10 - Attachment 6CDG CANNON DESIGN GROUP August 31, 2011 Mr. Joel Paulson Community Development Department Town of Los Gatos 110 E. Main Street P.O. Box 949) Los Gatos, CA 95031 RE: Albright Netflix Corporate Campus ARCHITECTURE PLANNING URBAN DESIGN Dear Joel: I have worked closely over the past several weeks with Form 4 Architects in the review and refinement of the site plan and buildings design for this project. The project is unique in scale for the Town of Los Gatos, but as the design has progressed, I have felt that it is well conceived and will fit comfortably into the context of this site. The collaboration with the architects has been very open, and they have been responsive to the dialogue and the exploration of alternative solutions when site plan and building design concerns were raised. At this point, I feel that most of the issues that I raised have been adequately addressed and resolved. In a couple of instances where time has not allowed the full resolution of an issue, I have been assured by the architects that they will continue to work on them during the design development phase of the project, and that their client and the end tenant for the campus are in agreement with that continued design refinement. The three issues that are still outstanding and worthy of further study and refinement are as follows: 1. There are two elements on the 5 story Building E west elevation that do not yet seem to be fully resolved. The first is the secondary entry from the front guest parking area. It is not as well integrated into the overall design as the rest of the buildings' details. And, the trellis at the entry, while perhaps reflecting the trellis elements on the upper levels, seems less substantial than the other ground floor design elements. The architects have indicated that they will continue studies on this element. The secondary entry and the resolution of the second floor roof termination at this point are two areas that need further refinement Building E Issues TEL: EMAIL: 180 HARBOR DRIVE 415.331.3795 cdgplan@pacbell.net SUITE 219 FAX: 415.331.3797 SAUSALITO . CA 94965 ATTACHMENT 6 Albright Netflie Corporate Campus Design Review Comments August 31, 2011 Page 2 The second element is the termination of the second level roof adjacent to this secondary entry where it reaches the two-story wall element to the south. In other locations (e.g., at the south end of Building D's west elevation), similar roofs terminate in a building volume rather than hanging out free. This more resolved solution can be seen on the draw- ing at the bottom of this page. As above, the architects have indicated that they will continue exploring alternatives for this roof condition. 2. The last issue relates to a wall condition where the initial proposal seemed to make the frontingwalls in a few locations appear to float free of the structure behind, rather than being a part of the overall building volume - one of the features that make the existing Netflix building seem so substantial and visually balanced. The architects' goal is to give the structure a more contemporary feel. We have discussed this, and the architects have studied a simple change of matching the return wall color to the front wall, rather than contrasting it with a lighter color as shown in the application drawing below. No change in the basic design is required. This seems to me to be a preferable solution. Wall appears to b floating and not as desirable as the alternative studied by the architects Floating Wall Issue Changing the wall color seems like a better solution for this wall condition Floating Wall Issue - Architects' Alternative Study CANNON DESIGN GROUP 180 HARBOR DRIVE . SUITE 219 . SAUSALITO . CA 94965 Albright Netflix Corporate Campus Design Review Comments August 31, 2011 Page 3 Apart from these minor issues which can be resolved in the future, I have no other issues with the design as proposed. Joel, please let me know if you have any questions, or if there are specific issues of concern that I did not address. Sincerely, CANNON DESIGN GROUP Larry Cannon AICP CANNON DESIGN GROUP 180 HARBOR DRIVE . SUITE 219 . SAUSALITO . CA 94965 THIS PAGE INTENTIONALLY LEFT BLANK