Verbal Gus Who < w`" w % The Curb,Gutter,and Sidewalk Maintenance Project was advertised for bid on Friday,February 20,2026. On March 17,2026,bids were opened with twelve contractors submitting bids. A summary of bid results is presented in Table 1 with QLM,Inc.as the apparent low bidder. A detailed bid summary is included in Attachment 2. Table 1.Bid Results for the Annual Curb,Gutter,and Sidewalk Maintenance Project(CIP No. 813-9921) Contractor I Base Bid Engineers Estimate $820,000.00 QLM,Inc. $646,336.00 Spektren Engineering,Inc. $646,465.19 Duran Construction Group $705,072.00 Bosco Co. $731,112.00 ASG Builders $798,927.60 _Sposeto Engineering Inc. $804,078.50 Zara Construction,Inc. $819,850.00 pencon Construction $832,592.00 FBD Vanguard Construction,Inc. $873,236.00 JJR Construction,Inc. $914,281.00 SAE Consulting Engineering $1,063,910.00 Precision Grade Inc. $1,225,022.52 Staff reviewed the bids received for responsiveness and responsibility.Based on this review, QLM Inc.was determined to be the lowest responsive and responsible bidder.The proposed construction contract amount of$646,336.00 is below the engineer's estimate and is consistent with the scope of work identified in the construction documents.The bid submitted by QLM, Inc.is approximately 21%below the Engineer's Estimate,indicating competitive pricing rn jetenf u.ifk r,I rrcnt n.mrLa*rnnriitinne