1978-073-Establishing A Fee Schedule For Zoning, California Environmental Quality Act, Subdivision Proceedings And Various Engineering ServicesRESOLUTION NO. 1978 -73
RESOLUTION ESTABLISHING A FEE SCHEDULE
FOR ZONING, CALIFORNIA ENVIRONMENTAL
QUALITY ACT, SUBDIVISION PROCEEDINGS
AND VARIOUS ENGINEERING SERVICES
RESOLVED, by the Town Council of the Town of Los Gatos, State
of California, as follows:
1. The following fee schedule is established for applications
filed pursuant to the Zoning Ordinance. The fees are collected by
the Planning Department.
Any application for change of zone
classification other than those types of
applications described below ................... $ 725.00
Use Permit Application ......................... 350.00
Variance Application ........................... 120.00
Architecture and Site ApprD val Application
not consolidated with a Use Permit
Application ..... ............................... 70.00
Planned Development Application ................ 875.00 plus
ordinance publication
costs
Use and Occupancy Permit ....................... 16.00
2. In exceptional circumstances regarding particular zoning
applications filed pursuant to the Zoning Ordinance, where justice
demands and a special privilege would not be created, the Planning
Commission may, in its discretion, waive all or a portion of the fees
heretofore prescribed.
3. The following fee schedule is established for California
Environmental Quality Act matters. The fees are collected by the
Planning Department.
-1-
Preliminary Review for Environmental
ImpactReport ... ............................... $ 60.00
Environmental Impact Report Review ............. 725.00
4. Pursuant to section 27a -8 of the Code of the Town of Los
Gatos, the following fee schedule is hereby established for processing
of subdivision applications. The parcel map and tentative map fees
are collected by the Planning Department; the balance of the fees are
collected by the Public Works Department.
Parcel Map filing fee .......................... 200.00
Parcel Map combining parcels only .............. No Fee
Tentative Map filing fee ....................... 300.00 plus $25.0(
for each lot shown
upon the tentative
map.
Final Map:
1. Filing fee .............................. 200.00 plus $25.00
for each lot shown on
the final map.
2. A sum equal to the amount required by law for the
recordation of the map.
3. A plan checking fee in the amount of one percent of
the Town Engineer's estimate of the value of the
street, drainage and other public improvements
proposed to be installed for the subdivision.
4. A fee to cover the costs of inspecting the installation
of such improvements, shall be based upon percentages
of the Town Engineer's estimate of the value of such
improvements, and shall be calculated as follows:
6.5 per cent of the first thirty thousand dollars of
value or any fraction thereof, plus
4.5 per cent of the next fifty thousand dollars of value
or any fraction thereof, plus
3.5 per cent of that value which exceeds eighty thousand
dollars.
-2-
5. Plan checking and inspection fees for the installation of
public improvements not related to a subdivision.
Fees for the various engineering services performed by the
Department of Public Works in checking plans and specifications for
and inspecting the installation of public street, drainage and other
improvements not related to subdivisions required by the Town to be
installed by private developers shall be as follows:
a. The fees for the checking of plans and specifications
shall be one per cent (1 %) of the Town Engineer's
estimate of the value of the public improvements to
be installed.
b. The fees for the inspection of installation of such
public improvements shall be based on percentages
of the Town Engineer's estimate of the value
thereof, and shall be calculated as follows:
6.5 per cent of the first thirty thousand dollars of value
or any fraction thereof, plus
4.5 per cent of the next fifty thousand dollars of
value or any fraction thereof, plus
3.5 per cent of that value which exceeds eighty thousand
dollars.
6. Encroachment Permit Fees. The application fee for an
excavation permit issued under Article III of Chapter 26 of the Los
Gatos Town Code shall be twenty dollars ($20.00). Such fee shall not
be charged when the applicant is a public agency.
The application fee for a permit to construct sidewalks,
driveways or curbs and gutters, as required by Article IV of Chapter
26 of the Los Gatos Town Code, shall be twenty dollars ($20.00).
Such fee shall not be charged when the applicant is a public agency
-3-
7. Overweight Vehicle Permit Fees. The application fee for
a permit for an overweight vehicle issued pursuant to the provisions
of Article 11 of Chapter 16 of the Los Gatos Town Code, containing
Sections 16 -90 through 16 -96, inclusive, shall be seventy -five
dollars ($75.00).
8. Resolution No. 1975 -105 adopted July 21, 1975 and Resolution
No. 1976 -82 adopted June 21, 1976 are hereby repealed.
PASSED AND ADOPTED at a continued regular meeting of the Town
Council of the Town of Los Gatos held on the 16th day of May
1978, by the following vote:
AYES: COUNCIL MEMBERS Ruth Cannon, Thomas J. Ferrito, John B. Lochner,
Peter W. Siemens and Mardi Gualtieri
NOES:
COUNCIL MEMBERS
None
ABSTAIN: COUNCIL MEMBERS None
ABSENT:
COUNCIL MEMBERS None
SIGNED: hia)/l,', XU-6AlA;
ATTEST:
\`
CLERK &V T TOWN OF LOS GATOS
(S�