Loading...
Attachment 6 - Project Proposal and JustificationDemolition & Rebuild Proposal – 313 University Avenue, Los Gatos Submitted by: Frank & Michelyn Delgado (Property Owners) Date: 10/3/2025 HPC Meeting Target Date: October/November Request Summary We are requesting: 1. Demolition Permit for the existing unsafe structure at 313 University Avenue. 2. Planning and Building Permit for a full reconstruction/restoration of the original home, using archival photos and period-appropriate materials to match the structure as it existed. Site & Structure Overview - Address: 313 University Ave., Los Gatos, CA-Historic Status: Contributor to University-Edelen Historic District - Original Construction Era: c. 1908–1928 - Structure Type: Single-story wood-framed residence (~850 sq ft) - Historic Style: Vernacular Craftsman or Bungalow Demolition Justification As outlined in the attached structural assessment by Structural Engineers, Inc. (Paul Slattery, SE): - Extensive termite damage, dry rot, and structural decay - Eroded, unanchored shoring at the basement edge - No flooring system; structure is suspended above excavation - Recommendation: Immediate demolition due to life-safety risk Per Section 4.5 of the Residential Design Guidelines, demolition is permitted when necessary for restoration. Proposed Rebuild / Restoration Plan Design Intent: -Match the original architecture as shown in archival photo - Retain contributing elements: gable roof, rafter tails, porch, wood siding, original window types Likely Historic Materials (c. 1908–1928): - Wood siding: 1x6 or 1x8 horizontal clapboard or shingles - Roofing: Wood shakes or composition shingles - Trim: Painted solid wood corner boards, fascia, and casings ATTACHMENT 6 - Foundation: Redwood mudsill over brick or early concrete - Windows: True divided-lite wood sash (6-over-1 or 4-over-1) Next Steps 1. Demolition Approval - Based on engineering report - Section 4.5 restoration pathway 2. Planning Review of Rebuild Concept - Elevations and site plan sketch 3. HPC Submission – - Structural report, photo, narrative, restoration plan 4. Post-Approval Actions - Demolish and backfill - Submit full construction drawings - Rebuild per historic guidelines