Loading...
2026-030 - ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY THE STATE SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 RESOLUTION 2026-030 RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY THE STATE SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our Town are aware of the projects proposed for funding in the community and which projects have been completed each fiscal year; and WHEREAS,the Town must adopt by resolution a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the Town will receive an estimated $1,917,808 in RMRA funding in Fiscal Year 2026/27 from SB 1; and WHEREAS, this is the tenth year in which the Town is receiving SB 1 funding and will enable the Town to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the Town used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the highest priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS,the funding from SB1 will help the Town maintain and rehabilitate streets throughout the Town this year and similar projects into the future; and 1of4 Resolution 2026-030 May 19, 2026 WHEREAS, SB 1 revenue will help the Town maintain and rehabilitate local streets and roads and support continued investment in the Town's roadway system; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure, with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials, and practices, will have significant positive co-benefits statewide. NOW,THEREFORE, BE IT RESOLVED: The foregoing recitals are true and correct, and the following list of projects will be funded in part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues: 2of4 Resolution 2026-030 May 19,2026 Base Bid+Alternate Street Begin Location End Location Treatment Estimated Construction Useful Life of Schedule Treatment Albert Ct Albert Dr End MS 8 Years Summer 2026 Albert Dr Nino Av Calfhill Ct RC 10 Years Summer 2026 Alberto Wy Hwy 9 End 2MO 20 years Summer 2026 Almond Blossom Ln Harwood Rd City Limits 2MO 20 years Summer 2026 Bird Av Woodland Av Chester St 2MO 20 years Summer 2026 Brooklyn Av Pleasant Chicago Ave 4MO 20 years Summer 2026 Calfhill Ct Albert Dr End RC 10 Years Summer 2026 Chester St Woodland Av University Av 2MO 20 years Summer 2026 Church St High School Ct E Main St MS 8 Years Summer 2026 Clifton Av Broadway End 20 20 years Summer 2026 Cooper Ct University Av End 20 20 years Summer 2026 Fisher Av Roberts Rd Nino Av MS 8 Years Summer 2026 Forrest Av Roberts Av Oak Meadow RC 10 Years Summer 2026 Dr High School Ct E Main St Church St MS 8 Years Summer 2026 Lundy Ln W Main St End 2M0 20 years Summer 2026 Nino Av Los Gatos BI Nino Wy MS 8 Years Summer 2026 Nino Wy Nino Av End MS 8 Years Summer 2026 Ohlone Ct Roberts Rd End MS 8 Years Summer 2026 Park Av W. Main St End 2M0 20 years Summer 2026 Roberts Rd East Blossom Hill Rd Los Gatos BI MS 8 Years Summer 2026 Terrace Ct Pleasant End 2MO 20 years Summer 2026 Woodland Av Chester St Wraight Av 2MO 20 years Summer 2026 Wraight Av Chester St Hwy 9 2MO 20 years Summer 2026 KEY: 4MO 4"Mill and Overlay 2MO 2"Mill and Overlay 20 2"Overlay RC Rubber Cape Seal MS Micro-Surfacing 3 of 4 Resolution 2026-030 May 19,2026 PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos, California, held on the 19th day of May of 2026 by the following vote: COUNCIL MEMBERS: AYES: Rob Rennie, Maria Ristow, Mary Badame, Matthew Hudes, Mayor Rob Moore NAYS: None ABSENT: None ABSTAIN: None SIGNED: 7 MAYOR OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA ATTEST: v, 1 tAvi TOWN CLERK'OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA 4 of 4 Resolution 2026-030 May 19,2026