Attachment 4 - Exhibit 11L: 1
BKF
April 18, 2013
Town of Los Gatos
110 E. Main Street
Los Gatos, CA 95030
Subject: Albright Office Park, Los Gatos
Dear Town Staff,
The purpose of this letter is to state that the story pole lifts (cherry pickers) shown on the
attached exhibits have been field surveyed for locations and elevations by BKF Engineers on
April 12, 2013.
The inspection and survey was performed under the direction of the undersigned.
Sincerely,
BKF Engineers
Jacob Nguyen, PE
Associate
1650 Technology Drive, Suite 650
San Jose, CA 95110
408.467.9100
408.467.9199 (fax)
PROPERTY UNE
z
ELEVATION
GROUND: 288.0
TOP OF FENCE: 353.0
TOP OF BLDG: 353.00
BLDG. 4 FFE: 288.00
ELEVATION
PAVEMENT: 286.3
TOP OF FENCE: 353.0
TOP OF BLDG: 353.00
BLDG. 4 FFE: 288.00
GRAPHIC SCALE
(m F6sr1
Lech 10 R
PROER)
UNE
Albright Office Park Exhibit
Winchester Boulevard, Los Gatos, CA
ELEVATION
GROUND: 284.9
TOP OF FENCE: 351.0
-TOP OF BLDG: 350.50
BLDG. 3 FFE: 285.50
PROPERTY LINE
EXISTING BUILDING AREA �9
14600 WINCHESTER BLVD. 53,297 SF.
90 ALBRIGHT WAY 15,600 SF. Gi
100 ALBRIGHT WAY 25,153 SF.
101 ALBRIGHT WAY 22,363 SF.
120 ALBRIGHT WAY 24,912 SF.
121 ALBRIGHT WAY 17,472 SF.
131 ALBRIGHT WAY 22,464 SF.
141 ALBRIGHT WAY 22,750 SF.
151 ALBRIGHT WAY 34,000 SF.
'60A_LBRIGHT WAY 13,185 SF.
TOTAL 251,196 SF.
rill Big
ENOI 4RS • 501e0O1S • MOMS
1650 RTNNOLOCT DRM1£
UM 650
SAN JOSE. CA 95110
10e/1ee-1100
10e/461-9199
CHARTER
OAKS DRIVE
FORM4 ARCHITECTURE. INC.
126 POST STREET, 3RD FLOOR
SAN FRANCISCO. CA 94158
415.775.8798
ELEVATION
PAVEMENT: 271.5
TOP OF FENCE: 308.5
TOP OF BLDG: 308.00
GARAGE FFE: 273.00
Rs CO
PROJECT A 2391.03 I
WINCHESTER BOULEVARD
PROPERTY LINE
ELEVATION
GROUND: 282.0
TOP OF FENCE: 346.0
TOP OF BLDG: 346.00
BLDG. 2 FFE: 281.00
ALBRIGHT WAY
Farm4
Stamp:
0 Dale Issue
ELEVATION
GROUND: 278.5
TOP OF FENCE: 344.5
TOP OF BLDG: 344.50
BLDG. 1 FFE: 279.50
ELEVATION
GROUND: 275.0
TOP OF FENCE: 344.5
TOP OF BLDG: 344.50
BLDG. 1 FFE: 279.50
N Date Issue
01052013 ICO% SCIEMAI:C DESIGN
Albright Phase 1
Sheet idle
EXISTING
CONDITIONS PLAN
Scale : As 940101
Sheet
No-
C1.0
zi
PROPERTY UNE
ELEVATION -�1 b
GROUND: 288.0
TOP OF FENCE: 353.0
I OP OF BLDG: 353.00
BLDG. 4 FFE: 288.00
•I
•I
'ELEVATION
PAVEMENT: 286.3
TOP OF FENCE: 353.0
TOP OF BLDG: 353.00
BLDG. 4 FFE: 288.00
PRO E
Albright Office Park Exhibit
Winchester Boulevard, Los Gatos, CA
91
PROPERTY UNE
.IBk
9
1650 IEOIN&L000 0915E
SATE 650
SAN JOY, CA 95110
.6/467-e199 (ra11I
WINCHESTER BOULEVARD
PROPERTY UNE
�00r00I11Q000001.000li! !0''(
[ELEVATION
GROUND: 282.0
TOP OF FENCE: 346.0
'TOP OF BLDG: 346.00
BLDG. 2 FFE 281.00
ELEVATION _
GROUND: 284.9
TOP OF FENCE: 351.0
TOP OF BLDG: 350.50
BLDG. 3 FFE: 285.50
-o
CHARTER
OAKS DRIVE
FORM4 ARCHITECTURE. INC. PROJECT R 2391.03
128 POST STREET. 3RD FLOOR
SAN FRANCISCO. CA 94108
415.775.8748
aim
flk
ELEVATION
PAVEMENT: 271.5
TOP OF FENCE: 308.5
TOP OF BLDG: 308.00
GARAGE FFE: 273.00
10000 ri0ill 010010 0 0
M Date Issue
00
ft
+0100�9��Qfrll��;i1811i%�
ELEVATION
GROUND: 278.5
TOP OF FENCE: 344.5 ' l•
TOP OF BLDG: 344.50
BLDG. 1 FFE: 279.50
ELEVATION
GROUND: 275.0
TOP OF FENCE: 344.5
TOP OF BLDG: 344.50
BLDG. 1 FFE: 279.50
0.
N Date Issue
03-05-2013 100% SCIEMRTIC DESIGII
GRAPHIC SCALE
(a inn1
1 Web • 40 ft.
Albright Phase 1
STATE HIGHWAY 85
Sheet TNe OVERALL SITE PLAN
Scale A5 slum
Sheet
Na:
C3.0