Loading...
1990-212-Approval Of A Five-Year Time Extension To A Previous Approval For Construction Of A Electrical Substation On Property Located In The CM ZoneRESOLUTION 1990 -212 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DENYING APPEAL OF PLANNING COMMISSION APPROVAL OF A FIVE -YEAR TIME EXTENSION TO A PREVIOUS APPROVAL FOR CONSTRUCTION OF AN ELECTRICAL SUBSTATION ON PROPERTY LOCATED IN THE CM ZONE (14750 Winchester Boulevard - Pacific Gas & Electric) WHEREAS: A. Thelma Spaziani, on behalf of the Charter Oaks Townhouse Association, had filed an appeal of a decision of the Planning Commission as follows: approval of a five -year time extension to a previous approval for construction of an electrical substation on property located in the CM Zone on property located at 14750 Winchester Boulevard and owned by Pacific Gas & Electric (Conditional Use Permit U- 75 -413); and B. A public hearing was held by the Town Council on October 1, 1990; and C. Thelma Spaziani, on behalf of the Charter Oaks Townhouse Association, requested withdrawal of the appeal; and D. Burt Click took the position of appellant to request particular conditions be added to the Conditional Use Permit; and BE IT RESOLVED: A. The Town Council hereby finds that no evidence or testimony was presented that the decision of the Planning Commission was in error. B. The Town Council hereby further finds that the Planning Commission was correct in requiring that a supplemental environmental impact report be done. C. The Town Council hereby further makes the following findings for the granting of a conditional use permit pursuant to Zoning Ordinance Section 5.20.210: 1. The proposed use is essential and desirable to the public convenience and welfare in that it will be a source of needed electrical power. 2. The proposed use will not impair the integrity of the zone as adequate measures will be taken to mitigate hazardous materials and noise impacts and the existing landscaping will be enhanced. 3. The project will not be detrimental to the public health, safety or general welfare because appropriate safety measures are being taken and all applicable local, state and federal laws will be adhered to. 4. The use is in harmony with the various elements and objectives of the General Plan and purposes of the Zoning Ordinance and is an appropriate use in the LM zone. D. Based on the foregoing findings, the request to withdraw the appeal is accepted, the appeal is denied and Conditional Use Permit U -75 -413 is hereby granted subject to the following conditions: TO THE SATISFACTION OF THE PLANNING DIRECTOR: 1. A comprehensive landscape plan shall be submitted for the site. Any new landscaping required to be planted by staff shall be installed by June 30, 1991. 2. The latest starting date for Phase four (substation construction) is extended to September 1, 1995, with a conditional five -year extension possible at that time, but no further extension after that. 3. An Architecture and Site Application shall be filed for the substation to allow Planning Commission review. 4. Additional sound barriers are required along the easterly property line bordering the Charter Oaks Condominiums at the time the substation is constructed. A noise analysis shall be submitted at the time an Architecture and Site application is filed. 5. P.G. & E. shall restrict the operation of heavy equipment within the site to the hours of 7:00 a.m. and 6:00 p.m. (this includes Davey Tree operations) with exception that operation of the tree chopping operation may operate outside those hours during emergency situations only, subject to Town staff approval that an emergency does exist. 6. A Supplemental Environmental Impact Report will be required to address the electromagnetic field health issue and other issues that may have changed since the first EIR was submitted. The supplemental EIR shall be required as part of the Architecture and Site Application or when a request is submitted for another time extension beyond 1995. LK07111QIMYVYf .`IWITOI16IM9]AM Mal M11811A S AM lei el01;A 7. The applicant shall enter into a new agreement providing for the undergrounding of overhead utilities on Winchester Boulevard from Lark Avenue to the north property line. Undergrounding is to be done at the time the substation is constructed, or by September 1, 2000, whichever occurs first. Pursuant to Los Gatos Town Code Section 1 -15, the time for seeking judicial review for the Town Council decision is governed by California Code of Civil Procedure Section 1094.6. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 15th day of October, 1990, by the following vote. Vote. COUNCIL MEMBERS: AYES: Joanne Benjamin, Eric D. Carlson, Brent N. Ventura Mayor Thomas J. Ferrito NAYS: NONE ABSENT: Robert L. Hamilton a: \cnc1rpts\pge.tcr