Loading...
2005-137 - Authorizing The Town Manager/Executive Director To Execute A Professional Services Agreement With Bkf Engineers To Provide Engineering Design Support Services For Project 04 -63 - Main Street Resurfacing And Streetscape ImprovementsRESOLUTION 2005 -137 RESOLUTION OF THE TOWN COUNCIL /REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS AUTHORIZING THE TOWN MANAGER/EXECUTIVE DIRECTOR TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH BKF ENGINEERS TO PROVIDE ENGINEERING DESIGN SUPPORT SERVICES FOR PROJECT 04 -63 - MAIN STREET RESURFACING AND STREETSCAPE IMPROVEMENTS WHEREAS, on June 6, 2005, the Town Council /Redevelopment Agency of the Town of Los Gatos adopted its budget for the period 2005 -2006; and WHEREAS, the budget includes funding for the Main Street Resurfacing and Streetscape Improvements; and WHEREAS, it is necessary for the Council /Redevelopment Agency to secure professional engineering design assistance for the Main Street Resurfacing and Streetscape Improvement Project; and WHEREAS, the Town Council /Redevelopment Agency has selected the firm of BKF Engineers to provide the necessary professional engineering assistance for the design of the Main Street Resurfacing and Streetscape Improvement Project. NOW, THEREFORE, IT IS RESOLVED that the Town Council /Redevelopment Agency of the Town of Los Gatos hereby approves the attached Agreement (Exhibit A) for Professional Design Services with BKF Engineers in connection with the Main Street Resurfacing Project at a cost not to exceed $75,464.00. BE IT FURTHER RESOLVED that the Town Manager /Executive Director is hereby authorized and directed to execute said agreement on behalf of the Council. PASSED AND ADOPTED at a regular meeting of the Town Council /Redevelopment Agency of the Town of Los Gatos, California, held on the 19th day of December, 2005 by the following vote: COUNCIL /AGENCY MEMBERS AYES: Steve Glickman, Joe Pirzynski, Barbara Spector, Mike Wasserman, Mayor Diane McNutt. NAYS: None ABSENT: None ABSTAIN: None SIGNED: ,Dl 8MPk MAYOR/CHAIR OF THE REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: CLERK ADM ISTRATOWSECRETARY OF THE REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Ae,Q: oss, ( AGREEMENT FOR ENGINEERING DESIGN CONSULTANT SERVICES THIS AGREEMENT is entered into this day of , 2005, by and between the Town of Los Gatos Redevelopment Agency, State of California, herein called the "Town/Agency ", and BKF Engineers, engaged in providing Engineering Design consulting services herein called the "Consultant ". RECITALS A. The Town/Agency is considering undertaking activities in connection with Project 04- 63 - Main Street Resurfacing and Streetscape Improvements. B. The Town/Agency desires to engage an engineering design consultant to provide consulting services in conjunction with the Main Street Resurfacing and Streetscape Improvements, because of Consultant's experience and qualifications to perform the desired work. C. The Consultant represents and affirms that it is qualified and willing to perform the desired work pursuant to this Agreement. AGREEMENTS NOW, THEREFORE, THE PARTIES HERETO AGREE AS FOLLOWS: i. Scope of Services The Consultant shall provide engineering design services as outlined in the attached proposal. ii. Time of Performance. The services of the Consultant are to commence upon the execution of this Agreement and issuance of a Town purchase order, with completion of the project by December, 2006. iii. Compliance with Laws The Consultant shall comply with all applicable laws, codes, ordinances, and regulations of governing federal, state and local laws. Consultant represents and warrants to Town/Agency that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant represents and warrants to Town/Agency that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, and approvals which are legally required for Consultant to practice its profession. Consultant shall maintain a Town of Los Gatos business license pursuant to Chapter 14 of the Code of the Town of Los Gatos. Exhibit A iv. Sole Responsibility Consultant shall be responsible for employing or engaging all persons necessary to perform the services under this Agreement. V. Information/Report Handling All documents furnished to Consultant by the Town/Agency and all reports and supportive data prepared by the Consultant under this Agreement are the Town's property and shall be delivered to the Town upon the completion of Consultant's services or at the Town's written request. All reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of its services pursuant to this Agreement are confidential until released by the Town to the public, and the Consultant shall not make any of the these documents or information available to any individual or organization not employed by the Consultant or the Town without the written consent of the Town before such release. The Town acknowledges that the reports to be prepared by the Consultant pursuant to this Agreement are for the purpose of evaluating a defined project, and Town's use of the information contained in the reports prepared by the Consultant in connection with other projects shall be solely at Town's risk, unless Consultant expressly consents to such use in writing. Town further agrees that it will not appropriate any methodology or technique of Consultant which is and has been confirmed in writing by Consultant to be a trade secret of Consultant. vi. Compensation Compensation for Consultant's professional services shall not exceed $75,464.00, and payment shall be based upon Town approval of each task. Billing shall be accompanied by a detailed explanation of the work performed by whom at what rate and on what date. Also, plans, specifications, documents or other pertinent materials shall be submitted for Town review, even if only in partial or draft form. Payment shall be net thirty (30) days. All invoices and statements to the Town shall reference the Town's purchase order number and be addressed as follows: Invoices: Town of Los Gatos Attn: Accounts Payable P.O. Box 655 Los Gatos, CA 95031 Statements Town of Los Gatos Attn: Finance Department P.O. Box 655 Los Gatos, CA 95031 vii. Availability of Records Consultant shall maintain the records supporting this billing for not less than three years following completion of the work under this Agreement. Consultant shall make these records available to authorized personnel of the Town at the Consultant's offices during business hours upon written request of the Town. viii Project Manager The Project Manager for the Consultant for the work under this Agreement shall be Natalina Bernardi. ix. Assignability and Subcontracting The services to be performed under this Agreement are unique and personal to the Consultant. No portion of these services shall be assigned or subcontracted without the written consent of the Town. X. To Town: Notices Any notice required to be given shall be deemed to be duly and properly given if mailed postage prepaid, and addressed to: John E. Curtis, P. E. Director of Parks and Public Works 41 Miles Avenue Los Gatos, CA 95030 To Consultant: Natalina Bernardi, P. E. Principal/Vice President 981 Ridder Park Drive San Jose, CA 95131 -2305 or personally delivered to Consultant to such address or such other address as Consultant designates in writing to Town. xi. Independent Contractor It is understood that the Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and not an agent or employee of the Town. As an independent contractor he /she shall not obtain any rights to retirement benefits or other benefits which accrue to Town employee(s). With prior written consent, the Consultant may perform some obligations under this Agreement by subcontracting, but may not delegate ultimate responsibility for performance or assign or transfer interests under this Agreement. Consultant agrees to testify in any litigation brought regarding the subject of the work to be performed under this Agreement. Consultant shall be compensated for its costs and expenses in preparing for, traveling to, and testifying in such matters at its then current hourly rates of compensation, unless such litigation is brought by Consultant or is based on allegations of Consultant's negligent performance or wrongdoing. xii. Conflict of Interest Consultant understands that its professional responsibilities is solely to the Town. The Consultant has and shall not obtain any holding or interest within the Town of Los Gatos. Consultant has no business holdings or agreements with any individual member of the Staff or management of the Town or its representatives nor shall it enter into any such holdings or agreements. In addition, Consultant warrants that it does not presently and shall not acquire any direct or indirect interest adverse to those of the Town in the subject of this Agreement, and it shall immediately disassociate itself from such an interest should it discover it has done so and shall, at the Town's sole discretion, divest itself of such interest. Consultant shall not knowingly and shall take reasonable steps to ensure that it does not employ a person having such an interest in this performance of this Agreement. If after employment of a person, Consultant discovers it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant shall promptly notify Town of this employment relationship, and shall, at the Town's sole discretion, sever any such employment relationship. xiii. Equal Employment OpportunitX Consultant warrants that it is an equal opportunity employer and shall comply with applicable regulations governing equal employment opportunity. Neither Consultant nor its subcontractors do and neither shall discriminate against persons employed or seeking employment with them on the basis of age, sex, color, race, marital status, sexual orientation, ancestry, physical or mental disability, national origin, religion, or medical condition, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment & Housing Act. xiv. Insurance A. Minimum Scope of Insurance: Consultant agrees to have and maintain, for the duration of the contract, General Liability insurance policies insuring him/her and his /her firm to an amount not less than: one million dollars ($1,000,000) combined single limit per occurrence for bodily injury, personal injury and property damage. ii. Consultant agrees to have and maintain for the duration of the contract, an Automobile Liability insurance policy ensuring him /her and his /her staff to an amount not less than one million dollars ($1,000,000) combined single limit per accident for bodily injury and property damage. iii. Consultant shall provide to the Town all certificates of insurance, with original endorsements effecting coverage. Consultant agrees that all certificates and endorsements are to be received and approved by the Town before work commences. iv. Consultant agrees to have and maintain, for the duration of the contract, professional liability insurance in amounts not less than $1,000,000 which is sufficient to insure Consultant for professional errors or omissions in the performance of the part icular scope of work under this agreement. B. General Liability: i. The Town, its officers, officials, employees and volunteers are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of Consultant, premises owned or used by the Consultant. This requirement does not apply to the professional liability insurance required for professional errors and omissions. ii. The Consultant's insurance coverage shall be primary insurance as respects the Town, its officers, officials, employees and volunteers. Any insurance or self - insurances maintained by the Town, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. iii. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Town, its officers, officials, employees or volunteers. iv. The Consultant's insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the limits of the insurer's liability. C. All Coverages: Each insurance policy required in this item shall be endorsed to state that coverage shall not be suspended, voided, cancelled, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the Town. current certification of such insurance shall be kept on file at all times during the term of this agreement with the Clerk Administrator. D. In addition to these policies, Consultant shall have and maintain Workers' Compensation insurance as required by California law and shall provide evidence of such policy to the Town before beginning services under this Agreement. Further, Consultant shall ensure that all subcontractors employed by Consultant provide the required Workers' Compensation insurance for their respective employees. xv. Indemnification The Consultant shall save, keep and hold harmless indemnify and defend the Town its officers, agent, employees and volunteers from all damages, liabilities, penalties, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property or personal injury received by reason of, or in the course of performing work which may be occasioned by a willful or negligent act or omissions of the Consultant, or any of the Consultant's officers, employees, or agents or any subconsultant. xvi. Waiver No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder, nor does waiver of a breach or default under this Agreement constitute a continuing waiver of a subsequent breach of the same or any other provision of this Agreement. xvii. Governing Law This Agreement, regardless of where executed, shall be governed by and construed to the laws of the State of California. Venue for any action regarding this Agreement shall be in the Superior Court of the County of Santa Clara. xviii. Termination of Agreement The Town and the Consultant shall have the right to terminate this agreement with or without cause by giving not less than 15 days written notice of termination. In the event of termination, the Consultant shall deliver to the Town all plans, files, documents and reports performed to date by the Consultant. In the event of such termination, Town shall pay Consultant an amount that bears the same ratio to the maximum contract price as the work delivered to the Town bears to completed services contemplated under this Agreement pursuant to (Exhibit A) hereto, unless such termination is made for cause, in which event, compensation, if any, shall be adjusted in light of the particular facts and circumstances involved in such termination. xvx. Amendment No modification, waiver, mutual termination, or amendment of this Agreement is effective unless made in writing and signed by the Town and the Consultant. xx. Disputes In any dispute over any aspect of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, including costs of appeal. xxi.. Entire Agreement This Agreement (Exhibit A), including (Exhibit B) attached hereto, constitutes the complete and exclusive statement of the Agreement between the Town/Agency and Consultant. No terms, conditions, understandings or agreements purporting to modify or vary this Agreement, unless hereafter made in writing and signed by the party to be bound, shall be binding on either party. IN WITNESS WHEREOF, the Town of Los Gatos Redevelopment Agency and Consultant have executed this Agreement as of the date indicated on page one (1). Town of Los Gatos, by: By: BKF Engineers 981 Rider Park Drive - Suite 100 5960 San Jose, CA 95131 -2305 Debra J. Figone, Town Manager /Executive Director of the Town of Los Gatos Recommended by: John E. Curtis Director of Parks and Public Works Approved as to Form: Orry P. Korb, Town Attorney /General Counsel ATTEST: (Signature) (Print Name) Marlyn Rasmussen, Clerk Administrator/ Secretary of the Redevelopment Agency 1®1 moms BKF ENGINEERS SURVEYORS PLANNERS November 15, 2005 Job # 20056132 -PP Mr. Kevin Rohani Town Engineer Town of Los Gatos Parks and Public Works Department 41 Miles Avenue Los Gatos, CA 95031 Subject: Town of Los Gatos Downtown Street Improvements Main Street Streetscape Project Between Santa Cruz Avenue and Alpine Avenue Proposal for Engineering and Surveying Services Dear Mr. Rohani: BKF Engineers is pleased to present our revised fee proposal for preparing plans. specifications and cost estimates for the Main Street Streetscape Project. Our revised fee proposal is based on information you have provided in response to our November 4, 2005 Proposal for Preparation of Plans, Specifications and Estimate for the Main Street Streetscape Project. We understand this is the final phase of the Town of Los Gatos Downtown Street Improvement Program. This final phase would roughly correspond to the following: Task 1 — "reli iinary Determinations Data Collection and Base Sheet Preparation The preliminary determination, data collection and base sheet preparation task of the project is a vital project phase which will facilitate and accelerate the course of the overall project. Given that the streetscape /sidewalk signalized intersection, and AC overlay improvements are dictated by existing conditions such as grades. utility conflicts, and conform locations, it is important that available record information as well as supplemental topographic survey information is gathered at an early stage, assessed, and implemented into the base sheet drawings to expedite design development. Following a kick -off meeting with the Town to confirm project objectives, BKF shall embark on requesting and collecting all available record and as -built 981 Ridder Park Drive information, including right of way, roadway, traffic signal, and utility Suite soo information. To supplement the available existing record data and as -built San lose information, as well as the aerial planimetric mapping (based on converting the California 95131 -2305 phone 4o8.467.9100 Exhibit B I, o8.467.9 . .. I.. available survey control and aerial photogranuTietric base mapping coverage from the 2002 Santa Cruz Avenue Streetscape Pro j ject), BKF shall conduct up to 2 clays of topographic survey to establish existing vertical criteria of adjacent storefronts /doorways, utilities, sidewalks, curb & gutter (TC, FL, and Lip), SS /SD structures, roadway crown/grade breaks, signalized intersection equipment and conform areas. Concurrent with reviewing the available traffic signal record information and the supplemental topographic survey, BKF shall meet with the Town's Traffic Engineer and field - investigate the signalized intersections at Santa Cruz Avenue and University Avenue to verify existing traffic signal equipment & appurtenances and their ability /capacity to be readily converted to video detection. Following these efforts, BKF will assess and consolidate the gathered information and develop Project Base Sheets at a 1" = 20' scale. Project base sheets shall include existing utility, aerial /topo, and signalized intersection base sheets. Task 2 — Design (65% Construction Documents) BKF's main goal of Task 2 is to establish limits of concrete reconstruction and proposed improvements. The accurate identification and development of the project's baseline or geometries will facilitate development of the 65% construction documents, as well as expedite fixture submittals. In identification of the concrete reconstruction and proposed improvements, BKF will establish Villa Hermosa sidewalk limits, standard sidewalk limits, bulbout configurations, tree well /grate sizes and locations, driveway replacement details, AC Overlay limits, and signalized intersection equipment relocations. Following the establishment of the project's baseline geometries and limits of proposed improvements, BKF will dive into developing 65 % construction documents. Similar to the Santa Cruz Avenue Beautification Project, BKF will prepare plan sheets for title, demolition, construction detail, Villa Hermosa sidewalk detail, stage construction, pavement delineation, and traffic signal. The construction detail sheets will address geometric layout, grading, and utilities whereas the Villa Hermosa sidewalk detail sheets will cover exact layout /dimensioning and details of the brick pattern, scoring pattern, expansion joints, and conform joints for the specialized sidewalk treatment. Street lighting design services will begin during this task. Street Lighting will be based on placing 6 Sternberg Teardrop Fixtures between Santa Cruz Avenue and Route 17 Bridge at 200' spacing (3 on either side). Our electrical subconsultant, AEC. Engineers, will coordinate the location of these fixtures with BKF's baseline geometrics and begin detailing the connections and opportunities ( electrical source to facilitate the Main Street lighting system. Through previous projects with the Town of Los Gatos (Santa Cruz Avenue Streetscape and Pavement Rehabilitation) and similar strectscape projects around the San Francisco Bay Area in downtown, built -out areas, BKF has determined that stage construction of the project improvements, including project phasing and traffic handling for vehicles, pedestrians, bicycles, and delivery vehicles, has become a critical design and public relations issue. In order to minimize the impacts during construction to the public, including businesses, residences, and the general community, BKF will attend and participate with the Town in a community /business notification meeting. The goal and outcome of this meeting is to poll the public and implement and mitigate their input, comments, and concerns in the construction documents. All components of the design plans, specifications and estimate will be included during the 65% phase. At this point in the project development process, the emphasis becomes design and production oriented. All project sheets, which will be represented in the bid documents, will be identified and developed in varying degrees of detail during this phase. Having a complete set of plan sheets facilitates the preparation of construction details, technical specifications and engineer's cost estimates. Requirements arising through the 65% design phase will be incorporated into the plans, specifications and supporting documents. The technical specifications will carefully be reviewed to ensure that all jurisdictional requirements, utility coordination work and stage construction restrictions have been incorporated. With this complete document packaging is the clear ability to identify conflicting and missing information. This allows us to focus and resolve these issues in a timely manner. BKF's in -house quality assurance and control review for the 65% submittal will include the review of the design package for compliance with jurisdictional standards and completeness. The review will focus on ensuring that the plan elements are clearly delineated. Task 3 — Pre -Final Design (95% Construction Documents) The intent of the pre -final design or 95% construction documents is to incorporate comments, complete the design development phase, and resolve remaining project issues. All the plans, specifications and estimate will be brought to completion. Details will be refined and completed. BKF will attend a comment resolution meeting with the Town staff and focus on resolving and incorporating all design comments resulting from the 65% submittal. In addition to our coordination efforts with the Town, BKF will also attend and participate with the Town in a community /business notification follow - up meeting. A major task associated with document resolution is balancing the requirements and sorting out the needs of the stakeholders, including the Town, utility owners, and community /businesses. All gaps in the design caused by late - coming changes or pending design and policy decisions will be specifically targeted on the 95% construction documents for immediate resolution. During the pre -final design, BKF will prepare and submit Notice to Owner packages to utility companies to notify and coordinate utility relocations with respect to the proposed improvements along Main Street; for this project, it is assumed that utility work would be limited to grade adjustments. Construction details for the project elements will be completed as part of this phase of the design process. During the 95% design phase, BKF's experienced Project Manager will closely monitor the progress of critical activities, which have their own separate and defined timeline. These activities must be integrated into the overall design process. Prior to completion of the 95% construction drawings, the design team will conduct additional field visits. It is crucial that the design engineers are confident that existing conditions are depicted accurately in the bid -ready documents. The design team members are encouraged to perform field visits to verify uncertain features `and to clarify survey data. Assumptions, in lieu of verifications, are not acceptable. Task 4 — Final Design (100% Bid Construction Documents) Upon coordinating with the Town at a final comment resolution meeting, BKF will incorporate or resolve all remaining comments received as a result of the 95% submittal. BKF will confirm that all comments are incorporated. Following a final in -house quality assurance and control of construction documents, all aspects of the design will be finalized in order to prepare a complete set of final and constructible bid documents for advertisement. It is not anticipated that any further design development will occur during this task. The construction specifications, estimate and plans will be updated and formatted to its final form. During this task, BKF will finalize coordination efforts with impacted utility companies for utility relocations (if needed). Notifications for relocations (if needed) will be submitted to utility owners and remaining coordination efforts will be conducted to insure conflicts are mitigated prior to or during construction. Following the submittal of the 100 %, bid construction documents, BKF will attend one final public meeting for Town Council Approval of the Main Street Streetscape Project construction documents. Task 5 — Bid Assistance (Pre -bid Support Services) -BKF will attend a pre -bid meeting and provide bid - assistance support services during the advertisement and pre -bid process. The attached spreadsheet has been organized to follow the above tasks and to further delineate sub - tasks. We believe that the described scope correctly captures all of the work requested and will assist the town in moving forward with the completion of the desired Main Street Streetscape Project. No construction administration work is included in this proposal. The Town Standard Specifications will be utilized along with special provisions to be prepared by BKF. We assume the Town will reproduce the bidding documents for distribution. Should any additional services be requested or required which are not included in our scope of services, these services will be considered extra work and will require and amendment for approval and processing prior to executing any additional work tasks. Please call if you have any questions regarding our revised proposal. Thank you again for the opportunity to work with the Town of Los Gatos. Very truly yours, BKF Engineers, frddC('P.E a lina Bern Pri cipal/ Vice President BKF Engineers 981 Ridder Park Drive San Jose, CA 95131 408.467.9100 (lel), 408.467.9199 (fax) Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Rate /Hr $174 $142 $121 $107 $94 $89 $52 $237 Task 1 FEE SCOPE OFSERVLCESAND TASK BREAKDOWN 16 ,11ain Street Streetscape Project - Town of Los Gatos 21 Proposal for Construction Plans, Specifications and Estimate Task 1 Preliminary Determinations, Data Collection and Base Sheet Preparation Task 2 Design (65% Construction Documents) Task 3 Pre -Final Design (95% Construction Documents) Task 4 Final Design (l00% Bic! Construction Documents) Task 5 Bid Assistance ( Pre -bid Support Services) BKF Engineers 981 Ridder Park Drive San Jose, CA 95131 408.467.9100 (lel), 408.467.9199 (fax) Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Rate /Hr $174 $142 $121 $107 $94 $89 $52 $237 Task 1 5 16 24 21 12 16 0 16 110 $ 14.637 Task 2 10 35 31 23 38 54 10 0 201 $ 21.820 Task 10 28 16 12 26 33 6 0 131 $ 14.629 Task 4 8 31 9 11 15 30 6 0 110 $ 12.452 Task 5 2 5 0 0 0 0 0 0 7 $ 1,058 Subtotal (Hours) 35 115 80 67 91 133 22 16 552 Cost$ $6,090 1 $16,330 1 $9,680 $7,169 $8,554 $11,837 $1,144 $3,792 BKF Professional Fee $ 64,596 Subconsultants AEC Engineers (Electrical Engineers) $ 3,200 Aero- Geodetic (Aerial Base Mapping) $ 2,500 Optional Services Total $ 5,700 Reimbursables Computer /Plotter (4% of Total BKF Professional Fees) $ 2,584 Printing /Delivery (4% of Total BKF Professional Fees) $ 2,584 Reimbursable Fees $ 5,168 Project Fee Total $ 75,464 Notes: 1. Geotechnical Design services are not included. Pavement shall be "grind and replace" or "overlay" as directed by the Town of Los Gatos. 2, Street Lighting Design services are based on placing 6 total Sternberg Teardrop Fixtures between Santa Cruz Avenue and Route 17 Bridge at 200' spacing). 3. Landcape and Irrigation Design services are not included. Proposed tree wells /grates shall be designed and constructed around existing trees. No trees shall be removed and no new trees or irrigation systems are proposed. Consultant shall identify size of tree well /grate. 4. There will be no railroad work involved in this project. 5. Aerial Base Mapping services are based on converting the available survey control and aerial photogrammetric base mapping coverage from the 2002 Santa Cruz Avenue Streetscape Project to an Aerial Planimetric Base Map. 6. Construction Administration (Post Bid Award) is excluded from this Fee Scope of Services and Task Breakdown. 7. Structural design, including any work required for basement /substructure retrofitting associated with the replacement of sidewalk, is excluded from the Fee Scope of Services and Task Breakdown. 8, Per Town direction, it is assumed that consultant will participate in 3 public meetings (Council and /or Community /Business). 9. An additional 3 meetings with Town of Los Gatos Staff have been assumed for project coordination /development purposes. 10.The Fee Scope of Services excludes the incorporation of site furniture and other architectural components. Page 1of 3 11/15/2005 i asK I vrenminary ueterminauons, uata touecuon ana base meet vreparauon Task 11 Attend Project Meeting with Town of Los Gatos Staff to Confirm Project Objectives Task 1.2 Request /Collect Record Drawing (As- Built) Information Task 2.2 Including Signalized Intersections at W. Main St /Santa Cruz Ave and W. Main St /University Ave Task 1.3 Request /Collect Right of Way Record Map Information Task 1.4 Request /Collect Utility Record Information Task 1.5 Conduct Topo Survey to Supplement Aerial Planimetric Drawing (Survey Coverage to Include Store- 1 front Conforms, Utilities, SS /SD Structures, TC, FL, Lip and Roadway Crown /Grade Breaks) Task 1.6 Review Available /Collected Record Information and Develop Project Base Sheets at 1 " =20' (Including Task 2.6 Aerial Planimetrics, Supplemental Topo Survey, Utility Record Information, Right of Way Record Information, and Roadway Record Information Task 1.7 Review Available /Collected Traffic Signal Record Information, Field Verify Existing Traffic Signal Task 2.8 Equipment, and Prepare Traffic Signal Base Sheet Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Task 1.1 2 2 Staging Task 2.2 Establish Limits of Concrete Reconstruction and Proposed Improvements, Including Villa Hermosa Sidewalk, Regular Concrete Sidewalk, Curb Ramps, Tree Grates, Bulbout, Curb & Gutter, Driveway, 4 $ 632 Task 1.2 Prepare Title Sheet 1 Prepare Demolition Plans 1 1 Task 2.6 Prepare Villa Hermosa Sidewalk Detail Plans (Including Layout of Brick Bands, Scoring, and Joint 3 $ 343 Task 1.3 Task 2.8 1 Task 2.9 1 1 of W. Main St /Santa Cruz Ave and Full Video Detection Signal Modification at W, Main St /University Ave) Task 2.10 Prepare Contract Specifications (Technical Specifications) 3 $ 343 Task 1,4 Conduct Complete In -House Quality Assurance and Control of Construction Documents 1 Package and Submit 65% Construction Documents to Town of Los Gatos 1 1 8 3 $ 343 Task 1.5 1 4 4 10 8 8 16 35 $ 6,088 Task 1.6 1 2 4 4 4 8 23 $ 2,458 Task 1.7 1 5 16 4 5 8 39 $ 4,430 Suhtotal (Hoursl 5 16 24 21 12 16 0 16 110 $ 14.637 I ask 2 uesign (tsb% GOnstruction u ocum e n tsr Task 2.1 Attend Community /Business Notification Meeting for Coordination of Design, Construction, and Staging Task 2.2 Establish Limits of Concrete Reconstruction and Proposed Improvements, Including Villa Hermosa Sidewalk, Regular Concrete Sidewalk, Curb Ramps, Tree Grates, Bulbout, Curb & Gutter, Driveway, 4 Traffic Signal Appurtenances, and AC Overlay /Replacement Limits Task 2.3 Prepare Title Sheet Task 2.4 Prepare Demolition Plans Task 2.5 Prepare Construction Detail Plans (Including Layout, Grading, Utilities and Construction Details) Task 2.6 Prepare Villa Hermosa Sidewalk Detail Plans (Including Layout of Brick Bands, Scoring, and Joint and Conform Locations) Task 2.7 Prepare Stage Construction Plans (Including Pedestrian and Vehicular Traffic Handling /Detours) Task 2.8 Prepare Pavement Delineations Plans Task 2.9 Prepare Traffic Signal, Equipment, and Conductors Schedule Plan (For Video Detection of Easterly Leg of W. Main St /Santa Cruz Ave and Full Video Detection Signal Modification at W, Main St /University Ave) Task 2.10 Prepare Contract Specifications (Technical Specifications) Task 2.11 Prepare Construction Cost Estimate Task 2.12 Conduct Complete In -House Quality Assurance and Control of Construction Documents Task 2.13 Package and Submit 65% Construction Documents to Town of Los Gatos Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Task 2.1 2 2 4 $ 632 Task 2.2 1 4 4 4 4 17 $ 1,902 Task 2.3 1 2 3 $ 299 Task 2.4 1 4 4 8 17 $ 1,658 Task 2.5 2 4 4 8 8 8 34 $ 3,720 Task 2.6 1 2 4 4 8 19 $ 2,030 Task 2.7 1 4 4 4 8 21 $ 2,314 Task 2.8 2 4 4 10 $ 1,016 Task 2.9 1 5 18 3 8 8 43 $ 4,847 Task 2.10 2 4 8 14 $ 1,332 Task 2.11 1 2 2 2 7 $ 722 Task 2.12 4 4 $ 568 Task 2.13 2 2 2 2 8 $ 780 iubtotal (Hours) 10 35 31 23 38 54 10 0 201 $ 21,82( Page 2 of 3 Task 3 Fre- l-Inal Design (9!) t;onstrucuon Documents) Task 3.1 Attend Project Meeting with Town of Los Gatos Staff to Coordinate 65% Review Comments Task 3.2 Review, Resolve and Incorporate 65% Review Comments Task 3.3 Prepare Notice to Owners Packages for Utility Verification Task 3.4 Package and Submit 95% Construction Documents to Town of Los Gatos Task 3.5 Attend Community /Business Notification Meeting to Confirm Construction /Staging Objectives Survey Attend Town of Los Gatos Council Meeting for Project Approval TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Task 3.1 2 2 Total Cost Task 4.1 2 2 4 $ 632 Task 3.2 6 22 16 10 24 29 4 0 111 $ 12,219 Task 3.3 4 84 $ 2 2 2 4 $ 366 Task 3.4 2 6 2 650 2 2 4 8 $ 780 Task 3.5 2 2 4 $ 568 Task 4.5 2 4 $ 632 Suhtotnl(Hours) 10 28 1.6 12 26 33 6 0 131 $ 14.629 Task 4 Final Design (100% bia l:onstructlon Documents) Task 4.1 Attend Project Meeting with Town of Los Gatos Staff to Coordinate 95% Review Comments Task 4.2 Review, Resolve and Incorporate 95% Review Comments Task 4.3 Prepare /Coordinate Notice to Relocate Utilities (As Needed) Task 4.4 Conduct Complete In -House Quality Assurance and Control of Construction Documents Task 4.5 Package and Submit 100% Bid Construction Documents to Town of Los Gatos Task 4.6 Attend Town of Los Gatos Council Meeting for Project Approval Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Task 4.1 2 2 4 $ 632 Task 4.2 4 19 9 9 13 26 4 84 $ 9,190 Task 4.3 2 2 2 6 $ 650 Task 4.4 4 4 $ 568 Task 4.5 2 2 2 2 8 $ 780 Task 4.6 2 2 4 $ 632 Siihtntal fHnursl 8 31 9 11 15 30 6 0 110 $ 12.452 i ask 0 tim Assistance trre -Dia support services) Task 5.1 Attend Pre -Bid Meeting Task 5.2 Provide Clarifications and RFIs Survey TASK PIC PM Eng III Eng II Eng I Tech Clerical Crew Total Cost Task 5.1 2 2 4 $ 632 Task 5.2 3 3 $ 426 Subtotal (Hours) 2 5 0 0 0 0 0 0 7 $ 1,051 Page 3 of 3 11/1512005