Loading...
2004-104-Accepting Work Of C.B. Construction Company For Project 04-40 Loma Alta Curb Gutter And Sidewalk Construction And Authorizing The Town Manager To Execute Certificate Of Acceptance And NoticeRESOLUTION 2004 -104 RESOLUTION OF THE TOWN COUNCIL OF'THE TOWN OF LOS GATOS APPROVING AN AGREEMENT WITH FEHR & .PEERS ASSOCIATES, INC. TO PERFORM TRAFFIC .ENGINEERING CONSULTANT SERVICES IN THE TOWN OF LOS GATOS ON AN ON-CALL :BASIS WHEREAS, it is necessary for the Council to secure professional consultant services to perform Traffic Engineering Consultant Services in the Town of Los Gatos on an on- call basis; .and WHEREAS, the Town Council has selected the firm of Fehr & Peers Associates, Inc. to provide professional services in .connection with Traffic. Engineering Consultant Services.; and NOW, THEREFORE, IT IS RESOLVED that the Town Council of the Town of Los Gatos hereby approves the attached Agreement (Exhibit A) for Professional Services with Fehr & Peers Associates, Inc.. to provide professional services in connection with Traffic Engineering Consultant Services; and BE IT FURTHER 'RESOLVED that the Town Manager is hereby authorized :and directed to .execute said agreement on behalf of the Council. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on the 16th day of August, 2004, by the following vote.: COUNCIL MEMBERS: AYES.: Sandy Decker, Diane McNutt, Joe Pirzynski, Mike Wasserman., Mayor Steve Glickman. NAYS: None ABSENT: None ABSTAIN: None ~~=~~ SIGNED.: ~~„`."-*-'~' -d---~-° MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: `~ ~(.. CLERK OF THE TOWN OFT S ATO LOS GATOS, CALIFORNIA ,l,i FZ, ~~ ~ ~~ AGREEMENT FOR TRAFFIC ENGINEERING CONSULTAI~~ SERVICES ~~n.r.~- THIS .AGREEMENT is entered .into this day of , 2004, b an etween own of Los Gatos, State of California, herein called "Town," and Fehr & P~~r.~ss~ci'a ., engaged in providing Traffic Engineering Consultant Services herein calle~'•'~ons~tk~' ~ ~~~" RECITALS A. Town is considering undertaking activities to PROVIDE TRAFFIC ENGINEE:R'ING CONSULTANT SERVICES FOR TOWN OF LOS GATOS. B. Town desires to .engage a Traffic Engineering consultant to provide consulting services to review, analyze, and comment on traffic engineeringprojects and to prepare traffic analyses. and reports :because of Consultant's experience and qualifications to perform the desired work. C. Consultant represents and affirms that it is qualified and willing to perform the desired work pursuant to this Agreement. AGREEMENTS NOW, THEREFORE, THE PARTIES .HERETO AGREE AS FOLLOWS: Scope of Services. Consultant shall provide the Traffic Engineering consultant services as .requested by the Town outlined in Exhibit A. 2. .Time of Performance. The services of Consultant are for the period of August 16, 2004 to June 30, 2005. The Town will review the consultants performance at the end of the contract period and will have the option of renewing the contract. Should Town not renew a contract, the award and authorization of the contract shall .automatically expire. Town shall give Consultant at least 15 days notice, prior to the cancellation or expiration of the contract. Compliance with Laws. Consultant shall complywith all applicable laws, codes, ordinances, and regulations of governing federal, state and local laws. Consultant represents and warrants to Town that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession.. Consultant represents .and warrants to Town that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement. any licenses, permits, and approvals which are legally required for Consultant to practice its profession. Consultant shall maintain a Town of Los Gatos business license pursuant to Chapter 14 of the Code of Town of Los Gatos. 4. Sole ResponsiblitX. Consultant shall be responsible for employing or engaging all persons necessary to perform the services under this Agreement. 5. Information/ReportHandiing. All documents furnished to Consu~[ant by Town and all reports and supportive data prepared by Consultant under this Agreement are Town's property and shall be delivered to Town upon the completion of Consultant's services or at Town's written request. All reports,..information, data, and exhibits prepared or assembled by Consultant in connection with the performance of its services pursuant to this Agreement are confidential until released by Town to the public; and Consultant shall not make any of the these documents or information available to any individual or organization not emp oyed by consultants by Consultant or Town without the wri#ten consent of Town before such release. Town acknowledges that the reports to be prepared by Consultant pursuant to thus Agreement are for the purpose of evaluating a defined project, and Town's use of .the information contained in the reports prepared by Consultant in connection with other projects shall be solely at Town's risk, unless Consultant expressly consents to such use in writing. Town further agrees that it will not appropriate any methodology or technique of Consultant which is and has been confirmed in writing by Consultant to be a trade secret of Consultant. Compensation. Compensation for Consultant's professional services shall be based on the Consultant's Schedule of Charges (attached hereto as Exhibit "A" and incorporated by reference .herein). Billing shall be accompanied by a .detailed explanation of the work performed by whom at what rate and on what date. Billing invoices submitted for payment must reference Town Purchase Order Number, and if applicable, the appropriate project address and Town .Application Number. Also., plans, specifications, documents or other pertinent materials shall be submitted for Town review, even if only in partial or draft form. Payment shall be net thirty (30) days. Onlyone (1) purchase order number per invoice will be accepted. All invoices and statements to Town shall reference Town's purchase order number and be addressed as follows.: Invoices:. Town of Los Gatos Attn: Accounts Payable P.O. Box 655 Los Gatos, CA 95030 Statements: Town of Los Gatos Attn: Sandy Ortiz P.O. Box 655 Los Gatos, CA 95030 7. Availability of Records. Consultant shall maintain the records supporting this billing for not 'less than three (3) years following completion of the work underthis Agreement. Consultant shall make these records available to authorized personnel of Town at Consultant's offices during business hours upon written request of Town. 8. Project Manager. The Project Manager for Consultant for the work under this Agreement shall be 7essy Pu, Traffic .Engineer. 9. Assn nability and Subcontracting. The services to be performed under this Agreement are unique and personal to Consultant. No portion of these services .shall be assigned or subcontracted without. the written consent of Town. 10. Notices. Any notic( required to be given shall be deemed to~~ .. duly and properly given if mailed postage prepaid, and addressed to: To Town: John E. Curtis Director of Parks and Public Works Town of Los Gatos P. O. Box 949 Los Gatos, CA 95030 Phone: (408) 399-5774 To Consultant: D. Sohrab Rashid, Senior Associate Fehr & Peers Associates, Inc. 255 North Market Street, Suite 200 San Jose, CA 95110 Phone: (408) 278-1700 or personally delivered to Consultant to such address or such other address as Consultant designates in writing to 'Town. 11, Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed,, shall act as and be an independent. contractor and not an agent or employee of Town. As an independent contractor he/she shall not obtain. any rights to retirement benefits or other benefits which accrue to Town emp ogee(s). With prior written consent, Consultant may perform some obligations under this Agreement by subcontracting, but. may .not delegate ultimate responsibility for performance or assign or transfer interests under this Agreement. Consultant agrees to testify in any litigation brought regarding the subject of the work to be performed under this Agreement. Consultant shall be compensated for its costs and expenses in preparing for, Graveling to, and testifying in such matters at its then current hourly rates of compensation, unless such litigation is brought by Consultant or is based on .allegations of Consultant's negligent performance or wrongdoing. 12. Conflict of Interest. Consultant understands that its professional responsibilities is solely to Town. Consultant has and shall not obtain any holding or interest within Town of Los Gatos. Consultant has no business holdings or agreements with any individual member of Staff or management of Town or its representatives nor shall it enter into any such holdings or agreements. In addition,. Consultant warrants that it does not presently and shall not acquire any direct or indirect interest adverse to those of Town in the subject of this Agreement, and it shall immediately disassociate itself from such an interest should it discover it has done so and shall, at Town's sole discretion, divest :itself of such interest. Consultant shall not knowingly and shall.take reasonable steps to ensure that it does .not employ a person having such an .interest in this performance of this Agreement. If .after employment of a person, Consultant discovers it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant shall promptly notify Town of this employment relationship, and shall, at Town's sole discretion, sever any such employment relationship. 13. Equal Employment Opportunity. Consultant warrants that it is an equal opportunity employer and. shall comply with applicable regulations governing equal emplo}mrent opportunity. Neither Consultant nor its subcontractors do and neither shall discriminate against ,persons employed or seeking employment with them on the basis of age, sex, color, race, marital status., sexual orientation, ancestry, physical or mental disability, national origin, religion, or medical condition, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment & Housing Act. 14. Insurance. A. Minimum Scope of Insurance: i. Consultant agrees to have and maintain, for the duration of the contract, General Liability insurance policies insuring him/her .:and his/her .firm to an amount not less than: one million dollars ($1,000,000) combined Ingle limit per occurrence for bodily injury, personal injury and property damage. ii. Consultant agrees to have and maintain for the duration of the contract, an Automobile Liability insurance. policy ensuring him/her and his/her staff to an amount not less than one'million dollars ($1,000,000) combined single limit per accident forbodily injury and property damage. iii. Consultant shall provide to Town all certificates of insurance, with original endorsements effecting coverage. Consultant agrees that all certificates and endorserrients are to be received and approved by Town before work commences. iv. Consultant :agrees to have and maintain, for the duration of the contract, professional liability insurance in amounts not less than $1,000,000 which is sufficient to insure Consultant for professional errors or omissions in the performance ofthe particular scope ofwork under this agreement. B. General Liability: i. Town, its officers, officials, employees and volunteers are to be covered as insured as respects: liability arising out ofactivities performed by or on behalf of Consultant; products and completed operations of Consultant, premises owned or used by Consultant. This requirement does not apply to the professional liabilityinsurance required for professional errors and omissions. ii. Consultant's insurance coverage shall be primary insurance as respects Town, its officers,, officials, employees .and volunteers. Any insurance or self-insurances maintained by Town, its officers, :officials, employees or volunteers shall be excess of Consultant's insurance and shall not contribute with it. iii. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to Town, its officers, officials, employees or volunteers.. iv. Consultant's .insurance shall apply separately to each insured .against whom a claim is made or suit is brought, except with respect to the limits of the insurer's liability. C. All Coverages: Each insurance policy required in this item shall be endorsed to state that coverage shall not be suspended, voided, canceled,. reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, .has been given to Town. Current certification of such insurance shall be :kept on fide at all times during the term of this agreement with Town Clerk. D. In addition to these policies, Consultant shall ha~~ e and maintain Workers' Compensationinsurance as requiredby California law and shall provide evidence of such po icy to Town before beginning services under this Agreement. Further, Consultant shall ensure that all subcontractors employed by Consultant provide the required Workers' Compensation insurance for their respective employees. 15. Indemnification.. Consultant shall save, keep and hold harmless indemnify and defend Town its officers, agent, employees and volunteers from all damages, liabilities, penalties, costs, or expenses in law or equity that may at any time arise or be set up because of damages to .property or personal injury received by reason of, or in the course of performing work which may be occasioned by a willful or negligent act or omissions of Consultant, or any of Consultant's officers, employees, or agents or any sub-consultant. 16. Waiver. No failure on the part of either partyto exercise any right or remedy hereunder sha'11 operate as a waiver of any other right or remedy that party may .have hereunder, nor does waiver of a breach or default under this Agreement constitute a continuing waiver of a subsequent breach of the same or any other provision of this Agreement. 17, Governng_Law. This .Agreement, regardless of where executed., shall be governed by and construed to the laws of the State of California. Venue for any action regarding this Agreement shall be in the Superior or.Municipal Court of the County ofSanta Clara. 18. Termination of Agreement. Town and Consultant shall have the right to terminate this agreement with or without cause by :giving not less than fifteen (15) days written notice of termination. In the event. of termination, Consultant shall deliver to Town all plans, files, documents, reports, performed to date by Consultant. In the event of such termination, Town shall pay Consultant an amount that bears the same ratio to the maximum contract price as the work delivered to Town bears to completed services contemplated :under this Agreement pursuant to the noted Scope of Services and Exhibit A hereto, unless such termination is made for cause, in which event, compensation, if any, shall be adjusted in light of the particular facts and circumstances involved in such termination. 19. Amendment. No modification, waiver, mutual termination, or amendment of this.Agreement is effective unless made in writing and signed by Town and Consultant. 20. Disputes. In any dispute over any aspect of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees, including costs of appeal. 21. Entire Agreement. This Agreement, (Exhibit A), constitutes the complete and exclusive statement of the Agreement between Town and Consultant. No terms, conditions, understandings or agreements purporting to modify or varythis Agreement, unless hereafter made in writing and signed by the party to be bound, shall be binding on either .party. ~ ~. IN WITNESS WHEREOF, Town and Consultant have executed ~nis Agreement as of the date indicated on page one (1). Town of Los Gatos Debra J. Figone, Town Manager Town of Los Gatos Fehr & Peers .Associates, Inc. Principal FEHR AND :PEERS ASSOCIATES, INC. Recommended by: John E. Curtis Director of Parks and Public Works ATTEST; Clerk of Town of Los Gatos, Los Gatos, California :Marian V. Cosgrove, Town Clerk .Approved as to Form: Orry P. Korb, Town Attorney PROPOSAL TOWN Of LOS GATOS TRAFFIC ENGINEERING ON-CALL 'SERVICES .. ,_, .~ ..- ~.... ~ - - - m .:~_ - - r:~-- _ - • ~ ~ ~e - ~-- - - ®~'-~~ N 8®~ ! .~ ^11 r. !.. _ r _... ___.. e . ~ .. ,..m® -._ a --- er ®® 's'- . e --_ ' _ __ ~ ~ - ' ^ _ .T. ..h _ ___ ,1.. ~ r - "~ M1 ' -~ _~~ ~' O S~,B!.~11TTEC T~~: Town of Los Gatos SJ~1.41TTEG BY: Fehr & Peers Associates, Inc. SU~1,11TTEG GN: March 31, 2003 Exhi'bi t A l FE,HR & PEERS LRANSPORLATION CONSULTANTS March 28, 2003 Kevin Rohani, P.E. Town Engineer Town of Los Gatos Parks and Public Works .Department 41 .Miles Avenue Los Gatos, California 95031 Subject: On-Call Traffic Engineering Consultant Services for the Town of Los Gatos Dear Mr. Rohani: Fehr & Peers Associates, inc. is pleased to submit this proposal to .provide On-Call Traffic I Engineering Consultant Services to the Town of Los Gatos. As afull-service traffic engineering and transportation planning consulting firm, we have in-house expertise to provide a broad range of transportation engineering and planning services. We proposed to provide the on-call services using staff from our San Jose office. However, if specific expertise is .required for an assignment, we can also call on experts located in our eight offices located in northern California, Utah, Nevada, and Colorado.. Robert Eckols, P,E. will be the lead consultant for our on-call team. Robert has over 22 years of experience providing engineering services to public and private sector clients in the San 'Francisco Bay Area. We have provided on-call services to San .Jose, Milpitas, Gilroy, Saratoga and Santa Clara County and enjoy working as extensions of city and county staff. We invite you to contact our references to .get first hand accounts of the types .and quality of services we .provide.. Should you have any questions, please do .not .hesitate to call me. We are looking forward. to working with you and your staff. Sincerely, FEHR & PEERS ASSOCIATES., INC.. ! / ~ . Lf/ / , D. Sohrab Rashid., P.E. Senior Associate 255 N. Market Street, Suite 200 San Jose, CA 95110 (408) 275-1700 Fax .(408) 278-1717 www.fehrandpeers:com PROPOSAL TOWN OF LOS GATOS TRAFFIC ENGINEERING ON-CALL SERVICES SUBMITTED TO: Town of Los Gatos SUBMITTED BY: Fehr & Peers Associates, Inc. SUBMITTED ON: March 31, 2003 TABLE OF CONTENTS 1 2 3. 4. Firm Description Contact Information Areas of Expertise Firm History Project Staffing Organization Chart Staff Qualifications & Expertise Hourly 'Rates Relevant Experience /References Gilroy On-Call Traffic Engineering Services San Jose On-Call Traffic Signal Design Services San Jose On-Call Transportation Planning Support Services Milpitas On-Call Traffic Engineering Services Saratoga Neighborhood Traffic .Management Program (NTMP) Santa Clara County On-Call Services Description of Services Traffic Signal 'Design Transportation Impact Analysis Neighborhood Traffic Management/Traffic Calming Parking Studies Travel Demand Forecasting Transportation Facility and Operations Analysis Interconnect and Coordinated System Designs 1 1 1 2 3 3 4 4 5 5 5 6 6 6 7 8 8 8 9 9 10 10 11 Fehr & Peers Associates, .Inc. ~ SOD Town of Los Gatos On-Call Traffic Engineering Services I CHAPTER 1 - FfRM DESCRIPTION CONTACT INFORMATION Fehr & Peers Associates, Inc. is pleased to submit this '.Statement of Qualifications for On-Call Traffic .Engineering Consultant Services for the Town of Los Gatos. Our address and. telephone number are: Fehr & Peers Associates, inc. 255 N. Market Street, Suite 200 San Jose, California 9b110 (408) 278-1700 / (408) 278-1717 (fax) AREAS OF EXPERTISE Fehr & Peers Associates, Inc. specializes in providing traffic engineering and transportation planning services to public and private sector clients. Our areas of expertise include: Travel Forecasting & Model Development integrated Land Usel1"ransportation/ Multi- Modal Planning Corridor Studies Major InvestmentStudies Transportation Master Plans Site Planning Analysis Hospital/University Studies 'Parking & Circutation'Plans Bikeway & Trail .Master Plans Transit Planning/Systems'Designs Pedestrian'Facility Master Plans Transportation'Demand Management .SMART Growth Neo-Traditional Neighborhood Planning Traffic Calming .Freeway Corridor & Interchange Studies Major Arterial Analysis intersection Operations Traffic Operation Analysis Microscopic Simulation (CORSIM, viSSIM) Signal Timing & Optimization Roundabout Design Bicycle/Pedestrian Facilities Design Signing & Striping Plans Traffic Signal Design Traffic Signal Interconnect .Freeway Ramp Metering Roadway & Freeway Lighting Traffic Safety Studies Traffic Control Plans Fehr & Peers Associates, Inc. 1 ~~ SOO Town of Los Gatos On-Call Traffic Engineering Services 1 FIRM HISTORY Fehr & .Peers Associates, Inc. was formed in 1985 by Juergen Fehr, .Jack Peers, and Jerry Walters who opened the first office in Lafayette., California. Since its inception, the firm has continued to grow and now has. eight offices (Lafayette, Roseville, San Jose, arid San Francisco., California.; Reno and 'Las Vegas., Nevada; Salt Lake City, Utah; and Denver,. Colorado) and a current staff of approximately 120 engineers, planners and support personnel. Company Growth 140 - t2o-- 100 ~, Company Total 80 o ~ W 40 20 -~ San Jose Office 0 1996 1997 1998 .1999 2000 2001 2002 Year The Town of Los Gatos On-Call Traffic Engineering services will be conducted out of .our San Jose office. The San Jose office currently has 14 employees. Fehr & Peers Associates, Inc. 2 { ;. SOQ Town of Los Gatos On-Call Traffic Engineering Services CHAPTER 2 -PROJECT STAFFFNG We are committing experienced staff of the San Jose. office to provide the on-call services. Robert Eckols, Senior Associate.., would be the Project 'Manager and main Town contact person. Our proposed organization chart is: ORGANIZATION CMART , Robert Eckols, P.E. Project .Manager Frank Aochi Sue DeBorde, P.E. Signal Designer Traffic Engineer .Norman Wong Jason Nesdahl Assist. Traffic .Engineer Assist. Traffic Engineer Fehr & Peers Associates, Inc. 3 ~~ SOO Town of Los Gatos On-Call Traffic Engineering Services STAFF QUALIFICATIONS AND AREAS OF EXPERTISE Qualifications of the individual team members are summarized in the table below. Resumes are included in the Appendix. Years Name/Title of Ex Re istrations Education Areas of Ex ertise Robert Eckols, 22 CE 36384 BS Architectural Engineering Project Managemerit, Senior Associate University of Texas., 1978 Traffic Calming, Master of Urban Planning. Traffic Study'Review, Texas A&M Universit , 1980 O erations Anai sis Sue DeBorde, 12 TE 2140 BS Civil Engineering, Traffic Study.Review, Associate Rensselaer Polytechnic Operations Analysis, Institute, 1990 Signal Timing Evaluation and O timization, Parkin Frank Aochi, 24 San Jose City College Traffic Signal Design, Senior Designer De Anza College Interconnect and Coordinated System .Design, Construction .Assistance Norman Wong, 4 Engineer-ln- BS Civil Engineering, Operations Analysis, Engineer Training San Jose .State University, Signal Timing 1998 Evaluation and Optimization, Travel Demand Forecastin Jason Nesdahl, 2 Engineer-In- BS Civil Engineering, Traffic Study.Review, Engineer Training San Jose State University, Operations Analysis, 1 ggg Parking HOURLY RATES OF KEY STAFF The hourly rates for these individuals are: Robert Eckols $175 Sue DeBorde $135 Frank Aochi $130 Normah'1Nong $105 Jason Nesdahl $95 If .needed for an assignment the staff of the San Jose office will be available to support the above individuals. In .addition to this local office support, Fehr & Peers Associates, Inc. has a strong commitment to maintaining a collaborative work. environment for our employees. This collaborative work environment includes the sharing of data, practical experience, and best practices between all of our offices. We believe that our services and clients benefit from this information exchange. Therefore, depending on the on-call assignment we may call on company experts located in any of our eight offices. Fehr & Peers Associates, .Inc. 4 SOQ Town of Los Gatos On-Call Traffic Engineering Services CHAPTER 3 - RELEVANT EXPERIENCE Fehr & Peers Associates has provided or is currently .providing on-call services to the Cities of Gilroy, San Jose., Milpitas., Saratoga, and to Santa Clara County. Descriptions of the services we provided these agencies .and the names, addresses, and telephone numbers of contacts that can provide references are presented below: ~F J A GILROY ON-CALL TRAFFIC ENGINEERING SERVICES t~~D"8~ Fehr & Peers Associates, Inc. was selected by the City of Gilroy to provide on-.calf traffic engineer`inf g services. These services .included preparing traffic signal design plans, conducting the 1999.,. 2000, and 2001 Traffic Monitoring Programs, .assisting City staff in responding to citizen traffic-related complaints, and reviewing plans prepared by others. The City of Gilroy established a citywide monitoring ..program in 1997 for the management ofi its road improvement program. 'The monitoring .program comprises conducting traffic counts for :selected intersections and roadway segments, projecting future traffic volumes, evaluating the current and future levels of service of the study locations, and identifying and prioritizing improvements for :any deficient locations. Fehr & Peers design staffi prepared traffic signal design ,plans and reviewed plans. prepared by others for conformance to Caltrans and the City of Gilroy's design standards. As part of the review process, the review .staff took the improvement ..plans to the job site and noted any potential problems with proposed layout and operation. Recommendations were made to address these problems. Review comments and .recommendations were provided to the City of Gilroy's traffic engineering .staff.. Fehr & Peers Associates also assisted City staff in .responding to citizen complaints of cut-through traffic and speeding on residential streets, Traffic data, .including machine counts and speed surveys, were collected on the subject streets and existing operating conditions were observed. Recommendations were-made as to the appropriateness of installing traffic calming devices and the types of devices that would. most effectively solve identified problems. f<risti A. Abrams, P:E. City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 {408) 846-0450 'SAN JOSE ON-CALL TRAFFIC SIGNAL.DESIGN SERVICES {: ~Y ~ s~iv~Jc~sE Fehr & .Peers Associates was retained by the City of San Jose's Design and Construction Department to provide signal design assistance on an as-needed basis. The city's design staff was not able to keep up with the .increasing number of signal design. projects that had been coming in from new developments. Our design staff became an extension of the '.Design. and Construction team and enabled the city to .produce construction documents for traffic signal installations and modifications within the project's budget period.. The design projects included traffic signals for private developments and modifications to existing intersections. Base maps were provided by the city and 'our design staff verified the base reap data by conducting a field reconnaissance. Fehr & Peers Fehr.& Peers Associates, Inc, ' SOQ Town ofLos Gatos On-Call Traffic Engineering Services would design the signal .and prepare the signal plans including technical. notes and .special provisions, The .city provided review and managed the construction phase. Satsuki Matsunami City of 'San Jose 801 .North First Street, Room 300 San Jose, CA 95110 (408) 277-5458 <q"'~- A SAN.IOSE TRANSPORl'ATION'PLANNING SUPPORT SERVICES SAI\1,]C;)SE Fehr & Peers .Associates is .leading a consultant team to assist City of San .Jose Department of Transportation staff in updating the transportation element of the General Plan and modifying the traffic .level of service policy. We conducted an audit of the city's roadway system to .determine which segments are or are not built out to their General Plan right-of-way width. Segments that .are not yet built out were field checked and measurements of their existing lane configurations and lane widths are taken. The measurements were drawn using AutoCAD and linked to the GiS audit results. We also conducted research on developing trip generation reductions for various. Smart Growth components. '.Manuel Pineda City of San Jose Department of Transportation 675 N. First Street, Room 400 San Jose, CA 95112 (408) 277-4217 CITY OF MILPITAS ON-CALL SERVICES Fehr & Peers Associates was retained by the City to provide a variety of transportation-.related consulting services. Projects performed included development of a database for the annual City employee transportation survey, preparation of a graphic for the SR 237/1-880 Interchange Upgrade 'Project, completion of a trip generation study of high-tech research & development office facilities in Silicon Valley, and attendance at Metropolitan Transportation Commission meetings. As part of this contract, a supplemental .analysis for the Milpitas Midtown Specific Plan study was conducted. Fehr & Peers staff worked as an extension of City staff on .all of these projects. Joseph Oliva III City of Milpitas 455 East Calaveras Blvd. Milpitas, CA 95035 (408) 586-3290 i. '~ SARATOGA NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM (NTMP) Fehr & Peers Associates assisted City of Saratoga .staff with implementation of their NTMP program, as well as provided traffic engineering suppgrt services for roadway .improvement projects and to :address citizen complaints. Fehr & .Peers staff collected field data, prepared existing conditions reports and made recommendations on the need for traffic calming devices in various neighborhoods. We helped to facilitate neighborhood meetings and worked with residents to develop effective Fehr & Peers Associates, Inc. ~ SOQ Town of Los Gatos On-Call Traffic Engineering Services management techniques to manage traffic and provide visual enhancements. Studies were conducted for residential .neighborhoods as well as school sites throughout the City. Fehr & Peers also served as an extension of City staff by working with a community task force to refine the .proposed Saratoga-Sunnyvale Road Gateway project, which included installation of a .raised median and sidewalk construction in a predominantly commercial corridor. We reviewed the plan to ensure that adequate capacity was provided and that truck turning. movements were accommodated with proposed channelization. We also worked with residents to :address specific traffic complaints .regarding the need for stop signs, red curbs, and other traffic control device requests. Lori Tinfow City of Saratoga 13777 Fruitvale Avenue T u~ ~° Saratoga., CA 95070 y ~ ~.~ ,, ~ ~ :(408).868-1215 r~~`.~ = :° ;a. _ SANTA'CLARA COUNTY ON-CALL SERVICES ~` Q~ ~9 ~ C LP tiTA Fehr & Peers Associates was retained by Santa Ciara County to .provide on-call traffic engineering and transportation planning services to the Roads and Airports Division. The two major tasks .included preparation of an Expressway Planning Vision Report and development of a new design standard for existing narrow streets in urban pocket areas. We also conducted research on the planning status for all major streets in the urban pocket areas. The Expressway Planning. Vision study involved assembling an extensive array of previously published information to identify potential 'improvements to all eight expressways in Santa Clara County. The purpose of the study was to provide background for a comprehensive study of the entire expressway system addressing operations, problem accident locations, high occupancy vehicle lanes, bicycle and pedestrian issues, landscaping, .pavement management, system expansion, etc. The report includes GiS-based graphics and a lengthy table listing improvements, the source planning documents, and the current status. The new design standard for existing narrow streets was .based on recent standards established in other communities and a desire to minimize impacts to adjacent residences. The new 40-foot right- of-way standard will accommodate pedestrian and bicycle travel, while helping to slow vehicular traffic in neighborhoods. We also contacted all of the cities and towns in the. County to obtain their standard cross-sections for collector and local streets, as well as the planned improvements to major roadways in :the urban pocket areas. Dan Collen Santa Clara County Department of Roads and Airports t01 Skyport Drive San Jose., CA 95110 {408) 573-2492 Fehr & Peers Associates, lnc. SOO Town of Los Gatos On-Call Traffic Engineering Services CHAPTER 4 -DESCRIPTION OF SERVICES This chapter .presents more extensive descriptions of the types of services that we provide that could provide to the Town of Los Gatos. TRAFFIC SIGNAL DESIGN Our San Jose office has one full-time (Frank Aochi) and one. part-time (Kristiann Choy) traffic signal designer and afull-time AutoCAD technician (Mona Sondossi). These staff members have prepared signal plans for many cities throughout Northern California. We have also prepared plans that meet Caltrans specifications, include signal preemption, bicycle detection, and pedestrian considerations (including ADA requirements). Frank has been providing on-call traffic signal design services to the City of San Jose and Gilroy for the past four years. Our traffic signal design experience includes signal installations and modifications, and signing and striping plans for the following ocations in and near Los Gatos: • Los Gatos Gateway Signal Modification Dobern Avenue and Jackson Avenue • Saratoga-.Sunnyvale Avenue and Seagull Way • Bascom .Avenue and Moorpark Avenue • Saratoga Avenue and State Route 9 Bohiman Road Signing and Striping • Saratoga-Los Gatos Boulevard and Oak Street Modification TRANSPORTATION .IMPACT .ANALYSIS The transportation. professionals at Fehr & Peers Associates have analyzed. the traffic impacts of proposed developments:, including office, residential, commercial, educational, medical, retail and other land uses. Our staff applies the latest analysis tools and software to develop reliable assessments of traffic impacts. We recommend ,practical, manageable solutions and innovative mitigation plans. We are very familiar with the requirements of the Town of Los Gatos and the Santa Clara Valley Transportation Authority (VTA). Since we know how to conduct these studies in detail, we are fully capable of reviewing them. A few examples of TIAs that our San Jose staff has prepared are: • Los Gatos Gateway Project San Jose State University Master Plan • Saratoga Library Expansion 3Com Expansion • Los Gatos School Studies NASA Reuse Project Fehr & Peers Associates, Inc, a ( ~/ SOQ Town of Los Gatos On-Call Traffic Engineering Services 'NEIGHBORHOOD TRAFFIC MANAGEMENT/TRAFFIC CALMING Our neighborhood traffic management and traffic calming studies begin with collecting volume and speed data and convening neighborhood meetings to understand resident issues and concerns, We recommend traffic calming measures that meet the .specific needs of the neighborhood and refine the plan though subsequent community workshops. Conceptual designs of tthe recommended measures are prepared. to .illustrate how they fit 'into the streetscape and to prepare cost estimates. We use AutoTurn to evaluate how trucks and emergency vehicles maneuver around the devices. Please visit our website at www.trafficcalming,org to see examples of traffic calming measures. We have conducted the #ollowing traffic calming studies: • Spartan/Keyes Traffic Calming Plan • Eden Avenue Traffic Calming Study • Vendome Neighborhood Traffic Calming • East'Palo Alto Commuter'Mitigation • 488 S. Almaden Neighborhood Traffic Calming Mitigation PARKING STUDIES The purpose of a parking study is to determine .the number of spaces that are needed to accommodate the parking demand. Recommending a number that is too low results ~ E in a parking shortage :and .potential overflow - parking into nearby residential neighborhoods or ~ ' adjacent developments. Recommending a number that is too high can result in parking facilities that are oversized and costly to construct. Weekday Hourly P~bng astrlb~,u«, Tama An important concept that is used to determine the .appropriate supply is shared parking. Shared parking looks at the .different parking characteristics of various land uses in a mixed-use development (especially the timing difference of when the peak demand occurs) to determine the overall combined peak demand, as opposed to the just the sum of the peak demands of the individual uses, We use this concept in helping cities determine the parking needs or their largest mixed-use developments - the downtowns. Fehr & Peers Associates, Inc. 9 SOQ Town of Los Gatos On-Call Traffic Engineering Services A few examples of other parking studies that we have conducted are: • Saratoga Village Parking Surveys Downtown Sunnyvale Parking Study • North of Bayshore Area Parking Study + Downtown Burlingame :Parking Study • Biltmore Hotel Parking Demand Analysis Eastside Academy Parking Study TRAVEL DEMAND .FORECASTING 'Fehr & Peers Associates .has developed citywide models that range from Traffix models to a full four-step #ravel demand-forecasting models. The type of model depends on the proposed use of the projections and the financial resources the city wishes to devote to the modeling effort. We can work with City staff to .identify the best and most efficient model for their needs, if so desired. ~~, r •~ :' ~, - , ~, ~` ~:~; ~~ ~: -, - - --- -- - ~ ~r'~~ ~" The citywide traffic model that we developed for Vacaville is linked to the MTC regional model to ensure consistency with regional estimates of external travel We developed asub-area model of the VTA's Santa Clara County model to develop traffic projections in the .Sand Hill Road Corridor. We have also developed models to update Capital Improvement Programs and to develop traffic 'impact fee programs as we did for the City of West Sacramento. Our modeling capabilities include the following software MINUTP, 'EMMEL2, TRANPLAN, TransCAD, T-MODEL, TP Plus, Viper. • Foster City Traffix .Model • Woodland Travel Demand Model • Gilroy Traffix Model • West Sacramento Traffic Model Development and Impact Fee Analysis • Tracy Citywide Traffic Model • Petaluma Travel Demand Model • Vacaville Citywide Traffic Model • Dixon Travel Demand Model TRANSPORTATION FACILITY AND OPERATIONS .ANALYSIS Fehr & Peers .Associates evaluates traffic operations of all types of roadway facilities: single, isolated intersections, coordinated systems of intersections on arteriaf and expressways., 'High Occupancy Vehicle (HOV) lanes, and complex systems of freeway interchanges. We also evaluate transit operations and the effect of bus and light rail on intersection operations. Measures that increase capacity, improve circulation, increase safety, reduce air pollufion and conserve fuel are '.identified as a result of our analyses. We .use a variety of tools from .intersection level of service software (TRAFFIX, HCS, HCS Cinema, Signal 94, GAPSSI, V/C) to microsimulation techniques such as CORSIM and ViSSIM. We also use a ,program called aaSIDRA to evaluate the operations of roundabouts. Fehr & Peers Associates. Inr. SOD Town of Los Gatos On-Call Traffic Engineering Services Some of our larger traffic operations analysis projects in Santa Clara County are: • I-280/Wolfe Interchange Modifications SA 17/85 Safety Improvement • US 101 Central Corridor Study - ~. <. , , _.._ - .~ .` ... ._ .. -.iT J.a. f:~ . ~~.. t~ V `~- t..'4 k 4 . ~ ... INTERCONNECT AND COORDINATED SYSTEM DESIGNS Fehr & 'Peers Associates has designed coordinated traffic signal systems using either traditional cable interconnect or the latest technology (including fiber optic and microwave). Our staff has prepared signal design plans., interconnect system design, and signal timing plans for arterial corridors and freeway interchange projects. Our traffic signal design experience includes signals and signal modifications for the following locations: • Sand Hill Road Projects • Ralston Avenue .Interchange • Hellyer Avenue Extension CONSTRUCTION ASSISTANCE • Hillsdale Boulevard Interchange • Woodside Road Improvements • Bellew Drive and Barber Avenue Improvements As .part of traffic signal design services, we routinely offer construction assistance in reviewing contractor submittals and answering questions during construction. We also prepared traffic control plans, such as the following: • Adobe Systems in downtown San Jose 8 East Office Tower in downtown San Jose • Cisco Systems in Milpitas andSan.Jose .Monterey Highway/Farrell.Avenue in Gilroy Fehr & .Peers Associates, Inc. 11 • Almaden Expressway LOS Improvements SR 87 HOV Lane Project • San Tomas/ Monroe Grade Separation Feasibility Analysis SOQ -Town of Los Gatos On-Call Traffic Engineering .Consultant APPENDIX RESUMES OF KEY STAFF Fehr & Peers Associates, Inc. F~l~h&fEI1~~ i RANSPO RrAT I-0N CONSU.l1ANiS ROBERT ECKOLS, P.E. Senior Associate EXPERIENCE 2003=Present Fehr & Peers .Associates i 996-2003 .Parsons Corporation 1989-1995 Eisenberg, Olvieri & Associates, Inc. 1980-1989 Barton-Aschman Associates, Inc. (Parsons) Freeway Operations/Interchange Design Studies Prepared freeway mainline, ramp, and intersection operations analyses .and developed conceptual .designs for ramp intersections, terminals, and adjacent local streets. Analyzed .:impacts of new freeway construction on local street circulation. • I-580 High Occupancy Vehicle Lane Corridor Study, Pleasanton to Livermore, California • U:S. 95, I-15 Interchanges, Las Vegas, Nevada • Operations Analysis Project. Study .Report I-880/Coleman Avenue Interchange • Operations Analysis U.S. 101/SR 87 Auxiliary Lane Project • Operations Analysis/Preliminary Engineering for I-880/Coleman Avenue and SR 87 Interchanges Master Plans • Site master plan .and related traffic studies for Travis Air Force Base; Fairfield, California • Mariposa County General Plan Update; Mariposa County, California • Transportation site master plan environmental impact reports for Cabrillo Community College, San Jose City College and Evergreen Community College • Site master planning and circulation studies for Lockheed Missile and Space, Sunnyvale, California and Hewlett-Packard Corporation, Cupertino, California Traffic En~ineerin~/Si~nal Timing • Signal timing studies for .San Jose, San Francisco, Redwood City, Upland, .and Richmond, California. • Site traffic analyses and environmental impact reports for developments in California, Arizona, and Oregon. EDUCATION • Master of Urban & Regional Planning, Texas A&M University, 1980 • Bachelor of Science Architectural .Engineering, University of Texas at .Austin, 1977 A:FFILIATIOIVS • Institute of Transportation Engineers (ITE) CERTIFICATION • Licensed Professional Civil Engineer, State of California (36384) PUBLICATIONS & PRESENTATIONS • "Operational Characteristics of Commercial Border Stations Along the U.S.-Mexico Border" Transportation Research Board 78th Annual Meeting, January 1999, • "Optimizing'Truck Movement through U,S.-Mexican Border Crossings" Transportation Research Board 78th Annual Meeting,. January 1999, + "Sizing aU.S.-Mexican Border Commercial Inspection Station" Transportation Research Board 78th Annual Meeting, January 1999. Robert Eckols, P.E. Page 2 Parking Studies • Parking demand analyses for community colleges: San Jose City College, Evergreen Community College, De Anza, and Foothill Community College Parking access and circulation studies for United Airlines Maintenance facilities located at San Francisco International and Oakland International airports • Parking demand analyses for the proposed shared use library between San .Jose City Library System and San Jose State University in San Jose, California Caltrain Extension to Monterey County, Monterey County, California. Developed conceptual station layout for the proposed station located in Pajaro, California Transit Feasibility and Design Studies Transit planning and traffic circulation studies for San Jose, California downtown transit mall; Santa Rosa, California transit development plan;. Fairfield, California transit .development plan; and Denver, Colorado downtown transit mall. • San. Mateo Rail Bridge Feasibility Study.. Project manager for developing. a strategy for improving the vertical clearances at four existing rail grade separations. Hayward Park Caltrain Station Parking Expansion, San Mateo, California. Project manager for developing preliminary engineering and cost estimates for an expanded parking facility and transit drop off .area for the Caltrain :Hayward Park Station. • Sam Trans Bus Stop Improvement Program, San Mateo County., California. Project .manager for developing conceptual designs and final PS&E for bus stops located throughout San Mateo County. .International Planning/Goods Movement U.S.-Mexico Binational Transportation Planning and Programming Study. This two and a half year study developed the core data and analytical methodologies for cross-border transportation planning between the United States and Mexico. The study was performed for the estate .departments, federal transportation agencies and the border state transportation departments in both countries. Border Congestion Study, Western Governors Association. The WGA desired to identify and develop consensus and .support for actions or improvements that can .reduce border- crossing congestion and :improve air quality along the U,S.- Mexican border. F~l1i:~: ~~-ll:~ iRA'NSP-0R TAT10'N (ON SU I'A.Nfj Robert Eckols, P.E. Page 3 Information System Design and Implementation Involved in the .needs assessment, design and implementation of information systems related to environmental engineering projects. Projects included the development of 'both database appticaCions and geographic information systems. These projects were primarily related to effective management of .ground, surface, and wastewater resources. • Water Pollution Control Plant Industrial Waste Data Management System, .Sunnyvale, California • Urban Runoff Clean Water Program Geographic :Information System, Alameda County, California • Urban 'Runoff Clean Water Program Information System, San Mateo County, California Regional Water Quality Control .Board Underground Tank Mapping ,System • Groundwater Well Mapping System, Alameda County, California • Santa Clara Valley Water District Wellhead Protection Geographic Information System, Santa Clara County, California • University of California Hazardous Materials Management Plan-Information System Assessment F~lil: b: htll:~ (R:4N SP O'R!q(I-0N CON S,U I'ANIS SUSAN M. DEBORDE Associate EXPERIENCE Traffic. and Circulation Elements Managed and prepared traffic and circulation studies for Environmental Impact .Reports, specific plans, .master .plans, and urban -design plans. The studies addressed internal and external circulation issues, traffic impacts. at key locations, alternative travel modes,. and the development of strategic .plans to address transportation demands and impacts. Representative projects include:. • Nortel Networks Santa Clara EIR • Downtown Sunnyvale Urban Design Plan • Sunnyvale Town Center Mall EIR • Evergreen Commons Shopping Center EIR • Moitozo Mixed-Use Development EIR • Gateway 101 Corridor Redevelopment Plan EIR and Specific Plan, East Palo .Alto, CA • San Jose Arena Parking Lot Alternative EIR • CiscoSystems/Agnews East Site EIR • Oakridge Golf Course/Barbaccia Property EIR • .Santa Clara Valley Medical Center North Tower Expansion EIR Traffic Impact Analyses Prepared analyses to determine the traffic impacts of a variety of developments for both public and private sector clients. Many studies also contained the evaluation of on-site :circulation and site access, Types of developments include office complexes, residential deve opments, shopping centers, hospitals, fast-food restaurants, medical office buildings, hotel/casinos, movie theater complexes, industrial parks, a landfill, a materials recovery facility, and multi- use developments in cities throughout the San Francisco Bay Area; Monterey and Modesto, California; Reno, Nevada; and Albuquerque, New Mexico. Traffic. Operations Analyses Prepared operational analyses in support of freeway corridor .and interchange studies for US 101 Central Corridor and :State Route 87 HOV Lane Project in San Jose, California; SR l7/SR 85 Improvements Project in Campbell/Los Gatos, California; .the High Street Seismic Retrofit Project (I-880) in Oakland, California; and the I-80/Pyramid Way Interchange Study in Sparks, 'Nevada; using FREQI?, CORS]M, TRANSYT-7F, and .Highway Capacity Ivlanual software (HCS). Conducted analyses of Almaden Expressway in San Jose and Mission College Boulevard in Santa Clara, California to .recommend improvements. Conducted weaving analyses to 'F[ I1I c~c f'l l I:~ '.RANSPORiAii ON (n NSU L'ANiS EDUCATION • Bachelor of Science in Civil Engineering, Rensefaer Polytechnic Institute, ly9O AFFILIATION • Institute of Transportation Engineers (ITE) CERTIFICATION • Licensed Professional Traffic Engineer, State of California (2.140) 0/02 .Susan M. DeBorde Page 2 evaluate alternatives for the addition of an auxiliary lane on U.S. 101 and for the construction of agrade-separation at the Montague Expressway/Trimble Road :intersection in San .Jose. Signal Timing and Coordination Studies Conducted analyses of signal operations and recommended signal timing, phasing, and lane configurations using Synchro, CORSIM, TRANSYT-7F, and PASSER II, as well as HCS.' Representative projects include the review of Cottle Road operations as part of an access/feasibility study for the development of the Oakridge Golf Course in San Jose, California; signal timing/coordination plan for the addition of the El Camino Real/Omega .Avenue traffic signal to the existing coordinated system on El Camino in Mountain View, California; intersection operations at locations throughout the City of Hayward., California, as .part of the Hayward Citywide Traffic Analysis and Intersection Improvement Project; Briggsmore Avenue operations with the proposed improvements at Coffee Road in Modesto, California; and the evaluation of operations along Virginia Street with the addition of a new traffic signal in Reno, Nevada. .Parking .Studies Prepared parking studies for the North of Bays'hore Area in Santa Clara, California; the Community Hospital of the Monterey Peninsula in Monterey, California; Altera Corporation in San Jose,. California; the University/101 Interchange Parking Relocation Study in East Palo Alto, California; Red Hawk Ranch Apartments in Fremont, California; '900 E. Hamilton Avenue office complex in Campbell, California. Also conducted a shared parking study for the Lester Industrial Park in Mountain View, California and an initial study of the parking .needs of the proposed .joint City of San Jose/San Jose State University library. Congestion Management Programs .Participated in the development of the 1991, 1993, .and 1995 Congestion Management Programs for San Mateo County as a member of the lead consultant team. working with the Technical Advisory Committee and the City/County Association of Governments of San Mateo County, the congestion management agency. Responsibilities included data collection, development of CMP levels of service standards, and monitoring of CMP facilities. Conducted the monitoring for the t 999 San Mateo County CMP. FEI-iI: & ~L[i:` TRA NSPORTAT ION {ON'SULTANTS 03/02 i F r. l -~ l cSz [~ E l ~: TRANSP-0RLATION CONSULTANdS FRANK AOCHI Senior Traffic .Designer EXPERIENCE Ivlr. Aochi has over twenty years of experience in traffic engineering.design services. He has managed and designed various traffic engineering projects throughout California and Nevada .including .traffic signal, signal interconnect, signing and striping design for both public agencies and private companies. :His design .experience also includes bike lane installations on County expressways .and local streets. Frank's professional experience includes working five years in :the Traffic Engineering Division for the City of Sunnyvale. His representative ..projects include: Traffic Signal and Safety Lighting Design Traffic signal design experience .includes Light Rail signals, railroad preemption, fire station preempt, freeway interchanges, single-.point urban interchange, ramp meters, video camera detection. systems and plans prepared in both English and metric units. • Valley Fair Shopping Center Expansion (1 new signal, 3 modifications), San Jose, CA • Bailey Avenue Extension (5 new signals), San Jose, CA • Tasman Corridor Light Rail Signals (1 new signal, 3 modifications),, .Mountain View, CA • Edenvale Redevelopment Area Signals (3 new signals, 1 modificatian), San Jose, CA • Cisco Systems .Site 5 Campus (2 new signals, 1 modification), Milpitas, CA • I-.880 Widening Ramp Meters (1 signal modification, 3 new ramp meters, 4 ramp meter modifications), San Jose, CA • I-$0/Pyramid Way {1 new single point urban interchange signal, 3 modifications), Sparks, NV • Virginia Street Corridor Traffic .Signals {l new signal, 6 .modifications), Reno, NV Signal Interconnect Studies and Design Traffic signal interconnect design experience includes use of twisted pair cables, fiber optic cables, wireless communications systems and timed based coordination systems. • Fremont Boulevard Signal Interconnect, Fremont, CA • North First Street TSMP, San Jose, CA • .Freedom Boulevard Signal Interconnect, Watsonville, CA • Grant Road Interconnect Study, Mountain View, CA • Montague Expressway Signal Interconnect, Santa Clara, San Jose and Milpitas, CA South Virginia Street .Signal Interconnect, Reno, NV EDUCATION • San Jose City College, San Jose, California • De Anza Ccallege, Cupertino, California • ITS Seminars • ITE Courses AFFILIATIONS • American Public Works .Association (APWA) • Institute of Transportation :Engineers (ITE) • South .Bay Transportation Officials Association (SBTOA) • Traffic Signal Association (TSA) .Frank Aochi Page 2 Striping and Signing Design Signing and striping design experience includes plans prepared for private sectors, local municipalities, counties and estate agencies. • Evelyn Avenue Widening, Sunnyvale, CA • Skyport Drive Widening, San Jose, CA • Cisco Site 6 Campus, San Jose, CA • I-880 Widening Freeway Signing, San Jose, CA ~• • Beach Road 'Signing. and Striping Modification, Marina, CA Traffic Monitoring Station Design TMS design experience includes video surveillance systems and changeable message signs on local streets and state freeway systems. • I-80/Richmond Parkway Interchange, Richmond, CA • Almaden Boulevard TOS, San Jose, CA • Guadalupe Corridor TSMP, San Jose, CA Light Rail Opetation Studies Light :Rail operation studies. include review and analysis of light rail signal priority system and design of system. • VTA Guadalupe Corridor, San Jose, CA • VTA Tasman Corridor, San Jose and ~ .nta Clara, CA • VTA Tasman Corridor Extension, Mountain View., CA Traffic Circulation Studies Traffic circulation studies include review and analysis of traffic operation and control for proposed projects and existing sites. • Kaiser Hospital Relocation, .Santa Clara, CA • IBM Cottle Road Campus, San Jose, CA • Mission CoNege Boulevard, Santa Clara, CA • UC Santa Cruz, Santa Cruz, CA On-call Traffic Engineering Services On-call services provide public agencies additional design staff .and capabilities on an as-needed basis. • City of Stan Jose (7 new signals, 1 signal :modification) • City of Gilroy {2 signal modifications, 4 plan reviews, 1 striping modification) • City of Milpitas (2 new signals., 1 striping modification) 03/02 F E H I: ~: '~' L 'I 1: &A.N SPO.R lAlIO.N ~ONSUI'AN lS 1 F 'l ~-~ l~ Cc 1' 1. ~ ~: (R.ANSPOR(AiiON C'?NS:; ~'AN (> NORMAN WONG 'Senior Transportation Engineer EXPERIENCE Transportation Impact Analysis Conducted traffic impact studies for new and redevelopment projects, including estimating .project trip generation, distribution, and assignment; evaluating site :access and on-site circulation; .conducting intersection operation and capacity analysis, and .documenting :results. Studies include: • Foster City Neighborhood Shopping Center Redevelopment Projects EIR, :Foster City, CA Foster/Woodstock EIR, Foster City, CA • Crowne Plaza Hotel Expansion, Burlingame, CA • Moitozo Development, .San Jose, CA • Olson. Cherry Orchard Site TIA, Sunnyvale, CA • Cisco TIA, Milpitas, CA • Home Depot TIA, Fremont, CA Wal-Mart TIA, Fremont, CA • FMC Development, Santa Clara, CA Traffic Modeling Developed or updated citywide TRAFFIX Models for the City of Foster City and the City of Gilroy. The models contained zones representing approved and proposed developments.. The model was used to develop traffic projections at key intersections and evaluate intersection levels of service under .existing and future/buildout scenarios. Pedestrian/.Bicycle Studies Assisted in preparation of studies to improve pedestrian and bicycle circulation. Cost estimates and/or improvements plans were prepared for the following studies: • San Jose Commuter. Bicycle Corridor Project • .Sunnyvale Long-Range Bicycle Capital Improvement Program • Emeline Campus Pedestrian Circulation Study, Santa Cruz County, CA Traffic Operations Anal~es Conducted operational .analyses in support of freeway corridor studies for State Route 17 in Los Gatos, California; using FREQI 1 software. EDUCATION • Bachelor of Science in Civil Engineering, San Jose State University, 1998 AFFILIATION • Institute of Transportation Engineers (ITE) COMPUTER .SKILLS Familiar with the use of transportation analysis software including: • TRAFFIX • CORSIM • HCS • NCAP • CAPSSI • Syncho • FREQ CERTIFICATION • Engineer-In-Training,. State of California 3/02 F~~~~: ~ I'<<E:~ 'R A.N SP-0RIAI(CN YONStit?ANTS JASON J. NESDAHL Transportation .Engineer/Planner EXPERIENCE General and Specific Plan Circulation Elements and Citywide. Studies Performed traffic analyses for citywide areas including intersection and roadway segment analysis; pedestrian, bicycle, and transit facilities; land use analysis and documenting results, .Studies include; • Los Altos General Plan,. Los Altos, CA • 2001 Gilroy Monitoring, Gilroy, CA • Milpitas Midtown Specific .Plan, Milpitas, CA • San Jose'S'tate University Master Plan, San Jose, CA • :East Gardener Specific Plan, San Jose, CA Transportation Impact AnalXsis TIA~ Conducted transportation impact studies for new and redevelopment projects, including estimating. project trip generation, distribution, and assignment; evaluating site access and on-site circulation; conducting intersection operation and capacity analysis, and documenting results. Studies .include: • .Ikea TIA, East Palo Alto, CA • Fresh Choice TIA, Gilroy, CA • Altera Building 5 TIA, San Jose, CA • Victory Outreach Church Development, Santa Clara County, CA • Great America Corporate Center, Santa Clara, CA • Third Street Residential Development, San Jose, CA • University Palms Developmen#, East Palo Alto, CA • Renaissance Hotel TIA, Milpitas, CA Parking And Other Studies Analyzed parking supply and demand for on-street and off- street parking as well as on-site circulation and access for vehicles. • .Saratoga Village Parking S udy, Saratoga, CA • 3Com Truck Capacity Study, Santa Clara, CA • El Camino Real Retail/Restaurant Parking Study, Sunnyvale, CA EDUCATION • 13achekor of Science in Cieil Engineering, San Jose State University, 1~yy AFFILIATION • .Institute of Transportation Engineers (ITE) CERTIFICATION • Engineer-In-Training, State of California COMPUTER S;[~LLS Developed TRAFFIX models in preparing transportation impart analyses. Utilized CORSIM and SYNCHRO to model detailed traffic operations,