Loading...
Staff Report PREPARED BY: LISA PETERSEN TOWN ENGINEER Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ● 408-354-6832 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 12/18/2018 ITEM NO: 10 DATE: DECEMBER 13, 2018 TO: MAYOR AND TOWN COUNCIL FROM: LAUREL PREVETTI, TOWN MANAGER SUBJECT: AUTHORIZE THE TOWN MANAGER TO: A. EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION FOR THE WORK OF MERCOZA ENGINEERING AND AUTHORIZE THE RECORDING BY THE TOWN CLERK FOR PPW JOB NO. 17-813-9921 ANNUAL CURB, GUTTER, AND SIDEWALK MAINTENANCE (RAMP UPGRADES) PROJECT AND PPW JOB NO. 17-812-0125/26 CROSSWALK IMPROVEMENTS. B. EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION FOR THE WORK OF BEAR ELECTRICAL SOLUTIONS, INC. AND AUTHORIZE THE RECORDING BY THE TOWN CLERK FOR PPW JOB NO. 17-812-0125/26 CROSSWALK IMPROVEMENTS. C. EXECUTE A CERTIFICATE OF ACCEPTANCE AND NOTICE OF COMPLETION FOR THE WORK OF ST. FRANCIS ELECTRIC AND AUTHORIZE THE RECORDING BY THE TOWN CLERK FOR PPW JOB NO. 17-812-0125/26 CROSSWALK IMPROVEMENTS. RECOMMENDATION: Authorize the Town Manager to: 1. Execute a Certificate of Acceptance and Notice of Completion (Attachment 1) for the work of Mercoza Engineering and authorize recording by the Town Clerk for PPW Job No. 17-813-9921 Annual Curb, Gutter, and Sidewalk Maintenance (Ramp Upgrades) and PPW Job No. 17-812-0125/26 Crosswalk Improvements Project. 2. Execute a Certificate of Acceptance and Notice of Completion (Attachment 2) for the work of Bear Electrical Solutions, Inc. and authorize recording by the Town Clerk for PPW Job No. 17-812-0125/26 Crosswalk Improvements Project. SUBJECT: AUTHORIZE THE TOWN MANAGER TO EXECUTE CERTIFICATES OF ACCEPTANCE AND NOTICES OF COMPLETION AND AUTHORIZE THE RECORDINGS BY THE TOWN CLERK FOR PPW JOB NUMBERS 17-811-9921 AND 17-812-0125/26 DECEMBER 13, 2018 S:\COUNCIL REPORTS\2018\12-18-18\NOC - Mercoza, Bear Electric, St Francis\Staff Report.docx 12/13/2018 9:46 AM RECOMMENDATION (continued): 3. Execute a Certificate of Acceptance and Notice of Completion (Attachment 3) for the work of St. Francis Electric and authorize recording by the Town Clerk for PPW Job No. 17-812-0125/26 Crosswalk Improvements Project. BACKGROUND: The Town’s adopted FY 2017/18-2021/22 Capital Improvement Program (CIP) Budget designated funding for these projects. At the February 6, 2018 Town Council meeting, Council approved the plans and specifications for the Annual Curb, Gutter, and Sidewalk Maintenance (Ramp Upgrades) project which included concrete improvements associated with the Crosswalk Improvements Project on Santa Cruz Avenue at Blossom Hill Road and Los Gatos Almaden Road at Cherry Blossom Lane. The Council authorized the Town Manager to advertise the projects for bid and to award the projects as one agreement in an amount not to exceed the available construction budget of $431,994, including contingencies and any change orders, to the lowest responsible bidder. The Town entered an agreement with Mercoza Engineering for the work for the low bid of $264,676. At the June 5, 2018 Town Council meeting, Council approved an additional change order of $135,000 to the contract to install the required ramps for the upcoming rubber cape seal project. Based on adding this additional work, the Council action at this meeting revised the not to exceed construction budget for the project to $439,377. At the March 20, 2018 Town Council meeting, Council approved the plans and specifications and authorized bidding for the electrical improvements associated with the crosswalk improvements on Santa Cruz Avenue at Blossom Hill Road and Los Gatos Almaden Road at Cherry Blossom Lane for a not to exceed amount of $79,301, including all contingencies and change orders. To complete the road cuts necessary for the work on Los Gatos Almaden Road prior to the Town’s upcoming overlay, the work was bid as two separate contracts. The Town entered into an agreement with Bear Electrical Solutions, Inc. for the work on Santa Cruz Avenue for the low bid of $57,320 and with St. Francis Electric for the work on Los Gatos Almaden Road for the low bid of $16,995. SUBJECT: AUTHORIZE THE TOWN MANAGER TO EXECUTE CERTIFICATES OF ACCEPTANCE AND NOTICES OF COMPLETION AND AUTHORIZE THE RECORDINGS BY THE TOWN CLERK FOR PPW JOB NUMBERS 17-811-9921 AND 17-812-0125/26 DECEMBER 13, 2018 S:\COUNCIL REPORTS\2018\12-18-18\NOC - Mercoza, Bear Electric, St Francis\Staff Report.docx 12/13/2018 9:46 AM DISCUSSION: Mercoza Engineering, Bear Electrical Solutions, Inc., and St. Francis Electric have satisfactorily completed all the work for their projects and staff recommends accepting the projects. Five percent of the faithful performance bonds for Mercoza Engineering and Bear Electric will remain in effect for a period of two years as a guarantee for any needed repair or replacement caused by defective materials and workmanship for each project. The execution and recordation of the Certificates of Acceptance is now required to finalize the Town's acceptance of the project. CONCLUSION: Approval of the recommended actions will allow for the close out of the three contracts associated with these projects. FISCAL IMPACT: The final construction costs totaled $503,310, for the work. Additional change order amount and the contingency within Council approved limits were used for the project, with the majority of this extra cost going toward curb ramp upgrades for the rubber cape seal project. Project delivery costs, including advertising, printing, materials testing, staff, and design, have totaled $94,080. The Parks and Public Works Department continues to track staff costs associated with delivering CIP projects on a project-level basis. In years with larger CIP projects such as the Library Facility or the Almond Grove Street Rehabilitation, these staff costs have been partially funded by the corresponding CIP project to allow for the additional staffing necessary to deliver the projects. For smaller projects, or years with smaller overall CIP budgets, staff costs have solely been charged to the Engineering Program Operating Budget . SUBJECT: AUTHORIZE THE TOWN MANAGER TO EXECUTE CERTIFICATES OF ACCEPTANCE AND NOTICES OF COMPLETION AND AUTHORIZE THE RECORDINGS BY THE TOWN CLERK FOR PPW JOB NUMBERS 17-811-9921 AND 17-812-0125/26 DECEMBER 13, 2018 S:\COUNCIL REPORTS\2018\12-18-18\NOC - Mercoza, Bear Electric, St Francis\Staff Report.docx 12/13/2018 9:46 AM FISCAL IMPACT (continued): Curb, Gutter, & Sidewalk Maintenance (Project 813-9921) & Crosswalk Improvements (Project 812-0125) Budget Costs Curb, Gutter, & Sidewalk Maintenance $ 398,488 Crosswalk Improvements $ 185,962 Total Project Budget $ 584,450 Mercoza Engineering (Construction) $ 432,607 Bear Electric (Construction) $ 53,064 St. Francis Electric (Construction) $ 17,639 Consultant Services $ 2,055 Advertising $ 1,960 Blueprint/Copy/Postage $ 288 Total Project Costs $ 507,613 Project Savings Not Including Staff Costs $ 76,837 Staff Costs $ 89,778 Project Overage Including Estimated Staff Costs $ (12,940) ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption was previously filed. Attachments: 1. Certificate of Acceptance and Notice of Completion - Mercoza Engineering 2. Certificate of Acceptance and Notice of Completion - Bear Electrical Solutions, Inc. 3. Certificate of Acceptance and Notice of Completion - St. Francis Electric