Loading...
Staff Report PREPARED BY : YING SMITH Transportation and Mobility Manager Reviewed by: Town Manager, Assistant Town Manager, Town Attorney, Finance Director, and Parks and Public Works Director 110 E. Main Street Los Gatos, CA 95030 ●A 40 8 -354 -68 32 www.losgatosca.gov TOWN OF LOS GATOS COUNCIL AGENDA REPORT MEETING DATE: 06/05 /201 8 ITEM NO: D ATE : MAY 2 9 , 2018 TO : MAYOR AND TOWN COUNCIL FROM: LAUREL PREVETTI, TOWN MANAGER SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE RECOMMENDATION : Staff recommends that the Town Council a uthorize staff to proceed with a school bus pilot program targeting a January 201 9 start date . EXECUTIVE SUMMARY When Measure B was initially proposed, the Town Council identified potential projects that should be included with the funding measure with p articular priority placed on a school bussing program modeled after the TRAFFIX program in Contra Costa County. Since this priority was identified, t he Town and the school community have been exploring new transit services customized to meet the needs of students traveling to and from schools. The primary areas of potential program formulation are corridors with the highest level of traffic, with congestion relief being a major measure of success. A significant amount of stakeholder outreach and analys is has gone into development of a pilot program in acknowledgement of the sensitivity around transporting children to and from school. A stakeholder group made up of representatives from the Los Gatos -Saratoga Union High School District, the Los Gatos Uni on Elementary School District, the Los Gatos -Monte Sereno Safe Routes to School Coalition, and the Transportation and Parking Commission participated in the process to date. Through this work, staff was encouraged by the interest and support of potential customers. PAGE 2 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM EXECUTIVEASUMM RYA(cont’d): Staff is recommending moving forward with the pilot project ; however, as this report details, getting prospective customers from the point of having interest in a program to actually riding a bus and paying a r easonable price for the service can be very difficult. Initial ly, staff considered piloting a small program with just a couple of routes, using the limited supply of seats to create interest through unmet demand. As the varying service needs of custome rs became more clear through the stu d y , it may be that the customer base is small due to a limited initial demand resulting from specific preferences of individual families , with some risk that filling two routes may be difficult to achieve. Cost will a lso be an ongoing concern as customers have demonstrated price sensitivity and constraints on gran t resources may create a less viable model. Based on the extensive outreach, staff identified these key findings through the feasibility study: 1. Parent and C ommunity Input: There is overwhelming support for the service in concept. 2. Ridership Demand: Enough potential demand for a small pilot program exists. 3. Price Sensitivity: Parents expressed a high level of price sensitivity. 4. Financial Feasibility: Fare revenue will not be sufficient to offset the total cost of the service, meaning additional revenue will be needed for the pilot and long -term services. BACKGROUND: The Town of Los Gatos and the school community have been exploring new transit services cu stomized to meet the needs of students traveling to and from schools. The primary areas of interest are corridors with the highest level of traffic , with congestion relief being the major measure of success. The Council approved $50,000 in Fiscal Year 20 17/18 for a Congestion Relief School Bus Feasibility Study. Town staff and a consulting team, School Bus Consultants (SBC), kicked off the study in October 2017 . Through the feasibility study, the t eam completed two parent surveys (Attachments 1 and 3), conducted focus group meetings (Attachment 2), and provided messages and updates on the s tudy’sAwebpage,A throughAtheATown’sAsocialAmediaAplatform , and through the school s’ newsletter s . The t eam received extensive input from the parents and community. In addition, the s tudy t eam conducted research o n similar programs being provided by other agencies, including Hillbrook School in Los Gatos, TRAFFIX bus service in the Danville -San Ramon area, Lamorinda in Lafayette, Moraga and Orinda , and several programs i n Marin County. PAGE 3 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM DISCUSSION : Through the outreach, staff explored several topics important to the future of a bus program. Service Model During the study process, staff considered and presented a few service delivery options, including the school bus service, leveraging VTA service for a school route, and a private provider youth shuttle service. These service options are subject to different regulations and requirements and are varied in cost. Based on the input from potential customers, the only o ption that proved viable was the “yellow school bus model ”,AwhichAisAaAserviceAthatAmeetsAallA the Federal and State student transportation requirements . The yellow school bus provides the highest of driver and safety standards and helps parents feel comfo rtable with the service. Actual service providers vary throughout the state and include school districts, transit agencies, and service specific joint powers authorities. One attractive element for parents are the safety features built into a school bus model. For example, i nput on a seat belt requirement received much discussion. Based on additional research on the State requirements and comparing peer agency experiences, s taff concluded that this is a feature that should and can be included. Other important factors include driver training and vehicle safety inspections. Pay per Ride v ersu s Subscription -Based Although up to 80% of the interested parents prefer a service schedule aligned with bell times, many survey respondents expressed their desire to have flexibility in the schedule, such as choosing to participate in morning or afternoon only, deviation from bell times to accommodate after school activities, pay ing only for the rides taken, etc. A key to the financial success of a program is pre dictability in filling a bus , which will result in congestion relief and fare revenue . Although the desire for a pay as you ride service is understandable, this does not provide for the budgetary planning necessary to run a successful program and no such model has been implemented in any of the jurisdictions with similar busing models. Fare Structure and Cost Sharing Like other models in the Bay Area, th e Los Gatos pilot would also be funded by three sources: fare revenue, grants, and potential Town sub sidy. A detailed discussion of potential Town subsidy is discussed later in the Fiscal Impact section of th is report. PAGE 4 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM DISCUSSIONA(cont’d): Typically, public agencies consider several factors in establishing the fare structure for public - funded bus services,AincludingAcustomers’ApriceAsensitivity,AcostAandArevenue,AandAtheAfaresA charged by similar services. Through the survey, respondents identified the maximum price they are willing to pay with sufficient data for a price sensitivity analysis. St aff concluded that a base fare of $350 annually will produce the maximum fare revenue while still attracting a requisite amount of committed ridership of 65 passengers per route . Price sensitivity is a dynamic factor and will likely change over time as the program is initiated and evolves . With a full school bus, staff estimates the total annual cost of providing service at $1,700 per rider , making the proposed base fare a significant discount on the cost of service . If the buses are not full, the actu al cost of the program on a per rider basis increases. Staff reviewed the fare structures of peer agencies. Base fares of comparable programs are provided in T able 1 below. Table 1 - Fare Comparison Service Annual Pass Mill Valley $625 Ross Valley $750 Tiburon and Belvedere $590 Lamorinda $492 TRAFFIX $335 For the pilot service, staff is recommending a base fare of $180 for the January through June 2019 program (one half of the school year) and $350 annually starting in August 2019. Within th e proposed pilot project financing plan, grants are expected ultimately to play a significant role. Staff has applied for a Transportation Fund for Clean Air (TFCA) grant in the amount of $120,000. In addition, Measure B funding will potentially be instr umental in reducing the startup costs of the program. Any grant funds not received would require the Town or riders to fund the balance. Staff believes the pilot program is competitive for non - Town funding due to its benefits in congestion relief and emi ssion reduction. However, it should be noted that during early discussions with VTA, staff has not received positive feedback on the eligibility for Measure B funding. Although that work is still in progress, it may ultimately require the expenditure of r egional political capital to achieve success. PAGE 5 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM DISCUSSIONA(cont’d): One unanticipated element associated with eligibility for these grants is that the pilot program not be restricted to particular population s . Many parents envisioned the proposed servic e as for school children only. In order to compete for grants, staff is attempting to construct a service model that is eligible for the grant programs while still being suitable and safe for students. The envisioned service design focuses specifically on home -to -school trips , thus mak ing it virtually useless for other purposes. Additionally, t he annual subscription requirement will give the Town information on the passengers, including age, home address and destination school , such that all potential riders are well identified . T he proposed fare structure will also make use by non -students unlikely as the annual unsubsidized subscription will be approximately $1,700. Geographic Considerations The surveys were distributed through the targeted schoo ls includ ing families outside of the Town limits and in C ounty pockets, such as mountain residents and residents of San Jose and Monte Sereno. There are two considerations when evaluating providing service to these areas. The first is focusing on congest ion relief around the schools and if providing service to areas outside Town limits makes sense from the perspective of that goal, it c ould be considered . The other consideration is that the program will likely require a heavy Town subsidy (as discussed b elow) and that the Town should not subsidize service to non -residents. Demand Analysis The concept of congestion relief as the basis for the service has been well received by survey respondents with parents expressing interest for over 1,000 students ac ross an estimated 680 families (see Attachment 1). The second survey targeted this group with the goal of further exploring service components that would influence the decision to participate in the program (see Attachment 3 ). Through the second survey , p arents shared their preference in cost, travel time, walk distance, bus stop locations, and schedule flexibility. Each question helped to refine the potential initial customer base. Parent response to each of these high priority service elements helpe d to identify the likely participation in an actual program. By incorporating the responses to these more refined questions, the likely (orA“amenable”)A customer base decreased to approximately 335 students . PAGE 6 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM DISCUSSIONA(cont’d): The amenable custo mer concept is not exact as there are still likely some who will choose not to participate and others w h o are not in the amenable customers category that will choose to participate. The chart below demonstrates how the various factors influenced a respond ent’sA potential decision to participate in the program or not . The chart simplifies the evaluation a little as the relationships are not as linear as depicted ; however , the end result is informative for the pilot program development . Using these resu lts , t he s tudy t eam mapped the home locations of these students using the addresses provided by the survey respondents . Attachment 3 includes maps showing the concentration of demand. The ideal route size is 65 students, which equals approximately 90% o f the capacity of a school bus and maximizes the program from a congestion relief and cost perspective. With 335 students as prime candidates for participation, creating effective routes becomes difficult as those students are distributed across a number of schools . 1046 335 0 200 400 600 800 1000 1200 Total Students Interested in Service Walk more than 1 block Ride on a bus more than 16 minutes Ride on a schedule aligns with bell times Willing to pay more than $350/year Amenable Population (Students) Amenable Population PAGE 7 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM CONCLUSION AND NEXT STEPS: Staff recommends starting a pilot program with two routes in January 2019 . To implement the pilot service, s taffAwillAundertakeAtwoArelatedAandAparallelAefforts,AoneArepresentsAtheA“demand”A and the other rep resentsAtheA“supply”Aside of the program . On the service demand side, s taff will design up to four routes based on results from the two surveys, taking into consideration congestion relief benefits, ridership potential , and service efficiency. The draft service plan will include routes, schedule, and tentative bus stops. These options will be made available for sign up and potential customers will be able to make a commitment by putting down a deposit. The selection of the routes will be based on custom er commitment. The two routes that best fill buses through sign ups by the schedule deadline would be selected for the pilot. Council will be kept apprised of the sign ups and the final routes for the pilot. The key milestones of this effort will include :  July 30, 2018: Release draft service plan for customer sign up.  July 30 – August 20, 2018: Customer sign up with deposits  August 20 - 30, 2018: Select final routes  September – December 2018: R efine service plan, publish schedule  November – December 2 018: Customer confirmation and receive passes In the meantime, to deliver the supply side , the s tudy t eam will begin preparing a b usiness p lan , including tasks of evaluating service provider options, evaluating staffing options for different function s , re commending best practices , and determining metrics for the evaluation of the pilot . In addition, the b usiness p lan will map out a phasing strategy and propose a potential revenue structure over five years. If the Council concurs with this direction, on a future Council agenda, s taff will bring the Council a contract amendment with SBC to assist in completing the b usiness p lan that will lead to service implementation in 2019 . Ultimately, the Council would also need to approve contracts with the bus serv ice providers , final routes in the pilot, and the fare schedule. The key milestones of this effort will include:  June 2018: Finalize transportation service scope and specifications  June 22 – July 20, 2018: Release Request for Proposal s for a transportatio n service contract  July 20 – August 20, 2018: Proposal evaluation, selection and negotiation  After August 20, 2018: Contract execution  September – December 2018: Selected vendor conducts v ehicle procurement, driver recruitment and training , and facility readiness PAGE 8 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM CONCLUSIONA NDANEXTASTEPSA(cont’d): The schedule to launch the pilot service in January 2019 remains very aggressive, with the tasks of obtaining a service provider and locking in commitments from customers as critical path milestones. If the re are unforeseen challenges in the process, the implementation schedule may be delayed until August 2019. Staff is looking for Council direction on the key topics as discussed above, with particular focus on the program structure, including the potentia l Town subsidy, grants, and fare structure as well as the grant requirements for inclusivity of ridership. COORDINATION: This report was coordinated with the Finance Department, the Stakeholder Group, and the Transportation and Parking Commission . FISC AL IMPACT : Like other models in the Bay Area, this service would also be funded by three sources: fare revenue, grants , and Town subsidy . The service expenditure and revenue are illustrated in Table 2 below. The program reflects a half year program to a lign with the school year with year two increasing to the full school year and year three increasing the number of routes. The costs include an estimate of additional staff time to administer the program equal to approximately 0 .5 FTE, depending on the ac tual classification. In addition, overall management of the program throughAtheApilotAperiodAwillArequireAapproximatelyA40%AofAtheAtimeAforAtheATown’sA Transportation and Mobility Manager . This time would otherwise be spent advancing other projects and se eking grant opportunities. PAGE 9 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM FISC LAIMP CTA(cont’d): Table 2 - Pilot School Bus Program Revenue and Expenditure Expenditure Based on information from peer agencies and potential service provider s , Town staff and consultant estimated the cos t of providing the pilot service. The expenditure s would include transportation service, contract management, customer service, ticket sale, and administration. The cost per route is higher for a small -scale service and would gradually decrease if the se rvice expands. The total cost, including all tasks and functions, will be updated as the t eam gathers and analyzes additional information in the business plan development. Revenue - Fare Establishing a sound fare structure is the key to the financial su ccess of this service. Staff is looking to strike a balance between reasonable share of the total cost and an indication of commitment from the customers. Staff is currently running estimates based on a year 1 fare of $180 per passenger and a fare of $35 0 annually thereafter with the expectation that these price point s would attract on average 65 passengers per route . Revenue - Competitive Funds Competitive f unding sources for providing the congestion relie f school bus service are limited. Staff has ide ntified the Santa Clara County 2016 Measure B and the TFCA as the only two potential source s , based on the current program policies and guidelines. Year 1/2 Year 2 Year 3 Expenses FY18-19 FY19-20 FY20-21 No. of Routes 2 2 4 Total 110,600 $ 221,200 $ 341,880 $ Per route 55,300 $ 110,600 $ 85,470 $ Per passenger (assume 65/route)851 $ 1,702 $ 1,315 $ Revenue FY18-19 FY19-20 FY20-21 Fare Revenue 23,400 $ 45,500 $ 91,000 $ GFAR 57,200 $ 115,700 $ 220,880 $ TFCA 30,000 $ 60,000 $ 30,000 $ Grant - Measure B ------ Other contributions ------ Total 110,600 $ 221,200 $ 341,880 $ Town Fund %52%52%65% PAGE 10 OF 10 SUBJECT: AUTHORIZE STAFF TO PROCEED WITH A SCHOOL BUS PILOT PROGRAM TARGETING A JANUARY 2019 START DATE MAY 29 , 2018 S:\COUNCIL REPORTS \2018 \06 -05 -18 \14 Bus Feasibility Stu dy \Staff Report.FINAL.docx 5/31/2018 9:53 AM FISC LAIMP CTA(cont’d): The TFCA funding of $120,000 to be awarded by VTA in September 2018 may suppleme nt funds for two routes for a total of 24 months. The TFCA grant amount is dependent upon the service’sAcostAeffectivenessAinA the number of reduced automobile trips and vehicle miles travelled resulting from the school bus service. The likelihood of cont inuing to compete well in the TFCA program is largely dependent upon the ridership success of the service. The program will have to compete for future funding every two years as long as this grant program is available. When the Measure B funds become ava ilable, staff will apply for the Innovative Mobility Models and Programs Category fund ing . It is important to note that Measure B is very different from Measure J in Contra Costa County, which includes dedicated funds for the TRAFFIX and Lamorinda service s . In comparison, Measure B has a competitive program in which the proposed service may qualify to compete , but funding is not guaranteed . The pilot may be scalable for future expansion , including future grant funding, d epending on demand and available outside funding. Service scale would depend on ridership, fare revenue , and other revenue sources , including grant funds and contributions from other organizations . The next TFCA cycle will be open in early 2019 and funds will be available in July 2019. The Measure B schedule is less predictable, but funds are likely to be available in the second half of 20 19 . Revenue – Town Sources The proposed FY 20 18 -19 Capital Improvement Program (CIP) Budget includes $80,000 for FY 18/19 for a pilot school bussing program . Additional Town subsidy would need to be discussed annually as part of the budget process. Prior to any additional funding decision, staff will return with the metrics for the Winter/Spring 2019 pilot to assist the Council in determining adjustm ents to fare s, schedule, Town subsidy, etc. ENVIRONMENTAL ASSESSMENT : This is a project defined under CEQA and staff will prepare a CEQA analysis prior to implementation. Attachment s : 1. Survey 1 Final Report 2. Focus Group Service Design Charrette Summary R eport 3. Survey 2 Final Report