Loading...
1978-073-Establishing A Fee Schedule For Zoning, California Environmental Quality Act, Subdivision Proceedings And Various Engineering ServicesRESOLUTION NO. 1978 -73 RESOLUTION ESTABLISHING A FEE SCHEDULE FOR ZONING, CALIFORNIA ENVIRONMENTAL QUALITY ACT, SUBDIVISION PROCEEDINGS AND VARIOUS ENGINEERING SERVICES RESOLVED, by the Town Council of the Town of Los Gatos, State of California, as follows: 1. The following fee schedule is established for applications filed pursuant to the Zoning Ordinance. The fees are collected by the Planning Department. Any application for change of zone classification other than those types of applications described below ................... $ 725.00 Use Permit Application ......................... 350.00 Variance Application ........................... 120.00 Architecture and Site ApprD val Application not consolidated with a Use Permit Application ..... ............................... 70.00 Planned Development Application ................ 875.00 plus ordinance publication costs Use and Occupancy Permit ....................... 16.00 2. In exceptional circumstances regarding particular zoning applications filed pursuant to the Zoning Ordinance, where justice demands and a special privilege would not be created, the Planning Commission may, in its discretion, waive all or a portion of the fees heretofore prescribed. 3. The following fee schedule is established for California Environmental Quality Act matters. The fees are collected by the Planning Department. -1- Preliminary Review for Environmental ImpactReport ... ............................... $ 60.00 Environmental Impact Report Review ............. 725.00 4. Pursuant to section 27a -8 of the Code of the Town of Los Gatos, the following fee schedule is hereby established for processing of subdivision applications. The parcel map and tentative map fees are collected by the Planning Department; the balance of the fees are collected by the Public Works Department. Parcel Map filing fee .......................... 200.00 Parcel Map combining parcels only .............. No Fee Tentative Map filing fee ....................... 300.00 plus $25.0( for each lot shown upon the tentative map. Final Map: 1. Filing fee .............................. 200.00 plus $25.00 for each lot shown on the final map. 2. A sum equal to the amount required by law for the recordation of the map. 3. A plan checking fee in the amount of one percent of the Town Engineer's estimate of the value of the street, drainage and other public improvements proposed to be installed for the subdivision. 4. A fee to cover the costs of inspecting the installation of such improvements, shall be based upon percentages of the Town Engineer's estimate of the value of such improvements, and shall be calculated as follows: 6.5 per cent of the first thirty thousand dollars of value or any fraction thereof, plus 4.5 per cent of the next fifty thousand dollars of value or any fraction thereof, plus 3.5 per cent of that value which exceeds eighty thousand dollars. -2- 5. Plan checking and inspection fees for the installation of public improvements not related to a subdivision. Fees for the various engineering services performed by the Department of Public Works in checking plans and specifications for and inspecting the installation of public street, drainage and other improvements not related to subdivisions required by the Town to be installed by private developers shall be as follows: a. The fees for the checking of plans and specifications shall be one per cent (1 %) of the Town Engineer's estimate of the value of the public improvements to be installed. b. The fees for the inspection of installation of such public improvements shall be based on percentages of the Town Engineer's estimate of the value thereof, and shall be calculated as follows: 6.5 per cent of the first thirty thousand dollars of value or any fraction thereof, plus 4.5 per cent of the next fifty thousand dollars of value or any fraction thereof, plus 3.5 per cent of that value which exceeds eighty thousand dollars. 6. Encroachment Permit Fees. The application fee for an excavation permit issued under Article III of Chapter 26 of the Los Gatos Town Code shall be twenty dollars ($20.00). Such fee shall not be charged when the applicant is a public agency. The application fee for a permit to construct sidewalks, driveways or curbs and gutters, as required by Article IV of Chapter 26 of the Los Gatos Town Code, shall be twenty dollars ($20.00). Such fee shall not be charged when the applicant is a public agency -3- 7. Overweight Vehicle Permit Fees. The application fee for a permit for an overweight vehicle issued pursuant to the provisions of Article 11 of Chapter 16 of the Los Gatos Town Code, containing Sections 16 -90 through 16 -96, inclusive, shall be seventy -five dollars ($75.00). 8. Resolution No. 1975 -105 adopted July 21, 1975 and Resolution No. 1976 -82 adopted June 21, 1976 are hereby repealed. PASSED AND ADOPTED at a continued regular meeting of the Town Council of the Town of Los Gatos held on the 16th day of May 1978, by the following vote: AYES: COUNCIL MEMBERS Ruth Cannon, Thomas J. Ferrito, John B. Lochner, Peter W. Siemens and Mardi Gualtieri NOES: COUNCIL MEMBERS None ABSTAIN: COUNCIL MEMBERS None ABSENT: COUNCIL MEMBERS None SIGNED: hia)/l,', XU-6AlA; ATTEST: \` CLERK &V T TOWN OF LOS GATOS (S�