Attachment 1THIRD AMENDMENT TO AGREEMENT This THIRD AMENDMENT TO AGREEMENT is dated for identification this 20t1 day of February 2018 and amends that certain agreement for Second Amendment to Contracting Agreement dated January 17, 2017, made by and between the Town of Los Gatos, ("Town,") and Trinity Source Group, Inc. ("Consultant.") RECITALS A. Town and Consultant entered into a Contracting Agreement on June 18, 2015, ("Agreement"), a copy of which is attached hereto and incorporated by reference as Attachment 1 to this Amendment. B. Town and Consultant entered into a First Amendment to Contracting Agreement on December 17, 2015, ("Agreement"), a copy of which is attached hereto and incorporated by reference as Attachment 2 to this Amendment. C. Town and Consultant entered into a Second Amendment to Contracting Agreement on January 17, 2017, ("Agreement"), a copy of which is attached hereto and incorporated by reference as Attachment 3 to this Amendment. D. Town desires to amend the Contracting Agreement to provide additional compensation for additional services and extend the term of the agreement. AMENDMENT 1. Scope of Services. Consultant shall conduct additional environmental consulting services as described in the 2018 Time and Materials Fee Estimate, a copy of which is attached hereto as Exhibit A and incorporated herein by reference. 2. Compensation is amended to provide an additional amount not to exceed $49,937. The total compensation for the agreement shall not exceed $112,367. 3. All other terms and conditions of the Agreement remain in full force and effect. Page 1 of 2 ATTACHMENT 1 Trinity Source Group — Third Amendment to Contracting Agreement IN WITNESS WHEREOF, the Town and Consultant have executed this Amendment. Town of Los Gatos Consultant, by: By: By: Laurel Prevetti, Town Manager Recommended by: Matt Morley Director of Parks and Public Works Approved as to Form: Attest: Name/Title Robert Schultz, Town Attorney Shelley Neis, CMC, Clerk Administrator Page 2 of 2 ATTACHMENT 1 Trinity Source Group — Third Amendment to Contracting Agreement Client Mr. Jim Harbin Town of Los Gatos Corporation Yard 41 Miles Avenue Los Gatos, CA Project: 2018 Additional Data Gap Investigation Town of Los Gatos Corporation Yard 41 Miles Avenue Los Gatos. CA Proj. No. 532.003 Table 1 Time and Materials Cost Estimate - 2018 Fee Schedule WORK TASK SUMMARY AND COST ESTIMATE TOTAL •• TRINITY ▪ tsource group, Mc - Vise+ ▪ LI4 i Juak'n. S":tw C'ns. CaPfixrai-0 ' ti 7,0142& 58011 Task Subtotals TASK 1: Well Silt Removal, HASP, and Project Management $5 249 TASK 2: Shallow Soil Sampling, Regulatory & Client Notifications, HASP Updates, and PM Tasks $14,204 TASK 3: Well Reconstruction, Well Development, and Sampling (contingent; if Task 1 does not succeed in silt removal) $18,386 TASK 4: Additional Data Gap Investigation Report and Low -Threat Closure Evaluation $8,552 TASK 5: Client and Regulatory Liaison $3 546 Total: $49,937 DETAILED SUMMARY TASK 1: Well Silt Removal, HASP, and Project Management LABOR & EQUIPMENT Number Units Rate Extended Cost 0.00 Hrs Principal Engineer/Geologist $210 $0 1.00 Hrs Senior Engineer/Geologist $189 $189 8.00 Hrs Project Engineer/Geologist $134 $1,072 2400 Hrs Staff Engineer/Geologist/Scientist $107 $2,568 0.00 Hrs Staff Engineer/Geologist1Soienlist $107 $0 0.00 Hrs Drafter $85 $0 4200 Mies Vehicle - Round Trip Travel $0.95 $40 SUBCONT. & MATERIALS 1.00 _ Each Integrated Wastestream Management Services (Silt and Waste Removal wNacuum Truck) $1,200 Task 1 Subtotal TASK 2: Shallow Soil Sampling, Regulatory & Client Notifications, HASP Updates, and PM Tasks LABOR & EQUIPMENT Number Units Rate Extended Cost $1,380 $5,249 0.00 Hrs Principal Engineer/Geologist $210 $0 2.00 Hrs Senior Engineer/Geologist $189 $378 16.00 Hrs Project Engineer/Geologist $134 $2,144 36.00 Hrs Staff Engineer/Geologist/Scientist $107 $3,852 8.00 Hrs Field Technician II $90 $720 1.00 Day Misc. Small Tools, Materials, Equipment, & Meters $75 $75 1.00 Day PID $145 $145 2 00 Each 55-gallon drum $57 $114 1.00 day Traffic cones, barricades $50 $50 126.00 Miles Truck Miles (3x Round Trip) $0 95 $120 SUBCONT. & MATERIALS 1.00 Job Utility Clearance $900 $1,035 1.00 ea Drum profiling $200 $230 1.00 ea Drum disposal $200 $230 1.00 Job Exploration Geoservices (Six Soil Borings) $2,445 $2,812 1.00 Job Soil Analyses -Torrent (12 Samples TPHg, TPHd, BTEX, Naphthalene, PNAs) $2,000 $2,300 Task 2 Subtotal $14,204 TASK 3: Well Reconstruction, Well Development, and Sampling (contingent; If Task 1 does not succeed in silt removal) LABOR & EQUIPMENT Number Units Rate Extended Cost 0.00 Hrs Principal Engineer/Geologist $210 $0 2.00 Hrs Senior Engineer/Geologist $189 $378 12.00 Hrs Project Engineer/Geologist $134 $1,608 44.00 Hrs Staff Engineer/Geologist/Scientist $107 $4,708 16.00 Hrs Field Technician II $90 $1,440 3.00 Day Misc. Small Tools, Materials, Equipment, & Meters $75 $225 2.00 Each Bailer $10 $20 3.00 Day PID $145 $435 2.00 Day Cord TDS pH meter $45 $90 3.00 Day Water level meter $30 $90 2.00 Day YSI Dissolved Oxygen meter $35 $70 1.00 Day Electric Groundwater Sampling Pump $15 $15 400 Each 55-gallon drum $57 $228 2018 Data Gap lavaa0gauun 532Al> Paw 1 1/22018 Table 1 Time and Materials Cost Estimate - 2018 Fee Schedule 3.00 day Traffic cones, barricades 126.00 Miles Truck Miles (3x Round Trip) $50 $0.95 $150 $120 SUBCONT. & MATERIALS 1.00 Job Exploration Geoservices (Well Reconstruction) $3,170 $3,646 6.00 ea Soil Analyses - Torrent (TPHg, TPHd, BTEX, Naphthalene) $125 $863 1.00 ea Groundwater Analyses - Torrent (TPHg, TPHd, BTEX) $350 $403 1.00 ea Drum profiling $200 $230 4.00 ea Drum disposal $200 $920 1.00 ea Mid -Coast Engineers Well Survey $1,480 $1,702 1.00 ea Santa Clara Valley Water District - Well Construction and Destruction Permit Fees $910 $1,047 Task 3 Subtotal $18,386 TASK 4: Additional Data Gap Investigation Report and Low -Threat Closure Evaluation LABOR & EQUIPMENT Number Units Rate Extended Cost 4.00 Hrs Senior Geologist $189 $756 24.00 Hrs Project Geologist $134 $3,216 32.00 Hrs Staff Geologist/Scientist $107 $3,424 12.00 Hrs Drafter $85 $1,020 0.00 Hrs Field Technician II $90 $0 2.00 Hrs Administrative $68 $136 Task 4 Subtotal $8,552 TASK 5: Client and Regulatory Liaison LABOR & EQUIPMENT Number Units Rate Extended Cost 6.00 Hrs Senior Geologist $189 $1,134 18.00 Hrs Project Geologist $134 $2,412 0.00 Hrs Staff Geologist/Scientist $107 $0 0.00 Hrs Drafter $85 $0 0.00 Hrs Administrative $68 $0 Task 5 Subtotal $3,546 20111 Daft Dap InvaaBpallat832.d5 Paget 1/2/2018