Loading...
1997-074-Authorizing The Execution Of An Agreement With C.W. ArchibaldRESOLUTION 1997 - 74 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH C. W. ARCHIBALD FOR THE CONSTRUCTION OF PROJECT 9615 BIANNUAL STREET RESURFACING WHEREAS, bids were sought in conformance with State and Town law, and C. W. Archibald was the lowest bidder for Project 9615 - Biannual Street Resurfacing. THEREFORE, BE IT RESOLVED: by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that the Town Manager is authorized to enter into an agreement with C. W. Archibald for the construction of Project 9615 - Biannual Street Resurfacing, (attached) as Exhibit A. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 7th day of July, 1997, by the following vote. COUNCIL MEMBERS: AYES: Randy Attaway, Steve Blanton, Jan Hutchins, Linda Lubeck, Mayor Joanne Benjamin. NAYS: None ABSENT: None ABSTAIN: None SIGNED. � MAYOR OF THE TO OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Section 7 AGREEMENT ruwry CLg., yl J: THIS IS AN AGREEMENT between the Town of Los Gatos (hereinafter referred to as "Owner ") and C. F. Archibald Paving, Inc. (hereinafter referred to as "Contractor "). Owner and Contractor, for the consideration hereinafter named, agree as follows: 1 - SCOPE OF WORK Contractor shall furnish all materials and perform all of the work for the construction of PROJECT #9615 - BI- ANNUAL STREET RESURFACING in accordance with the Contract Documents. 2 -..CONTRACT PRICE As full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay the amount specified by Contractor in Contractor's Bid Form. 3 - CONTRACT DOCUMENTS All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The Contract Documents are defined in section 8 -01(a) of these Specifications and are incorporated herein by reference the same as though set out in full. 4 - BEGINNING OF WORK Following the execution of this agreement and the approval of bonds and insurance policies and certificates, Owner shall issue a notice to proceed with the work. Commencing work or the entrance of equipment or materials on the site of the work by Contractor before receipt of the notice to proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. 5 - TIME OF COMPLETION The work called for herein shall be fully completed within the time limit set forth in the Special Conditions. Revised: August 29, 1996 (ATY) SECTION 7 - AGREEMENI 2 6 - CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN Contractor shall remedy any defects due to faulty materials and /or workmanship and pay for any damages to other work and /or existing facilities resulting therefrom which shall appear within a period of two years from the date of recording of the Notice of Completion. 7 - LIQUIDATED DAMAGES The undersigned has reviewed and is thoroughly familiar with the appropriate sections of the Contract and Section 8 -060 of these Specifications pertaining to liquidated damages. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day of , 19 . TOWN OF LOS GATOS By Town Manager CONTRACTOR By President C. F. Archibald Paving, Inc. P.O. Box 37 Redwood City CA 94064 Business Address 267077 A C12 Contractor's License Number APPROVED AS TO FORM: Orry Korb Town Attorney ATTEST: MARIAN COSGROVE Town Clerk, Town of Los Gatos SCOPE OF SERVICES Work shall generally consist of resurfacing by the overlay method. Work shall also consist of placing new asphaltic concrete on existing surfaces after the existing surface has been ground to a uniform depth; grinding both sides of the streets along gutters and at the ends of the overlay; crack sealing; placement of pavement fabric and fabric membrane strips; adjusting appurtenances to grade; and installation of pavement markers, legends and striping to the extent as required in the contract documents. Work items for each location are as follows: Street Name.: SS From To Items: of Work '. Blossom Hilt Rd. Los Gatos Blvd. Camellia Tem. Grind Ex. AC to 2" uniform depth (westside of (eastside of Crack sealing ", Pavement Fabric intersection) intersection) Fill to grade with 2" new AC intersection) - X" aggregate Camellia Terr. Cherry Blossom Ln. ES Lane Fabric Membrane Strips (eastside of (westside of Wedge Cut (10' wide at gutter) intersection) intersection) (20' wide at conforms) Pavement Fabric 3" Overlay - 1.5" Bottom Lift -'h" aggregate 1.5" Top Lift - %f aggregate WB Lanes Wedge Cut (6 wide at gutter) (10' wide at conforms) Pavement Fabric,.1.5" Overlay - %" aggregate Cherry Blossom Ln. Hillbrook Dr. Wedge Cut (6' wide at gutter) ( westside of (212 ft. east of (10' wide at conforms) intersection) eastside of Leveling Course, Pavement Fabric intersection) 1.5" Overlay -'R' aggregate Hilibrook Dr. Camino Del Cerro Wedge Cut (12' wide at gutter - EB) (212 ft. east of ( westside of (6' wide at gutter - W B) eastside of intersection) (20' wide at conforms) intersection) Leveling Course 4" Overlay - 2" Bottom Lift -' /l aggregate 2' Top Lift - W aggregate Camino Del Cerro Union Avenue Wedge Cut (6 wide at gutter) (westside of (200 ft. west of (20' wide at conforms) intersection) eastside of Leveling Course, 3" Overlay intersection) 15" Bottom Lift -'W aggregate re ate Crack sealing shall be performed on all sections of Blossom Hill between Los Gatos Blvd. and Union Avenue prior to new surfacing. Street Name - From To Items of Work Los Gatos Blvd. Loma Alta Ave. Mitchell Ave. Wedge Cut (6 wide at gutter) (10' wide at (southside of (southside of conforms) intersection) intersection) Leveling Course, Pavement Fabric intersection) 1.5" Overlay - W aggregate Mitchell Ave. Blossom Hill Rd. Grind Ex. AC to 2" uniform depth Fabric Membrane Strips (southside of (northside of Pavement Fabric, Fill to grade with 2" new AC intersection ) intersection ) - %" aggregate 'Crack sealing shall be performed on all sections of Los Gatos Blvd. between Loma Alta and Blossom Hill Rd. prior to new surfacinq. Street Name from To Items of Work North Santa Cruz Los Gatos/ Blossom Hill Rd. Grind Ex. AC(2" t uniform depth) Saratoga Rd. ( southside of to PCC surface (northside of intersection) Wedge Cut (6 wide at gutter) intersection) (10' wide at conforms) Fabric Membrane Strips Crack sealing Fill to grade with T't new AC - 3/4" aggregate 1.5" ovens -'h" aggregate ATTACHMENT 2