1996-150-An Agreement With Signal Maintenance, Inc. For Left Turn Green Arrow Overlap And Audible Pedestrian SignalsRESOLUTION 1996 -150
RESOLUTION OF THE TOWN COUNCIL
OF THE TOWN OF LOS GATOS
AUTHORIZING THE TOWN MANAGER TO EXECUTE AN
AGREEMENT WITH SIGNAL MAINTENANCE, INC.
FOR LEFT TURN GREEN ARROW OVERLAP AND
AUDIBLE PEDESTRIAN SIGNALS
WHEREAS, left -turn arrow overlap will benefit traffic flow and safety at both
Blossom Hill Road /Cherry Blossom Lane and Los Gatos Boulevard /Shannon Road /Roberts
Road,
WHEREAS, audible WALK indicators at both Blossom Hill Road /Cherry Blossom
Lane and Los Gatos Boulevard /Shannon Road /Roberts Road will benefit the sight impaired,
and,
WHEREAS, both improvements can be completed by the same contractor for most
efficiency,
RESOLVED, by the Town Council of the Town of Los Gatos, County of Santa Clara,
State of California, that the Town of Los Gatos enter into a contract with Signal Maintenance
Inc., for left turn arrow overlap and audible pedestrian walk indicators, and that the Town
Manager is authorized, and is hereby directed, to execute said contract /agreement in the name
and on behalf of the Town of Los Gatos.
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of
Los Gatos, California, held on the 2nd day of December, 1996 by the following vote:
COUNCIL MEMBERS:
AYES: Randy Attaway, Steven Blanton, Linda Lubeck, Mayor Joanne Benjamin
NAYS: None
ABSENT: Patrick O'Laughlin
ABSTAIN: None
SIGNED:
/,MAYOR OF THE TOWNIOF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
CLERK OF THE TOWN OF LOS GA
LOS GATOS, CALIFORNIA