Loading...
1990-073-Enter Agreement With Safety Specialists, Inc.RESOLUTION 1990 - 73 RESOLUTION AUTHORIZING THE INTERIM TOWN MANAGER TO ENTER INTO AGREEMENT WITH SAFETY SPECIALISTS, INC. FOR MONITORING WELL INSTALLATION AND HYDROGEOLOGIST INVESTIGATION - BILLY JONES RAILROAD BE IT RESOLVED that the Town Council of the Town of Los Gatos, County of Santa Clara State of California, enter into an agreement with Safety Specialists, Inc. for monitoring well installation and hydrogeologist investigation at Billy Jones Railroad and that the Interim Town Manager is authorized, and is hereby directed, to execute said agreement in the name and in behalf of the Town of Los Gatos. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 19th day of March, 1990, by the following vote: COUNCIL MEMBERS: AYES: Joanne Benjamin, Eric D. Carlson, Robert L. Hamilton, Brent N. Ventura Mayor Thomas J. Ferrito NAYS: None ABSENT: ABSTAIN: SIGNED: MAYOR OF THE T LOS GATOS, CA ATTEST: CLERK OF THE TOWN OF LO StfCj °ATOS LOS GATOS, CALIFORv1A a: \AMRTS AJ OF LOS GATOS SAFETY SPECIALISTS, Inc. March 12, 1990 Mr. Mike LaRocca Town of Los Gatos P.O. Box 949 Los Gatos, CA. 95031 P.O. Box 4420, Santa Clara, CA 95054 Telephone (408) 988-1 ? 11 Contractor's License No 460905 TOWN CLERK AGR:- qL/" (!1:'i: _ LLD Reference: Safety Specialists, Inc., Project Number 530135 Dear Mr. LaRocca: Following our meeting of March 8, 1990 with you and Mr. Bob Bryant, we are updating and formalizing our proposal for enginering services related to monitoring an oil spill at the Billy Jones Wildcat Railroad site in Oak Meadow /Vasona Parks, Los Gatos, California. SCOPE OF WORK The scope of work has been carefully delineated in a Technical Report Proposal dated November 27, 1989 (Proposal Number P- 742 -89a), and a Site Assessment Work Plan Addendum dated January 19, 1990 (Project Number 530135). Copies of these documents are attached. These documents are hereby incorporated into our Scope of Work by reference. The most current Site Plan is also enclosed. The work schedule is included in the Work Plan. Basically, we will require 8 weeks from the date of your Purchase Order to complete the work. If this does not meet the time constraints imposed by the Santa Clara Valley Water District, it will be the responsibility of Town of Los Gatos to obtain any necessary time extensions. We also request assistance from Town of Los Gatos for the following: 1. As discussed previously, please survey in and establish a benchmark on the northern side of the manhole rim just northeast of the maintenance building. 2. Please have your personnel backfill and compact soil in the existing pit northwest of the maintenance building, to facilitate our drilling operations in this area. 3. Please move all drums in the yard north of the maintenance building. They can be moved immediately adjacent to the building. 4. Rather than try to move our drilling equipment through the existing gate (it is too narrow and too close to the building), please Town of Los Gatos Project Number 530135 March 12, 1990 Page 2 remove the next section of fencing on the east side of the storage yard. Also, please arrange for fence replacement after our work is completed. 5. We will start drilling the most southerly holes first. We would like to have County Park maintenance people meet with us on the first day of drilling, so we can show them some brush and tree limb clearing that is necessary at the northerly monitoring well. COMPENSATION The work described in the Work Plans will be performed for a lump sum fee of $12,500.00. In the event that a change in the Scope of Work is required, a corresponding change in the project cost shall also be negotiated. Safety Specialists, Inc., will invoice upon completion of the project. All invoices are due Net 10 days, upon credit approval. Agreement An authorizing signature below represents an agreement for Safety Specialists, Inc., to perform the services as stated above and acceptance of the terms herein. A signed copy of this document and /or your company purchase order must be received before work will be scheduled. TOWN OF LOS GATOS FETY PEC LISTS I C. i BY: h. BY: L TITLE: Interim Tbwn n;49 TITLE: ,. DATE: 31 -2 -.,I-t o DATE: — -`Z Safety Specialists, Inc., appreciates your confidence in our abilities. The proposed project is within Safety Specialists, Inc.'s, normal scope of business and can be performed in a routine manner. Do not hesitate to contact me, if you have further questions. Sincerely, SAFETY SPECIALISTS, INC. & f Kenneth L. Meleen, P.E. Group Manager Environmental Management Division KLM:chs SAFETY SPECIAIPSTS, Inc