Attachment 2AGR LO
IHH.
SECOND AMENDMENT TO AGREEMENT
This SECOND AMENDMENT TO AGREEMENT is dated for identification this 17th day of
January., 2017 and amends that certain agreement for First Amendment to Contracting Agreement
dated December 17, 2015. made by and between the Town of Los Gatos, ("Town,") and Trinity
Source Group, Inc. (-Consultant-)
RECITALS
A. Town and Consultant entered Into a Contracting Agreement on June 18, 2015,
(-Agreemenr), a copy of which is attached hereto and incorporated by reference as
Attachment 2 to this Amendment.
Town and Consultant entered into a First Amendment to Contracting Agreementon
December 17, 2015, (-Agreernenti, a copy of which is attached hereto and incorporated by
reference as Attachment I to this Amendment
Town desires to amend the Contracting Agreement to provide additional compensation for
additional services and extend the term of the agreement.
AMENDMENT
1. Scope of Services, Consultant shall conduct additional environmental consulting services as
described in the Time and Materials Fee Estimate dated November 30, 2016, a copy of which
is attached hereto as Exhibit A and incorporated herein by reference.
2. Compensation is amended to provide an additional amount not to exceed S17,628.
The total CO pensation for the agreement shall not exceed $62,430.
3. Period o f Performance. The term of the Agreement shall he extended to expire on December
31, 2017.
4. All other terms and conditions of the Agreement remain in fUH force and effect.
IN WITNESS WHEREOF. the Town and Consultant have executed this Amendment.
Town of Los Gatos
By:
Laurel Prevetti. To
Trinity Source Group, by:
By:
Dat6mc Q
Name(Title
Page I of 2
irimy Source Group - Second Amendment to Contracting Agieenient
vl"cie-Precido.41--
Recommended by:
Matt Morley
Director of Parks and Public W
Approved as to Form: Attest:
TdiL
Shelley Neis, C, Clerk Administrator
Page 2 of 2
Trinity Source Group. Second Amendment to Contracting Agreement
Mt. alm Harbin
Town M los Galas
CorponGon Yard
41 Mires Ave.
Los Gatos. CA
UST Case Cbawe Status
532.092
Tabio
Tines 4rtd atateriata Fee Estimate
K TA$1(6 MItAPS ANO COST ESTIMATE TOTAL
TASKS 3,0 Grouiliiwater Itomtering Omni -`1..ML nft 470 Wo6s
TASK 10 R.ponnio • 00,4 Gro,+n4wat.r Mon4orey From
CASK 11. 4t1r Grvundwat*r Mor,ttxk 9 Event • 7 lannitrdarIona*
TASK. 1? 1l 1,m1tng•.4tn.0rounAwirfsr Monitoring Event
TASi( 9: 3t4 Groumdwst.r Monitoring Evanl . 7 Monitoring Wails
LABOR i EQ4jrr MEN7
Number Units
0 00 '1R Pritl:fpal Gtaogat
2 00 11 s Sena Geologist
4.00 Mrs Prolecl GaoiogaoStaanost
6.00 lira Star Geologis•ttS:,EnGtt
24,00 lin farad Technician 0.
1,0U Day Mix, Small Tools, Mammas, and Equipment
1400 Each 8s!ier
70 00 Maas Venice - Round Trip Tartar
100 O*y GIS Sampling Pump
1.CCI day Carol IDS pNrnemr
00 oily. Water toast fete.
%CV Day Diswiwo(?Anima!~
a 00 FAO 55-ge;lon drum
7.00
7:05
1.00
1.00
3.00
50000NT.6 MA`.E twa-5
G W Analysts tot Tosco arro Tp4g • ESC E0130
ON Analysis for `ADCs roll trst - ESC. 02449
en charges to" Qrspcoa&. avow
/OtaniDCliv r Pi0SupStarrroe
Drum Disposal
Twnr'CYa1MY40 aw+,a wsw.„T! 30.1141
TRINITY
rasa
SUAalats
55,730
12,419
95.730
53.679
TO4f:........ S17,629
$200
31S0
$124
$99
$63
$15
515
$0.95
316.
25.00
25.0O
25r%0
557
$55
$70
632
$100
50
5360
S4%6
5594.
$1.092
$75
$210
$56.50
515
$25
$25
$25
$171.
$115
$510
nnitairt
EXHIBIT A
7A544 t0: Rsporting <.3rd Geoimdwlw Mop9oan9boob
hurstber Unit
0.5e Virg Pnneipli Gay054t
7.00 Hrs £emr Gedogrst
2.00 His F1FojeeiGedtigaa5cierest
14 00 tfB Staff Ge609.$6'Syierarst
0.00 krs Fend Tecnaselan
5.UV Hrs Meter
0.00 Was'vehicle .•'Round Tap Tama
?A8 (11 4tq Ground*atsr Htoottortrig E09m . 7 Nas*or ng Webs
IneOR 3. EQU0,I(ENT
Number Unns
000 His ?feudal Gea7984
2.00stirs Server Geo1Ogat
4.00. Hrs Project Geotosisb5cernnu
r..00 Hrs Staff GedagisttSct sf st
24.00 '.Hrs Meld Ted`nician It
100 Day 0.03c. Small Tcon. Valerian. and Ebutorstnl
14.00 Each Baler
70 00 Was Venrela • Hayes Trip Trowel
1.03 Rai GW 54eopanq Ponta
1G3 4*y Done '0$pHr-oleo
1,00 der Water I ' Prosser
1.00 Day Dissolves 08y92e Miler
3.03 '0ac5 539e1on whin
SUBCONT. i M&TERIALS
7.00 ea CAN rvwy0a tot TPHd and 7Pf19 • ESC 801581
7.03- ea GW Analysis to( VOCS full ist - ESC 82606.
1.00 ea ESC cnargea far eltsWoael, energy
1 00 es Otun Deeuary4Nciwo Stop Fee
3 00.. ea. Dann 01$yp$H
7ABK 12, Reporttat9.ad, Groundwater II,I ins Ewen
Murree! Linda
1.00 HrS Pnn0Ral Geologist
2.00 Hrs SenorGetroget
6.00 His Project Geols90t asobst.
20.00 Hrs Staff Geolcgi.9b$cientrsl
0.00 Hes Field Technician tl
5.00 firs Dreher
0.00 . . Wes veracte- Rgnw lno Tmill
.we�aq,taeypNMEv«gs Ewwate.,e13n,m. 4
pi4ENT
Tabu 1
Time and .Malmo* Fee Estim*o,
fask.9 Subtotal
Rate Ea
$20n
5160
$124
599
$83
$74
6100
4360
6248
5T.38t,
40
$395
$0
$2,454
£atbdde5Cosi
$200 S0
$180 $360
5124 6496
999 $584
SWF 5,,882
575 Sze
$15 5210
50.95 $66.50.
$15 515
25.0E 025
2500 S25
25.00 $25
$57 5171
655
570
432
Stow
6150
Tess it lubtatal' ..
$200
$180
$124
$88
S93
679
Taitc 12 %aibbotal
Ertanded
3M3
5564
$37
*115
6518
$5, ,30
$200
$360 S
41,960
$0
$39$
SO
$3.470