Loading...
2010-035-PPW Job 09-06 Library - Agreement With Verizon Telephone Co.RESOLUTION 2010-035 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AUTHORIZING THE TOWN MANAGER/EXECUTIVE DIRECTOR TO EXECUTE A PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES AGREEMENT WITH VERIZON TELEPHONE COMPANY TO PROVIDE TELEPHONE SERVICES FOR PPW JOB NO. 09-06 -LOS GATOS LIBRARY PROJECT WHEREAS, the 2009-10 Capital Improvement Program budget includes funding for the for PPW Job No.09-06 Los Gatos Library Project; and WHEREAS, telephone service is .needed for this project; and WHEREAS, aerial and underground telephone facilities has to be relocated around the site of new Library; and WHEREAS, it is necessary for the Town Council/Redevelopment Agency to secure the services of Verizon Telephone Company to provide design and construction service for the Los Gatos Library Project. NOW, THEREFORE, BE IT RESOLVED that the Town Council/Redevelopment Agency of the Town of Los Gatos .hereby approves the attached Agreement (Exhibit A) with Verizon Telephone Company to provide design and construction services in connection with the Los Gatos Library Project in an amount not to exceed $102,977.02. BE IT FURTHER RESOLVED that the Town Manager/Executive Director is hereby authorized and directed to execute said agreement on behalf of the Town Council/Redevelopment Agency. PASSED AND ADOPTED at a regular meeting of the Town Council/Redevelopment Agency of the Town of Los Gatos, California, held on the 5th day of April, 2010 by the following vote: COUNCIL/AGENCY MEMBERS AYES: Joe Pirzynski, Steve Rice, Barbara Spector, Mile Wasserman, Mayor Diane McNutt NAYS: ABSENT: ABSTAIN: SIGNED.: MAYOR/CHAIR OF THE REDEVELOPMENT AGENCY TOWN OF LOS GATOS ATT T; r ~.:, \ • '~s~ \~ SEC ~~ A~ OF THE REDEVELOPMENT AGENCY TOWN OF LOS GATOS I;XT-IT13IT A ~r~ ~.~ ~~® t5 Monteballo Way l_os Gatos, GA 95030 March 4, 2010 Town of Los Gatos Attn; ~i<evin .Rohani, P.E. 41 Miles Avenue P. 0. Box 949 Los Gatos, CA :95031 SUBJECT: AERIAL TO UNDERGROUND -LOS GATOS LIBRARY 100 VILLA AVENUE VERIZON WORK ORDER # 0925-~BPOAOAX Dear Mr. Rohani: The estimated cost of the work you have requested from Verizon is $102,977.02. As stated, this Fgure is an estimate and only covers the costs for aerial to underground. Your agreement with Verizon is to pay for the actual cost of the work, which may be greater or less than the estimated cost listed above. If the actual cost is greater than the estimated cost, you will be billed the additional charges. If the actual cost is less than the estimated cost, you will receive a refund. Description of scope of work: The request of work shall entail the relocation of underground and aerial cables as well as the relocation of a Verizon cross-connect box. Performance of this task shall require Verizon to place .and splice underground cables in~Tawn to provided conduit to a new cross-connect panel. The existing commercial and residential services in the area will be transferred to 'the new cross-connect panel. During our performance of the requested work, an additional advance payment could be required should you alter the scope of work, take other action which would cause us to incur additional costs, or If we encounter unforeseen events or obstructions, Please indicate your acceptance by returning. a signed copy of this letter along with a check for $102,977.02. Make the check payable to Verizon California Incorporated. Please indicate Verizon Work Qrder #0925•BAOAOAX. Upon receipt of your signed agreement and payment, your work order will be completed and released to our Construction Department far scheduling. March 4, 2010 Tawn of Laos Gatos Page 2 Verizon will attempt to complete the work for which it is responsible under this agreement within 90 days after receipt of payment and a fully executed copy of this agreement letter. However, no damages or other liability shall accrue against Verizon in favor of the Customer if the work is not completed within said period due to Verizon's action or the action of other utilities, agencies, or other companies, which may have become involved in this project. The costs and engineering specii'ICations will be null and void if this letter is not signed and returned within 30 days from this date or if customer requests a new engineering study. Any questions regarding the work can be directed to me at 408-354-6374, Darryl vanMaanen Engineer -Network Engineering Concurred: Customer signature 2, Date Verizon signature