2026-030 - ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY THE STATE SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 RESOLUTION 2026-030
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY THE STATE
SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April
2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our Town are aware of the projects proposed for funding in the community and
which projects have been completed each fiscal year; and
WHEREAS,the Town must adopt by resolution a list of all projects proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the Town will receive an estimated $1,917,808 in RMRA funding in Fiscal
Year 2026/27 from SB 1; and
WHEREAS, this is the tenth year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the highest priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS,the funding from SB1 will help the Town maintain and rehabilitate streets
throughout the Town this year and similar projects into the future; and
1of4
Resolution 2026-030 May 19, 2026
WHEREAS, SB 1 revenue will help the Town maintain and rehabilitate local streets and
roads and support continued investment in the Town's roadway system; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure, with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials, and practices, will have significant
positive co-benefits statewide.
NOW,THEREFORE, BE IT RESOLVED: The foregoing recitals are true and correct, and
the following list of projects will be funded in part or solely with Fiscal Year 2026-27 Road
Maintenance and Rehabilitation Account revenues:
2of4
Resolution 2026-030 May 19,2026
Base Bid+Alternate
Street Begin Location End Location Treatment Estimated Construction
Useful Life of Schedule
Treatment
Albert Ct Albert Dr End MS 8 Years Summer 2026
Albert Dr Nino Av Calfhill Ct RC 10 Years Summer 2026
Alberto Wy Hwy 9 End 2MO 20 years Summer 2026
Almond Blossom Ln Harwood Rd City Limits 2MO 20 years Summer 2026
Bird Av Woodland Av Chester St 2MO 20 years Summer 2026
Brooklyn Av Pleasant Chicago Ave 4MO 20 years Summer 2026
Calfhill Ct Albert Dr End RC 10 Years Summer 2026
Chester St Woodland Av University Av 2MO 20 years Summer 2026
Church St High School Ct E Main St MS 8 Years Summer 2026
Clifton Av Broadway End 20 20 years Summer 2026
Cooper Ct University Av End 20 20 years Summer 2026
Fisher Av Roberts Rd Nino Av MS 8 Years Summer 2026
Forrest Av Roberts Av Oak Meadow RC 10 Years Summer 2026
Dr
High School Ct E Main St Church St MS 8 Years Summer 2026
Lundy Ln W Main St End 2M0 20 years Summer 2026
Nino Av Los Gatos BI Nino Wy MS 8 Years Summer 2026
Nino Wy Nino Av End MS 8 Years Summer 2026
Ohlone Ct Roberts Rd End MS 8 Years Summer 2026
Park Av W. Main St End 2M0 20 years Summer 2026
Roberts Rd East Blossom Hill Rd Los Gatos BI MS 8 Years Summer 2026
Terrace Ct Pleasant End 2MO 20 years Summer 2026
Woodland Av Chester St Wraight Av 2MO 20 years Summer 2026
Wraight Av Chester St Hwy 9 2MO 20 years Summer 2026
KEY:
4MO 4"Mill and Overlay
2MO 2"Mill and Overlay
20 2"Overlay
RC Rubber Cape Seal
MS Micro-Surfacing
3 of 4
Resolution 2026-030 May 19,2026
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos,
California, held on the 19th day of May of 2026 by the following vote:
COUNCIL MEMBERS:
AYES: Rob Rennie, Maria Ristow, Mary Badame, Matthew Hudes, Mayor Rob Moore
NAYS: None
ABSENT: None
ABSTAIN: None
SIGNED: 7
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
v, 1
tAvi
TOWN CLERK'OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
4 of 4
Resolution 2026-030 May 19,2026