Attachment 2jPROPOSED PARKS AND TRAILS PROGRAM D-1 PARK PROJECT DIRECTORY 4605 Parks Playground Fibar Project D – 6 3104 Park Rehabilitation – Bachman Park D – 8 3303 Belgatos Park Restroom Improvements D – 10 4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 12 4202 Town Plaza Turf Repairs D – 14 4006 Outdoor Fitness Equipment D – 16 TRAIL PROJECT DIRECTORY 4504 Open Space Trail Upgrades D – 22 4507 Forbes Mill Footbridge Improvements D – 24 4503 Charter Oaks Trail Repair D – 26 4505 Trailhead Connector Project D – 28 PROPOSED PARKS AND TRAILS PROGRAM Park Improvement Projects D-2 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-3 PROJECT LOCATIONS A Parks Playground Fibar Project B Park Rehabilitation – Bachman Park C Belgatos Park Restroom Improvements D Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping E Town Plaza Turf Repairs F Outdoor Fitness Equipment LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLE S A, D AND F ARE TOWN-WIDE PROJECTS B RD BE L G A T O S E C PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-4 PROGRAM SECTION DIRECTORY PAGE 4605 Parks Playground Fibar Project D – 6 3104 Park Rehabilitation – Bachman Park D – 8 3303 Belgatos Park Restroom Improvements D – 10 4609 Creek Trail & Parks Pathway & Parking Lot Seal Coat and Striping D – 12 4202 Town Plaza Turf Repairs D – 14 4006 Outdoor Fitness Equipment D – 16 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-5 The Parks Program’s Park Improvement Projects section contains Capital Improvement Program projects that repair or improve a Town park as the primary scope of work. Typical park improvement projects include parking lot, walkway, and basketball or tennis court resurfacing; and park equipment or facility upgrades. The Park Improvement Projects section does not have ongoing programs; all projects are considered one-time projects. The exception to this is the Parks Fibar replacement project. Because Fibar requires regular replacement and infill, this project is scheduled as a bi-annual project. One-time park improvement projects are prioritized based on health and safety issues, available funding sources, infrastructure impacts, project costs, and community impacts. Los Gatos does have Park Construction Tax Revenue as a designated funding source for the Parks operating program budget; however, tax receipts are limited to approximately $11,000 per year, and are not sufficient for a capital program. In addition to GFAR funding, grants, in-lieu fees, and CDBG funds are pursued and utilized for park improvements when available. PARK IMPROVEMENT PROJECTS SUMMARY * Total FY 2017/18 Carryforward $565,659 Unfunded Projects • Oak Meadow Park Upgrades • Worcester Park • Civic Center Irrigation System Replacement & Upgrade • Turf Renovations - Various Parks • Oak Meadow Park Fencing Upgrades • Oak Meadow Park Turf Upgrades • Oak Meadow Park Restroom Expansion • Park Rehabilitation – La Rinconada Park • Park Rehabilitation –Live Oak Manor Park • Park Rehabilitation – Blossom Hill Park PARKS Carryforward Projects 4605 Parks Playground Fibar Project 63,460$ 36,540$ -$ 25,000$ -$ 25,000$ 150,000$ 3104 Park Rehabilitation - Bachman Park 10,418 529,119 - - - - 539,537 3303 Belgatos Park Restroom Improvements - 25,000 - - - - 25,000 New Projects 4202 Town Plaza Turf Repairs - 28,000 - - - - 28,000 4006 Oak Meadow Park Exercise Equipment - 60,000 - - - - 4609 Creek Trail & Parks Path & Parking Lot Seal & Striping - 225,000 - - - - Total Park Improvement Projects 73,878$ 903,659$ -$ 25,000$ -$ 25,000$ 742,537$ 2018/19 Budget & Carryfwd* 2019/20 Budget 2020/21 Budget 2021/22 Budget FY 2018/19- 2022/23 CAPITAL IMPROVEMENT PROGRAM PARK AND TRAIL IMPROVEMENT PROJECTS Expended Through 2017/18 2022/23 Budget Total Budgeted PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-6 Project Name Parks Playground Fibar Project Project Number 831-4605 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will replace fibar material at all Town playgrounds. Location This project will be completed at various parks in Los Gatos. Project Background Several Town parks have playground structures that are heavily used by children and their families. Playground safety codes require that the fibar material be spread under and around playground structures to prevent injury to children. Fibar replacement is required when the material is below a specific depth near the playground structure. Fibar is a wood product that degrades over time based on foot traffic and weather conditions. This material should be replaced on a regular, as needed basis. This is an annual CIP project to improve the safety of the Town’s playgrounds. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the department’s FY 2018/19 Operating Budget. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-7 Project Components & Estimated Timeline Summer 2018 Design Project development Summer 2018 Bid Process Project bidding & contract award Summer 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 42,500$ 20,960$ 11,540$ 25,000$ 36,540$ -$ 25,000$ -$ 25,000$ 150,000$ TOTAL SOURCE OF FUNDS 42,500$ 20,960$ 11,540$ 25,000$ 36,540$ -$ 25,000$ -$ 25,000$ 150,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 42,500 20,960 11,540 25,000 36,540 - 25,000 - 25,000 150,000 TOTAL GFAR 42,500$ 20,960$ 11,540$ 25,000$ 36,540$ -$ 25,000$ -$ 25,000$ 150,000$ TOTAL USE OF FUNDS 42,500$ 20,960$ 11,540$ 25,000$ 36,540$ -$ 25,000$ -$ 25,000$ 150,000$ PARKS PLAYGROUND FIBAR PROJECT Project 831-4605 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-8 H W Y 9 W M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Park Rehabilitation - Bachman Park Project Number 831-3104 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will make improvements to the park pathway and lighting system. Location The project is located at Bachman Park, bordered by Bachman, Belmont, and Nicholson Avenues. Project Background Bachman Park is a small 3.6-acre neighborhood park close to downtown Los Gatos. The park features a basketball court on the southwest side of the park, playground equipment, as well as a large lawn area for recreational use. Over the last several years, the basketball court was resurfaced, the playground equipment was retrofitted to be in compliance with consumer quality guidelines, and the turf irrigation system was replaced. Other major park infrastructure improvements have not been made to this park in many years due to limited funding. This project will make improvements to the asphalt pathway, retaining walls, as well as the park’s pathway lighting. The lighting in this particular park is outdated and will be replaced with more energy efficient lighting fixtures. Additional improvements include: a new concrete sidewalk, landscape improvements, ivy removal, and reseeding and grading. The improvements will be scheduled in phases to minimize the impact on park users. This project shows the use of CDBG funds for pathway improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-9 Project Components & Estimated Timeline Fall 2017 Design Project design through community outreach process Spring 2018 Bid Process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ 10,418$ 314,582$ -$ 314,582$ -$ -$ -$ -$ 325,000$ GRANTS & AWARDS - - 214,537 - 214,537 - - - - 214,537 TOTAL SOURCE OF FUNDS -$ 10,418$ 529,119$ -$ 529,119$ -$ -$ -$ -$ 539,537$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 10,418 314,582 - 314,582 - - - - 325,000$ TOTAL GFAR -$ 10,418$ 314,582$ -$ 314,582$ -$ -$ -$ -$ 325,000$ GRANTS &AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses - - 214,537 - 214,537 - - - - 214,537$ TOTAL GRANTS & AWARDS -$ -$ 214,537$ -$ -$ -$ -$ -$ 214,537$ TOTAL USE OF FUNDS -$ 10,418$ 529,119$ -$ 529,119$ -$ -$ -$ -$ 539,537$ PARK REHABILITATION - BACHMAN PARK Project 831-3104 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-10 Project Name Belgatos Park Restroom Improvements Project Number 831-3303 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description The project will restore minor structural elements, repaint the exterior, and relocate and replace the existing drinking fountain with a hydration station. Location The project is located at Belgatos Park, which is at 330 Belgatos Road. Project Background Belgatos Park is a popular destination for local residents and hikers due to its proximity to Heintz Open Space Reserve. In FY 2013/14, the Town completed restroom partition upgrades and accessibility modifications at Blossom Hill Park, Belgatos Park, Oak Meadow Park, and Balzar Field. During these improvements, some deficiencies have come to life. The restroom improvements project at Belgatos Park will repair some dry rot structural members on the building, replace a drinking fountain, and repaint the exterior surfaces of the building. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. BLOSSOM HILL RD BE L G A T O S R D PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-11 Project Components & Estimated Timeline Fall 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000$ TOTAL GFAR - - 25,000 - 25,000 - - - - 25,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ BELGATOS PARK RESTROOM IMPROVEMENTS Project 831-3303 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-12 TOWN-WIDE Project Name Creek Trail & Park Pathway & Parking Lot Seal Coat & Striping Project Number 831-4609 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description The project will resurface and restripe park parking lots, pathways, and sections of the Los Gatos Creek Trail. Location The project is located at Belgatos Park, Blossom Hill Park, Live Oak Manor Park, Oak Meadow Park, and the Los Gatos Creek Trail. Project Background The parking lots located in parks and the Los Gatos Creek Trail are heavily used on a daily basis. In order to keep their surfaces in good condition and prevent long term wear and damage, the parking lots and trails need to be resurfaced and striped. This project is necessary to prevent future damages to existing pavement surfaces in the future. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-13 Project Components & Estimated Timeline Fall 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 225,000$ 225,000$ -$ -$ -$ -$ 225,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 225,000$ 225,000$ -$ -$ -$ -$ 225,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 225,000 225,000 - - - - 225,000 TOTAL GFAR -$ -$ -$ 225,000$ 225,000$ -$ -$ -$ -$ 225,000$ TOTAL USE OF FUNDS -$ -$ -$ 225,000$ 225,000$ -$ -$ -$ -$ 225,000$ CREEK TRAIL, PARKS PATHS & PARKING LOTS SEAL AND STRIPING Project 831-4609 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-14 E MAIN ST HWY 1 7 N S A N T A C R U Z UN I V E R S I T Y A V AV Project Name Town Plaza Turf Repairs Project Number 831-4202 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will renovate the turf at Plaza Park. Location The project is located at Town Plaza Park, at the corner of West Main Street and Santa Cruz Avenue. Project Background Plaza Park, located in the heart of downtown Los Gatos, is a popular park and hosts a variety of community events, such as Jazz on the Plazz and the Farmer’s Market. Because of the amount of high foot traffic at this location, the turf is heavily impacted. This project will remove the existing sod and soil. New soil will be added to the area to enhance root growth and to re-grade the ground to mitigate standing water issues. Additionally, along with the installation of new turf grass, minor changes to the irrigation system will be completed to maximize water coverage. The turf was last replaced around 2010. The project will be completed during a period when there is the least impact on scheduled downtown events. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-15 Project Components & Estimated Timeline Summer 2018 Design Project design & development Summer 2018 Bid Process Project bidding & contract award Summer 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 28,000 28,000 - - - - 28,000 TOTAL GFAR -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$ TOTAL USE OF FUNDS -$ -$ -$ 28,000$ 28,000$ -$ -$ -$ -$ 28,000$ TOWN PLAZA TURF REPAIRS Project 831-4202 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-16 Project Name Outdoor Fitness Equipment Project Number 831-4006 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will install outdoor fitness equipment. Location The project location is still being determined. Project Background The Town was awarded an outdoor fitness rig after attending a California Parks & Recreation Society conference and competing in a competition. The Town will receive equipment that is valued at $30,000 and Town staff will install the equipment at a location to be determined. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-17 Project Components & Estimated Timeline Summer 2018 Design Project design & development Summer 2018 Bid Process Project bidding & contract award Summer 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 60,000$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 60,000$ 60,000$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 60,000 60,000 - - - - 60,000 TOTAL GFAR -$ -$ -$ 60,000$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS -$ -$ -$ 60,000$ 60,000$ -$ -$ -$ -$ 60,000$ OUTDOOR FITTNESS EQUIPMENT Project 831-4006 PROPOSED PARKS & TRAILS PROGRAM Park Improvement Projects D-18 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-19 PROJECT LOCATIONS A Open Space Trail Upgrades B Forbes Mill Footbridge Improvements C Charter Oaks Trail Repair D Trailhead Connector Project LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES "A" IS A TOWN-WIDE PROJECT B C D PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-20 PROGRAM SECTION DIRECTORY PAGE 4504 Open Space Trail Upgrades D – 22 4507 Forbes Mill Footbridge Improvements D – 24 4503 Charter Oaks Trail Repair D – 26 4505 Trailhead Connector Project D – 28 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-21 The Parks Program’s Trail Improvement Projects section contains Capital Improvement Program projects that construct, repair, or improve a Town trail as the primary scope of work. Typical trail improvement projects include pathway construction or resurfacing. TRAIL IMPROVEMENT PROJECTS SUMMARY * Total FY 2017/18 Carryforward $226,510 ` Carryforward Projects 4504 Open Space Trail Upgrades -$ 152,000$ -$ -$ -$ -$ 152,000$ 4202 Forbes Mill Footbridge Improvements 16,338 74,510 - - - - 90,848 New Projects 4503 Charter Oaks Trail Repair Project - 163,051 350,000 - - - 513,051 4505 Trailhead Connector - 387,440 - - - - 387,440 Total Trail Improvement Projects 16,338$ 777,001$ 350,000$ -$ -$ -$ 1,143,339$ 2022/23 Budget 2019/20 Budget 2018/19 Budget & Carryfwd* Total Budgeted FY 2018/19- 2022/23 CAPITAL IMPROVEMENT PROGRAM 2020/21 Budget Expended Through 2017/18 2021/22 Budget TRAIL IMPROVEMENT PROJECTS PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-22 Project Name Open Space Trail Upgrades Project Number 832-4504 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair and replace old damaged retaining walls, fences, and embankments along the trails in the Town’s open spaces. Location This project is located at Santa Rosa Open Space, Heintz Open Space, and Belgatos Park. Project Background The Town has a number of open space preserves that are under its jurisdiction. There are several public trail networks that traverse the open space preserves in the hillsides. The aging process has deteriorated a number of retaining walls and embankments along some trail sections. Without proper repair and replacement, the possibility of failure of the trails will increase greatly. This project will repair and replace several retaining walls that are supporting the trails and their embankments. In addition, this project will improve the drainage system around the retaining walls to prevent further erosion of the trails. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. . TOWN-WIDE PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-23 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR Open Space Reserve Fund -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ TOTAL SOURCE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 152,000 - 152,000 - - - - 152,000 TOTAL GFAR -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ TOTAL USE OF FUNDS -$ -$ 152,000$ -$ 152,000$ -$ -$ -$ -$ 152,000$ OPEN SPACE TRAIL UPGRADES Project 832-4504 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-24 Project Name Forbes Mill Footbridge Improvements Project Number 832-4507 Department Parks & Public Works Project Manager Facilities Manager: Jim Harbin Description The project will provide pathway lighting across the 400-foot span of the pedestrian bridge and install additional art panels. Location The project is located on the pedestrian bridge between Forbes Mill and Old Town across Highway 17. Project Background Forbes Mill footbridge is a heavily used pathway crossing Highway 17 between the Main Street businesses, Civic Center, and high school on the east side of the freeway, and the downtown on the west. The interior walls of the walkway are decorated with murals painted by students over the past decades. The pathway structure once had a lighting system, but fell into disrepair several years ago and was removed. This leaves the pathway dark in the evening, which has prompted concerns from residents. The footbridge improvements will include LED lighting for the pathway. This project will also install additional art panels to occupy the remaining space. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-25 Project Components & Estimated Timeline Fall 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 7,815$ 8,522$ 74,510$ -$ 74,510$ -$ -$ -$ -$ 90,848$ TOTAL SOURCE OF FUNDS 7,815$ 8,522$ 74,510$ -$ 74,510$ -$ -$ -$ -$ 90,848$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 7,815 8,522 74,510 - 74,510 - - - - 90,848 TOTAL GFAR 7,815$ 8,522$ 74,510$ -$ 74,510$ -$ -$ -$ -$ 90,848$ TOTAL USE OF FUNDS 7,815$ 8,522$ 74,510$ -$ 74,510$ -$ -$ -$ -$ 90,848$ FORBES MILL FOOTBRIDGE IMPROVEMENTS Project 832-4507 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-26 HW Y 1 7 WIN C H E S T E R B L V D LO S G A T O S B L V D HW Y 8 5 LA R K A V KNOWLE S Project Name Charter Oaks Trail Repair Project Project Number 832-4503 Department Parks & Public Works Project Manager Superintendent: Steve Regan Description This project will repair the storm damage on the Los Gatos Creek Trail near Charter Oaks, which includes damage to the fencing and asphalt pathway. Location This project is located on the Los Gatos Creek Trail near Charter Oaks. Project Background The existing trail is adjacent to Los Gatos Creek and was damaged by flooding during the winter storms of 2017. The impacts of the storm included damage to the fencing and to the asphalt concrete pathway. The trail is well used by the public and the damage has negatively impacted trail users by making the trail more difficult to use. Funds for this project will be provided by FEMA. The FEMA funding must be spent by the fall of 2018. Subsequent to the trail repair work, this project will further evaluate improvements along the trail from Lark Avenue towards Highway 85 utilizing Community Benefit funds in the amount of $350,000 from the Albright project. This project scope will be determined through community outreach efforts for construction in FY 2019/20. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-27 Project Components & Estimated Timeline Summer 2018 Design Project design & development Summer 2018 Bid Process Project bidding & contract award Fall 2018 Construction Project construction Fall 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 15,000$ 15,000$ 350,000$ -$ -$ -$ 365,000$ GRANTS - - - 148,051 148,051 - - - - 148,051 TOTAL SOURCE OF FUNDS -$ -$ -$ 163,051$ 163,051$ 350,000$ -$ -$ -$ 513,051$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 15,000 15,000 350,000 - - - 365,000 TOTAL GFAR -$ -$ -$ 15,000$ 15,000$ 350,000$ -$ -$ -$ 365,000$ GRANTS &AWARDS Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 148,051 148,051 - - - - 148,051 TOTAL GRANTS &AWARDS -$ -$ -$ 148,051$ 148,051$ -$ -$ -$ -$ 148,051$ TOTAL USE OF FUNDS -$ -$ -$ 163,051$ 163,051$ 350,000$ -$ -$ -$ 513,051$ CHARTER OAKS TRAIL REPAIR PROJECT Project 832-4503 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-28 H W Y 9 HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Trailhead Connector Project Project Number 832-4505 Department Parks & Public Works Project Manager Asst. Director Lisa Petersen Description This project will fund the design of a trailhead connection for Los Gatos Creek Trail to Highway 9. Location This project is located on the Los Gatos Creek Trail near Highway 9. Project Background This project will fund the design of a trailhead connection for Los Gatos Creek Trail to Highway 9. The project will become a “shovel ready” project which will allow the Town to be in a better position to obtain grant funding to fund project construction. The project is an identified priority within Measure B and the Bicycle and Pedestrian Plan. The Council approved the staff recommendation for the next steps on this project in June 2017. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-29 Project Components & Estimated Timeline Summer 2018 Design Project design & development Pending Bid Process Project bidding & contract award Pending Construction Project construction Pending Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 44,440$ 44,440$ -$ -$ -$ -$ 44,440$ GRANTS & AWARDS - - - 343,000 343,000 - - - - 343,000 TOTAL SOURCE OF FUNDS -$ -$ -$ 387,440$ 387,440$ -$ -$ -$ -$ 387,440$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 44,440 44,440 - - - - 44,440 TOTAL GFAR - - - 44,440 44,440 - - - - 44,440 GRANTS &AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 343,000 343,000 - - - - 343,000 TOTAL GRANTS &AWARDS -$ -$ -$ 343,000$ 343,000$ -$ -$ -$ -$ 343,000$ TOTAL USE OF FUNDS -$ -$ -$ 387,440$ 387,440$ -$ -$ -$ -$ 387,440$ TRAILHEAD CONNECTOR Project 831-4505 PROPOSED PARKS & TRAILS PROGRAM Trail Improvement Projects D-30