1992-170-Authorizing The Execution Of An Agreement With Arbor Care And Corporate Commercial ServicesRESOLUTION 1992 -170
RESOLUTION OF THE TOWN COUNCIL
OF THE TOWN OF LOS GATOS
AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH
ARBOR CARE AND CORPORATE COMMERCIAL SERVICES, INC.
FOR THE CONSTRUCTION OF PROJECT 9303
TREE PRUNING AND REMOVAL
BE IT RESOLVED, by the Town Council of the Town of Los Gatos, County of Santa
Clara, State of California, that the Town Manager is authorized to enter into the agreement
with Arbor Care and Coporate Commerical Services Inc., attached as Exhibit A for the
construction of Project 9303 -Tree Pruning and Removal, as attached on Exhibits A & B.
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town
of Los Gatos, California, held on the 8th day of September, 1992, by the following vote.
COUNCIL MEMBERS:
AYES: Randy Attaway, Steven Blanton, Brent N. Ventura
Mayor Eric D. Carlson
NAYS: None
ABSENT: Joanne Benjamin
ABSTAIN: None
SIGNED:
ATTEST:
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
CLERK OF THE TOWN OF L GATOS
LOS GATOS, CALIFORNIA
Section 7
AGREEMENT��
THIS IS AN AGREEMENT between the Town of Los Gatos (hereinafter referred to as
"Owner ") and ARBOR CARE A DIVISION OF ENVIRONMENTAL CARE INC.
(hereinafter referred to as "Contractor ").
Owner and Contractor, for the consideration hereinafter named, agree as follows:
1 - SCOPE OF WORK
Contractor shall furnish all materials and perform all of the work for the construction of
PROJECT 9303 - TREE PRUNING AND TREE REMOVAL - PROJECTS "A" AND "B ",
in accordance with the Contract Documents.
2 - CONTRACT PRICE
As full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement, also for all loss of damage arising out of the nature of
the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by Owner, and for all risks of every description connected with the work,
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work, and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Contract Documents, Owner shall pay the amount specified
by Contractor in Contractor's Bid Form.
3 --CONTRACT DOCUMENTS
All rights and obligations of Owner and Contractor are fully set forth and described in the
Contract Documents. All parts of the Contract Document are intended to be correlated
so that any work called for in one part and not mentioned in the other, or vice versa, is
to be executed the same as if mentioned in all said documents. The Contract Documents
are defined in section 8 -01(a) of these Specifications and are incorporated herein by
reference the same as though set out in full.
4 - BEGINNING OF WORK
Following the execution of this agreement and the approval of bonds and insurance
policies and certificates, Owner shall issue a notice to proceed with the work.
Commencing work or the entrance of equipment or materials on the site of the work by
Contractor before receipt of the notice to proceed is at the sole risk and expense of
Contractor, and the Contractor shall be fully liable for any damage or injury sustained by
Owner or third persons resulting therefrom.
5 - TIME OF COMPLETION
The work called for herein shall be commenced within ten (10) working days of the Notice
to Proceed issued by Owner, and shall be fully completed within the time limit set forth in
(Revised September 10, 1992)
r �
SECTION 7 - AGREEMENT
the Special Conditions.
6 - CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY
TOWN
Contractor shall remedy any defects due to faulty materials and /or workmanship
and pay for any damages to other work and /or existing facilities resulting therefrom which
shall appear within a period of one year from the date of recording of the Notice of
Completion.
7 - LIQUIDATED DAMAGES
The undersigned has reviewed and is thoroughly familiar with the appropriate sections of
the Contract and Section 8 -06(c) of these Specifications pertaining to liquidated damages.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the
8TH, day of September, 1992.
TOWN OF LOS GATOS
By
Mayor
CONTRACTOR:
By DAVID HANSON VICE PRESIDENT - LICENSE NO: 266211 C27
ARBOR CARE A DIVISION OF ENVIRONMENTAL CARE INC.
825 MABURY ROAD SAN JOSE CA 95133
Approved as to form:
Katherine Anderton, Town Attorney
ATTEST:
Marian Cosgrove, Town Clerk, Town of Los Gatos
N:SNARE \PR0J9303.PPH
(Revised September 10, 1992)
Section 7
AGREEMENT =_
Ito:
THIS IS AN AGREEMENT between the Town of Los Gatos (hereinafter referred to as
"Owner ") and CORPORATE AND COMMERCIAL SERVICES INC. (hereinafter referred
to as "Contractor ").
Owner and Contractor, for the consideration hereinafter named, agree as follows:
1 -SCOPE OF WORK
Contractor shall furnish all materials and perform all of the work for the construction of
PROJECT 9303 - TREE PRUNING AND TREE REMOVAL - PROJECTS "C" AND "D ",
in accordance with the Contract Documents.
2 - CONTRACT PRICE
As full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement, also for all loss of damage arising out of the nature of
the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by Owner, and for all risks of every description connected with the work,
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work, and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Contract Documents, Owner shall pay the amount specified
by Contractor in Contractor's Bid Form.
3 - CONTRACT DOCUMENTS
All rights and obligations of Owner and Contractor are fully set forth and described in the
Contract Documents. All parts of the Contract Document are intended to be correlated
so that any work called for in one part and not mentioned in the other, or vice versa, is
to be executed the same as if mentioned in all said documents. The Contract Documents
are defined in section 8 -01(a) of these Specifications and are incorporated herein by
reference the same as though set out in full.
4 - BEGINNING OF WORK
Following the execution of this agreement and the approval of bonds and insurance
policies and certificates, Owner shall issue a notice to proceed with the work.
Commencing work or the entrance of equipment or materials on the site of the work by
Contractor before receipt of the notice to proceed is at the sole risk and expense of
Contractor, and the Contractor shall be fully liable for any damage or injury sustained by
Owner or third persons resulting therefrom.
5 - TIME OF COMPLETION
The work called for herein shall be commenced within ten (10) working days of the Notice
to Proceed issued by Owner, and shall be fully completed within the time limit set forth in
the Special Conditions.
(Revised September 10, 1992)
SECTION 7 - AGREEME v r
6 - CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY
TOWN
Contractor shall remedy any defects due to faulty materials and /or workmanship
and pay for any damages to other work and /or existing facilities resulting therefrom which
shall appear within a period of one year from the date of recording of the Notice of
Completion.
7 - LIQUIDATED DAMAGES
The undersigned has reviewed and is thoroughly familiar with the appropriate sections of
the Contract and Section 8 -06(c) of these Specifications pertaining to liquidated damages.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the
8TH, day of September, 1992.
TOWN OF LOS GATOS
By
CONTRACTOR:
By VIRGINIA HANSON PRESIDENT - LICENSE NO.: 562785 C61
CORPORTATE & COMMERCIAL SERVICES INC.
175 CRISTICH LN CAMPEBILL CA 95008
Approved as to form:
Katherine Anderton, Town Attorney
ATTEST:
Marian Cosgrove, Town Clerk, Town of Los Gatos
N: \SRARE \PR0.19303.PFH
(Revised September 10, 1992)