1978-203-Establishing A Fee Schedule For Zoning, California Environmental Quality Act, Subdivision Proceedings And Various Engineering ServicesRESOLUTION NO. 1978 -203
RESOLUTION ESTABLISHING A FEE SCHEDULE
FOR ZONING, CALIFORNIA ENVIRONMENTAL
QUALITY ACT, SUBDIVISION PROCEEDIJGS
AND VARIOUS ENGINEERING SERVICES
RESOLVED, by the Town Council of the Town of Los Gatos, State of California,
as follows:
1. The following fee schedule is established for applications filed
pursuant to the Zoning Ordinance. The fees are collected by the Planning
Department.
Any application for change of zone
classification other than those types of
applications described below .... ........................$725.00
Use Permit Application ... ...............................
350.00
Variance Application ..... ...............................
120.00
Architecture and Site Approval Application
not consolidated with a Use Permit
Application.... .........................................
70.00
Planned Development Application .........................
875.00 plus ordinance
publication costs
Use and Occupancy Permit . ...............................
16.00
2. In exceptional circumstances regarding particular zoning
applications
filed pursuant to the Zoning Ordinance, where justice demands
and a special
privilege would not be created, the Planning Commission may,
in its discretion,
waive all or a portion of the fees heretofore prescribed.
3. The following fee schedule is established for California
Environmental
Quality Act matters. The fees are collected by the Planning
Department.
Consultant fees for preparation of
Initial Study ............ ...............................
200.00* deposit
Initial Study and preparation of Negative
Declaration .............. ...............................
30.00
Environmental Impact Review Report ......................
725.00
Note; The $200 is a deposit. If the actual cost of the consultant's
study is less than $200 the difference will be refunded to the applicant.
If the cost is greater than $200 due to special studies that may be
necessary, the specific study and its cost will be determined before
the study is authorized and an additional deposit will be required
before the additional study is commenced.
4. Pursuant to section 27a -8 of the Code of the Town of Los Gatos, the
following fee schedule is hereby established for processing of subdivision
applications. The parcel map and tentative map fees are collected by the
Planning Department; the balance of the fees are collected by the Public Works
Department.
Parcel Map filing fee ........ ........................$200.00
Parcel Map combining parcels only .................... No fee
Tentative Map filing fee ............................. 300.00 plus $25.00 for
each lot shown upon the
tentative map.
Final Map:
1. Filing fee ..... ............................... 200.00 plus $25.00 for
each lot shown on the
tentative map.
2. A sum equal to the amount required by law for the recordation
of the map.
3. A plan checking fee in the amount of one percent of the Town
Engineer's estimate of the value of the street, drainage and
other public improvements proposed to be installed for the
subdivision.
4. A fee to cover the costs of inspecting the installation
of such improvements, shall be based upon percentages
of the Town Engineer's estimate of the value of such
improvements, and shall be calculated as follows:
6.5 percent of the first thirty thousand dollars of
value or any fraction thereof, plus
4.5 percent of the next fifty thousand dollars of value
or any fraction thereof, plus
3.5 percent of that value which exceeds eighty thousand
dollars.
-2-
5. Plan checking and inspection fees for the installation of
public improvements not related to a subdivision.
Fees for the various engineering services performed by the Department
of Public Works in checking plans and specifications for and inspecting the
installation of public street, drainage and other improvements not related
to subdivisions required by the Town to be installed by private developers
shall be as follows:
a. The fees for the checking of plans and specifications
shall be one percent (1 %) of the Town Engineer's
estimate of the value of the public improvements to
be installed.
b. The fees for the inspection of installation of such
public improvements shall be based on percentages
of the Town Engineer's estimate of the value thereof,
and shall be calculated as follows:
6.5 percent of the first thirty thousand dollars of value
or any fraction thereof, plus
4.5 percent of the next fifty thousand dollars of value
or any fraction thereof, plus
3.5 percent of that value which exceeds eighty thousand
dollars.
6. Encroachment Permit Fees. The application fee for an excavation
permit issued under Article III of Chapter 26 of the Los Gatos Town Code
shall be twenty dollars ($20.00). Such fee shall not be charged when the
applicant is a public agency.
The application fee for a permit to construct sidewalks, driveways
or curbs and gutters, as required by Article IV of Chapter 26 of the Los
Gatos Town Code, shall be twenty dollars ($20.00). Such fee shall not be
charged when the applicant is a public agency.
7. Overweight Vehicle Permit Fees. The application fee for a permit
for an overweight vehicle issued pursuant to provisions of Article II of
-3-
Chapter 16 of the Los Gatos Town Code, containing sections 16 -90 through
16 -96, inclusive, shall be seventy -five dollars ($75.00).
8. Resolution No. 1975 -105 adopted July 21, 1975, Resolution No.
1976 -82 adopted June 21, 1976, and Resolution No. 1978 -73 adopted
May 16, 1978 are hereby repealed.
PASSED AND ADOPTED at a regular meeting of the Town
Council of the Town of Los Gatos held on the 18th day of December
1978, by the following vote:
AYES: COUNCIL MEMBERS Ruth cannon, Thomas J. Ferrite,
NOES:
ABSENT
John B. Lochner, Peter W. Siemens and Mardi Gualtieri
COUNCIL MEMBERS None.
COUNCIL MEMBERS None.
SIGNED: ' ,$ y Lll ALL
MAYOR OF THE TOWN OF LOS GATOS
ATTEST:
ASSISTANT CLEF THE TOWN OF LOS OTOS
KIM