2011060604 - Norcal Concrete - Curb, Gutter, and Sidewalk ReplacementMEETING DATE: 6/6/11 ITEM NO: 1 i COUNCIL AGENDA REPORT DATE: MAY 25, 2011 TO: MAYOR AND TOWN COUNCIL FROM: GREG LARSON, TOWN MANAGER SUBJECT: PPW JOB NO. 10-08 — FY 2010/11 CURB, GUTTER AND SIDEWALK REPLACEMENT PROJECT 411-813-9921 A. AUTHORIZE THE TOWN MANAGER TO EXECUTE A CONSTRUCTION CONTRACT WITH NOR -CAL CONCRETE COMPANY IN AN AMOUNT NOT TO EXCEED $223,072. B. AUTHORIZE STAFF TO EXECUTE FUTURE CHANGE ORDERS TO THE CONSTRUCTION CONTRACT AS NECESSARY IN AN AMOUNT NOT TO EXCEED $25,000. RECOMMENDATION: 1. Authorize the Town Manager to execute a construction contract with Nor -Cal Concrete Company in an amount not to exceed $223,072. 2. Authorize staff to execute future change orders to the construction contract as necessary in an amount not to exceed $25,000. BACKGROUND: The adopted Capital Improvement Program designates funding for curb, gutter, and sidewalk replacement projects. This is consistent with the Town's goals to improve public safety and to improve the quality of Town streets. One of the primary causes of damage to curbs, gutters, and sidewalks is tree root growth. The Town has many mature trees that were planted years ago, and despite their many positive attributes, have outgrown their respective planter areas and their roots continue to cause damage to the Town street infrastructure. Their roots have grown under curbing, sidewalks, and in some PREPARED BY: TODD CAPURSO Director of Parks and Public Works Reviewed by: Assistant Town Manager 118 Town Attorney Clerk Administrator 4c'F ance Community Development N:\PPW\MANAGEMENT\COUNCIL\COUNCIL REPORTS\2011 Reports\June 6\10.08.curb.gutter.sidewalk.award.docx PAGE 2 MAY 25, 2011 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 10-08 — FY 2010/11 CURB, GUTTER AND SIDEWALK REPLACEMENT PROJECT 411-813-9921 BACKGROUND (cont'd): cases, under the roadway, causing uplifts and extensive damage, which result in uneven surfaces and present safety concerns. DISCUSSION: At the May 2, 2011, Town Council meeting, the Council approved plans and specifications for this project and authorized staff to advertise the project for bids. This project will repair and replace damaged curbs, gutters and sidewalks throughout the Town. Locations for repair and replacement work were identified over the past year by the Parks and Public Works Department staff and were also determined by service calls the Town received from residents. In conjunction with the replacement of hazardous and damaged concrete, tree roots will be pruned and root barriers placed to minimize further damage to new curbs, gutters and sidewalks. On May 25, 2011, five bids were received for this project (Attachment 1). Staff reviewed the five bids received and determined that Nor -Cal Concrete Company is the most responsible entity and is most responsive to the Town's formal bid process. Staff recommends the Town Council award the construction contract to Nor -Cal Concrete Company. Staff also would recommend the Town Council approve a contingency amount of $25,000 for this contract. CONCLUSION: Staff recommends that the Town Council authorize the Town Manager to execute a construction contract in an amount not to exceed $223,072. Additionally, due to the variables associated with this particular type of construction and unforeseen circumstances during the course of construction, it is further recommended that the Town Council authorize staff to execute future change orders to the construction contract, as necessary, in an amount not to exceed $25,000 for additional quantities of work that may exceed those included in the contract. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301c). A Notice of Exemption will not be filed. PAGE 3 MAY 25, 2011 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. 10-08 — FY 2010/11 CURB, GUTTER AND SIDEWALK REPLACEMENT PROJECT 411-813-9921 FISCAL IMPACT: There are sufficient funds for this project as demonstrated in the table. Available] Budhet' FY2010/11 Fiscal Impact 411-813-9921 TOTALS ?Construction `Contingency TOTALS Attachments: 1. Bid Summary _tended/:::. Encumbered Funding ! To Date_._. $ 278,035 I $ 278,035 Proposed Contract Amount $ 248,072 248,072 25,000 248,072 1 THIS PAGE INTENTIONALLY LEFT BLANK ATTACHMENT 1 Nor -Cal Concrete Co. P.O. Box 521 Suisun, CA 94585 0 C.) N I 1,287.00 I I 7,319.00 000000 Vo aomoom-8 �omi pp O (O O. 0 DO d'�M`-V'� 01 O NQ 19,800.00 I 2,400.00 00 p0, p01t V.- iN'i NMO 0' ui r N7 '~ CIinr-Soo$Oa,og.u,00 �OM88 m 881`Om§ND IOO Wattis Construction Co. 964 Stockton Avenue San Jose, CA 95110 'rq p 00 O N `- O (n N 190,190.00 10,070.00 7,482.00 4,697.00 5,100.00 1,150.00 11,270.00 17,550.00 21,060.00 7,080.00 00 0 0 • cO co co.0 i 16,875.00 O 0U 0) In N VI O� N°6 52.25 50.35 f00,o. ^^O it) O .0000 47 N,- 000 If?IOO 0 0 0 10.20 2,340.00 225.00 CB Construction Co. 641 University Ave. Los Gatos, CA 95032 p b '{`, Q 1 Vco I 936.00 12,273.40 160,160.00 8,800.00 O co0 0 0 oro m 4,000.00 300.00 6,900.00 7,000.00 9,600.00 1,500.00 00'000` L 00'0E9 N ` V fV 2 N 00 0 0I 0 44.00 44.00 0000p0 0 pq 4V'VE3eN-2- co O pp 1,600.00 250.00 000 MNr JJR Construction Co. 1120 Ninth Avenue San Mateo, CA 94402 p °Cyr ` O D I 198,016.00 10,880.00 10,150.00 5,490.00 0 0 N 7,676.25 12,000.00 9,000.00 3,600.00 900.00 4,000.00 0 O O (• N va"+. 20.00 8.65 54.40 54.40 70.00 90.00 q0 N O 13.35 2,400.00 O 0•0 LOO 0 00-000` 1 00'S 0 N RP Engr. Construction Co. 2 North Santa Cruz Ave. Suite 209 Los Gatos, CA 95030 pcc! U y� • o pp,� 0 1`. 140,140.00 9,140.00 ON 1� i ce. -' co VOV 00 O 0 u 0 MI° 7,187.50 18,000.00 21,600.00 2,100.00 918.00 2,300.00 8,550.00 233,750.40 1 �".. d' V 0)0 38.50 45.70 28.60 45.70 35.70 250.00 o N o (V0 C') 3,600.00 350.00 5.10 575.00 0 V dEN to irs m C 1 _ ;. 0 k O 000.00. oc�o `Do� 'too o i; = I4 500 00 f4 .180 OOr5 IFY a00 00S 14. ; I =:00 006 94;MII -- O0 oe. 900 00 4480000 4`-' s O -c <;, O' o. r CD e N V x� Pi 'oo 0000Op00000 NDNoN00oa0AV oo.0oo0'00008000 p N, 0oo0 LL(L ...i(!)1.11 IL IL _IJ LLU- JJJ LL¢LL W COli W <<L.L al 1 a �(.(900(�p_N SON to (0 (O (O OW V'h Iltem No. JDescription Y Y to co R&R Rolled Curb (Aft Type) R&R Rolled Curb (Town Std.) R&R Vertical Curb (Town Std.) R&R Valley Gutter New Rolled Curb (Town Std.) Curb Transition (Town Std.) R&R Driveway Apron R&R Inlet R&R Inlet with Hood R&R Inlet Apron Demo. Concrete Tree removal W m o - m TOTAL' N 007 tO tO 1� 00 O)° 0 <o THIS PAGE INTENTIONALLY LEFT BLANK