Loading...
Attachment 2hPROPOSED STREETS PROGRAM Street Improvements C-31 LO S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E MA I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LOS G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V LOS GATOS-ALMADEN RD UN I V E R S I T Y A V WEDGEWOOD KNOWLES A HIC K S RD B C, J, K, M, N, P, Q, R, S, W AND X ARE TOWN-WIDE PROJECTS E F H I G L O QU I T O R D BICKNELL RD T Y D, U, V PROJECT LOCATIONS A Highway 9/University Avenue Intersection Improvements N Traffic Signal Modernization B Los Gatos Boulevard/Shannon Road Improvements O Bicknell Road Storm Drain Improvements C Monument Control Network Update P Bicycle & Pedestrian Improvements D Downtown Parking Lots Seal Coat & Restriping Q Stormwater Master Plan E Hernandez Avenue Storm Drain Improvements R Stormwater System – Pollution Prevention Compliance F Blossom Hill Road/Cherry Blossom Lane Intersection Improvements S Public Arts Gateway G 224 West Main Property Acquisition (Parking Lot 6) T Jones Road Storm Drain Improvements H Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane Sidewalk Improvements U Downtown Parking Study I Stonybrook Road/Kennedy Road Sidewalk Improvements V One-Way Downtown Street Pilot J Sidewalk Improvements – Multiple Locations W Annual Storm Drain Improvements K LED Streetlights X Pilot School Busing Program L Utility Undergrounding Improvements Y Highway 17 Bicycle & Pedestrian Bridge M Cut-Through Traffic Mitigation PROPOSED STREETS PROGRAM Street Improvements C-32 PROGRAM SECTION DIRECTORY PAGE 0202 Highway 9/University Avenue Intersection Improvements C – 34 0213 Los Gatos Boulevard/Shannon Road Improvements C – 36 0214 Monument Control Network Update C – 38 0705 Downtown Parking Lots Seal Coat & Restriping C – 40 0409 Hernandez Avenue Storm Drain Improvements C – 42 0212 Blossom Hill Road/Cherry Blossom Lane Intersection Improvements C – 44 0704 224 West Main Property Acquisition (Parking Lot 6) C – 46 0218 Sidewalk Improvements for Shannon Road/Los Gatos Boulevard/Cherry Blossom Lane C – 48 0219 Stonybrook Road & Kennedy Road Sidewalk Improvements C – 50 0221 Sidewalk Improvements – Multiple Locations C – 52 0224 LED Street Lights C – 54 0225 Utility Undergrounding Improvements C – 56 0229 Cut – Through Traffic Mitigation C – 58 0227 Traffic Signal Modernization C – 60 0410 Bicknell Road Storm Drain Improvements C – 62 0231 Bicycle & Pedestrian Improvements C – 64 0413 Stormwater Master Plan C – 66 0414 Stormwater System – Pollution Prevention Compliance C – 68 0232 Public Arts Gateway C – 70 0415 Jones Road Storm Drain Improvements C – 72 0233 Downtown Parking Study C – 74 0234 One-Way Downtown Street Pilot C – 76 0420 Annual Storm Drain Improvements C – 78 0128 Pilot School Busing C – 80 0803 Highway 17 Bicycle & Pedestrian Bridge C – 82 PROPOSED STREETS PROGRAM Street Improvements C-33 The Streets Program’s Street Improvements section contains Capital Improvement Program projects that improve a roadway’s function or structure, other than paving, as the primary scope of work. Typical Street Improvements projects include sidewalk, curb, and gutter improvements, storm drain improvements, the undergrounding of utilities, intersection improvements, sidewalk and median ramps, crosswalk improvements, street lighting, and retaining walls. In this CIP, the Street Improvements section contains one-time projects and no ongoing projects. One-time Street Improvements projects are prioritized based on safety needs, traffic levels, available funding sources, project costs, and community impacts. Traffic Mitigation Funds, Storm Drain Funds, and the Utility Underground Fund all provide designated funding revenue through development fee charges for their related project categories. Los Gatos does not have a designated funding source for other street improvements which do not fall into these categories; however, grants, in-lieu fees, CDBG funds, and community benefit funds are utilized when available. STREET IMPROVEMENT PROJECTS SUMMARY * Total FY 2017/18 Carryforward $4,999.335 Unfunded Projects for future consideration • Parking Lot 4 Repair & Waterproofing • Montebello Way Island Removal • Blossom Hill Road & Union Avenue Improvements • Los Gatos-Almaden Road Improvements • Union Avenue Widening and Sidewalks Carryforward Projects 0202 Hwy 9/University Intersection 969,790$ 199,211$ -$ -$ -$ -$ 1,169,000$ 0213 Los Gatos Blvd/Shannon Improvements - 20,000 - - - - 20,000 0214 Monument Control Network Update - 30,000 - - - - 30,000 0705 Downtown Parking Lots Seal Coat & Restriping 24,915 75,085 - - - - 100,000 0409 Hernandez Avenue Storm Drain Improvements 17,180 - - - - 65,000 82,180 0212 Blossom Hill Rd/Cherry Blossom Ln Intersection Improvements - 500,000 - - - - 500,000 0704 224 W. Main Street Property Acquisition (Parking Lot 6)24,000 1,214,913 - - - - 1,238,913 0218 Shannon/LGB/Cherry Blossom Sidewalk Improvements 104 129,896 - - - - 130,000 0219 Stonybrook & Kennedy Sidewalk Improvements 63,868 516,132 - - - - 580,000 0221 Sidewalk Improvements - Multiple Locations - 60,000 - - - - 60,000 0224 LED Streetlights 396,178 108,470 - - - - 504,648 0415 Jones Road Storm Drain Improvements 18,700 2,300 - - - - 21,000 0225 Utility Undergrounding Improvements - 2,330,000 4,436,000 - - - 6,766,000 0229 Cut-Through Traffic Mitigation 222,828 109,839 - - - - 332,667 0227 Traffic Signal Modernization 20,250 1,915,263 324,949 415,027 - - 2,675,489 0232 Public Art Gateway - 25,000 - - - - 25,000 0410 Bicknall Avenue Storm Drain Improvements 108,392 63,108 - - - - 171,500 0231 Bicycle & Pedestrian Improvements 63,700 611,300 - - - - 675,000 0413 Stormwater Master Plan - 200,000 - - - - 200,000 0414 Stormwater System - Pollution Prevention Compliance - 300,000 - - - - 300,000 New Projects 0233 Downtown Parking Study - 200,000 - - - - 200,000 0234 One-Way Downtown Street Pilot - 130,000 - - - - 130,000 0128 Pilot School Busing Program - 110,600 221,200 341,880 - - 673,680 0803 Highway 17 Bicycle & Ped Bridge - 200,000 - - - - 200,000 0412 Annual Storm Drain Improvement Prj - 150,000 150,000 150,000 150,000 150,000 750,000 Total Street Improvement Projects 1,929,904$ 9,201,116$ 5,132,149$ 906,907$ 150,000$ 215,000$ 17,535,076$ 2022/23 Budget Expended Through 2017/18 2020/21 Budget 2019/20 Budget STREET IMPROVEMENT PROJECTS Total Budgeted 2021/22 Budget 2018/19 Budget & Carryfwd* FY 2018/19- 2022/23 CAPITAL IMPROVEMENT PROGRAM PROPOSED STREETS PROGRAM Street Improvements C-34 Project Name Highway 9/University Avenue Intersection Improvements Project Number 813-0202 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project replaced the old and outdated traffic signal at the Highway 9 and University Avenue intersection with a new traffic signal system. Additionally, dedicated left turn lanes were constructed on University Avenue to improve vehicle traffic flow. Sidewalks were repaired to be in compliance with current codes. Construction associated with this project was completed in FY 2015/16 with project closeout, including processing associated documentation lasting into FY 2018/19. Location The project is located at the intersection of Highway 9 and University Avenue. Project Background The lack of an updated traffic signal system and dedicated left turn lanes has impacted vehicle traffic flow, causing vehicle and pedestrian safety and capacity issues. To address these issues, a new traffic signal system, including dedicated left turn lanes, were installed. The sidewalks located at this intersection were also improved to comply with current codes. The project intersection is located in the Caltrans right-of-way and due to state budget challenges, funding has been limited for the past several years. However, the Town secured a grant through the Highway Safety Implementation Program (HSIP). The project was funded through this grant and revenue from development projects in the immediate area. Although all of the work has been done for some time, project closeout has been delayed on this project as staff has struggled with obtaining and providing information to Caltrans for grant documentation. Operating Budget Impacts This project will use staff time for grant management. The staff time for this project is included in the Department’s FY 2018/19 Operating Budget. HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED STREETS PROGRAM Street Improvements C-35 Project Components & Estimated Timeline Winter 2014 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION 66,963$ -$ -$ -$ -$ -$ -$ -$ -$ 66,963$ GRANTS & AWARDS 902,827 - 199,211 - 199,211 - - - - 1,102,038 TOTAL SOURCE OF FUNDS 969,790$ -$ 199,211$ -$ 199,211$ -$ -$ -$ -$ 1,169,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 66,963 - - - - - - - - 66,963 TOTAL TRAFFIC MITIGATION 66,963$ -$ -$ -$ -$ -$ -$ -$ -$ 66,963$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 902,827 - 199,211 - 199,211 - - - - 1,102,038 TOTAL GRANTS & AWARDS 902,827$ -$ 199,211$ -$ 199,211$ -$ -$ -$ -$ 1,102,038$ TOTAL USE OF FUNDS 969,790$ -$ 199,211$ -$ 199,211$ -$ -$ -$ -$ 1,169,000$ HIGHWAY 9 / UNIVERSITY AVENUE INTERSECTION IMPROVEMENTS Project 813-0202 PROPOSED STREETS PROGRAM Street Improvements C-36 LO S G A T O S B L V D BLOSSOM HILL R D SHANN O N R D Project Name Los Gatos Boulevard/Shannon Road Improvements Project Number 813-0213 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will create a new pedestrian signalized crossing and restripe Shannon Road to provide longer turn lanes and improve the overall safety for pedestrians and bicyclists. The project will be coordinated with any potential development of adjacent parcels. Location This project is located at the intersection of Los Gatos Boulevard and Shannon Road. Project Background The intersection of Los Gatos Boulevard and Shannon Road is a heavily used area, especially during the morning and afternoon school and commute hours. To improve the safe operation of this intersection, a new pedestrian push button signal will be installed and also new striping on Shannon Road will provide a longer turn lane onto Los Gatos Boulevard. Should a development project occur at this location, that project will take on this work and the Town funding will revert to the GFAR in future budget cycles Operating Budget Impacts This project will use staff time for design and construction. Engineering staff time associated with these projects will be charged to the project as they are identified and delivered. PROPOSED STREETS PROGRAM Street Improvements C-37 Project Components & Estimated Timeline Fall 2018 Preliminary Design Project design & development Spring 2019 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL SOURCE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 20,000 - 20,000 - - - - 20,000 TOTAL TRAFFIC MITIGATION -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TOTAL USE OF FUNDS -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ LOS GATOS BOULEVARD / SHANNON IMPROVEMENTS Project 813-0213 PROPOSED STREETS PROGRAM Street Improvements C-38 Project Name Monument Control Network Update Project Number 813-0214 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will provide ongoing update of the existing Town-wide survey monument control network in phases. Location This project is located Town-wide. Project Background In 2002, the Town undertook a project to establish a survey monument network for Los Gatos, which has been used by surveyors and engineers for the last 10 years. Due to new development projects, and changes to the Town’s infrastructure, such as new streets, the survey monument network is outdated. The survey monuments are a planning resource when considering new development projects or when designing or providing engineering specifications for projects. This project will provide a verification of the location of the Town monuments per the original survey. This survey document will enable staff to detect any variations of location of any monuments that have been affected by earth movements. Operating Budget Impacts This project will use staff time for design and management. This project is tentatively scheduled to begin in FY 2018/19. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-39 Project Components & Estimated Timeline Fall 2018 Design Phase I project development Winter 2018 Bid process Phase I project bidding & contract award Summer 2019 Completion Phase I project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TRAFFIC MITIGATION - - 10,000 - 10,000 - - - - 10,000 TOTAL SOURCE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 20,000 - 20,000 - - - - - TOTAL GFAR -$ -$ 20,000$ -$ 20,000$ -$ -$ -$ -$ 20,000$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 10,000 - 10,000 - - - - - TOTAL TRAFFIC MITIGATION -$ -$ 10,000$ -$ 10,000$ -$ -$ -$ -$ 10,000$ TOTAL USE OF FUNDS -$ -$ 30,000$ -$ 30,000$ -$ -$ -$ -$ 30,000$ MONUMENT CONTROL NETWORK UPDATE Project 813-0214 PROPOSED STREETS PROGRAM Street Improvements C-40 HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name Downtown Parking Lots Seal Coat & Restriping Project Number 817-0705 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will resurface downtown parking lots by applying a seal coat and then restriping. Location This project is located at various Town-owned parking lots in downtown Los Gatos. Project Background The public parking lots in downtown Los Gatos are heavily used on a daily basis. In order to keep their surfaces in good condition and prevent long term wear and damage, the parking lots need to be resurfaced and restriped. This project is necessary to prevent possible drainage or broken pavement problems in the future. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-41 Project Components & Estimated Timeline Winter 2017 Preliminary Design Project design & development Spring 2018 Final Design Project bidding & contract award Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ 24,915$ 75,085$ -$ 75,085 -$ -$ -$ -$ 100,000$ TOTAL SOURCE OF FUNDS -$ 24,915$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 24,915 75,085 - 75,085 - - - - 100,000 TOTAL GFAR -$ 24,915$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ TOTAL USE OF FUNDS -$ 24,915$ 75,085$ -$ 75,085$ -$ -$ -$ -$ 100,000$ DOWNTOWN PARKING LOTS SEAL COAT & RESTRIPING Project 817-0705 PROPOSED STREETS PROGRAM Street Improvements C-42 Project Name Hernandez Avenue Storm Drain Improvements Project Number 816-0409 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will improve the Hernandez Avenue storm drain system with the installation of an underground storm drain pipe and sidewalk above. Location The storm drain project is located on the south side of Hernandez Avenue, between Walnut Avenue and Wissahickon Avenue. Project Background Hernandez Avenue is a hillside collector street with an incomplete sidewalk network and storm drain systems alongside the roadway. This street averages over 1,000 vehicles per day, a normal amount for a collector street. At previous neighborhood meetings, residents indicated an interest in having continuous sidewalks, particularly in the area where an open storm drain exists. This project proposes to install an underground storm drain pipe into the existing ditch and put a concrete sidewalk, curb, and gutter system along the roadway to feed runoff water into the storm drain pipe. This street improvement addresses several neighborhood needs, including an improved drainage system, a safer pedestrian area, and an improved appearance of the neighborhood. This project will be funded by the Storm Basin Fund. This project is scheduled for FY 2021/22. Operating Budget Impacts Ongoing operating costs would be significantly reduced as this project would eliminate the need to clean or repair the existing open ditch. Engineering staff time associated with these projects will be charged to the project as it is delivered in FY 2021/22. L O S G A T O S - S A R A T O G A R D HWY 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V PROPOSED STREETS PROGRAM Street Improvements C-43 Project Components & Estimated Timeline Fall 2020 Design Design project, include alternative methods and estimated costs, and determine best outcome Winter 2021 Bid Process Obtain bids from licensed contractors and submit to Council for approval Summer 2021 Construction Construction of storm drains and related street improvements Fall 2021 Completion Project completed Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #3 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL SOURCE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #3 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 17,180 - - - - - - - 65,000 82,180 TOTAL STORM BASIN 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ TOTAL USE OF FUNDS 17,180$ -$ -$ -$ -$ -$ -$ -$ 65,000$ 82,180$ HERNANDEZ AVENUE STORM DRAIN IMPROVEMENTS Project 816-0409 PROPOSED STREETS PROGRAM Street Improvements C-44 LO S G A T O S B L V D BLOSSOM HILL RD SHANNO N R D Project Name Blossom Hill Road/Cherry Blossom Lane Intersection Improvements Project Number 813-0212 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will install a new traffic signal and reconfigure this intersection to improve flow of vehicle, bicycle, and pedestrian traffic. Location This project is located at the intersection of Blossom Hill Road and Cherry Blossom Lane. Project Background In 2011, the Town conducted safety improvements on Blossom Hill Road from Cherry Blossom Lane to Camino del Cerro. This project was funded by Town Traffic Mitigation funds along with funding received from the State of California’s Safe Routes to School grant. The improvements from the first phase of the project included: reconfiguration of the crosswalks at Blossom Hill Road and Cherry Blossom Lane, widening of Blossom Hill Road from Cherry Blossom Lane to Camino del Cerro, construction of bicycle lanes on a section of Blossom Hill Road, construction of sidewalks on a section of Blossom Hill Road, and construction of a lighted crosswalk across Blossom Hill Road. The final phase of this project will replace the existing traffic signal system at the intersection of Blossom Hill Road and Cherry Blossom Lane. Additionally, this project will reconfigure this intersection to improve its operations for vehicles, pedestrians, and bicyclists. Operating Budget Impacts This project was recommended within the study of traffic around schools and is consistent with the Town’s Bicycle and Pedestrian Master Plan. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-45 Project Components & Estimated Timeline Fall 2018 Design Project design & development Winter 2018 Bid Process Project bidding & contract award Spring 2019 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ TOTAL SOURCE OF FUNDS -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 500,000 - 500,000 - - - - 500,000 TOTAL TRAFFIC MITIGATION -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ TOTAL USE OF FUNDS -$ -$ 500,000$ -$ 500,000$ -$ -$ -$ -$ 500,000$ BLOSSOM HILL ROAD / CHERRY BLOSSOM LANE INTERSECTION IMPROVEMENTS Project 813-0212 PROPOSED STREETS PROGRAM Street Improvements C-46 HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name 224 West Main Property Acquisition (Parking Lot 6) Project Number 817-0704 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project, carried forward from previous years, allocates funding from the GFAR Parking Reserve for the purchase of property (formerly 224 West Main Street) for Parking Lot 6. Location This project is located at Parking Lot 6, which is at 224 West Main Street. Project Background In 2009, the Town purchased a property next to Parking Lot 6 to expand the existing parking lot. This property was purchased by Town Housing/Redevelopment Agency (RDA) funds. Because the State dissolved redevelopment agencies, it is necessary that the Town use an alternative funding source for this purchase if affordable housing is not constructed at this site. Reserve funds for GFAR are identified for this use. Staff is recommending proceeding with the transfer of funds in the FY 2018/19 budget to complete this action. Operating Budget Impacts This project would use staff time for processing of the new property purchase. The staff time for this project is included in the FY 2018/19 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-47 Project Components & Estimated Timeline Summer 2018 Estimated Completion Property purchase and funding completed. Prior Yrs Actuals 2017/18 Adjusted 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 5,375$ 1,194,625$ 18,625$ 1,176,000$ 38,913$ 1,214,913$ -$ -$ -$ -$ 1,238,913$ TOTAL SOURCE OF FUNDS 5,375$ 1,194,625$ 18,625$ 1,176,000$ -$ -$ -$ -$ -$ -$ 1,238,913$ Prior Yrs Actuals 2017/18 Adjusted 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - - Consultant Services - - - - - - - - - - - Project Construction Expenses 5,375 1,194,625 18,625 1,176,000 38,913 1,214,913 - - - - 1,238,913 TOTAL GFAR 5,375$ 1,194,625$ 18,625$ 1,176,000$ 38,913$ 1,214,913$ -$ -$ -$ -$ 1,238,913$ TOTAL USE OF FUNDS 5,375$ 1,194,625$ 18,625$ 1,176,000$ 38,913$ 1,214,913$ -$ -$ -$ -$ 1,238,913$ 224 WEST MAIN PROPERTY ACQUISITION (PARKING LOT 6)Project 817-0704 PROPOSED STREETS PROGRAM Street Improvements C-48 LOS G A T O S B L V D BLOSSOM HILL RD SHANNON R D Project Name Sidewalk Improvements/Shannon/Los Gatos Blvd/Cherry Blossom Lane Project Number 813-0218 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb and gutter along the north side of Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane, completing the pedestrian link between the two roads. Location The project is located on Shannon Road between Los Gatos Boulevard and Cherry Blossom Lane. Project Background Shannon Road is a heavily traveled two-lane roadway, especially when the schools are in session. Shannon Road is used by residents dropping off students at various schools, such as Blossom Hill Elementary, Van Meter Elementary, and Fisher Middle Schools. In addition, many parents walk their children to school along this segment of roadway. Shannon Road currently has intermittent sections of sidewalk on the south side of the roadway between Los Gatos Boulevard and Cherry Blossom Lane. Most pedestrians cross Shannon Road to walk along the south side, while some walk along the unimproved shoulder on the north side. This project will complete the sidewalk segment on the north side of the roadway and reduce congestion at Shannon Road and Cherry Blossom Lane, where a 3-way stop is inundated by crossing students, crossing guards, and vehicle traffic during peak school hours. With the proposed sidewalk, pedestrians will be encouraged to walk along the north side of Shannon Road, thus reducing the number of pedestrians crossing Shannon Road. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2018/19 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-49 Project Components & Estimated Timeline Fall 2018 Design Project design & development Winter 2018 Bid process Project bidding & contract award Spring 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ TOTAL SOURCE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed $ - USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 104 - 129,896 - 129,896 - - - - 130,000 TOTAL GFAR 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ TOTAL USE OF FUNDS 104$ -$ 129,896$ -$ 129,896$ -$ -$ -$ -$ 130,000$ SIDEWALK IMPROVEMENTS/SHANNON/LOS GATOS BLVD/CHERRY BLOSSOM LANE Project 813-0218 PROPOSED STREETS PROGRAM Street Improvements C-50 LO S G A T O S B L V D KENNE D Y R D SHANNO N R D Project Name Stonybrook & Kennedy Road Sidewalk Improvements Project Number 813-0219 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will remove a failing wooden sidewalk along Kennedy Road between Stonybrook Road and Longmeadow Drive and replace with new concrete sidewalk, retaining wall, curb, gutter, drainage improvements, and ADA ramps. Location This project is located on Kennedy Road between Stonybrook Road and Longmeadow Drive. Project Background The existing elevated wooden sidewalk was constructed a number of years ago. Over time, the wooden deck has deteriorated with age and has been damaged by termites. The improvements will be made to remove the existing walkway and replace with a concrete sidewalk. The walkway is adjacent to a drainage course and will require a retaining wall element in order for the sidewalk to match the elevation of Kennedy Road. The design of the project began in Winter 2015, and construction is anticipated to follow in FY 2018/19. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with this project will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-51 Project Components & Estimated Timeline Fall 2015 Design Project design & development Spring 2018 Bid process Project bidding & contract award Spring 2018 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 35,511$ 28,357$ 516,132$ -$ 516,132$ -$ -$ -$ -$ 580,000$ TOTAL SOURCE OF FUNDS 35,511$ 28,357$ 516,132$ -$ 516,132$ -$ -$ -$ -$ 580,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 35,511 28,357 516,132 - 516,132 - - - - 580,000 TOTAL GFAR 35,511$ 28,357$ 516,132$ -$ 516,132$ -$ -$ -$ -$ 580,000$ TOTAL USE OF FUNDS 35,511$ 28,357$ 516,132$ -$ 516,132$ -$ -$ -$ -$ 580,000$ STONYBROOK & KENNEDY SIDEWALK IMPROVEMETNS Project 813-0219 PROPOSED STREETS PROGRAM Street Improvements C-52 TOWN-WIDE Project Name Sidewalk Improvements – Multiple Locations Project Number 813-0221 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will construct sidewalk, curb, and gutter on the north side of Kennedy Road from Ferris Avenue to Los Gatos Boulevard and on the south side of Mitchell Avenue from George Street to Fisher Avenue. Location This project is located in the following areas: Kennedy Road from Ferris Avenue to Los Gatos Boulevard; Mitchell Avenue from George Street to Fisher Avenue; and Los Gatos Boulevard/Shannon Road. Project Background Kennedy Road from Ferris Avenue to Los Gatos Boulevard currently has a shoulder that is heavily utilized by parents and students walking and biking to school in the morning and afternoons. The sidewalk improvements will complete the connection in this residential block. In 2009, the Town completed the sidewalk installation on the north side of Mitchell Avenue from George Street to Fisher Avenue. Then in 2012, sidewalk was constructed on north and south side of Mitchell Avenue between Los Gatos Boulevard and George Street as part of the redevelopment of the former Honda site. This project will complete the last component of the sidewalks in this heavily utilized pedestrian area between Van Meter Elementary and Fisher Middle Schools. Operating Budget Impacts Engineering staff time for design and construction of this project will be addressed in the FY 2018/19 Operating Budget. PROPOSED STREETS PROGRAM Street Improvements C-53 Project Components & Estimated Timeline Fall 2018 Design Project design & development Winter 2018 Bid process Project bidding & contract award Spring 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL SOURCE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 60,000 - 60,000 - - - - - TOTAL GFAR -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ TOTAL USE OF FUNDS -$ -$ 60,000$ -$ 60,000$ -$ -$ -$ -$ 60,000$ SIDEWALK IMPROVEMENTS - MULTIPLE LOCATIONS Project 813-0221 PROPOSED STREETS PROGRAM Street Improvements C-54 Project Name LED Streetlights Project Number 813-0224 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project has replaced existing streetlights with new energy efficient LED streetlights. Location This project is located Town-wide for all Town-owned streetlights. Project Background The work to install LED streetlights has been completed. This project remains active to allow for project closeout, including paying for project costs and ensuring applicable rate changes are processed by PG&E. The Town has replaced its low pressure sodium lights because the bulbs are not energy efficient and are costly to repair and maintain. LED streetlights have become a proven technology with demonstrable savings in both operations and maintenance costs. LED streetlights are now the Town standard and are being used throughout the Town as new development occurs. This project has replaced old existing streetlight heads with new LED heads. LED streetlights have three main benefits over traditional low-pressure sodium lights. First, LED lights can appear brighter, creating an increased sense of security. Additionally, LED streetlights are far more energy efficient versus the traditional streetlight bulb. Lastly, LED lights last longer, decreasing the costs for replacement. LED streetlights are more expensive to purchase, however, these costs will be recouped in the form of energy savings within less than four years. Generally, any energy efficiency projects with savings under a seven-year timeframe are highly desirable projects to implement. Operating Budget Impacts This project will result in electricity savings, which is projected at $413,000 over the span of this five- year CIP. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $43,050 or approximately 11% of the total project cost. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-55 Project Components & Estimated Timeline Summer 2015 Design Project design & development Summer 2016 Bid process Project bidding & contract award Summer 2017 Construction Project construction Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR 826$ 395,352$ 108,470$ -$ 108,470$ -$ -$ -$ -$ 504,648$ TOTAL SOURCE OF FUNDS 826$ 395,352$ 108,470$ -$ 108,470$ -$ -$ -$ -$ 504,648$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 826 395,352 108,470 - 108,470 - - - - 504,648 TOTAL GFAR 826$ 395,352$ 108,470$ -$ 108,470$ -$ -$ -$ -$ 504,648$ TOTAL USE OF FUNDS 826$ 395,352$ 108,470$ -$ 108,470$ -$ -$ -$ -$ 504,648$ LED STREET LIGHTS Project 813-0224 PROPOSED STREETS PROGRAM Street Improvements C-56 HW Y 1 7 LO S G A T O S B L V D LOS GA T O S - ALMADEN R D Project Name Utility Undergrounding Improvements Project Number 813-0225 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will remove utilities from above ground poles and install them underground. Location This project is located on Los Gatos Boulevard between Lark Avenue and Chirco Drive. Project Background Through the State of California’s Public Utilities Commission, Pacific Gas & Electric (PG&E) collects funds from ratepayers to provide for the undergrounding of utilities. These funds grow in reserve called Rule 20A funds, until such time that local jurisdictions identify an area for this project and begin working with PG&E. The funds are limited to use on roadways where traffic is heavy, making Los Gatos Boulevard a viable location. The Town’s allocation of Rule 20A funds has grown to the point where there is now approximately $3.8M available for programming. These funds will never actually come to the Town, but rather PG&E will deliver the project with coordination from Town staff. In addition to the Rule 20A funds, the Town collects developer fees for utility undergrounding. These funds are held by the Town for future projects. Staff has asked PG&E to look at an expanded project scope utilizing some or all of the Town funds as well. This will take full advantage of economies of scale through design and construction. The timeframe for PG&E to deliver Rule 20A projects has been between seven and ten years; however, indications are that this project may begin sooner. Funds have been moved to demonstrate a start of construction in FY 2018/19, with the bulk of the work occurring in FY 2019/20. Operating Budget Impacts There will be no Operating Budget impact as a result of this project. Project delivery costs for this project are included in the CIP project’s total cost. Project delivery costs are estimated at $266,000 over the five year term of the project or 4% of the total project cost. Project costs are significantly lower on this project due to the efficiencies in the project size and a larger proportion of work that will be coordinated by PG&E. PROPOSED STREETS PROGRAM Street Improvements C-57 Project Components & Estimated Timeline Fall 2017 Design Project design & development Summer 2019 Construction Project construction begins Summer 2020 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) UTILITY UNDERGROUNDING -$ -$ 112,000$ 2,218,000$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ TOTAL SOURCE OF FUNDS -$ -$ 112,000$ 2,218,000$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) UTILITY UNDERGORUNDING Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 112,000 2,218,000 2,330,000 4,436,000 - - - 6,766,000 TOTAL GFAR -$ -$ 112,000$ 2,218,000$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ TOTAL USE OF FUNDS -$ -$ 112,000$ 2,218,000$ 2,330,000$ 4,436,000$ -$ -$ -$ 6,766,000$ UTILITY UNDERGROUNDING IMPROVEMENTS Project 813-0225 PROPOSED STREETS PROGRAM Street Improvements C-58 Project Name Cut-Through Traffic Mitigation Project Number 813-0229 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will provide infrastructure changes to help mitigate cut-through traffic. Location This project is located Town-wide. Project Background This project aims to mitigate cut-through traffic through the use of various measures, some of which have been previously used. In the summer of 2015, staff implemented various measures such as the deployment of portable message signs, messages on Caltrans changeable message signs, signal modifications, and temporary street closures to reduce cut-through traffic. In the summer of 2016, this project included signal modifications and synchronization at various intersections, roadway markings and additional signage, as well as costs associated with the temporary closure of south Santa Cruz Avenue at Wood Road and associated data collection. In FY 2018/19, funding will be used to advance the design of a permanent traffic circle at Santa Cruz Avenue at Wood Road, potential street closures, and neighborhood turn restriction signage as needed. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-59 Project Components & Estimated Timeline Winter 2017 Design Coordinate and design projects Summer 2018 Construction Install infrastructure and implement projects Fall 2018 Completion Assess Results Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ 149,655$ 63,118$ -$ 63,118$ -$ -$ -$ -$ 212,773$ TRAFFIC MITIGATION 13,695 59,478 46,721 - 46,721 - - - - 119,894$ TOTAL SOURCE OF FUNDS 13,695$ 209,133$ 109,839$ -$ 109,839$ -$ -$ -$ -$ 332,667$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 149,655 63,118 - 63,118 - - - - 212,773 TOTAL GFARS -$ 149,655$ 63,118$ -$ 63,118$ -$ -$ -$ -$ 212,773$ TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 13,695 59,478 46,721 - 46,721 - - - - 119,894 TOTAL TRAFFIC MITIGATIONS 13,695$ 59,478$ 46,721$ -$ 46,721$ -$ -$ -$ -$ 119,894$ TOTAL USE OF FUNDS 13,695$ 209,133$ 109,839$ -$ 109,839$ -$ -$ -$ -$ 332,667$ CUT-THROUGH TRAFFIC MITIGATION Project 813-0229 PROPOSED STREETS PROGRAM Street Improvements C-60 Project Name Traffic Signal Modernization Project Number 813-0227 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will modernize the Town’s traffic signal controllers. Location This project is located Town-wide. Project Background This project will modernize the Town’s traffic signal controllers to allow for greater control by staff, ensure that the current system meets current safety standards, and increase the traffic flow. The Town was awarded several grants through the VTA and the MTC for $1,200,000 of the project budget to complement the Town’s investment of Traffic Impact Mitigation Funds. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-61 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION -$ -$ 177,869$ 177,869$ 355,738$ 324,949$ 415,027$ -$ -$ 1,095,714$ GRANTS & AWARDS 3,375 16,875 1,183,125 376,400 1,559,525$ - - - - 1,579,775 TOTAL SOURCE OF FUNDS 3,375$ 16,875$ 1,360,994$ 554,269$ 1,915,263$ 324,949$ 415,027$ -$ -$ 2,675,489$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATIONS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 177,869 177,869 355,738 324,949 415,027 - - 1,095,714 TOTAL TRAFFIC MITIGATIONS -$ -$ 177,869$ 177,869$ 355,738$ 324,949$ 415,027$ -$ -$ 1,095,714$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 3,375.00 16,875 1,183,125 376,400 1,559,525 - - - - 1,579,775 TOTAL GRANTS & AWARDS 3,375$ 16,875$ 1,183,125$ 376,400$ 1,559,525$ -$ -$ -$ -$ 1,579,775$ TOTAL USE OF FUNDS 3,375$ 16,875$ 1,360,994$ 554,269$ 1,915,263$ 324,949$ 415,027$ -$ -$ 2,675,489$ TRAFFIC SIGNAL MODERNIZATION Project 813-0227 PROPOSED STREETS PROGRAM Street Improvements C-62 Project Name Bicknell Road Storm Drain Improvements Project Number 816-0410 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will reroute a Town storm drain line. Location This project is located on Bicknell Road near Montclair. Project Background This project will provide design services for the rerouting of an existing Town storm drain line from private property, after it was determined that the Town does not have a storm drain easement. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2018/19 Operating Budget. QUI T O R D BICKNELL RD HWY 9 PROPOSED STREETS PROGRAM Street Improvements C-63 Project Components & Estimated Timeline Fall 2017 Design Project design & development Spring 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #3 12,750$ 95,642$ 63,108$ -$ 63,108$ -$ -$ -$ -$ 108,392$ TOTAL SOURCE OF FUNDS 12,750$ 95,642$ 63,108$ -$ 63,108$ -$ -$ -$ -$ 108,392$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #2 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses 12,750 95,642 63,108 - 63,108 - - - - 108,392 TOTAL STORM BASIN 12,750$ 95,642$ 63,108$ -$ 63,108$ -$ -$ -$ -$ 108,392$ TOTAL USE OF FUNDS 12,750$ 95,642$ 63,108$ -$ 63,108$ -$ -$ -$ -$ 108,392$ BICKNELL ROAD STORM DRAIN IMPROVEMENTS Project 816-0410 PROPOSED STREETS PROGRAM Street Improvements C-64 Project Name Bicycle & Pedestrian Improvements Project Number 813-0231 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will enhance bicycle and pedestrian safety and mobility throughout the Town. Location This project is located Town-wide. Project Background This project will enhance bicycle and pedestrian safety and mobility Town-wide in the form of multiple projects. In the first year of funding, the Town Council has prioritized projects that were recommended by Safe Routes to School from the original Traffic Around Schools Study. In future years of funding, staff will continue to work with Safe Routes to School, Town Commissions, the Town Council, and the general public on prioritizing projects that have been recommended in the Council adopted Bicycle and Pedestrian Master plan and priorities identified in FY 2017/18 budget cycle for bicycle and pedestrian projects. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-65 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ 63,700$ 236,300$ 300,000$ 536,300$ -$ -$ -$ -$ 600,000$ TRAFFIC MITIIGATION - - 75,000 - 75,000 - - - - 75,000 TOTAL SOURCE OF FUNDS -$ 63,700$ 311,300$ 300,000$ 611,300$ -$ -$ -$ -$ 675,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 63,700 236,300 300,000 536,300 - - - - 600,000 TOTAL GFAR -$ 63,700$ 236,300$ 300,000$ 536,300$ -$ -$ -$ -$ 600,000$ TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - Consultant Services - - - - - - - - - Project Construction Expenses - - 75,000 - 75,000 - - - - 75,000 TOTAL TRAFFIC MITIGATION -$ -$ 75,000$ -$ 75,000$ -$ -$ -$ -$ 75,000$ TOTAL USE OF FUNDS -$ 63,700$ 311,300$ 300,000$ 611,300$ -$ -$ -$ -$ 675,000$ BICYCLE & PEDESTRIAN IMPROVEMENTS Project 813-0231 PROPOSED STREETS PROGRAM Street Improvements C-66 Project Name Stormwater Master Plan Project Number 816-0413 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will develop a Stormwater Master Plan. Location This project is located Town-wide. Project Background The Town of Los Gatos does not currently have an adopted Stormwater Master Plan. This project will develop a Stormwater Collection System Master Plan and provides the Town of Los Gatos with the necessary planning tools and capital improvement projects to address flood management and water quality within the collector portion of the storm drainage system. The Plan will be developed to help the Town meet its overarching environmental and economic goals. The goal of the Stormwater Master Plan is to manage stormwater runoff proactively to protect water quality and to minimize impacts of localized and downstream flooding by identifying infrastructure improvements for the collection, conveyance, and treatment of stormwater runoff within the Town. The Stormwater Master Plan will prioritize storm drain and water quality improvements within the Town and provides an implementation plan for the construction of conveyance and water quality improvements. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-67 Project Components & Estimated Timeline Summer 2018 Design Develop request for proposals Fall 2018 Bid Process Award consultant agreement Winter 2018 Construction Conduct study Spring 2019 Completion Finalize report Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$ TOTAL SOURCE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ -$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 200,000 - 200,000 - - - - - TOTAL GFAR -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ 200,000$ -$ 200,000$ -$ -$ -$ -$ 200,000$ STORMWATER MASTER PLAN Project 816-0414 PROPOSED STREETS PROGRAM Street Improvements C-68 Project Name Stormwater System – Pollution Prevention Compliance Project Number 816-0414 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will install improvements, such as trash capture devices, to reduce pollution in the storm water solution. Location This project is located Town-wide. Project Background This project will install solutions, such as multiple trash capture devices in storm inlets, throughout the Town to meet the Municipal Regional Permit Provision C.10 trash reduction requirements. The Town has submitted a plan to meet the requirement to reduce trashload impacts to creeks which are: 70% by 2017 and 100% by 2022. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-69 Project Components & Estimated Timeline Summer 2018 Design Project design & development Winter 2018 Bid Process Project bidding & contract award Spring 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 300,000 300,000 - - - - 300,000 TOTAL GFAR -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ TOTAL USE OF FUNDS -$ -$ -$ 300,000$ 300,000$ -$ -$ -$ -$ 300,000$ STORMWATER SYSTEM - POLLUTION PREVENTION COMPLIANCE Project 816-0414 PROPOSED STREETS PROGRAM Street Improvements C-70 Project Name Public Arts Gateway Project Number 821-2009 Department Library Project Manager Library Director: Ryan Baker Description This project will install public art at gateway locations throughout the Town. Location This project is located Town-wide. Project Background The Arts and Culture Commission identified this project as a way to enhance the appearance of the entrances into Los Gatos. At the January 31, 2017 Priority Setting, Council identified $25,000 for public art and on April 18, 2017 the Arts and Culture Commission proposed the gateway project as the best use of the funds, which Council approved. This project will install the first phase of artwork at Town entrances based on the Town’s Public Art Selection Policy and Procedures. Operating Budget Impacts This project will use staff time for construction inspection and management. The staff time for this project is included in the Department’s FY 2018/19 Operating Budget. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-71 Project Components & Estimated Timeline Summer 2018 Call for artist Project design & award Winter 2018 Construction Project construction Spring 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL SOURCE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - 25,000 - 25,000 - - - - 25,000 TOTAL TRAFFIC MITIGATION -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ TOTAL USE OF FUNDS -$ -$ 25,000$ -$ 25,000$ -$ -$ -$ -$ 25,000$ PUBLIC ART GATEWAY Project 821-2009 PROPOSED STREETS PROGRAM Street Improvements C-72 E MAIN ST HWY 1 7 Project Name Jones Road Storm Drain Improvements Project Number 816-0415 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will install new storm piping and a drain inlet on Jones Road. Location This project is located on Jones Road. Project Background The existing storm drain improvements along Jones Road were part of a 1948 subdivision. This portion of the storm drain system accepts Town roadway runoff from Jones Road and empties the water into the Town’s storm system. Currently water from the Jones Road trailhead flows down the street and overwhelms the system, creating ponding and carrying debris to downstream residential residents. Resolution to this issue can be achieved through the installation of new storm piping and a drain inlet on Jones Road. The new infrastructure will capture the stormwater upstream and channel it into the stormy system, relieving the ponding issues that now occur. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-73 Project Components & Estimated Timeline Summer 2018 Design Project design & development Fall 2018 Bid Process Project bidding & contract award Winter 2018 Construction Project construction Spring 2019 Completion Project Completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #2 -$ 18,700$ 2,300$ -$ 2,300$ -$ -$ -$ -$ 18,700$ TOTAL SOURCE OF FUNDS -$ 18,700$ 2,300$ -$ 2,300$ -$ -$ -$ -$ 18,700$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #2 Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - 18,700 2,300 - 2,300 - - - - 18,700 TOTAL STORM BASIN -$ 18,700$ 2,300$ -$ 2,300$ -$ -$ -$ -$ 18,700$ TOTAL USE OF FUNDS -$ 18,700$ 2,300$ -$ 2,300$ -$ -$ -$ -$ 18,700$ JONES ROAD STORM DRAIN IMPROVEMENTS Project 816-0415 PROPOSED STREETS PROGRAM Street Improvements C-74 Project Name Downtown Parking Study Project Number 813-0233 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will fund a consultant to examine parking holistically in the downtown and high school areas. Location This project is located downtown and near Los Gatos High School. Project Background The project scope will include the following: • Analyze existing parking capacity. • Provide a recommendation for residential (permit area parking, especially as it is impacted around Los Gatos High School. • Provide recommendations for parking management for time limited parking. • Analyze paid parking. • Provide best practices recommendations for managing employee parking. • Identify the need for additional parking capacity vis-a-vis a parking structure. • Review the impacts of one-way streets on parking capacity. Operating Budget Impacts This project will use staff time for project management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-75 Project Components & Estimated Timeline Summer 2018 Design Project design & development Summer 2018 Bid Process Project bidding & contract award Summer 2019 Completion Project Completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 200,000 200,000 - - - - 200,000 TOTAL GFAR -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ DOWNTOWN PARKING STUDY Project 813-0233 PROPOSED STREETS PROGRAM Street Improvements C-76 HWY 9 E M A I N S T HW Y 1 7 N S A N T A C R U Z A V UN I V E R S I T Y A V Project Name One-Way Downtown Street Pilot Project Number 813-0234 Department Parks & Public Works Project Manager PPW Director: Matt Morley Description This project will fund the implementation of a one-way streets pilot. Location This project is located downtown on North Santa Cruz Avenue and University Avenue. Project Background This project will fund a trial of one-way streets for North Santa Cruz and University Avenues between Highway 9 and Main Street. Operating Budget Impacts This project will use staff time for management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-77 Project Components & Estimated Timeline Summer 2018 Design Project design & development Summer 2018 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR - - - 130,000 130,000 - - - - 130,000 TOTAL SOURCE OF FUNDS - - - 130,000 130,000 - - - - 130,000 Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits - - - - - - - - - - Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 130,000 130,000 - - - - 130,000 GFAR - - - 130,000 130,000 - - - - 130,000 TOTAL USE OF FUNDS - - - 130,000 130,000 - - - - 130,000 ONE-WAY DOWNTOWN STREET PILOT Project 813-0234 PROPOSED STREETS PROGRAM Street Improvements C-78 Project Name Annual Storm Drain Improvement Project Project Number 816-0414 Department Parks & Public Works Project Manager Assistant Director/Town Engineer: Lisa Petersen Description This project will install infill storm drain systems that are required to enhance safety and improve infrastructure to accept water runoff. Location This project is located Town-wide. Project Background The Town is responsible for keeping Town roads clear of excessive water and managing storm water running down Town streets. Storm drain improvements in the Town right of ways and parking lots are necessary to manage water drainage issues within these Town locations. The intent of this project is to keep pace with the needs of the Town’s storm drain system to prevent flooding in the Town right of ways. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-79 Project Components & Estimated Timeline Summer 2018 Design Project design & development Winter 2018 Bid Process Project bidding & contract award Spring 2019 Construction Project construction Summer 2019 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #1 -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ STORM BASIN #2 - - - 50,000 50,000 50,000 50,000 50,000 50,000 250,000 STORM BASIN #3 - - - 50,000 50,000 50,000 50,000 50,000 50,000 250,000 TOTAL SOURCE OF FUNDS -$ -$ -$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) STORM BASIN #1 Project Construction Expenses - - - 50,000 50,000 50,000 50,000 50,000 50,000 250,000 TOTAL STORM BASIN #1 -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ STORM BASIN #2 Project Construction Expenses -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ TOTAL STORM BASIN #2 -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ STORM BASIN #3 Project Construction Expenses -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ TOTAL STORM BASIN #3 -$ -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$ TOTAL USE OF FUNDS -$ -$ -$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 750,000$ ANNUAL STORM DRAIN IMPROVEMENT PROJECT Project 816-0412 PROPOSED STREETS PROGRAM Street Improvements C-80 Project Name Pilot School Busing Program Project Number 812-0128 Department Parks & Public Works Project Manager Transportation & Mobility Manager: Ying Smith Description This project will explore congestion relief through piloting school bus service. The pilot school bus service will provide morning and afternoon routes to and from school, with neighborhood-based stops. Vehicles and drivers would meet Federal, State and industry-best-practice safety standards. The Town will contract the service to a qualified school bus transportation provider through a RFP process. The service schedule and designated pick up and drop off locations will be published. Interested families may purchase an annual pass to reserve a seat. The pilot program will provide two routes for a total of 24 months. Location This project is located Town-wide. Project Background The Town of Los Gatos and the school community have been exploring new transit services customized to meet the needs of students traveling to and from schools. The primary areas of interest are corridors with the highest level of traffic congestion. Town staff and a consulting team are working on a Congestion Relief School Bus Feasibility Study, which will be completed in the fall of 2019. Based on surveys with the school families and community input, staff is recommending a Pilot Service starting in January 2019. Operating Budget Impacts Funding would come from Transportation Fund for Clean Air grant (pending), Town sources as well as fees from parents / guardians whose students utilize the service. This project will use staff time for service design. PPW staff time associated with these projects will be charged to the project as it is delivered. TOWN-WIDE PROPOSED STREETS PROGRAM Street Improvements C-81 Project Components & Estimated Timeline Summer 2018 Design Service plan design, marketing, customer sign up Fall 2018 Bid Process RFP & service contract award, finalize service plan Spring 2019 Construction Service Launch Winter 2020 Completion Completion of total 2 years (24 mo.) of service Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) GFAR -$ -$ -$ 80,600$ 80,600$ 161,200$ 311,880$ -$ -$ 553,680$ GRANTS & AWARDS - - - 30,000 30,000$ 60,000 30,000 - - 120,000 TOTAL SOURCE OF FUNDS -$ -$ -$ 110,600$ 110,600$ 221,200$ 341,880$ -$ -$ 673,680$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) GFAR Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 80,600 80,600 161,200 311,880 - - 553,680 TOTAL GFAR -$ -$ -$ 80,600$ 80,600$ 161,200$ 311,880$ -$ -$ 553,680$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 30,000 30,000 60,000 30,000 - - 120,000 TOTAL GRANTS & AWARDS -$ -$ -$ 30,000$ 30,000$ 60,000$ 30,000$ -$ -$ 120,000$ TOTAL USE OF FUNDS -$ -$ -$ 110,600$ 110,600$ 221,200$ 341,880$ -$ -$ 673,680$ PILOT SCHOOL BUSING PROGRAM Project 812-0128 PROPOSED STREETS PROGRAM Street Improvements C-82 LO S G A T O S B L V D HW Y 1 7 N S A N T A C R U Z A V BLOSSOM H I L L R D SHANN O N R D UN I V E R S I T Y A V Project Name Highway 17 Bicycle & Pedestrian Bridge Preliminary Design Project Number 818-0803 Department Parks & Public Works Project Manager Transportation & Mobility Manager: Ying Smith Description This project will fund the conceptual engineering for a potential bicycle and pedestrian bridge. Location This project is located at Blossom Hill Road or Nino Way over Highway 17. Project Background Crossing Highway 17 in the project vicinity is a barrier for bicyclists and pedestrians. This is a suggested path included in the Safe Routes to School Phase 1 Study. Improvements for Highway 17 crossing have been included in several policy documents. The Bicycle and Pedestrian Master Plan (BPMP) identified the Nino Avenue Bridge over Highway 17 as one of the new bike/pedestrian bridge connections. The Town’s General Plan identified widening the Blossom Hill Road Bridge over Highway 17 for bicyclists and pedestrians. The project is also included in the Traffic Impact Mitigation Fee program and the Town’s submittals to the VTA’s Valley Transportation Plan 2040. Implementing long-term and complex capital projects requires a strategic financing plan. Obtaining the first round of funding at the critical time is the key to initiate the process. Most funding programs either require or prioritize projects that are “shovel ready.” This funding allocation will advance the project to enable greater competition for funding of later phases. In future years, additional funds will be needed for environmental clearance, right-of-way, and final design. It is estimated that additional $800,000 will be required to complete all engineering and design work, over approximately three to five years. The construction cost will be in the $5 to $10 million range. Completing the first step would enhance the Town’s access to a combination of funds available through competitive opportunities. Operating Budget Impacts This project will use staff time for construction inspection and management. Engineering staff time associated with these projects will be charged to the project as it is delivered. PROPOSED STREETS PROGRAM Street Improvements C-83 Project Components & Estimated Timeline Summer 2018 Design Project design & development Spring 2023 Bid Process Project bidding & contract award Summer 2023 Construction Project construction Summer 2024 Completion Project completion Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project SOURCE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION -$ -$ -$ 147,005$ 147,005$ -$ -$ -$ -$ 147,005$ GRANTS & AWARDS - - - 52,995 52,995$ - - - - 52,995 TOTAL SOURCE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ Prior Yrs Actuals 2017/18 Estimated Estimated Carryfwd 2018/19 New Funding 2018/19 Budget 2019/20 Proposed 2020/21 Proposed 2021/22 Proposed 2022/23 Proposed Total Project USE OF FUNDS to 2018/19 (with Carryfwd) TRAFFIC MITIGATION Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 147,005 147,005 - - - - 147,005 TOTAL TRAFFIC MITIGATION -$ -$ -$ 147,005$ 147,005$ -$ -$ -$ -$ 147,005$ GRANTS & AWARDS Salaries and Benefits -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Services/Supplies/Equipment - - - - - - - - - - Site Acquisition & Preparation - - - - - - - - - - Consultant Services - - - - - - - - - - Project Construction Expenses - - - 52,995 52,995 - - - - 52,995 TOTAL GRANTS & AWARDS -$ -$ -$ 52,995$ 52,995$ -$ -$ -$ -$ 52,995$ TOTAL USE OF FUNDS -$ -$ -$ 200,000$ 200,000$ -$ -$ -$ -$ 200,000$ HIGHWAY 17 BICYCLE AND PEDESTRIAN BRIDGE Project 818-0803 PROPOSED STREETS PROGRAM Street Improvements C-84