle and Pedestrian Master Plan Project Number 813-0226 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will develop a Bicycle and Pedestrian Master Plan. Location This project is located Town-wide. Project Background The Town of Los Gatos does not currently have an adopted Bicycle and Pedestrian Master Plan (BPMP). Development of a BPMP is identified as an Action Item in the Los Gatos General Plan (Transportation Element Action TRA 11.1) and is a top strategic goal for the recently established Bicycle and Pedestrian Advisory Commission (BPAC). Beyond providing a roadmap for enhancing bicycle and pedestrian mobility throughout the Town, adoption of a BPMP is anticipated to allow the Town to compete more successfully for a range of regional and State grant funds for bicycle and pedestrian related improvement projects. The Bicycle and Pedestrian Plan was adopted by the Town Council on March 7, 2017. Staff will close out the project in FY 2017/2018. Operating Budget Impacts There are no operating impacts associated with the completion of the plan. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-65 Project Components & Estimated Timeline Winter 2015 Request for Proposal (RFP) Develop RFP Winter 2015 Award Council award of Consultant Summer & Fall 2016 Field Work Collect data and develop plan March 2017 Completion Present plan to Council Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 32,794$ 66,097$ 43,457$ -$ 43,457$ -$ -$ -$ -$ 142,348$ GRANTS & AWARDS 39,640 - 80,208 - 80,208 - - - - 119,848 TOTAL SOURCE OF FUNDS 72,434$ 66,097$ 123,665$ -$ 123,665$ -$ -$ -$ -$ 262,196$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 32,794 66,097 43,457 - 43,457 - - - - 142,348 TOTAL GFAR 32,794$ 66,097$ 43,457$ -$ 43,457$ -$ -$ -$ -$ 142,348$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 39,640 - 80,208 - 80,208 - - - - 119,848 TOTAL GRANTS & AWARDS 39,640$ -$ 80,208$ -$ 80,208$ -$ -$ -$ -$ 119,848$ TOTAL USE OF FUNDS 112,074$ 66,097$ 123,665$ -$ 123,665$ -$ -$ -$ -$ 301,836$ BICYCLE & PEDESTRIAN MASTERPLAN Project 813-0226 PROPOSED STREETS PROGRAM Street Improvements C-66 Project Name Cut-Through Traffic Mitigation Project Number 813-0229 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will provide infrastructure changes to help mitigate cut-through traffic. Location This project is located Town-wide. Project Background This project aims to mitigate cut-through traffic through the use of various measures, some of which have been previously used. In the summer of 2015, staff implemented various measures such as the deployment of portable message signs, messages on Caltrans changeable message signs, signal modifications, and street closures to reduce cut-through traffic. In the summer of 2016, this project included signal modifications and synchronization at various intersections, roadway markings and additional signage, as well as costs associated with the temporary closure of south Santa Cruz Avenue at Wood Road and associated data collection. In FY 2017/18, funding will be used for a temporary traffic circle and road closure at Santa Cruz Avenue at Wood Road, portable changeable message signs (PCMS) at eight locations throughout Town to notify motorists of the closure as well as temporary traffic control and detour signs installed and removed on closure days for each weekend day and holiday from May 27 through Monday, September 4. Data collection is also part of this project. Additional work will continue on permanent solutions through this project. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-67 Project Components & Estimated Timeline Winter 2016 Identify Projects Review and identify projects Winter 2016 Design Coordinate and design projects Summer 2017 Construction Install infrastructure and implement projects Fall 2017 Completion Assess Results Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TRAFFIC MITIGATION 13,695 145,213 271,092 - 271,092 - - - - 158,908 TOTAL SOURCE OF FUNDS 13,695$ 145,213$ 271,092$ 300,000$ 571,092$ -$ -$ -$ -$ 458,908$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 300,000 300,000 - - - - 300,000 TOTAL GFARS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 13,695 145,213 271,092 - 271,092 - - - - 430,000 TOTAL TRAFFIC MITIGATIONS 13,695$ 145,213$ 271,092$ -$ 271,092$ -$ -$ -$ -$ 430,000$ TOTAL USE OF FUNDS 13,695$ 145,213$ 271,092$ 300,000$ 571,092$ -$ -$ -$ -$ 730,000$ CUT-THROUGH TRAFFIC MITIGATION Project 813-0229 PROPOSED STREETS PROGRAM Street Improvements C-68 Project Name Traffic Signal Modernization Project Number 813-0227 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will modernize the Town’s traffic signal controllers. Location This project is located Town-wide. Project Background This project will modernize the Town’s traffic signal controllers to allow for greater control by staff, ensure that the current system meets current safety standards, and increase the traffic flow. The Town was awarded a grant through the VTA for $500,000 of the project budget. Full completion of this project relies on increases Traffic Impact Fees related to development projects. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-69 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATIONS -$ -$ 177,869$ -$ 177,869$ 177,869$ 592,895$ 415,027$ -$ 1,363,659$ GRANTS & AWARDS - - 75,000 250,000 325,000$ 175,000 - - - 500,000 TOTAL SOURCE OF FUNDS -$ -$ 252,869$ 250,000$ 502,869$ 352,869$ 592,895$ 830,053$ -$ 1,863,659$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 177,869 - 177,869 177,869 592,895 415,027 - 1,363,659 TOTAL TRAFFIC MITIGATIONS -$ -$ 177,869$ -$ 177,869$ 177,869$ 592,895$ 415,027$ -$ 1,363,659$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 75,000 250,000 325,000 175,000 - - - 500,000 TOTAL GRANTS & AWARDS -$ -$ 75,000$ 250,000$ 325,000$ 175,000$ -$ -$ -$ 500,000$ TOTAL USE OF FUNDS -$ -$ 252,869$ 250,000$ 502,869$ 352,869$ 592,895$ 415,027$ -$ 1,863,659$ TRAFFIC SIGNAL MODERNIZATION Project 813-0227 PROPOSED STREETS PROGRAM Street Improvements C-70 Project Name Bicknell Road Storm Drain Improvements Project Number 816-0410 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will reroute a Town storm drain line. Location This project is located on Bicknell Road near Montclair. Project Background This project will provide design services for the rerouting of an existing Town storm drain line from private property, after it was determined that the Town does not have a storm drain easement. Once design is complete, construction will begin in FY 2017/18. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2017/18 Operating Budget. QUI T O R D BICKNELL RD HWY 9 PROPOSED STREETS PROGRAM Street Improvements C-71 Project Components & Estimated Timeline Fall 2017 Design Project design & development Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) STORM BASIN #3 -$ 21,500$ -$ 150,000$ -$ -$ -$ -$ -$ 171,500$ TOTAL SOURCE OF FUNDS -$ 21,500$ -$ 150,000$ -$ -$ -$ -$ -$ 171,500$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) STORM BASIN #2 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 21,500 - 150,000 150,000 - - - - 171,500 TOTAL STORM BASIN -$ 21,500$ -$ 150,000$ 150,000$ -$ -$ -$ -$ 171,500$ TOTAL USE OF FUNDS -$ 21,500$ -$ 150,000$ 150,000$ -$ -$ -$ -$ 171,500$ BICKNALL AVENUE STORM DRAIN IMPROVEMENTS Project 816-0410 PROPOSED STREETS PROGRAM Street Improvements C-72 Project Name Bicycle & Pedestrian Improvements Project Number 813-0231 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will enhance bicycle and pedestrian safety and mobility throughout the Town. Location This project is located Town-wide. Project Background This project will enhance bicycle and pedestrian safety and mobility Town-wide in the form of multiple projects. In the first year of funding, the Town Council has prioritized projects that were recommended by Safe Routes to School from the original Traffic Around Schools Study. In future years of funding, staff will continue to work with Safe Routes to School, the Town Council, and the general public on prioritizing projects that have been recommended in the recently adopted Bicycle and Pedestrian Master plan. The first round of projects include: a feasibility study on private bussing service to reduce traffic congestion ($50,000), Fisher Avenue Intersection Improvements ($15,000), Blossom Hill Road Enhanced Bikeway ($75,000), Roberts Road – Fisher School Frontage Improvement ($15,000), Shannon Road and Shady View Lane Intersections Improvements ($15,000), Daves Avenue and Poppy Lane Left Turn Lane Installation ($10,000), Highway 9 and Massol Enhanced Crosswalk Improvements ($30,000), Hilow Road Improvements and Hilow Road-Marchmont Drive Bicycle Routes ($5,000), Cherry Blossom Lane Bikeway Improvements ($40,000), and E. Main Street Speed Tables ($35,000). Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-73 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 300,000 300,000 - - - - 300,000 TOTAL GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL USE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ BICYCLE & PEDESTRIAN IMPROVEMENTS Project 813-0231 PROPOSED STREETS PROGRAM Street Improvements C-74 Project Name Stormwater Master Plan Project Number 816-0413 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will develop a Stormwater Master Plan. Location This project is located Town-wide. Project Background The Town of Los Gatos does not currently have an adopted Stormwater Master Plan. This project will develop a Stormwater Collection System Master Plan and provides the Town of Los Gatos with the necessary planning tools and capital improvement projects to address flood management and water quality within the collector portion of the storm drainage system. The Plan will be developed to help the Town meet its overarching environmental and economic goals. The goal of the Stormwater Master Plan is to manage stormwater runoff proactively to protect water quality and to minimize impacts of localized and downstream flooding by identifying infrastructure improvements for the collection, conveyance, and treatment of stormwater runoff within the Town. The Stormwater Master Plan will prioritize storm drain and water quality improvements within the Town and provides an implementation plan for the construction of conveyance and water quality improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-75 Project Components & Estimated Timeline Summer 2017 Design Develop RFP Fall 2017 Bid Process Award Consultant Agreement Winter 2018 Construction Conduct Study Spring 2018 Completion Finalize Report Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 200,000 200,000 - - - - 200,000 TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ STORMWATER MASTER PLAN Project 816-0414 PROPOSED STREETS PROGRAM Street Improvements C-76 Project Name Stormwater System – Pollution Prevention Compliance Project Number 816-0414 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will install improvements, such as trash capture devices, to reduce pollution in the storm water solution. Location This project is located Town-wide. Project Background This project will install solutions, such as multiple trash capture devices in storm inlets, throughout the Town to meet the Municipal Regional Permit Provision C.10 trash reduction requirements. The Town has submitted a plan to meet the requirement to reduce trashload impacts to creeks which are: 70% by 2017 and 100% by 2022. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-77 Project Components & Estimated Timeline Summer 2017 Design Project design & development Winter 2017 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR - - - - - 300,000 - - - 300,000 TOTAL SOURCE OF FUNDS - - - - - 300,000 - - - 300,000 Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - 300,000 - - - 300,000 TOTAL GFAR - - - - - 300,000 - - - 300,000 TOTAL - - - - - - - - - - TOTAL USE OF FUNDS - - - - - 300,000 - - - 300,000 STORMWATER SYSTEM - POLLUTION PREVENTION COMPLIANCE Project 816-0414 PROPOSED STREETS PROGRAM Street Improvements C-78 Project Name Gateway Project Project Number 813-0232 Department Town Manger’s Office Project Manager Town Manager: Laurel Prevetti Description This project will install public art at gateway locations throughout the Town. Location This project is located Town-wide. Project Background The Arts and Culture Commission identified this project as a way to enhance the appearance of the entrances into Los Gatos. At the January 31, 2017 Priority Setting, Council identified $25,000 for public art and on April 18, 2017 the Arts and Culture Commission proposed the gateway project as the best use of the funds, which Council approved. This project will install the first phase of artwork at Town entrances based on the Town’s Public Art Selection Policy and Procedures. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2017/18 Operating Budget. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-79 Project Components & Estimated Timeline Summer 2017 Design Project design & development Winter 2017 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR - - - 25,000 25,000 - - - - 25,000 TOTAL SOURCE OF FUNDS - - - 25,000 25,000 - - - - 25,000 Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 25,000 25,000 - - - - 25,000 TOTAL GFAR - - - 25,000 25,000 - - - - 25,000 TOTAL USE OF FUNDS - - - 25,000 25,000 - - - - 25,000 PUBLIC ARTS GATEWAY PROJECT 813-0232 PROPOSED STREETS PROGRAM Street Improvements C-80 PROPOSED STREETS PROGRAM Bridge Projects C-81 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D A POLLARD R D QU I T O R D PROJECT LOCATIONS A Quito Road - Bridge Replacement PROPOSED STREETS PROGRAM Bridge Projects C-82 PROGRAM SECTION DIRECTORY PAGE 0801 Quito Road - Bridge Replacement C – 84 PROPOSED STREETS PROGRAM Bridge Projects C-83 The Streets Program’s Bridge Projects section contains Capital Improvement Program projects that repair, replace, or rehabilitate a deficient bridge structure as the primary scope of work. Bridge structure safety falls under the guidance of state and federal regulations, and bridge projects are often driven by available funding from these jurisdictions, such as Caltrans grant programs or the federal Highway Bridge Replacement and Rehabilitation (HBRR) program. Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s bridges, and relies upon grant programs for major bridge improvement projects. BRIDGE PROJECTS SUMMARY Carryforward Projects 0801 Quito Road - Bridge Replacement 64,594$ 235,087$ -$ -$ -$ -$ 299,681$ Total Bridge Projects 64,594$ 235,087$ -$ -$ -$ -$ 299,681$ BRIDGE PROJECTS 2020/21 Budget 2019/20 Budget 2018/19 Budget 2017/18 Budget & Carryfwd* 2021/22 Budget Expended Through 2016/17 Total Budgeted FY 2017/18- 2021/22 CAPITAL IMPROVEMENT PROGRAM * Total FY 2016/17 Carryforward $235,087 PROPOSED STREETS PROGRAM Bridge Projects C-84 Project Name Quito Road - Bridge Replacement Project Number 818-0801 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project funds the Town’s portion of the replacement cost for two bridges on Quito Road to improve roadway safety and provide adequate storm water flow capacity in the creek under the bridge. Location The two Quito Road bridges span a tributary of San Tomas Aquino Creek. The bridges are located on Quito Road in the vicinity of Old Adobe Road, approximately 1½ miles north of Highway 9, on the common boundary line between the City of Saratoga and the Town of Los Gatos. Project Background San Tomas Aquino Creek is under the jurisdiction of the Santa Clara Valley Water District (SCVWD), while the replacement of the bridges is the shared responsibility of the City of Saratoga and the Town of Los Gatos. Both bridges are approximately ninety years old and have been classified “structurally deficient” under Caltrans guidelines. In addition, both bridges are not adequate to receive 100-year flood flows. In 2001, the City of Saratoga, the project sponsor, secured partial funding (80%) through the federal Highway Bridge Replacement and Rehabilitation (HBRR) program to replace both bridges with wider span structures that will allow the 100-year design flood flow to pass underneath. Saratoga is the lead agency to oversee the design, environmental, right-of-way acquisition, and construction services for the project. The City of Saratoga, the Town of Los Gatos, and SCVWD agreed to share the duties and responsibilities for the project and the remaining 20% local match funding requirement. After further evaluation of the bridges, it was determined that Quito Road would require reconstruction at each end of the bridge, which in turn requires additional right-of-way acquisitions and environmental reviews under both the State of California (Caltrans) and federal regulations. These changes have made it necessary to redesign this project, significantly increasing the estimated costs. The City of Saratoga has applied for additional funding from Caltrans due to the redesign. As a result of the additional project costs, the local funding match from the City of Saratoga, the Town of Los Gatos, and the SCVWD has increased from $155,000 to $238,000 for each agency. Based on the April 2012 schedule from the City of Saratoga, the construction of these bridges is anticipated to be completed by 2018. Operating Budget Impacts Engineering staff time for coordination of this project with the City of Saratoga is incorporated into the FY 2017/18 Operating Budget. Completion of this project will mitigate the potential costs of lawsuits from bridge failure and pre-empt the cost of replacing the bridge in an emergency situation. HW Y 8 5 POLLARD R D QU I T O R D PROPOSED STREETS PROGRAM Bridge Projects C-85 Project Components & Estimated Timeline Jan 2001 Grant Funding The City of Saratoga obtained grant funding from the federal HBRR program Oct 2001 Cooperative Agreement Council approved a cooperative agreement with the City of Saratoga and SCVWD for the replacement of the two bridges May 2002 Preliminary Design City of Saratoga started preliminary design 2013 Right of way Right of way acquisition process is ongoing and environmental permitting is underway 2015 Final Design Design completed and project bidding by the City of Saratoga 2018 Completion Construction is anticipated to begin in 2016 and be completed by 2018 Prior Yrs Actuals Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 64,594$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ TOTAL SOURCE OF FUNDS 64,594$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ Prior Yrs Actuals Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses 64,594 235,087 - 235,087 - - - - 299,681 TOTAL GFAR 64,594$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ TOTAL USE OF FUNDS 64,594$ 235,087$ -$ 235,087$ -$ -$ -$ -$ 299,681$ QUITO ROAD - BRIDGE REPLACEMENT Project 818-0801 PROPOSED STREETS PROGRAM Bridge Projects C-86 PROPOSED PARKS AND TRAILS PROGRAM D-1 PARK PROJECT DIRECTORY 4605 Parks Playground Fibar Project D – 6 3104 Park Rehabilitation – Bachman Park D – 8 3407 Blossom Hill Park – Little League Backstop D – 10 4608 Tennis Courts Resurfacing – Various Town Parks D – 12 4507 Forbes Mill Footbridge Improvements D – 14 3303 Belgatos Park Restroom Improvements D – 16 TRAIL PROJECT DIRECTORY 4504 Open Space Trail Upgrades D – 22 PROPOSED PARKS AND TRAILS PROGRAM Park Improvement Projects D-2 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-3 PROJECT LOCATIONS A Parks Playground Fibar Project C Park Rehabilitation – Bachman Park D Blossom Hill Park Little League Backstop E Tennis Courts Resurfacing – Various Town Parks F Forbes Mill Footbridge Improvements G Belgatos Park Restroom Improvements LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLE S "A" AND "E" ARE TOWN-WIDE PROJECTS D C RD BE L G A T O S B F G PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-4 PROGRAM SECTION DIRECTORY PAGE 4605 Parks Playground Fibar Project D – 6 3104 Park Rehabilitation – Bachman Park D – 8 3407 Blossom Hill Park – Little League Backstop D – 10 4608 Tennis Courts Resurfacing – Various Town Parks D – 12 4507 Forbes Mill Footbridge Improvements D – 14 3303 Belgatos Park Restroom Improvements D – 16 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-5 The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and basketball or tennis court resurfacing; and park equipment or facility upgrades. The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. The exception to this is the Parks Fibar replacement project. Because Fibar has requires regular replacement and infill, this project is scheduled as a bi-annual project. One-time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available. PARK IMPROVEMENT PROJECTS SUMMARY * Total FY 2016/17 Carryforward $545,146 Unfunded Projects • Oak Meadow Park Upgrades • Los Gatos Creek Trail Improvements at Charter Oaks • Worcester Park • Plaza Park Improvements • Civic Center Irrigation System Replacement & Upgrade • Turf Renovations - Various Parks • Oak Meadow Park Fencing Upgrades • Oak Meadow Park Turf Upgrades • Oak Meadow Park Restroom Expansion • Park Rehabilitation – La Rinconada Park • Park Rehabilitation –Live Oak Manor Park • Park Rehabilitation – Blossom Hill Park PARKS Carryforward Projects 4605 Parks Playground Fibar Project 42,500$ 32,501$ 25,000$ -$ 25,000$ -$ 125,000$ 3104 Park Rehabilitation - Bachman Park - 325,000 - - - - 325,000 3407 Blossom Hill Park Little League Backstop 99,815 10,185 - - - - 110,000 4608 Tennis Courts Repairs - Various Town Parks 572 139,428 - - - - 140,000 4507 Forbes Mill Footbridge Improvements 7,815 83,033 - - - - 90,848 New Projects 3303 Belgatos Park Restroom Improvements - 25,000 - - - - 25,000 Total Park Improvement Projects 150,702$ 615,146$ 25,000$ -$ 25,000$ -$ 815,848$ 2017/18 Budget & Carryfwd* 2018/19 Budget 2019/20 Budget PARK & TRAIL PROJECT SUMMARY BY PROGRAM 2020/21 Budget FY 2017/18- 2021/22 CAPITAL IMPROVEMENT PROGRAM PARK AND TRAIL IMPROVEMENT PROJECTS Expended Through 2016/17 2021/22 Budget Total Budgeted PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-6 Project Name Parks Playground Fibar Project Project Number 831-4605 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace fibar material at all Town playgrounds. Location This project will be completed at various parks in Los Gatos. Project Background A number of Town parks have playground structures that are heavily used by children and their families. Playground safety codes require that the fibar material be spread under and around playground structures to prevent injury to children. Fibar replacement is required when the material is below a specific depth near the playground structure. Fibar is a wood product that degrades over time based on foot traffic and weather conditions. This material should be replaced on a regular, as needed basis. This is an annual CIP project to improve the safety of the Town’s playgrounds. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2017/18 Operating Budget. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-7 Project Components & Estimated Timeline Summer 2017 Design Project development Summer 2017 Bid Process Project bidding & contract award Summer 2017 Construction Project construction Summer 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 42,500$ -$ 32,501$ -$ 32,501$ 25,000$ -$ 25,000$ -$ 125,000$ TOTAL SOURCE OF FUNDS 42,500$ -$ 32,501$ -$ 32,501$ 25,000$ -$ 25,000$ -$ 125,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 42,500 - 32,501 - 32,501 25,000 - 25,000 - 125,000 TOTAL GFAR 42,500$ -$ 32,501$ -$ 32,501$ 25,000$ -$ 25,000$ -$ 125,000$ TOTAL USE OF FUNDS 42,500$ -$ 32,501$ -$ 32,501$ 25,000$ -$ 25,000$ -$ 125,000$ PARKS PLAYGROUND FIBAR PROJECT Project 831-4605 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-8 H W Y 9 W M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Park Rehabilitation - Bachman Park Project Number 831-3104 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will make improvements to the park pathway and lighting system. Location The project is located at Bachman Park, bordered by Bachman, Belmont, and Nicholson Avenues. Project Background Bachman Park is a small 3.6-acre neighborhood park close to downtown Los Gatos. The park features a basketball court on the southwest side of the park, playground equipment, as well as a large lawn area for recreational use. Over the last several years, the basketball court was resurfaced, the playground equipment was retrofitted to be in compliance with consumer quality guidelines, and the turf irrigation system was replaced. Other major park infrastructure improvements have not been made to this park in many years due to limited funding. This project will make improvements to the asphalt pathway as well as the park’s pathway lighting. The lighting in this particular park is outdated and will be replaced with more energy efficient lighting fixtures. The improvements will be scheduled in phases to minimize the impact on park users. This project shows the use of CDBG funds for pathway improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-9 Project Components & Estimated Timeline Fall 2017 Design Project design through community outreach process Winter 2017 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 325,000$ -$ 325,000$ -$ -$ -$ -$ 325,000$ TOTAL SOURCE OF FUNDS -$ -$ 325,000$ -$ 325,000$ -$ -$ -$ -$ 325,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 325,000 - 325,000 - - - - 325,000 TOTAL GFAR -$ -$ 325,000$ -$ 325,000$ -$ -$ -$ -$ 325,000$ TOTAL USE OF FUNDS -$ -$ 325,000$ -$ 325,000$ -$ -$ -$ -$ 325,000$ PARK REHABILITATION - BACHMAN PARK Project 831-3104 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-10 Project Name Blossom Hill Park – Little League Backstop Project Number 831-3407 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace the outdated backstop at the Blossom Hill Park baseball field. Location This project is located at Blossom Hill Park, 16300 Blossom Hill Road. Project Background The existing backstop at Blossom Hill Park was installed several decades ago, and does not meet the current safety standards for use. This park is used heavily during the spring and summer months by the Los Gatos Little League for baseball practice, games, and tournaments. The Los Gatos Little League has offered to supplement the Town funds to replace the backstop, up to $25,000. The additional funding was approved by the Los Gatos Little League Board in March 2015. Staff completed the project in time for the Spring 2017 season, and will close out the project in FY 2017/18. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $6,000 or 12% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-11 Project Components & Estimated Timeline Summer 2016 Design Project design and development Fall 2016 Bid process Project bidding & contract award Winter 2016 Construction Project construction 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ 74,815$ 10,185$ -$ 10,185$ -$ -$ -$ -$ 85,000$ Leattle League Contribution - 25,000 - - - - - - 25,000 TOTAL SOURCE OF FUNDS -$ 99,815$ 10,185$ -$ 10,185$ -$ -$ -$ -$ 110,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 99,815 10,185 - 10,185 - - - - 110,000 TOTAL GFAR -$ 99,815$ 10,185$ -$ 10,185$ -$ -$ -$ -$ 110,000$ TOTAL USE OF FUNDS -$ 99,815$ 10,185$ -$ 10,185$ -$ -$ -$ -$ 110,000$ BLOSSOM HILL PARK - LITTLE LEAGUE BACKSTOP Project 831-3407 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-12 Project Name Tennis Courts Resurfacing –.Various Town Parks Project Number 831-4608 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will perform necessary repairs, resurfacing, and application of a color finish and line painting atop of the existing tennis court surfaces. Location This project is located at the tennis courts at both Blossom Hill and La Rinconada Parks. Project Background The seven tennis courts are used on a daily basis by members of the community and are also used as part of the annual programming for adult groups through the Los Gatos – Saratoga Recreation Department. Major failure to the court system will impact the overall use for members of the community along with a number of outside organizations that use the facility for major tennis tournaments. The seven tennis courts have not been resealed since FY 2010-2011 and are in need of repairs to eliminate cracking and chipping of the color coating play surfaces. Surface cracks allow for water intrusion, which causes more damage to the court support structure and play surface. Preventative maintenance is necessary to reduce the need for major reconstruction of the surfaces, and would reduce the downtime of the courts. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. This project will use staff time for construction inspection and management. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $14,000 or 10% of the total project cost. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-13 Project Components & Estimated Timeline Fall 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ 572$ 139,428$ -$ 139,428$ -$ -$ -$ -$ 140,000$ TOTAL SOURCE OF FUNDS -$ 572$ 139,428$ -$ 139,428$ -$ -$ -$ -$ 140,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits Services/Supplies/Equipment -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Site Acquisition & Preparation - - - - - - - - - - Project Construction Expenses - 572 139,428 - 139,428 - - - - 139,428 TOTAL GFAR -$ 572$ 139,428$ -$ 139,428$ -$ -$ -$ -$ 139,428$ TOTAL USE OF FUNDS -$ 572$ 139,428$ -$ 139,428$ -$ -$ -$ -$ 139,428$ TENNIS COURTS RESURFACING - VARIOUS TOWN PARKS Project 831-4608 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-14 Project Name Forbes Mill Footbridge Improvements Project Number 832-4507 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description The project will provide pathway lighting across the 400-foot span of the pedestrian bridge. Location The project is located on the pedestrian bridge between Forbes Mill and Old Town across Highway 17. Project Background Forbes Mill footbridge is a heavily used pathway crossing Highway 17 between the Main Street businesses, Civic Center, and high school on the east side of the freeway, and the downtown on the west. The interior walls of the walkway are decorated with murals painted by students over the past decades. The pathway structure once had a lighting system, but fell into disrepair several years ago and was removed. This leaves the pathway dark in the evening, which has prompted concerns from residents. The footbridge improvements will re-establish an electrical power source to the bridge and provide LED lighting for the pathway. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. . HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-15 Project Components & Estimated Timeline Fall 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ 7,815$ 38,033$ 45,000$ 83,033$ -$ -$ -$ -$ 90,848$ TOTAL SOURCE OF FUNDS -$ 7,815$ 38,033$ 45,000$ 83,033$ -$ -$ -$ -$ 90,848$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 7,815 38,033 45,000 83,033 - - - - 90,848 TOTAL GFAR -$ 7,815$ 38,033$ 45,000$ 83,033$ -$ -$ -$ -$ 90,848$ TOTAL USE OF FUNDS -$ 7,815$ 38,033$ 45,000$ 83,033$ -$ -$ -$ -$ 90,848$ FORBES MILL FOOTBRIDGE IMPROVEMENTS Project 832-4507 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-16 Project Name Belgatos Park Restroom Improvements Project Number 831-3303 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description The project will restore minor structural elements, repaint the exterior, and relocate and replace the existing drinking fountain with a hydration station. Location The project is located at Belgatos Park, which is at 330 Belgatos Road. Project Background Belgatos Park is a popular destination for local residents and hikers due to its proximity to Heintz Open Space Reserve. In FY 2013/14, the Town completed restroom partition upgrades and accessibility modifications at Blossom Hill Park, Belgatos Park, Oak Meadow Park, and Balzar Field. During these improvements, some deficiencies have come to life. The restroom improvements project at Belgatos Park will repair some dry rot structural members on the building, replace a drinking fountain, and repaint the exterior surfaces of the building. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. BLOSSOM HILL RD BE L G A T O S R D PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-17 Project Components & Estimated Timeline Fall 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ -$ 25,000$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL GFAR -$ -$ -$ 25,000$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipm - - - - - - - - - - Site Acquisition & Prepar - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expe - - - 25,000 25,000 - - - - 25,000 TOTAL GFAR -$ -$ -$ 25,000$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL USE OF FUNDS -$ -$ -$ 25,000$ 25,000$ -$ -$ -$ -$ 25,000$ BELGATOS PARK RESTROOM IMPROVEMENTS Project 831-3303 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-18 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-19 PROJECT LOCATIONS A Open Space Trail Upgrades LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES "A" IS A TOWN-WIDE PROJECT B PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-20 PROGRAM SECTION DIRECTORY PAGE 4504 Open Space Trail Upgrades D – 22 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-21 The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct, repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction or resurfacing. TRAIL IMPROVEMENT PROJECTS SUMMARY * Total FY 2016/17 Carryforward $250,000 Unfunded Projects • Los Gatos Creek Trail Resurfacing • Los Gatos Creek Trail at Charter Oaks Construction ` Carryforward Projects 4504 Open Space Trail Upgrades -$ 250,000$ -$ -$ -$ -$ 250,000$ New Projects - - - - - - - Total Trail Improvement Projects -$ 250,000$ -$ -$ -$ -$ 250,000$ 2021/22 Budget 2018/19 Budget 2017/18 Budget & Carryfwd* Total Budgeted FY 2017/18- 2021/22 CAPITAL IMPROVEMENT PROGRAM 2019/20 Budget Expended Through 2016/17 2020/21 Budget TRAIL IMPROVEMENT PROJECTS PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-22 Project Name Open Space Trail Upgrades Project Number 832-4504 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair and replace old damaged retaining walls, fences, and embankments along the trails in the Town’s open spaces. Location This project is located at Santa Rosa Open Space, Heinz Open Space, and Belgatos Park. Project Background The Town has a number of open space preserves that are under its jurisdiction. There are several public trail networks that traverse the open space preserves in the hillsides. The aging process has deteriorated a number of retaining walls and embankments along some trail sections. Without proper repair and replacement, the possibility of failure of the trails will increase greatly. This project will repair and replace several retaining walls that are supporting the trails and their embankments. In addition, this project will improve the drainage system around the retaining walls to prevent further erosion of the trails. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. . TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-23 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR Open Space Reserve Fund -$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 250,000$ TOTAL SOURCE OF FUNDS -$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 250,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 250,000 - 250,000 - - - - 250,000 TOTAL GFAR -$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 250,000$ TOTAL USE OF FUNDS -$ -$ 250,000$ -$ 250,000$ -$ -$ -$ -$ 250,000$ OPEN SPACE TRAIL UPGRADES Project 832-4504 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-24 PUBLIC FACILITIES DIRECTORY PROPOSED E -1 TOWN INFRASTRUCTURE PROJECT DIRECTORY 2302 Building Replacement at Corporation Yard E – 6 2110 Civic Center Building Energy Efficiency Measures E – 8 2304 Fuel System Enhancements E – 10 2008 Energy Efficiency Upgrades – Town-wide E – 12 2112 Exterior Lighting Replacement – Civic Center E – 14 2113 Civic Center – Fountain Modification E – 16 2115 HVAC – Chiller Repair E – 18 EQUIPMENT PROJECT DIRECTORY 6101 Information System Upgrade E – 24 6001 Audio/Video System Upgrade E – 26 6003 Town-Wide Document Imaging Project E – 28 6302 Tiburon CAD/RMS Upgrade E – 30 2305 Engineering Document Archiving E – 32 2402 Police & PPW Interoperability Radio Project E – 34 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 36 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 2 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 3 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES "D" IS A TOWN-WIDE PROJECT B, E, F, G A, C PROJECT LOCATIONS A Building Replacement at Corporation Yard E Exterior Lighting Replacement – Civic Center B Civic Center Building Energy Efficiency Measures F Civic Center – Fountain Modification C Fuel System Enhancements G HVAC – Chiller Repair D Energy Efficiency Upgrades – Town-wide PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 4 PROGRAM SECTION DIRECTORY PAGE 2302 Building Replacement at Corporation Yard E – 6 2110 Civic Center Building Energy Efficiency Measures E – 8 2304 Fuel System Enhancements E – 10 2008 Energy Efficiency Upgrades – Town-wide E – 12 2112 Exterior Lighting Replacement – Civic Center E – 14 2113 Civic Center – Fountain Modification E – 16 2115 HVAC – Chiller Repair E – 18 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 5 The Town Infrastructure & Facilities Projects section contains Capital Improvement Program projects that maintain or improve the Town’s public buildings and structures to keep them in a clean, safe, and functional condition. Town-owned buildings include the Civic Center, Library, Police Operations Center, Parks & Public Works Building, Corporation Yard and associated structures, and the following buildings leased to other agencies: the Los Gatos-Saratoga Community Education and Recreation headquarters building and the Adult Recreation Center (formerly the Neighborhood Center). Other Town facilities include the Venue, Tait Avenue, and Forbes Mill. Town Infrastructure and Facilities Projects are prioritized in consideration of the user needs, federal and state mandates, federal and state grant restrictions, and local community standards. The Community Development Department assumes responsibility for evaluating the overall conformance to the General Plan and the status of environmental assessment. The Parks & Public Works Department assumes responsibility for project design, planning, and construction. This section contains annual ongoing improvement projects as well as identified one-time projects. One-time infrastructure and facilities projects are prioritized based on health and safety issues, infrastructure impacts, available funding sources, project costs, and community needs. Los Gatos does not have a designated funding source for repairing, maintaining, and improving the Town’s public facilities; however, grants, CDBG funds, and donations are pursued and utilized when available. TOWN INFRASTRUCTURE & FACILITIES PROJECTS SUMMARY *Total FY 2016/17 Carryforward $308,135 Unfunded Projects • Civic Center Improvements • Deferred maintenance at Town-owned, leased properties • Lighting system improvements throughout Town • Deferred improvements to Town-owned properties Carryforward Projects 2302 Building Replacement at Corporation Yard 16,717$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 166,717$ 2110 Civic Center Building Energy Efficiency Measures - 25,000 - - - - 25,000 2304 Fuel System Enhancement - 75,000 - - - - 75,000 2008 Energy Efficiency Upgrade - Town-wide - 50,000 25,000 - - - 75,000 2112 Exterior Lighting Replacement - Civic Center - 25,000 - - - - 25,000 2113 Civic Center Fountain Modification - 33,135 - - - - 33,135 2115 HVAC - Chiller Repair - 125,000 - - - - 125,000 New Projects Total Infrastructure / Facility Projects 16,717$ 358,135$ 50,000$ 25,000$ 25,000$ 50,000$ 524,852$ 2017/18 Budget & Carryfwd* 2018/19 Budget Expended Through 2016/17 Total Budgeted 2020/21 Budget ` 2021/22 Budget 2019/20 Budget TOWN INFRASTRUCTURE & FACILITIES PROJECTS PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 6 Project Name Building Replacement at Corporation Yard* Project Number 821-2302 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin *This project was presented to Council as part of the Capital Improvement Program in FY 2015/16. A portion of these funds ($200,000) for this project was transferred to provide funding for the Almond Grove Street Reconstruction project. Description This project will replace an old building at the Parks and Public Works Department (PPW) Corporation Yard that is used for office space and evidence storage. Location This project is located at the PPW Corporation Yard, which is located at 41 Miles Avenue. Project Background The maintenance lead staff has been using a small portable building located at the north side of the PPW Corporation Yard for their office facility. This building has deteriorated over the years and is becoming more difficult to maintain because of its aging infrastructure. The existing building has several problems including a leaky roof and windows, a poor heating and cooling (HVAC) system, and lacks a restroom facility in the building. This building is also used partially by the Police Department as their evidence storage facility. Evidence must be stored and kept at a certain room temperature, which requires an updated HVAC system. This project will replace the existing building and configure an effective layout in the new building for both office and storage space uses. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 7 Project Components & Estimated Timeline Summer 2016 Design Project design & development Fall 2016 Bid Process Project bidding & contract award Summer 2017 Construction Project construction Fall 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ -$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 150,000$ Transfer from Facilities 12,146 4,571 - - - - - - - 16,717 TOTAL SOURCE OF FUNDS 12,146$ 4,571$ -$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 166,717$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 12,146 4,571 - 25,000 25,000 25,000 25,000 25,000 50,000 166,717 TOTAL GFAR 12,146$ 4,571$ -$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 166,717$ TOTAL USE OF FUNDS 12,146$ 4,571$ -$ 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 166,717$ BUILDING REPLACEMENT AT CORPORATION YARD Project 821-2302 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 8 Project Name Civic Center Building Energy Efficiency Measures Project Number 821-2110 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will identify energy reduction measures to reduce overall utility costs. Location This project is located at the Civic Center, which is at 110 E. Main Street. Project Background The Civic Center was designed and built about 50 years ago and lacks the energy efficient design needed to keep energy costs down. With single pane windows, insulation deficiencies, and mechanical system limitations, the need for system modifications to reduce energy waste is crucial to save operating costs. For example, since the current mechanical system cannot manage multiple zones and only operates either on or off, the system must run 24/7 to accommodate police operations in the Civic Center building, which is causing high energy costs. This project consists of an energy efficiency study to evaluate the overall mechanical system at the Civic Center, identify a plan to allow operation of the system in separate zones, and control those zones separately as operating schedules dictate. This is expected to reduce energy usage by 20% given the mechanical equipment operation is the largest portion of the electricity and gas usage. The project plan, recommended as a result of this study, will be evaluated in relation to the ongoing savings they create and the ability to recover costs within a short payback period. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 9 Project Components & Estimated Timeline Summer 2017 Design Project Development Summer 2017 Bid process Project bidding & contract award Winter 2017 Construction Project construction Fall 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000 TOTAL GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ CIVIC CENTER BUILDING ENERGY EFFICIENCY MEASURES 821-2110 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 10 Project Name Fuel System Enhancements Project Number 821-2304 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will enhance and replace the existing fuel system to a new modern system. Location This project is located at the Corporation Yard, 41 Miles Avenue. Project Background The existing fuel system technology in place is outdated and not efficient Staff uses chip key technology to track user’s identification and mileage for each vehicle used manually. This has led to some issues with tracking and logging vehicle use data accurately. If the data are not manually inputted properly, the data usage information is incorrect. The data are used to track vehicle usage as well as fuel data use. The new technology system will automatically track this data via a transmittal device that is inside each vehicle. The data will be tracked and transmitted wirelessly. This data will be sent to a database system that staff can manage and administer electronically. This new fuel replacement system will minimize the number of data errors, and allow staff to better manage vehicle and fleet operations more efficiently. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 11 Project Components & Estimated Timeline Fall 2017 Design Project development Winter 2017 Bid process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$ TOTAL SOURCE OF FUNDS -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses - - 75,000 - 75,000 - - - - 75,000 TOTAL GFAR -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$ TOTAL USE OF FUNDS -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$ FUEL SYSTEM ENHANCEMENTS 821-2304 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 12 Project Name Energy Efficiency Upgrades Town-wide Project Number 821-2008 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will perform various energy efficiency upgrades throughout Town-owned facilities. Location This project location is Town-wide. Project Background This project will complete various improvements in Town-owned facilities, which will improve energy efficiency, resulting in cost savings over the long term. Once these improvements are completed, it can lead to an average seven year payback on utility and operating expenses. Many of the existing fixtures and equipment throughout Town-owned facilities are outdated. Although these items are functional, they are not the most energy efficient option at the current time. These funds are a placeholder for future work. After an energy efficiency audit has occurred, these funds will be used to make improvements at Town owned buildings. Some locations may include the Adult Recreation Center, the Police Operations Building, and Civic Center. A sample of various improvements will include low flow water fixtures, light motion sensors, and energy efficient equipment. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $3,000 or 2% of the total project cost. TOWN-WIDE PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 13 Project Components & Estimated Timeline Summer 2017 Design Project design & development Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 25,000$ 25,000$ 50,000$ 25,000$ -$ -$ -$ 75,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ 25,000$ 50,000$ 25,000$ -$ -$ -$ 75,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 25,000 50,000 25,000 - - - 75,000 TOTAL GFAR -$ -$ 25,000$ 25,000$ 50,000$ 25,000$ -$ -$ -$ 75,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ 25,000$ 50,000$ 25,000$ -$ -$ -$ 75,000$ ENERGY EFFICIENCY - TOWN WIDE Project 821-2008 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 14 Project Name Exterior Lighting Replacement – Civic Center Project Number 821-2112 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will replace the original exterior lights at the Civic Center. Location This project location is outside the Civic Center. Project Background This project will replace the five remaining original incandescent pole lights behind the Civic Center with new LED lights to match the front lights that were recently replaced. The existing lights are dim, so the replacement of these lights will enhance the safety of the back lot by increasing the amount of visibility. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $2,500 or 10% of the total project cost. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 15 Project Components & Estimated Timeline Fall 2017 Bid Process Project bidding & contract award Winter 2017 Construction Project construction Spring 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000 TOTAL GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ CIVIC CENTER - EXTERIOR LIGTHING REPLACEMENT Project 821-2112 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 16 Project Name Civic Center – Fountain Modification Project Number 821-2113 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin *This project was presented to Council as part of the Capital Improvement Program in FY 2016/17. A portion of the funds ($1,865) for this project was transferred to the Green Bike Lane project. Description This project will make alterations to the fountain and add planting to a portion of the fountain. Location This project location is on the deck of Town Hall. Project Background This project would make alterations to the fountain to reduce the water feature to the center of the existing fountain basis. The project will also add drought tolerant planting to the remaining basin outer ring. This improvement would visually enhance the existing fountain, reduce the water usage, and create a natural protection for younger visitors. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $3,500 or 10% of the total project cost. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 17 Project Components & Estimated Timeline Winter 2017 Design Project design & development Spring 2018 Bid Process Project bidding & contract award Summer 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ -$ 33,135$ -$ 33,135$ -$ -$ -$ -$ 33,135$ TOTAL SOURCE OF FUNDS -$ -$ 33,135$ -$ 33,135$ -$ -$ -$ -$ 33,135$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2016/17 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 33,135 - 33,135 - - - - 33,135 TOTAL GFAR -$ -$ 33,135$ -$ 33,135$ -$ -$ -$ -$ 33,135$ TOTAL USE OF FUNDS -$ -$ 33,135$ -$ 33,135$ -$ -$ -$ -$ 33,135$ CIVIC CENTER - FOUNTAIN MODIFICATION Project 821-2113 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 18 Project Name HVAC – Chiller Repair Project Number 821-2115 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description This project will rebuild the chiller at the Civic Center. Location This project is located at the Civic Center, which is at 110 East Main Street. Project Background The Civic Center chiller is at its half-life and recent tests on the chiller show several refrigerant leaks, which will require a rebuild of the chiller to remedy. Staff recommends rebuilding the chiller, and will reassess for replacement in 10 years. Operating Budget Impacts The project will use staff time for construction management and inspection. The staff time for this project will be included in the department’s FY 2017/18 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 19 Project Components & Estimated Timeline Spring 2017 Design Project design & development Spring 2017 Bid Process Project bidding & contract award Spring 2017 Construction Project construction Spring 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR - - 125,000 - 125,000 - - - - - TOTAL SOURCE OF FUNDS - - 125,000 - 125,000 - - - - - Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - TOTAL GFAR - - - - - - - - - - TOTAL USE OF FUNDS - - - - - - - - - - HVAC - CHILLER REPAIR Project 821-2115 PROPOSED PUBLIC FACILITIES PROGRAM Town Infrastructure & Facilities Projects E- 20 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 21 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES A, B, C, D, F, H E, G PROJECT LOCATIONS A Information System Upgrade B Audio/Video System Upgrade C Town-Wide Document Imaging Project D Tiburon CAD/RMS Upgrade E Engineering Document Archiving F Police & PPW Interoperability Radio Project G Silicon Valley Regional Interoperability Project (SVRIP) Service PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 22 PROGRAM SECTION DIRECTORY PAGE 6101 Information System Upgrade E – 24 6001 Audio/Video System Upgrade E – 26 6003 Town-Wide Document Imaging Project E – 28 6302 Tiburon CAD/RMS Upgrade E – 30 2305 Engineering Document Archiving E – 32 2402 Police & PPW Interoperability Radio Project E – 34 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service E – 36 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 23 The Equipment Projects section contains Capital Improvement Program projects that provide new equipment; or replace, improve, or upgrade existing Town equipment. This section does not have ongoing equipment programs; all projects are considered one-time projects. One-time equipment capital improvement projects are prioritized based on service level considerations, available funding sources, project costs, and community impacts. Los Gatos does not have a designated funding source for new equipment or the replacement or upgrading of existing equipment; however, grants are pursued and utilized when available. EQUIPMENT PROJECTS SUMMARY Carryforward Projects 6101 Information System Upgrade 402,215$ 72,785$ -$ -$ -$ -$ 475,000$ 6001 Audio/Video System Upgrade 52,440 58,160 - - - - 110,600 6003 Town-wide Document Imaging Project 198,011 16,990 - - - - 215,000 6302 Tiburon CAD/RMS Upgrade 70,000 - - - - - 70,000 2305 Engineering Document Archiving 8,284 51,716 - - - - 60,000 2402 Police & PPW Interoperability Radio Project 11,593 584,087 - - - - 595,680 6305 Silicon Valley Regional Interoperability Project (SVRIP) Service 270,311 188,317 - - - - 458,628 Total Equipment Projects 1,012,853$ 972,056$ -$ -$ -$ -$ 1,984,909$ Expended Through 2016/17 2017/18 Budget & Carryfwd* Total Budgeted 2018/19 Budget 2019/20 Budget 2020/21 Budget 2021/22 Budget EQUIPMENT PROJECT SUMMARY BY PROGRAM Total FY 2016/17 Carryforward $819,180. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 24 Project Name Information System Upgrade Project Number 841-6101 Department Finance Project Manager Finance Director : Stephen Conway Description This project upgrades the Town’s existing financial/human resources information database, enhancing its reporting system and providing future web-based online services. This project will be coordinated with the upgrade of the Town’s existing permit tracking system. Location The project will enhance the information systems used by the Finance, Human Resources, and Building Departments. Purchased computer hardware will be located in the MIS Department, 110 E. Main Street. Project Background In FY 2008/09, staff completed a significant portion of a multi-year financial information system upgrade. This project involved the conversion of General Ledgers, Payroll, Budget, and Human Resources modules, followed by the implementation of the Cashiering and Business License modules. Planned for FY 2017/18 is the final completion of the fixed asset module and continuation of electronic commerce, including online permitting and business license applications. Operating Budget Impacts The remaining project balance is estimated to be $72,785. It is anticipated that the maintenance costs for the Finance/Human Resources information system would be approximately $40,000 annually, which has been incorporated into the FY 2017/18 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 25 Project Components & Estimated Timeline Fall 2017 System Implementation Develop and test fixed assets and electronic commerce functions. Spring 2018 System Implementation Implementation of electronic commerce, including applicable online permits and business license applications. Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR Transfer from MIS 394,421$ -$ 72,785$ -$ 72,785$ -$ -$ -$ -$ 467,206$ TOTAL SOURCE OF FUNDS 394,421$ -$ 72,785$ -$ 72,785$ -$ -$ -$ -$ 467,206$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services 394,421 - 72,785 - 72,785 - - - - 467,206 Project Construction Expenses - - - - - - - - - - TOTAL GFAR 394,421$ -$ 72,785$ -$ 72,785$ -$ -$ -$ -$ 467,206$ TOTAL USE OF FUNDS 394,421$ -$ 72,785$ -$ 72,785$ -$ -$ -$ -$ 467,206$ INFORMATION SYSTEM UPGRADE Project 841-6101 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 26 Project Name Audio/Video System Upgrade Project Number 841-6001 Department Town Manager Project Manager MIS Manager: Chris Gjerde Description This project provides for the replacement and/or upgrade of Council Chamber video, audio/visual, and other applicable equipment used for televised and non-televised public meetings. Location The video production system is located in the audio/video equipment room at the Civic Center, 110 E. Main Street, and involves various electronic equipment required to cablecast public meetings and make presentations. Project Background In FY 2008/09, the audio/visual equipment located in the Town Council Chambers was upgraded to meet the needs at that time. The maintenance of the video production equipment is now the responsibility of KCAT, who receives Public, Educational, and Governmental (PEG) fees, provided by local cable operators for this purpose. The remaining funds in this project will be used to replace and/or upgrade the Town’s A/V equipment in the Council Chambers, as needed. Staff will also explore the availability of additional audio/visual meeting management enhancements. Operating Budget Impacts This Audio/Video System Upgrade project is funded in the GFAR Fund. It is unknown at this time which replacements or upgrades will be required during FY 2017/18. Staff oversight of this project will be included in the FY 2017/18 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 27 Project Components & Estimated Timeline Fiscal Year 17/18 Monitoring As needed. Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 52,440$ -$ 58,160$ -$ 58,160$ -$ -$ -$ -$ 110,600$ TOTAL SOURCE OF FUNDS 52,440$ -$ 58,160$ -$ 58,160$ -$ -$ -$ -$ 110,600$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment 52,440 - 58,160 - 58,160 - - - - 110,600 Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR 52,440$ -$ 58,160$ -$ 58,160$ -$ -$ -$ -$ 110,600$ TOTAL USE OF FUNDS 52,440$ -$ 58,160$ -$ 58,160$ -$ -$ -$ -$ 110,600$ AUDIO / VIDEO SYSTEM UPGRADE Project 841-6001 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 28 Project Name Town-Wide Document Imaging Project Project Number 841-6003 Department Community Development/Police Project Manager Community Development Director: Joel Paulson Description This is the continuation of the first phase of a Town-wide project to convert existing microfiche and paper files to electronic storage and provide desktop access. Location Town of Los Gatos Civic Center complex, 110 E. Main Street. Project Background The Community Development has an immediate need to provide electronic storage and retrieval of many archived documents. The electronic retrieval system will allow immediate access to all building and planning files for members of the Community Development Department via desktop access. Following implementation, priorities will be identified to expand document imaging to other departments, subject to available funding. Operating Budget Impacts The Community Development Department collects permit fees, a portion of which will be used to offset some costs for document storage. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 29 Project Components & Estimated Timeline FY 2017/18 Production Continue document conversion of Building and Planning Division files. Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR Transfer from MIS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$ TOTAL SOURCE OF FUNDS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 198,011 - 16,990 - 16,990 - - - - 215,000 TOTAL GFAR 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$ TOTAL USE OF FUNDS 198,011$ -$ 16,990$ -$ 16,990$ -$ -$ -$ -$ 215,000$ TOWN-WIDE DOCUMENT IMAGING PROJECT Project 841-6003 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 30 Project Name Tiburon CAD/RMS Upgrade Project Number 841-6302 Department Police Project Manager Lieutenant JR Langer Description This project will upgrade the existing Police Tiburon CAD/RMS system through a cooperative agreement with the City of Sunnyvale Department of Public Safety. Location Town of Los Gatos Civic Center complex, 110 E. Main Street and the Town of Los Gatos Police Operations Building, 15900 Los Gatos Boulevard. Project Background Since 1993, the Police Department has relied on a computer aided dispatch (CAD) and records management system (RMS) for all police operations. The current software provider, Tiburon, is in the process of upgrading its systems to a more contemporary .NET platform, resulting in the phase-out of older UNIX-based systems. Working in partnership with the City of Sunnyvale Department of Public Safety, the Police Department concluded that it would be mutually beneficial to upgrade and combine both departments’ operating systems in order to share real-time information with the potential to expand the system to other law enforcement agencies in the future. The City of Sunnyvale Department of Public Safety and the Police Department upgraded the computer aided dispatch (CAD) in February 2013. The records management system (RMS) was scheduled to be upgraded in December 2014; however the current software provider, Tiburon, experienced some delays in the development of their upgraded RMS. In March 2015, Tiburon was purchased by TriTech Software Systems. Completion of the upgraded software platform intended for December 2014 was ultimately completed in October 2016. Project closeout will occur in FY 2017/18. Operating Budget Impacts With completion of the upgrade the annual RMS payments previously paid to Tiburon will now be paid to the City of Sunnyvale and contract negotiations will continue with the City of Sunnyvale for the updated Cost Sharing Agreement. The Police Department will continuously reevaluate to assess effectiveness and sustainability of this software system and our Cost Sharing Agreement with the City of Sunnyvale. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 31 Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR - Transfer from MIS 28,000$ 42,000$ -$ -$ -$ -$ -$ -$ -$ 70,000$ TOTAL SOURCE OF FUNDS 28,000$ 42,000$ -$ -$ -$ -$ -$ -$ -$ 70,000$ Prior Yrs Actuals 2016/17 Adjusted Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment 28,000 42,000 - - - - - - - 70,000 Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - - - - - - - - TOTAL GFAR 28,000$ 42,000$ -$ -$ -$ -$ -$ -$ -$ 70,000$ TOTAL USE OF FUNDS 28,000$ 42,000$ -$ -$ -$ -$ -$ -$ -$ 70,000$ TIBURON CAD / RMS UPGRADE Project 841-6302 Project Components & Estimated Timeline Winter 2016 Completion Project Completion PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 32 HW Y 9 E MA I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Engineering Document Archiving Project Number 821-2305 Department Parks & Public Works Project Manager Town Engineer: Lisa Petersen Description This project will scan and archive all engineering record documents such as as-builts, federal and state funded capital improvement projects, and recorded documents, all of which are currently stored in paper format. Location This project is located at the Engineering Services office, which is at 41 Miles Avenue. Project Background Currently, most files are kept in a hard copy format in the Engineering Services office. These hard copies have become damaged due to age and need to be preserved through archiving to maintain pertinent records. By digitally archiving these documents, searching through records becomes much more efficient. It is anticipated that this project will be implemented over four fiscal years, starting in FY 2014/15 and completion estimated in FY 2017/18. Operating Budget Impacts This project will use staff time for management. The staff time for this project is included in the FY 2017/18 Operating Budget. Project Summer 2015 Design Project development PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 33 Components & Estimated Timeline Fall 2015 Bid process Project bidding & contract award Summer 2017 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 1,126$ 7,158$ 51,716$ -$ 51,716$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS 1,126$ 7,158$ 51,716$ -$ 51,716$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 1,126 7,158 51,716 - 51,716 - - - - 60,000 TOTAL GFAR 1,126$ 7,158$ 51,716$ -$ 51,716$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS 1,126$ 7,158$ 51,716$ -$ 51,716$ -$ -$ -$ -$ 60,000$ ENGINEERING DOCUMENT ARCHIVING Project 821-2305 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 34 Project Name Police & PPW Interoperability Radio Project Project Number 821-2402 Department Police Project Manager Lieutenant JR Langer & Superintendent Steve Regan Description This project will update the existing police radio system to be compatible with the regional interoperability requirements. The project will replace current mobile and portable radios with new digital P25 compliant equipment using a 700 Mhz. spectrum. Location This project is located at Police Administration Building. Project Background The Town is a member of a County-wide joint powers authority which is moving forward with an aggressive program for regional interoperability of public safety communications for police and fire services across all jurisdictions. The Town’s Police Department has taken steps to update their radio system to be compatible with this regional interoperability requirement. In advance of the upgrade of the existing police radio system, the Police Department moved forward with Communications Center upgrades that will be compatible with the new police radio system. New digital radio consoles were installed in November 2014 and were purchased through an agreement with the County of Santa Clara to obtain the best pricing. The Police Department is working with other County law enforcement agencies to obtain best possible pricing for the mobile and portable radios. The Parks and Public Works Department staff also uses a similar radio system in order to communicate with public safety officials and requires it as part of day-day operations. In order to be compatible with these radio system changes, Park and Public Works Department’s radio system must also be updated. Operating Budget Impacts Staff oversight of this project will be included in the FY 2017/18 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 35 Project Components & Estimated Timeline Spring 2017 Bid process Project bidding & contract award Fall 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR -$ 11,593$ 584,087$ -$ 584,087$ -$ -$ -$ -$ 595,680$ TOTAL SOURCE OF FUNDS -$ 11,593$ 584,087$ -$ 584,087$ -$ -$ -$ -$ 595,680$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 11,593 584,087 - 584,087 - - - - 595,680 TOTAL GFAR -$ 11,593$ 584,087$ -$ 584,087$ -$ -$ -$ -$ 595,680$ TOTAL USE OF FUNDS -$ 11,593$ 584,087$ -$ 584,087$ -$ -$ -$ -$ 595,680$ POLICE & PPW INTEROPERABILITY RADIO PROJECT Project 821 -2402 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 36 Project Name Silicon Valley Regional Interoperability Project (SVRIP) Service Project Number 841-6305 Department Police Project Manager Lieutenant JR Langer Description This project will update the existing police radio system infrastructure to be compatible with the regional interoperability requirements. Location Town of Los Gatos Civic Center Complex, 110 E Main Street and the Town of Los Gatos Police Operations Building, 15900 Los Gatos Boulevard. Project Background The Silicon Valley Radio Interoperability Authority (SVRIA) in conjunction with the City Managers Association and the County Chiefs Association is moving towards a program for regional interoperability of public safety communications for police, fire services, and public works across all jurisdictions. The Police Department, in conjunction with other public safety agencies within Santa Clara County, will be contributing to radio system infrastructure for a period of three years to allow for interoperability of public safety communications regionally. Operating Budget Impacts Staff oversight of this SVRIP project will be included in the FY 2017/18 Operating Budget. PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 37 Project Components & Estimated Timeline Summer 2015 Design Project development Winter 2016 Bid process Project bidding & contract award Fall 2018 Completion Project completion Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project SOURCE OF FUNDS to 2017/18 (with Carryfwd) GFAR 129,600$ 140,711$ 35,441$ 152,876$ 188,317$ -$ -$ -$ -$ 458,628$ TOTAL SOURCE OF FUNDS 129,600$ 140,711$ 35,441$ 152,876$ 188,317$ -$ -$ -$ -$ 458,628$ Prior Yrs Actuals 2016/17 Estimated Estimated Carryfwd 2017/18 New Funding 2017/18 Budget 2018/19 Proposed 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed Total Project USE OF FUNDS to 2017/18 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 129,600 140,711 35,441 152,876 188,317 - - - - 458,628 TOTAL GFAR 129,600$ 140,711$ 35,441$ 152,876$ 188,317$ -$ -$ -$ -$ 458,628$ TOTAL USE OF FUNDS 129,600$ 140,711$ 35,441$ 152,876$ 188,317$ -$ -$ -$ -$ 458,628$ SILICON VALLEY REGIONAL INTEROPERABILITY PROJECT (SVRIP) SERVICE Project 841-6305 PROPOSED PUBLIC FACILITIES PROGRAM Equipment Projects E - 38 REFERENCE SECTION Glossary of Terms F -1 Accrual Basis Accounting - Under this accounting method, transactions are recognized when they occur, regardless of the timing of related cash receipts and disbursements. Adoption - Formal action by the Town Council which sets the spending limits for the fiscal year. The Town's budget is adopted by Council resolution. Appropriation - An authorization made by the Town Council that permits officials to incur obligations against and to make expenditures of government resources. Appropriations are typically granted for a one-year period. Audit - Prepared by an independent Certified Public Accountant (CPA), the primary objective of an audit is to determine if the Town's Financial Statements present fairly the Town's financial position and results of operations in conformity with generally accepted accounting principles. In conjunction with its performance of an audit, it is customary for an independent auditor to issue a Management Letter stating the adequacy of the Town's internal controls as well as recommending improvements to the Town's financial management practices. Bonds - A bond is a written promise to pay a specified sum of money (called the face value or principal amount) at a specified date or dates in the future (called the maturity date) together with period interest at a specified rate. Bonds are typically used to finance capital facilities. Budget - As the Town's financial operating plan for the fiscal year, the budget displays the estimated expenditures (costs) for providing services and the estimated sources of revenue (income) to pay for them. Once the Town Council adopts the budget, the total becomes the maximum spending limit. Los Gatos' budget encompasses a single fiscal year (July 1 through June 30). Budget Amendment - The Council has the sole responsibility for adopting the Town's budget, and may amend or supplement the budget at any time after adoption. The Town Manager has the authority to approve administrative adjustments to the budget as outlined in the Financial and Administrative Policies set by Council. Budget Document - The official financial spending and resource plan submitted by the Town Manager and adopted by the Town Council explaining the approved budget to the public and Town Council. Budget Message - Included in the opening section of the budget, the Budget Message provides the Council and the public with a general summary of the most important aspects of the budget, comparative data from previous fiscal years, goals and objectives, and the views and recommendations of the Town Manager. Budget Overview - This section provides an overview of the changes adopted in the budget. Additionally, the significant impacts of budgetary changes are outlined along with dollar amounts (increase/decrease). Budget Policies - General and specific guidelines adopted by the Council that govern the financial plan's preparation and administration. REFERENCE SECTION Glossary of Terms F -2 Capital or Community Improvements - Capital or community improvements are major construction, acquisition, or maintenance/repair projects. Typical examples of major construction would include new street improvements, park development, and public buildings. Acquisition includes land for parks and open space. Major maintenance/repairs may include street resurfacing or modifications to public buildings. Capital Improvement Program (CIP) - The plan or schedule of expenditures for major construction of roads, sidewalks, Town facilities, and/or park improvements and for the purchase of equipment. The Town of Los Gatos' CIP follows a five-year schedule. Although the Town adopts the CIP budget in a process which is separate from the adoption of the budget, the budget incorporates the first year of the five-year CIP. Capital Projects Fund - In governmental accounting, a fund that accounts for financial resources to be used for the acquisition or construction of capital facilities. The total cost of a capital project is accumulated in a single expenditures account which accumulates until the project is completed, at which time the fund ceases to exist. Capital Outlay - Expenditures which result in the acquisition of or additions to fixed assets. Examples include land, buildings, machinery, equipment, and construction projects. Capital Assets – See “Fixed Assets.” Cash Basis Accounting - A basis of accounting under which transactions are recognized only when cash is received or disbursed. CDBG (Community Development Block Grant) - Federal grant funds distributed from the U.S. Department of Housing and Urban Development that are passed through to the Town. The Town primarily uses these funds for housing rehabilitation, public improvements, and local social programs. Construction Tax - A construction tax is imposed upon the construction of any building, portion of a building, or a mobile home lot. Construction by definition means either new construction or enlargement. The taxes imposed are based upon a set rate per square foot as follows: a) Capital Improvement Tax - $0.18 for each square foot of building addition or alteration b) Underground Utility Tax - $0.18 for each square foot of building addition or alteration c) Park Fund Tax - $0.04 for each square foot of building addition or alteration Contingency - A budgetary reserve set aside for emergencies or unforeseen expenditures not otherwise budgeted. Contingent Liabilities - Items which may become liabilities of the Town but are undetermined at a given date, such as pending lawsuits, unsettled disputed claims, unfilled purchase orders, and uncompleted contracts. Contract Services - Services provided to the Town from the private sector or other public agencies. REFERENCE SECTION Glossary of Terms F -3 Contributed Capital - Resources which are extremely restricted for the acquisition or construction of capital assets. This category includes, but is not limited to, capital grants, residual equity transfers in, and contributions from developers. Cost Allocation - A fair and equitable methodology for identifying and distributing direct and indirect cost from a service provider to the service consumer. In the Town’s case, the general fund is the service provider and the external funds are the service consumer. Deficit - The excess of liabilities over assets. Department - A major organizational unit of the Town that has been assigned overall management responsibility for an operation or a group of related operations within a functional area. Developer Fees and Permits - Fees that are charged for various development-related services or permits based upon actual cost to the Town for providing the service or permit. Documentary Transfer Tax - Imposed on the transfer of real property, exclusive of any lien or encumbrance. The Town receives 50% of such revenue collected by Santa Clara County. Encumbrance - Commitment against an approved budget for unperformed (executory) contract for goods or services. Encumbrances cease when the obligation is paid or otherwise terminated. A purchase order is a common encumbrance. Expenditure - The outflow of funds paid or to be paid for an asset obtained or goods and services obtained. An encumbrance is not an expenditure; an encumbrance reserves funds to be expended. Fiscal Year - A 12-month period to which the annual operating budget applies and at the end of which the Town determines its financial position and results of its operations. The Town’s fiscal year runs from July 1 to June 30. Five-Year Financial Forecast - Estimates of future revenues and expenditures to help predict the future financial condition of the community. Fixed Assets - Assets which are intended to be held or used for a long term, such as land, buildings, improvements other than buildings, machinery and equipment. Fund - An independent fiscal and accounting entity with a self-balancing set of accounts in which financial transactions relating to revenues, expenditures, assets, and liabilities are recorded. Funds other than the General Fund typically have a unique funding source and purpose. Establishing funds enables the Town to account for the use of restricted revenue sources and carry on specific activities or pursue specific objectives. Fund Accounting - System used by non-profit organizations, particularly governments. Since there is no profit motive, accountability is measured instead of profitability. The main purpose is stewardship of financial resources received and expended in compliance with legal requirements. REFERENCE SECTION Glossary of Terms F -4 Fund Balance - Also known as financial position, fund balance is the excess of current assets over current liabilities, and represents the cumulative effect of revenues and other financing sources over expenditure and other financing uses. GAAP - (Generally Accepted Accounting Principles) - Uniform standards for financial accounting and reporting. They govern the form and content of the basic financial statements of the Town. Gas Tax Fund - The Gas Tax Fund is used to account for revenues and expenditures apportioned under the Streets and Highways Code of the State of California. Expenditures may be made for any street- related purpose in the Town’s system of streets. General Fund - In governmental accounting, fund used to account for all assets and liabilities of a non- profit entity, except those particularly assigned for other purposes in another more specialized fund. The General Fund is the primary operating fund of the Town. General Government – Includes offices and departments to support the Town Council, Town Clerk, Town Manager, Town Attorney, Town Treasurer, Human Resoures, Finance, Community Development, Police, Parks and Public Works, and Library functions. General Liability Self Insurance Fund - The General Liability Self Insurance Fund is used to provide the Town with liability and property insurance. Coverage is provided through the Town’s participation in a joint powers agreement through the Association of Bay Area Governments (ABAG). Grant - External contribution, and/or gift of cash, or other asset typically from another governmental entity to be used or expended for a specific purpose, activity, or facility. An example is Community Development Block grant funding from the federal government. Housing Set-Aside Fund – This fund is used to account for the Redevelopment Agency’s 20% set-aside property tax increment revenues and the associated expenditures to be used for increasing or improving low and moderate income housing. Improvements - Buildings, structures, or attachments to land such as sidewalks, trees, drives, tunnels, drains, and sewers. Intergovernmental Revenue - Revenue received from other governmental agencies and municipalities, such as grants from the state or federal government. Inter-Fund Transfers - When the Town moves money between its various funds, it makes an inter-fund transfer, referred to as “transfers in” and “transfers-out.” In aggregate, transfers in and out offset each other for the fiscal year. Levy - (Verb) To impose taxes, special assessments, or service charges for the support of governmental activities. (Noun) The total amount of taxes, special assessments, or service charges imposed by Santa Clara County levying property taxes. Licenses and Permits - Revenues earned by the issuance of licenses or permits levied in accordance with the benefits conferred by the license or permit. REFERENCE SECTION Glossary of Terms F -5 Lighting and Landscape Fund - The Town has formed six landscape and lighting district funds established by written consent of the property owners owning all of the property within the boundaries of the district. Objective - A statement of specific direction, purpose, or intent based on the needs of the community and the goals established for a specific program or service level. Ordinance - A formal legislative enactment by the Town Council. It has the full force and effect of law within Town boundaries unless pre-empted by a higher form of law. An Ordinance has a higher legal standing than a Resolution and is typically codified in a Town's municipal code. Operating Budget - The operating budget is the primary means by which most of the financing of acquisition, spending, and service delivery activities of a government are controlled. The use of annual operating budgets is required by law. Personnel - Town staff. Program - As subdivisions of departments, programs are budgetary or organizational units of government with limited sets of work responsibilities within their respective departments. Programs also serve to increase budgetary accountability. Los Gatos' budget is compiled on a program basis. Property Tax – A tax Imposed on real property (land and permanently attached improvements). The tax is based upon the assessed value of such property. The tax rate may not exceed 1% of assessed value. Reserve - An account used to indicate that a portion of fund equity is designated, undesignated, or legally restricted for a specific purpose. Resolution - A special order of the Town Council, which has a lower legal standing than an ordinance. Resources - Total amounts available for appropriation including estimated revenues, inter-fund transfers, and beginning fund balances. Revenue - Sources of income which the Town receives during a fiscal year. Examples of revenue include taxes, intergovernmental grants, charges for services, resources forwarded from the prior year, operating transfers for other funds, and other financing sources such as the proceeds derived from the sales of fixed assets. Revenue Estimate - A formal estimate of how much revenue will be earned from a specific revenue source for some future period; typically, a fiscal year. Road Impact Fees - Pursuant to Article III of Chapter 15 of the Town Code, the Town collects road impact fees to finance road construction and maintenance projects throughout the town. Article IX of Chapter 15 authorizes the establishment of special fund accounts known as Road Impact #1, Road Impact #2, and Road Impact #3, into which all such fees are deposited. Because the road systems generally follow drainage patterns, the existing drainage basin map boundaries are used to track and expend funds for road construction and maintenance. REFERENCE SECTION Glossary of Terms F -6 The amount of each fee collected is based on an estimate of the weight of the loads to be hauled to or from the project and the weight of heavy vehicles to be used in connection with the project. The fee is collected for Building Permits, Grading and Landscape Permits, Improvement Contracts, and Encroachment Permits. Money collected from such fees is to be used solely for design, construction, and repair of Town streets and installation of sidewalk curb cut ramps when such a requirement is triggered by the level of work as provided by the Americans with Disabilities Act, within the prescribed area. Projects will be brought forward on an as-needed basis. SA Trust Fund – Fund used to account for the proceeds of notes, and other forms of indebtedness, and the expenditure of these funds to pay the debt, administrative services and projects with the specified boundaries of the Successor Agency of the Town of Los Gatos Redevelopment Agency. Sales Tax – 1% of taxable sales is returned to the Town by the State Board of Equalization on a monthly direct deposit basis. Under the “Triple Flip” agreement, 0.25% of the 1% is now received in association with property tax, but remains sales tax in substance. Special Revenue Fund - In governmental accounting, a fund used to account for the proceeds of a special revenue source (other than special assessments, expandable trusts, or for major capital projects) that are legally restricted to expenditure for a specified purpose. Service Charge - Charges for specific services rendered. Services and Supplies - Expenditures for services and supplies which are directly related to a department's primary service activities. State Gas Tax Funds - Portions of the tax rate per gallon levied by the State of California on all gasoline purchases are allocated to cities throughout the state. These funds are restricted to expenditures for transit and street-related purposes. Supplemental Appropriation - An appropriation approved by the Council after the initial budget is adopted. Taxes - Compulsory charges levied by the Town, county, or state governments for the purpose of financing services performed for the community’s benefit. Town Code - A legal compilation of Town Council-approved ordinances currently in effect. The code defines Town policy with respect to areas such as planning, etc. Transfers In/Out - Money transferred from one Town fund to another. Differs from revenues and expenses - see definition of these terms, above. REFERENCE SECTION Index F -7 Financial Summaries – by Fund Total CIP Fund Summary .................................................................................................................. B – 9 Fund 411 - GFAR Fund ..................................................................................................................... B – 10 Fund 471 – Traffic Mitigation Fund ................................................................................................. B – 12 Fund 421 – Grants Fund................................................................................................................... B – 14 Fund 461/462/463 – Storm Basin Funds ......................................................................................... B – 16 Fund 472 – Utility Underground Fund ............................................................................................. B – 18 Fund 481 – Gas Tax Fund ................................................................................................................. B – 20 Financial Summaries – by Program Streets Program ............................................................................................................................... B – 5 Parks Program .................................................................................................................................. B – 6 Public Facilities Program .................................................................................................................. B – 6 Glossary .................................................................................................................................................. F – 1 FY 2015/16 Completed CIP Projects ..................................................................................................... A – 15 Parks Program - Park Improvement Projects Belgatos Park Restroom Improvements .......................................................................................... D – 16 Blossom Hill Park – Little League Backstop ..................................................................................... D – 10 Forbes Mill Footbridge Improvements ............................................................................................ D – 14 Parks Playground Fibar Project ........................................................................................................ D – 6 Park Rehabilitation – Bachman Park ................................................................................................ D – 8 Tennis Courts Resurfacing – Various Town Parks ............................................................................ D – 12 Parks Program – Trail Improvement Projects Open Space Trail Upgrades .............................................................................................................. D – 22 Public Facilities Program – Equipment Projects Audio/Video System Upgrade ......................................................................................................... E – 26 Engineering Document Archiving .................................................................................................... E – 32 Information System Upgrade .......................................................................................................... E – 24 Police & PPW Interoperability Radio Project ................................................................................... E – 34 Silicon Valley Radio Interoperability Project (SVRIP) Service .......................................................... E – 36 Tiburon CAD/RMS Upgrade ............................................................................................................. E – 30 Town-Wide Document Imaging Project .......................................................................................... E – 28 Public Facilities Program – Infrastructure Projects Building Replacement at Corporation Yard ...................................................................................... E – 6 Civic Center Building Energy Efficiency Measures ............................................................................ E – 8 Civic Center – Fountain Modification ............................................................................................... E – 16 Energy Efficiency Upgrades Town-wide .......................................................................................... E – 12 Exterior Light Replacements – Civic Center...................................................................................... E – 14 Fuel System Enhancements ............................................................................................................. E – 10 HVAC – Chiller Repair ....................................................................................................................... E – 18 REFERENCE SECTION Index F -8 Streets Program - Bridge Projects Quito Road - Bridge Replacement ................................................................................................... C – 84 Street Program - Street Improvement Projects 224 West Main Property Acquisition (Parking Lot 6) ...................................................................... C – 50 Blossom Hill Road/Cherry Blossom Lane Intersection Improvements ............................................. C – 48 Bicycle & Pedestrian Improvements ................................................................................................ C – 72 Bicycle & Pedestrian Master Plan .................................................................................................... C – 64 Bicknell Road Storm Drain Improvements ....................................................................................... C – 70 Cut-Through Traffic Mitigation ........................................................................................................ C – 66 Downtown Parking Lots Seal Coat & Restriping .............................................................................. C – 44 Hernandez Avenue Storm Drain Improvements ............................................................................. C – 46 Highway 9/University Avenue Intersection Improvements. ............................................................ C – 38 LED Streetlights ................................................................................................................................ C – 58 Los Gatos Boulevard/Shannon Road Improvements ....................................................................... C – 40 Monument Control Network Update .............................................................................................. C – 42 Pageant Way Parking Lot Reconstruction ....................................................................................... C – 60 Public Arts Gateway Project ............................................................................................................ C – 78 Sidewalk Improvements – Multiple Locations ................................................................................. C – 56 Sidewalk Improvements/Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane .................... C – 52 Stonybrook Road & Kennedy Road Sidewalk Improvements .......................................................... C – 54 Stormwater Master Plan .................................................................................................................. C – 74 Stormwater System – Pollution Prevention Compliance ................................................................ C – 76 Utility Undergrounding Improvements ........................................................................................... C – 62 Traffic Signal Modernization ............................................................................................................ C – 68 Streets Program - Street Reconstruction & Resurfacing Projects Almond Grove Street Rehabilitation Project .................................................................................. C – 8 Street Repair & Resurfacing ............................................................................................................. C – 6 Streets Program - Street Repairs, Maintenance & Safety Projects Annual Street Restriping .................................................................................................................. C – 22 Crosswalk Improvements at Santa Cruz Ave/Blossom Hill Rd ......................................................... C – 30 Crosswalk Lighting Upgrades ........................................................................................................... C – 32 Curb, Gutter & Sidewalk Maintenance ............................................................................................. C – 18 Electrical Panel Replacement on Pageant Way ............................................................................... C – 28 Guardrail Replacement Projects ...................................................................................................... C – 26 Public Access Infrastructure Improvement Projects ....................................................................... C – 24 Retaining Wall Repairs...................................................................................................................... C – 20 Traffic Calming Projects .................................................................................................................... C – 16 Town Manager’s Message .................................................................................................................... A – 1 REFERENCE SECTION F -10