1996-127-Authorizing The Execution Of An Agreement With J.J.R. Construction For The Construction Of Project 9605BRESOLUTION 1996 -127
RESOLUTION OF THE TOWN COUNCIL
OF THE TOWN OF LOS GATOS
AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH
J.J.R. CONSTRUCTION
FOR THE CONSTRUCTION OF PROJECT 9605B
DISABLED ACCESS RAMP CONSTRUCTION
WHEREAS, bids were sought in conformance with State and Town law, and J.J.R.
Construction is the lowest bidder for Project 9605B - Disabled Access Ramp Construction.
THEREFORE, BE IT RESOLVED: by the Town Council of the Town of Los Gatos,
County of Santa Clara, State of California, that the Town Manager is authorized to enter into an
agreement with J.J.R. Construction for the construction of Project 9605B - Disabled Access
Ramp Construction, (attached) as Exhibit A.
PASSED AND ADOPTED at a regular meeting of the Town Council of the
Town of Los Gatos, California, held on the 21 st day of October, 1996, by the following vote.
COUNCIL MEMBERS:
AYES: Joanne Benjamin, Steven Blanton, Linda Lubeck, Mayor Randy Attaway
NAYS: None
ABSENT: Patrick O'Laughlin
ABSTAIN: None
SIGNED: MA OR OF THE OWN OF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
CLERK OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
Section 7
AGREEMENT
TO`,' +:u CLERK
R:
REC:
THIS IS AN AGREEMENT between the Town of Los Gatos (hereinafter referred to as "Owner ") and J.J.R.
Construction (hereinafter referred to as "Contractor ").
Owner and Contractor, for the consideration hereinafter named, agree as follows:
1 -SCOPE OF WORK
Contractor shall furnish all materials and perform all of the work for the construction of PROJECT #96058
DISABLED ACCESS RAMP CONSTRUCTION in accordance with the Contract Documents.
2 - CONTRACT PRICE
As full compensation for furnishing all materials and for doing all the work contemplated and embraced in
this agreement, also for all loss or damage arising out of the nature of the work aforesaid, or from the
actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be
encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every
description connected with the work, also for all expenses incurred by or in consequence of the suspension
or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Contract Documents, Owner shall pay the amount specified by Contractor
in Contractor's Bid Form.
3 - CONTRACT DOCUMENTS
All rights and obligations of Owner and Contractor are fully set forth and described in the Contract
Documents. All parts of the Contract Documents are intended to be correlated so that any work called for
in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all
said documents. The Contract Documents are defined in section B -01(a) of these Specifications and are
incorporated herein by reference the same as though set out in full.
4 - BEGINNING OF WORK
Following the execution of this agreement and the approval of bonds and insurance policies and certificates,
Owner shall issue a notice to proceed with the work. Commencing work or the entrance of equipment or
materials on the site of the work by Contractor before receipt of the notice to proceed is at the sole risk and
expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner
or third persons resulting therefrom.
5 - TIME OF COMPLETION
The work called for herein shall be fully completed within the time limit set forth in the Special Conditions.
Revised: April 24, 1996 (ATY)
Exhibit A
SECTION 7- AGREEMENT
2
6 - CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN
Contractor shall remedy any defects due to faulty materials and /or workmanship and pay for any damages
to other work and /or existing facilities resulting therefrom which shall appear within a period of two years
from the date of recording of the Notice of Completion.
7 - LIQUIDATED DAMAGES
The undersigned has reviewed and is thoroughly familiar with the appropriate sections of the Contract and
Section 8 -06(c) of these Specifications pertaining to liquidated damages.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day of
'19 .
TOWN OF LOS GATOS
By
Town Manager
J.J.R. CONSTRUCTION - CONTRACTOR
By
Title
Business Address
Contractor's License Number
APPROVED AS TO FORM:
LARRY ANDERSON
Town Attorney
ATTEST:
MARIAN COSGROVE
Town Clerk, Town of Los Gatos
Revised: April 24, 1996 (ATY)