Loading...
1991-239-Authorizing The Town Manager To Sign An Amendment To Agreement Between The Town Of Los Gatos And Applied Geosystems For Consultant Services For Parking Assessment District Lot #4-Project 8805RESOLUTION 1991 - 239 RESOLUTION OF THE TOWN OF LOS GATOS AUTHORIZING THE TOWN MANAGER TO SIGN AN AMENDMENT TO AGREEMENT BETWEEN THE TOWN OF LOS GATOS AND APPLIED GEOSYSTEMS FOR CONSULTANT SERVICES FOR PARKING ASSESSMENT DISTRICT LOT #4 - PROJECT 8805 WHEREAS, the Regional Water Quality Control Board requires ongoing groundwater monitoring at Parking Lot #4; and WHEREAS, additional studies were required by Town staff for preparation of soil and water remediation plans; and WHEREAS, the Town required Applied Geosystems to provide bid period services, including specification preparation, bid proposal analysis, and vendor recommendation for remediation services. THEREFORE, BE IT RESOLVED, that the contract between the Town of Los Gatos and Applied Geosystems for consultant services for the Parking Assessment District Lot #4 (Project 8805) be amended as shown on the attached (Exhibit A). BE IT FURTHER RESOLVED, by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that the Town Manager is authorized, and is hereby directed, to execute said agreement amendments in the name and in behalf of the Town of Los Gatos. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 4th day of November, 1991 by the following vote: COUNCIL MEMBERS: AYES: Randy Attaway, Joanne Benjamin, Steven Blanton, Eric D. Carlson Mayor Brent N. Ventura NAYES: None ABSENT: None ABSTAIN: None SIGNED: MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST f CLERK OF OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA 1 Y 1 E%fiIBIT A AMENDMENTS TO AGREEMENT BETWEEN THE TOWN OF LOS GATOS AND APPLIED GEOSYSTEMS FOR CONSULTANT SERVICES FOR THE PARKING ASSESSMENT DISTRICT - LOT #4 (PROJECT 8805) 1. Task 4. Design the plans and oreoaration of specifications for the installation of the remediation systems /facilities in a form proper for contractor quote /bidding Add a new paragraph following Paragraph 2, to read as follows: "The Town has requested and the Engineer has agreed to provide bid period services, including specification preparation, bid proposal analysis, and vendor recommendation." 2. Task 6. Continuation of Quarterly monitoring and reports (on an annual renewal basis). Delete the existing paragraph, and add the following paragraph: "Ongoing quarterly monitoring and reports are required by the Regional Water Quality Board. The Engineer will provide these services." 3. Amend Article VII - Fee Compensation as follows: Task 3 The maximum fee for services specified under Task 3 - Interim Remedial Action Plan and Cost Analysis of Article 1 without further authorization shall be $32,819.35. Task 4 The maximum fee for services specified under Task 4 - Engineering Plans and Specifications for the Installation of the Remediation System without further authorization shall be $46,000.60. Between Task 5 and Task 6 delete total $154,900. Task 6 Delete existing language and add: "The fee for services specified under Task 6, Continuing Quarterly Monitoring shall be $48,326.03." After Task 6, add:.. TOTAL $229,146.