Loading...
Attachment 2 - Details of Project RevisionsTOWN OF LOS GATOS Ms. Maria Chavarin (Planning) Mr. Robert Gray (Building) Ms. Susan O’Brien (OCC - Building) 110 East Main Street Los Gatos, CA 95030 Tuesday, October 21, 2025 RE: Snigdha/Dharmavaram Residence 328 Bachman Avenue Los Gatos CA, 95030 B25-0330 Ladies & gentlemen, This letter is intended to explain and/or identify voluntary revisions made to the plans based on returning preliminary construction cost items. All revisions are noted with “B2” for the Building Permit 2nd Review. I have indicated the sheets that were revised with more detailed descriptions of the changes. PLANNING DIVISION: (Ms Chavarin) 1.With respect to Planning implications, the following changes were made which would have negated most of the reviews already completed. The owner has decided to completely abandon the reconstruction of the Cellar/Basement. The plan is to now simply reconstruct the stairs to be more inviting with respect to rise/run, but all other aspects shall remain “as-is”. Due to the above, there will be NO light-wells so “Tree-Protection” fencing is no longer required. The entire 2nd story addition has also been reconfigured to be a simple second dormer to match the existing along that same roof plane. See also the changes made for the Building Division for description. BUILDING DIVISION: (Mr. Gray, Ms. O’Brien) 1.A1.1: TITLE SHEET/SITE PLAN: New floor areas have been identified with the reduction of scope of work, specifically the 2nd story addition. 2.A1.1: TITLE SHEET/SITE PLAN: All light-wells have been removed and storm water retention wattles have been reconfigured and dedicated to the area of scope of work. 3.A2.1: CELLAR/BASEMENT FLOOR PLAN(S): Revised so only the stair is noted for reconstruction. All windows in that space shall remain. 4.A2.2: 1ST LEVEL FLOOR PLAN(S): The front bedroom bath/closet has been reconfigured resulting in the elimination of a proposed new window along that right side exterior wall. 638 University Avenue Los Gatos. California. 95032 T 408.292.3252 F 253.399.1125 studio-three.com ATTACHMENT 2 5.A2.3: 2ND LEVEL FLOOR PLAN(S): As previously mentioned, the Primary Bathroom Suite has been completely reconfigured to ONLY include a new dormer matching the existing. 6.A2.4: ROOF PLAN(S): Correct roof line layout has been revised indicating the new dormer. 7.A2.5: (E) “COLORIZED” EXTERIOR ELEVATIONS: Slight adjustments to the (e) exterior elevations have been made indicating the reduction of demolition. 8.A3.1: EXTERIOR ELEVATIONS: All plan adjustments made resulting in exterior modifications have been made. 9.A3.2: EXTERIOR ELEVATIONS: All plan adjustments made resulting in exterior modifications have been made. 10.A3.3: EXTERIOR ELEVATIONS: All plan adjustments made resulting in exterior modifications have been made. 11.A3.4: EXTERIOR ELEVATIONS: All plan adjustments made resulting in exterior modifications have been made. 12.A4.1: SECTIONS: All plan adjustments made resulting in sectional modifications have been made. 13.A4.2: SECTIONS: All plan adjustments made resulting in sectional modifications have been made. 14.ME.1: CELLAR/BASEMENT ELECTRICAL: Reduced scope of work indicated. 15.ME.2: 1ST LEVEL ELECTRICAL: Reduced scope of work indicated. 16.ME.3: 2ND LEVEL ELECTRICAL: Revised scope of work indicated. 17.S.1: FOUNDATION PLAN: Revision to scope of work indicated, stamped & signed by EOR. 18.S.2: 2ND LEVEL FLOOR FRAMING: Revision to scope of work indicated, stamped & signed by EOR. 19.S.3: ROOF FRAMING: Revision to scope of work indicated, stamped & signed by EOR. 20.T24: New Title 24 Energy Calculations provided for reduction of SF, glass area, etc….. 21.STRUCTURAL CALCS: New calculations provided for redesign of shear, beams, etc… If you have any further questions or requirements, please do not hesitate to ask. Best, M. Mike Rowe for Studio-Three