Loading...
Attachment 2d COMPLETED CIP PROJECTS FY 2017/18 A-15 A Pageant Way Parking Lot Reconstruction B Bicycle and Pedestrian Master Plan C Blossom Hill Park Little League Backstop D Tennis Courts repairs – Various Town Parks E Tiburon CAD/RMS Upgrade L O S G A T O S - S A R A T O G A R D LO S G A T O S B L V D E M A I N S T HW Y 1 7 HW Y 1 7 N S A N T A C R U Z A V WIN C H E S T E R B L V D BLOSSOM HILL RD LO S G A T O S B L V D HW Y 8 5 KENNE D Y R D SHA N N O N R D LA R K A V UN I V E R S I T Y A V WEDGEWOO D POLLARD R D C KNOWLES A B, D AND E ARE TOWN-WIDE PROJECTS COMPLETED CIP PROJECTS FY 2017/18 A-16 A Pageant Way Parking Lot Reconstruction Pageant Way Parking Los Reconstruction This project reconstructed the existing parking lot on Pageant Way The original lot was in a failing state due to storm drainage issues, tree root upheaval, and general wear. Through this project, an evaluation of the electrical panel in the parking lot was completed and an expenditure of $1,437 allowed for retention of the exiting panel. The total project cost was approximately $216,437 C Blossom Hill Park Little League Backstop Blossom Hill Park Little League Backstop This project replaced the outdated backstop at the Blossom Hill Park baseball field in partnership with the Los Gatos Little League. The total project cost was approximately $101,000. B Bicycle and Pedestrian Master Plan Bicycle and Pedestrian Master Plan This project developed a Bicycle and Pedestrian Master Plan which provides a roadmap for enhancing bicycle and pedestrian mobility throughout the Town. Additionally, the plan allows the Town to compete more successfully for a range of regional and State grant funds for bicycle and pedestrian related improvement projects. The total project cost was approximately $110,000. COMPLETED CIP PROJECTS FY 2017/18 A-17 D Tennis Courts Repairs – Various Town Parks Tennis Courts Repairs – Various Town Parks This project resurfaced and applied color finish and lines atop the existing tennis courts at Blossom Hill and La Rinconada Parks. The total project cost was approximately $48,000. E Tiburon CAD/RMS Upgrade Tiburon CAD/RMS Upgrade This project completed upgrade of the Police Tiburon Computer Aided Dispatch and Records Management System (CAD/RMS). The total project cost was approximately $70,000. A-18