Loading...
1993-072-Continuing Certain Departmental Fees, Rates And Charges, And Amending Certain Fees, Rates And ChargesRESOLUTION 1993 -72 RESOLUTION OF THE TOWN OF LOS GATOS CONTINUING CERTAIN DEPARTMENTAL FEES, RATES AND CHARGES, AND AMENDING CERTAIN FEES, RATES AND CHARGES RESOLVED, that certain imposed fees for Building, Community Services, Engineering, General Administration Services, Library, Parks, Forestry and Maintenance, Planning and Police Departments be continued. RESOLVED, that certain imposed fees for Building, Community Services, Engineering, General Administration Services, Library, Parks, Forestry and Maintenance, Planning and Police Departments be amended. RESOLVED, that the amended fees for these departments will be effective 60 days from date of adoption of this resolution. 139. BE IT FURTHER RESOLVED, that this resolution repeals Resolution No. 1992- PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 7th day of June, 1993 by the following vote: COUNCIL MEMBERS: AYES: Randy Attaway, Steven Blanton, Linda Lubeck, Patrick O'Laughlin and Mayor Joanne Benjamin. NAYES: None ABSENT: None ABSTAIN: None ` SIGNED: YOR OF THE TOW OF LOS GATOS S GATOS, CALIFOR A ATTEST: C--Q (�� CLERK OF THE TOWN O S GATOS LOS GATOS, CALIFORNIA LIBRARY DEPARTMENT FEES A) Non - Resident Library Fees Individual $45 per year Family Low Income 60 per year 15 per year B) Book Requests (by Adults) $.50 each C) Video Check -out $1.00 each D) Inter - Library Loan $1.00 OVERDUE FINES A) Adult materials (including CD's and Books on Tape) $.15 /day up to $10.00 B) Children's Materials $.10 /day up to $5.00 C) Videos Overdue $1.00 /day up to cost of video D) Fine for return through book drop for videos, CDs, and audio cassettes $2.00 plus cost of damage as determined by the Library Director LOST OR DAMAGED ITEMS A) B) C) D) E) F) Replacement of Lost Item Cost of item plus $7.00 processing fee Rebinding a book Cost of outside binding service Replacement of lost pamphlet or newspaper clipping if no other price is marked $1.00 Replacement of damaged record covers $2,00 Replacement of damaged plastic book covers Replacement of missing date due cards MM062 A: \FEES \LISRARY.FEE $.50 $1.00 Parks and Forestry Department Fees Resident Non- Resident Specific Park Use Fees (Weddings, Catering Fees, Use of Bandstand) $40.00 $55.00 Parking Fees (Oak Meadow Park) Group B.B.Q. Areas MGRO62 A: \FEES \PFM.FEES eff 35.00 1 group site 55.00 1 group site 65.00 2 group sites 110.00 2 group sites PLANNING DEPARTMENT FEES 1. ZONING APPROVALS The following fee schedule Is established for applications filed pursuant to the Zoning Ordinance. The fees are collected by the Planning Department. A. ARCHITECTURE AND SITE APPLICATIONS 1) New single family detached (HR & RC zone) ............................. 3,160 2) New single family or two family units .... ............................... 2,240 3) New nonresidential or expansion over 50% , ...... 14,400 3) floor area of existing nonresidential ..... ............................... 2,900 4) New multiple family ................ ............................... 2,820 5) All other ......................... ............................... 2,080 6) Modification to approved application ..................:....... 75% of current fee 7) Minor Projects (DRC approval) ......... ............................... 400 * There shall be no filing fee for any Architecture & Site Approval application in an historic district which would not require Architecture & Site approval if located outside a historic district. B. CONDITIONAL USE PERMITS 1) Conditional Use Permit .............. ............................... 2,415 2) Conditional Use Permit (when consolidated with another application for new development) ............................ 400 3) Conditional Use Permit for restaurant ** TierOne ...................... ............................... 1,470 TierTwo ...................... ............................... 2,415 4) Modification to approved application .......................... 75% of current fee ** Conditional Use Permits for restaurants shall be accompanied by a fee applicable to Tier One If the Restaurant Conditional Use Permit checklist has all questions answered 'NO'. If 'YES' is answered to any question on the Checklist, the Tier Two fee will be applicable. C. VARIANCE ......................... ............................... 1,610 D. REZONING (other than Planned Development) 1) Without General Plan or Specific Plan Amendment ........................ 2,520 2) With General Plan or Specific Plan Amendment ........................... 3,520 E. PLANNED DEVELOPMENT 1) Without General Plan or Specific Plan Amendment ....................... 10,315 2) Without General Plan or Specific Plan Amendment (HR or RC Underlying Zone) ........... ....................... , ...... 14,400 3) With General Plan or Specific Plan Amendment .......................... 11,400 4) With General Plan or Specific Plan Amendment (HR or RC Underlying Zone) .......... ............................... 16,400 5) Modification to a Planned Development Zone .................. 50% of current fee Publication costs shall be charged in addition to the fees for Planned Development under E F. APPLICATION FOR MINOR RESIDENTIAL DEVELOPMENT ...................... 460 G. AGRICULTURAL PRESERVE WITHDRAWAL . ............................... 1,610 H. TIME EXTENSIONS TO APPROVED APPLICATION ................. 50% of Current Fee CERTIFICATES OF USE AND OCCUPANCY .. ............................... 130 2. J. HAZARDOUS MATERIALS STORAGE FACILITY APPLICATION ................... 710 K. HOME OCCUPATION PERMIT ........... ............................... 80.00 L. SIGN APPLICATION 3. ENVIRONMENTAL ASSESSMENT FEES A. CATEGORICAL EXEMPTION ......... ............................... No Fee B. INITIAL STUDY ................... ............................... 1,200 Deposit ** C. NEGATIVE DECLARATION .......... ............................... 1,240 D. TRAFFIC STUDY REVIEW FEE ....... ............................... 320.00 plus 10% of Traffic Study cost E. DRAFT EIR REVIEW ............................... 5,860 plus 10% of EIR cost * *The $1,200 is a deposit. If the actual cost of the consultant's study is less than $1,200 the difference will be refunded to the applicant. if the cost is greater than $1,200 due to special studies that may be necessary, the specific study and its cost will be determined before the study is authorized and an additional deposit will be required before the additional study is commenced. F. IMPACT MONITORING PROGRAM (AB3180)` .................. 50.00 PER HOUR- ... This fee will be assessed upon completion of the environmental review process and will be due prior to any permits or entitlements being granted to begin work. MGR062 A. \FEES \PLNG.FEE 2 1) NEW PERMANENT SIGN ........... ............................... 125.00 2) TEMPORARY NONRESIDENTIAL SIGN . ............................... 25.00 3) CHANGE OF FACE ONLY ........... ............................... 25.00 M. SECONDARY DWELLING UNITS ........ ............................... 540.00 N. TWO SECONDARY DWELLING UNITS .... ............................... 750.00 O. MOBILEHOME PARK CONVERSION PERMIT ............................... 7,705 SUBDIVISIONS A. LOT LINE ADJUSTMENT (DRC Approval) .............................. 430.00 B. 4 LOTS OR LESS ..... ............................... 3,380 plus $100 per lot C. 5 LOTS OR MORE .... ............................... 5,360 plus $100 per lot D. VESTING TENTATIVE MAP ... ............................... Fee to be based on the number of lots under 2B and 2C E. LOT MERGER (DRC Approval) ....... ............................... 400.00 F. TOWNHOUSE OR CONDOMINIUM .... ............................... 1,602 G. CERTIFICATE OF COMPLIANCE (DRC Approval) .......................... 900 H. MODIFICATION ......... ............................... 75% of Current Fee 3. ENVIRONMENTAL ASSESSMENT FEES A. CATEGORICAL EXEMPTION ......... ............................... No Fee B. INITIAL STUDY ................... ............................... 1,200 Deposit ** C. NEGATIVE DECLARATION .......... ............................... 1,240 D. TRAFFIC STUDY REVIEW FEE ....... ............................... 320.00 plus 10% of Traffic Study cost E. DRAFT EIR REVIEW ............................... 5,860 plus 10% of EIR cost * *The $1,200 is a deposit. If the actual cost of the consultant's study is less than $1,200 the difference will be refunded to the applicant. if the cost is greater than $1,200 due to special studies that may be necessary, the specific study and its cost will be determined before the study is authorized and an additional deposit will be required before the additional study is commenced. F. IMPACT MONITORING PROGRAM (AB3180)` .................. 50.00 PER HOUR- ... This fee will be assessed upon completion of the environmental review process and will be due prior to any permits or entitlements being granted to begin work. MGR062 A. \FEES \PLNG.FEE 2 4. OTHER A. FEES FOR ADDITIONAL DRC REVIEW BEYOND THREE ....... 10% of total current fee for each DRC resubmittal B. MICROFILMING OF FILES ......................... To be determined at the time of filing a building permit C. BUILDING PERMIT PLAN CHECK FEE ............. 20% OF BUILDING PERMIT FEE D. CONCEPTUAL DEVELOPMENT ADVISORY COMMITTEE REVIEW ........... $ 282.00 E. PUSH CART PERMIT .............. ..............................$ 135.00 F. OUTSIDE TRAFFIC CONSULTANT REPORT PREPARATION FEE .... ............................... Consultant fee plus traffic study review G. WATER EFFICIENT LANDSCAPE PLAN REVIEW .......................... 400.00 H. PUBLIC SERVICE COUNTER RESEARCH AND COPYING CHARGE....................... ..........................30.00 per hour plus .10 per page I. PERMIT TRACKING MAINTENANCE AND UPDATE SURCHARGE ............ 2% of Development Application Fee, 1.00 minimum J. GENERAL PLAN UPDATE SURCHARGE .................. .5% of Building Valuation for new construction and additions or 10% of zone change and Subdivision Fee K. ROUTE 85 STUDY PLAN SURCHARGE .......... 10% of Development Application Fee for applications for property in Route 85 Study Plan Area 5. PAYMENT OF APPLICATION FEES All application fees are to be paid at the time the applications are submitted to the Planning Department. If the applicant withdraws the application prior to processing the application to a Planning Commission hearing, 40% of the paid application fee shall be refunded to the applicant at the discretion of the Planning Director. All other fees are nonrefundable. 6. CODE COMPLIANCE A. ZONING VIOLATIONS 1) AFTER 30 DAYS THE FOLLOWING FEE SCHEDULE WILL BE ACTIVATED (CUMULATIVE): a. $160.00 Penalty b. Administrative permits: penalty equals 100% of permit cost c. Permits involving a public hearing: penalty equals 10% of permit cost. 2) AFTER 60 DAYS THE FOLLOWING FEE SCHEDULE WILL BE ACTIVATED (CUMULATIVE): a. $160.00 Penalty b. Administrative permits: penalty equals 100% of permit cost c. Permits involving a public hearing: penalty equals 10% of permit cost. d. Times and charges accumulated by the code compliance officer after the 30 day period. MGRD62 A \FEES \PLNG.FEE 3 B. SIGN VIOLATIONS 1) SIGN PERMIT FEES ARE DOUBLED AS SOON AS THE SECOND NOTICE OF VIOLATION IS SENT OUT. 2) AFTER 30 DAYS THE FOLLOWING FEE SCHEDULE WILL BE ACTIVATED (CUMULATIVE): a. $160.00 Penalty b. Administrative permits: penalty equals 100% of permit cost c. Permits involving a public hearing: penalty equals 10% of permit cost. 3) AFTER 60 DAYS THE FOLLOWING FEE SCHEDULE WILL BE ACTIVATED (CUMULATIVE): a. $ 160.00 Penalty b. Administrative permits: penalty equals 100% of permit cost c. Permits involving a public hearing: penalty equals 10% of permit cost. d. Times and charges accumulated by the code compliance officer after the 30 day period. 4) SIGNS IN THE PUBLIC RIGHT -OF -WAY WILL BE PICKED UP BY CODE COMPLIANCE AND THE OWNER WILL BE ASSESSED A $ 250.00 PICK -UP FEE. C. REPEAT CODE VIOLATION ................... .........................200.00 7. ORDINANCES AND PLANS General Plan (including maps) ............ ............................... 17.25 Hillside Specific Plan ..................... ............................... 5.75 Zoning Ordinance ........................... .......................... 40.25 Subdivision Ordinance .................... ............................... 25.00 Downtown Specific Plan ................. ............................... 10.35 Zoning Maps ....................... ............................... 8.00 Blossom Hill Open Space Study ............ ............................... 13.50 Commercial Specific Plan Report ........... ............................... 11.50 Residential Design Guidelines for Pre -1941 Structures ............................ 4.50 8. DUPLICATING COSTS All reports and studies will be made available for the actual cost of duplicating that report or study. MGRD62 A \FEES \PLNG.FEE 4 POLICE DEPARTMENT FEES Fingerprinting $ 10.00 /1st card Tow Truck Service Permit (initial) $ 5.00 /add'I cards Report Copies $ 15.00 (1 -20 pgs) Tow Truck Service Permit (renewal) (.50 ea. pg. over 20) Subpoena Duces Tecum Per Evidence Code Photographs $ 32.00 for 1 St 3 with Administrative Fee for: $ 5.00 for each thereafter Bingo Permits $ 50.00 each Concealed Weapons Permit $ 3.00 plus F/P fee Solicitor /Peddler's Permit $ 25.00 Bicycle Licenses $ 2.00 each Tow Truck Driver's Permit $ 50.00 Tow Truck Driver Renewal $ 50.00 Tow Truck Service Permit (initial) $ 5000 plus Department of Justice fingerprint process fee Tow Truck Service Permit (renewal) $100.00 Clearance Letters $ 15.00 each Fortune - Telling Registration $100.00 each Administrative Fee for: Special Events 1) For -Profit Groups $200.00 each 2) Not - For - Profit Groups $ 50.00 each Administrative Fee tor: Motion Picture/Television/ Commercial Still Photo 1) For -Profit Groups $200.00 each 2) Not - For - Profit Groups $ 50.00 each MGR062 A \FEES \POLICE.FEE -1- Emergency Response Caused by Police Department 1) Drinking Drivers 2) Second Response due to adopted budget minus Parking Control program Disturbances budget, divided by the number of 15.40.075 (Parking for Car Sale or Repairs) direct patrol and traffic officers, 15.40.080 (Preferential Parking) multiplied by the number of 15.40.085 (Emergency Access) working hours (2080) per year Horse Drawn Vehicle $ 35.00 Application Fee 15.40.065 (Vehicle Storage on Streets) $ 20.00 Driver's Permit (annual) 15.40.070 (Commercial Vehicles in Residential Zones) $ 25.00 Vehicle Permit and 15.40.075 (Parking for Car Sale or Repairs) inspection Fee 15.40.080 (Preferential Parking) $ 20.00 Annual Renewal and 15.40.085 (Emergency Access) Inspection Fee Firearms Dealers Permit $175.00 Vehicle Release Fee $32.00 False Alarm $ 75.00 (3rd false alarm) $150.00 (4th false alarm) $250.00 (5th false alarm) Sixth and subsequent alarms service charge shall be increased by 250.00 per activation Town Code Parking Violations 15.40.015 (Overtime Parking) $ P5 15.40.065 (Vehicle Storage on Streets) $ 25 15.40.070 (Commercial Vehicles in Residential Zones) $ 56 15.40.075 (Parking for Car Sale or Repairs) $ 25 15.40.080 (Preferential Parking) $ 25 15.40.085 (Emergency Access) $ 25 15.40.095 (Marked Parking Space) $ 25 15.40.110 (Marked Curbs) $ 25 MGRO62 A \FEES \PCLICE.FEE -2- DEPARTMENT OF BUILDING SERVICES FEES EG NERAL Permit Copies a. The fee for copies of permits shall be: $3.00 (one address only) plus .10 /pg Plan copies b. The fee for microfiche reprints shall be: $25.00 plus costs File Search c. The fee for permits /plans file search shall be: $25.00 /hr. (for more than one address at one time) (one hr. minimum) 2. BUILDING PERMIT FEES A. Permit Issuance The fee for issuing a building permit shall be: $20.00 B. Building Permit The fee for each Building Permit shall be based upon the following valuation of each building or structure for which a permit is issued: Total Valuation $1 to $500 $20 $501 to $2,000 $20 for the first $500 plus $2 for each additional $100 or fraction thereof, to and Including $2,000 $2,001 to $25,000 $50 for the first $2,000 plus $10 for each additional thousand or fraction thereof, to and including $25,000 $25,001 to $50,000 $280 for the first $25,000 plus $7 for each additional thousand or fraction thereof, to and including $50,000 $50,001 to $100,000 $455 for the first $50,000 plus $5 for each additional thousand or fraction thereof, to and including $100,000 $100,001 to $500,000 $705 for the first $100,000 plus $4 for each additional thousand or fraction thereof, to and including $500,000 MGRO62 A: \FEES \BLDG.FEE $500,001 to $1,000,000 $2,305 for the first $500,000 plus $3 for each additional thousand or fraction thereof, to and including $1,000,000 $1,000,001 and over $3,805 for the first $1,000,000 plus $2.50 for each additional thousand or fraction thereof. C. STATE OF CALIFORNIA TITLE 24 PART 2 ENERGY AND ACCESSIBILITY CODE AND REGULATION PLAN REVIEW AND INSPECTION FEES A surcharge shall be added to the building permit fee for the cost to plan review and inspect for compliance with State of California Title 24 Regulations. Fifty percent (50 %) building permit fee. D. PLAN REVIEW FEE A plan review fee shall be charged at the time of filing application. Sixty-five percent (65 %) building permit fee. 3. ELECTRICAL PERMIT FEES A. Permit Issuance The fee for issuing each electrical permit shall be: B. System Fee Schedule *(Note: The following do not include permit- issuing fee.) 1) New Construction (for new residential building only) The following fees shall include all wiring and electrical equipment in or on or related to each building on the same premises constructed at the same time, per square foot 2) Private Swimming Pools For new private, residential, in- ground, swimming pods for single - family and multifamily occupancies Including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each For other types of swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pods, use the UNIT FEE SCHEDULE. MGRO62 A: \FEES \BLDG.FEE 2 $20.00 DIM. r rr 3) Temporraty Power Service For a temporary service power pole or pedestal including all pole or pedestal - mounted receptacle outlets and appurtenances, each: For a temporary distribution system and temporary lighting and receptacle outlet for construction sites decorative light, Christmas tree sale lots, firework stands, etc., each: C. Unit Fee Schedule (Note: The following do not include permit issuing fee.) 1) Receptacle. Switch and Lighting Outlets For receptacle, switch, lighting or other outlets at which current is used or controlled, except service feeders and meters, each: Note: For multi - outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet. 2) Lighting Fixtures a) For lighting fixtures, sockets or other lampholding devices b) For pole or platform- mounted lighting fixtures, each: c) For theatrical -type lighting fixtures or assemblies, each: 3) Residential Ap lances For fixed residential appliances or receptacle outlets for same, including wall - mounted electric ovens; counter - mounted cooking tops; electric ranges, self- contained room, console, or through -wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor - operated appliances not exceeding one horsepower (HP) in rating Note: For other types of air conditioners and other motor - driven appliances having larger electrical ratings, see Power Apparatus. MGRO62 A: \FEES \BLDG.FEE r rr $10.00 $0.9 $0.9 $0.9 $3.00 4) Nonresidential Appliances For residential appliances and self- $6.00 contained factory- wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each: Note: For other types of air conditioners and other motor - driven appliances having larger electrical ratings, see Power Apparatus. 5) Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (HP), Kilowatts (KW) Kilovoltampers (KVA), or kilovolt - amperes- reactive (KVAR): a) Up to and including 1, each $3.00 b) Over 1 and not over 10, each $8.00 c) Over 10 and not over 50, each $15.00 d) Over 50 and not over 100, each $30.00 e) Over 100, each $45.00 Note: 1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. 2. These fees include all switches, circuit breakers, conductors, thermostats, relays and other directly related control equipment. MGRO62 A: \FEES \BLDG.FEE 4. 6) Busways For trolley and plug -in -type busways, each 100 feet $5.00 or fraction thereof Note: Note: This fee is not applicable when An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug -in -type busways. outlets, fixtures, appliances, power No fee is required for portable tools. 7) Signs, Outline Lighting and Maroues For signs, outline lighting systems or $20.00 marquees supplied from one branch circuit, each: D. $) Services 25% of electrical permit fee For services of 600 volts or less and not $20.00 over 200 amperes in rating, each: Permit Issuance For services of 600 volts or less and over $40.00 200 amperes to 100 amperes in rating, each: $20.00 9) Miscellaneous Apparatus. Conduits and Conductors System Fee Schedule For electrical apparatus, conduits and $12.00 conductors for which a permit is required but for which no fee is herein set forth 1) New Construction (for new residential building only) MGRO62 A: \FEES \BLDG.FEE Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment. D. Plan Review Fee 25% of electrical permit fee MECHANICAL PERMIT FEES A. Permit Issuance 1. For issuing each mechanical permit the fee shall be: $20.00 B. System Fee Schedule (Note: The following do not include permit issuing fee.) 1) New Construction (for new residential building only) The following fees shall include all ducts $0.04 and mechanical equipment in or on or related to each building on the same premises constructed at the same time, per sq. ft. C. UNIT FEE SCHEDULE (Note: The following do not include permit issuing fee.) 1) For the installation, relocation, or repair $16.00 of each heating appliance, including vents MGRO62 A: \FEES \BLDG.FEE 2) For the installation, relocation or $18.00 repair of each boiler or compressor, including ducts and vents attached 3) For the installation, relocation or $15.00 repair for each separate air handlings system 4) For installation of ventilating fan $6.00 5) For installation of each hood with mechanical exhaust: Domestic $15.00 Commercial or industrial $25.00 6) For each air duct outlet or register $1.00 in a mechanical heating or cooling system 7) For installation of separate flue or vent not included with appliance installation $6.00 8) For installation of evaporative cooler $12.00 9) For installation of each appliance or equipment $15.00 regulated by the Uniform Mechanical Code for which no fee is specified herein 10) For installation of gas piping incidental to heating appliance installation $10.00 11) For installation of solar collector systems $22.00 D. PLAN REVIEW FEES: 25% of Mechanical Permit Fee PLUMBING PERMIT FEES A. Permit Issuance The fee for issuing each plumbing permit shall be: $20.00 B. ,System Fee Schedule (NOTE: The following do not include permit issuing fee) 1. New Construction (for new residential building only) The following fees shall include all pipes $0.06 and plumbing equipment in or on related to each building on the same premises constructed at the same time, per square foot. 2. Private Swimming Pools (including water /heater, water $30.00 piping system, and gas system) MGRO62 A: \FEES \BLDG.FEE 19 C. Unit Fee Schedule (NOTE: The following do not include permit issuing fee) 1. For each plumbing fixture or trap or set of fixtures on one trap (including water, piping, and backfow protection therefore) 2. For each building sewer and each trailer park sewer 3. Rainwater systems -- per drain 4. For each private sewage disposal system 5. For each water heater and /or vent 6. For each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen -type grease interceptors functioning as fixture traps 7. For installation, alteration, or repair of water piping and /or water- treating equipment, each 8. For repair or alteration of drainage or vent piping, each fixture 9. For each lawn sprinkler system on any one meter, including backfiow protection devices therefor 10. For atmospheric -type vacuum breakers not included in Item 2 each 11. For each backfow protective device other than atmospheric -type cavum breakers 12. For each gas piping system 13. For each water piping system IpmgI_1 � f'II'Pti9 MGRO62 A: \FEES \BLDG.FEE 7 $7.00 r� $7.00 $45.00 $10.00 $12.00 M. rr $3.00 $9.00 $2.00 $8.00 $10.00 $10.00 25% of Plumbing Permit Fee 6. -OTHER FEE SCHEDULE Permit Fees MGRO62 A: \FEES \BLDG.FEE 8 The permit issuance fee shall be added to the following fee schedule. A. Reinspection Fee $45.00 /hr. (one hour min.) B. Inspection Requested to be made $60.00 /hr. other than normal business hours (two hour min.) C. Inspection for which no fee is $45.00 /hr. specifically indicated (one hour min.) D. Additional plan review required by $55.00 /hr. changes, additions or revisions to approved plans (one hour min.) E. Shop drawing plan review fee $55.00 /hr. (one hour min.) F. Demolition permit fee $35.00 G. Parking Lot restriping fee $35.00 H. Computer surcharge on Building /Plumbing /Mechanical /Electrical Permits 2% of permit with $1.00 minimum 7. INVESTIGATION FEE SCHEDULE Investigation fee for compliance inspections of work done without permits (effective January 1, 1994) Double Actual Permit Fees MGRO62 A: \FEES \BLDG.FEE 8 A. COMMUNITY SERVICES DEPARTMENT FEES Conference Cateaory II: Private Parties a. Resident $60 /hr. $20 $30 /hr b. Non - resident $120 /hr. $50 $60 /hr C. Security Deposit $100 N/C $25 B. PROGRAM SPACE FOR NON - PROFIT AGENCIES $1.17/sq. ft. /month Neighborhood Center tenants may schedule rooms in the facility for business purposes. Fees are not collected unless the value of the space scheduled exceeds $50 x sq. ft. leased on annual cumulative basis C. HOUSING REHABILITATION SERVICES 1. Termite Report 2. Lot Book and Credit Check 3. Installment Collection Services a. Initiation Fee b. Monthly Fee C. Annual Interest Reporting Fee *Fee charged only when Hall is rented for three or more hours. MGRO62 A \FEES \COMMSERV.FEES $ 50.00 $ 135.00 $35.00 $ 8.00-9.25 $ 7.50 $20 /hr. $40 /hr. N/C Hall Kitchen* Lounae Room NEIGHBORHOOD CENTER t I: Community Service Groups 1. Activities (non - profits) a. Resident $20 /hr. $20 $15 /hr. $10 b. Non - resident $40 /hr. $40 $30 /hr. $20 /hr. C. Security Deposit (only if alcohol is served) $100 N/C $25 N/C 2. Fundraising Activities a. Resident $40 /hr. $20 $25 /hr. $15 /hr. b. Non - resident $50 /hr. $40 $40 /hr. $30 /hr. C. Security Deposit $100 N/C $25 N/C Cateaory II: Private Parties a. Resident $60 /hr. $20 $30 /hr b. Non - resident $120 /hr. $50 $60 /hr C. Security Deposit $100 N/C $25 B. PROGRAM SPACE FOR NON - PROFIT AGENCIES $1.17/sq. ft. /month Neighborhood Center tenants may schedule rooms in the facility for business purposes. Fees are not collected unless the value of the space scheduled exceeds $50 x sq. ft. leased on annual cumulative basis C. HOUSING REHABILITATION SERVICES 1. Termite Report 2. Lot Book and Credit Check 3. Installment Collection Services a. Initiation Fee b. Monthly Fee C. Annual Interest Reporting Fee *Fee charged only when Hall is rented for three or more hours. MGRO62 A \FEES \COMMSERV.FEES $ 50.00 $ 135.00 $35.00 $ 8.00-9.25 $ 7.50 $20 /hr. $40 /hr. N/C 1. ENGINEERING PLAN CHECK AND INSPECTION FEES (Based on the estimated cost of street, drainage, and other public Improvements) A. PLAN CHECK FEE 1) First $30,000 of value or any fraction thereof . ............................... 5 %+ 2) Next $50,000 of value or any fraction thereof . ............................... 3 %+ 3) That value exceeding $60,000 ............ ............................... 2 %+ 4) Developer's option of using an .... ............................... Consultant cost outside plan check consultant plus 10% for as designated by the Town Town administrative for projects over $30,000 services B. INSPECTION FEE 1) First $30,000 of value or any fraction thereof . ............................... 10 %+ 2) Next $50,000 of value or any fraction thereof . ............................... 5 %+ 3) That value exceeding $60,000 ............. ............................... 4% 2. SUBDIVISION MAP CHECKING A. 1-4 Lots ............................. ............................... $1,350 B.5 or more Lots .............................. ..............................$ 1,350+ 250 /lot over 4 C. 4 units with air space condos ............. ............................... $ 4,000 D. 5 or more Lots with air space condos ...... ............................... $ 4,000+ 250 /Unit over 4 3. REVERSION TO ACREAGE ................. ............................... $ 700 4. LOT MERGER A. Certificate ............................ ............................... $ 550 B. Map checking ......................... ............................... $ 650 5. LOT LINE ADJUSTMENTS A. Certificate ............................ ............................... $ 550 B. Map checking ......................... ............................... $ 900 6. CERTIFICATE OF COMPLIANCE ............ ............................... $ 550 MGRO62 A \FEES \ENGR.FEE -1- 7..STORM DRAINAGE FEES A. DEVELOPMENT PROJECTS 1) Single family lots - hillside area ....... ............................... $2,000 /ac 2) Single family lots - not hillside area ..... ............................... $2,400 /ac 3) Multiple family dwelling units ......... ............................... $2,400 /ac. plus $90 for ea. unit in excess of two not to exceed $3,000 /ac. 4) Commercial, industrial, hospitals, churches . ............................. $3,000 /ac. schools and others B. BUILDING PERMITS (Buildings, Structures or Improvements) 1) New impervious area .............. ............................... $.33 /sq. ft. 8. CONSTRUCTION ENCROACHMENT PERMIT FEE A. First $30,000 of value or any fraction thereof ... ............................... 5 %+ B. Next $50,000 of value or any fraction thereof ... ............................... 3 %+ C. That value exceeding $80,000 .............. ............................... 2 %+ D. Minimum ............................. ............................... $100 E. Investigation fee for work done without Encroachment permits (effective January 1, 1994) ........................... Double actual permit fees 9. OVERWEIGHT VEHICLE PERMIT (House Moving) FEE A. Per House, plus ......................... ............................... $130 B. Deposit for Facilities Damage .............. ............................... $1,000 10. REVOCABLE ENCROACHMENT PERMIT A. Application Fee ......................... ............................... $ 800 B. Processing Fee ........................ ............................... $ 550 MGR062 k \FEES \ENGR.FEE -2- 11. ABANDON EXCESS PUBLIC RIGHT -OF -WAY A. Application Fee ........................ ............................... $ 850 B. Processing Fee ....................... ............................... $1,300 C. Appraisal Costs and Fair Market Value ......... ............................... $800 12. ABANDON EXCESS EASEMENT A. Application Fee ........................ ............................... $ 850 B. Processing Fee ............................. ........................... $550 13. ASSESSMENT DISTRICT RE- SPREAD ............. ...........................$300 14. ASSESSMENT DISTRICT FORMATION ..... ............................... $2,600 15. ,STREET TREE ...................... ............................... $165/Tree MGR062 A \FEES \ENGR.FEE -3- GENERAL ADMINISTRATION FEES Neighborhood Parking Permit Fee Fee for Use of Town Hall Facilities (Council Chamber) Cleaning and Utility Fee Document Duplicating Fee Copy of Town Code Annual Subscription for Quarterly Town Code Supplements Copy of Zoning Ordinance Annual Subscription for Quarterly Zoning Ordinance Supplements Copy of Subdivision Ordinance Annual Subscription for Quarterly Subdivision Ordinance Supplement Certified Copy of Birth Certificate Certification of Town Records Annual Financial Report Annual Budget Capital Improvement Plan Schedule of Meetings (annual mailing list) Council or Planning Commission Agendas (annual mailing list) Council or Planning Commission Minutes and Agendas (annual mailing list) Tapes of Council Meetings Address Change Fee Returned Check Fee Election Filing Fee Ordinances and Resolutions Town Map MGR062 A: \FEES \ADMINIST.FEE 1 $ 10 per resident automobile per year $ 20.00 for one hour, plus $10.00 for each additional hour $ 30.00 per hour, plus $ 0.10 per page $150.00 $100.00 $ 40.25 $ 25.00 $ 25.00 $ 15.00 $ 12.00 $ 1.00 $ 5.00 (each subject) $ 15.00 $ 5.00 $ 24.00 $ 65.00 $ 10.00 (first tape) 6.50 (each additional tape) $ 50.00 $ 10.00 $ 25.00 $ 4.00* • rr Dog License Spayed and neutered: $ 6.00 per year 10.00 for two years Not spayed and neutered: $12.00 per year 20.00 for two years *To promote the general public interest in a fully informed participatory citizenry, any senior citizen, student or indigent may request and receive copies at .10 cents per page up to a maximum of 10 pages. MGRD62 A: \FEES \ADMINIST.FEE