Loading...
1993-035-Execute An Agreement With San Jose Water Company For Water Service And A Hydrant At 4 New York AvenueRESOLUTION 1993 -35 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AUTHORIZING THE TOWN MANAGER TO EXECUTE AN AGREEMENT WITH SAN JOSE WATER COMPANY FOR WATER SERVICE AND A HYDRANT AT 4 NEW YORK AVENUE BE IT RESOLVED: by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that the Town of Los Gatos approve an agreement with San Jose Water Company for water service and a fire hydrant at 4 New York Avenue and that the Town Manager is authorized, and is hereby directed to execute the contract attached as Exhibit A in the name and on behalf of the Town of Los Gatos. PASSED AND ADOPTED at a regular meeting of the Town Council held on the 15th day of March, 1993, by the following vote: COUNCIL MEMBERS: AYES: Randy Attaway, Steven Blanton, Linda Lubeck, Patrick O'Laughlin, Mayor Joanne Benjamin NAYS: None ABSENT: None ABSTAIN: None SIGNED: YO OF THE TOW OF LOS GATOS OS GATOS, CALIFORNIA ATTEST: is r CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA C29 \PESOS \HYDRANT San Jose Water IMCompany 374 West Santa Clara St. San Jose. CA 95196 408 279'7808 Fax 408 279 -7934 BIC:_ December 28, 1992 Town of Los Gatos Building & Engineering Department Q , , P.O. Box 949;) Los Gatos, CA 95031 T0'6N' OF LOS GAGS Attention: Chris Gjerde ERGlNFERkNGC�RgTWW Gentlemen: REFERENCE: A PLACE FOR TEENS NEW YORK AVENUE As requested, we are providing final plans and an estimated cost to install 1 - 6" hydrant next to the proposed parking stalls off New York Avenue and 1 - 1 1/2" service on New York Avenue. Based on the loading information for the domestic service supplied by you, we are proposing a 1 1/2" service which means your line size at the service connection should be at least a 1 1/211. The total estimated cost is $8,946. Our design drawing is enclosed for your information and the following table represents the breakdown of costs for our proposal. 1 - 6" Hydrant $5,420 1 - 1 1/2" Service 1,362 Tax Gross -up 2.164 TOTAL $8,946 The total amount of $8,946 must be deposited at our office, located at 1221 South Bascom Avenue, before we can process this job further. our estimate is subject to review after 30 days. The actual cost of the work outlined above will be determined upon completion of the job. If the actual cost exceeds the estimated cost (amount deposited), you will be invoiced for the difference which must be paid within 30 days. If the actual cost is less than the amount deposited, the difference will be refunded to you. Town of Los Gatos December 28, 1992 Page Two As noted on the drawing, it will be your responsibility to install an approved reduced pressure principle backf low prevention assembly (RPP) on the domestic /irrigation service. This assembly must be installed, above ground, as near as possible to our service connection, that is to say, immediately following the meter. Any deviation from this location must be approved in advance by our Backflow Prevention Department. We have enclosed a list of approved models for your information. The RPP assembly must be installed before we will allow water use through the service. Arrangements for initiating water service should be made with our Backflow Prevention Department at (408) 279 -7946. Please allow 24 notice. A field inspection will be made by this company prior to commencement of service. A very important item regarding our installation is the need for an easement to accommodate the proposed hydrant. It will be your responsibility to provide, clear and stake the easement. Please prepare a legal description and plat, and submit them to us for approval and preparation of the easement document. You will also need to hire the services of a title company to close the easement transaction. We will need to contact them for a title report and they will need to issue a joint protective policy of title insurance for the easement in the amount of $10, 000 in the names of San Jose Water Company and Bank of America, as trustee. A conformed recorded copy of the right -of -way must be received by us before we can schedule this job for construction. As noted on the drawing, minor encroachments, (i.e. meter boxes) can be handled by way of a letter from the property owner granting such permission. Finally, please submit one set of the APPROVED IMPROVEMENT PLANS when available. Since our plans and estimate are based on unapproved improvement plans, any changes made to these items due to approval requirements may result in the need for us to re- engineer our installation. You will be responsible for the cost of additional engineering, if so required, and the associated time delay. Construction normally begins 6 -10 weeks after we have received the aforementioned items, depending upon availability of labor and materials and permit approvals. Town of Los Gatos December 28, 1992 Page Three If you should have any questions or require further information, please contact this office at 279 -7874. Since ely, y JRB:bn NB90 -078 Enclosure N890- 07S.DOC cc: John Lien, Architect ACKNOWLEDGED AND AGREED TOWN OF LOS GATOS Y. NNE BENJAMI MAYOR Date James R. Bariteau New Business Department COST ADJUSTMENT BILL OR REFUND TO: Town of Los Gatos Name P.O. Box 949 Address Los Gatos, CA 95031 354 -6834 Phone Number ATTEST APPROVE AS TO FORM: -y� r MARIAN V. COSGR E p" ° ' CLERK OF THE TOWN OF LOS GATOS' JAMES JACKSON, INTERIM TOWN ATTORNEY 3fas�ly3 Date