Item 13 Staff Report Award of Construction Contract for Storm Drain Improvement ProjectsDATE: TO: FROM: SUBJECT: MEETING DATE: 8/7/00 ITEM NO. / COUNCIL/AGENCY AGENDA REPORT August 2, 2000 MAYOR AND TOWN COUNCIL CHAIR AND MEMBERS OF THE REDEVELOPMENT A rQ NCY TOWN MANAGER/EXECUTIVE DIRECTOR AWARD OF CONSTRUCTION CONTRACT FOR 'STORM DRAIN IMPROVEMENT PROJECTS: PROJECT 00-12 - HOLLYWOOD/YOSEMITE/ WHEELER AVENUES PROJECT 00-24 - MASSOL/NICHOLSON/TAITIHERNANDEZ AVENUES PROJECT 00-35 - CYPRESS/HIGH STREETS PROJECT 00-36 - LORA DRIVE PROJECT 00-39 - BACHMAN PARK A. DECLARE MCH GENERAL ENGINEERING CONTRACTORS, INC. OF SAN JOSE TO BE THE LOWEST RESPONSIBLE BIDDER ON THE PROJECT. B. AWARD A CONSTRUCTION CONTRACT TO MCH GENERAL ENGINEERING CONTRACTORS, INC. IN THE AMOUNT OF $526,156. C. AUTHORIZE STAFF TO ISSUE CHANGE ORDERS TO THE CONTRACT UP TO AN AMOUNT OF $78,920. D. ADOPT RESOLUTION AUTHORIZING THE TOWN MANAGER/EXECUTIVE DIRECTOR TO EXECUTE A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. IN THE AMOUNT OF $526,156. E. APPROVE RECOMMENDED AMENDMENTS TO THE ADOPTED FY 00-01 CAPITAL BUDGET AS DESCRIBED UNDER FISCAL IMPACTS. RECOMMENDATION: 1. Declare MCH General Engineering Contractors, Inc. of San Jose to be the lowest responsible bidder on the project. 2. Award a construction contract to MCH General Engineering Contractors, Inc. in the amount of $526,156. 3. Authorize staff to issue change orders to the contract up to an amount of $78,920. 4. Adopt Resolution authorizing the Town Manager/Executive Director to execute a construction contract with MCH General Engineering Contractors, Inc. in the amount of $526,156. 5. Approve recommended amendments to the adopted FY 00-01 Capital Budget as described under Fiscal Impacts. DISCUSSION: Sealed bids for the five subject storm drain improvement projects were received and opened by the Town Clerk on July 12. Qualified contractors were required to bid on all five projects as it is statf's intention to award a single construction contract for all of the work. In general, the bundled project involves the replacement of both deficient and defective storm drainage facilities at five separate locations throughout the Town, one of which is within the limits of the Town's Redevelopment Project Area which will be funded by the RDA. For the remaining four projects, staff proposes using Storm Drainage Impact Fees imposed on prior development projects to fund the recommended construction contract PREPARED BY: LARRY I. PERLIN AUL L. CURTIS V Director of Parks and Public Works Director of Community D elopment/Deputy Director Reviewed by: (K- Attorney Revised: 8/2/00 7:51 pm Reformatted: 7/14/00 N:1 B&EICNCLRPTS100-12AWD r PAGE 2 MAYOR AND TOWN CCiu— CHAIR AND MEMBERS OF THE REDEVELOPMENT AGENCY SUBJECT: PROJECT 00-12, 00-24, 00-35, 00-36, 00-39 STORM DRAIN RECONSTRUCTION JULY 25, 2000 and contingency amounts. Chapter 60 of Title 24 of the Town's Municipal Code authorizes the assessment of storm drainage impact fees on most new developments in the Town. These fees may then be used by the Town to improve its publicly maintained storm drainage system to adequately convey the additional runoff generated by these developments. It is proposed to use Storm Drainage Impact Fees to fund the four non -RDA projects because each of these projects will enhance the capacity of the Town's storm drainage system within the Town's three drainage basins. CONCLUSION: A total of three contractors submitted bids for the work, however staff deemed one of the bids to be non -responsive due to the contractor's failure to appear at the mandatory pre -bidding conference held on June 28. A summary of the two responsive bids is attached. MCH General Engineering Contractors, Inc. of San Jose submitted the lowest bid of $526,156, which is 18% below the Engineer's Estimate of $642,133. Staffhas carefully canvassed the bids and checked the low bidder's references, and has determined that the bid submitted by MCH General Engineering Contractors, Inc. is responsive to the Town's Notice to Contractors. Consequently, it is recommended that the Council declare MCH General Engineering Contractors, Inc. to be the lowest responsible bidder on the project; that the Council award the attached construction contract to this firm in the amount of $526,156, the total of their bid for all five projects; and that the Council adopt the attached Resolution authorizing the Town Manager/Executive Director to execute the construction contract on behalf of the Town/Agency. It is further recommended that the Council authorize staff to execute change orders to the contract up to an amount of $78,920, roughly 15% of the construction contract amount, to cover any unforeseen circumstances and/or conditions that may arise during the course of construction. If the Council acts as recommended, construction is expected to begin in early September, and last through mid -November. ENVIRONMENTAL ASSESSMENT: All five projects have been determined to be Categorically Exempt under CEQA. FISCAL IMPACT: Project #00-24 - Massol/Nicholson/Tait/Hernandez Avenues is the one project within the limits of the Town's Redevelopment Project Area. Sufficient funding for both the recommended construction contract and contingency amounts for this project exists within the adopted FY 2000-2005 RDA budget. To fund the four Basin projects, the following adjustments to the adopted FY 00-01 budget will be required: Source of Funds Adopted Fund Balance Increase in Fund Balance Decrease in Fund Balance Revised Fund Balance Basin #1 $ 192,000 $ 49,350 $ 17,500 Owner Participation $ 10,400 $ 213,450 Basin #2 $ 169,000 $ 104,550 Owner Participation $10,400 $ 74,850 Basin #3 $ 109,000 $ 20,400 S 88,600 PAGE 3 i M MAYOR AND TOWN COuNt,.L,., CHAIR AND MEMBERS OF THE REDEVELOPMENT AGENCY SUBJECT: PROJECT 00-12, 00-24, 00-35, 00-36, 00-39 STORM DRAIN RECONSTRUCTION JULY 25, 2000 Use of Funds Project No. Basin No. Adopted Budget Recommended Adjustment Revised Budget Hollywood/ Yosemite/ Wheeler 00-12 1 $ 0 $ 17,500 $ 17,500 Cypress/High 00-35 1 $ 49,350 ($ 49,350) $ 0 Cypress/High 00-35 2 $ 38,950 $ 59,550 $ 98,500 Bachman Park 00-39 2 $ 0 $ 45,000 $ 45,000 Lora Drive 00-36 3 $ 0 $ 20,400 $ 20,400 Since staff believes that the bid amounts for each of the five drainage projects are fair, and because these projects will correct existing drainage problems throughout the Town, it is recommended that the Council approve the above budget adjustments as indicated. ATTACHMENTS: 1. Bid Summary Schedule. 2. Resolution authorizing award and execution of construction contract (with Exhibit A). 0) co � p (0 p E co C E M O U) 0 2 • L.n - m ch C O O O O co N O N rr • o O 62 • N O J i 45 O 3 (1) o (i 1 O d Opening 7/12/00 at 3:OOPM Pfister Excavatina Inc 00000000 V O -01 2LnN O E- 0 0CCO N 69 0 - - 69 0 (0000(00 V'L()NOM MOO1-NL0 69 0 69 0 N 69 0 69 0 (9 00 00 CCOCCOO CO�t (3)C15 6f3 69 0 O o00 - co- 69- 0 0 000 N co- co N- 69 000000000 000000000 r-00o000LO(00 ,:rOr-�LL)OMLnN M66056,--0o00- co N 69 69- 69 N 69-69 69 69- 69 ' 69 0 0 ti C r� x- CD 6/9 G 1 0 0 O O O O O $230.001 O 0 0 000000000 C..)000040.00 •'-00 a00 0000 N000(O Lr) O co (3) 0 U0 Co 0 O 00 000000000 1—Lf N 0)CNON-=0 600 cc) OON. t r_+ •'CIO O N W- r- d- 0 69 69 N N M 69 .- N- C0 69 69 L0 6 9 N- C N E9- 69 69 6 9 69- Ln ao D N6f3 69 6f3 64 (.069 MCH General Engineering Contractors'. Inc I Total Price O $5,532.00 $6,055.00 000 I $13,420.00 00 0 $97,580.00 0 $8,448.00 $9,882.00I 0 $34,200.00I 0 $14, 246.00I O $42, 096.00 I $526,156.00 0 O O 000 d OOO O O 00 O O1� N 0 O 0 O O 0) O L 0 00 0 O 0 O O in 1- 0 O CO (O 1` O CO ' 00 d- 0 'I N 1` ti 0) Cr) r 0) N (N W- C) 69 (fT 69 CO 69 69 Ef3 I Unit Price 000 $1,200.00 00 $55.00 0 $154.00 0 0 $235.00 $132.00 0 $123.00 O O $17.00I 0 $48.00I 000 00 0 0 0 0 00 O OO L!) OO O O L() N OO O OOM 00 0 0 0 N Or--- L0 1` 69 1~ 0 N N N t- COW- N 0 6<3 CO 69 69 6969(r) N CV 69 VI 69 (fJ EA- ENGINEER'S ESTIMATE I Total Price 0000000 00 0 $138,516.00 $279,174.00 $4,480.00 0000000 $642,132.80 00000000 00 0 0000000 OO) OOOOO NO N cc) 00000ct ON 0)0000 CO NI- 0) 1`1.000000OCO 000 '-OOL()00 NCO CO OL0ONMOO Ln(44 L()00Nco- 6)Ln N CC) 1�1�te CC) C 00 - 69 y- N 69 d' 69 N- 6f3 69 N- N 6fl 69 N 64 69- (f3 69 69 69-69- 69 Unit Price $15,000.00 000000 $221.00 0 $241.00 $291.00 00000 $2.00 000 000000 O O O O O O 0 O 0 ,-CD. 0 O 0 L r 7 0 0 0 0 0 O 0 O 0 N C0 M0000 M 0) 1`1-0)0 -OM 69 69 0 10 (0 N N M Et 69 69 0 Ef3 Ln 6f3 C C69' 6f3 69 M (4 6f3 Ef3 6f3 69 69 m Unit LS TONS LF EA LF LF LF LF SF LF I I TOTAL I 1 La W J J J J J W U) W (Quantity coco 173 244 N 68 N 64 195 130 I L() 00 �— 'cl- ti `— 00 6) M Co N— 1- CO I Description (Asphalt Paving Asphalt Curb Catch Basin (D.I.) Curb Inlet Catch Basin Standard Energy Dissipator Ribbed PVC 12" Dia. Ribbed PVC 21" Dia. W/PCC Pav'nt Ribbed PVC 24" Dia Ribbed PVC 30" Dia. W/PCC Pav'nt Ribbed PVC 36" Dia. W/PCC Pav'nt Ribbed PVC 42" Dia. W/PCC Pav'nt RCP 12" Dia. 0) 0 Slope Protection Sidewalk ADA Sidewalk Ramp Curb and Gutter L (Q C (ts O _N (0 Er) e- o Ea. o C cr cC 0 I Item No c- N M .q' Ln Cfl ti 00 6) O N M I 14 (0 .- M ti 00 N- O .- O N PRINTED 8/2/00 6:22 PM RESOLUTION RESOLUTION OF THE TOWN COUNCIL/REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. FOR STORM DRAINAGE IMPROVEMENT PROJECTS - PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES; PROJECT 00-24 - MASSOL/NICHOLSON/TAIT/HERNANDEZ AVENUES; PROJECT 00-35 - CYPRESS/HIGH STREETS; PROJECT 00-36 - LORA DRIVE; PROJECT 00-39 - BACHMAN PARK WHEREAS, bids were sought in conformance with State and Town law for the following storm drainage improvement projects: Project 00-12 - Hollywood/Yosemite/Wheeler Avenues; Project 00-24 - Massol/Nicholson/Tait/Hernandez Avenues; Project 00-35 - Cypress/High Streets; Project 00-36 - Lora Drive; Project 00-39 - Bachman Park; and WHEREAS, MCH General Engineering Contractors, Inc. of San Jose, California submitted the lowest bid which the Town Council/Redevelopment Agency deems to be responsive to the Town's Notice Inviting Sealed Bids. NOW, THEREFORE, BE IT RESOLVED by the Town Council/Redevelopment Agency of the Town of Los Gatos, County of Santa Clara, State of California, that: 1) MCH General Engineering Contractors, Inc. of San Jose, California is declared to be the lowest responsible bidder for Projects 00-12, 00-24, 00-35, 00-36, and 00-39; and 2) the Town Manager/Executive Director is authorized to execute a construction contract (attached as Exhibit A) for said projects on behalf of the Town. PASSED AND ADOPTED at a regular meeting of the Town Council/Redevelopment Agency of the Town of Los Gatos, California, held on the 7th day of August, 2000, by the following vote. COUNCIL/AGENCY MEMBERS: AYES: NAYS: ABSENT: ABSTAIN: SIGNED: MAYOR/CHAIR OF THE TOWN OF LOS GATOS REDEVELOPMENT AGENCY LOS GATOS, CALIFORNIA ATTEST: CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA RESOLUTION 2000 - 100 RESOLUTION OF THE TOWN COUNCIL/REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. FOR STORM DRAINAGE IMPROVEMENT PROJECTS - PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES; PROJECT 00-24 - MASSOL/NICHOLSON/TAIT/HERNANDEZ AVENUES; PROJECT 00-35 - CYPRESS/HIGH STREETS; PROJECT 00-36 - LORA DRIVE; PROJECT 00-39 - BACHMAN PARK WHEREAS, bids were sought in conformance with State and Town law for the following storm drainage improvement projects: Project 00-12 - Hollywood/Yosemite/Wheeler Avenues; Project 00-24 - Massol/Nicholson/Tait/Hernandez Avenues; Project 00-35 - Cypress/High Streets; Project 00-36 - Lora Drive; Project 00-39 - Bachman Park; and WHEREAS, MCH General Engineering Contractors, Inc. of San Jose, California submitted the lowest bid which the Town Council/Redevelopment Agency deems to be responsive to the Town's Notice Inviting Sealed Bids. NOW, THEREFORE, BE IT RESOLVED by the Town Council/Redevelopment Agency of the Town of Los Gatos, County of Santa Clara, State of California, that: 1) MCH General Engineering Contractors, Inc. of San Jose, California is declared to be the lowest responsible bidder for Projects 00-12, 00-24, 00-35, 00-36, and 00-39; and 2) the Town Manager/Executive Director is authorized to execute a construction contract (attached as Exhibit A) for said projects on behalf of the Town. n n (Th t PASSED AND ADOPTED at a regular meeting of the Town Council/Redevelopment Agency of the Town of Los Gatos, California, held on the 7th day of August, 2000, by the following vote. COUNCIL/AGENCY MEMBERS: AYES: Randy Attaway, Jan Hutchins, Linda Lubeck, Joe Pirzynski, Mayor Steven Blanton NAYS: ABSENT: ABSTAIN: ATTEST: None None None SIGNED: /s/ Steven Blanton MAYOR/CHAIR OF THE TOWN OF LOS GATOS REDEVELOPMENT AGENCY LOS GATOS, CALIFORNIA /s/ Marian V. Cosgrove CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA CONTRACT THIS AGREEMENT is between the Town of Los Gatos (hereinafter referred to as "Owner") and MCH General Engineering Contractors, Inc. (hereinafter referred to as "Contractor"). Owner and Contractor, for the consideration hereinafter named, agree as follows: A. SCOPE OF WORK Contractor shall furnish all materials and perform all of the work for the construction of Project #_ 00-12, 00-24 00-35, 00-36, 00-39 in accordance with the Contract Documents. B. CONTRACT PRICE As full compensation for furnishing all materials, equipment, labor, appurtenances and incidentals, and for doing all the work contemplated and embraced in this Contract, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the Work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay Five -Hundred -Twenty -Six -Thousand - One -Hundred -Fifty -Six dollars ($526,156), which shall supersede any other amount specified in the Contract Documents. C. CONTRACT DOCUMENTS All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The Contract Documents are defined in Part I, Section 1-1.01(A) of these Specifications and are incorporated herein by reference the same as though set out in full. D. BEGINNING OF WORK Following the execution of this Contract and the approval of bonds and insurance policies and certificates, Owner shall issue a Notice to Proceed with the Work. Commencing work or the entrance of equipment or materials on the site of the Work by Contractor before receipt of the Notice to Proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. E. TIME OF COMPLETION The Work called for herein shall be fully completed within the time limit set forth in the Special Conditions. F. CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN Contractor shall remedy any defects due to faulty materials and/or workmanship and pay for any damages to other work and/or existing facilities resulting therefrom which shall appear within a period of 2 years from the date of recording of the Notice of Completion. G. LIQUIDATED DAMAGES The undersigned has reviewed and is thoroughly familiar with the appropriate sections of the Contract and Part I, Section 8-1.03 of these Specifications pertaining to liquidated damages. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of day of , 20 TOWN OF LOS GATOS, by: CONTRACTOR, by: Les White, Interim Town Manager (Signature) APPROVED AS TO FORM: (Print Name) Orry P. Korb, Town Attorney ATTEST: Marian V. Cosgrove, Town Clerk (Address) (City, State, Zip) (Contractor's License Number) RESOLUTION 2000 - 100 RESOLUTION OF THE TOWN COUNCIL/REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. FOR STORM DRAINAGE IMPROVEMENT PROJECTS - PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES; PROJECT 00-24 - MASSOL/NICHOLSON/TAIT/HERNANDEZ AVENUES; PROJECT 00-35 - CYPRESS/HIGH STREETS; PROJECT 00-36 - LORA DRIVE; PROJECT 00-39 - BACHMAN PARK WHEREAS, bids were sought in conformance with State and Town law for the following storm drainage improvement projects: Project 00-12 - Hollywood/Yosemite/Wheeler Avenues; Project 00-24 - Massol/Nicholson/Tait/Hernandez Avenues; Project 00-35 - Cypress/High Streets; Project 00-36 - Lora Drive; Project 00-39 - Bachman Park; and WHEREAS, MCH General Engineering Contractors, Inc. of San Jose, California submitted the lowest bid which the Town Council/Redevelopment Agency deems to be responsive to the Town's Notice Inviting Sealed Bids. NOW, THEREFORE, BE IT RESOLVED by the Town Council/Redevelopment Agency of the Town of Los Gatos, County of Santa Clara, State of California, that: 1) MCH General Engineering Contractors, Inc. of San Jose, California is declared to be the lowest responsible bidder for Projects 00-12, 00-24, 00-35, 00-36, and 00-39; and 2) the Town Manager/Executive Director is authorized to execute a construction contract (attached as Exhibit A) for said projects on behalf of the Town. (T fl PASSED AND ADOPTED at a regular meeting of the Town Council/Redevelopment Agency of the Town of Los Gatos, California, held on the 7th day of August, 2000, by the following vote. COUNCIL/AGENCY MEMBERS: AYES: Randy Attaway, Jan Hutchins, Linda Lubeck, Joe Pirzynski, Mayor Steven Blanton NAYS: ABSENT: ABSTAIN: ATTEST: None None None SIGNED: /s/ Steven Blanton MAYOR/CHAIR OF THE TOWN OF LOS GATOS REDEVELOPMENT AGENCY LOS GATOS, CALIFORNIA /s/ Marian V. Cosgrove CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA CONTRACT THIS AGREEMENT is between the Town of Los Gatos (hereinafter referred to as "Owner") and MCH General Engineering Contractors, Inc. (hereinafter referred to as "Contractor"). Owner and Contractor, for the consideration hereinafter named, agree as follows: A. SCOPE OF WORK Contractor shall furnish all materials and perform all of the work for the construction of Project #_ 00-12, 00-24, 00-35, 00-36, 00-39 in accordance with the Contract Documents. B. CONTRACT PRICE As full compensation for furnishing all materials, equipment, labor, appurtenances and incidentals, and for doing all the work contemplated and embraced in this Contract, also for all loss or damage arising out of the nature of the work aforesaid, or from the actions of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by Owner, and for all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the Work, and the whole thereof, in the manner and according to the Contract Documents, Owner shall pay Five -Hundred -Twenty -Six -Thousand - One -Hundred -Fifty -Six dollars ($526,156), which shall supersede any other amount specified in the Contract Documents. C. CONTRACT DOCUMENTS All rights and obligations of Owner and Contractor are fully set forth and described in the Contract Documents. All parts of the Contract Documents are intended to be correlated so that any work called for in one part and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The Contract Documents are defined in Part I, Section 1-1.01(A) of these Specifications and are incorporated herein by reference the same as though set out in full. D. BEGINNING OF WORK Following the execution of this Contract and the approval of bonds and insurance policies and certificates, Owner shall issue a Notice to Proceed with the Work. Commencing work or the entrance of equipment or materials on the site of the Work by Contractor before receipt of the Notice to Proceed is at the sole risk and expense of Contractor, and the Contractor shall be fully liable for any damage or injury sustained by Owner or third persons resulting therefrom. E. TIME OF COMPLETION The Work called for herein shall be fully completed within the time limit set forth in the Special Conditions. F. CORRECTION OF WORK AFTER ACCEPTANCE AND FINAL PAYMENT BY TOWN Contractor shall remedy any defects due to faulty materials and/or workmanship and pay for any damages to other work and/or existing facilities resulting therefrom which shall appear within a period of 2 years from the date of recording of the Notice of Completion. G. LIQUIDATED DAMAGES The undersigned has reviewed and is thoroughly familiar with the appropriate sections of the Contract and Part I, Section 8-1.03 of these Specifications pertaining to liquidated damages. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of day of , 20 TOWN OF LOS GATOS, by: CONTRACTOR, by: Les White, Interim Town Manager (Signature) APPROVED AS TO FORM: (Print Name) Orry P. Korb, Town Attorney ATTEST: Marian V. Cosgrove, Town Clerk (Address) (City, State, Zip) (Contractor's License Number) RESOLUTION 2000 - 6RD RESOLUTION OF THE TOWN COUNCIL/REDEVELOPMENT AGENCY OF THE TOWN OF LOS GATOS AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. FOR STORM DRAINAGE IMPROVEMENT PROJECTS - PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES; PROJECT 00-24 - MASSOL/NICHOLSON/TAIT/HERNANDEZ AVENUES; PROJECT 00-35 - CYPRESS/HIGH STREETS; PROJECT 00-36 - LORA DRIVE; PROJECT 00-39 - BACHMAN PARK WHEREAS, bids were sought in conformance with State and Town law for the following storm drainage improvement projects: Project 00-12 - Hollywood/Yosemite/Wheeler Avenues; Project 00-24 - Massol/Nicholson/Tait/Hernandez Avenues; Project 00-35 - Cypress/High Streets; Project 00-36 - Lora Drive; Project 00-39 - Bachman Park; and WHEREAS, MCH General Engineering Contractors, Inc. of San Jose, California submitted the lowest bid which the Town Council/Redevelopment Agency deems to be responsive to the Town's Notice Inviting Sealed Bids. NOW, THEREFORE, BE IT RESOLVED by the Town Council/Redevelopment Agency of the Town of Los Gatos, County of Santa Clara, State of California, that: 1) MCH General Engineering Contractors, Inc. of San Jose, California is declared to be the lowest responsible bidder for Projects 00-12, 00-24, 00-35, 00-36, and 00-39; and 2) the Town Manager/Executive Director is authorized to execute a construction contract (attached as Exhibit A) for said projects on behalf of the Town. PASSED AND ADOPTED at a regular meeting of the Town Council/Redevelopment Agency of the Town of Los Gatos, California, held on the 7th day of August, 2000, by the following vote. COUNCIL/AGENCY MEMBERS: AYES: Randy Attaway, Jan Hutchins, Linda Lubeck, Joe Pirzynski, Mayor Steven Blanton NAYS: None ABSENT: None ABSTAIN: None SIGNED: /s/ Steven Blanton MAYOR/CHAIR OF THE TOWN OF LOS GATOS REDEVELOPMENT AGENCY LOS GATOS, CALIFORNIA ATTEST: /s/ Marian V. Cosgrove CLERK OF THE TOWN OF LOS GATOS LOS GATOS, CALIFORNIA Town Council Minutes August 7, 2000 Redevelopment Agency Los Gatos, California DOWNTOWN SPECIFIC PLAN REPEALED/RESOLUTION 2000-98 (10.47) Motion by Mr. Hutchins, seconded by Mr. Pirzynski, that Council adopt Resolution 2000-98 entitled. RESOLUTION OF THE TOWN OF LOS GATOS RESCINDING RESOLUTION 1982-101 THEREBY REPEALING THE DOWNTOWN SPECIFIC PLAN. Carried unanimously. GUM TREE LANE 15690/ACCESSORY UNIT/RESOLUTION 2000-99 (12.09) Motion by Mr. Hutchins, seconded by Mr. Pirzynski, that Council adopt Resolution 2000-99 entitled. RESOLUTION OF THE TOWN OF LOS GATOS GRANTING AN APPEAL OF A PLANNING COMMISSION DECISION REQUESTING APPROVAL TO CONSTRUCT AN ACCESSORY LIVING QUARTER AND A VARIANCE APPLICATION TO EXCEED THE ALLOWABLE HEIGHT ON PROPERTY ZONED HR-2.5. Carried unanimously. STORM DRAIN IMPROVEMENT PROJECTS/RESOLUTION 2000-100 (13.35) PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES PROJECT 00-24 - MASSOL/NICHOLSON/TAIT/HERNANDEZ AVENUES PROJECT 00-35 - CYPRESS/HIGH STREETS PROJECT 00-36 - LORA DRIVE PROJECT 00-39 - BACHMAN PARK STORM DRAIN CONSTRUCTION Motion by Mr. Hutchins, seconded by Mr. Pirzynski, that Council adopt Resolution 2000-100 entitled. RESOLUTION OF THE TOWN OF LOS GATOS AUTHORIZING THE AWARD AND EXECUTION OF A CONSTRUCTION CONTRACT WITH MCH GENERAL ENGINEERING CONTRACTORS, INC. FOR STORM DRAINAGE IMPROVEMENT PROJECTS: PROJECT 00-12 - HOLLYWOOD/YOSEMITE/WHEELER AVENUES; PROJECT 00-24 - MASSOL NICHOLSON/TAIT/HERNANDEZ AVENUES; PROJECT 00-35 - CYPRESS/HIGH STREETS; PROJECT 00-36 - LORA DRIVE; PROJECT 00-39 - BACHMAN PARK STORM DRAIN CONSTRUCTION. Carried unanimously. VERBAL COMMUNICATIONS Music In The Plaza: Ray Davis, resident, spoke highly of the Music in the Plaza program and encouraged others to attend. Anti Graffiti Program: John Tice, 570 University Ave, #13, has been working with San Jose on the severe graffiti problem on the Highway 85/Winchester overpass and asked Council to agendize this issue and address the three overpasses in this location at the same time. The City of San Jose, CalTrans and Union Pacific are all taking a part in this graffiti program. Council Consensus to put this subject on the agenda as soon as information is compiled. PUBLIC HEARINGS ABATEMENT OF HAZARDOUS VEGETATION (BRUSH)/RESOLUTION 2000-101 (14.28) Mayor Blanton announced that this was the time and place so noted for public hearing to consider and confirm report and assessment on abatement of brush within the Town of Los Gatos. TC: D I I : MM080700 3 1