Loading...
09 Staff Report - Town Plaza Fountain Filtration System9 DATE: TO: FROM: COUNCIL AGENDA REPORT DECEMBER 4,2008 MAYOR AND TOWN COUNCIL GREG LARSON,TOWN MANAGER MEETING DATE:12/15/08 ITEM NO: SUBJECT:PPW JOB NO.08-14 -TOWN PLAZA FOUNTAIN FILTRATION SYSTEM- PROJECT 411-831-4201 ADOPT RESOLUTION APPROVING PLANS AND SPECIFICATIONS FOR THE TOWN PLAZA FIL TRATION SYSTEM UPGRADE. RECOMMENDATION: Adopt resolution approving plans and specifications for the Town Plaza Foundation Filtration System Upgrade. BACKGROUND: The Town Plaza Interactive Fountain was constructed as a part of the Town Plaza Reconstruction Project in 2003.The fountain was built with the most current and state-of-the-art filtration system for this time period. In 2006,the discovery of the microorganism protozoa Cryptosporidium in interactive fountains nationwide caused the Santa Clara County Health Department to notify the owners and operators of the associated public health risks.The County has directed all cities with interactive fountains to eliminate the risk of the microorganism in their fountains.Other interactive fountains in Santa Clara County,including the fountain at Plaza de Cesar Chavez in San Jose,were shut down due to this discovery,while new treatment systems could be installed.Interactive fountains are most at risk for exposure because water is re-circulated through a series of jets,increasing the opportunity for Cryptosporidium and other contaminants to potentially cause human health problems.The current filtration system at Town Plaza uses a combination of chemical treatment and an ozonator.Ozone is one of the most powerful sterilizing agents in the world;however,it cannot neutralize Cryptosporidium.Technical and health experts familiar with the protozoa have determined the only treatment method is the ultraviolet treatment of water. PREPARED BY:TODD CAPURSO Director of Parks and Public Works N:\EN GINEERfN G\COUN elL REPORTS\2 008 Reports\08-14.PI aza.fountain.fi [trati on.system,ll pgrade.adap 1.plans.specs.doc PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT:PPW JOB NO.08-14 -TOWN PLAZA FOUNTAIN FILTRATION SYSTEM - PROJECT411831-4201 DECEMBER 4,2008 DISCUSSION: On,April 21,2008,the Council authorized the Town Manager to execute a Professional Service Agreement with eMS Collaborative to provide design services for an ultraviolet filtration system for the Town Plaza fountain. This fmn was the original designer of the fountain at the Town Plaza and has designed nearly all other such fountains in the Bay Area.The design of the upgraded water treatment system has been completed.The addition of a new ultraviolet (UV)filtration system will bring the fountain into compliance with new County health regulations and provide a long term solution to the Cryptosporidium problem.UV purification is a proven technology (EPA approved)that can protect the public from waterborne disease causing microorganisms,such as Cryptosporidium, bacteria,vilUses,and fungi.UV disinfection works by delivering concentrated amounts of UV light energy to the reproductive mechanism of the microbe,effectively killing it.As water passes through the UV chamber,it instantly disinfects it. It is anticipated that the consuuction of the UV filu'ation system will take place in early 2009 during winter months,while the fountain is not in operation. CONCLUSION: It is recommended that the Council adopt the attached Resolution approvmg plans and specifications for the Town Plaza Fountain Filtration System Upgrade. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section l530lc).A Notice of Exemption will not be filed. FISCAL IMP ACT: Sufficient funds are available for this project pending upon the Town Council's approval of the Year End Fund Balance Reserve Designation of $300,000,which is addressed on a separate report submitted by Finance for the December 15 th Council meeting.$200,000 was estimated in the Council approved CIP,but an additional $100,000 is needed due to the pending reallocation of State Park Bond monies. PAGE 3 MAYOR AND TOWN COUNCIL SUBJECT:PPW JOB NO.08-14 -TOWN PLAZA FOUNTAIN FILTRATION SYSTEM- PROJECT411831-4201 DECEMBER 4,2008 Tri';'n Plaza Filtration System PROJECT 411-831'4201 Available Expended/ Budget Encumbered Available Funding To Date Balance $31,378 $31,378 300,000 $300,000 $331,378 $31,378 $300,000 FY 2008/09Fiscal Impact Project 411-831-4201 Designated Fund Balance TOTALS TQ!A,L EXPENDltI!R~S:\lVCATEGORY: Staff Labor Materials Engineel'inglDesign Construction Contingency TOTALS Attachments: $ $ 31,378 31,378 Resolution approving plans and specifications for the Town Plaza Foundation Fith'ation System Upgrade. RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS APPROVING THE PLANS AND SPECIFICATIONS FOR PPW JOB NO. 08-14 -TOWN PLAZA FOUNTAIN FILTRATION SYTEM WHEREAS,plans and specifications for the Town Plaza Fountain Filtration System have been prepared by the Town Engineer and duly filed with the Clerk Administrator;and WHEREAS,the Town Council of the Town of Los Gatos has reviewed said plans and specifications. NOW,THEREFORE,BE IT RESOLVED THAT the Town Council hereby approves the plans and specifications for the Town Plaza Fountain Filtration System. BE IT FURTHER RESOLVED THAT the Clerk Administrator is hereby authorized and directed to advertise the Town Fountain Filtration System for bids in the manner prescribed by the Town Municipal Code. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos held on the 15th day of December,2008 by the following vote: AYES: NAYS: ABSENT: ABSTAIN: SIGNED:MAYOR OF THE TOWN OF LOS GATOS LOS GATOS,CALIFORNIA ATTEST: CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS,CALIFORNIA