Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Attachment 4
TOWN OF LOS GATOS ITEM NO: 4 PLANNING COMMISSION STAFF REPORT Meeting Date: March 9, 2016 PREPARED BY: APPLICATION NO: LOCATION: APPLICANT/ CONTACT PERSON: PROPERTY OWNER: APPLICATION SUMMARY: RECOMMENDATION: PROJECT DATA: North East South West Erin Walters, Associate Planner ewalters@losgatosca.gov Subdivision Application M-15-00 1 Architecture and Site Applications S-15-009 through S-15- 011 15975 Un ion Avenue (located at the northwest corner of Union A venue and Blossom Hill Ro ad) Gary Kolhsaat Betchart Union Ave Joint Venture Partnership Requesting approval to demolish an existing single-family residence, subdivide one lot into three lots , construct three new single-famil y residences , and remove large protected trees on property zo ned R-1: 10. APN 523-42-017. DEEMED COMPLETE: February 19 ,20 16 FINAL ACTION TO TAKE ACTION ON SUBDIVISION : April 8 , 2016 ARCHITECTURE AND SITE: August 19 ,2016 Approve, s ubject to conditions General Plan Designation: Low Density Residential Zoning Designation : Applicable Plans & Standards: Parcel Size: Surrounding Area: Existing Land Use Residential Residential Residential Residential R-1 : 10 -Single-Family Residential, 1 0,000-square foot lot minimum General Plan; Residenti a l Design Guidelines; Hill side Development Standards and Guidelines 43 ,103 square feet General Plan Zoning Low Density Residential R-1:8 Low Density Resid ential R-1:10 Hillside HR-1 Low Density Residential R-1: 10 ATTACHMENT 4 Planning Commission Staff Report -Page 2 15975 Union Avenue/M-15-001 /S-15-009 through S-15-011 March 9, 2016 CEQA: FINDINGS: CONSIDERATIONS: ACTION : EXHIBITS: The project is Categorically Exempt pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, Section 15303: New Construction or Conversion of Small Structures and Section 15315: Minor Land Divisions. • As required, pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, this project is Categorically Exempt, Section 15303: New Construction or Conversion of Small Structures and Section 15315: Minor Land Divisions. • As required by Section 29.10.09030(e) of the Town Code for the demolition of a single-family residence. • As required by the Residential Design Guidelines that the project complies with the Residential Design Guidelines . • As required by Section 66474 of the Subdivision Map Act if the Planning Commission denies the subdivision application. As required by Section 29.20.150 ofthe Town Code for granting approval of Architecture and Site applications . The decision of the Planning Commission is final unless appealed within ten days. Previously received with the January 27,2016 Staff Report: 1. Location Map (one page) 2. Findings (two pages) 3. Recommended Conditions of Approv al (18 pages) 4. CDAC Meeting Minutes (two pa ges) 5. Project Data Sheets (three pages) 6. Applicant's Letter, received April 10, 2015 (five pages) 7 . Applicant's Summary of Changes, received November 24, 2015 (three pages) 8. Applicant's Arborist Report, received on February I 0, 2015 (34 pages) 9. Town 's Consulting Arborist Report, received on April 3 , 2015 (nine pages) 10. Original Development Plans, received on February 10, 2015 and reviewed by the Town's Consulting Architect (32 pages) 11. Town 's Consulting Architect report , received April 6, 2015 (five pages) Planning Commissi on Staff Report-Page 3 15975 Union Avenue/M -15-001/S-15-009 through S-15-011 March 9, 2016 BACKGROUND: 12 . Drainage Issues and Solutions Memorandum from nearby subdivision (three pages) 13. Public C omments received July 26, 2015 through 1:00 p.m. January 21,2016 (22 pages) 14 . Currently proposed Development Plans, received on November 24,2015 (36 pages) Previously rece ived with the January 27, 2016 Desk Item: 15. Conceptual Layout Off-Site Improvements (one page) Received with this StaffReport : 16. Revised Conditions of Approval ( 18 pages) 17. Applicant 's Letter (three pages) includes Drainage Diagrams, Site Sections, Site Plan, Conceptual Off-Site Improvements and Conceptual Planting Plan (seven pages), received February 19 ,2016 18. Public Comments, received February 1, 2016 through 1 :00 p.m. March 4 , 2016 (four pages) 19. Revised Development Plans, received February 19, 2016 (37 pages) On January 27, 2016, the Planning Commission considered a Subdivision application to subdivide one lot into three lots and three Architecture and Site applications to demolish an existing single-family house and construct three single-family houses with attached garages. The Commission continued the Subdivision and the three Architecture and Site applications to this agenda and directed the applicant to address concerns and questions regarding the following topics: • Site Design • Fire Access and Parking Restrictions • On-site Parking • Shared Driveway • CC&R's • Privacy Between Properties • Improving Site Drainage • Long Term Maintenance of Storm water Treatment Facilities Additionally, the Planning Commission directed staff to an swer traffic and public improvement questions . The responses and analysis are discussed in the body of this report. Planning Commission Staff Report-Page 4 15975 Union Avenue/M-15-001 /S-15-009 through S-15-011 March 9, 2016 ANALYSIS: The applicant submitted a letter and exhibits addressing concerns and questions raised by the Planning Commission (Exhibit 17). Staffhas provided analysis below. A. Site Design and Parking Shared Driveway vs. Flag Lot The Planning Commission and neighbors asked if the project could be a two-lot, flag lot subdivision rather than a three-lot subdivision with a shared driveway. While the applicant could request two lots, instead of three, the proposed three-lot subdivision complies with applicable policies, regulations, and guidelines . The applicant has stated that the project is not viable with only two lots (Exhibit 17). On-Site Parking and Fire Access Concerns were raised regarding the proposed fire truck turnaround on Lot 3, prohibited parking in the driveway in the Lot 3 driveway, and prohibited parking on the shared driveway due to fire access. In response to the Planning Commission's concerns the applicant has modified the site plan to provide additional on-site parking for each lot by relocating the fire truck turnaround from the Lot 3 driveway to the Lot 2 driveway (Exhibit 19, Sheet A4.5). To accommodate the relocated turnaround the house on Lot 2 was shifted over by two feet to the west and four feet, four inches towards Blossom Hill Road providing additional distance between the proposed house and neighbor's house to the north at I 04 Lausen Court (Exhibit 19, Sheet A4.4). By relocating the fire truck turnaround to Lot 2 and recognizing that the fire access parking restrictions will apply to the Lot 2 driveway the applicant has enlarged the driveway. The revised driveway dimensions of Lot 2 will support both the clear and free fire truck turnaround and one additional surface parking space. With the relocation of the fire truck turnaround, Lot 3 can accommodate three guest parking spaces in the driveway. In addition, the applicant has provided two more parking spaces at the western end of the shared driveway which will be designated as shared parking for all three homeowners and their guests. The applicant has also designated one of the surface spaces on Lot 1 to be a shared parking space for all homeowners and their guests. Staffhas included a condition of approval that the Maintenance Agreement will require one surface space on Lot 1 and two surfaces spaces at the end of the shared driveway to be maintained as shared parking spaces for all three property owners and their guests (Condition #58 of Exhibit 16). Planning Commission Staff Report -Page 5 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 The revised site plan provides the fire truck turnaround and a total of 17 on-site parking spaces for the three single-family homes which require six parking spaces pursuant to Town Code. The following chart provides the on-site parking summary: On-Site Parking Spaces Required by Additional On-Site Town Code for Provided Parking Provided Single Family Homes Not Required by Town Code Lot 1 2 spaces 3 garage spaces 2 spaces 1 surface space Lot2 2 spaces 3 garage spaces 2 spaces 1 driveway space Lot3 2 spaces 3 garage spaces 4 spaces 3 driveway spaces Shared 0 spaces 3 spaces (one surface at Lot 1 3 spaces and two surface at the end of the shared driveway) Total 6 spaces 17 spaces 11 spaces Keeping Fire Access Clear Concerns were raised regarding the enforcement to keep the driveway and fire tum around free and clear for fire access. The shared driveway and Lot 2's driveway apron with the exception of the surface parking space are required to be signed and marked (Condition #58 of Exhibit 16) for fire access. The requirement to keep these areas clear must be included in the Maintenance Agreement (Condition #58 of Exhibit 16) and Deed Restrictions (Condition #133 of Exhibit 16). The 20-foot width of the shared driveway allows for a fire truck and a car to pass each other. The applicant has modified the plans to add additional surface and guest parking on- site to relieve the need to park on the shared driveway (Exhibit 19, Sheet A4.5). Examples of Developments The Planning Commission requested that the applicant provide examples of projects they have developed with shared driveways with no parking. The applicant has provided five examples of projects they have developed in Redwood City, Palo Alto , San Jose, Menlo Park and Sunnyvale (Exhibit 17). T he applicant has stated that parking enforcement has not been an issue for these sites. Site plans for the examples will be available at th e Planning Commission meeting. Planning Commission Staff Report -Page 6 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 Pedestrian Access at Shared Driveway Concerns were raised that the site does not have a sidewalk on the shared drivew ay. The proposed driveway does not require a sidewalk pursuant to Town Code. The driveway is set four feet from the property line and the project includes landscaping and fencing to provide separation from adjacent properties. A curb is also included as part of the project. The width of the driveway allows room for both pedestrians and vehicles to pass (Exhibit 17, Traffic Plan). B. CC&R/Shared Maintenance Agreement Concerns were raised regarding the use of CC&R' s for the project. The applicant has requested to utilize a shared Maintenance Agreement between the three property owners to address and define all responsibilities ofthe owners rather than the use ofCC&R's (Exhi bit 17). The Town Attorney has confirmed that a shared Maintenance Agreement recorded on the deeds would be appropriate for this project. The Maintenance Agreement will be required but not limited to include the following (Condition# 58, Exhibit 16): • Maintenance of the shared driveway • All three property owners to be responsible for keeping the shared driveway signed, marked, and free and clear for fire access • Lot 2 property owner to be responsible for keeping the Lot 2 driveway signed, marked, and free and clear for fire access with the exception of the designated surface parking space • One s urface space on Lot 1 and two surfaces spaces at the end of the shared driveway shall be maintained as shared parking spaces for all three property owners and their guests D eed R estrictions • Maintenance of all private utilities • Maintenance of stormwater treatment facilities • Maintenance of landscape and other common areas • Maintenance of the fences located on th e northern property lin e • Maintenance of wildland and fire buffer areas In addition the Town will require that a deed restriction be recorded for each property requiring all three property owners to be responsible for keeping the shared driveway signed, marked, and free and clear for fire access and requiring the Lot 2 property owner to be responsible for keeping the Lot 2 driveway signed, marked, and free and clear for fire Planning Commission Staff Report-Page 7 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 access with the exception ofthe designated surface parking space (Condition #133, Exhibit 16). C. Privacy Fence Height and Privacy Screening The neighbor at 100 Lasuen Court requested a taller fence and landscape screening to address noise and light from Lot 1 's garage. The applicant has addressed this by providing an eight-foot fence along the northern property boundary and providing screening trees along the northern property perimeter (Exhibit 19, Sheet L1). A condition of approval (Condition #9 of Exhibit 16) for the tall shrubs proposed along that fence to be planted at a 24-inch box size has been included to provide landscape screening sooner than if the smaller shrubs were planted. Staff also included a condition of approval that requires an eight-foot tall fence, where it does not interfere with traffic visibility, to help shield light and noise (Condition #14 of Exhibit 16). Fence Maintenance In addition the neighbor at 100 Lasuen Court has requested that the fence on the northern property line be maintained by the property owners of the new development long term. The applicant has addressed this by ensuring that the new fences will be inside the subject property line and the Maintenance Agreement will require maintenance by the new property owners. Staff has included that the Maintenance Agreement will require that fences located along the northern property line will be maintained by the project property owners (Condition #58 of Exhibit 16). D . Drainage Improved Drainage Drainage will be improved after this project is implemented as the project meets the requirements to capture storm water on-site. The project's design will reduce the impact of storm water for adjacent properties by capturing water onsite and facilitating better water flow along the street. The project's proposed stormwater treatment facilities address the neighbor's concerns regarding surface drainage and the presence of the high groundwater table (Exhibit 19, Sheet 6 and 7). The applicant has provided additional exhibits regarding drainage (Exhibit 17, Drainage Cross Section, Existing Drainage Pattern, and Proposed Drainage Pattern). E. Public Improvements and Traffic The applicant 's team and staff met to review the conceptual off-site improvement plan. The applicant has provided a revised Off-Site Improvement Plan (Exhibit 17, Sheet PD-1 ). The Planning Commission Staff Report-Page 8 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 plan provides the location and striping of the proposed bike lane on Union Avenue, the future bike lane on Blossom Hill Road, the dedicated right turn lane, the cross walk, and on-street parking along Union A venue and Blossom Hill Road. On January 27,2016, the Planning Commission and members of the public raised questions and concerns regarding traffic at Union A venue and Blossom Hill Road and the proposed off-site improvements. Staffs response is below in italic type. • Can "Keep Clear" be painted in front of Lasuen Court along Union A venue? Staff Response: A "keep clear " pavement marking is not recommended. There was a recent legal case concerning the use of "keep clear" pavement markings. Staff does not recommend painting "keep clear" markings for new intersections due to concerns regarding liability. • Will adding a lane on Union increase or decrease traffic? Staff Response: Adding a lane on Union Avenue will not increase traffic or decrease. The new lane is for right turns onto Blossom Hill Road, which is a movement of lower traffic demand. • Safety concerns were raised regarding the speed on Union A venue. Staff Response: The posted speed limits are 35 mph. Based on field observation, traffic on Union Avenue slows down when approaching Blossom Hill Road to turn left or right. The turning movements will be defined with lane delineation. In addition, there is a traffic signal defining the right of way at the intersection. Staff believes the traffic movements are safe at this location. • Is turning left onto Union from the shared driveway dangerous? Staff Response: This movement is not dangerous. Because of low traffic volumes, residential driveway turning movements are typically not restricted. The primary users of residential driveways are familiar with the traffic conditions and can exercise their due caution entering and exiting the driveways. Typical morning commute hours are 7:00 a.m. to 9:00a.m., assuming six adults leave the driveway in the morning commute hours, it would be an average of one vehicle every 20 minutes. Based on field observation, there are adequate gaps for turning left onto Union Avenue. Periodically residents may need to wait until the end of the green light cycle when Union Avenue traffic is clear. • Concerns were raised regarding traffic backing up along Union A venue during peak hours. Staff Response: During the morning commute hours, the backup on Union Avenue occurs occasionally and more frequently between 8:00a.m. and 8:30a.m. The queue clears out Planning Commission StaffReport-Page 9 15975 Union Avenue/M-15-001 /S-15-009 through S-15-011 March 9, 2016 at the end of the green light cycle and would provide adequate gaps for exiting the driveway. • Safety concerns were raised that new tenant vehicles would need to cross over street parking, two lanes of traffic on Union A venue, and a bike lane to make a left tum onto Blossom Hill Road. Staff Response: The residents will be familiar with the traffic condition and their access opportunities. If there is a backup blocking the driveway, they can wait until the end of the green light cycle when the queue clears. If there is a gap between stopped vehicles, they can choose to exit with caution or wait until the queue clears. • Safety concerns with vehicles turning right from Blossom Hill Road onto Union A venue. Staff Response: The motorists have to slow down and yield at the turn although they are not required to stop. This is a typical situation for right turn movements to the right of a pork-chop island. Staff believes the right turn movements are safe. • What are the alternatives? Staff Response: Right-in right-out for the development if the Planning Commission deems it appropriate. The applicant does not want turning restrictions into or out of the project's shared driveway. • Are bike lanes currently located on Union A venue? Staff Response: Not anywhere on Union Avenue between Los Gatos Almaden Road and Blossom Hill Road. • Could a bike lane be located adjacent to the street parking along Union A venue? This would provide a further buffer between the traffic on Union and the existing homes that front Union A venue. Staff Response: The design standard is that a bike lane be placed between the left turn and right turn lanes. • Which municipality has jurisdiction on Blossom Hill Road for bike path improvements- San Jose or Los Gatos? Staff Response: From Union Avenue west, half of the road on the north side between Francis Oaks and Blossom Dale is within the City of San Jose jurisdiction. The other areas are under the Town 's jurisdiction. Planning Commission StaffReport-Page 10 15975 Union Avenue/M-15-001 /S-15-009 through S-15-011 March 9 , 2016 • Can a bike lane be reserved on Blossom Hill Road as a long term solution? Staff Response: This development provides an opportunity for a future bike lane from Union Avenue to Blossom Dale. Bike lanes can be provided even with permitted parking. With this condition, the bicyclists will have an option ofbypassing the section of Blossom Hill Road between Blossom Dale and Camino Del Cerro through other residential streets. With the pedestrian and bicycle master plan in process, this section of Blossom Hill Road will be reviewed for solutions to include future bike lane opportunities. • Is the parking proposed at Blossom Hill Road needed? Is it safe? Staff Response: The improved roadway will provide adequate width for on-street parking. Parking along this section of Blossom Hill Road is safe and has been permitted along the improved section with no reported accident rates involving on-street parking for the past three years. • Can Blossom Hill Road be striped for parked cars? Staff Response: Yes it could be striped for parking. • How will garbage trucks access the property? Staff Response: The applicant contacted the garbage company and the garbage will be picked up for all three lots at the Union Avenue curb near the entrance of the shared driveway. • Is the proposed six-foot wood property fence at Blossom Hill Road adequate to prevent cars from going through the fence onto the property below (approximate 10 foot grade difference)? Staff Response: The six-foot wood fence is consistent with the existing fences along Blossom Hill Road. The six-foot fence meets pedestrian requirements for safety as required by the Building Code. There is not a design requirement for installation of a guardrail or vehicle barrier at the back of sidewalk except where there is a history of vehicles running off the roadway or if there is a concern of vehicles running off the road, such as a curved roadway. Staff and the applicant's consulting traffic engineer have determined that a guardrail or barrier behind the sidewalk is not necessary. The proposed fence meets the standards. PUBLIC COMMENTS: The Town has received four public comments following the January 27, 2016 Planning Commission meeting (see Exhibit 18). Staffwill be prepared to respond to Planning Commission questions regarding comments at the public hearing. Planning Commission Staff Report -Page 11 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 COORDINATION: Planning staff coordinated with the Parks and Public Works Engineering and Traffic divisions, the Town Attorney's Office, and the Santa Clara County Fire Department. SUMMARY AND RECOMMENDATION: A. Summary Staffbelieves the applicant has addressed the Commission's concerns by providing additional on-site parking, moving the house on Lot 2 back further back from the neighbor at 1 00 Lasuen Court, moving the fire truck turnaround to Lot 2, providing neighborhood privacy through the use of an 8-foot fence and landscape screening, providing additional information on the off-site improvements and additional information on the proposed drainage plan. The project improves the drainage for the site and neighbors, complies with the Residential Guidelines as the residences are well designed , are an appropriate size for the lots, and would be compatible with surrounding homes in the immediate neighborhood . The proposed project meets all zoning requirements, and required considerations and for these reasons staff recommends approval of the revised project. B . Recommendation Staff recommends approval ofthe Subdivision and Architecture and Site applications based on the summary above. If the Planning Commission finds merit with the proposed project, it should: 1. Make the required finding pursuant to the adopted Guidelines for the Implementation of the California Environmental Quality Act, that this project is CategoricaJly Exempt, Section 15303 : New Construction or Conversion of Small Structures and Section 15315: Minor Land Divisions; and 2. Make the required findings as required by Section 29.1 0.09030(e) of the Town Code for granting approval of demolition of a single-family residence (Exhibit 2); and 3. Make the finding that the project is in conformance with the Residential Design Guidelines (Exhibit 2); and 4. Do not make any of the findings required by Section 66474 of the Subdivision Map Act to deny the subdivision application ; and 5. Make the required considerations as required by Section 29.20.150 ofthe Town Code for granting approval of Architecture & Site applications (Exhibit 2); and 6. Approve Subdivision Application M-15-001 and Architecture and Site Applications S-15-009 through S-15-0 11 with the conditions contained in Exhibit 16 and development plans attached as Exhibit 19 . Planning Commission Staff Report -Page 12 15975 Union Avenue/M-15-001/S-15-009 through S-15-011 March 9, 2016 ALTERNATIVES: Alternatively, the Commission can: 1. Continue the matters to a date certain with specific direction ; or 2. Approve the applications with additional and/or modified conditions; or 3. Deny the applications. Prepared by: "= Approved by: Erin Walters Joel Paulson, AICP Associate Planner Community Development Director JP:EW :sr cc: Gary Kohlsaat, 51 University A venue, Suite L, Los Gatos, CA 95030 Betchart Union Avenue Joint Venture Partnership, 349 Front Street, Los Altos, CA 94022 N :\DEV\PC REPORTS\20 16\Union 15975 _continu e. 3-9-16.doc x PLANNING COMMISSION-March 9, 2016 CONDITIONS OF APPROVAL 15975 Union A venue Subdivision Application M-15-001 Architecture and Site Applications S-15-009 thr ough S-15-01 1 Requesting approval to demolish an existing single-family residence, subdivide one lot into three lots, construct three new single-family residences, and remove large protected trees on property zoned R-1:10. APN 523-42-017. PROPERTY OWNER: Betchart Union Ave Joint Venture Partnership APPLICANT : Gary Kohlsaat, Architect TO THE SATISFACTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT : Plan ning Division 1. APPROVAL: This application shall be completed in accordance with all of the conditions of approval listed below and in substantial compliance with the plans approved and noted as received by the Town on February 19, 2015. Any changes or modifications to the approved plans shall be approved by the Community Development Director, the Development Review Committee, the Planning Commission, or Town Council , depending on the scope of the changes. 2. EXPIRATION: The approval will expire two years from the approval date pursuant to Section 29.20.320 of the Town Code, unless the approval has been vested. 3. OUTDOOR LIGHTING : Exterior lighting shall be kept to a minimum, and shall be down directed fixtures that will not reflect or encroach onto adjacent properties. No flood lights shall be used unless it can be demonstrated that they are needed for safety or security. The lighting plan shall be reviewed during building plan check. 4 . GENERAL: All existing trees shown on the plan and trees required to remain or to be planted are specific subjects of approval of this plan, and must remain on the site. 5. TREE REMOVAL PERMIT : A Tree Removal Permit shall be obtained for any trees to be removed, prior to the issuance of a building or grading permit. 6. ARBORIST REQUIREMENTS: The developer shall implement, at their cost, all recommendations made by Monarch Consulting Arborists LLC and Deborah Ellis, MS , identified in the Arborist reports , dated as received February 10, 2015 and April3, 2015 , respectively, on file in the Community Development Department. A Compliance Memorandum shall be prepared by the applicant and submitted with the building permit application detailing how the recommendations have or will be addressed. These recommendations must be incorporated in the building permit plans, and completed prior to issuance of a building permit where applicable. 7. TREE FENCING: Protective tree fencing shall be placed at the drip line of existing trees and shall remain through all phases of construction. Fencing shall be six foot high cyclone attached to two-inch diameter steel posts drive 18 inches into the ground and spaced no further than 1 0 feet apart. Include a tree protection fencing plan with the construction plans. 8. REPLACEMENT TREES: New trees shall be planted to mitigate the loss of trees being removed. The number of trees and size of replacement trees shall be determined using the canopy replacement table in the Town Code. Town Code requires a minimum 24-inch box size replacement tree. New trees shall be double staked with rubber ties and shall be planted prior to final inspection and issuance of occupancy permits. 9. LANDSCAPE SCREENING: Landscape screening shall be planted along all property lines. Shrubs and tall shrubs shall be planted with larger than 5-gallon size plants for faster landscape screening. A minimum 24-inch box size trees shall be planted, including some along the project's western property line, and large size trees shall be considered. 10. WATER EFFICIENCY LANDSCAPE ORDINANCE: The final landscape plan, including landscape and irrigation plans and calculations, shall meet the Town of Los Gatos Water Conservation Ordinance or the State Water Efficient Landscape Ordinance, whichever is more restrictive. The final landscape plan shall be reviewed by the Town's consultant prior to issuance of building permits. A review fee based on the current fee schedule adopted by the Town Council is required when working landscape and irrigation plans are submitted for review. 11. SALVAGE OF BUILDING MATERIALS: Prior to the issuance of a demolition permit, the developer shall provide the Community Development Director with written notice of the company that will be recycling the building materials. All wood, metal, glass, and aluminum materials generated from the demolished structure shall be deposited to a company which will recycle the materials. Receipts from the company(s) accepting these materials, noting the type and weight of materials, shall be submitted to the Town prior to the Town's demolition inspection. 12 . STORY POLES : The story poles on the project site shall be removed within 30 days of approval of the Architecture & Site application. 13. BLOSSOM HILL ROAD FENCE HEIGHT: Fence height is limited to six feet from grade along Blossom Hill Road. 14 . OTHER FENCE HEIGHT: Fence height for fences not along Blossom Hill Road are limited to eight feet from grade and may not conflict with traffic view areas. 15 . BUILDING PERMIT PLANS: The building permit plans shall include correct calculations for allowable floor areas. The building permit plans shall be consistent between plan sheets, including references for retaining wall and fence details, fence heights, pavers, pipes, and chimneys. The applicant must include this information in the building permit plans prior to issuance of building permits. 16. DRIVEWAY MATERIAL: Stamped concrete shall be used at the driveway entrance and the garage aprons. Stamped concrete at these locations shall be shown on the building permit plans prior to issuance and be installed prior to final of building permits. 17. TOWN INDEMNITY: Applicants are notified that Town Code Section 1.10.115 requires that any applicant who receives a permit or entitlement from the Town shall defend, indemnify, and hold harmless the Town and its officials in any action brought by a third party to overturn, set aside, or void the permit or entitlement. This requirement is a condition of approval of all such permits and entitlements whether or not expressly set forth in the approval, and may be secured to the satisfaction of the Town Attorney. Building Division 18. PERMITS REQUIRED : A Demolition Permit shall be required for the demolition of the existing single-family residence and associated accessory structures and a Building Permit the construction of each new single-family residence with attached garage. A separate plan set is required for each lot. Separate permits are required for electrical, mechanical, and plumbing work as necessary. 19 . CONDITIONS OF APPROVAL: The Conditions of Approval must be blue-lined in full on the cover sheet of the construction plans . A Compliance Memorandum shall be prepared and submitted with the Building Permit application detailing how the Conditions of Approval will be addressed. 20. SIZE OF PLANS: Four sets of construction plans, minimum size 24" x 36 ", maximum size 30" x 42". 21. DEMOLITION REQUIREMENTS: Obtain a Building Department Demolition Application and a Bay Area Air Quality Management District Application from the Building Department Service Counter. Once the demolition form has been completed, all signatures obtained, and written verification from PG&E that all utilities have been disconnected, return the completed form to the Building Department Service Counter with the Air Quality District's J# Certificate, PG&E verification, and three (3) sets of site plans showing all existing structures, existing utility service lines such as water, sewer, and PG&E. No demolition work shall be done without first obtaining a permit from the Town. 22. BUILDING ADDRESSES : Submit requests for new building addresses to the Building Division prior to submitting for the Building Permit application process. 23 . SOILS REPORT: A Soils Report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations, shall be submitted with the Building Permit Application. This report shall be prepared by a licensed Civil Engineer specializing in soils mechanics. 24. FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed Civil Engineer or Land Surveyor shall be submitted to the project building inspector at foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report, and that the building pad el evation and on-site retaining wall locations and elevations have been prepared according to the approved plans. Horizontal and vertical controls shall be set and certified by a licensed Surveyor or registered Civil Engineer for the following items: a. Building pad elevation b . Finish floor elevation c. Foundation comer locations d. Retaining Walls 25. RESIDENTIAL TOWN ACCESSIBILITY STANDARDS: The residence shall be designed with adaptability features for single family residences per Town Resolution 1994- 61: a. Wood backing (2 " x 8" minimum) shall be provided in all bathroom walls at water closets, showers, and bathtubs, located 34-inches from the floor to the center of the backing, suitabl e for the installation of grab bars. b. All passage doors shall be at least 32-inches wide on the accessible floor. c. Primary entrance shall be a 36-inch wide door including a 5 'x5 ' level landing, no more than l-inch out of plane with the immediate interior floor level with an 18-inch clearance at interior strike edge. d . Door buzzer, bell or chime shall be hard wired at primary entrance. 26. TITLE 24 ENERGY COMPLIANCE: All required California Title 24 Energy Compliance Forms must be blue-lined, i .e. directly printed, onto a plan sheet. 27. BACKWATER VALVE: The scope of this project may require the installation of a sanitary sewer backwater valve per Town Ordinance 6.50.025 . Please provide information on the plans if a backwater valve is required and the location of the installation. The Town of Los Gatos Ordinance and West Valley Sanitation District (WVSD) requires backwater valves on drainage piping serving fixtures that have flood level rims less than 12-inches above the elevation of the next upstream manhole. 28. TOWN FIREPLACE STANDARDS: New wood burning fireplaces shall be an EPA Phase II approved appliance or a gas appliance as per Town Ordinance 1905. Tree limbs shall be cut within 10-feet of Chimney. 29 . FIRE ZONE: The project requires a Class A Roof assembly. 30. WILDLAND-URBAN INTERFACE: This project is located in a Wildland-Urban High Fire Interface Area and must comply with the materials and construction methods for exterior wildfire exposure requirements of Section R327 of the 2013 California Residential Code. 31. SPECIAL INSPECTIONS : When a special inspection is required by CBC Section 1704, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permit. The Town Special Inspection form must be completely filled-out and signed by all requested parties prior to permit issuance. Special Inspection forms are available from the Building Division Service Counter or online at www.losgatosca.gov/building 32. BLUE PRINT FOR A CLEAN BAY SHEET: The Town standard Santa Clara County Valley Nonpoint Source Pollution Control Program Sheet (24x36) shall be part of the plan submittal as the second page. The specification sheet is available at the Building Division Service Counter for a fee of $2 or at ARC Blue Print for a fee or online at www.losgatosca.gov/building. 33. APPROVALS REQUIRED: The project requires the following departments and agencies approval before issuing a building permit: a. Community Development -Planning Division: Erin Walters (408) 354-6867 b . Engineering/Parks & Public Works Dept.: Mike Weisz (408) 354-5236 c. Santa Clara County Fire Department: (408) 378-4010 d. West Valley Sanitation District: (408) 378-2407 e. Local School District: The Town will forward the paperwork to the appropriate school district(s) for processing. A copy of the paid receipt is required prior to permit issuance. f . Bay Area Air Quality Management District: (415) 771-6000 TO THE SATISFACTION OF THE DIRECTOR OF PARKS AND PUBLIC WORKS: Engineering Division 34. GENERAL: All public improvements shall be made according to the latest adopted Town Standard Plans, Standard Specifications and Engineering Design Standards. All work shall conform to the applicable Town ordinances. The adjacent public right-of-way shall be kept clear of all job related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and/or the street will not be allowed unless an encroachment permit is issued. The Developer's representative in charge shall be at the job site during all working hours. Failure to maintain the public right-of-way according to this condition may result in the Town performing the required maintenance at the Developer's expense. 35. APPROVAL: This application shall be completed in accordance with all the conditions of approvals listed below and in substantial compliance with the latest reviewed and approved development plans. Any changes or modifications to the approved plans or conditions of approva ls shall be approved by the Town Engineer. 36. ENCROACHMENT PERMIT: All work in the public right-of-way will require a Construction Encroachment Permit. All work over $5 ,000 will require construction security. It is the responsibility of the Applicant/Developer to obtain any necessary encroachment permits from affe cted agencies and private parties, including but not limited to , Pacific Gas and Electric (PG&E), AT&T, Comcast, Santa Clara Valley Water District, California Department of Transportation. Copies of any approvals or permits must be submitted to the Town Engineering Division of the Parks and Public Works Department prior to releasing any permit. 37. PUBLIC WORKS INSPECTIONS : The DevelopeF or his representative shall notify the Engineering Inspector at least twenty-four (24) hours before starting any work pertaining to on-site drainage facilities , grading or paving, and all work in the Town's right-of-way. Failure to do so will result in rejection of work that went on without inspecti on . 38 . RESTORATION OF PUBLIC IMPROVEMENTS: The Developer shall repair or replace all existing improvements not designated for removal that are damaged or removed because of the Developer's operations. Improvements such as , but not limited to: curbs , gutters, sidewalks, driveways, signs, pavements, rai sed pavement markers, thermoplastic pavement markings, etc. shall be repaired and replaced to a condition equal to or better than the original condition. Any new concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor's sole expense and no additional compensation shall be allowed therefore. Existing improvement to be repaired or replaced shall be at the direction of the Engineering Construction Inspector, and shall comply with all Title 24 Disabled Access provisions. The Developer shall request a walk-through with the Engineering Construction Inspector before the start of construction to verify existing conditions. 39. SITE SUPERVISION : The General Contractor shall provide qualified supervision on the job site at all times during construction. 40. STREET CLOSURE: Any proposed blockage or partial closure of the street requires an encroa chment permit. Special provisions such as limitations on works hours , protective enclosures, or other means to facilitate public access in a safe manner may be required . 41. PLAN CHECK FEES: Plan check fees shall be deposited with the Town prior to plan review at the Engineering Division of the Parks and Public Works Department. 42. INSPECTION FEES: Inspection fees shall be deposited with the Town prior to issuance of any Permit or recordation of the Parcel Map. 43 . DESIGN CHANGES : Any proposed changes to the approved plans shall be subject to the approval of the Town prior to altered work is started. The Applicant's project engineer shall notify, in writing, the Town Engineer at least 72 hours in advance of all the proposed changes. Any approved changes shall be incorporated into the fina l "as-built" plans . 44. PARKING: Any proposed parking restriction must be approved by The Town of Los Gatos, Community Development Department. 45. PLANS AND STUDIES: All required plans and studies shall be prepared by a Registered Professional Engineer in the State of California, and submitted to the Town Engineer for review and approval. 46. GRADING PERMIT: Grading permit is required for all site grading and drainage work except for exemptions listed in Section 12.20.015 of the Town Grading Ordinance. The grading permit application (with grading plans) shall be made to the Engineering Division of the Parks and Public Works Department located at 41 Miles A venue. The grading plans shall include final grading, drainage, retaining wall location, driveway, utilities and interim erosion control. Grading plans shall list earthwork quantities and a table of existing and proposed impervious areas. Unless specifically allowed by the Director of Parks and Public Works, the grading permit will be issued concurrently with the building permit. The grading permit is for work outside the building footprint(s). A separate building permit, issued by the Building Department on E. Main Street is needed for grading within the building footprint. 47. DRIVEWAY: The driveways conform to existing pavement on Union Avenue shall be constructed such that existing drainage patterns will not be obstructed. 48 . DRAINAGE STUDY: Prior to the issuance of any grading permits, the following drainage studies shall be submitted to and approved by the Town Engineer: A drainage study of the project including diversions, off-site areas that drain onto and/or through the project, and justification of any diversions; a drainage study evidencing that proposed drainage patterns will not overload existing storm drains ; and detailed drainage studies indicating how the project grading, in conjunction with the drainage conveyance systems including applicable swales, channels, street flows, catch basins, storm drains, and flood water retarding, will allow building pads to be safe from inundation from rainfall runoff which may be expected from all storms up to and including the theoretical 1 00-year flood. 49 . DRAINAGE IMPROVEMENT: Prior to the recordation of a subdivision map (except maps for financing and conveyance purposes only) or prior to the issuance of any grading/improvement permits, whichever comes first, the Applicant shall: a) Design provisions for surface drainage; and b) Design all necessary storm drain facilities extending to a satisfactory point of disposal for the proper control and disposal of storm runoff; and c) Provide recorded copy of any required easements to the Town. 50. TREE REMOVAL: Copies of all necessary tree removal permits shall be provided prior to issuance of a grading permit/building permit. 51. SURVEYING CONTROLS: Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer qualified to practice land surveying, for the following items: a. Retaining wall : top of wall elevations and locations. b. Toe and top of cut and fill slopes. 52. PAD CERTIFICATION: A letter from a licensed land surveyor shall be provided stating that the building foundation was constructed in accordance with the approved plans shall be provided subsequent to foundation construction and prior to construction on the structure. The pad certification shall address both vertical and horizontal foundation placement. 53. PRECONSTRUCTION MEETING: Prior to issuance of any permit or the commencement of any site work, the general contractor shall : a . Along with the project applicant, attend a pre-construction meeting with the Town Engineer to discuss the project conditions of approval , working hours, site maintenance and other construction matters; b. Acknowledge in writing that they have read and understand the project conditions of approval , and will make certain that all project sub-contractors have read and understand them prior to commencing work and that a copy of the project conditions of approval will be posted on site at all times during construction. 54. RETAINING WALLS: A building permit, issued by the Building Department at 110 E. Main Street, may be required for site retaining walls. Walls are not reviewed or approved by the Engineering Division of Parks and Public Works during the grading permit plan review process. 55. CERTIFIF ATE OF COMPLIANCE : A Certificate of compliance shall be recorded. Two copies of the legal description for each lot configuration, a plat map (8-Vl in . X 11 in.) shall be submitted to the Engineering Division of the Parks and Public Works Department for review and approval. The submittal shall include closure calculations, title reports less than 90 days old and the appropriate fee . The certificate shall be recorded before any permits may be issued. 56. CERTIFICATE OF LOT LINE ADJUSTMENT: A Certificate of Lot Line Adjustment shall be recorded. Two copies of the legal description for each new lot configuration, a plat map (8-Vl in. X 11 in.) and two copies ofthe legal description ofthe land to be exchanged shall be submitted to the Engineering Division of the Parks and Public Works Department for review and approval. The submittal shall include closure calculations, title reports less than 90 days old and the appropriate fee. The certificate shall be recorded before any permits may be issued. 57 . PARCEL MAP: A parcel map shall be recorded. Two copies of the parcel map shall be submitted to the Engineering Division of the Parks and Public Works Department for review and approval. Submittal shall include closure calculations, title reports and the appropriate fee. The map shall be recorded before any permits for new construction are issued. The Applicant/Subdivider shall provide the Engineering Division with an electronic copy (in PDF format) and two hardcopies of the signed recorded map along with a CAD drawing of the Parcel Map after it is recorded. 58 . SHARED MAINTENANCE AGREEMENT: The Applicant/Subdivider shall record a shared Maintenance Agreement at the time of recordation of the parcel subdivision map. The shared Maintenance Agreement shall be subject to the review and approval of the Town prior to recordation of the parcel map . The owners of the three properties shall be responsible for the maintenance of all private utilities, wildland fire and buffer areas , storm water treatment facilities (including the three bioretention ponds,and bio-treatment swale) landscape areas , the long term maintenance the fences located on the northern boundary line, and other common areas/facilities within the proposed subdivision. The owners of the three properties shall be responsible for keeping the shared driveway signed, marked, free and clear for fire department access. The property owner of Lot 2 shall keep Lot 2 's driveway apron signed, marked, free and clear for fire vehicle turnaround with the exception of the surface parking space. One surface space on Lot 1, and two surface spaces at the end of the shared driveway will be shared parking and available to all property owners and their guests. 59. WEST VALLEY SANITATION DISTRICT: All sewer connection and treatment plant capacity fees shall be paid either immediately prior to the recordation of any subdivis ion or tract maps with respect to the subject property or properties, or immediately prior to the issuance of a sewer connection permit, which ever event occurs first. Written confirmation of payment of these fees shall be provided prior to map recordation . 60. PRIVATE UTILITIES-STREET: Prior to the recordation of a subdivision map the Applicant/Subdivider shall place a note on the map, in a manner that meets the approval of the Town Engineer that states: "The private streets, utilities constructed within this map shall be owned, operated and maintained by the Developer, successors or assigns." 61. DEDICATIONS: The following shall be dedicated on the parcel map by separate instrument. The dedication shall be recorded before any permits are issued: a. Union Avenue: A 25-foot right-of-way dedication b. Blossom Hill Road: A 15-foot right-of-way dedication with a 36-foot radius at the intersection with the newly-dedicated right-of-way line of Union Avenue. c . A 3-foot wide sidewalk easement along Union Avenue. d. A reciprocal Ingress & Egress Easement (ISE) by separate easement, recorded concurrently with the Parcel Map. e . Emergency Vehicle Access Easement: A 24-foot wide easement through Lots 1 thru 3, in addition to a 20-foot wide easement for turnaround , as shown on Lot 3. 62. DEMOLITION: The existing building shall be demolished prior to recordation of the parcel map affected by this existing building. 63 . SOILS REPORT: One copy of the soils and geologic report shall be submitted with the application. The soils report shall include specific criteria and standards governing site grading, drainage, pavement design, retaining wall design, and erosion control. The reports shall be signed and "wet stamped" by the engineer or geologist, in conformance with Section 6735 of the California Business and Professions Code. 64. SOILS REVIEW: Prior to issuance of any permit, the Applicant's engineers shall prepare and submit a design-level geotechnical/geological investigation for review and approval by the Town. The Applicant's soils engineer shall review the final grading and drainage plans to ensure that designs for foundations , retaining walls, site grading, and site drainage are in accordance with their reconunendations and the peer review comments. Approval of the Applicant 's soils engineer shall then be conveyed to the Town either by letter or by signing the plans. 65. SOILS ENGINEER CONSTRUCTION OBSERVATION: During construction, all excavations and grading shall be inspected by the Applicant's soils engineer prior to placement of concrete and/or backfill so they can verify that the actual conditions are as anticipated in the design-level geotechnical report, and reconunend appropriate changes in the reconunendations contained in the report, if necessary. The results of the construction observation and testing shall be documented in an "as-built" letter/report prepared by the Applicant's soils engineer and submitted to the Town before final release of any occupancy permit is granted. 66. SOIL RECOMMENDATIONS: The project shall incorporate the geotechnical/geological reconunendations contained in the Geotechnical Investigation by Silicon Valley Soils Engineering, dated November 2014, and any subsequently required report or addendum. Subsequent reports or addendum are subject to peer review by the Town's consultant and costs shall be borne by the Applicant. 67. IMPROVEMENTS AGREEMENT: The Applicant shall enter into an agreement to construct public improvements that are part of the development in a form acceptable to the Town in the amount of 100% (performance) and 100% (labor and materials) prior to issuance of any permit. The Applicant shall provide two (2) copies of documents verifying the cost of the public improvements to the satisfaction of the Engineering Division of the Parks and Public Works Department. 68. JOINT TRENCH PLANS: Joint trench plans shall be reviewed and approved by the Town prior to recordation of a map . The joint trench plans shall include street and/or site lighting and associated photometries. A letter shall be provided by PG&E stating that public street light billing will by Rule LS2A, and that private lights shall be metered with billing to the owners of the three properties. Pole numbers, assigned by PG&E, shall be clearly delineated on the plans. 69. WATER DESIGN: Water plans prepared by San Jose Water Company must be reviewed and approved prior to issuance of any permit. 70. PUBLIC IMPROVEMENTS: The following improvements shall be installed by the Developer. Plans for those improvements shall be prepared by a California registered civil engineer, reviewed and approved by the Town, and guaranteed by contract, Faithful Performance Security and Labor & Materials Security before the issuance of a building permit or the recordation of a map. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. a. Union A venue & Blossom Hill Road: curb, gutter, sidewalk, tie-in paving, signing, striping, storm drainage and sanitary sewers, street lights, traffic signal, intersection improvement, as required. b. Union A venue & Blossom Hill Road: an appropriate structural pavement section for the half-width immediately adjacent to the project frontage of both Union Avenue and Blossom Hill Road shall be constructed to the centerline. 71. FRONTAGE IMPROVEMENTS: The Applicant shall be required to improve the project's public frontage to current Town Standards. These improvements may include but not limited to curb, gutter, sidewalk, driveway approaches, curb ramps , traffic signal, street lighting (upgrade and/or repaint) etc. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 72. FRONT AGE IMPROVEMENTS (STREET LIGHT): Remove existing street light on PG&E power pole and replace with a Town standard octaflute street light pole with LED light fixture. 73. FRONTAGE IMPROVEMENTS (TRAFFIC): The Applicant shall construct and modify the Blossom Hill Road/Union A venue intersection improvements as required including, and may not be limited to, curb, gutter, sidewalk, asphalt concrete pavement, pork chop island, median island, signs, striping, traffic signal poles, conduits, and equipment, etc., as directed by the Town Engineer. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 74. FRONTAGE IMPROVEMENTS (SIGNALIZED INTERSECTION): The Applicant shall upgrade existing traffic signal to current Town standards including, and may not be limited to , the following: a. Replace non-LED signals with LEDs b. Replace 8" signal heads with 12 " signal heads c. Install pedestrian signal countdown heads d. Install ADA compliant pedestrian push buttons e. Install two video detection cameras f. Install LED safety lighting fixture g. Install EMTRAC fire preemption device h. ADA-compliant pedestrian improvements including curb ramps and pork chop islands 1. Others as applicable The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 75. ADA COMPLIANCE: The Applicant shall be required to meet all ADA standards, which must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. This may require additional construction measures as directed by the Town. 76. UTILITIES: The Developer shall install all new, relocated , or temporarily removed utility services, including telephone, electric power and all other communications lines underground, as required by Town Code Section 27 .50.015(b ). All new utility services shall be placed underground . Underground conduit shall be provided for cable television service. The Applicant is required to obtain approval of all proposed utility alignments from any and all utility service providers. The Town of Los Gatos does not approve or imply approval for final alignment or design of these facilities. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued . 77. UTILITY EASEMENTS : Deed restrictions shall be placed on lots containing utility easements. The deed restrictions shall specify that no trees , fences, or hardscape are allowed within the easement boundaries, and that maintenance access must be provided. The Town will prepare the deed language and the Applicant's surveyor shall prepare the legal description and plat. The Applicant shall pay any recordation costs. 78 . PRIVATE EASEMENTS. Agreements detailing rights , limitations, and responsibilities of involved parties shall accompany any proposed private easement. Access driveway shall be within the recorded access easement. New private access easement shall be recorded prior to issuance of building permit. The easement(s) and associated agreement(s) shall be recorded simultaneously with the Parcel Map. 79. TRENCHING MORATORIUM: Trenching within a newly paved street will be allowed subject to the following requirements: a . The Town standard "T" trench detail shall be used. b . A Town approved colored controlled density backfill shall be used . c. All necessary utility trenches and related pavement cuts shall be consolidated to minimize the impacted area of the roadway. d . The total asphalt thickness shall be a minimum of3-inches, meet Town standards, or shall match the existing thickness, whichever is greater. The final lift shall be 1.5- inches ofhalfinch medium asphalt. The initiallift(s) shall be of three quarter inch medium asphalt. e. The Contractor shall schedule a pre-paving meeting with the Town Engineering Construction Inspector the day the paving is to take place. f. A slurry seal topping may be required by the construction inspector depending his assessment of the quality of the trench paving. If required , the slurry seal shall extend the full width of the street and shall extend 5-feet beyond the longitudinal limits of trenching. Slurry seal materials shall be approved by the Town Engineering Construction Inspector prior to placement. Black sand may be required in the slurry mix. All existing striping and pavement markings shall be replaced upon completion of slurry seal operations. All pavement restorations shall be completed and approved by the Inspector before occupancy. 80. SIDEWALK REP AIR: The Developer shall repair and replace to existing Town standards any sidewalk damaged now or during construction of this project. All new and existing adjacent infrastructures must meet current ADA standards. Sidewalk repair shall match existing color, texture and design, and shall be constructed per Town Standard Details. New concrete shall be free of stamps, logos, names, graffiti , etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor's sole expense and no additional compensation shall be allowed therefore. The limits of sidewalk repair will be determined by the Engineering Construction Inspector during the construction phase of the project. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 81. CURB AND GUTTER: The Developer shall repair and replace to existing Town standards any curb and gutter damaged now or during construction of this project. All new and existing adjacent infrastructures must meet Town standards. New curb and gutter shall be constructed per Town Standard Details. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor's sole expense and no additional compensation shall be allowed therefore. The limits of curb and gutter repair will be determined by the Engineering Construction Inspector during the construction phase of the project. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 82. DRIVEWAY APPROACH: The Developer shall install one Town standard residential driveway approach at the project's vehicular point of entry along Union Avenue. The new driveway approach shall be constructed per Town Standard Plans and must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. New concrete shall be free of stamps, logos, names, graffiti , etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor's sole expense and no additional compensation shall be allowed therefore. 83. CURB RAMPS: The Developer shall construct all curb ramps in compliance with ADA Standards which must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. New concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal shall be removed and replaced at the Contractor's sole expense and no additional compensation shall be allowed therefore. 84. FENCING: Any fencing proposed within 200-feet of an intersection shall comply with Town Code Section §23.10.080. 85. SIGHT TRIANGLE AND TRAFFIC VIEW AREA: Any proposed improvements, including but not limiting to trees and hedges, shall abide by Town Code Section 23.1 0.080, 26.1 0.065, 29 .40.030. 86. FENCES: Fences between all adjacent parcels shall be located on the property lines/boundary lines. Any existing fences that encroach into the neighbor's property shall be removed and replaced to the correct location of the boundary lines before a Certificate of Occupancy for any new building can be issued. Waiver of this condition will require signed and notarized letters from all affected neighbors. 87. TRAFFIC IMPROVEMENTS (OFF-SITE IMPROVEMENT): Off-site improvement plans shall be prepared by the Developer's design consultants and submitted to Town Engineer for approval prior to construction. The Applicant is required to designate necessary right of way for the required widening. The improvements must be completed and accepted by the Town before a Certificate of Occupancy for any new building can be issued. 88 . STREET LIGHTS AND TRAFFIC SIGNAL INSPECTION FEES: The Developer shall pay for the Town's inspection of street lights and traffic signal related work installed by the developer. The fees, $2 ,000, shall be due at time of building permit application. 89. TRAFFIC STUDY: Any development ofland use that generates greater traffic impacts than those assumed in the traffic study report may be required an updated traffic study in accordance with Town's traffic impact policy. 90 . TRAFFIC IMPACT MITIGATION FEE: The Developer shall pay the project's proportional share of transportation improvements needed to serve cumulative development within the Town of Los Gatos. The fee amount will be based upon the Town Council resolution in effect at the time the building permit is issued. The fee shall be paid before issuance of a building permit. The traffic impact mitigation fee for this project shall be calculated from the final plans using the rate schedule and current fee schedule in effect at the time the building permit is issued, using a trip generation rate based on a comparison of the site 's current and proposed uses. 91 . PRECONSTRUCTION PAVEMENT SURVEY: Prior to issuance of a Grading Permit, the project applicant shall complete a pavement condition survey documenting the extent of existing pavement defects using a 35-mm or digital video camera. The results shall be documented in a report and submitted to the Town for review. 92. POSTCONSTRUCTION PAVEMENT SURVEY: The project applicant will complete a pavement condition survey and pavement deflection analysis to determine whether road damage occurred as a result of project construction and whether there were changes in pavement strength. Rehabilitation improvements required to restore the pavement to pre- construction condition and strength shall be determined using State of California procedures for deflection analysis. The results shall be documented in a report and submitted to the Town for review and approval before a Certificate of Occupancy for any new building can be issued. The Applicant shall be responsible for completing any required road repairs prior to release of the faithful performance bond. 93. CONSTRUCTION STREET PARKING: No vehicle having a manufacture 's rated gross vehicle weight exceeding ten thousand (10,000) pounds shall be allowed to park on the portion of a street which abuts property in a residential zone without prior to approval from the Town Engineer. 94. TRAFFIC CONTROL PLAN: Traffic control plan is required and must be submitted and approved prior to issuance of any work in the public right-of-way. This plan shall include, but not be limited to , the following measures: a. Construction activities shall be strategically timed and coordinated to minimize traffic disruption for schools, residents, businesses, special events, and other projects in the area. The schools located on the haul route shall be contacted to help with the coordination of the trucking operation to minimize traffic disruption. b. Flag persons shall be placed at locations necessary to control one-way traffic flow. All flag persons shall have the capability of communicating with each other to coordinate the operation. c. Prior to construction, advance notification of all affected residents and emergency services shall be made regarding one-way operation, specifying dates and hours of operation. 95. TRAFFIC SIGNAL MODIFICATION PLAN : A Traffic Signal Modification Plan is required and must be submitted and approved prior to issuance of any work in the public right-of-way. This plan shall be prepared by a licensed traffic engineer. 96. HAULING OF SOIL: Hauling of soil on or off-site shall not occur during the morning or evening peak periods (between 7:00a.m. and 9:00a.m. and between 4:00p.m. and 6:00 p.m.). Prior to the issuance of a building permit, the Developer shall work with the Town Building Department and Engineering Division Inspectors to devise a traffic control plan to ensure safe and efficient traffic flow under periods when soil is hauled on or off the project site. This may include, but is not limited to provisions for the Developer/Owner to place construction notification signs noting the dates and time of construction and hauling activities, or providing additional traffic control. Coordination with other significant projects in the area may also be required. Cover all trucks hauling soil, sand, and other loose debris. 97 . CONSTRUCTION HOURS : All subdivision improvements and site improvements construction activities, including the delivery of construction materials, labors, heavy equipment, supplies, etc. shall be limited to the hours of 8:00a.m. to 8:00p.m., weekdays and 9:00a.m. to 7:00p.m. weekends and holidays. The Town may authori ze on a case-by- case basis alternate construction hours . The Applicant/Subdivider shall provide written notice 24 hours in advance of modified construction hours. Approval of this request is at discretion of the Town. 98. CONSTRUCTION NOISE: Between the hours of 8:00a.m. to 8:00p.m., weekdays and 9 :00a.m. to 7:00p.m. weekends and holidays, construction, alteration or repair activities shall be allowed. No individual piece of equipment shall produce a noise level exceeding eighty-five (85) dBA at twenty-five (25) feet from the source. If the device is located within a structure on the property, the measurement shall be made at distances as close to twenty-five (25) feet from the device as possible. The noise level at any point outside of the property plane shall not exceed eighty-five (85) dBA. 99. CONSTRUCTION MANAGEMENT PLAN : Prior to the issuance of any permits, the Applicant shall submit a construction management plan that shall incorporate at a minimum the Earth Movement Plan, Traffic Control Plan, Project Schedule, site security fencing, employee parking, construction staging area , materials storage area(s), construction trailer(s), concrete washout(s) and proposed outhouse locations. 100. MAINTENANCE ACCESS: Prior to the issuance of any permits, the Applicant shall propose maintenance access improvements for the Town Engineer to review, comment on, and approve. The Engineering Division of the Parks and Public Works Department shall approve the surface materials over each public easement. 101. COMMON PRIVATE DRIVEWAY: The common private driveway accessing the Project Site shall be kept open and in a safe, drive-able condition throughout construction and in perpetuity after construction has been completed. If temporary closure is needed, then formal written notice shall be provided at least one week in advance of closure. 102. WVSD (WEST VALLEY SANITATION DISTRICT): Sanitary Sewer Clean-out shall be installed for each property at the property line, or a location specified by the Town. 103. SANITARY SEWER BACKWATER VALVE : Drainage piping serving fixtures which have flood level rims less than twelve (12) inches (304.8 mm) above the elevation of the next upstream manhole and/or flushing inlet cover at the public or private sewer system serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve, unless first approved by the Building Official. The Town shall not incur any liability or responsibility for damage resulting from a sewer overflow where the property owner or other person has failed to install a backwater valve as defined in the Uniform Plumbing Code adopted by the Town and maintain such device in a functional operation condition. Evidence of West Sanitation District's decision on whether a backwater device is needed shall be provided prior to issuance of a building permit. 104. STORMW A TER MANAGEMENT : Construction activities including but not limited to clearing, stockpiling, grading or excavation ofland, which disturbs 1 acre or more which are part of a larger common plan of development which disturbs less than 1 acre are required to obtain coverage under the construction general permit with the State Water Resources Control Board. The Applicant is required to provide proof ofWDID# and keep a current copy of the storm water pollution prevention plan (SWPPP) on the construction site and shall be made available to the Town of Los Gatos Engineering Division ofthe Parks and Public Works Department and/or Building Department upon request. 105. BEST MANAGEMENT PRACTICES (BMPs): The Applicant is responsible for ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Best Management Practices (BMPs) shall be maintained and be placed for all areas that have been graded or disturbed and for all material , equipment and/or operations that need protection. Removal ofBMPs (temporary removal during construction activities) shall be replaced at the end of each working day. Failure to comply with the construction BMP will result in the issuance of correction notices, citations, or stop work orders. I 06 . STORMW ATER DEVELOPMENT RUNOFF: All new development and redevelopment projects are subject to the Storm water development runoff requirements. Every applicant shall submit a stormwater control plan and implement conditions of approval that reduce stormwater pollutant discharges through the construction, operation and maintenance of treatment measures and other appropriate source control and site design measures. Increases in runoff volume and flows shall be managed in accordance with the development runoff requirements in such a way that post-development flows meet or are below pre-development flows. 107. SITE DESIGN MEASURES: All projects shall incorporate the following measures: a. Protect sensitive areas and minimize changes to the natural topography. b . Minimize impervious surface areas. c. Direct roof downspouts to vegetated areas. d. Use landscaping to treat stormwater. 108 . LANDSCAPING: In finalizing the landscape plan for the biotreatment area, it is recommended that the landscape architect ensure that the characteristics of the selected plants are similar to those of the plants listed for use in bioretention areas in Appendix D of the SCVURPPP C.3 Stormwater Handbook. 109. EROSION CONTROL: Interim and final erosion control plans shall be prepared and submitted to the Engineering Division of the Parks and Public Works Department. A Notice of Intent (NOI) and Storm Water Pollution Prevention Plan (SWPPP) shall be submitted to the San Francisco Bay Regional Water Quality Control Board for projects disturbing more than one acre . A maximum of two weeks is allowed between clearing of an area and stabilizing/building on an area if grading is allowed during the rainy season. Interim erosion control measures, to be carried out during construction and before installation of the final landscaping shall be included. Interim erosion control method shall include, but are not limited to: silt fences , fiber rolls (with locations and details), erosion control blankets, Town standard seeding specification, filter berms, check dams, retention basins, etc. Provide erosion control measures as needed to protect downstream water quality during winter months. The grading, drainage, erosion control plans and SWPPP shall be in compliance with applicable measures contained in the amended provisions C .3 and C.14 ofmost current Santa Clara CountyNPDES MRP Permit. Monitoring for erosion and sediment control is required and shall be performed by the QSD or QSP as required by the Construction General Permit. Stormwater samples are required for all discharge locations and projects may not exceed limits set forth by the Construction General Permit Numeric Action Levels and/or Numeric Effluent Levels. A Rain Event Action Plan is required when there is a 50% or greater forecast of rain within the 48 hours, by the National Weather Service or whenever rain is imminent. The QSD or QSP must print and save records of the precipitation forecast for the project location area from (http ://www.srh.noaa.gov/forecast) and must accompany monitoring reports and sampling test data. A Rain gauge is required on site. The Town of Los Gatos Engineering Division of the Parks and Public Works Department and the Building Department will conduct periodic NPDES inspections of the site throughout the recognized storm season to verify compliance with the Construction General Permit and Stormwater ordinances and regulations. 110. DUST CONTROL: Blowing dust shall be reduced by timing construction activities so that paving and building construction begin as soon as possible after completion of grading, and by landscaping disturbed soils as soon as possible. Further, water trucks shall be present and in use at the construction site. All portions of the site subject to blowing dust shall be watered as often as deemed necessary by the Town, or a minimum of three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads , parking areas , and staging areas at construction sites in order to insure proper control of blowing dust for the duration of the project. Watering on public streets shall not occur. Streets shall be cleaned by street sweepers or by hand as often as deemed necessary by the Town Engineer, or at least once a day. Watering associated with on-site construction activity shall take place between the hours of 8 a.m. and 5 p.m. and shall include at least one late-afternoon watering to minimize the effects of blowing dust. All public streets soiled or littered due to this construction activity shall be cleaned and swept on a daily basis during the workweek to the satisfaction of the Town. Demolition or earthwork activities shall be halted when wind speeds (instantaneous gusts) exceed 25 MPH . All trucks hauling soil, sand, or other loose debris shall be covered. 111 . CONSTRUCTION ACTIVITIES : All construction shall conform to the latest requirements of the CASQA Stormwater Best Management Practices Handbooks for Construction Activities and New Development and Redevelopment, the ABAG Manual of Standards for Erosion & Sediment Control Measures, the Town's grading and erosion control ordinance, and other generally accepted engineering practices for erosion control as required by the Town Engineer when undertaking construction activities. 112. SITE DRAINAGE: Rainwater leaders shall be discharged to splash blocks. No through curb drains will be allowed. Any storm drain inlets (public or private) directly connected to public storm system shall be stenciled/signed with appropriate "NO DUMPING -Flows to Bay" NPDES required language. On-site drainage systems for all projects shall include one of the alternatives included in section C.3.i of the Municipal Regional NPDES Permit. These include storm water reuse via cisterns or rain barrels, directing runoff from impervious surfaces to vegetated areas and use of permeable surfaces. If dry wells are to be used they shall be placed 1 0 ' minimum from adjacent property line and/or right-of-way. 113 . STORM WATER MANAGEMENT PLAN : A storm water management plan shall be included with the grading permit application for all Group 1 and Group 2 projects as defined in the amended provisions C.3 of the Municipal Regional Stormwater NPDES Permit, Order R2-2009-074 . The plan shall delineate source control meas ures and BMP's together with the sizing calculations. The plan shall be certified by a professional pre- qualified by the Town. In the event that storm water measures proposed on the Planning approval differ significantly from those certified on the Building/Grading Permit, the Town may require a modification of the Planning approval prior to release of the Building Permit. The Applicant may elect to have the Planning submittal certified to avoid this possibility. 114. STORM WATER MANAGEMENT PLAN NOTES: The following note shall be added to the storm water management plan: "The biotreatment soil mix used in all stormwater treatment landscapes shall comply with the specifications in Attachment L of the MRP. Proof of compliance shall be submitted by the contractor to the Town of Los Gatos 30 days prior to delivery of the material to the job site using the Biotreatment Soil Mix Supplier Certification Statement." 115 . STORM WATER MANAGEMENT PLAN CERTIFICATION: Certification from the biotreatment soils provider is required and shall be given to Engineering Division Inspection staff 30 days prior to delivery of the material to the job site. Additionally deliver tags from the soil mix shall also be provided to Engineering Division Inspection staff. Sample Certification can be found here: http://www.scvurppp-w2k.com/nd_wp.shtml?zoom_highlight=BIOTREATMENT+SOIL 116 . AGREEMENT FOR STORMW A TER BEST MANAGEMENT PRACTICES INSPECTION AND MAINTENANCE OBLIGATIONS : The owners of the three properties shall enter into an agreement with the Town for maintenance of the storm water treatment facilities required to be installed on this project by Town's Stormwater Discharge Permit and all current amendments or modifications. The agreement shall specify that certain routine maintenance shall be performed by the owners of the three properties and shall also specify facility maintenance reporting requirements. The agreement shall also specify routine inspection requirements, permits and payment of fees. The agreement shall be recorded prior to release of any occupancy permits. 117 . SILT AND MUD IN PUBLIC RIGHT-OF-WAY : It is the responsibility of contractor and home owner to make sure that all dirt tracked into the public right-of-way is cleaned up on a daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into the Town's storm drains. 118. GOOD HOUSEKEEPING: Good housekeeping practices shall be observed at all times during the course of construction. All construction shall be diligently supervised by a person or persons authorized to do so at all times during working hours. The storing of goods and/or materials on the sidewalk and/or the street will not be allowed unless an encroachment permit is issued by the Engineering Division of the Parks and Public Works Department. The adjacent public right-of-way shall be kept clear of all job related dirt and debris at the end of the day. Dirt and debris shall not be washed into storm drainage facilities. The storing of goods and materials on the sidewalk and/or the street will not be allowed unless an encroachment permit is issued. The Developer's representative in charge shall be at the job site during all working hours. Failure to maintain the public right-of-way according to this condition may result in the Town performing the required maintenance at the Developer's expense. 119 . NEIGHBORHOOD CONSTRUCTION COMMUNICATION PLAN: The Applicant shall initiate a weekly neighborhood e-mail notification program to provide project status updates. The e-mail notices shall also be posted on a bulletin board placed in a prominent location along the project perimeter. 120. PERMIT ISSUANCE: Permits for each phase; reclamation, landscape, and grading , shall be issued simultaneously. 121. COVERED TRUCKS : All trucks transporting materials to and from the site shall be covered. 122 . FUTURE STUDIES: Any post project traffic or parking counts, or other studies imposed by Planning Commission or Town Council shall be funded by the Applicant. 123 . SUBDIVISION IMPROVEMENT AGREEMENT: The Applicant shall enter into an agreement to construct public improvements in accordance with Town Code Section 24.40.020. The Applicant shall supply suitable securities for all public improvements that are part ofthe development in a form acceptable to the Town in the amount of 100% (performance) and I 00% (labor and materials) prior to issuance of any permit. Applicant shall provide two (2) copies of documents verifying the cost of the public improvements to the satisfaction ofthe Engineering Division of the Parks and Public Works Department. 124 . UTILITY COMPANY REVIEW: Letters from the electric, telephone, cable, and trash companies indicating that the proposed improvements and easements are acceptable shall be provided prior to recordation of the parcel map. 125. ABOVE GROUND UTILITIES : The Applicant shall submit a 75-percent progress printing to the Town for review of above ground utilities including backflow prevention devices, fire department connections, gas and water meters, off-street valve boxes, hydrants, site lighting, electrical/communication/cable boxes, transformers, and mail boxes. Above ground utilities shall be reviewed and approved by Community Development prior to issuance of any permit. 126. PRIVATE EASEMENTS: Agreements detailing rights, limitations, and responsibilities of involved parties shall accompany each private easement. The easements and associated agreements shall be recorded simultaneously with the parcel map. TO THE SATISFACTION OF THE SANTA CLARA COUNTY FIRE DEPARTMENT: 127. WILDLAND-URBAN INTERFACE: This project is located within the designated Wildland-Urban Interface Fire Area. The building construction shall comply with the provisions of California Building Code (CBC) Chapter 7 A . Note that vegetation clearance shall be in compliance with CBC Section 701A.3 .2.4 prior to project final approval. Check with the Planning Department for related landscape plan requirements. 12 8. FIRE SPRINKLERS REQUIRED: An automatic residential fire sprinkler system shall be installed in one-and two-family dwellings as follows : In all new one-and two-family dwellings and in existing one-and two-family dwellings when additions are made that increase the building area to more than 3,600 square feet. Exception : A one-time addition to an existing building that does not total more than 1,000 square feet of building area. NOTE : The owner(s), occupant(s) and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to this department for review and approval prior to beginning their work. CRC Sec. 313 .2 as adopted and amended by LGTC. 129. CONSTRUCTION SITE FIRE SAFETY: All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification SI- 7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chapter 33. 130. ADDRESS IDENTIFICATION. New and existing buildings shall have approved address numbers , building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 4 inches (101.6 mm) high with a minimum stroke width of0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. CFC Sec. 505.1 131. FIRE DEPARTMENT ACCESS: The minimum clear width of fire department access roads shall be 20 feet. Modifications to the design or width of a fire access road, or additional access road(s) may be required when the fire code official determines that access to the site or a portion thereof may become compromised due to emergency operations or nearby natural or manmade hazards (flood prone areas, railway crossings , bridge failures, hazardous material-related incidents, etc. Refer to SCCFD SD&S A-1 and A-6 , available on our web site www.sccfd.org in the Fire Resources and Services Section, Fire Prevention CFC Chapter 5. 132. FIRE LANE MARKING: Detailed plans showing the location of the lanes may be required . Fire apparatus access roads, driveways and access ways shall not be marked as fire lanes without first obtaining Fire Department approval. Fire lanes shall be identified by red curb marking, signage or roadway surface marking as specified in our SD&S A-6 . CFC Chapter 5. 133. DEED RESTRICTION: Prior to the issuance of a building permit, a deed restriction shall be recorded by the applicant with the Santa Clara County Recorder's Office that requires that the owners of the three properties be responsible for keeping the shared driveway signed, marked, free and clear for fire department access. The property owner of Lot 2 shall keep Lot 2's driveway apron signed , marked, free and clear for fire vehicle turnaround with the exception of the surface parking space. N:\DEV\CON DITIONS\20 16\Unio n 15975-revi sed.docx 2/17/16 Town of Los Gatos Planning Commission Subject: Project Proponents’ Responses to Planning Commission and Neighbors Concerns Regarding Development of 15975 Union Ave Madam Chair and Other Commissioners: Thank you for the opportunity to improve and clarify our proposed plan of development for the subject property. Responsive to the Commission’s comments, we have improved the project layout by moving the fire truck turn around to Lot 2. This improves the availability of parking for Lot 3, which now has use of its driveway. We have added an extra parking space for Lot 2 by increasing its driveway dimensions, recognizing the parking restriction that will apply to part of the Lot 2 driveway. There are now three parking places on the property to be shared among the homeowners for use by their guests. We have also worked with the Town Staff to provide graphics regarding building placement and cross sections, topography, drainage, and traffic that we believe will more clearly present the proposed development. Our specific responses to the topics identified during the previous Commission meeting are: 1.Request for taller fence and screening at adjacent property line: This has been addressed by indicating an 8-foot fence on property line and adding Laurel trees along property in planter strip. (See Revised Landscape Plan – Drawing Number L1 2.Fence to be on property and maintained by new owners long term: The surveyor will place stakes ensuring that the new fence is on project property and the Maintenance/CCR Agreement will assign maintenance responsibility to the new owners. 3.Provide and verify other project examples with shared driveways with no parking: We have 4 examples of similar single-family projects we have developed in other jurisdictions listed below: a.264 Sequoia Avenue Redwood City b.145 Hawthorne Avenue Palo Alto c.842, 846, & 858 West Taylor Road San Jose d.731 & 735 Bay Road Menlo Park e.441 & 449 S. Sunnyvale Road Sunnyvale We have shown documentation of these examples to Town Staff and will have those documents available for Commissioner to view, per suggestion from Staff. 4.Concerns about no parking on shared driveway to provide fire access: This can be defined by adding no parking signs, red curb striping (if needed) along driveway on each side and also defined in a Maintenance Agreement exhibit to be recorded on Title. The Fire Department Standard for a shared driveway is a width of 20 feet. This is to accommodate two fire trucks passing each other. If a car is Illegally parked on the shared driveway a fire truck or engine can pass the car without issue. 5.Concerns regarding no parking in Lot 3 to provide fire access: The new plan has changed the fire turn around to be placed at Lot 2. Lot 3 driveway will be available for owner parking only. Lots 1 and 2 now each have an extra parking space designated for their owner use only. Three additional spots are included in the project property, assigned for guest parking. There are also 3 spots directly in front of project on Union Avenue with others on Blossom Hill Road. 6.Concerns regarding the self-enforcement to keep shared driveway and fire turn around free and clear: This can be clearly required in the Maintenance Agreement / CCR’s and this will be a recorded document against title of each lot. Additionally each owner will be clearly informed on the parking restrictions before they enter into sales contract to purchase property. 7.Concern there is no sidewalk on shared driveway: The Driveway is twenty feet wide. There is plenty of room for cars to pass safely (even a fire truck) and still allow enough room for pedestrian to be safe. This is equivalent to walking in a parking lot. (See the new Traffic exhibit) 8.Would like surface parking for each lot: As explained above both Lots 1 and 2 have a dedicated extra parking space (beyond their three-car garages) and Lot 3 will have use of their entire driveway. This does not count the use of the three shared “Guest” parking spaces. 9.Can a flag lot not be implemented?: The project is not viable with only two lots. We see no advantage to a flag lot concept in a three-lot project. 10.How will drainage be improved after this project is implemented?: The drainage improvement plan and additional exhibits created show that none of the storm water that may currently be surface draining from this property to the neighbors will occur in the future. It will all be detained on site or routed to the Union Avenue storm drain facilities. Our improvements cut off (as shown on plan) any storm water that may be coming onto project property from Blossom Hill Road or other sources. The plan prevents this water from subsequently impacting our neighbors. (See exhibits and explanation by Town Engineer and our Engineer) 11.How will Garbage trucks access the property: We have contacted the garbage company and they will pick up all three lots at curb side on Union Ave near the entrance to the project’s shared drive way. 12.Concerns regarding CCR’s for this project: The shared Maintenance Agreement document and/ or CCR’s can appropriately address and define all responsibilities for all owners. As discussed above there are many projects existing that deal with these issues. Bio-retention systems can have their own section with clear maintenance instructions and “how to and not to” advice. The Town Staff has informed us that they will address the issues regarding traffic and bike lanes. We have provided a schematic diagram incorporating Staff suggestions that we believe provides clarification. We want the Commission to understand that the proposed plan includes the dedication of 7,514 square feet of land (17 % of the parcel) to the Town, valued at $309,000. The Town is also requiring approximately $225,000 of improvements on this dedicated land and the existing street frontage. Additionally, we must install approximately $350,000 of retaining walls to support the elevations required by the Town’s perimeter improvements. This is a total contribution of $884,000 to the Town and the neighborhood. This magnitude of improvements costs cannot be supported without a three-lot, luxury-home development plan. We have met with the neighbors and the Town Staff on multiple occasions and have made all refinements that are practical to respond to concerns raised, We respectfully request that the Commission approve the plan as now proposed. Sincerely, D & C Development/Union Joint Venture Partnership Attachments: 1.Section and Site plan overlays (2 pages) 2.Existing Drainage 3.Proposed Drainage 4.Drainage Cross Section 5.Traffic Plan 6.Planting Plan DRAINAGE FLAW DIRECTION TYPICAL SECTION NE Hanna• Brunetti ■ Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 DRAINAGE EXHIBIT CROSS SECTION UNION AVE LOS GATOS, CA LOCATION: UNION AVE DATE 02/09/16 JOB NUMBER: 14075 SCALE: NONE I SHEET 1 Cf stm mh rim 296.85 inv 291.35 stm mh mm 213307 y 27612 ss mh m 303.1 pu lie thorounfare de looted La he to n of los go as p 732 c.r. E95 balm de planter porch f. f. 295.05 Irig;firo, xoll 4s- high wall s 894922 W Parcel A 571 M 50 ga brick :xisting house f.f. 294.37 f.f. 294.87 3 —4 M9' Parcel B 571 M 50 a exisf'ng garage f.f. 294, 44 brakp0 concrete 2n eo' 3.. hose bib hose bib Parcel C 571 M 50 existing shed catch basin manhole 0 rim 316,66 mein jG} curb utility box Parcel 4 407 M 45 and au le DRAINAGE FLOW DIRECTION Hanna • Brunetti ■ Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 DRAINAGE EXHIBIT EXISTING DRAINAGE PATTERN UNION AVE LOS GATOS, CA LOCATION: UNION AVE DATE 02/09/16 JOB NUMBER: 14075 SCALE: NONE SHEET 1 V' 1 — (w) (ss) (Ss) BiLOSSOM "HILL R-0`VD NE Hanna• Brunetti ■ Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 utility boe LEGEND mrSTORM WATER FLOW DIRECTION DRAINAGE EXHIBIT PROPOSED DRAINAGE PATTERN LOCATION: UNION AVE DATE 02/09/16 JOB NUMBER' SCALE: NONE SHEET 14075 1 V' 1 O F R E V I S I O N S D A T E : S C A L E : 51 UNIVERSITY AVE. "L" • LOS GATOS, CA. • 95030 • (408) 395-2555 NOTE: •The Contractor shall verify all dimensions, elevations and conditions, prior to starting any field work. •Any deviation called by field conditions, or any conditions different from those indicated on the plans shall be brought to the Architect's attention prior to installation. S H E E T A NEW SUBDIVISION: UNION ESTATES 15975 UNION AVENUE LOS GATOS, CA A S S H O W N A 4 . 4 - 3 7 1 1 / 1 9 / 1 5 3 1 ' - 2 " 1 0 0 ' S I T E R E T A I N I N G W A L L S W / D R A I N A G E SITE RETAININGWALLS W/DRAINAGE SITE RETAININGWALLS W/DRAINAGE FILL FOR ROAD,PARKING, & SIDEWALKPL P L BLOSSOM HILL RD. 1 0 0 L A S U E N C T . A C C E S S D R I V E W A Y 15' DEDICATION 9 1 ' 6 4 ' - 6 " 2 7 ' - 6 " 1 9 ' - 6 " 1 1 4 ' - 6 " FILL FOR ROAD,PARKING, & SIDEWALKSITE RETAININGWALLS W/DRAINAGE SITE RETAININGWALLS W/DRAINAGE S I T E R E T A I N I N G W A L L S W / D R A I N A G E PL P L BLOSSOM HILL RD. P O O L 1 0 4 L A S U E N C T . A C C E S S D R I V E W A Y OUTLINE OF HOUSE FROMORIGINAL LOCATION. NEWHOUSE 3' LOWER & 4'-4" FARTHERAWAY FROM NORTHERN NEIGHBOR15' DEDICATION 6 2 ' - 5 " 2 7 ' - 5 " 8 2 ' - 3 " 2 0 ' 1 0 6 ' S I T E R E T A I N I N G W A L L S W / D R A I N A G E SITE RETAININGWALLS W/DRAINAGE SITE RETAININGWALLS W/DRAINAGE FILL FOR ROAD,PARKING, & SIDEWALK P L PL BLOSSOM HILL RD. A C C E S S D R I V E W A Y 1 0 8 L A S U E N C T . 15' DEDICATIONPL LO T 1 LO T 2 LO T 3 SITE SECTIONS S C A L E : 1 " = 1 0 ' O F R E V I S I O N S D A T E : S C A L E : 51 UNIVERSITY AVE. "L" • LOS GATOS, CA. • 95030 • (408) 395-2555 NOTE: •The Contractor shall verify all dimensions, elevations and conditions, prior to starting any field work. •Any deviation called by field conditions, or any conditions different from those indicated on the plans shall be brought to the Architect's attention prior to installation. S H E E T A NEW SUBDIVISION: UNION ESTATES 15975 UNION AVENUE LOS GATOS, CA A S S H O W N A 4 . 5 - 3 8 1 1 / 1 9 / 1 5 R 36' O R I G I N A L L O C A T I O N N E W L O C A T I O N 2 ' T O T H E R I G H T & 4 ' - 4 " T O W A R D B L O S S O M H I L L R D . N 8 9 ° 4 8 ' 1 1 " E 2 4 7 . 8 0 ' S00°17'30"E 156.93' S 8 9 ° 4 9 ' 2 2 " W 2 7 7 . 8 0 ' N 00°17'30" W 117.02'24.14'N 25°18'30" E 26.58'N 47°06'58" ES 00°17'30" E 105.73' S 8 9 ° 4 8 ' 1 1 " W 2 3 1 . 6 7 ' S 00°17'30" E 141.87' N 00°17'30" W 141.90' 56.5 8 ' 141.93' 92.80' 8 0 . 0 0 ' 8 0 . 0 0 ' 71. 6 7 ' 8 0 . 0 0 ' 8 0 . 0 0 ' 3 9 . 7 ' 4 4 ' 4 5 . 9 ' S C A L E : 1 " = 1 0 ' SITE PLAN Drawn By:Designed By:FCJEChecked By:ACAD FILE NO:DATE:LT 354831 C52-18-16 1"=20'SCALE:STRIPING PLANPLANS FOR THE IMPROVEMENTS OF 15975 UNION AVE CALIFORNIASANTA CLARA COUNTY 2PD-1 SHEET OF 21300-B FIRST STREET GILROY, CA 95020 (408)848-3122 WWW.HATCHMOTT.COM CONCEPTUAL Revision IMO Landscape Notes 11 Final construction droning call Include rs'i Irrigation Plan, Details, and 5pecifleatlons that meet the requirements of the N4ter Efficient landscape Rules 2) Eeaet location of plants on site to bo adjustsd so as to best 000rdirote with irrigation csrportsnt locations, 1ghLs, drainage features, and sealer. SI Use 3 Inch deep mulch In old planting arena. Fradde a1ror wlth different much samples oral prices Irwludhg Rodnood ohlp Prom Reueer In Cloverdale, and Mahogany colored Piondor MUlah tram Vision Recycling In Fremont 4) Install plants For all plant circles shahs on the plan even If they aren't labeled. Call far clarification. For bidding purposes, If no ens Is avallablo to answer Questions, assume that any plant circle scaled less than 5' wide is 5 gal. size and wry circle scaled Ierger Is 15 gal. size 5) The pion is schematic. pent install plants too close to edges of paring on buildings. Keep valves and q'ck cotplers away Pram trees. 6) The plants will do much bettor If efforts to uncompact soil that has Is corrpootsd during building construction, 1) See space, concerning soil amendment., and Fertilizer. For bidding purposes until the soil fertility teat is done, bid 6 cubic yards of DPI Organics Super Humus Oampast 16 pounds of I2-12-12 Fertilizer tilled Into the top 6" to 5' of soli after ripping sail to 12" deep. except on stoop slopes. Some of the planting areas are so marrow that It will reed to be dug in by hand_ 5) There ors no lawn aneoo NJ l'reservs nd protect the sedating Reined Tree on Let I oe per the reommerdotlars m the ANrorlat Report 'including proteetlYe fencing pla:od In the location specified In the orborbt report Ho utility trench shall be °Named within 15 feet radius of on existing mature tree, 5oring, air spade, or other excavation method as approved by Line Gity Amorist shall be considered to protect sxistng mature tree. Consult with the filly Arborist prior to adjusting locations of utility fins. Read the project anborlst's Vela report and tree protection plan concerning the protection of all exleting trees to be saved during canetructlon, :/// w r 5 Landscape Fence Legend L❑ 6'-D' tall Aped fence ❑S 6'-0' tall Hood fence on top of retailing nail 6'-0' eoll Head gat0 to moleh fdroe 6'-0' toll solid woad fence plus 2'-D" lattice on top on top of retalnhg mail on north property line 6'-0' tall aalld woad fence plus 2'-O" lattice on tap Fences step down slope, 51_0550M Landscaping In rear yards by future avers Existing trees to be nemovad 012J See Arbarlst Report LL RCAF) 4 511E BOTANICAL NAME COMMON NAME Plstacla chlnensle replacement trees for hoes Laurus Saratoga replacement trees for trees c024 15 24. box Garcia occidental-15 replacemnt tress for Nees L 1. 30 Fohvl 24" laax replacement trees + L9 total = the aqulvdlent of 56 - 24" box replacarent In Dieu Fees ors ',squired for I55-56=11 - e'4" Plant Legend KEm' QTr TREES ® p196 15 36" box LL L524 15 24" tzar: TALL 5HRLE5 and VINES RI 5 Rhus Integliolla 511 5 Hestring1a fruticaso PI 5 PlttesplNn tenulrol1n1 F5 5 FOlyoa sollowlana cc GL • Myrtus eomrnunis oorpecto • Clytoetoma aa111etlgaldes provide lattice on mall ?7B S Dletlotls baoalnatcrla provide lattice an Troll Landscaping In rear yard, by Puturs owners 1sa ri nevr1ss Chines Pletadle being removed being r rnovad ltern Redlaid being removed 36' box replacement trees tre booareplocement trees KEY 51ZE BOTANICAL. NAME NE➢II1M 5HRLB5 KC 5 RC 5 DV 5 N.C. 5 LB 3 GC 5 SWUNG' COVERS LM I Lemonade Derry 1211 I I❑ 1 SL 1 Fleaapple esauo `a''1 14ynbe T 1 L mender Trumpet Vine CA I \ BIO RERTITION AREA DIcadrod Trumpet Vine J I C. Mf Heroine Gulf Stream Rha hie lapis minor plate egeta Nandlna Sul? Stream �Lc�mr,a1_ndra Breese ]' ""J commie campacta COMMON NAME keavenly Bamboo India ffawthame Fortnight Lily Heavenly Bamboo 'Rvarf Myrtle Lantana montevlldordb purple Purple Lantana Lantana mont0Ylderlsle white Mite Lantana Irrs da gloslara 122140n Sian Native Iris Salvia leuccrtha 00Klaan Sage Salvia Hatlps Teucrn n chamomile Germander Galomagostls Karl Foerster Pacific Read Grass amaus batons chandropotolum tectnus J LOT 5 r� 1 ' r I X� _ ��' is r .�;.._...-..r ul.�aaic�ufva�'� r . • � e_ fi rest-fekl �T-' �.SMegh�r's) -RI LJ Sgve Tree� (Nelghtwr's) 5- e Trees TfZEE PRCTEGTION 94," CHAIN LINK FENCE 1'1/2" GALVANIZED IRON POSTS DRIVEN 2' MIN INTO GROUND NO MORE THAN IC' ,,,,FART AT LEAST 5' FROM TRUNK OF 11rot BEFORE ANY DEMOLITION AND DARING OONSYRL4TION 54tF Planting Plan 111 =1100r-On 20. 21FI Rush Small cope Rush I-F536 8@8116 Mamma* 76 Mammas isk sninsdMxmnrh [� Dom 5 le newtonadded az PHin6 Tnse errd Nye ulormd APN 523-42-017 Oman Gnu soh 2L1 Erin M. Walters From: Sent: Jan Murray <alwaysmurrayjl@yahoo.com > Monday, February 01, 2016 8:31 AM RECE~VED FEB 0 1 2016 TOVVN OF LOS GATOS PLANNING DIVISION To: Sub jed: Erin M . Walters M-i?-~\ . ::;..-tG-~-6 \\ re 15975 Union Ave ingress/egress traffic--and my voice message to you Hello Erin, I just left you a voice message about ingress/egress from 15975 Union. In hindsight, I was thinking that an e-mail might have been a better choice. Regarding the traffic concerns raised by the Planning commissioners, they addressed the issue of exiting the driveway. 1. Left turn onto union, simultaneous with a driver from Blossom Hill turning right. (As raised at the meeting.) Also, entering the driveway presents challenges: 2 . From Blossom Hill, turning onto union and immediately stopping to make a left turn into the driveway. Often vehicles follow quite closely and are surprised when a vehicle stops to left into Lasuen. we (as residents) have all learned to pump our brakes a bit as we pass the first lot so that the car behind us recognizes that we are slowing for Lasuen Ct . The cars then typically swerve around in the gap left near Leeward. Entering 15975 union from Blossom Hill g1ves the drivers less lead time to prepare. (This situation happens da1ly, but over the years we've only seen a couple of fender benders as a result.) 3. If there is a right turn lane at 15975 union and traffic is backed up to the BH light for a left turn, and a driver is coming from Blossom Hill to turn left into 15975, if the stopped traffic in the center lane allows the turn, there's still the chance that a driver could pull out into the right lane near and accelerate into the car trying to cross the traffic into 15975. Last summer we saw this periodically at Lasuen Ct . due to the drivers using the unmarked parking lane mistakenly as access to bypass traffic waiting at the light. clear striping will likely help avoid this problem, but it would be useful for the traffic engineers to think this through with the mind of an impatient driver who is possibly using WAYZ to avoid highway 85 and unfamiliar with the intersection. (This situation does not occur as often as #2, however it seems to pose a higher risk to occupants if it were to occur .) when considering some of the traffic issues that have come up at Lasuen and how those issues might affect the 15975 driveway that is both closer to the intersection and compounded with an adjacent right turn lane, it occurred to me that perhaps it would be possible to explore the option of using the shared driveway from Blossom Hill that already exists. Perhaps those homeowners would be interested in sharing the maintenance and expanding their neighborhood group for some negotiated accommodation. Just a thought. Jan UHIBIT 1 8 1 From: Susanne Belshe [mailto:susannebelshe@gmail.com] Sent: Wednesday, March 02, 2016 11:51 AM To: Erin M. Walters RECE ~VIED MAR 0 2 2016 TOWN OF LOS GATOS PLAN NING D IVISION Subject: Re: 15975 Union Avenue-Planning Commission Meeting March 9th at 7pm Hi Erin, As I mentioned before, my family and I live in an impacted home on 108 Lasuen Ct, Los Gatos . I will not be at the meeting on March 9th, can you please include my comments 1. Last meeting I raised concerns about that the houses are too large in terms of height which I don't feel were addressed due to the traffic issues. The homes tower over their neighboring homes. I am specifically concerned about Lot 3 whose base elevation is the highest and is adjacent to my home. The only reduction they have implemented has been a result ofthe change ofthe floor base due to the city's requirement for a different drainage solution. I don't understand why the first floor needs to be 1 0' 1" tall and the second floor 9'4"! Ideally, I would like to see the entire home height reduced! The way it stands right now, Page A4-3 dated November 19 show significant shadow from lot 2 over our backyard and house during the winter. The mass can be reduce in the following ways 1. Ideally, lower the height of the first and second floor 2. Lower the height of the first floor only 3. Lower the height of the 2nd floor only 4 . at least lowering the height of the garage (it is 11' 2" tall!) This would at least reduce the mass that is closest to Lasuen Ct homes (the garages). I realize that this would cause the 2nd floor to be hi-level but they have so much unnecessary vertical space add here to avoid adding the steps (11 '2" tall ceiling in the garage, and duct space in both the floor and ceiling!) 5. And if none of the above , I understand that LOT 2 has been moved back 4 fe et ... if LOT 3 could be moved back then the mass would be minimized 2. Secondly, I am concerned about the impact on traffic when the residents turn on left at the light on Blossom Hill Road onto Union only to immediately stop in order to enter their driveway. I would hate to be the car behind the resident that unexpectedly comes to a halt immediately after the light turns green. If it is during the evening rush hour (when Union is backed up at the light) it could cause a grid lock. The resident will be unable to turn left because of queued cars and the people who followed the resident will block the intersection and no one will be able to move even when Union's light turns green. (Does this make sense? If not, I can draw a diagram!) Thank you, Susanne Belshe 1 08 Lasuen Ct Los Gatos 408-356-6708 From : ggimlan@comcast.net [mailto:ggimlan@comcast.net] Sent: Thursday, March 03, 2016 12:26 AM To: Erin M. Walters Cc: Gimlan, Joni; Jan Murray; susannebelshe@gmail.com Subject: Re: 15975 Union Avenue-Planning Commission Meeting March 9th at 7pm RECEIVED MAR 0 3 2016 TOWN OF LOS GATOS PLANNING DIVISION Jv{,-l ?-oo ! 8 -~~~-CJI\ Subject: Fw: Fwd : 15975 Union Avenue-Planning Commission Meeting March 9th at 7pm · Hi Erin, We are getting mixed messages about changed plans. This seems very confusing . There is much that has not been addressed, particularly on the traffic flow impact on our property just North of Lot 1 . Are we going to have garbage trucks beeping loudly to back up behind our house AND in front of our house 6AM every Friday? We did not sign up for that. Are the folk on lots 2 and 3 going to be noisily rolling their trash cans every Thursday night to behind our house? Will the heavy garbage trucks undermine our existing retaining walls? What about in and out truck traffic by delivery trucks into that private driveway for all 3 homes? It appears that the whole nature of our back yard is going to be changed from one where we backed up onto a quite single family home to one where we have a major highway in our back yard prone to all sorts of deterioration of our previous enjoyment of our property including with respect to noise, heavy traffic impact on our retaining walls, air pollution (we will get the vehicle offgas i.e. diesel from all of lots 1, 2 and 3}. Will the driveway be allowed to be a hangout for teenagers blasting their radios? Garage bands? None of this has been addressed in the rush for profits. Also as Susan Belche rightly points out, there will be no way for the new neighbors (or delivery trucks to them) to safely enter their driveway if coming home via Blossom Hill Road . They will invariably end up making U turns through our court (Lasuen Ct) and in particular right in front of our house. Noise and traffic are going to increase for us both in the back and in the front of our house. A double whammy. Signed, concerned --The Gimlans From: Jan Murray [mailto:alwaysmurrayjl@yahoo.com] Sent: Friday, March 04, 2016 12:12 AM To: Erin M. Walters Subject: 15975 Union Avenue proposal comments Erin , hello, Per the 15975 proposal as it stands, To Erin Walters, the DRC and the Planning Commission, RECEIVED MAR 0 4 2016 TOWN OF LO S GATOS PLANNING DIVI SION M-\~-~\ {'It -\t7 -ooq -o\ \ During 2015, the majority of discussion and developer revisions have been on critical engineering design factors that the developer had not incorporated in the original proposals. According t o my understanding from the town documentation, the developers revisions appear to have corrected problems including runoff water management, emergency vehicle access, safe parking, and resident driveway acc ess. Those critical basics took multiple iterations with the DRC to resolve . Some of the concerns regarding neighborhood , community, and environmental impact that were raised earlier in the process are yet to be addressed. The Belshes and Gimlans have enumerated several of these remaining concerns including -noise management, -traffic safety, and -relatively excessive mass and height of the proposed houses. In addition to their comments, we ask that you please recommend that the developer reduce the height and mass of the proposed homes for both energy conservation and for the impact on the neighbors. Ce iling heights proposed remain over 10 feet in most rooms and are in excess of 9 ft 4" in the remainder. This excessive ceiling height trend represents up to 20% waste in energy used for heating, cooling and lighting. As for impact to the neighbors, house 3 as proposed not only looms over the Lasuen neighbors, it also looms over the future lot 2 house eclipsing sunlight from that home, and increasing house 2's energy consumption as well. The ex cessive tall nature of these proposed suburban homes is a lose-lose proposition for existing and future residents. -In regard to traffic safety, we ask that Union Avenue in Los Gatos be permanently planned and stri ped as a 2 lane road with only limited,additional designated tum lanes and adequate space for bi kes, on street parking as well as safe pedestrian pathways. When the Union and Blossom Hill intersection is enlarged, there is a good possibility of an increased traffic flow in the area. We also ask that the town of Los Gatos act as our agents in working with San Jose to improve the lane striping and clarity and to limit the speed for the safety of all traveling along Union Avenue to and from Highway 85. Thank you for your consideration of these matters, Jan Murray and Peter Costigan OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W S U B D I V I S I O N : UN I O N E S T A T E S 15 9 7 5 U N I O N A VE N U E LO S G A TO S , C A AS SHOWN A0.1 -1 11/19/15 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 CIVIL TITLE SHEET BLUEPRINT FOR A CLEAN BAY STANDARD GRADING NOTES DEMOLITION PLAN TENTATIVE MAP GRADING AND DRAINAGE PLAN GRADING AND DRAINAGE PLAN SECTIONS SECTIONS STORM DRAIN BASIN PLAN EROSION CONTROL PLAN PROJECT DATA SITE 1 SITE AREA = 12,886 SF ALLOWABLE AREAS: HOUSE F.A.R. = .35 - [ 12.9-5 X .2 ] = .35 - .06 = .287 25 .287 X 12,886 = GARAGE F.A.R. = .10 X [12.9-5 X .07] = .10-.022 = .078 25 .078 X 12,886 = ALLOWABLE STRUCTURAL COVERAGE = 5,176 SF PROPOSED STRUCTURAL COVERAGE = 2,958 SF IMPERVIOUS COVERAGE = 3,666 SF SITE 2 SITE AREA = 11,351 SF ALLOWABLE AREAS: HOUSE F.A.R. = .35 - [ 11.4-5 X .2 ] = .35 - .05 = .300 25 .300 X 11,352 = GARAGE F.A.R. = .10 X [11.4-5 X .07] = .10-.018 = .078 25 .082 X 11,352 = ALLOWABLE STRUCTURAL COVERAGE = 4,540 SF PROPOSED STRUCTURAL COVERAGE = 2,988 SF IMPERVIOUS COVERAGE = 3,937 SF 1,850 SF 1,548 SF 3,398 SF FIRST FLOOR SECOND FLOOR TOTAL3,698 SF 1,004 SF GARAGE 760 SF PROPOSED AREAS: 1,646 SF 1,722 SF 3,368 SF FIRST FLOOR SECOND FLOOR TOTAL GARAGE 737 SF PROPOSED AREAS: 3,406 SF 931 SF 1,646 SF 1,722 SF 3,368 SF FIRST FLOOR SECOND FLOOR TOTAL GARAGE 737 SF PROPOSED AREAS: SITE 3 SITE AREA = 11,353 SF ALLOWABLE AREAS: HOUSE F.A.R. = .35 - [ 11.4-5 X .2 ] = .35 - .05 = .300 25 .300 X 11,352 = GARAGE F.A.R. = .10 X [11.4-5 X .07] = .10-.018 = .078 25 .082 X 11,352 = ALLOWABLE STRUCTURAL COVERAGE = 4,541 SF PROPOSED STRUCTURAL COVERAGE = 2,882 SF IMPERVIOUS COVERAGE = 4,132 SF 3,406 SF 931 SF AVERAGE SLOPE 5.65% AVERAGE SLOPE 8.00% AVERAGE SLOPE 9.59% TOTAL LOT AREA GROSS 43,104 SQ FT. DEDICATION 7,514 SQ FT. NET 35,590 SQ FT. MAX. HEIGHT ABOVE (E) OR PROPOSED GRADE WHICHEVER IS LOWEST = 27'-1" MAX. HEIGHT ABOVE (E) OR PROPOSED GRADE WHICHEVER IS LOWEST = 26'-9" MAX. HEIGHT ABOVE (E) OR PROPOSED GRADE WHICHEVER IS LOWEST = 27'-8" SITE DATA ARCHITECT: KOHLSAAT & ASSOCIATES 51 UNIVERSITY AVENUE, SUITE L LOS GATOS, CA 95030 TEL: (408) 395-2555 CIVIL ENGINEER: HANNA-BRUNETTI 7651 EIGLEBERRY STREET GILROY, CA 95020 TEL: (408) 842-2173 SCOPE OF WORK REMOVE EXISTING STRUCTURES FROM PROPERTY, CREATE THREE NEW LOTS AND BUILD THREE NEW SINGLE FAMILY RESIDENCES: LOT 1 - 3,398 SF RESIDENCE WITH 760 SF GARAGE; LOT 2 - 3,368 SF RESIDENCE WITH 737 SF GARAGE; LOT 3 - 3,368 SF RESIDENCE WITH 737 SF GARAGE. LANDSCAPE ARCHITECT: GREG LEWIS LANDSCAPE ARCHITECT 736 PARK WAY SANTA CRUZ, CA 95065 TEL: (831) 425-4747 SOIL ENGINEER: SILICON VALLEY SOIL ENGINEERING 2391 ZANKER ROAD, SUITE 350 SAN JOSE, CA TEL: (408) 324-1400 ARBORIST RICHARD GESSNER MONARCH CONSULTING ARBORISTS LLC P.O. BOX 1010 FELTON, CA 95018 (831)331-8982 PROJECT DIRECTORY OWNER: PROJECT ADDRESS: APN#: ZONING: SITE AREA (GROSS): (NET): BETCHART UNION AVENUE JOINT VENTURE PARTNERSHIP C/O DeNARDI GROUP 349 FIRST STREET LOS ALTOS, CA. 94022 15975 UNION AVENUE LOS GATOS, CA 95032 523-42-017 R-1:10 43,104 SF (.99 AC) AVG. SLOPE 10.35% 35,590 SF (.82 AC) AVG. SLOPE 7.75% SHEET INDEX Map data ©2015 Google 500 ft Street View ·Search nearby 15975 Union Ave, Los Gatos, CA 95032 Search nearby: (hotels·restaurants) VICINITY MAP SITELOS GATOS A0.1 COVER SHEET A2.1 A2.2 A2.3 A2.4 A2.5 A2.6 FIRST FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN FRONT & LEFT ELEVATION REAR & RIGHT ELEVATION SECTIONS A3.1 A3.2 A3.3 A3.4 A3.5 A3.6 FIRST FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN FRONT & LEFT ELEVATIONS REAR & RIGHT ELEVATIONS SECTIONS A4.1 A4.2 A4.3 A4.4 A4.5 NEIGHBORHOOD PLAN STREETSCAPE SHADOW STUDY SITE SECTIONS A, B, C ADJUSTED SITE PLAN A1.1 A1.2 A1.3 A1.4 A1.5 A1.6 FIRST FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN FRONT & LEFT ELEVATIONS A REAR & RIGHT ELEVATIONS A CROSS SECTIONS L1 L2 PLANTING PLAN EXISTING TREE LIST LOT 1 LOT 3LOT 2 LOT 1 LOT 2 LOT 3 GENERAL SITE CIVIL THIS PROJECT IS LOCATED IN THE WILDLAND URBAN INTERFACE ZONE AN APPROVED RESIDENTIAL FIRE SPRINKLER SYSTEM COMPLYING WITH NFPA 13D SHALL BE INSTALLED THROUGHOUT ALL 3 RESIDENCES. CLIENT CHANGE 2/18/161 0 1- O 0_ 1-7 0 11 O J O z 0 O 2 H >- co z O 0 J CO 0 [L' 0 z 0 0 0 0 L.LJ L.L w z 0 z w I z Nit�1�y 3 GPEN yYALEr--- Yl•'N.rJi�, i.O SiIRA&CGS -^., aro: SPRL'E PTiEZE-�•VE I 6! _� MONTE OPEN S WISE PRESERVE er.MA!Y G Las Altos unn vale fi. 105 f f'er3 O- w-Y SPACE .: SAN A.V'v.'1.YJ.1 e l—'YQ A.ARV 4? Permant nit VONT 9ELLf.CPE•� SPACE PT. SES't I 6 ^ STATE �: L'oaysv PARK r I SARAT1OA GA dp#N APR=E rt. :is 34 a3 LSARA IGGA •r" OjbER OPER SPACE iFf.EiEns£ d. E—� dam, v"n Saratoga r {r • v > I 6 .. k/', ••• AfCY•'k163� 'ASTLE 'AF&'GPEr UM -.._ERR I it. v.,,,d ELL 365 '' urie,-_.t AO. PLEASANT Los Gatos c0u ABBREVIATIONS AC AB AD BC BLDG BOC BO BWF CATV CB CI CL CMP CO CONC DI DIP DWY E EC EG ELEV EP ER (E) FF FG FH ASPHALT CONCRETE AGGREGATE BASE AREA DRAIN BEGINNING OF CURVE BUILDING BACK OF CURB BLOW OFF BARBWIRE FENCE CABLE TELEVISION CATCH BASIN CURB INLET CENTERLINE CORRUGATED METAL PIPE CLEAN OUT CONCRETE DROP INLET DUCTILE IRON PIPE DRIVEWAY ELECTRIC LINE END OF CURVE EXISTING GRADE ELEVATION EDGE OF PAVEMENT END OF RETURN EXISTING FINISH FLOOR FINISH GRADE FIRE HYDRANT LEGEND EXISTING 450 tc 236.56 inv 169.63 pcc 259.56 fl 158.95 ac 365.75 tg 365.75 tw 365.75 bw 395.65 0 0 L PARR !" L-I FL G GM GB CUY GV HP INV IP JP JT LP MAX MIN N.I.C. OHU PB r• Monte Serena 3TOR rsing:an Res. T9'9' rov a CATER REC. d molt FLOWLINE GAS LINE GAS METER GRADE BREAK GUY WIRE FOR POLE GATE VALVE HIGH POINT INVERT OF PIPE IRON PIPE JOINT POLE JOINT TRENCH LOW POINT MAXIMUM MINIMUM NOT IN CONTRACT OVERHEAD UTILITY PULL BOX ose c ,mpbell 0_, 6U.laALL'PE t?E3: WArO9 REG. AR0A 141945 ti:iL'.-IEiY 11 0` Y . ~ "NEW ALLIA,LEN WV C. H'SF, LA.YCMA,5.5 C,SF _71 VICINITY MAP NO SCALE PL PROPERTY LINE P.S.E. PUBLIC SERVICE EASEMENT P.S.D.E. PRIVATE STORM DRAIN EASEMENT PVI POINT OF VERTICAL INTERSECTION RCP REINFORCED CONCRETE PIPE R/W RIGHT OF WAY SD STORM DRAIN PIPE SS SANITARY SEWER PIPE STM STORM DRAIN MANHOLE SSMH SANITARY SEWER MANHOLE SP SERVICE POLE PROPOSED 454 w (length) LF (size) SD (length) LF (size) SS CONTOUR ELEVATION -w WATER MAIN s-(grade)STORM DRAIN TC 236.65 INV 457.35 PCC 257.65 FL 125.48 AC 359.45 TG 359.45 TW 359.45 BW 458.25 ■ 0 ■ STD SW T TBM TC TOB TOE TYP W WM WV s=(grade) SANITARY SEWER TOP OF CURB ELEVATION PIPE INVERT ELEVATION PORTLAND CONCRETE ELEVATION FLOWLINE ELEVATION ASPHALT CONCRETE ELEVATION TOP OF GRATE ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION ELECTROLIER FLOW DIRECTION DROP INLET MANHOLE CURB INLET WATER METER FIRE HYDRANT WATER VALVE SS * MON SIDEWALK VERTICAL CURB CURB & GUTTER JOINT TRENCH RETAINING WALL SEWER LATERAL TREE TO BE REMOVED MONUMENT ROCK RIP -RAP STANDARD SIDEWALK TELEPHONE LINE TEMPORARY BENCHMARK TOP OF CURB TOP OF BANK TOE OF BANK TYPICAL WATER LINE WATER METER WATER VALVE Tentative Map Grading & Drainage Plans NOTE: WHERE THE FIRM OF HANNA & BRUNETTI DOES NOT PROVIDE CONSTRUCTION STAKES, SAID FIRM WILL ASSUME NO RESPONSIBILITY WHATSOEVER FOR IMPROVEMENTS CONSTRUCTED THEREFROM. NOTE TO CONTRACTOR CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER. for 15975 Union Avenue in the Town of Los Gatos Santa Clara County, California EXISTING UNDERGROUND UTILITIES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED ON RECORD INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF PREPARATION OF THESE PLANS. LOCATION MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AT LEAST 2 WORKING DAYS IN ADVANCE OF CONSTRUCTION TO FIELD LOCATE UTILITIES. CALL UNDERGROUND SERVICE ALERT (U.S.A.), AT 1-800-642-2444. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF UTILITIES SHOWN ON THESE PLANS, INDICATED IN THE FIELD BY LOCATING SERVICES, OR EVIDENCE BY FACILITIES VISIBLE AT OR ADJACENT TO THE JOB SITE. ANY ADDITIONAL COST INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR AND IS DEEMED INCLUDED AND MERGED IN THE CONTRACT UNIT PRICE. NOTE: ADVANCE NOTICE SHALL BE PROVIDED TO NEIGHBORING PROPERTY OWNERS AND SCHOOLS OF HEAVY CONSTRUCTION ACTIVITIES AND HEAVY CONSTRUCTION SHALL NOT START BEFORE 8:30 AM ON DAYS WHEN SCHOOLS ARE IN SESSION. NO CONSTRUCTION IS ALLOWED ON SUNDAYS. DATE: 15 HANNA & BRUNETTI ARNOLD R. BRUNETTI RCE 17186 EXPIRES 6-30- 17 Lu * BENCHMARK THESE PLANS ARE BASED ON THE TOWN OF LOS GATOS BENCHMARK. BENCHMARK ID: LG24 ELEVATION: 348.83 FEET DESCRIPTION: SET BRASS DISK IN MONUMENT WELL STAMPED 'LG#24' LOCATION: INTERSECTION OF BLOSSOM HILL ROAD AND CAMINO DE CERRO PROFESS/ Q -4-- NO. 17186 — ▪ Z m EXP. 6-30-15 C/VI1- \P z,,OFCALI. / BASIS OF BEARINGS THESE PLANS ARE BASED ON THE CENTERLINE OF UNION AVENUE AS SHOWN ON THESE PLANS AS NORTH 00' 17' 30" WEST. FLOODZONE STATEMENT COMMUNITY PANEL NUMBER: 06085C0381H MAP REVISED: MAY 18, 2009 PROJECT IS LOCATED IN ZONE X500 ZONE X500 AN AREA INUNDATED BY 500-YEAR FLOODING; AN AREA INUNDATED BY 100-YEAR FLOODING WITH AVERAGE DEPTHS OF LESS THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE MILE; OR AN AREA PROTECTED BY LEVEES FROM 100-YEAR FLOODING. OWNER DENARDI GROUP 349 FIRST STREET LOS ALTOS, CA 94022 WWW.DENARDIHOMES.COM CIVIL ENGINEER HANNA & BRUNETTI 7651 EIGLEBERRY STREET GILROY, CA 95020 OFFICE: 408 842-2173 FAX: 408 842-3662 EMAIL: ENGINEERING@HANNABRUNETTI.COM ARCHITECT KOHLSAAT & ASSOCIATES 51 UNIVERSITY AVENUE 'L' LOS GATOS, CA 95030 OFFICE: 408 395-2555 LANDSCAPE ARCHITECT GREGORY LEWIS 736 PARK WAY SANTA CRUZ, CA 95065 OFFICE: 831 425-4747 SHEET INDEX 1 COVER SHEET 2 BLUEPRINT OF A CLEAN BAY 3 GRADING NOTES AND STORM WATER TREATMENT DETAIL 4 DEMOLITION PLAN 5 TENTATIVE MAP 6-7 GRADING AND DRAINAGE PLAN 8-9 SECTIONS & DETAILS 10 STORM WATER MANAGEMENT PLAN 11 EROSION CONTROL PLAN a) O J O O (0 0 N REFERENCES >- z HORIZ. SCALE: z d cn h DESIGNED BY: A.W. CHECKED BY: DRAWN BY .— +� 0 C _ c0 cnrn -0 COD L- 5 v 120 ■ 0 • +, v L L 1.0 a) v— C 0 Cu. 30 CU T 0 1 REVISIONS: DESCRIPTION BLDG SUBMITTAL w SHEET 1 OF 11 JOB NO. 140 75 ORDINANCE OF THE T • ESTABLISHING REQUI STORM WATER POL,LUTI • Sec. 22.30 040.1,0forooreent A. t:rirrtinai. penaiities. Any p violates any provision of this a misderneanor anti upon con punishable by imprisonment i term not to exceed six mon exceed $1,000 or by both. E of this Article shall constitut Every day each such violation additional offense. B ivit Penalties. Any person applicable materials, grease: watercourse or the municipai violations of any provision o croiily liable to the TOWN QP not to ex $2,000 per day the viola c n occurs In dete such award, the court shah e ,matters as justice may req repeated violation,. which contemporaneously with the treated as separate cause o subject to a separate award of C Cfyil Liability.' Any perso provision of this Article shall TOWN OF LOS GATOS fo attorneys fees, associated elimination and remediatio conditions caused by the disc the municipal storm drain syst violation of this Article D. Remedies Cumulative. The in this Article are cumulative shall be in addition to any a available to the TOWN OF L• and federal Jaw (Ord No 1940, § i, 5-3-93) rson who knowingly rticle shall be •guilty of action there& shall be the county jail for a or by a fine not to and every violation a separate offense. continues shalt be an who discharges any or pollutants into a storm drain system in this Article shall be OS GATOS in a sum far each day in which mining the amount of • nsider proof of such 're. Subsequent or are not committed ttial violation, shall be action and shall be damages who violates any • = civilly liable to the all costs, including th the investigation, of environmental rge of pollutants into m or a watercourse in emedies provided for nd not exclusive and d all other remedies GATOS under state Urban Runoff • ollution In the Santa Ci. ra Valley, storm drains flo directly to local creeks - nd San Francisco Bay with no treatment. Urb - n runoff pollution is a serious problem for wildlife depen • ing on our waterways and fo the people who live near s reams or baylands. Stain . common sources of urn runoff pollution include spilled oil, fuel, and other uids from vehicles and heavy equipment; co struction debris; and of er used materials such as paint, concrete, a d soil. Thirteen valley ities have joined together ith Santa Clara County and Santa Clara Valley Water r istrict to educate and en age local residents and bu,inesses in preventing urb: n runoff pollution. We ho • e you will join us by using t e practices described ere. Spill Respons - Agencies Dial 9-1-1 For currently occurring s►dl Santa Clara Valley W Environmental Comp! For spills in creek District since Division 408) 265-2600 Santa Clara County E vironmental Health Services 408) 299-6060 For more informat on on related topics, contact a encies fisted belo Santa Clara County Hi usehold Hazardous Waste P ► ram 408) 299-7300 Santa Clara County 0 " ice of Toxics and Solid Waste Man gement 408) 441-1195 Santa Clara County R San Jose/Santa Clara Control Plant Serving Campbell, Cupertin Monte Sereno, San Jose Santa Clara Valley U Pollution Prevention cycling Hotline 800) 533-8414 ter Pollution 408) 945-6300 Los Gatos, Mlfpitas, anta Clare, Saratoga n Runoff rogratn 800) 794-2482 fIluepiint rail g Best Man for Constr 1,•`,•_ -i a_ s re Iffilfrl:,laT gement Practice ction Activities ecial Note: As a contrac ponsible for any environ n. General Construction and Site Supervision r �4c.• i1t1 , Fresh Concrete and Mortar Application Painting and Application of Solvents and Adhesives Advanced Manning C1 schedule wave ion and grading activities f. r dry weather periods. ❑ Plan water flow a d runoff across site so as t. reduce movement.of soil, especially during excavation U Train and inform : mployees on stormwater requirements. ❑ inform subcontra tors about their responsibilit to follow stormwater requirements. ❑ Designate an are creeks and storm for auto parking, refueling and rout equipment maint ❑ Prepare, maintai implement a site Grading, Erosion Sediment Control Cl Provide proof of RWQCB), which i site specific SWP than 5 acres of la disturbed (total, a ❑ Train and inform on stormwater req ❑ Designate an are creeks and storm for equipment wa ❑ Dispose washwat dirt area or captur recycling or off -sit O Designate an are creeks and storm for material and w storage ❑ Protect catch bas creeks from runo concrete residue . sediment. Consid: fabric mesh to cat ❑ Repair equipmen Ci Never dispose of water into street, drain, drainage di Advanced Planning ❑ Train and inform e on stormwater requ ❑ Inform subcontract their responsibility t stormwater require ❑ Designate an area creeks and storm d for material and wa storage. ❑ Designate an area away from creeks and storm d ain inlets for mixing paints and cleaning equipment. away from rain inlets elide ne nance. and pecific nd Plan. 01 filing (to eludes a P, if more d is I phases) mployees irements. away from rain inlets hing. rs into a for disposal. away from rain inlets te n inlets and containing nd fine r use of a h fine silts off -site. ashout utter, storm ch or creek. Housekeeping Li Contain or divert w for paint preparatio from the street, gut drain and creek O Store and use all li -products away fro gutter, storm drain ❑ Provide tight -fitting secondary contain paints, solvents, thi glues,' etc. or, site supervisor, owner or operator of a site, yo may be mental damage caused by your subcontractors or employees, ployees rements. rs about follow ents. away from ain inlets te ter used away er, storm uid paint the street, nd creek. lids and ent for ners, Housekeeping O Designate an area away from creeks and storm drain inlets for material and waste storage 0 Cover piles of soil and other construction materials prior to and during rain. U lover and maintain dumpsters. Minimize litter around site ❑ Provide secondary containment for solvents, paints, vehicle fluids, etc. ❑ Maintain portable toilets and check frequently for leaks L7 Repair equipment off site CI Clean-up spills and leaks immediately using "dry methods " CI Dispose of all wastes properly - recyclable, hazardous, garbage. Li Never hose down to clean pavement or other surfaces L7 Never bury or leave waste materials in streets, gutters, or near creeks. During Construction LI Mix only amount of fresh concrete or mortar that will be used in a day ❑ Use tarps or heavy plastic drop cloths under small mixers and other equipment LI Collect and dispose of all wastes and excess materials properly - recyclable, hazardous, garbage • Protect materials from wind and rain. O Cover and maintain dumpsters. Minimize litter around site. O Clean-up spills and leaks Immediately using "dry methods " O Never allow slurry or runoff from saw cutting to reach or enter storm drain O Never bury or leave waste materials in streets, gutters, or near creeks. Clean Up ❑ Cover all materials prior to and during rain Li Clean-up spills and leaks immediately using "dry methods " Li Dispose of all wastes properly - recyclable, hazardous, garbage. Lt Never hose down to clean pavement or other surfaces ❑ Never clean brushes or equipment in the street, gutter, storm drain or creek. O Never pour solvents, wash water or other liquids in the street, gutter, storm drain or creek O Never bury or leave waste materials in streets, gutters, or near creeks A Road Work and Paving operations Earth -Moving Activities Heavy Equipment Operation cAL Advanced Planning LI Schedule excavation and grading activities for dry weather Li Train and inform employees on stormwater requirements LI Inform subcontractors about their responsibility to follow stormwater requirements Designate an area away from creeks and storm drain inlets for auto parking, vehicle refueiing and routine equipment maintenance 1:1 Prepare, maintain and implement an Erosion and Sediment Control Plan for embankments. LI Provide secondary containment for solvents, paints, vehicle fluids, etc CI Cover or seal catch basins and manholes while applying seal coat, slurry seal, fog seal, etc. 0 Repair equipment off site Advanced Planning O Schedule excavation and grading activities for dry weather periods • Train and inform employees on stormwater requirements. C.3 Designate an area away from creeks and storm drain inlets for auto parking, vehicle refueling and routine equipment maintenance. LI Repair equipment off site LI Prepare, maintain and implement a site specific Grading, Erosion and Sediment Control Plan RWQCB), which includes a site specific SWPPP, if more than 5 acres of land is disturbed (total, all phases) Detecting Contaminated Soil or Contaminated groundwater is a common problem in the indications of contamination during excavation and grad It Unusual soil conditions, discoloration, o X Abandoned wells * Buried barrels, debris, or trash X Abandoned underground tanks For more information when contaminated sots or groundwater is suspecte call the Santa Clara Valley Water District at 265-2600 or the Regional Water Quality Control Board, San Fra cisco Bay Region at (510) 622-2300 Housekee Li Avoid breaki LI Avoid dust c LI Cove durin slurry, enten basin Clea imme meth west hazer lubric Li Neve from aggr treat stor dirt tr ing excess dust when g asphalt or concrete. over -watering during ntrol operations stockpiles prior to and rain I or vacuum saw -cut keeping residue from g flow lines, catch and creek -up spills and leaks lately using "dry ds." ve and dispose of ail s properly - recyclable, ous, garbage t use diesel oil as a wash excess material quipment, exposed gate concrete or similar ents into a street, gutter, drain or creek. \hose to clean up mud/ cks. During Construction Prot ct existing trees and vege ation. Remove only what is ne essary Li Prot ct catch basin inlets and cree s from runoff Consider use itf a fabric mesh to catch fine ilts Divert water flow and runoff acro s site so as to reduce mov ment of soil t-.3 Plant temporary vegetation earl , especially in exposed area not scheduled for imm diate construction inst il erosion and sediment dont ols before it rains. con truction materials prior to and during rain oundwater Santa Clara Valley Look for ng work odor Advanced Planning Li Train and inform employees on stormwater requirements Li Inform subcontractors about their responsibility to follow stormwater requirements LI Designate an area away from flow lines, creeks and storm drain inlets for vehicle and equipment parking and LI Provide an off -site location for major equipment repair and maintenance. Li Provide regular maintenace for all equipment Check frequently for leaks U Provide secondary containment for solvents, paints, vehicle fluids, etc. Li Dispose of all wastes properly - recyclable, hazardous, garbage. IJ Do not use diesel oil as a lubricant. This material adapted from - Use clo mai 1111111111111111111111111111111111.11111.1. drip pans and/or drop s while conducting tenance activities. mat dais prior to and during rain Cov r and maintain dum sters Minimize litter around site • Coll ct and contain all spent fluid in separate containers, with tight fitting lids. LI Cie n-up spills and leaks imm diately using "dry • Nev r wash excess material ! from equipment into a street or star drain inlet. • Nev r clean equipment over a l catc basin inlet Nev r bury or leave waste mat rials in streets, gutters, or nea creeks Santa Clara VaIley Urban Runoff Pollution Prevention Pr ram REVISIONS: DATE DESCRIPTION BY: Hanna • Brunetti HORIZ. SCALE: NONE VERT. SCALE: NONE REFERENCES Blueprint of a Clean Bay SHEET 2 • Construction Managers • Gilroy California (408) 842-2173 DESIGNED BY: A.W. CHECKED BY: DRAWN BY: T.M. TOWN OF LOS GATOS FEBRUARY 2016 15975 Union Avenue - apn 523-42-017 SANTA CLARA COUNTY CALIFORNIA OF 11 JOB NO. 14075 TOWN OF LOS GATOS STANDARD GRADING NOTES 1. All work shall conform to Chapter 12 of the Town of Los Gatos Grading Ordinance, the adopted California Building Code and the latest edition of the Standard Specifications for Public Works Construction except as specified otherwise on these plans and details. 2. No work may be started on -site without an approved Grading Plan and a Grading Permit issued by the Town of Los Gatos, Public Works Department located at 41 Miles Avenue, Los Gatos, CA 95030 3. A Pre -Job meeting shall be held with the Town Engineering Inspector from the Department of Parks and Public Works prior to any work being done. The Contractor shall call the Inspections Line at 408.399.5771 at least 48 hours prior to any grading or onsite work. This meeting should include: a. A discussion of the project conditions of approval, working hours, site maintenance and other construction matters; b. Acknowledgement in writing that Contractor and Applicant have read and understand the project conditions of approval, and will make certain that all project sub -contractors have read and understand them prior to commencing work and that a copy of the project conditions of approval will be posted on site at all times during construction. 4. Approval of plans does not release the developer of the responsibility for the correction of mistakes, errors, or omissions contained therein. If, during the course of construction of the improvements, public interest and safety requires a modification or departure from the Town Specifications or these improvement plans, the Town Engineer shall have full authority to require such modification or departure and to specify the manner in which the same is to be made. 5. Approval of this plan applies only to the grading, excavation, placement, and compaction of natural earth materials. This approval does not confer any rights of entry to either public property or the private property of others and does not constitute approval of any other improvements. 6. Excavated material shall be placed in the fill areas designated or shall be hauled away from the site to be disposed of at approved location(s). 7. It shall be the responsibility of the Permittee or Contractor to identify, locate and protect all underground facilities. Permittee or Contractor shall notify USA (Underground Service Alert) at 1-800-227-2600 a minimum of 48 hours but not more than 14 days prior to commencing all work. 8. All grading shall be performed in such a manner as to comply with the standards established by the Air Quality Management District for airborne particulates. 9. The Contractor shall comply with all local, state and federal laws, codes, rules and regulations governing the work identified on these plans. These shall include, without limitation, safety and health rules and regulations established by or pursuant to the Occupational Safety and Health Act or any other applicable public authority. 10.The General Contractor shall provide qualified supervision on the job site at all times during construction. 11. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer qualified to practice land surveying, for the following items: a. Retaining wall --top of wall elevations and locations (all walls to be permitted separately and applied for at the Town of Los Gatos Building Department). b. Toe and top of cut and fill slopes 12. Prior to issuance of any permit, the applicant's soils engineer shall review the final grading and drainage plans to ensure that designs for foundations, retaining walls, site grading, and site drainage are in accordance with their recommendations and the peer review comments. The applicant's soils engineer's approval shall then be conveyed to the Town either by letter or by signing the plans. Soils Engineer Reference Report No. , dated , 20 Letter No. , dated , 20 , shall be thoroughly complied with. Both the mentioned report and all updates/addendums/letters are hereby appended and made a part of this grading plan. 13. During construction, all excavations and grading shall be inspected by the applicant's soils engineer. The engineer shall be notified at least 48 hours before beginning any grading. The engineer shall be onsite to verify that the actual conditions are as anticipated in the design -level geotechnical report and/or provide appropriate changes to the report recommendations, as necessary. All unobserved and/or unapproved grading shall be removed and replaced under soils engineer observance (the Town Inspector shall be made aware of any required changes prior to work being performed). 14.The results of the construction observation and testing should be documented in an "as -built" letter/report prepared by the applicants' soils engineer and submitted for the Town's review and acceptance before final release of any occupancy permit is granted. 15.AII private and public streets accessing Project Site shall be kept open and in a safe, drive -able condition throughout construction. If temporary closure is needed, then formal written notice to the adjacent neighbors and the Town of Los Gatos Public Works Department shall be provided at least one week in advance of closure and no closure shall be granted without the express written approval of the Town. No material or equipment shall be stored in the public or private right-of-way. 16.The contractor shall install and maintain fences, barriers, lights and signs that are necessary to give adequate warning and/protection to the public at all times. 17.Owner/Applicant: Phone: 18.General Contractor (If available): Phone: 19.Grading Contractor (If available): Phone: 20. Building Driveway/Parking a. cut:2246± CY Export:1654± cut 515± c.y. cut 250± c.y. b. Fill: 592+ CY Import: 0± fill 53± C.Y. fill 14± C.Y. 21.Water shall be available on the site at all times during grading operations to properly maintain dust control. 22.This plan does not approve the removal of trees. Appropriate tree removal permits and methods of tree preservation shall be required. Tree Removal Permits are required prior to the approval of all plans. 23.A Town Encroachment Permit is required for any work within the public right-of-way. A State Encroachment Permit is required for any work within State right-of-way (if applicable). The Permittee and/or Contractor shall be responsible coordinating inspection performed by other governmental agencies. 24. No cross lot drainage will be permitted without satisfactory storm water acceptance deed/facilities. All drainage shall be directed to the street or other acceptable drainage facility via a non -erosive method as approved by the Town Engineer. 25. It is the responsibility of contractor andlor owner to make sure that all dirt tracked into the public right-of-way is cleaned up on a daily basis. Mud, silt, concrete and other construction debris SHALL NOT be washed into the Town's storm drains. 26.Good housekeeping practices shall be observed at all times during the course of construction, Superintendence of construction shall be diligently performed by a person or persons authorized to do so at all times during working hours. The storing of goods and/or materials on the sidewalk and/or the street will not be allowed unless a special permit is issued by the Engineering Division. The adjacent public right-of-way shall be kept clear of all job related dirt and debris at the end of the day. Failure to maintain the public right-of-way according to this condition may result in the Town performing the required maintenance at the developer's expense. 27.Grading shall be undertaken in accordance with conditions and requirements of the project Storm Water Pollution Control Plan and/or Storm Water Pollution Prevention Plan, the Town of Los Gatos Storm Water Quality Management Program, National Pollutant Discharge Elimination System (NPDES) and any other permits/requirements issued by the State of California Regional Water Quality Control Board. Plans (including all updates) shall be onsite at all times. No direct storm water discharges from development will be allowed onto Town streets or onto the public storm drain system without treatment by an approved storm water pollution prevention device or other approved methods. Maintenance of private storm water pollution prevention devices shall be the sole responsibility of the owner. Discharges or connection without treatment by an approved and adequately operating storm water pollution prevention device or other approved method shall be considered a violation of the above referenced permit and the Town of Los Gatos Stormwater Ordinance. Landscaping cut1346± c.y. fill 18± c.y. Off -site cut 135± c.y. fill 507± c.y. NPDES NOTES 1. Sediment from areas disturbed by construction shall be retained on site using structural controls as required by the statewide General Construction Stormwater Permit. 2. Stockpiles of soil shall be properly contained to minimize sediment transport from the site to streets, drainage facilities or adjacent properties via runoff, vehicle tracking, or wind as required by the statewide General Construction Stormwater Permit. 3, Appropriate BMPs for construction -related materials, wastes, spill or resides shall be Implemented to minimize transport from the site to streets, drainage facilities, or adjoining property by wind or runoff as required by the statewide General Construction Stormwater Permit. 4. Runoff from equipment and vehicle washing shall be contained at construction sites and must not be discharged to receiving waters or to the local storm drain system. 5. All construction contractor and subcontractor personnel are to be made aware of the required best management practices and good housekeeping measures for the project site and any associated construction staging areas. 6. At the end of each day of construction activity all construction debris and waste materials shall be collected and properly disposed in trash or recycle bins. 7. Construction sites shall be maintained in such a condition that a storm does not carry Wastes or pollutants off the site. Discharges of material other than stormwater (nonstormwater discharges) are prohibited except as authorized by an individual NPDES permit or the statewide General Construction Stormwater Permit. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, solvents, detergents, glues, lime, pesticides, herbicides, fertilizers, wood preservatives and asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery fluids; concrete and related cutting or curing residues; floatable wastes; wastes from engine/equipment steam cleaning or chemical degreasing; wastes from street cleaning; and superchlorinated potable water from line flushing and testing. During construction, disposal of such materials should occur in a specified and controlled temporary area on -site physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements. 8. Discharging contaminated groundwater produced by dewatering groundwater that has infiltrated into the construction site is prohibited. Discharging of contaminated soils via surface erosion is also prohibited. Discharging non -contaminated groundwater produced by dewatering activities requires a National Pollutant Discharge Elimination System (NPDES) permit from the respective State Regional Water Quality Control Board Last updated: 8/18/2011 B AND GUTTER OR PLANTER WALL 4a d ---3"-- TOP OF SIDEWALK 2" FREEBOARD; 6" OF 3"-6" ROUNDED, WASHED COBBLE SEE CONSTRUCTION NOTE. 2 EXISTING SUBGRADE OR ROCK STORAGE 6" III - EXISTING' SUBGRADE OR ROCK STORAGE BIORETENTION DESIGN NOTES 1. FOR USE WITH BIORETENTION PLANTERS OR SLOPED SIDED SWALES/RAIN GARDENS, 2. FOR CHECK DAMS LONGER THAN 12' SPECIFY REBAR OVERLAP LENGTH. 3. SPACE CHECK DAMS TO MAXIMIZE PONDING ACROSS CELLS. 4. PROVIDE ELEVATIONS AND STATIONING AND/OR DIMENSIONING FOR CHECK DAMS. 5. ENSURE THAT CHECK DAM ELEVATIONS DO NOT CAUSE STORMWATER TO OVERFLOW TO SIDEWALK. 6. SHOW PLANTER WALL EMBEDDED IN EXISTING SUBGRADE OR DRAINROCK. PLANTER WALL LAP SPLICE 13 REBAR TO EMBEDDED REBAR, OVERLAP 12" (SEE DESIGN NOTE 2) TOP OF PLANTER WALL FLOW B" MIN /3 REBAR CONSTRUCTION NOTES 1. EMBED 13 REBAR 3" INTO CURB AND PLANTER WALL 2. DO NOT WORK DURING RAIN OR UNDER WET CONDITIONS. 3. KEEP ALL HEAVY MACHINERY OUTSIDE BIORETENTION AREA OMITS. CONCRETE CHECK DAM N.T.S. LOW PACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS VERSION: 3/6/2013 Concrete Municipality Der rtment Name heck Dam detail number 131 -qq111111%•"'"'" 0 atm ift mi • h w SCALE: 1 •=30' TORtJI WATER OW DIRECTION REVISIONS: DATE DESCRIPTION BY: Hanna• Brunetti ■Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 DATE FEIRRUARY ZOI G HORIZ. SCALE. NONE VERT. SCALE- NONE DESIGNED BY. A.W. CHECKED BY: QROFESS/ hq-• &0R.BR� -+ w ' NO. 17186 - ec EXP. 6-30-17 C/VIL REFERENCES Grading Notes and Storm Water Treatment Detail TOWN OF LOS GATOS FEBRUARY 2 0 1 6 15975 Union Avenue - apn 523-42-017 SANTA CLARA COUNTY CALIF 0 R N I A SHEET 3 OF 11 JOB NO. 140 75 DRAWN BY. T.M. OF CALI DATE REVISIONS: DESCRIPTION TOP AC BER 300.03 x 300.46 SIGNAL U TOP AC BE TFC 300.36 main TFC 300.36 W) 10.49 TFC CL DI TOP A 300.07 530 300.48 �- 3- RMAPK NAIL `,� 300.78' 300.68301.063� 1002 AC AC TOP AC 300.26 S- 1 -(w) L existing median to be re Oft off -site improyernent 300.61 299.12 GRAPHIC SCALE ( IN FEET ) 1 inch = 20 ft. 299.25 TFC HCR 98.75 0.77 TFC STREET TFC .61x 299.69 3 299.92 298.37 CL HCR 98.44 Hanna• Brunetti ■ Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 291 15 29 298.25 TFC HCR 7.78 297.86 TFC 97.09 FL 6 296. 296.83 .61 296.5 291. TFC 290.55 stm mh rim 288.07 0288.07 inv 278.12 DATE• 300.86 96.85 stm mh rim 296.85 91.35 301.24 301 301 TFC suolic thorn de ed to to n of los per 8732 o.r. 95 B ' END ss mh OP AC TFC CL DI ASIGNAL SIGNAL LITE 01 2 302.31 AP '18; T C GAS VALVE .302.00 e 302.24 TFC 302.34 302.12 01.597 2.01 TOP AC BER (W) :.:: .-: WC TFC . 2.79 303.03 303.10 02 303.03 303.07 TFC TFC 301. e TFC 301.58 TFC 296.90 19913 298.84 33DP AC BERM GASIALVE 293.8 P AC BERM YIE 301.08. 296.96 x 299.73 tintra' lc TOP AC BERM (w) existing u ility pole ttbe relo ated 0 RCEND x 299.87 9 #1714 298.26 298.32799.3(�V -T16:25 T22-50 #171 "#9 #1713 O 299.2 1#1 �0 297.5uT12-15 (4-8 7 1 all existing trees ° to be r-moved .297.02 typical #1721 #1723 all existing trees o . e remove. typical #1724 293.27 O T24-40 #1725 293.25 T36-75 29:. #1720 TZ 3 293.82 #1732 294.36 planter 293.71 a126-5y3.73 ,0 existing gas & electric #1725 meter to be removed9386 O qL T' Qy othe .' 12(1731 #1729 ® 2' .22 T1 10 293.54 fijTE 94,10,_, T10 10 h��41 293.46 293.11 293.36 290.23 m EP-DWY MLSI( 290,48„ 290.24`, Q 291. 1 #16 04-2t0 289.41 289.95 x 28�.65 289.63 AC AP ' T12-15 290`15�g1� . 0 0 290.'. . , TOP FACE 12W T14 ArA rim mh289.33 FD N2893,01289AIL bars inv 274.73 288 . 2 A AP 289.33 �• :8 RW EN'section of existing retaining wall to be 13 removed with off -site improvements AC AP T6 89.89 1007 288.38 FD : ON WV existing street bar icade to b removed with off-ite im•rovemen1 • 287.68 x 287.10 rEi3RUARY 2016 HORIZ. SCALE• 1"=2-0" VERT. SCALE• NONE DESIGNED BY• A.W. CHECKED BY: DRAWN BY. T.M. 286.66 TFC 286.113 FL CONC GE FA. WALL 2;6.49 C:NC EDGE high wall 294.64 294.50 x 299.44 #1737 297.82 294.61 BLD AP -PORCH COF f.f. 295.06. FFS.as existing house x 295.09 297.62 32-55 307.70 308.06 TOP AC BERM 308.4 302.41 T18-20 exi infence to be re -d 15 298.48 S-60D 295.45„ 293.95 e x i stOi be remov electric meter gas mgter- - 300.59 298.45 • 4.10 ® 293.93 T • -15 293.78 294.16 14 294.16 = S-60D 293.' existing driveway to be removed #1700 3 88 ®T18\35 297.78 F i$7294.87 - 1294.44 294.42 294.32 1,293.280 1 T10-15 REFERENCES 294.24 293.71 #1657-1661 301797 T6-10 3-4' high wall #1742 294.03. FH 310.07 TOP AC BERM 29> 97 T8'', 5 19 297.61 S-60D 29 .1 02 4.06 exist to be 294.29 TOWN OF FEBRUARY 294.03 • 311.09 311.53 BERM END 311.59 305.89 304.43 A S-60D 312.92 313.27 TOP AC BERM 313.75 #1683 305.64 u 24-40 303.33 #1743® 46 298.62 300.37 0 • 299.55 typical 99.12 299.30 299.35 9 299.34 298.26 . 01.46 T12 10 3T 301.57 01.36' isting concrete to b- removed 299.54 ' 299.60 i #1748 m 30. T16-20 302.46 #1 ® i6§g6T1168 e isti g tre to ke' - • yed ty .i hose bib " . 303.52 301.61 T14-2000#175 300.71 T14-20 51® 300.79 300.34 T8-15 #1755, 1754 . " ' 3-2 T36-30301.80 „ �T18-25 97.83 ! 297.84 , 2'6.65 10-Concrete 298.14 ,' eata Ucherry < 8.04j ., 298.11 T6-12 298.59 U. hose bib 29 297.66 296'7 97.27 POST x 296.72 isting shed removed LOS GATOS 296.37 max high wall 304.67 e sting shed 314.18 BEG TOP FACE RW 316.65 T8 1#16 3.58 `itfd3 9retnove• al 0 #1668 298.15 • 315.57 manhole rim 316.66 316.6 x 315.81 x 317.49 31 EP A catch basin 31 a i n ( G ) 1011 x 316.99 316.40 S-MAG ;xis ng utility pole may require ;.-.•:.•ho o be de : rmined by ethers' 18.03 WM MIIIIMUM _' 3 4 !rWIl r_�1316.30 © L • . 5 68 utility box Op c o • c r e t e318.16 FL It NI Ir - 318. 0 315.53 14.68 315.7 C CL DI TFC .04315.42 315.25 298.15 477 -' 297.90 r-• FD 1-PST W-FLAG Demolition Plan on o exi 15975 Union Avenue - apn 523-42-017 utter 317.71 SANTA CLARA COUNTY 2 0 1 6 CALIFORNIA SHEET JOB NO. 14075 0 to wZ O m I— OU dI- N(1) — cc W Q (f) Q. W o _ O — W li — 1p O = W 0 zZ 0 OW I—U WU >- z >- z 0 1- 0 J d cc 0 z 0 H 0 0 0 d W g a s main water main Tract no. 8899 685 M 36-37 'L e e w DATE REVISIONS: DESCRIPTION BY: (w) sNl \Nvdit Hanna• Brunetti • Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 stm mh rim 296.85 in 291.35 stm mh rim 288.07 inv 278.12 DATE • FE'RUARY 20I( HORIZ. SCALE. r=2-0. VERT. SCALE. NONE de to n of los per 8732 o.r. uulic thoroug ed to (w) 31 high wal R=36.00 L=56.61 25' =90.05'42" BUILD! G SETBACK Li planter 1g wall electric meter gas meter. Parcel A 571 M 50 APN 523-42-068 high wall REFERENCES T. ` e BE DEDICA 0 / /e'er''' .er99% //f.)` 3'4 i // /// //// // ////// /// ///// p a o l Parcel B 571 M 50 paal APN 523-42-067 UI DING SET: ACK LINE hose bib existing shed hose bib* 24.5' WIDE IN RESS & EGRESS ESMT, 25PUBLIC UTILITIES EASEMENT max high wall Parcel C 571 M 50 APN 523-42-066 manhole rim 316.66 a i n (a) catch basin *1curb and • utter Ill VIM -_ Tentative Map utility box Parcel 4 407 M 45 APN 523-42-062 '451 PROJECT SUMMARY 43,104 SQ. FT. 35,590 SQ. FT. 7,514 SQ. FT. GROSS AREA NET AREA STREET AREA (TO BE DEDICATED) 20 El 10 GRA' HI I C A LE 20 MEI 80 ( IN FEE inch = 2? )ft. SHEET 5 DESIGNED BY• A.W. CHECKED BY: DRAWN BY• TM. TOWN OF FEBRUAR Y LOS GATOS 2 0 1 6 15975 Union Avenue - apn 523-42-017 SANTA CLARA COUNTY CALIFORNIA OF 11 JOB NO. 14075 EXISTING UNDERGROUND UTILITIES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED ON RECORD INFORMATION AVAILABLE TO THE ENGINEER -AT -THERE -OF -PREPARATION ) OF THESE PLANS. LOCATION MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AT LEAST 2 WORKING DAYS IN ADVANCE OF CONSTRUCTION TO FIELD LOCATE UTILITIES. CALL UNDERGROUND SERVICE ALERT (U.S.A.), AT 1-800-642-2444. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF UTILITIES SHOWN ON THESE PLANS, INDICATED IN THE FIELD BY LOCATING SERVICES, OR EVIDENCE BY FACILITIES VISIBLE AT OR ADJACENT TO THE JOB SITE. ANY ADDITIONAL COST INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO -BEGINNING CONSTRUCTION SHALEBE-BORNE-BY THE CONTRACTOR AND IS DEEMED INCLUDED AND MERGED IN THE CONTRACT UNIT PRICE. EXISTING FIRE HYDRANT OD CD 28.0' CO CO • rTh 4 g-TtEX INV 278.12 EXISTING WATER MAIW 15" INV 280.25 SD PIPE NEW 15" SD TO PASS UNDER WATER MAIN 15" INV 281.03 SDJIPE NEW 15" SD TO PAS OVER EX SEWER PIPE EXISTING CENTERLINDE EXISTING SANITARY SEWR C)D CD 00 CD Clp CD CA 15" INV 281.57 41 PIPE NEW 15" SD TO 'PASS UNDER EX GAS MAIN 11D' EXISTING CENTERLINE 11 b 0 0 EXISTING CURB, GUTTER AND SIDEWALK 0 Co cA 71 71 CO CO CONST. CURB INLET TC 287.75 TG 287.04 15" INV 282.7 OUT 15" INV 284.0 IN EX TC 287.38 CONFORM curb and gutter &INFORM TO EXISTING RBAUTTER AND SIDEWALK concrete INJ ND 00 CO 28.0' (SD) .811 EXISTING RIGHT OF WAY CO CO CD concrete e walk EXISTING STORM DRAIN 1..o.) storrn2 drain water cn 6 INV 277.7 IN CO CCD PIPE =TOMAS UNDER EX GA4AAIN -71 ND CA CD CO Cip OD OD CD CD ea =WI NOTES: 1. ALL EXISTING TREES WITHIN THE STREET RIGHT OF WAY AND PROJECT SITE BOUNDARY TO BE REMOVED; UNLESS OTHERWISE DESIGNATED. (WITH APPROVAL FROM TOWN OF LOS GATOS) CONSTRUCTION NOTES: 0 0 10 11 14 16 EXISTING UTILITY POLE; TO BE RELCATED 'BY OTHERS' CONSTRUCT DRIVEWAY APPROACH PER STDS. FURNISH & INSTALL 3 WATER METERS PER STDS. CONNECT NEW WATER SERVICE MANIFOLD TO EXISTING WATER MAIN PER SIDS. CONSTRUCT NEW SANITARY SEWER MANHOLE OVER EXISTING SANITARY SEWER PIPE CONSTRUCT NEW SANITARY SEWER MANHOLE PER STDS. CONSTRUCT NEW SANITARY SEWER LATERAL PER STDS. CONSTRUCT CALTRANS CASE 'C' HANDICAP RAMP CONSTRUCT RETAINING WALL; SEE STRUCTURAL PLANS FOR DIMENSIONS AND DETAILS CONNECT NEW 15" STORM DRAIN PIPE TO EXISTING STORM DRAIN MANHOLE; EX INV 278.12. PROVIDE TRENCH RESTORATION PER TOWN OF LOS GATOS STDS. CONSTRUCT CURB INLET PER STDS. CONSTRUCT 6" HIGH PCC VERTICAL CURB ON TOP OF WALL PROVIDE ROCK RIP -RAP; 6" MIN DIA ROCK SIZE WITH 2 COURSES GRADE TO DIRECT DRAINAGE FLOW TO BIORETEN11ON POND CONSTRUCT OUTLET STRUCTURE (CHRISTY TYPE DRAIN BOX V1 WITH GRATE) CONSTRUCT CHRISTY TYPE DRAIN BOX V64 (JUNCTION BOX) WITH GRATE 10 DATE GRAPHIC SCALE 0 5 10 20 REVISIONS: DESCRIPTION ( IN FEET ) 1 inch = 10 ft. EXISTING RIGHT 1U4/AY > CHRISTY TYPE V64 15" INV 285'.0 OUT 12" INV 285.0 IN MATCH LIN 4° 7r SHEET 7 Hanna• Brunetti Gilroy California (408) 842-2173 CD 00 TW 293.8 END WALL EXISTING PROPE TY LINE VERT. SCALE. NONE DESIGNED BY. A.W. CHECKED BY: DRAWN BY• TM. DC. ND CO 288.92 12" INV 2 6" INV 2 0 2 ci CD CO 4.0' ar EX 290.90 2911. SD DTh cso UNION AVENUE bo EDGE OF PAVEME TYPICAL IND CAI 293.34 El 3' CURB CUT FOR BIOTREATMENT SWALE -292.5 glk mew LA FDOMESTIC PROP WA . 293.0 "AD 292.0 FG GUEST PARKING STALL BIORETENTION POND CAPACITY-461 CF TOP OF B_ANK= 294-5 TC /293.32 293.57 FG 293.8 utter 45.0' TING CO NN( TREE TO BE REM EXISTING CURB, GUTTER c_o AND SIDEWALK , Co CO CO CD 20.0' ND- o 3' CURB Oft- FOR fBIOTREATMENT' SWALE (so co • cn cc) NUE:: kc; RE§' Npl) TO SPLASH BLOCKS AND F.F. 294.5 WATER DIRECTED TOWARD PAD 293.5 DRAINAGE SWALE •MIELMEld Fe 94.34 REFERENCES FG 293.8 ND CA CO Els1:1) WALL 293.9\ 17 6' cn 293.6V cn 611 END WALL ' TOWN OF FEBRUAR Y LOS 2016 ND cri EX 297.68\ GATOS CO oo OD IND ND CD CO • CO -IP CA OD OD Cci CC) CA EX co N R=3' 7o co TO -t00.23 5' HIGH CO ND ND 73 64NG HANDICAP po RAMP ND 0 co 30 le - T- 1 CD colg -71 CSD CO Co o cp cP o 300.24 P.0 CO 304.7 HIGH CD Cn CD ▪ CD CD 0 ND CD CA CD CD CD CD 00 cA CD all 1I1INIS 303.65 - - Tl CD CA CD CD OD CA R=3' CD CD. CD CD EXISTING CENTERLINE CA CA CD CD OD CO CA CD CA OD EXISTING ISL ND TO BE REMOVED AND REPLAC D. DESIGN OF ISLAND TO BE COMPLETED WITH _ CONSTRUCTION DRAWINGS C 302.36 -41 27 0 cA CO AC 302.36 EX \ TYPICAL • o • EX Grading & Drainage Plan 15975 Union Avenue - apn 523-42-017 CA CD CD Dr= ND 0 cm 302 EXISTIN TRAFFIC SIGNAL 'TO BE RELOCATED PER TRAFFI ENGINEER CD CO CA CA CA CD CD A CA CD CO CJI MATCH L NE SEE SHEET 7 ND all 1VNDIS - - r1 CD • CD CI' CD - CD CD - 131 00 CD CO CD Clp -I CA FT1 CD CD CD CD OJ 71 70 OD 73 CA CD CA 0 CD CD CO 0 cA cp cD olo cA CD OD CD CD cA 0 CD CO 73 CA CD SANTA CLARA COUNTY CALIFORNIA CO CA CD 0 CD CO 71 SHEET JOB NO. 6 OF 11 MATCH LINE S'E SHEET 6 0 0 EXISTING PROPE EMERGENCY VEHICLE ACCESS EASEMENT (E.V.A.) FIRE TRUCK TURNAROUND AREA (HATCHED AREA) 0 0 NOTES: 1. ALL EXISTING TREES WITHIN THE STREET RIGHT OF WAY AND PROJECT SITE BOUNDARY TO BE REMOVED; (WITH APPROVAL FROM TOWN OF LOS GATOS) 2. PROPOSED SHARED DRIVEWAY TO BE 20 FEET WIDE CONSTRUCTION NOTES: 0 EXISTING UTILITY POLE; TO BE RELCATED 'BY OTHERS' 0 CONSTRUCT DRIVEWAY APPROACH PER STDS. 3 FURNISH & INSTALL 3 WATER METERS PER STDS. ® CONNECT NEW WATER SERVICE MANIFOLD TO EXISTING WATER MAIN PER STDS. 0 CONSTRUCT NEW SANITARY SEWER MANHOLE OVER EXISTING SANITARY SEWER PIPE © CONSTRUCT NEW SANITARY SEWER MANHOLE PER STDS. Q7 CONSTRUCT NEW SANITARY SEWER LATERAL PER STDS. ® CONSTRUCT CALTRANS CASE 'C' HANDICAP RAMP 9Q CONSTRUCT RETAINING WALL; SEE STRUCTURAL PLANS FOR DIMENSIONS AND DETAILS 10 CONNECT NEW 15" STORM DRAIN PIPE TO EXISTING STORM DRAIN MANHOLE; EX INV 278.12. 11 PROVIDE TRENCH RESTORATION PER TOWN OF LOS GATOS STDS. Q CONSTRUCT CURB INLET PER STDS. Q CONSTRUCT 6" HIGH PCC VERTICAL CURB ON TOP OF WALL 14 PROVIDE ROCK RIP -RAP; 6" MIN DIA ROCK SIZE WITH 2 COURSES GRADE TO DIRECT DRAINAGE FLOW TO BIORETENTION POND 1© CONSTRUCT OUTLET STRUCTURE (CHRISTY TYPE DRAIN BOX V1 WITH GRATE) 16 CONSTRUCT CHRISTY TYPE DRAIN BOX V64 (JUNCTION BOX) WITH GRATE DATE z 10 TY LINE CA > -HN CD CO ) I (SD® TW 295.7 1.71 HIGH N co N N jO EXISTING PROPERTY LINE TW 29 .2 2' HIG 24' WIDE INGRESS EGRESS EASEME PUBLIC UTILITIES EASEMENT, STORM DRAIN EASEMENT AND EMERGENCY VEHICLE ACCESS EASE EXISTING PROPERTY LINE GRAPHIC SCALE 0 5 10 20 X TW 2 2.1' Tl D 40 REVISIONS: DESCRIPTION ( IN FEET ) 1 inch = 10 ft. BY: 296.67 TC 294.40 294.99 N r7 67' INV 294 298.37 FG 299.1 0 II N 02) (/) co CO J N 4.0' TC c c° TW 299.6 (-0� 1.4' HIGH Hanna• Brunetti ■Civil Engineers • Land Surveyors ■ ■ Construction Managers • Gilroy California (408) 842-2173 LOT 1 GUEST PARKING STALL 18 0' 18.0' PERFORATED PERC PIPE BIORETENTION POND FG 295.0 22.0' GA F.F. 2g6.0 PAD 295.0 297.0 295.0 BIORETE1111ON FOND CAPACITY-494 CF TOP OF BANK-297:5 OTTOM OF POND- 299.20 G 299.5 o'y moo,°'. 1HIGH DATE • FEi5RUARY 201 G HORIZ. SCALE. 111=10' VERT. SCALE. NONE DESIGNED BY• A.W. CHECKED BY: DRAWN BY - TW 300.0 TM ARAGE r FG 94.34 PORCH FG 297.0 FG 296.8 00 /`96.4 8 FG FG 298.0 298.0 N <, 0 Cr, O EXISTING FENCE ALONG PROPERTY LINE -I N CA CO I v r 293.6c 94.3 165',� DOWNSPOUTS. TO-! ' AIN TO PLASH ,BLOCKS AND WATER DIRECTED TOWARC' DRAINAGE SWALE `COVERD PATIO rn N OTE: DOWNSPOUTS TO DRAIN TO SPLASH BLOCKS AND CA 0 J CA ) FG 300.0 °- --) x o ') 01 x 1 n FENCE'A PROPER TE I N CA 0) N C.9 ^ r TW 300.8 • 3' HIGH ei e FENCF_ AT PROPERTY LINE 299.O DRAINAGE SWALE FG 300.3 o)S' TW 303.9 c� slope ) o"� 3.4' HIGH o CONST. RETAINiNc WALL ALONG PROPERTY LINE WITH FENCE ON TOP SEE STRUCTURAL PLANS FOR DETAILS REFERENCES TOWN OF FEBRUAR Y cD CA 0 TW 306.9 6' HIGH 5. HIGH TC HIGH 1.48 31 61 314.6 wc c 0 6�,J o v J oHIGH c� CONFORM TO EXISTING1 CURB/GUTTER AND SI1C LOS 2 0 1 6 GATOS N 307.35 311.31 CD N) \ MUVIUt IVtiv Alit/WU. IiAJt MATCH EXISTING STREET SECTION TYPICAL \-d\ \ cn \ 0 C� \ EX SIDEWALK r-' 311.24 MATCH LINE SEE --SHEET 6 Grading & Drainage Plan 15975 Union Avenue - apn 523-42-017 C1 0 0 0 EXISTING -FIRE HYDRANT D cu m EXISTING UNDERGROUND UTILITIES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED ON RECORD INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF PREPARATION OF THESE PLANS. LOCATION MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES AT LEAST 2 WORKING DAYS IN ADVANCE OF CONSTRUCTION TO FIELD LOCATE UTILITIES. CALL UNDERGROUND SERVICE ALERT (U.S.A.), AT 1-800-642-2444. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF UTILITIES SHOWN ON THESE PLANS, INDICATED IN THE FIELD BY LOCATING SERVICES, OR EVIDENCE BY FACILITIES VISIBLE AT OR ADJACENT TO THE JOB SITE. ANY ADDITIONAL COST INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR AND IS DEEMED INCLUDED AND MERGED IN THE CONTRACT UNIT PRICE. SANTA CLARA COUNTY CALIF 0 R N I A SHEET 7 OF 11 JOB NO. 14075 LOT 3 LOT 2 LOT 1 0 z 0) z J a_ Ld w O w N w 0 z (n z J 0 w 0 w J 1- --n--+ f- 1 wl -ZIZ -�3-20 J J 1 3 - - - - I I LOT 3 1--II LOT 2 wIcc LOT 1 316 JI zI = wi3 . `D "! : cn Eilu- o ce O UNION A NUE 312 N of � N N '' NI Z w N N Zla b -1 31-2 1 LOU�1a 0 I v �l 308 FINISH CRADE a . `� 304 I TC N S �� 304 1 299.45- 1 IAUSI� GRADE I CONST. DROP INLET 1 = � �1� - 308 - - - - - - - -00% -5.00% (24"x36") 5 c� ao 300- - - - - �� TG 289.0 �, ' ' ' ' APPROX. LOCATION _ 4.? Y 296 _ -3.33% .'" ::,1 1 n. K MAIN 296 JI 1 -2.78% I 1 z m WIC �►�wy w I Q I 292 �I 292 •' I - - - - - - OUST. RETAINING -WALE -I - _ _ _ _ oT .- SEE STRUCTURAL PLANS FOR 1 1 1 288 DIMENSIONS AND DETAILS ° 288 21 SECTION E-E284 I 284 1 1 NI SCALE: HORIZONTAL " 1"=10 RCP STORMI DRAiN w I 1 1 L VERTICAL 1 =10' INV 2r4.73 312 1 -I40- Z 312 308 1 Y 308 24'INGRESS & EGRESS ESMT ; :10., 304 304 PUBLIC UTILITIES EASEMENTFG 26.8' ZOO- STORM DRAIN EASEMENT ANDli L 300- - 316 314.61 FG 309.E NOTE: 316 tEMERGENCYVEHICLEACCESSESMT' J GARAGE >- AT BOTTOM OF WALL OPERTrUNE EX'RET_ WALL ZI ( 20. ' j m 312 TW ON TOP OF RETAINING WALL 312 k 296 , F.F. 293.0 296 45 HIGH JI TC PAD 292.0 - 306.9 TOP -Or WAL1= /292.24 74 20.0' 15.0' 5% i_-3•J 308 PROFILE 308 I ' 1 - II 292 wI 292 < 35.0 TW TOP OF WALL a 5.0 - ......... PROFILE _ H _ I 304 I _303.9 304 288c:el ZI TW TW 'SECTION 300.0 299.6 FI F-F 300 W IC LA 1.4-T _ _ _ _ - �_� - - 284 cnl " 2$4 a J Z J EXISTING GROUND AT PROPERTY LINE I WI SCALE: HORIZONTAL 1=10� BLOSSOM HILL ROAD oIQ ccI� CONST. RETAINING WALL 1.0 VERTICAL 1 _ �i (ON -SITE) 0r _ ( -10 296 al3 �, al WI al SEE STRUCTURAL PLANS FOR 296 al co c� `o W o-�= 0 DIMENSIONS AND DETAILS LI _ ... _ 292 N N= ra 292 a w w wla z1a J 288 288 31-2 312 W z 284 284 308 308 1 1 L 0 T 3 0= ` 47.8: in 2801 2 304 304 RETAINING WALL PROFILE < 41.8 > 0Ia N N I I ALONG WESTERLY AND NORTHERLY PROPERTY LINE JI' �, 276 I I 276 -300- - - -� - - - -300- SCAT E: HORIZONTAL =10' o PROPOSED VERTICAL 1"=10' -0.5' 272 8% 296- 0.5' .1 6.9% -1-r 292 T 292 OR CONSTRUCT FENCE TO CONFORM TO NEW ON TOP OF RETAINING WALL - - - - -CAP tCHECK - CHECK DAMS '-WIDE-CURS-OPENING- - - - 308 -YPICgl I FENCE/RETAINING WALL ALONG PROPERTY LINE I I� 288 3'WIDE CURB DAMS OPENING TYPICAL 288 TOP OF WALL TYPICAL TYPICAL NOTE: 304 T TW TW PROFILE 304 284 PROPOSED PROVIDE CONCRETE CHECK DAM 299.6 299.5 .� ]299.7 J 1 T TOP OF WALL 1 30� - FLOWLINt GUTItR PAN I PER DETAIL, SEE SHEET 3 TW PROFILE SECTION_ G-G G1.� 111V- 1`? z 295.7 TW $ ,, SCALE: HORIZONTAL 1"-10' 29 1 1 - "=10' 2`1 ,� 294.5 VERTICAL 1 " �I 2.0' ' EXIS11NG GROUND AT PROPERTY LINE EXISTING GROUND AT PROPERTY LINE 292 ¢ zI RADE AT WALL 1.7'- -(ON 1.i -w -1 2922------ w Z =I -SIT€) �1 28 o1 288 WIZ J 284 �I= LOT 3 aj LOT 2 8 �j LOT 1 284 2 Qr RETAINING WALL PROFILE oI- I I ALONG WESTERLY AND NORTHERLY PROPERTY LINE 276 I I I SCAI E. HORIZONTAI 1=10' 276 272 I I VERTICAL 1 "=10' 272 320r EXISTING GROUND 1 3-2$ -320- - AT PROPERTY LINE TOP OF WALL NOTE; 316 316 316 TOP OF WALL 6' FENCE TO BE INSTALLED ALONG PROPERTY LINE 1 EXISTING RETAINING WALL 1 FOOT FROM INSIDE PROPERTY LINE 312 312 RETAINING WALL - - - }FINICN _AT_PROPERIY_LINE_ $� r_R I nT ' TOP OF WALL 308 DE- �nrT0M OF WA �' �8 5.3' T' MOM PKUPERTY LINL J I a LOWER TOP OF WALL FINISH GRADE AT BOTTOM OF WALL ' . - 5.6' - 304 ' ; 613 304 4.9' c FINISH GRADE N LOWER TOP OF WALL. LL AT PROPERTY LINE m 300 - FINISH -GRADE- AT BOTTOM- OF tUWER-WALC- �T�R9PERIY 1lNE 40 - - - -C�E+STING GROUND-- - - �� 3 AT PROPERTY LINE 296 FINISH GRADE AT BOTTOM OF LOWER WALL 296 '� 5r0' EXISTING GROUND - - - 29 JI NOTE' CONST. RETAINING WALL AT PROPERTY LINE ___ - - - - �' Zi ____________________ - - 6 FENCE TO BE INSTALLED ALONG PROPERTY UNE SEE STRUCTURAL PLANS FOR CONST. RETAINING WALL FINISH GRADE AT BOTTOM OF I OWER WAI I AT PROPERTY LINE 292 aI o a_ RETAINING WALC�I FUOT FROM I 1NSIUL PROPERTY UNE �I oI a,�� DIMENSIONS AND DETAILS 292 v. ,, zI - - -SEE STRUCIUBAL KANS_ ER_ DIMENSIONS AND DETAILS 2g2 288 288 =1 288 d LET 3 aj ``�''�� L0T 2 L0T 1 GRAPHIC SCALE 284 x w; aIi RETAINING WALL PROFILE 284 al coiln 20 ° 10 20 284 - 280 - I ALONG -RIGHT OF WAY ---BLOSSOM- littLLOAD AND -UNION -AVENUE 280- - - - - - - -280- a j SCALE. 1 HORIZONTAL 1"-10' VERTICAL-1"_1V I (IN FEET ) 276 I ( 1 inch = 20 276 ft. REVISIONS: DATE• I=Ei5RUARY 201/v REFERENCES e ct 15975 Union Avenue TOWN OF LOS GATOS FEBRUARY 2016 • i o - apn n s 523-42-017 SANTA CLARA COUNTY CALIFORNIA SHEET C 9 OF 11 DATE DESCRIPTION BY: HORIZ. SCALE• PER PLAN Hanna •Civil Gilroy •Brunetti Engineers • ■ Construction California Land Surveyors Managers • (408) 842-2173 • ■ VERT. SCALE PER PLAN DESIGNED BY A.W. CHECKED BY: JOB NO. 14075 DRAWN BY. TM. (n - Z m 0 OU o_i- L� - w w < (/) ww Ct OF- W b- JO =w zZ 0 et Ow =0 wU Q >- >- m z 0 0 J CO CL CC 0 z 0 0 0 0 w W CC W (/) 0 cn w H- LL 0 w 0 z w 0 w _w 0 t 2 D_ w H- H- (1) z 0 0 J J I (n H- 0 H- z 0 J (n w z z w (n z 0 0 Li 0 w EL 0 z (1) z J w O w J 1- JI TOP TS a STREET UTE 300.15 jTFC 61 299.69 300.13 299.92 FD PK NAIL 300.78. 300.68301.06 301.26 1002 AC AC TOP AC BERM 300.26 S-MAG 1 '3.83 300.35 4 298.25 TFC HCR 7.78 297.86 29K3 DI 89 .42 (G) -(w) 301.38 300.86 rw TFC 97.09 FL 297.26 296.99 296.83 61 296.5 • 0 -o 291.4 60 TFC 29 . 290.55 _ L 0, Ih . 8.07 8.12 0 96.85 stm mh rim 296.85 inv 291.35 " 29 291.44 iS 96.28 62 E e 2 65 20 public dedicat tov n of per 8732 299.3S 296.90 wv 29 13 "- C BF" 2981EP 9 GASRALVE 294. 248 293. EPto 291.991� a) 289.89 AC n I291.16 EP-DWY 290.23 EP-DWY rn 289.63 1007 288.38 FD BD MON (w) 304.22 AC TFC TFC 2 79 303.03 303.10 303.03 GAS VALVE 290.4E 290 290,k8„ MLQI( 6> 289.41 289.9, AC AP '1 T12- I 28' ''• TO, 3 289E 289.01 T barricade FD NAIL 28 TFC EN (w) " 304.95 303.92 304.27 TOP AC BERM 3)03.60 EP tG(G) TOP RM END 302.12 C BERM = j' 0300.45 T16-25 13 290, S-6 286.66 " 8 RW END GS 287.52 FACE WALL GRAPHIC SCALE 0 10 20 40 • 299.87 (:) • 299.23 _ - • 37" high wall . 296.97 t, porch 2j3.94 291.86 f. f. 29 293.03 80 Figure 6-3: ( IN FEET ) 1 inch = 20 ft. ric met sr 29 78 293.61 307.70 water 308.06 TOP AC BERM main (W) 306.33 EP 301,c •T20-2v Q 233.JD 0 296.14 T8-15 25.09 " 299.44 294.61 PORCH (ORLI �293.24 293:1�: `'L 0' • • ,- , 45" high all C. 3 STORMWATER HANDBOOK Gross Section of a Bioretention Area (Side View) NOTE; SURFACE AREA OF THE BOTREATMENT SOIL SHALL EQUAL 4% Of THE AREA OF THE SITE THAT DRAINS TO TREATIIAENT MEASURE, UNLESS SIZING CALCULATIONS ARE SUBMITTED DEMONSTRATING THAT PROVISION C.3 REQUIREMENTS ARE MET USING A SMALLER SURFACE AREA CLEANOUT IMTH CAP AT FIN. GRADE (SEE MUNICIPAL STANDARD DRAWING) BEGINNING OF LINE. 6" MIN PONDING LINED WITH 30 MIL VISQUEEN OR AS APPROVED BY SOILS ENGINEER 4" MIN 12" MIN OF CLASS 11 PERMEABLE --- ROCK PER CALTRANS SPECIFICATIONS PERFORATED OR SLOTTED SLOPED UNDERDRAIN (SLOPE AT 0.50% MIN) WITH PERFORATIONS DOWN. SEE PLAN FOR CONNECTION TO C.B. & FOR INVERT ELEVATION. OPTIONAL MOUNDING PARAMETERS; PLANTING MOUNDS CONSTRUCTED OF BSM MAY BE PROVIDED SUBJECT TO MUN#CIPAL APPROVAL. TOP OF MOUNDS AT LEAST 2" BELOW CREST OF OVERFLOW RISER, LOW POINTS NO MORE THAN 12" BELOW CREST OF OVERFLOW RISER OVERFLOW RISER WITH GRATE CHRISTY V12 12"X12" DRAIN BOX OR APPROVED EQUAL. DOME GRATE MAY BE ADEQUATE IN SOME CASES, SUBJECT TO LOCAL AGENCY APPROVAL. 6-INCH MINIMUM 12-INCH MAXIMUM ABOVE LOW POINT OF PLANTING AREA NATIVE SQL DO NOT COMPACT B#O-TREATMENT SOIL (BSM) MIX PER SPECS. GRAVITY DRAIN TO STORM DRAIN OR DISCHARGE; BOTTOM -OUT OR SIDE -OUT OPTIONS (USE CHRISTY V12 DRAIN BOX FOR SIDE-OUTOPTION) ,'299.61 • 308.44 300.59 (W) FH 309. 310.07 TOP AC BERM wv 310.56 AC 309.12 306 88 0T18-35 • 297.13, /°\S-n 29760D.61 '94t37 I//////// / / / / / / / k///////11,, K///////I F f872 a 4.: 3.21 293.37 • 293.28® 299.81 T10-15 T6-10 301:97 - 3'-4' high wall • 311.09 303.89 TR-1 fl 299 8Q 0 • 2 8.98 297.84 297 64 �T20-40 2 15 1 olc,err conc 297. 29 PO' (w) 311.79 TOP AC BERM END 313.27 TOP AC BERM 314.67 EP 311.53 312.92 T12-20 299.12 2 9 296.72 /3/�/// //////// // //////// / ///// 4 //// 294.03 310.51 0 311.92 0 ,' T24-20 RDWD T24-20 RDWD NOTE: SEE BIORETENTION DETAIL FIG 6-3 (THIS SHEET) FOR OUTLET STRUCTURE gk0 314.13 0 T24-20 RDWD 311.59 030564 T24-40 301 301.36' 30 299.351 29� g.34 411 8.97 7' • 300.77 hose b'ib 9.54 '> 0 298.51 T12-20 (W) ®TSB 314.88 DETECTOR x 313.75 0310.29 T22-30 300.79 298. ose b 3max high wall • 297.46 T4-4 �24" MIN -- BOTTOM WIDTH CLEANOUT W/CAP 2 MINIMUM 6" VARIES PONDING 2 (G) 314.18 BEG TOP FACE R 306.65 307.77 T19-7 ® O 307.6 ® 304.99 T8-10 3 - 302.89 299.5 0298.29 T24-30 0299.81 T14-15 x 315.57 (W) • 315.81 315.16 EP AP catch 314.26 basin 314 314.23 TOP FACT R' 314.36 23A 308.04 34z FD .751P EN[ 07.70 307.73 9 45 305.69 39.= 477 297.90 FD T--PST W 12" 12"- #4 REBAR © 3' 0.C. we- � 1 ,�....� 1-.- ,, IT BIORETENTION SOIL MEDIA (BSM) 2 x 0 STORM DRAIN PER PLAN 3" FROM BOTTOM 24/ MIN 2' MI 0 0 - SEE NOTE 4 oI EXISTING SUBGRADE 6" PERFORATED PIPE SIDEWALK STREET BIORETENTION SWALE DETAIL WITHOUT UNDERDRAIN - NOT TO SCALE DESIGN NOTES 1. FULL DESIGN GUIDANCE PROVIDED IN BIORETENTION TECHNICAL SPECIFICATIONS DOCUMENT. 2. OVERFLOW STRUCTURE REQUIRED FOR IN -LINE SYSTEMS WITHOUT AN OVERFLOW BYPASS. 3. CURB AND SIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY GEOTECHNICAL ENGINEER. 4. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP LAYER OF 3/4" (NO. 4) OPEN -GRADED AGGREGATE. 5. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS. REFER TO APPENDIX C OF THE SCVURPPP C.3 STORMWATER HANDBOOK. 6. PLANTING DESIGN AND IRRIGATION PER BIORETENTION TECHNICAL SPECIFICATIONS. 7. MULCH (OPTIONAL) PER BIORETENTION TECHNICAL SPECIFICATIONS. A MINIMUM 2-INCH LAYER OF COMPOSTED WOOD MULCH SHOULD BE PROVIDED ON ALL EXPOSED AREAS OF BIOTREATMENT SOIL. 8. LOCATE ENERGY DISSIPATION COBBLE PADS AS SPECIFIED IN INLET DETAILS - AVOID DECORATIVE USE. BIORETENTION DETAIL NO SCALE INSPECTION/MAINTENANCE CONSIDERATIONS BIORETENTION REQUIRES FREQUENT LANDSCAPING MAINTENANCE, INCLUDING MEASURES TO ENSURE THAT THE AREA IS FUNCTIONING PROPERLY, AS WELL AS MAINTENANCE OF THE LANDSCAPING ON THE PRACTICE. IN MANY CASES, BIORETENTION AREAS INITIALLY REQUIRE INTENSE MAINTENANCE, BUT LESS MAINTENANCE IS NEEDED OVER TIME. IN MANY CASES, MAINTENANCE TASKS CAN BE COMPLETED BY A LANDSCAPING CONTRACTOR, WHO MAY ALREADY BE HIRED AT THE SITE. IN COLD CLIMATES THE SOIL MAY FREEZE, PREVENTING RUNOFF FROM INFILTRATING INTO THE PLANTING SOIL. MAINTENANCE ACTIVITIES: 1. WATER PLANTS DAILY FOR 2 WEEKS 2. REMOVE LITTER AND DEBRIS 3. REMOVE SEDIMENT 4. REMULCH VOID AREAS 5. TREAT DISEASED TREES AND SHRUBS 6. MOW TURF AREAS 7. REPAIR EROSION AT INFLOW POINTS 8. REPAIR OUTFLOW STRUCTURES 9. UNCLOG UNDERDRAIN 10. REGULATE SOIL PH REGULATION 11. REMOVE AND REPLACE DEAD AND DISEASED VEGETATION 12. ADD MULCH 13. REPLACE TREE STAKES AND WIRES 14. MULCH SHOULD BE REPLACED EVERY 2 TO 3 YEARS OR WHEN BARE SPOTS APPEAR. REMULCH PRIOR TO THE WET SEASON. LINED WITH 30 MIL VISQUEEN OR AS APPROVED BY SOILS ENGINEER CONSTRUCTION NOTES 1. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM. 2. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED SOIL AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ON CIVIL PLANS. 3. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. UNDERDRAIN DISCHARGE ELEVATION SHALL BE NEAR TOP OF AGGREGATE LAYER. UNDERDRAIN SLOPE MAY BE FLAT. 4. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFORE PLANTING. 4. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS. 5. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS. .125" SIDE VIEW 4" TOP VIEW 4 SUGGESTED FREQUENCY AT PROJECT COMPLETION MONTHLY AS NEEDED AS NEEDED AS NEEDED AS NEEDED AS NEEDED AS NEEDED AS NEEDED AS NEEDED AS NEEDED ANNUAL ANNUAL EVERY 2-3 YEARS, OR AS NEEDED EMBOSSING HEIGHT.032" CORNER RADIUS .187" FINISH UV BAKED ENAMEL - 1-2 COLOR OPTION OR NATURAL FINISH MATERIAL THICKNESS WEIGHT 304 ANNEALED STAINLESS STEEL BRASS ALUMINUM ANODIZED ALUMINUM .062" .062" .062" .062" .218 LBS. .250 LBS. .082 LBS. .082 LBS. OPTIONS SQUARE HOLE: 1/4" X 1/4" SERIAL NOS.: .250" HIGH, MAX. 6 DIGITS PROPRIETARY ANN CONFIDENTIAL THE INFORMATION CONTAINED IN PHIS DRAWING IS ME 501E PROPERTY OF ALMETEK INDUSTRIES. INC, ANY REPRODUCTION IN PART OR A5 A HOLE WITHOUT IHE WRITTEN PERMISSION OF ALMETEK INDUSTRIES, INC. IS PROHIBITED. Customer: Job Name: Date: ALMETEK INDUSTRIES SPECIFICATION STORM DRAIN MARKERS OCT. 5, 2005 SDS4R0231 NA00Q.pdf TOLERANCE FRACTION 1-118" .05 os° xxx 0,00s° LMETEI 1-800-248-2080 Fax: 908-880-9618 STORM DRAIN LABEL DETAIL NO SCALE PLAN VIEW SECTION A -A 1, 16" STORMWATER FACILITY STORMWATER TREATMENT AREA TCM ID DESCRIPTION OF AREA TOTAL AREA (SF) LANDSCAPE SELF -TREATING AREA (SF) TREATMENT AREA HARDSCAPE/ROOF (SF) TREATMENT AREA REQUIRED (SF) TREATMENT AREA PROVIDED (SF) DMA 1 BLOSSOM HILL & UNION 13,037 761 12,276 491 563 DMA 2 LOT 1 12,378 6,728 5,650 226 229 DMA 3 LOT 2 10,880 5,357 5,523 221 242 DMA 4 LOT 3 11,139 5,565 5,574 223 227 PERVIOUS AND IMPERVIOUS SURFACES COMPARISON TABLE a. Total Site (acres): 0.99 ac b. Total Area of Site Disturbed (acres): 0.99 ac Existing Area (square feet) Proposed Area (square feet) Replaced' New2 Impervious Area Roof (not Green Roof) 3,009 3,009 6,231 Parking 0 0 853 Sidewalks & Streets 4,244 4,244 9,712 Other (e.g. tennis court) 0 0 0 c. Total Impervious Area 7,253 7,253 16,796 d. Total new and replaced impervious area 24,049 Pervious Area Landscaping 35,851 0 21,810 Pervious Paving 0 0 0 Other (e.g. green roof) 0 0 0 e. Total Pervious Area 35,851 0 21,810 f. Percent of Replacement of Impervious Area in redevelopment projects (Replaced Total Impervious Area / Existing Total Impervious Area x 100%): 100 % 0 Table Footnotes: 'Proposed Replaced Impervious Surface: All impervious surfaces added to any area of the site that was a previously existing impervious surface. 2 Proposed New Impervious Surface: All impervious surfaces added to any area of the site that was a previously existing pervious surface. PERSPECTIVE VIEW BIORETENTION DESIGN NOTES 1.FOR USE WITH STORMWATER FACILITIES WITH SIDE SLOPES. 2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE, CIE, IE). SEE DETAIL 100. 3. CURB AND WALL DETAILS MAY BE MODIFIED BY CIVIL AND GEOTECHNICAL ENGINEERS. 4. WHERE INLET FLOW VELOCITY IS HIGH, EXTEND COBBLE INTO FACILITY, BUT AVOID EXCESSIVE USE. 5. CURB HEIGHT MAY BE REDUCED TO 4-INCHES WHERE ADJACENT TO A SIDEWALK. SEE DETAILS 110 & 111. CONSTRUCTION NOTES 1.AFTER CONSTRUCTION PLACE SAND BAGS AT GUTTER OPENINGS TO KEEP STORM FLOWS FROM ENTERING FACILITY UNTIL VEGETATION IS ESTABLISHED. CURB CUT WITH SLOPE DETAIL WITHOUT UNDERDRAIN - NOT TO SCALE REVISIONS: DATE DESCRIPTION BY: Hanna• Brunetti •Civil Engineers • Land Surveyors ■ ■ Construction Managers ■ Gilroy California (408) 842-2173 DATE • I=E%RUARY 2016 HORIZ. SCALE: r=267' VERT. SCALE. NONE DESIGNED BY• A.W. CHECKED BY: DRAWN BY. T.M. REFERENCES TOWN OF FEBRUAR Y LOS GATOS 2 0 1 6 Storm Drain Basin Plan 15975 Union Avenue - apn 523-42-017 SANTA CLARA COUNTY CALIFORNIA SHEET 10 OF 11 JOB NO. 14075 SIGNAL UTE iUi AC BE TFC CL DI TOP AC BERIr 300.56 300.49 530 300.48 FD PK NAIL 301.93 301.49 TOP AC BERM END ss mh AC "II zg�� TSB rim 303.1 TOP AC BERM 0 Inv L93.b. 301.19 03.1>- TFC CL DI ASIGNAL YnA 304 51 306.37 TOP AC BERM IOP AC BERM AP EROSION CONTROL NOTES gas 300.17 TOP AC BERM 300.03 • 300.46 main (G) water Main 299.27 299.65 TFC 299.16 FL 299.72 299.49 TFC ER 299.n1 299.12 FL 299.68 (w) 30.21 300.61 300 58 TFC TFC 300.36 TFC 300.36 300.15 TFC 299.63 TFC 299.61 299.69 300TFC 300.07 " 300.68 1002 300.26 S-MAG 1 300.83 TFC 300.35 {%300.7/ (0) TFC 299.25 TFC HCR 98.75 299.33 TFC 298. SE-5 (SS) 46 TFC 298 93 298.37 CL HCR 98.44 CVWD BM 489 TFC 98.38 297. TFC 297 1L DI 38 298.25 TFC HCR 7.78 297.86 2943 286.89 T`C 2 )6.42 FL 291180 291,15 TFC TFC 290.55 FL (SS) stm mh rim 288.07 inv 278.12 TFC 97.09 FL 297.26 )0.78; 300.68301.06 301.26 AC TOP AC BERM - (w) STREET UTE 299.92 296.99 296.83 61 296.5 .29 60 E 0 1n 296.8' stm mh rim 296.85 inv 291.35 cn 0 287.1 wv 301.38 300.86 Wv . 296.28 x 293.62 291.44 iS E-e 0 • 65 Fiber Rolls ai Note Install fiber roll along a level contour. Vertical spacing meosured olong the face of the slope varies between 10' and 20' TYPICAL FIBER ROLL INSTALLATION .v Install a fiber roll near slope where it transitions into a steeper slope EE N a Slope vies E NTS Fiber roll /- Fiber min 3/4" r 3/4" wood stakes mow 4' spacing ENTRENCHMENT DETAIL N.T S. 1, 301.24 301 301. TFC public thoroi� icated to n of los a de to per 8732 o.r. 299.39 P9 P 2.79 TFC oil 303.07 SIGNAL LITE a 301. 2 302.31 TFC AP 301.88 , CJ L.99 9 e TFC GAS VALVE •/lam 302.24 TFC , 302.01 30L59TFC 301. TFC .58 5 13 298. AC BER 296.8 • 296.90 2's EF GAS1ALVE 29,3.8 w 0v 291.99 > 290.23 EP-DWY rn 289.89 AC • 287.68 29 EP 901 1R EP-OW 289.63 1007 288.38 FD BD MON 289.01 FD NAIL 28 297.5 • 296.37 291.3 303.03 303.10 303.03 303 35 TFC 302.-s) 302 • 299.73 303.92 TOP AC B 0 2-15 0 292.58 1 304.22 AC (w) • 304.95 304.27 73 ai 26-50 30-30 300.45 O T16-25 • 299.87 24-35 " 296.97 294 36 _,,294.26 t, porch 2)3.94 f.f. 29 ric met r gas e • 296.14 T8-15 (w) 307.70 water 308.06 TOP AC BERM main 306.33 0301..05 • T20 20 297.60 • 308.44 301,87; •• • ' 30241 5 98.4£, -600 300.59 2.3.93 TEPS (w) FH 309. 310.07 TOP AC BERM wv 310.56 AC 309.12 O 306 88 T18-35 302.26 T24-20 297.13r' s-4o/9 6 ///// r 293.21 y �• 111UU i C �-~��~C�J�C ���G1� 93.03 `<' ; JZ93.24 2931J: _ 4r jir 287.61 barricay 286.E6 " 286.35 = TFC 286.18 FL 286.43 noun rnnF igwall 1 8 RW END GS 0 287.52 FACE WALL 37" high wall 1 45" high wall Stabilized Construction Entrance/Exit TC-1 EXISTING PAVED ROADWAY Match Existing Grade Crushed aggregate greater than 3" but smoller than 6° 1 Filter fabric Original grade 12 " Min. unless otherwise specified by a soils engineer 0 u SECTION B-B NTS NOTE: Construct sediment borrier and chonnelize runoff to a I sediment trapping device Temporary pipe culvert as needed 50' Min or four times the circumference of the largest construction vehicle tire, whichever is greater PLAN NTS Width os required to occomodote anticipated traffic •3.21 SE-10 3'-4' high wall pool 297. 306.67 T101 10 303.89 • 311.09 (w) 311.79 TOP AC BERM END 313.27 TOP AC BERM 314.67 EP 311.53 312.92 304.54 : 304.49 TR-in T4-5 . T3-5 303.80 299.o T2-3 T12-20 //9zY//ale///// //"/ / /////) // //////// / ////////// 4/////////) pool Storm Drain Inlet Protection 307.34 Sheet flow Less than 1 acre Geotextile Blanket Drain inlet SECTION A -A xiSilt Fence per SE-01 1 Drain inlet PLAN 6" Min overlap at ends of silt fence Geotextile Blanket ----Silt Fence per SE-01 DI PROTECTION TYPE 1 NOT TO SCALE NOTES 1 For use in areos where grading hos been completed ond final soil stabilization ond seeding ore pending 2. Not applicable in paved areas 3 Not opplicoble with concentrated flows. 311.59 12-20 304.09 303.18 299.34 hose bl,its 298.51 040 314.88 DETECTOR (TA 310.29 301.61 300.71 T14-20 29801 296.37 3' max high wall T8-10 314.18 BEG TOP FACE RW 303.5 304.67 .308.8 298.73 298.60 15.16 P AP 316.68 fP rim 316.66 1011 316.99 A 316.40 b„in TFC CL DI TFC tiler curb and gutter 43.00, OP FA41 RW 07.70 307.73 45 305.09 298. 5 477 297.90j- utility box 315.68 315.53 Storm Drain Inlet Protection Row Inlet Edge of Pavement Spillway, 1-bog high - Flow Sandbags 2-bags high TYPICAL PROTECTION FOR INLET ON SUMP Edge of Pavement Inlet Flow Spillway, 1-bog high TYPICAL PROTECTION FOR INLET ON GRADE NOTES: 1. Intended for short-term use 2 Use to inhibit non -storm water flow 3. Allow for proper mointenonce and cleanup 4 Bogs must be removed after adjacent operation is completed 5 Not applicable in areas with high silts and clays without filter fabric. DI PROTECTION TYPE 3 NOT TO SCALE Sandbags 2-bogs high 1 EROSION CONTROL MEASURES SHALL BE EFFECTIVE FOR CONSTRUCTION DURING THE RAINY SEASON; OCTOBER 15 THROUGH APRIL 15. 2. NO STORM WATER RUNOFF SHALL BE ALLOWED TO DRAIN INTO THE EXISTING AND/OR PROPOSED UNDERGROUND STORM SYSTEM UNTIL SUITABLE EROSION CONTROL MEASURES ARE FULLY IMPLEMENTED. NO STORM WATER RUNOFF SHALL BE ALLOWED TO ENTER THE STORM DRAIN SYSTEM THAT IS NOT CLEAR. AND FREE OF SILTS. 3. A FIBER ROLL PER "FIBER ROLL DETAIL SE-5" SHALL BE INSTALL ALONG THE PERIMETER OF THE PROJECT SITE. THE LOCATION OF THE FIBER ROLL ALONG THE PERIMETER SHALL BE ADJUSTED TO ELIMINATE SEDIMENT LADEN RUNOFF FROM LEAVING THE SITE. A FIBER ROLL SHALL ALSO BE REQUIRED AROUND THE PERIMETER OF ANY STOCKPILE OR OTHER SITE OF BARE, LOOSE EARTH. 4. ALL STORM DRAIN MANHOLES, CATCH BASINS, AND/OR DROP INLETS THAT ARE TO ACCEPT STORM WATER SHALL HAVE INLET PROTECTION MEASURES PER DETAIL SE-10. STORM WATER RUNOFF SHALL BE DIRECTED TO THESE INLETS ONLY. STORM DRAIN CATCH BASINS THAT ARE NOT COMPLETE, SHALL BE BLOCKED OFF COMPLETELY. 5. THE NAME, ADDRESS, AND 24 HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR THE IMPLEMENTATION OF THE EROSION 'f1:CONTROL PLAN SHALL BE PROVIDED TO THE CITY. jp concrete '18.1'6. PRIOR TO GRADING, AN ENTRANCE SHALL BE CONSTRUCTED, CONSISTING OF A MINIMUM OF 50 LF OF DRAIN ROCK, 3" IN DIAMETER, PLACED OVER MIRAFI 500X (OR EQUAL) PER DETAIL TC-1. THE ENTRANCE SHALL CONFORM TO "CONSTRUCTION ENTRANCE DETAIL TC-1". THERE SHALL BE ONLY ONE ENTRANCE/EXIT POINT TO THE SITE DURING THE RAINY SEASON. THE LOCATION SHALL BE AS SHOWN ON THESE PLANS, OR AT A LOCATION APPROVED BY THE CITY. 7. ALL AREAS OF BARE, TURNED OR DISTURBED EARTH SHALL BE STABILIZED BY USE OF HYDROSEED OR NON -VEGETATIVE STABILIZATION PER EC-16, PER THE TABLE BELOW. ALL STOCKPILES, AND/OR BORROW AREAS SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES SUCH AS A PERIMETER SILT FENCE, AND OTHER METHODS TO PREVENT ANY EROSION OR SILTS MIGRATION. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. CHANGES TO THE EROSION CONTROL PLAN SHALL BE MADE TO MEET FIELD CONDITIONS, BUT ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE QSD. THE STORM DRAIN SYSTEM SHALL MAINTAIN A FORM OF DRAIN INLET PROTECTION UNTIL CITY ACCEPTS THE FINAL STREET IMPROVEMENTS. THE DRAIN INLET PROTECTION SHALL BE MAINTAINED, EFFECTIVE AND SUBJECT TO CITY ENGINEER'S APPROVAL 8. ALL PAVED STREET, AND AREAS ADJACENT TO THE SITE SHALL BE KEPT CLEAR OF EARTH MATERIALS AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO ELIMINATE SEDIMENT LADEN RUNOFF FROM ENTERING THE STORM DRAIN SYSTEM. 9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL FACILITIES AT THE END OF EACH DAY. ANY DAMAGED STRUCTURAL MEASURES ARE TO BE REPAIRED BY END OF THE DAY. TRAPPED SEDIMENT IN "SD INLETS" (AND OTHER EROSION CONTROL MEASURES) SHALL BE REMOVED TO MAINTAIN TRAP EFFIIENCY. REMOVED SEDIMENT SHALL BE DISPOSED BY SPREADING ON SITE, WHERE IT WILL NOT MIGRATE. 10. IT IS THE RESPOSIBILITY OF THE CONTRACTOR TO PREVENT THE FORMATION OF AIRBORNE DUST NUISANCE AND SHALL BE RESPOSIBILE FOR ANY DAMAGE RESULTING FROM A FAILURE TO DO SO. 11. ALL DRAIN SWALES SHALL BE PER DETAIL EC-9. 12. INCOMPLETE GRADING SHALL NOT BE ALLOWED. CON TRATOR SHALL MAINATIN A DRAIN PATH AS SHOWN ON THIS PLAN. SAID DRAIN PATH SHALL BE MAINTAINED LINED DRAIN SWALES, AND INLET PROTECTION AT A MINIMUM. IF PONDING DOES OCCUR ON THE SITE AFTER GRADING, THE WATER MUST BE FREE AND CLEAR OF SEDIMENT PRIOR TO DISCHARGE TO THE STORM DRAIN SYSTEM. THIS REQUIREMENT MAY NECESSITATE THE USE OF NATURAL AND/OR MECHANICAL DESILTING METHODS, SUBJECT TO APPROVAL BY THE CITY ENGINEER. 13. IF THESE EROSION CONTROL MEASURE PROVE INADEQUATE, STRAW MULCH, TACKIFIER, AND ADDITIONAL HYDROSEEDING MAY BE REQUIRED. HYDROSEED TABLE ITEM LBS/ACRE COMMON BARLEY ANNUAL RYEGRASS CRIMSON CLOVER FERTILIZER 7-2-3 FIBER MULCH 45 45 10 400 2000 100 LEGEND • Storm Drain Inlet Protection CONSTRUCTION ENTRANCE/EXIT PER DETAIL TC-1 FIBER ROLL BARRIER PER DETAIL SE-5 STORM DRAIN INLET PROTECTION PER DETAIL SE-10 12”- 24" Concrete block laid lengthwise on sides itti perimeter of opening Runoff with sediment OVerflow Sediment 4. wire mesh Hordwore cloth or wire mesh DI PROTECTION - TYPE 4 NOT TO SCALE Filtered water • Curb inlet 20 GRAPHIC SCALE 0 10 20 ( IN FEET ) 1 inch = 20 ft. REVISIONS: DATE DESCRIPTION BY: Hanna • Brunetti VERT. SCALE. NONE REFERENCES Erosion Control Plan SHEET 11 Gilroy California (408) 842-2173 DESIGNED BY. A.W. CHECKED BY: DRAWN BY. T.M. TOWN OF LOS GATOS 15975 Union Avenue - apn 523-42-017 SANTA CLARA COUNTY CALIFORNIA OF 11 JOB NO OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.1 -15 11/19/15 LOT 1 B A1.6 B A1.6 RE F R WCD 71 ' - 0 " 23 ' - 1/ 2 " 6' - 1 1 1/ 2 " 11 ' - 0 " 8' - 0 " 22 ' - 0 " 42'-0" 5'-0"17'-71/2"19'-41/2" 8'-31/4" 7'-0"33'-0"2'-0" 23 ' - 1/ 2 " 17 ' - 1 1 1/ 2 " 15 ' - 0 " 15 ' - 0 " 2'-0" 5'-0" 5' - 0 " KITCHEN 3-CAR GARAGE COVERED PORCH MUD ROOM FOYER BEDROOM 5 UP VERANDA DN DN BATH 4 POWDER LAUNDRY INFORMAL DINING FAMILY ROOMDEN/FORMAL DINING NORTH FAU W/H A A1.6 A A1.6 SCALE: 1/4" = 1'-0" FIRST FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.2 -16 11/19/15 LOT 1 B A1.6 B A1.6 14 ' - 6 " 11 ' - 6 " 14 ' - 1 1 " 21 ' - 6 1/ 2 " 14 ' - 6 " 11 ' - 1 1 1/ 2 " 6' - 0 " 15 ' - 0 " 15 ' - 0 " 1'-0"5'-0" 3'-0" 20'-2"18'-41/2" 14'-61/2"19'-51/2"7'-0"1'-0" 62 ' - 5 1/ 2 " 42'-0" 305.67' A A1.6 A A1.6 A1.5 A1.5 A1.5 A1.5 A1.6 A1.1 A1.1 A1.1 A1.1 A1.2 A1.2A1.2 A1.2 A1.2 A1.3 A1.7 A1.7 A1.7 MASTER SUITE BEDROOM 2 BEDROOM 3 BEDROOM 4 BATH 3 OPEN TO BELOW DN BATH 3 MASTER BATHMASTER CLOSET BATH 3 OPEN TO BELOW DN BATH 2 NORTH LI N E N SCALE: 1/4" = 1'-0" SECOND FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.3 -17 11/19/15 LOT 1 ARCHITECTURAL COMPOSITION SHINGLE ROOF PAINTED SLOPED GUTTERS 1 1 RIDGE RIDGE V A L L E Y V A L L E Y HI P H I P V A L L E Y RIDGE RIDGE RIDGE RI D G E RI D G E RIDGE RIDGE HI P H I P HI P HI P V A L L E Y V A L L E Y H I P V A L L E Y V A L L E Y V A L L E Y V A L L E Y RIDGE RIDGE V A L L E Y 5/12 5/12 5/ 1 2 5/ 1 2 3.5/12 3.5/12 5/12 5/12 5/12 PAINTED SHEET METAL CHIMNEY CAP 5/12 5/ 1 2 5/ 1 2 5/12 5/ 1 2 5/ 1 2 5/12 5/12 5/12 5/12 5/12 5/ 1 2 5/ 1 2 5/12 5/12 5/ 1 2 5/ 1 2 5/ 1 2 NORTH SCALE: 1/4" = 1'-0" ROOF PLAN RIGHT FRONT LEFT FRONT OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.4 -18 11/19/15 LOT 1 10 ' - 1 " 9' - 4 " 10 ' - 1 " 1' - 1 " 9' - 4 " 5' - 1 0 1/ 2 " 27 ' - ½" PAINTED WOOD WINDOW TRIM COMPOSITION SHINGLE ROOF 6X KNEE BRACES PAINTED WOOD COLUMNS PAINTED BARGE RAFTER PAINTED WOOD BELLY BAND VINYL CLAD WINDOWS LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE 304.58' TOP PLATE 315.00'315.00' 304.58' TOP PLATE 293.00' GARAGE 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE PAINTED LAP SIDING 27 ' - 1/ 2 " 10 ' - 2 " 1' - 0 " 9' - 4 " 5' - 1 0 1/ 2 " PAINTED WOOD WINDOW TRIM VINYL CLAD WINDOWS COMPOSITION SHINGLE ROOF PAINTED BARGE RAFTER PAINTED WOOD COLUMNS 6X KNEE BRACES SHINGLES AT GABLE END SHEET METAL CHIMNEY CAP PAINTED LAP SIDING PAINTED LAP SIDING LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE 304.58' TOP PLATE 315.00'315.00' 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE SCALE: 1/4" = 1'-0" FRONT (EAST) ELEVATION SCALE: 1/4" = 1'-0" LEFT (NORTH) ELEVATION EXTERIOR ELEVATIONS OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.5 -19 11/19/15 LOT 1 9' - 4 " 5' - 1 0 ½" 10 ' - 1 " 27 ' - 1/ 2 " PAINTED WOOD WINDOW TRIM 6X KNEE BRACES COMPOSITION SHINGLE ROOF PAINTED BARGE RAFTER PAINTED LAP SIDING PAINTED WOOD COLUMNS SHINGLES AT GABLE END VINYL CLAD WINDOWS LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE 12 5 293.00' GARAGE 304.58' TOP PLATE 315.00'315.00' 304.58' TOP PLATE 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE 1' - 6 " 10 ' - 1 " 1' - 1 " 9' - 4 " 5' - 1 0 ½" 27 ' - 1 0 1/ 2 " SHINGLES AT GABLE END PAINTED LAP SIDING COMPOSITION SHINGLE ROOF PAINTED BARGE RAFTER 6X KNEE BRACES PAINTED WOOD COLUMNS PAINTED WOOD GARAGE DOOR TRIM PAINTED SLOPED GUTTER LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE 12 5 304.58' TOP PLATE 315.00'315.00' 304.58' TOP PLATE 293.00' GARAGE 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE SCALE: 1/4" = 1'-0" REAR (WEST) ELEVATION SCALE: 1/4" = 1'-0" RIGHT (SOUTH) ELEVATION EXTERIOR ELEVATIONS OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 1 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A1.6 -20 11/19/15 LOT 1 10 ' - 1 " 9' - 4 " 26 ' - 1 0 1 / 2 " 27 ' - 1 " EXISTING GRADE LINE LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST BEDROOM 5 VERANDAKITCHENHALL BEDROOM 2 MASTER BATH MASTER CLOSETHALL TOP PLATE TOP PLATE 12 5 300.17' TOP PLATE 300.17' TOP PLATE 310.50'310.50' 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE 10 ' - 1 " 9' - 4 " 27 ' - 1 " 9' - 4 " LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST EXISTING GRADE LINE LINE OF PROPOSED GRADE 3-CAR GARAGE FOYER DEN/ FORMAL DININGHALL BEDROOM 3 MASTER CLOSET BATH 3 TOP PLATE TOP PLATE 12 5 300.17' TOP PLATE 300.17' TOP PLATE 310.50'310.50' 294.50' MAIN FLOOR 294.50' MAIN FLOOR 305.67' SECOND FLOOR 305.67' SECOND FLOOR 320.87' HIGHEST RIDGE 320.87' HIGHEST RIDGE SCALE: 1/4" = 1'-0" SECTION A-A SCALE: 1/4" = 1'-0" SECTION B-B SECTIONS OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.1 11/19/15 LOT 2 REFR 34 ' - 0 " 12 ' - 0 " 6' - 0 " 16 ' - 6 " 21'-0"14'-0"12'-6"4'-0" 4' - 4 " 14 ' - 0 " 16 ' - 6 " 14 ' - 0 " 16'-0"7'-0"8'-10" 8"21'-0" 11 ' - 6 " 22 ' - 6 " 1' - 0 " 68 ' - 6 " 53'-6" 2'-0" 11 ' - 7 " 8'-41/2" 48 ' - 1 0 " 18 ' - 0 " 31'-10" 5' - 0 " 5'-0" 297.5' 296' B A-2.6 GAS FIREPLACE NEW 200 AMP SERVICE CLEAN OUT NEW GAS METER FAMILY ROOM INFORMAL DINING KITCHEN BEDROOM 5 3-CAR GARAGE COVERED PORCH DEN/ FORMAL DINING FOYER UP POWDER BATH 4 LOGGIA DN DN CLG 9'-1" CLG 10'-1" CLG 9'-1" CLG 10'-1" CLG VAULTED CLG 10'-1" CLG 10'-1" OPEN TO ABOVE CLG 11'-1" Ç Ç 6" 6" 6" 6" 6" 6" 0" 0"0" 0" A A-2.6 A A-2.6 NORTHSCALE: 1/4" = 1'-0" FIRST FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.2 11/19/15 LOT 2 WCD B A-2.6 12'-0"4'-0"7'-0" 16 ' - 6 " 11'-0"15'-6" 7' - 0 " 7' - 9 " 11 ' - 9 " 6' - 6 " 7' - 6 " 16 ' - 6 " 15'-2"6'-6" 12 ' - 5 " 11 ' - 1 " 16'-0"7'-0"8'-10" 13 ' - 2 " 5' - 1 0 " 57 ' - 0 " 53'-6" 4'-0"1'-0" 31'-10" 19 ' - 0 " 23'-0" 21'-8" 14 ' - 0 " 14 ' - 9 " 3' - 0 " 26'-6" 308.67' A A-2.6 A A-2.6 BATH 2 LAUNDRY MASTER SUITE BEDROOM 2 BEDROOM 4 BATH 3 DN OPEN TO BELOW BEDROOM 3 LINEN MASTER CLOSET LINEN MASTER BATH CLG VAULTED CLG VAULTED CLG VAULTED CLG 9'-4" CLG 9'-4" CLG 9'-4" CLG 9'-4" HALL CLG 9'-4" CLG 9'-4" CLG 9'-4" NORTHSCALE: 1/4" = 1'-0" SECOND FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.3 11/19/15 LOT 2 LOWER ROOF LOWER ROOF LOWER ROOF LOWER ROOF LOWER ROOF "S" TILE ROOF 5" HALF ROUND GALV. GUTTERS DECORATIVE CHIMNEY CAP 5" HALF ROUND GALV. GUTTERS 4/ 1 2 4/ 1 2 4/ 1 2 4/ 1 2 4/ 1 2 4/ 1 2 4/12 4/12 4/12 4/12 4/12 4/12 3/12 3/12 4/ 1 2 4/ 1 2 4/12 4/ 1 2 4/ 1 2 4/ 1 2 4/12 4/12 4/12 4/ 1 2 4/ 1 2 3/12 NORTH SCALE: 1/4" = 1'-0" ROOF PLAN FRONT ABOVE REAR OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.4 11/19/15 LOT 2 1' - 6 " 11 ' - 2 " 9' - 4 " 5' - 7 " 27 ' - 7 " 8' - 1 " 1' - 3 " SAND FINISH STUCCO "S" TILE ROOF VINYL CLAD CASEMENT WINDOWS SHAPED CORBELS SHAPED & PAINTED 3X RAFTER TAILS @ 3' O/C SHAPED & PAINTED BARGE RAFTERS 5" HALF ROUND GALV. GUTTERS DECORATIVE HALF COLUMN DECORATIVE TERRA COTTA GABLE VENTS STUCCO MOLDING SILL. TYP. LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE FIRST FLOOR SECOND FLOOR GARAGE FLOOR SECOND FLOOR TOP PLATE 12 4 297.50' 308.67' 296.00' 318.00' 323.58'RIDGE HEIGHT 308.67' 318.00' 323.58' 316.75' FIRST FLOOR 297.50' 1' - 6 " 11 ' - 2 " 9' - 4 " 5' - 7 " 27 ' - 7 " SAND FINISH STUCCO "S" TILE ROOF SHAPED & PAINTED 3X RAFTER TAILS @ 3' O/C STAINED WOOD BEAMS & RAFTERS W/2X6 V-RUSTIC ON CEILING VINYL CLAD CASEMENT WINDOWS SHAPED & PAINTED LATTICE OVER GARAGE DOOR 5" HALF ROUND GALV. GUTTERS DECORATIVE CHIMNEY SHROUD STUCCO ON CORNER COLUMNS PAINTED WOOD BEAMS & RAFTERS W/2X6 V-RUSTIC ON CEILING SECTIONAL ROLLUP GARAGE DOOR STUCCO MOLDING SILL. TYP. LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE SECOND FLOOR FIRST FLOOR SECOND FLOOR TOP PLATE 12 4 12 3 GARAGE FLOOR 297.5' 308.67' 318.00' 296.00' 297.50' 308.67' 318.00' 323.58'RIDGE HEIGHTRIDGE HEIGHT323.58' FIRST FLOOR SCALE: 1/4" = 1'-0" FRONT (NORTH) ELEVATION SCALE: 1/4" = 1'-0" LEFT (EAST) ELEVATION OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.5 11/19/15 LOT 2 8" 26 ' - 1 " "S" TILE ROOF STUCCO ON CORNER COLUMNS SHAPED & PAINTED 3X RAFTER TAILS @ 3' O/C PAINTED WOOD BEAMS & 3X8 RAFTERS @ 32" O/C W/2X6 V-RUSTIC ON CEILING VINYL CLAD CASEMENT WINDOWS SAND FINISH STUCCO PAINTED WOOD POST & BEAMS DECORATIVE TERRA COTTA GABLE VENTS DECORATIVE TERRA COTTA GABLE VENTS STUCCO MOLDING SILL. TYP. LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE SECOND FLOOR SECOND FLOOR FIRST FLOOR FIRST FLOOR 12 4 TOP PLATE 297.5' 308.67' 319.00' 323.58' 318.00' 297.50' 318.00' 323.58' 308.67' RIDGE HEIGHT RIDGE HEIGHT 11 ' - 2 " 9' - 4 " 5' - 7 " 12 ' - 8 " 8" 26 ' - 1 " 11 ' - 2 " 9' - 4 " 1' - 0 " 4' - 7 " SAND FINISH STUCCO "S" TILE ROOF PAINTED & SHAPED CORBEL @ GARAGE DOOR ROOF SHAPED & PAINTED 3X RAFTER TAILS @ 3' O/C PAINTED WOOD BEAMS & 3X8 RAFTERS @ 32" O/C W/2X6 V-RUSTIC ON CEILING VINYL CLAD CASEMENT WINDOWS SHAPED & PAINTED BARGE RAFTERS STUCCO COLUMNS @ CORNER OF LOGGIA DECORATIVE TERRA COTTA GABLE VENTS STUCCO MOLDING SILL. TYP. LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL TOP PLATE TOP PLATE SECOND FLOOR GARAGE FLOOR FIRST FLOOR SECOND FLOOR 12 4 12 3 TOP PLATE318.60' 296.00' RIDGE HEIGHT 297.5' 308.67' 319.00' 323.58' 318.00' RIDGE HEIGHT323.58' 308.67' SCALE: 1/4" = 1'-0" REAR (SOUTH) ELEVATION SCALE: 1/4" = 1'-0" RIGHT (WEST) ELEVATION OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 2 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A-2.6 11/19/15 LOT 2 9' - 4 " 26 ' - 9 " 17 ' - 6 1 / 2 " 8" 10 ' - 1 " 1' - 1 " 10 ' - 4 " 4' - 7 " VINYL CLAD CASEMENT WINDOWS STUCCO FINISH "S" TILE ROOFSHAPED & PAINTED 3X RAFTER TAILS @ 3' O/C DECORATIVE CHIMNEY SHROUD CONCRETE SLAB FOUNDATION GAS ONLY FIREPLACE LINE OF EXISTING GRADE LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST FIRST FLOOR SECOND FLOOR TOP PLATE SECOND FLOOR FIRST FLOOR FAMILY ROOM INFORMAL DINING KITCHEN MASTER BATH MASTER SUITE 297.50' 308.67' 323.60' MAX. HEIGHT 308.67' 297.50' 319.00' 10 ' - 1 " 9' - 4 " 8" 11 ' - 2 " 9' - 4 " 5' - 7 " 1' - 6 " 11 ' - 2 " 9' - 4 " 5' - 7 " 26 ' - 9 " CONCRETE SLAB FOUNDATION VINYL CLAD CASEMENT WINDOWS "S" TILE ROOF SHAPED & STAINED 3X RAFTER TAILS @ 3' O/C 5" HALF ROUND GALV. GUTTERS LINE OF EXISTING GRADE LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST FIRST FLOOR SECOND FLOOR KITCHEN HALL BDRM 5 BEDROOM 5 CLOSET FIRST FLOOR SECOND FLOOR TOP PLATE 323.60' 308.67' 297.50' MAX. HEIGHT 308.67' 297.50' 296.00' 318.00' 323.60'MAX. HEIGHT TOP PLATE318.00' LINEN BEDROOM 3 CLOSET BEDROOM 4 MASTER BEDROOM POWDER ROOM GARAGE SCALE: 1/4" = 1'-0" A-A SECTION SCALE: 1/4" = 1'-0" B-B SECTION REAR RIGHT REAR OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.1 11/19/15 -2 LOT 3 REFR 34 ' - 0 " 18 ' - 0 " 16 ' - 6 " 2'-0"21'-0"13'-6"13'-0"4'-0" 1'-0"21'-0" 11 ' - 6 " 22 ' - 6 " 1' - 0 " 68 ' - 6 " 53'-6" 3' - 0 " 14 ' - 0 " 16 ' - 6 " 14 ' - 3 1/ 2 " 16'-0"7'-0"8'-6" 47'-91/2" 5' - 0 " 5'-0" 301' 299.5' A A3.6 A A3.6 B A3.6 B A3.6 NEW 200 AMP SERVICE NEW GAS METER CLEAN OUT A1.1 A1.1 A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 FAMILY ROOM INFORMAL DINING KITCHEN BEDROOM 5 3-CAR GARAGE COVERED PORCH DEN/ FORMAL DINING FOYER UP POWDER BATH 4 LOGGIA DN DN PATIO Ç NORTHSCALE: 1/4" = 1'-0" FIRST FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.2 11/19/15 -3 LOT 3 WCD A A3.6 A A3.6 B A3.6 B A3.6 10'-61/2"15'-111/2"4'-0"1'-0" 14 ' - 3 1/ 2 " 12 ' - 2 1/ 2 " 14 ' - 0 " 17 ' - 6 " 31'-6"22'-0" 12 ' - 5 " 11 ' - 1 " 13'-6"9'-6"8'-6" 14 ' - 0 " 58 ' - 0 " 53'-6" 23 ' - 6 " 3' - 0 " 16 ' - 6 " 23'-0" 312.17' BATH 2 LAUNDRY MASTER SUITE BEDROOM 2 BEDROOM 4 BATH 3 DN BEDROOM 3 LINEN MASTER CLOSET LINEN MASTER BATH NORTHSCALE: 1/4" = 1'-0" SECOND FLOOR PLAN OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.3 11/19/15 -4 LOT 3 LOWER ROOFLOWER ROOF LOWER ROOFLOWER ROOF LOWER ROOFLOWER ROOF LOWER ROOFLOWER ROOF 5/12 5/12 5/12 5/12 5/12 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/12 5/12 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/ 1 2 5/12 5/12 5/12 5/ 1 2 5/ 1 2 2% 2%2% 5/12 5/12 NORTH SCALE: 1/4" = 1'-0" ROOF PLAN SCALE: 1:1.11 FRONT LEFT SCALE: 1:1.11 LEFT REAR OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.4 11/19/15 -5 LOT 3 11 ' - 2 " 9' - 4 " 1' - 0 " 5' - 7 " 27 ' - 1 " PAINTED LAP SIDING PAINTED WOOD WINDOW TRIM COMPOSITION SHINGLE ROOFPAINTED "OGEE" GUTTER WOOD FRAME WINDOWS PAINTED WOOD COLUMNS PAINTED FASCIA DECORATIVE PAINTED WOOD SHUTTERS DECORATIVE PAINTED WOOD SHUTTERS PAINTED WOOD TRELLIS W/KNEE BRACES LINE OF EXISTING GRADE AT FACE OF WALLLINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES HIGHEST RIDGE HIGHEST RIDGE TOP PLATETOP PLATE TOP PLATE 299.5' 321.50' 328.08' 322.50' 328.08' 321.50' GARAGE FLOOR 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR 11 ' - 2 " 9' - 4 " 1' - 0 " 5' - 7 " 27 ' - 7 " PAINTED WOOD WINDOW TRIM PAINTED "OGEE" GUTTER PAINTED WOOD GARAGE DOOR & TRIM PAINTED FASCIA WOOD FRAME WINDOWS PAINTED FASCIA COMPOSITION SHINGLE ROOF ADHERED FIELD STONE VENEER PAINTED WOOD COLUMNS PAINTED LAP SIDING PAINTED WOOD COLUMNS PAINTED "OGEE" GUTTER LINE OF PROPOSED GRADE LINE OF EXISTING GRADE AT FACE OF WALL LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES HIGHEST RIDGE HIGHEST RIDGE TOP PLATE TOP PLATE TOP PLATE TOP PLATE 299.5' 321.50' 328.08' 322.50' 328.08' 322.50' 321.50' GARAGE FLOOR 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR SCALE: 1/4" = 1'-0" FRONT (NORTH) ELEVATION SCALE: 1/4" = 1'-0" LEFT (EAST) ELEVATION OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.5 11/19/15 -6 LOT 3 11 ' - 2 " 9' - 4 " 1' - 0 " 5' - 7 " 27 ' - 7 " PAINTED WOOD WINDOW TRIM COMPOSITION SHINGLE ROOF PAINTED LAP SIDING ADHERED FIELD STONE VENEER PAINTED "OGEE" GUTTER PAINTED "OGEE" GUTTER PAINTED WOOD COLUMNS PAINTED FASCIA COMPOSITION SHINGLE ROOF LINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES HIGHEST RIDGE HIGHEST RIDGE TOP PLATE TOP PLATE TOP PLATE 321.50' 328.08' 322.50' 328.08' 321.50' 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR 10 ' - 4 " 9' - 4 " 10 ' - 1 " 10 ' - 1 " 1' - 1 " 9' - 4 " 6' - 7 " 27 ' - 1 " 1' - 6 " PAINTED WOOD WINDOW TRIM PAINTED "OGEE" GUTTER COMPOSITION SHINGLE ROOF PAINTED WOOD COLUMNS PAINTED WOOD BELLY BAND PAINTED FASCIA PAINTED "OGEE" GUTTER WOOD FRAME WINDOWS PAINTED LAP SIDING LINE OF EXISTING GRADE LINE 30' ABOVE EXISTING GRADE SEE SECTION FOR ACCURATE (E) GRADE LINES LINE OF EXISTING GRADE AT FACE OF WALL HIGHEST RIDGE HIGHEST RIDGE TOP PLATE TOP PLATE TOP PLATE 1st FLOOR TOP PLATE 1st FLOOR TOP PLATE 299.5' 322.50' 321.50' 328.08' 321.50' 328.08' GARAGE FLOOR 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR SCALE: 1/4" = 1'-0" REAR (SOUTH) ELEVATION SCALE: 1/4" = 1'-0" RIGHT (WEST) ELEVATION OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W C U S T O M H O M E : UN I O N E S T A T E S - L O T 3 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A3.6 11/19/15 -7 LOT 3 1' - 6 " 11 ' - 2 " 9' - 4 " 6' - 7 " 10 ' - 4 " 10 ' - 1 " 28 ' - 7 " 27 ' - 8 " LINE OF EXISTING GRADELINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST KITCHEN BDRM 5 CLOSET 3-CAR GARAGEPOWDER MASTER SUITE BEDROOM 4BEDROOM 3 CLOSETLINENHALL NICHE COVERED PATIO ATTIC HIGHEST RIDGE HIGHEST RIDGE TOP PLATE TOP PLATE FF 299.5' GARAGE FF 330.08' 324.50' 323.50' 330.08' BDRM 5 BDRM 3 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR 9' - 4 " 6' - 7 " 10 ' - 1 " 27 ' - 1 " 27 ' - 8 " LINE OF EXISTING GRADELINE OF PROPOSED GRADE LINE 30' ABOVE EXISTING GRADE OR PROPOSED GRADE, WHICHEVER IS LOWEST MASTER SUITE MASTER BATH KITCHENFAMILY ROOM INFORMAL DINING HIGHEST RIDGE HIGHEST RIDGE TOP PLATETOP PLATE 326.58' 323.50' 330.08' 323.50' 301.00' FIRST FLOOR PLAN 301.00' FIRST FLOOR PLAN 312.17' SECOND FLOOR 312.17' SECOND FLOOR SCALE: 1/4" = 1'-0" SECTION A-A SCALE: 1/4" = 1'-0" SECTION B-B OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W S U B D I V I S I O N : UN I O N E S T A T E S 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A4.1 -34 11/19/15 (E) 6' FENCE barricade c o n c r e t e s i d e w a l k c u r b a n d g u t t e r c u r b a n d g u t t e r c o n c r e t e c u r b a n d g u t t e r N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E s t o r m d r a i n public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 B l o s s o m H i l l R o a d U n i o n A v e n u e L e e w o o d C o u r t HOME 2 HOME 1 HOME 2 HOME 3 ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE ADJACENT RESIDENCE BLOSSOM HILL ROAD UN I O N A V E N U E 100 LASUEN COURT 104 15055 15010 15054 LEEWOOD CT. 100106 101 10.35% AVG. SLOPE OF ENTIRE LOT BEFORE SUBDIVIDING SCALE: 1" = 30' NEIGHBORHOOD PLAN 4/9/15 A4.2 5/15/15 11/19/15 OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W S U B D I V I S I O N : UN I O N E S T A T E S 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A4.3 -36 11/19/15 xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E xx xx xx xx xx xxxx xx xx xx xx xx xx N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.58 'N 47° 0 6 ' 5 8 " E public thoroughfare dedicated to the town of los gatos per 8732 o.r. 695 BLOSSOM HILL ROAD UN I O N A V E N U E SHADOW STUDY 12-21 9AMSHADOW STUDY 12-21 3PM SHADOW STUDY 12-21-12PM SHADOW STUDY 6-21 3PM SHADOW STUDY 6-21 12PM SHADOW STUDY 6-21 9AM CLIENT CHANGE 2/18/161 OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W S U B D I V I S I O N : UN I O N E S T A T E S 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A4.4 -37 11/19/15 31'-2" 100' SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE FILL FOR ROAD, PARKING, & SIDEWALK PL PL BLOSSOM HILL RD. 100 LASUEN CT. ACCESS DRIVEWAY 15' DEDICATION 91' 64'-6" 27'-6" 19'-6" 114'-6" FILL FOR ROAD, PARKING, & SIDEWALK SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE PL PL BLOSSOM HILL RD. POOL 104 LASUEN CT. ACCESS DRIVEWAY OUTLINE OF HOUSE FROM ORIGINAL LOCATION. NEW HOUSE 3' LOWER & 4'-4" FARTHER AWAY FROM NORTHERN NEIGHBOR 15' DEDICATION 62'-5" 27'-5" 82'-3" 20' 106' SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE SITE RETAINING WALLS W/DRAINAGE FILL FOR ROAD, PARKING, & SIDEWALK PL PL BLOSSOM HILL RD. ACCESS DRIVEWAY 108 LASUEN CT. 15' DEDICATION PL LOT 1 LOT 2 LOT 3 SITE SECTIONS SCALE: 1" = 10' OF REVISIONS DATE: SCALE: 51 U N I V E R S I T Y A V E . " L " • L O S G A T O S , C A . • 9 5 0 3 0 • ( 4 0 8 ) 3 9 5 - 2 5 5 5 NO T E : •T h e C o n t r a c t o r s h a l l v e r i f y a l l d i m e n s i o n s , el e v a t i o n s a n d c o n d i t i o n s , p r i o r t o s t a r t i n g an y f i e l d w o r k . •A n y d e v i a t i o n c a l l e d b y f i e l d c o n d i t i o n s , or a n y c o n d i t i o n s d i f f e r e n t f r o m t h o s e in d i c a t e d o n t h e p l a n s s h a l l b e b r o u g h t to t h e A r c h i t e c t ' s a t t e n t i o n p r i o r t o in s t a l l a t i o n . S H E E T A N E W S U B D I V I S I O N : UN I O N E S T A T E S 15 9 7 5 U N I O N A V E N U E L O S G A T O S , C A AS SHOWN A4.5 -38 11/19/15 R 36' ORIGINAL LOCATION NEW LOCATION 2' TO THE RIGHT & 4'-4" TOWARD BLOSSOM HILL RD. N89°48'11"E247.80' S0 0 ° 1 7 ' 3 0 " E 15 6 . 9 3 ' S 89°49'22" W277.80' N 0 0 ° 1 7 ' 3 0 " W 11 7 . 0 2 ' 24. 1 4 ' N 2 5 ° 1 8 ' 3 0 " E 26.5 8 'N 47° 0 6 ' 5 8 " E S 0 0 ° 1 7 ' 3 0 " E 10 5 . 7 3 ' S 89°48'11" W 231.67' S 0 0 ° 1 7 ' 3 0 " E 14 1 . 8 7 ' N 0 0 ° 1 7 ' 3 0 " W 14 1 . 9 0 ' 56.58' 14 1 . 9 3 ' 92.80'80.00'80.00' 71.67'80.00'80.00' 39.7'44'45.9' SCALE: 1" = 10' SITE PLAN Landscape Notes I) Final construction drawing will include an Irrigation Plan, Details, and Specifications that meet the requirements of the Water Efficient Landscape Rules 2) Exact location of plants on site to be adjusted so as to best coordinate with irrigation component locations, lights, drainage features, and swales 3) Use 3 inch deep mulch in all planting areas. Provide owner with different mulch samples and prices including Redwood Chip from Reuser in Cloverdale, and Mahogany colored Wonder Mulch from Vision Recycling in Fremont 4) Install plants for all plant circles shown on the plan even if they aren't labeled. Gall for clarification. For bidding purposes, if no one is available to answer questions, assume that any plant circle scaled less than 8' wide is 5 gal. size and any circle scaled larger is 15 gal. size 5) The plan is schematic. Don't install plants too close to edges of paving or buildings. Keep valves and quick couplers away from trees. 6) The plants will do much better if efforts to uncompact soil that has is compacted during building construction. 1) See specs. concerning soil amendments and fertilizer. For bidding purposes until the soil fertility test is done, bid 6 cubic yards of BFI Organics Super Humus Compost 16 pounds of 12-12-12 fertilizer tilled into the top 6" to 8" of soil after ripping soil to 12" deep. except on steep slopes. Some of the planting areas are so narrow that it will need to be dug in by hand. 8) There ore no lawn areas 1) Preserve and protect the existing Redwood Tree on Lot I as per the recommendations in the Arborist Report including protective fencing placed in the location specified in the arborist report No utility trench shall be allowed within 15 feet radius of an existing mature tree. Boring, air spade, or other excavation method as approved by the City Arborist shall be considered to protect existing mature tree. Consult with the City Arborist prior to adjusting locations of utility lines. Read the project arborist's tree report and tree protection plan concerning the protection of all existing trees to be saved during construction. 0 I I -T Remove REDWOOD A 172 17 fl <'is ,W,,.gk1 so octi d Oa► o oat sae-orI—P MDe tille;4t o 6-09 0010 Otlrla'6 wit) Goo Er ellil oe 044 Or6r0 ..0 �, OltAA) 1 714 ;3.���J hill 1724 ►�1� A � 7411 et) ex oral k 10.,01.6 IFY*0 11- egri4i-1) , 114h4414 ��,.C►� p0ti- OCR - 1 Myt., NO 7t, _3. r+.1 �tampe 1709 1708 gram ALIMPWTI Landscape Fence Legend I❑ 6'-0" tall wood fence �2 6'-0" tall wood fence on top of retaining wall ❑3 6'-0" tall wood gate to match fence ® 6'-0" tall solid wood fence plus 2'-0" lattice on top on top of retaining wall on north property line 6'-0" tall solid wood fence plus 2'-0" lattice on top 5 Fences step down slopes 5,OSSOlvi H 1704 RQA� )K1702 8-NC 0Il-ik--t.11' '� 1kilS1,i0e-1f1:-16-0reT �� �Q: w�00 11:44 - #v4 ��.�� 1.r-izirimoi �Cgtic�l t,N, ro-- • 014., itAft Mil, e ff74 k 14 I h OW' 0111. DV 6;�p�.01 iO0o . �►�1paOd001. w000ke 1701 1700 0 1657-1661 _Save Trees 6-WF (Neighbor's) TREE FROTEGTION 5'-6" CHAIN LINK FENCE 1^1/2" GALVANIZED IRON POSTS DRIVEN 2' MIN. INTO GROUND NO MORE THAN 10' APART AT LEAST S' FROM TRUNK OF TREE BEFORE ANY DEMOLITION AND DURING CONSTRUCTION Plant Legend KEY QTY SIZE BOTANICAL NAME TREES PC36 13 36" box / \ LS24 15 24" box / \ G024 15 24" box Landscaping in rear yards by future owners II -RI 8-WF 5 5 5 5 5 5 1662 E,ave Tree (Neighbor's) COMMON NAME Pistacia chinensis Chinese Pistache replacement trees for trees being removed Laurus Saratoga replacement trees for trees being removed Cercis occidental's Western Redbud replacement trees for trees being removed 30 total 24" box replacement trees + 13 total 36" box replacement trees = the equivalent of 56 - 24" box replacement trees In lieu fees are required for 133-56=T1 - 24" box replacement trees TALL SHRUBS and VINES RI 5 WF PI FS CC CL DB 1690-16.2 O 693 Rhus integrifolia Westringia fruticosa Pittosporum tenuifolium Feijoa sellowiana Myrtus communis compacts Glytostoma cal listigoides provide lattice on wall Distictis buccinatoria provide lattice on wall 1685-1687 Lemonade Berry Pineapple Guava Myrtle Lavender Trumpet Vine Bloodred Trumpet Vine` "'88 PATIO COVERED PORCH KEY SIZE MEDIUM SHRUBS NC 5 RC 5 DV 5 NC 5 LB 5 CC 5 GROUND COVERS LM LW I ID SL SH T I CA BIO RETENTION AREA J Landscaping in rear yards by future owners RI/WAY Gimped Conc. Planting Plan o, 750 BOTANICAL NAME Nandina Gulf Stream Rha hiolepis minor Dietes vegeta Nandina Gulf Stream Lomandra Breeze Myrtus communis compacts Lantana montevidensis purple Lantana montevidensis white Iris douglasiana Canyon Snow Salvia leucantha Salvia Hotlips Teucrium chamaedrys Calamagrostis Karl Foerster Juncus patens Chondropetalum tectorum LOGGIA 1" 10'-0" 10' 20' 21-PI COMMON NAME Heavenly Bamboo India Hawthorne Fortnight Lily Heavenly Bamboo Dwarf Myrtle Purple Lantana White Lantana Native Iris Mexican Sage Germander Pacific Reed Grass Rush Small Gape Rush 1677 6'fENGE 6' fENGE ❑ 1009 Gate 1668 .�. n 2 2 2 2 2 2 I -PG36 Revision 3/23/15 City comments 4/8/15 City comments A\ 5/21/15 City comments 9/24/15 Bio retention added & 2/11/16 House 2 moved bio r. and driveway Trees and hedge upsized GREGORY LEWIS LANDSCAPE ARCHITECT #2176 / ) 736 Park Way Santa Cruz, CA 95065 (831) 425-4747 Los, CA tcd Date 2/15/15 Scale As Noted Drawn Greg Job Sheet of 2 Renewal Date F 2/6/15 As Noted Greg L2 3 R e s i d e n c e s of Sheet Job Date Drawn Scale S OETA T 15 9 7 5 U n i o n A v e n u e , L o s G a t o s , C A Date A I AC RILFO N N D O 4/30/2016 Signature No. 2176 R GR E G O R Y L E W I S L A N D S C A P E A R C H I T E C T A E C L I GDREGNES L 73 6 P a r k W a y S a n t a C r u z , C A 9 5 0 6 5 ( 8 3 1 ) 4 2 5 - 4 7 4 7 CS PA T T E C H I ASC RIWEYLE Existing Tree List le w i s l a n d s c a p e @ s b c g l o b a l . n e t 2 AP N 5 2 3 - 4 2 - 0 1 7 Revision City Comments 3/23/15 4/8/15 City Comments 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Appendix B: Tree Inventory Table Table 2: Tree Inventory Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Coast live oak (Quercus agrifolia) 1646 12 25 10 Fair Fair High Privet (Ligustrum lucidum) 1647 4 15 6 Fair Poor High Privet (Ligustrum lucidum) 1648 4 15 6 Fair Poor High Privet (Ligustrum lucidum) 1649 4 15 6 Poor Poor High Privet (Ligustrum lucidum) 1650 4 15 6 Poor Poor High Canary Island pine (Pinus canariensis) 1651 16 45 10 Good Good High Aleppo pine (Pinus halapensis) 1652 25 45 10 Fair Poor High California buckeye (Aesculus californica) 1653 6 10 6 Good Good Moderate Privet (Ligustrum lucidum) 1654 8 15 6 Fair Poor Moderate Privet (Ligustrum lucidum) 1655 8 15 6 Fair Poor Moderate Privet (Ligustrum lucidum) 1656 8 18 6 Fair Poor Moderate Podocarpus (Podocarpus macrophyllus) 1657 10 15 6 Fair Fair Moderate Podocarpus (Podocarpus macrophyllus) 1658 6 15 6 Fair Fair Moderate Podocarpus (Podocarpus macrophyllus) 1659 6 15 6 Fair Fair Moderate Podocarpus (Podocarpus macrophyllus) 1660 8 15 6 Fair Fair Moderate Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 14 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Podocarpus (Podocarpus macrophyllus) 1661 6 15 6 Poor Fair Moderate Coast redwood (Sequoia sempervirens) 1662 30 45 10 Good Good Moderate Coast redwood (Sequoia sempervirens) 1663 24 45 10 Good Good Moderate Lemon (Citrus limon) 1664 4 10 5 Poor Poor High Holly oak (Quercus ilex) 1665 9 And 9 35 8 Fair Poor High Deodar cedar (Cedrus deodara) 1666 16 45 10 Good Good Moderate Mulberry (Morus alba) 1667 11 25 5 Poor Poor High Shamel ash (Fraxinus uhdei) 1668 30 35 8 Poor Poor High Mulberry (Morus alba) 1669 10 20 6 Poor Poor High Eastern black walnut (Juglans nigra) 1670 14 25 8 Poor Poor High Privet (Ligustrum lucidum) 1671 6 20 5 Good Poor High Eastern black walnut (Juglans nigra) 1672 14 25 10 Poor Poor High Coast redwood (Sequoia sempervirens) 1673 16, 14, 10, 4 45 10 Fair Poor High Eastern black walnut (Juglans nigra) 1674 12 25 8 Poor Poor High Giant sequoia (Sequoiadendron giganteum) 1675 13 25 8 Poor Poor High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 15 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Monterey pine (Pinus radiata) 1676 10 35 8 Dead Poor High Monterey pine (Pinus radiata) 1677 18, 18 45 15 Poor Poor High Eastern black walnut (Juglans nigra) 1678 18 35 10 Fair Poor High Privet (Ligustrum lucidum) 1679 8 25 8 Fair Poor High Monterey pine (Pinus radiata) 1680 19 35 10 Dead Poor High Coast live oak (Quercus agrifolia) 1681 12 25 10 Fair Fair High Privet (Ligustrum lucidum) 1682 6 15 6 Fair Poor High Privet (Ligustrum lucidum) 1683 6 15 6 Fair Poor High Eastern black walnut (Juglans nigra) 1684 24 30 12 Fair Poor High Privet (Ligustrum lucidum) 1685 6 25 6 Fair Poor High Privet (Ligustrum lucidum) 1686 6 25 6 Fair Poor High Privet (Ligustrum lucidum) 1687 10 25 6 Fair Poor High Privet (Ligustrum lucidum) 1688 6 25 6 Fair Poor High Silk tree (Albizia julibrissin) 1689 7 20 8 Fair Poor High Deodar cedar (Cedrus deodara) 1690 4 20 6 Good Poor High Catalina cherry (Prunus ilicifolia) 1691 4 10 5 Fair Poor High Privet (Ligustrum lucidum) 1692 10 20 8 Fair Poor High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 16 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Coast live oak (Quercus agrifolia) 1693 4 10 6 Poor Poor High Eastern black walnut (Juglans nigra) 1694 22 30 10 Poor Poor High Privet (Ligustrum lucidum) 1695 8 15 6 Fair Poor High Privet (Ligustrum lucidum) 1696 8 15 6 Fair Poor High Privet (Ligustrum lucidum) 1697 8 15 6 Fair Poor High Privet (Ligustrum lucidum) 1698 8 15 6 Fair Poor High Madrone (Arbutus menziesii) 1699 6 15 6 Fair Poor High Coast live oak (Quercus agrifolia) 1700 14 25 10 Fair Fair High Privet (Ligustrum lucidum) 1701 16 35 12 Fair Poor High Privet (Ligustrum lucidum) 1702 10 25 10 Fair Poor High Silk oak (Grevillea robusta) 1703 16 25 10 Poor Poor High Coast live oak (Quercus agrifolia) 1704 9 20 8 Fair Fair High Silk oak (Grevillea robusta) 1705 17 25 10 Poor Poor High Privet (Ligustrum lucidum) 1706 8 20 8 Fair Poor High Deodar cedar (Cedrus deodara) 1707 4 25 5 Good Poor High Coast live oak (Quercus agrifolia) 1708 5 20 6 Fair Poor High Coast live oak (Quercus agrifolia) 1709 12 25 8 Fair Poor High Aleppo pine (Pinus halapensis) 1710 24 30 8 Poor Poor High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 17 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Coast live oak (Quercus agrifolia) 1711 4 20 5 Fair Poor High Coast live oak (Quercus agrifolia) 1712 2 20 5 Fair Poor High Chinese elm (Ulmus parvifolia) 1713 20 15 10 Poor Poor High Catalina cherry (Prunus ilicifolia) 1714 8 15 8 Fair Poor High Privet (Ligustrum lucidum) 1715 8 15 6 Fair Poor High Privet (Ligustrum lucidum) 1716 8 15 6 Fair Poor High Privet (Ligustrum lucidum) 1717 8 15 6 Fair Poor High Eastern black walnut (Juglans nigra) 1718 22 25 10 Poor Poor High Pittosporum (Pittosporum eugenoides) 1719 10 15 10 Poor Poor High Pear (Pyrus communis) 1720 4 10 5 Poor Poor High Privet (Ligustrum lucidum) 1721 4 20 6 Fair Poor High Holly oak (Quercus ilex) 1722 5 20 6 Fair Poor High Coast redwood (Sequoia sempervirens) 1723 28, 32, 10, 6 45 15 Fair Poor High Coast live oak (Quercus agrifolia) 1724 20 35 20 Fair Poor High Coast live oak (Quercus agrifolia) 1725 16, 16 30 15 Fair Poor High Privet (Ligustrum lucidum) 1726 12 20 10 Fair Poor High Pittosporum (Pittosporum eugenoides) 1727 12 20 10 Poor Poor High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 18 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Privet (Ligustrum lucidum) 1728 12 20 10 Fair Poor High Southern magnolia (Magnolia grandiflora) 1729 2 8 4 Poor Poor High Pyracantha (Pyracantha angustifolia) 1730 6 8 6 Poor Poor High Elm (Ulmus americana) 1731 19 40 10 Poor Poor High Deodar cedar (Cedrus deodara) 1732 20 45 10 Poor Poor High Deodar cedar (Cedrus deodara) 1733 14 45 12 Fair Fair High Deodar cedar (Cedrus deodara) 1734 18 45 12 Fair Fair High Stone pine (Pinus pinea) 1735 36 45 15 Fair Poor High Coast live oak (Quercus agrifolia) 1736 4 10 5 Fair Poor High Apple (Malus domestica) 1737 4 10 5 Poor Poor High English walnut (Juglans regia) 1738 10 25 10 Poor Poor High Plum (Prunus sp.)1739 2 10 5 Poor Poor High Coast live oak (Quercus agrifolia) 1740 8 10 6 Fair Poor High Silver acacia (Acacia dealbata) 1741 30 25 8 Poor Poor High Willow (Salix babylonica) 1742 8 20 6 Fair Poor High Hollywood juniper (Juniperus chinensis ‘Torulosa’ 1743 8 20 8 Fair Poor High Hollywood juniper (Juniperus chinensis ‘Torulosa’ 1744 10 20 8 Fair Poor High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 19 31 15975 Union Avenue Tree Inventory, Assessment, and Protection Plan January 5, 2015 Cherry (Prunus serrata) 1745 2 10 5 Fair Poor High Crape myrtle (Lagerstroemia indica) 1746 4 10 5 Fair Poor High Deodar cedar (Cedrus deodara) 1747 22 45 12 Good Good High Privet (Ligustrum lucidum) 1748 6 20 6 Fair Poor High Southern magnolia (Magnolia grandiflora) 1749 6 20 6 Poor Poor High Carob (Ceratonia siliqua) 1750 10 15 10 Fair Poor High Tristania (Tristania lorina) 1751 4 10 5 Fair Poor High Black acacia (Acacia melanoxylon) 1752 4 20 5 Fair Poor High Black acacia (Acacia melanoxylon) 1753 18 35 10 Fair Poor High Silver dollar eucalyptus (Eucalyptus polyanthemos) 1754 14, 22 35 12 Fair Poor High English walnut (Juglans regia) 1755 12 20 8 Fair Poor High Hollywood juniper (Juniperus chinensis ‘Torulosa’ 1756 8 20 6 Fair Poor High Loquat (Eriobotrya japonica) 1757 10 20 10 Fair Fair High Tree Species #Trunk Diameter ~ Height ~ Crown Radius Condition Suitability for Preservation Influence Level Monarch Consulting Arborists LLC - P.O Box 1010, Felton, CA 95018 831.331.8982 - rick@monarcharborist.com Page of 20 31 Dripline Diameter Dripline Diameter Dripline Diameter Dripline Diameter 20' 12' 12' 12' 12' 20' 20' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 20' 20' 10' 16' 20' 10' 16' 16' 16' 16' 20' 20' 10' 16' 30' 20' 16' 20' 20' 12' 12' 24' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 12' 16' 16' 16' 16' 16' 16' 10' 10' 20' 20' 20' 20' 20' 24' 10' 10' 20' 16' 12' 12' 12' 20' 20' 10' 12' 12' 30' 40' 30' 20' 20' 20' 8' 12' 20' 20' 24' 24' 30' 10' 10' 20' 10' 10' 16' 12' 16' 16' 10' 10' 24' 12' 12' 20' 10' 10' 20' 24' 16' 12' 20' SAVED TREE 11/19/15 8' - 0 " 9 1 / 4 " 1 1 / 2 " 3' - 1 0 1 / 4 " 1 1 / 2 " 1' 1 1 / 2 " 2' 6' 6x12 P.T. D.F. LAGGINGS HP10 X 42 SOLDIER PILES 4X4 P.T. D.F. FENCE POST @ 8' O/C BURIED 2' BOLTED TO LAGGING 2x10 P.T. D.F. KICK BOARD 2x4 REDWOOD BOTTOM RAIL 1x12 CON. COM. REDWOOD FENCE BOARDS, BOARD ON BOARD W/1" OVERLAP 1x1 REDWOOD STOP HP10 X 42 SOLDIER PILES 2x4 REDWOOD TOP RAIL 1x1 REDWOOD STOP 12" REDWOOD DIAGONAL LATTICE 2x4 REDWOOD TOP RAIL 1x1 REDWOOD STOP 2x4 REDWOOD TOP RAIL 1x1 REDWOOD STOP 12" REDWOOD DIAGONAL LATTICE 2x4 REDWOOD TOP RAIL 1x1 REDWOOD STOP 1x12 CON. COM. REDWOOD FENCE BOARDS, BOARD ON BOARD W/1" OVERLAP 1x1 REDWOOD STOP 2x4 REDWOOD BOTTOM RAIL 2x10 P.T. D.F. KICK BOARD PLAN VIEWSECTION RETAINING WALL/REDWOOD FENCE SCALE: 1/2" = 1'-0" FENCE/RETAILING WALL DETAIL