Loading...
07 Staff Report - Los Cerritos Drive Storm Drain Project~pW N OF G A'~~5 DATE TO FROM: MEETING DATE: 6116108 ITEM NO: I COUNCIL AGENDA REPORT JUNE 12, 2008 MAYOR AND TOWN COUNCIL GREG LARSON, TOWN MANAGER / SUBJECT: PPW JOB NO. A08-017 - LOS CERRITOS DRIVE STORM DRAIN PROJECT NO. 816-0406 A. AUTHORIZE ESTABLISHMENT OF THE LOS CERRITOS DRIVE STORM DRAIN PROJECT NO. 816-0406 B. AUTHORIZE PROJECT BUDGET IN THE AMOUNT OF $27,500 PAYABLE FROM STORM DRAIN BASIN #1 C. ADOPT RESOLUTION DECLARING MST UNDERGROUND IMPROVEMENTS, INC. TO BE THE LOWEST RESPONSIBLE BIDDER ON THE PROJECT AND AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $27,500.00 RECOMMENDATION: 1. Authorize establishment of the Los Cerritos Drive Storm Drain Project No. 816-0406. 2. Authorize project budget in the amount of $27,500 payable from Storm Drain Basin #1. 3. Adopt resolution (Attachment 1) declaring MST Underground Improvements, Inc. to be the lowest responsible bidder on the project and award a construction contract (Exhibit A) in the amount of $27,500.00. BACKGROUND: The storm drain pipes in the hillside sections of the Town were built over 50 years ago and are mainly made of corrugated metal pipes as was the standard of construction at that time. These metal pipes corrode over time and require replacement and the Town has replaced some of these pipes over the past few years with new High-Density Polyethylene (HDPE) pipes that are industry standard and resistent to corroison and have high durability and strength for these applications. PREPARED BY: KEVIN ROHANI Interim Director of Parks and Public Works RNENGINEERINGICOUNCIL REPORTS12008 Reports1A08-017.1os. cerritos.drive.stonn.drain.prj.revised.doc Reviewed by: W b Assistant Town Manager Town Attorney Clerk Administrator Finance Community Development PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. A08-017 - LOS CERRITOS DRIVE STORM DRAIN PROJECT Nn_ R 16-0406 JUNE 4, 2008 DISCUSSION: A recent inspection of Los Cerritos Drive identified a 36" corrugated metal pipe storm drain pipe that was corroded almost entirely and collapsed in sections, This pipe has to be replaced and roadway repaired before the rainy season begins. This project is consistent with the Town's goals to improve public health and safety. This is a new project that was not in the Capital Improvement Program as it was not anticipated, and because of the urgency to make the repairs and replacement of this pipe, it is recommended that this project be established as a new Capital Improvement Program project and funded by the Storm Basin #1 funds. Clearly under normal circumstances, such a project would have been considered during the Capital Improvement Program budget process and incorporated in the annual Capital Improvement Program. For projects under $100,000 construction costs, the Town's informal bid process does not require public advertising and the preparation of a set of complete plans and specifications for a project. This informal bid process allows staff to prepare a scope of work, solicit bids from three (3) contractors, and award the contract to the lowest bidder. The Town uses this process for small and uncomplicated projects. Bids for the Los Cerritos Drive Storm Drain Project received by the Town Engineer on June 2, 2008. The following contractors submitted bids for this project: MSI Underground Improvements, Inc. $27,500.00 Menlo Pipelines, Inc. $28,000.00 Joseph J. Albanese, Inc. $61,575.00 It is recommended that the Council adopt the attached Resolution that would declare MSI Underground Improvements, Inc. to be the lowest responsible bidder on the project and award a construction contract to this company in the amount of $27,500.00. Staff has checked all of the bids received and has determined that MSI Underground Improvements, Inc. is responsible and that its bid is responsive to the Town's informal bid process. The construction of this project is anticipated to take place in July 2008. CONCLUSION: Staff recommends that the Council accept the staff recommendations noted above. ENVIRONMENTAL ASSESSMENT: This is a project as defined under CEQA but is Categorically Exempt (Section 15301 c). A Notice of Exemption will not be filed. PAGE 3 MAYOR AND TOWN COUNCIL SUBJECT: PPW JOB NO. A08-017 - LOS CERRITOS DRIVE STORM DRAIN PROJECT NO. 816-0406 JUNE 4, 2008 FISCAL IMPACT: Sufficient funds are available in the Storm Drain Basin #1 Fund. The current unencumbered balance is $142,942. Attachments: Resolution declaring MSI Underground Improvements, Inc. as the lowest responsible bidder (with Exhibit A) Agreement RESOLUTION RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS AWARDING A CONSTRUCTION CONTRACT TO MSI UNDERGROUND IMPROVEMENTS, INC. FOR PPW JOB NO. A08-017 LOS CERRITOS DRIVE STORM DRAIN PROJECT WHEREAS, bids were sought in conformance with State and Town law for PPW Job No. A08-017 - Los Cerritos Drive Storm Drain Project; and WHEREAS, MSI Underground Improvements, Inc. submitted a bid which the Town Council deems to be responsive to the Town's solicitation. NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town of Los Gatos, County of Santa Clara, State of California, that MSI Underground Improvements, Inc. is declared to be the lowest responsible bidder for PPW Job No. A08-017 - Los Cerritos Drive Storm Drain Project. BE IT FURTHER RESOLVED that the Town Manager is hereby authorized and directed to execute a construction contract (Attached as Exhibit A) for said project on behalf of the Town in the amount of $27,500.00. PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 16th day of June, 2008, by the following vote: COUNCIL MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR OF THE TOWN OF LOS GATOS/ LOS GATOS, CALIFORNIA ATTEST: CLERK ADMINISTRATOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA CONTRACT THIS AGREEMENT is between the Town of Los Gatos (hereinafter referred to as "Owner") and MSI Underground Improvements, Inc. (hereinafter referred to as "Contractor").Owner and Contractor, for the consideration hereinafter named, agrees as follows: A. SCOPE OF WORK Contractor shall furnish all materials and perform all of the work for the construction of PPW Job No. A08-017 - Los Cerritos Drive Storm Drain Project in accordance with the Contract Documents. B. CONTRACT PRICE As full compensation for furnishing all materials and for doing all the work contemplated and embraced in this Contract, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the Work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay (twenty seven thousand five hundred dollars) ($27,500.00), which shall supersede any other amount specified in the Contract Documents. C. CONTRACT DOCUMENTS All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. D. BEGINNING OF WORK Following the execution of this Contract and the approval of bonds and insurance policies and certificates, Owner shall issue a Notice to Proceed with the Work. Commencing work or the entrance of equipment or materials on the site of the Work by Contractor before receipt of the Notice to Proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting there from. E. TIME OF COMPLETION The Work called for herein shall be fully completed in fifty (50) working days of Contractor's receipt of the Notice to Proceed. F. CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN Contractor shall remedy any defects due to faulty materials and/or workmanship and pay for any damages to other work and/or existing facilities resulting there from which shall appear within a period of 2 years from the date of recording of the Notice of Completion. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of day of , 20 TOWN OF LOS GATOS, by: CONTRACTOR, by: MSI Underground Improvements, Inc. Greg Larson, Town Manager RECOMMENDED BY: Kevin Rohani Interim Director of Parks and Public Works (Signature) (Print Name) (Address) APPROVED AS TO FORM: Orry P. Korb, Town Attorney (City, State, Zip) ATTEST: Jackie Rose, Clerk Administrator (Contractor's License Number)