Exhibit 3 - Draft Conditions of Approval for Architecture and Site, Variance, and Lot MergerPLANNING COMMISSION – September 10, 2025 CONDITIONS OF APPROVAL
15860-15894 Winchester Boulevard and 17484 Shelburne Way
Architecture and Site Application S-25-034
Variance Application V-25-001
Subdivision Application M-25-007
Consider a Request for Approval of a One-Year Time Extension for the Existing
Architecture and Site (S-21-008), Conditional Use Permit (U-21-010), Variance
(V-21-003), and Lot Merger (M-22-008) Applications to Demolish One Existing Office
and Four Residential Buildings, Construct an Assisted Living and Memory Care
Facility, a Variance from the Maximum Height and Lot Coverage of the Zone, Merger
of Four Lots Into One, and Removal of Large Protected Trees on Property Zoned O.
APN 529-11-013, -038, -039, and -040. A Mitigated Negative Declaration (ND-22-001)
was Adopted for this Project.
Applicant/Property Owner: Green Valley Corp. d.b.a. Swenson.
TO THE SATISFACTION OF THE DIRECTOR OF COMMUNITY DEVELOPMENT:
Planning Division
1. APPROVAL: This application shall be completed in accordance with all of the conditions
of approval and in substantial compliance with the approved plans. Any changes or
modifications to the approved plans and/or business operation shall be approved by the
Community Development Director, DRC, or the Planning Commission depending on the
scope of the changes.
2. EXPIRATION: The approval will expire one year (September 10, 2026) from the approval
date pursuant to Section 29.20.325 of the Town Code, unless the approval has been
vested. unless the approval has been vested per Section 29.20.335 of the Town Code.
Reasonable extensions of time not exceeding one year may be granted upon
application, and can be granted if approved by the deciding body prior to the expiration
date. Therefore, it is recommended that applications for a time extension be filed with
the Community Development Department at least 60 days prior to the expiration date
of the approval.
3. HEIGHT REDUCTION: The building height shall be reduced through plate height
reductions of one foot each for second and third floors, and roof height reduction of an
additional six (6) inches.
4. SCREENING TREES: Trees planted along the south property line for screening shall be
evergreen.
5. SIGN PERMIT: A Sign Permit from the Los Gatos Community Development Department
must be obtained prior to any changes to existing signs or installation of new signs.
6. OUTDOOR LIGHTING: Exterior lighting shall be kept to a minimum, and shall be down
directed fixtures that will not reflect or encroach onto adjacent properties. No flood
lights shall be used unless it can be demonstrated that they are needed for safety or
EXHIBIT 3
security.
7. TREE REMOVAL PERMIT: A Tree Removal Permit shall be obtained for any trees to be
removed, prior to the issuance of a building or grading permit.
8. EXISTING TREES: All existing trees shown on the plan and trees required to remain or to
be planted are specific subjects of approval of this plan, and must remain on the site.
9. TREE FENCING: Protective tree fencing and other protection measures shall be placed at
the drip line of existing trees prior to issuance of demolition and building permits and
shall remain through all phases of construction. Include a tree protection plan with the
construction plans.
10. ARBORIST REQUIREMENTS: The developer shall implement, at their cost, all
recommendations identified in the Arborist’s report and Arborist’s Peer Review for the
project, on file in the Community Development Department. These recommendations
must be incorporated in the building permit plans and completed prior to issuance of a
building permit where applicable.
11. TREE STAKING: All newly planted trees shall be double-staked using rubber tree ties.
12. FRONT YARD LANDSCAPE: Prior to issuance of a Certificate of Occupancy the front yard
must be landscaped.
13. WATER EFFICIENCY LANDSCAPE ORDINANCE: The final landscape plan, including
landscape and irrigation plans and calculations, shall meet the Town of Los Gatos Water
Conservation Ordinance or the State Water Efficient Landscape Ordinance, whichever is
more restrictive. The final landscape plan shall be reviewed by the Town’s consultant
prior to issuance of building permits. A review fee based on the current fee schedule
adopted by the Town Council is required when working landscape and irrigation plans
are submitted for review.
14. ROOFTOP EQUIPMENT: Any new or modified roof-mount equipment shall be fully
screened and painted to match the roof material prior to issuance of an occupancy
permit.
15. STORY POLES: The story poles on the project site shall be removed within 30 days of
approval of the Architecture & Site application.
16. TOWN INDEMNITY: Applicants are notified that Town Code Section 1.10.115 requires
that any applicant who receives a permit or entitlement (“the Project”) from the Town
shall defend (with counsel approved by Town), indemnify, and hold harmless the Town,
its agents, officers, and employees from and against any claim, action, or proceeding
(including without limitation any appeal or petition for review thereof) against the Town
or its agents, officers or employees related to an approval of the Project, including
without limitation any related application, permit, certification, condition,
environmental determination, other approval, compliance or failure to comply with
applicable laws and regulations, and/or processing methods (“Challenge”). Town may
(but is not obligated to) defend such Challenge as Town, in its sole discretion,
determines appropriate, all at applicant’s sole cost and expense.
Applicant shall bear any and all losses, damages, injuries, liabilities, costs and expenses
(including, without limitation, staff time and in-house attorney’s fees on a fully-loaded
basis, attorney’s fees for outside legal counsel, expert witness fees, court costs, and
other litigation expenses) arising out of or related to any Challenge (“Costs”), whether
incurred by Applicant, Town, or awarded to any third party, and shall pay to the Town
upon demand any Costs incurred by the Town. No modification of the Project, any
application, permit certification, condition, environmental determination, other
approval, change in applicable laws and regulations, or change in such Challenge as
Town, in its sole discretion, determines appropriate, all the applicant’s sole cost and
expense. No modification of the Project, any application, permit certification, condition,
environmental determination, other approval, change in applicable laws and
regulations, or change in processing methods shall alter the applicant’s indemnity
obligation.
Per Government Code Section 66474.9, Applicant’s indemnification obligation with
respect to any Challenge concerning a subdivision (tentative, parcel, or final map
application or approval) shall be limited to actions brought within the time period
provided for in Government Code Section 66499.37, unless such time period is extended
for any reason. The Town shall promptly notify Applicant of any such claim, action, or
proceeding and shall cooperate fully in the defense.
17. COMPLIANCE MEMORANDUM: A memorandum, in compliance with standard Town
practice, shall be prepared and submitted with the building permit detailing how the
conditions of approval will be addressed.
ENVIRONMENTAL REVIEW MITIGATION MEASURE CONDITIONS:
18. Mitigation Measure IV-1: A pre-construction survey for nesting birds shall be conducted
by a qualified biologist within a 250-foot buffer around the project site boundaries, if
feasible, not more than three days prior to site disturbance during the breeding season
(February 1st to August 31st). If site disturbance commences outside the breeding
season, a pre-construction survey for nesting birds is not required. Survey results shall
be submitted to the Town of Los Gatos Community Development Department. If active
nests of migratory birds are not detected within approximately 250 feet of the project
site, further mitigation is not required. If nesting birds are detected, the applicant shall
implement Mitigation Measure IV-2.
19. Mitigation Measure IV-2: If nesting raptors or other migratory birds are detected on or
adjacent to the site during the survey, an appropriate construction-free buffer shall be
established around all active nests. Actual size of buffer would be determined by the
project biologist, and would depend on species, topography, and type of activity that
would occur in the vicinity of the nest. Typical buffers are 25 feet for non-raptors and up
to 250 feet for raptors. The project buffer shall be monitored periodically by the project
biologist to ensure compliance. After the nesting is completed, as determined by the
biologist, the buffer shall no longer be required. Buffers shall remain in place for the
duration of the breeding season or until a qualified biologist has confirmed that all
chicks have fledged and are independent of their parents. Proof of compliance with this
Mitigation Measure shall be provided to the Town of Los Gatos Community
Development Department prior to recommencing construction within the buffer area.
20. Mitigation Measure IV-3: The applicant shall comply with the Town of Los Gatos Tree
Protection Ordinance and a tree removal permit shall be obtained from the Town for
the removal of any on-site trees that qualify as a protected tree. If the trees proposed
for removal are found to be in good condition, and the tree removal permit is granted
primarily for the convenience of the applicant, then the full cost and responsibility of
such removal shall be borne by the applicant including planting of replacement trees.
Where replanting is impractical or infeasible, the property owner may pay an in-lieu fee
in an amount approved by the Town Council. New trees planted on site shall have a
trunk diameter of more than 1.5 inches. The above noted requirements shall be
completed to the satisfaction of the Town of Los Gatos Parks and Public Works
Department.
21. Mitigation Measure IV-4: The project applicant shall comply with all recommendations
included in the Arborist Report prepared for the proposed project by Arborist Resources
(2021) to ensure that tree protection measures are incorporated into the project design
and construction. Recommended tree protection measures include, but are not limited
to, establishing tree protection zones (TPZs) and setbacks for each protected tree;
installing tree protection fencing around each TPZ which would include warning signs
stating, “WARNING - Tree Protection Zone - this fence shall not be removed and is
subject to penalty according to Town Code 29.10.1025”; avoiding damaging or cutting
roots with a diameter of two or more inches; avoiding the use of herbicides; establishing
staging, cleanout areas, and all routes of access beyond unpaved areas beneath tree
canopies; and conducting a site meeting with the general contractor and project arborist
several weeks or months prior to demolition for the purpose of reviewing all tree
protection measures. All relevant recommendations included in the Arborist Report
shall be noted on project Improvement Plans. Compliance with the recommended tree
protection measures shall be monitored by the Town of Los Gatos Parks and Public
Works Department and a qualified arborist.
22. Mitigation Measure V-1: If historic or archeological resources are encountered during
subsurface excavation activities, all construction activities within a 100-foot radius of
the resource shall cease until a qualified archaeologist determines whether the resource
requires further study. The Town shall require that the applicant include a standard
inadvertent discovery clause in every construction contract to inform contractors of this
requirement. Any previously undiscovered resources found during construction shall be
recorded on appropriate California Department of Parks and Recreation forms and
evaluated for significance in terms of California Environmental Quality Act (CEQA)
criteria by a qualified archaeologist. Potentially significant cultural resources consist of,
but are not limited to, stone, bone, fossils, wood, or shell artifacts or features, including
hearths, structural remains, or historic dumpsites.
If the resource is determined to be significant under CEQA, the Town and a qualified
archaeologist shall determine whether preservation in place is feasible. Such
preservation in place is the preferred mitigation. If such preservation is infeasible, the
qualified archaeologist shall prepare and implement a research design and
archaeological data recovery plan for the resource. The archaeologist shall also conduct
appropriate technical analyses, prepare a comprehensive written report and file it with
the appropriate information center (California Historical Resources Information System),
and provide for the permanent curation of the recovered materials.
23. Mitigation Measure V-2: If human remains, or remains that are potentially human, are
found during construction, all work shall be halted immediately within 200 feet, and a
professional archeologist shall ensure reasonable protection measures are taken to
protect the discovery from disturbance. The archaeologist shall notify the Contra Costa
County Coroner (per §7050.5 of the State Health and Safety Code). The provisions of
§7050.5 of the California Health and Safety Code, §5097.98 of the California Public
Resources Code, and Assembly Bill 2641 will be implemented. If the Coroner determines
the remains are Native American and not the result of a crime scene, then the Coroner
will notify the Native American Heritage Commission (NAHC), which then will designate
a Native American Most Likely Descendant (MLD) for the project (§5097.98 of the Public
Resources Code). The designated MLD will have 48 hours from the time access to the
property is granted to make recommendations concerning treatment of the remains. If
the applicant does not agree with the recommendations of the MLD, the NAHC can
mediate (§5097.94 of the Public Resources Code). If an agreement is not reached, the
qualified archaeologist or MLD must rebury the remains where they will not be further
disturbed (§5097.98 of the Public Resources Code). This will also include either
recording the site with the NAHC or the appropriate Information Center, using an open
space or conservation zoning designation or easement, or recording a reinternment
document with the county in which the property is located (AB 2641). Work cannot
resume within the no-work radius until the lead agency, through consultation as
appropriate, determines that the treatment measures have been completed to the
Town’s satisfaction.
24. Mitigation Measure VII-1: The project applicant shall include all relevant 2019 CBSC
standards, as recommended by the Design-Level Geotechnical Investigation prepared by
Cornerstone Earth Group (2021) on all project improvement plans to ensure that the
recommended standards for development of foundations, subsurface improvements,
etc. are incorporated into the project design and construction. All project improvement
plans shall be reviewed by a licensed engineer and approved by the Town of Los Gatos
Community Development Department and the Town’s Engineer.
25. Mitigation Measure VIII-1: The following requirements shall be noted on project
improvement plans, subject to review and approval by the Town of Los Gatos
Community Development Department:
• The proposed project shall be designed such that the project is built all-electric, and
natural gas infrastructure shall be prohibited on-site; and
• A minimum 10 electric vehicle (EV) capable parking spaces shall be included on-site,
consistent with the Tier 2 CALGreen standards.
26. Mitigation Measure IX-1: Following demolition and prior to issuance of a grading
permit, a sampling grid shall be superimposed across the site and discrete shallow
samples shall be collected. The samples shall be tested for organochlorine pesticides to
determine whether Regional Water Quality Control Board Environmental Screening
Levels (ESLs) are exceeded in any samples. The applicant shall submit a report to the
Parks and Public Works Department for review and approval that includes, but is not
limited to, sampling activities performed, relevant ESLs for identified contaminants,
summary of contaminated concentrations, and locations where ESLs are exceeded, if
any. If ESLs are exceeded in on-site soils, the impacted areas shall be removed and
properly disposed of under oversight by the Santa Clara County Department of
Environmental Health (SCCDEH) prior to issuance of a grading permit; and proof of
remediation under SCCDEH oversight shall be provided to the Town of Los Gatos Parks
and Public Works Department prior to grading. For larger quantities of soils that are
non-hazardous, subject to approval by the Town of Los Gatos Parks and Public Works
Department, such soils may generally be placed under interior roads, parking areas, or
buildings during normal grading operations, and verification of proper handling and
disposal.
27. Mitigation Measure IX-2: Prior to issuance of a demolition permit for on-site structures,
the project applicant shall consult with certified Asbestos and/or Lead Risk Assessors to
complete an asbestos and lead survey. The completed asbestos and lead survey shall be
submitted to the Town of Los Gatos Building Department for review and approval. If
asbestos-containing materials or lead-containing materials are not discovered during
the survey, further mitigation related to asbestos-containing materials or lead-
containing materials shall not be required. If asbestos-containing materials and/or lead-
containing materials are discovered by the survey, the project applicant shall prepare a
work plan to demonstrate how the on-site asbestos-containing materials and/or lead-
containing materials shall be removed in accordance with current California
Occupational Health and Safety (Cal-OSHA) Administration regulations and disposed of
in accordance with all CalEPA regulations, prior to the demolition and/or removal of the
on-site structures. The plan shall include the requirement that work shall be conducted
by a Cal-OSHA registered asbestos and lead abatement contractor in accordance with
Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training,
engineering controls, and certifications. The applicant shall submit the work plan to the
Town for review and approval. The Town has the right to defer the work plan to the
SCCDEH for additional review. Materials containing more than one (1) percent asbestos
that is friable are also subject to BAAQMD regulations. Removal of materials containing
more than one (1) percent friable asbestos shall be completed in accordance with
BAAQMD Section 11-2-303.
28. Mitigation Measure XIII-1: Prior to approval of demolition permits the following
requirements shall be noted on project improvement plans, subject to review and
approval by the Town of Los Gatos Community Development Department:
• Operational and Situational Controls:
o All work on-site shall be restricted to the hours of 8:00 AM to 8:00 PM
Weekdays, and 9:00 AM to 7:00 PM weekends and Holidays, pursuant to the
requirements of the Town of Los Gatos Noise Ordinance.
o All exterior stationary equipment shall be kept at least 100 feet from neighboring
property lines unless acoustically shielded.
o Material deliveries shall not be allowed on Sundays or Federal Holidays.
o Cranes shall be located at least 100 feet from any neighboring property line with
the exception of cranes or lifts necessary to dismantle scaffolding.
o Material movement along the east and south sides of the site shall be minimized.
o Stockpiles shall be located adjacent to neighbors as much as possible to help
shield people from on-site noise generation.
o Music shall not be audible off-site.
o Dirt berming and stockpiling materials shall occur whenever possible to reduce
noise to sensitive receptor locations.
o Mobile equipment such as haul trucks, and concrete trucks, shall be kept off of
local streets near residences as much as possible.
o Vehicle paths shall be graded smooth as rough roads and paths can cause
significant noise and vibration from trucks (particularly empty trucks) rolling over
rough surfaces. Loud bangs and ground-borne vibration can occur.
• Interior Work:
o For interior work, the windows of the interior spaces facing neighbors where
work is being performed shall be kept closed while work is proceeding.
o Noise generating equipment indoors shall be located within the building to use
building elements as noise screens.
• Equipment:
o Earth Removal: Use scrapers as much as possible for earth removal, rather than
the noisier loaders and hauling trucks.
o Backfilling: Use a backhoe for backfilling, as it is quieter than either dozers or
loaders.
o Ground Preparation: Use a motor grader rather than a bulldozer for final
grading. Wheeled heavy equipment is less noisy than track equipment. Use
wheeled equipment rather than track equipment whenever possible, with the
exception of work within the vibration distances shown in Table IV of the Noise
Assessment Study. The soil conditions at the site indicate that wheeled
equipment may generate higher levels of ground vibration than tracked
equipment. Small, rubber tracked equipment, such as skid steers, would produce
the lowest levels of noise and vibration
o Building Construction: Nail guns shall be used where possible as they are less
noisy than manual hammering.
o Generators and Compressors: Use generators, compressors and pumps that are
housed in acoustical enclosures rather than weather enclosures or none at all.
o Use temporary power service from the utility company in lieu of generators
wherever possible.
o All stationary equipment shall be rated no higher than 85 dBA at 25 feet under
the equipment’s most noisy condition.
o Circular saws, miter/chop saws and radial arm saws shall be used no closer than
50 feet from any residential property line unless the saw is screened from view
by any and all residences using an air-tight screen material of at least two
pounds per sf surface weight, such as three-quarter-inch plywood.
o Use electrically powered tools rather than pneumatic tools whenever possible.
o Mitigation of the construction phase noise at the site can be accomplished by
using quiet or "new technology" equipment.
o The greatest potential for noise abatement of current equipment shall be the
quieting of exhaust noises by use of improved mufflers.
o All internal combustion engines used at the project site shall be equipped with a
type of muffler recommended by the vehicle manufacturer.
o All equipment shall be in good mechanical condition so as to minimize noise
created by faulty or poorly maintained engines, drive-trains and other
components. Worn, loose or unbalanced parts or components shall be
maintained or replaced to minimize noise and vibration.
o Use wheeled equipment rather than tracked equipment whenever possible.
o Use the lowest vibration inducing equipment when within the distance limits
shown in Table IV of the Noise Assessment Study. Small grading and earth
moving equipment, such as “Bobcat” size equipment shall be used.
• Noise Complaint Management:
o The project applicant shall designate a noise complaint officer. The officer shall
be available at all times during construction hours by both telephone and email.
Signs shall be posted at site entries.
o Notify, in writing, all residential and noise sensitive commercial neighbors within
300 feet of the site of construction. The notification shall contain the name,
phone number, and email address of the noise complaint officer. A flyer may be
placed at the doors of the residences.
o A log of all complaints shall be maintained. The logs shall contain the name and
address of the complainant, the date and time of the complaint, the
nature/description of the noise source, a description of the remediation attempt
or the reason remediation could not be attempted.
29. Mitigation Measure XVII-1: The following requirements shall be noted on project
improvement plans, subject to review and approval by the Town of Los Gatos Parks and
Public Works Department:
• A minimum of one long term and three short term bicycle parking spaces shall be
included on-site, consistent with the VTA Bicycle Technical Guidelines; and
• A new crosswalk shall be installed to cross Shelburne Way at Winchester Boulevard.
The crosswalk shall meet the standards of the Town of Los Gatos.
30. Mitigation Measure XVII-3: The following requirement shall be noted on project
improvement plans, subject to review and approval by the Town of Los Gatos Parks and
Public Works Department:
• Red curbs shall be implemented adjacent to both sides of the project driveways to
prohibit parking and ensure adequate sight distance.
Building Division
31. PERMITS REQUIRED: A Demolition Permit is required for the demolition of each existing
dwelling. A separate Building Permit is required for the construction of the new multi-
story, multi-family residential development and parking garage. A separate permit is
required for the photovoltaic system required by the California Energy Code.
32. APPLICABLE CODES: The current codes, as amended and adopted by the Town of Los
Gatos as of January 1, 2023, are the 2022 California Building Standards Code, California
Code of Regulations Title 24, Parts 1-12.
33. CONDITIONS OF APPROVAL: The Conditions of Approval must be included on plan
sheets within the construction plans. A Compliance Memorandum detailing how the
conditions of approval will be addressed shall be prepared and submitted with the
building permit application.
34. BUILDING & SUITE NUMBERS: Submit requests for new building addresses to the
Building Division prior to submitting for the building permit application process.
35. SIZE OF PLANS: Minimum size 24” x 36”, maximum size 30” x 42”.
36. REQUIREMENTS FOR COMPLETE DEMOLITION OF STRUCTURE: Obtain a Building
Department Demolition Application and a Bay Area Air Quality Management District
Application for the removal of each existing structure. Once the demolition form has
been completed, all signatures obtained, and written verification from PG&E that all
utilities have been disconnected, submit the completed form to the Building
Department with the Air District’s J# Certificate, PG&E verification, and site plans
showing all existing structures, existing utility service lines such as water, sewer, and
PG&E. No demolition work shall be done without first obtaining a permit from the
Town.
37. AIR QUALITY: To limit the project’s construction-related dust and criteria pollutant
emissions, the following the Bay Area Air Quality Management District (BAAQMD)-
recommended basic construction measures shall be included in the project’s grading
plan, building plans, and contract specifications:
a. Idling times shall be minimized either by shutting equipment off when not in use or
reducing the maximum idling time to 2 minutes. Clear signage shall be provided for
construction workers at all access points.
b. All construction equipment shall be maintained and properly tuned in accordance
with manufacturer’s specifications. All equipment shall be checked by a certified
visible emissions evaluator. All non-road diesel construction equipment shall at a
minimum meet Tier 3 emission standards listed in the Code of Federal Regulations
Title 40, Part 89, Subpart B, §89.112.
c. Developer shall designate an on-site field supervisor to provide written notification
of construction schedule to adjacent residential property owners and tenants at
least one week prior to commencement of demolition and one week prior to
commencement of grading with a request that all windows remain closed during
demolition, site grading, excavation, and building construction activities in order to
minimize exposure to NOx and PM10. The on-site field supervisor shall monitor
construction emission levels within five feet of the property line of the adjacent
residences for NOx and PM10 using the appropriate air quality and/or particulate
monitor.
38. SOILS REPORT: A Soils Report, prepared to the satisfaction of the Building Official,
containing foundation and retaining wall design recommendations, shall be submitted
with the Building Permit Application. This report shall be prepared by a licensed Civil
Engineer specializing in soils mechanics.
39. SHORING: Shoring plans and calculations will be required for all excavations which
exceed five
40. (5) feet in depth, or which remove lateral support from any existing building, adjacent
property, or the public right-of-way. Shoring plans and calculations shall be prepared by
a California- licensed engineer and shall conform to the Cal/OSHA regulations.
41. FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed civil engineer or
land surveyor shall be submitted to the project Building Inspector at the foundation
inspection. This certificate shall certify compliance with the recommendations as
specified in the Soils Report, and that the building pad elevations and on-site retaining
wall locations and elevations have been prepared according to the approved plans.
Horizontal and vertical controls shall be set and certified by a licensed surveyor or
registered Civil Engineer for the following items:
a. Building pad elevation
b. Finish floor elevation
c. Foundation corner locations
d. Retaining wall(s) locations and elevations
42. TITLE 24 ENERGY COMPLIANCE: All required California Title 24 Energy Compliance Forms
must be directly printed onto a plan sheet.
43. SITE ACCESSIBILITY: At least one accessible route within the boundary of the site shall be
provided from public transportation stops, accessible parking, accessible passenger
loading zones, and public streets or sidewalks to the accessible building entrance that
they serve. The accessible route shall, to the maximum extent feasible, coincide with the
route for the general public. At least one accessible route shall connect all accessible
buildings, facilities, elements, and spaces that are on the same site.
44. ACCESSIBLE PARKING: The parking lots, as well as the parking structure, where parking is
provided for the public, as well as clients, guests, or employees, shall provide accessible
parking. Accessible parking spaces serving a particular building shall be located on the
shortest accessible route of travel from adjacent parking to an accessible entrance. In
buildings with multiple accessible entrances with adjacent parking, accessible parking
spaces shall be dispersed and located closest to the accessible entrances.
45. BACKWATER VALVE: As required by Town Ordinance 6.40.020, provide details for any
required sanitary sewer backwater valve on the plans and provide its location. The Town
of Los Gatos Ordinance and West Valley Sanitation District (WVSD) require backwater
valves on drainage piping serving fixtures that have flood level rims less than 12 inches
above the elevation of the next upstream manhole.
46. HAZARDOUS FIRE ZONE: All projects in the Town of Los Gatos require Class A roof
assemblies.
47. SPECIAL INSPECTIONS: When a special inspection is required by CBC Section 1704, the
Architect or Engineer of Record shall prepare an inspection program that shall be
submitted to the Building Official for approval prior to issuance of the Building Permit.
The Town Special Inspection form must be completely filled out and signed by all
requested parties prior to permit issuance. Special Inspection forms are available online
at www.losgatosca.gov/building.
48. CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs): The Town standard West
Valley Clean Water Authority Nonpoint Source Pollution Control Program Sheet (page
size same as submitted drawings) shall be part of the plan submittal. The specification
sheet is available online at www.losgatosca.gov/building.
49. APPROVALS REQUIRED: The project requires the following departments and agencies'
approval before issuing a building permit:
a. Community Development – Planning Division: (408) 354-6874
b. Engineering/Parks & Public Works Department: (408) 399-5771
c. Santa Clara County Fire Department: (408) 378-4010
d. West Valley Sanitation District: (408) 378-2407
e. Santa Clara County Environmental Health Department: (408) 918-3479
f. Local School District: The Town will forward the paperwork to the appropriate
school district(s) for processing. A copy of the paid receipt is required prior to permit
issuance.
TO THE SATISFACTION OF THE DIRECTOR OF PARKS AND PUBLIC WORKS:
Engineering Division
47. GENERAL: All public improvements shall be made according to the latest adopted Town
Standard Plans, Standard Specifications and Engineering Design Standards. All work
shall conform to the applicable Town ordinances. The adjacent public right-of-way shall
be kept clear of all job-related mud, silt, concrete, dirt and other construction debris at
the end of the day. Dirt and debris shall not be washed into storm drainage facilities.
The storing of goods and materials on the sidewalk and/or the street will not be allowed
unless an encroachment permit is issued by the Engineering Division of the Parks and
Public Works Department. The Developer's representative in charge shall be at the job
site during all working hours. Failure to maintain the public right-of-way according to
this condition may result in the issuance of correction notices, citations, or stop work
orders and the Town performing the required maintenance at the Developer's expense.
48. APPROVAL: This application shall be completed in accordance with all the conditions of
approval listed below and in substantial compliance with the latest reviewed and
approved development plans. Any changes or modifications to the approved plans or
conditions of approvals shall be approved by the Town Engineer.
49. CONSTRUCTION PLAN REQUIREMENTS: Construction drawings shall comply with Section
1 (Construction Plan Requirements) of the Town’s Engineering Design Standards, which
are available for download from the Town’s website.
RIGHT-OF-WAY CONDITIONS:
50. ENCROACHMENT PERMIT: All work in the public right-of-way will require a Construction
Encroachment Permit. All work over $5,000 will require construction security. It is the
responsibility of the Developer to obtain any necessary encroachment permits from
affected agencies and private parties, including but not limited to, Pacific Gas and
Electric (PG&E), AT&T, Comcast, Santa Clara Valley Water District, California Department
of Transportation (Caltrans). Copies of any approvals or permits must be submitted to
the Town Engineering Division of the Parks and Public Works Department prior to
releasing any permit.
51. RESTORATION OF PUBLIC IMPROVEMENTS: The Developer or their representative shall
repair or replace all existing improvements not designated for removal that are
damaged or removed because of the Developer or their representative's operations.
Improvements such as, but not limited to: curbs, gutters, sidewalks, driveways, signs,
pavements, raised pavement markers, thermoplastic pavement markings, etc., shall be
repaired and replaced to a condition equal to or better than the original condition. Any
new concrete shall be free of stamps, logos, names, graffiti, etc. Any concrete identified
that is displaying a stamp or equal shall be removed and replaced at the Contractor’s
sole expense and no additional compensation shall be allowed therefore. Existing
improvement to be repaired or replaced shall be at the direction of the Engineering
Construction Inspector and shall comply with all Title 24 Disabled Access provisions. The
restoration of all improvements identified by the Engineering Construction Inspector
shall be completed before the issuance of a certificate of occupancy. The Developer or
their representative shall request a walk-through with the Engineering Construction
Inspector before the start of construction to verify existing conditions.
52. STREET/SIDEWALK CLOSURE: Any proposed blockage or partial closure of the street
and/or sidewalk requires an encroachment permit. Special provisions such as
limitations on works hours, protective enclosures, or other means to facilitate public
access in a safe manner may be required.
53. PUBLIC IMPROVEMENTS: The following improvements shall be installed by the
Developer. Plans for those improvements shall be prepared by a California registered
civil engineer, reviewed and approved by the Town, and guaranteed by contract,
Faithful Performance Security and Labor & Materials Security before the issuance of any
grading or building permits or the recordation of a map. Plans for the improvements
must be approved by the Town prior to the issuance of any grading or building permits.
The improvements must be completed and accepted by the Town before a Certificate of
Occupancy for any new building can be issued unless otherwise allowed by the Town
Engineer.
a) Winchester Blvd: New curb, gutter, minimum 5-foot detached sidewalk, minimum 4-
foot park strip, pavement, street lights, tie-in paving, signing striping, and 2-inch
grind and overlay along the eastern half of Winchester Boulevard.
b) Shelburne Way: New curb, gutter, minimum 5-foot detached sidewalk, minimum 4-
foot park strip, half-street pavement reconstruction along the southern half of the
roadway, 2-inch grind and overlay along the northern half of the roadway, signing,
and striping
c) Bicycle lane: The project shall re-stripe Winchester Boulevard along the project
frontage plus necessary conform transition for adding bicycle lanes. The roadway
shall be re-surfaced prior to striping.
d) Pedestrian crosswalk: The project shall provide a corner bulb-out and a striped
pedestrian crosswalk crossing Shelburne Way at Winchester Boulevard as directed
by Town Engineer.
e) Class IV bike lanes along Winchester Boulevard frontage and Class III bike lanes along
Shelburne Way frontages per the Town’s Bicycle and Pedestrian Master Plan.
f) Street lights: A new Town standard street light shall be installed on Winchester
Boulevard at the corner of Shelburne Way along the project frontage. A new Town
standard street light shall be installed on Shelburne Way along the project frontage
replacing an existing PG&E street light across the project site. The developer shall
coordinate with PG&E for the removal and installation.
54. PUBLIC WORKS INSPECTIONS: The Developer or their representative shall notify the
Engineering Inspector at least twenty-four (24) hours before starting any work
pertaining to on-site drainage facilities, grading or paving, and all work in the Town's
right-of-way. Failure to do so will result in penalties and rejection of any work that
occurred without inspection.
55. SITE SUPERVISION: The General Contractor shall provide qualified supervision on the job
site at all times during construction.
GRADING PERMIT CONDITIONS:
56. PLAN CHECK FEES: Plan check fees associated with the Grading Permit shall be
deposited with the Engineering Division of the Parks and Public Works Department prior
to the commencement of plan check review.
57. GRADING PERMIT FEES: All fees associated with the grading permit shall be deposited
with the Engineering Division of the Parks and Public Works Department prior to the
issuance of a grading permit.
58. GRADING PERMIT: A grading permit is required for all site grading and drainage work
except for exemptions listed in Section 12.20.015 of The Code of the Town of Los Gatos
(Grading Ordinance). After the preceding Architecture and Site Application has been
approved by the respective deciding body, the grading permit application (with grading
plans and associated required materials and plan check fees) shall be made to the
Engineering Division of the Parks and Public Works Department located at 41 Miles
Avenue. The grading plans shall include final grading, drainage, retaining wall
location(s), driveway, utilities and interim erosion control. Grading plans shall list
earthwork quantities and a table of existing and proposed impervious areas. Unless
specifically allowed by the Director of Parks and Public Works, the grading permit will be
issued concurrently with the building permit. The grading permit is for work outside the
building footprint(s). Prior to Engineering signing off and closing out on the issued
grading permit, the Developer’s soils engineer shall verify, with a stamped and signed
letter, that the grading activities were completed per plans and per the requirements as
noted in the soils report. A separate building permit, issued by the Building
Department, located at 110 E. Main Street, is needed for grading within the building
footprint.
59. DESIGN CHANGES: Any proposed changes to the approved plans shall be subject to the
approval of the Town prior to the commencement of any and all altered work. The
Developer’s project engineer shall notify, in writing, the Town Engineer at least seventy-
two (72) hours in advance of all the proposed changes. Any approved changes shall be
incorporated into the final “as-built” plans.
60. PLANS AND STUDIES: All required plans and studies shall be prepared by a Registered
Professional Engineer in the State of California and submitted to the Town Engineer for
review and approval. Additionally, any post-project traffic or parking counts, or other
studies imposed by the Planning Commission or Town Council shall be funded by the
Developer.
61. DRAINAGE IMPROVEMENT: Prior to the issuance of any grading/improvement permits,
whichever comes first, the Developer shall: a) design provisions for surface drainage;
and b) design all necessary storm drain facilities extending to a satisfactory point of
disposal for the proper control and disposal of storm runoff; and c) provide a recorded
copy of any required easements to the Town.
62. TREE REMOVAL: Copies of all necessary tree removal permits shall be provided prior to
the issuance of a grading permit/building permit.
63. SURVEYING CONTROLS: Horizontal and vertical controls shall be set and certified by a
licensed surveyor or registered civil engineer qualified to practice land surveying, for the
following items:
a) Retaining wall: top of wall elevations and locations.
b) Toe and top of cut and fill slopes.
64. PRECONSTRUCTION MEETING: Prior to issuance of any grading or building permits, the
general contractor shall:
a) Along with the Developer, attend a pre-construction meeting with the Town
Engineer to discuss the project conditions of approval, working hours, site
maintenance and other construction matters;
b) Acknowledge in writing that they have read and understand the project conditions
of approval and will make certain that all project sub-contractors have read and
understand them as well prior to commencing any work, and that a copy of the
project conditions of approval will be posted on-site at all times during construction.
65. RETAINING WALLS: A building permit, issued by the Building Department, located at 110
E. Main Street, may be required for site retaining walls. Walls are not reviewed or
approved by the Engineering Division of Parks and Public Works during the grading
permit plan review process.
SUBDIVISIONS/MAPS:
66. GENERAL: The Developer shall comply with all Town, County, State and Federal laws and
regulations applicable to this land division. No other proposed development is included
in this particular application of the lot merger. Issuance of a lot merger will
acknowledge the Town’s acceptance of the parcel as legally created in accordance with
the Subdivision Map Act. Any subsequent development will be required to demonstrate
compliance with the Town Development Standards and Codes.
67. LOT MERGER: A Lot Merger shall be recorded. Two (2) copies of the legal description for
exterior boundary of the merged parcel and a map shall be submitted to the
Engineering Division of the Parks and Public Works Department for review and approval.
The submittal shall include closure calculations, title reports less than ninety (90) days
old and the appropriate fee. The documents shall be recorded prior to the issuance of
any grading or building permits.
68. WEST VALLEY SANITATION DISTRICT: All sewer connection and treatment plant capacity
fees shall be paid either immediately prior the issuance of a sewer connection permit,
which ever event occurs first. Written confirmation of payment of these fees shall be
provided prior to map recordation.
GEOLOGICAL AND GEOLOGY:
69. SOILS REPORT: One electronic copy (PDF) of the soils and geologic report shall be
submitted with the application. The soils report shall include specific criteria and
standards governing site grading, drainage, pavement design, retaining wall design, and
erosion control. The reports shall be signed and "wet stamped" by the engineer or
geologist, in conformance with Section 6735 of the California Business and Professions
Code.
70. GEOLOGY AND SOILS MITIGATION MEASURE: A geotechnical investigation shall be
conducted for the project to determine the surface and sub-surface conditions at the
site and to determine the potential for surface fault rupture on the site. The
geotechnical study shall provide recommendations for site grading as well as the design
of foundations, retaining walls, concrete slab-on-grade construction, excavation,
drainage, on-site utility trenching and pavement sections. All recommendations of the
investigation shall be incorporated into project plans.
71. SOILS REVIEW: Prior to Town approval of a development application, the Developer’s
engineers shall prepare and submit a design-level geotechnical and geological
investigation for review by the Town’s consultant, with costs borne by the Developer,
and subsequent approval by the Town. The Developer’s soils engineer shall review the
final grading and drainage plans to ensure that designs for foundations, retaining walls,
site grading, and site drainage are in accordance with their recommendations and the
peer review comments. Approval of the Developer’s soils engineer shall then be
conveyed to the Town either by submitting a Plan Review Letter prior to issuance of
grading or building permit(s).
72. SOILS ENGINEER CONSTRUCTION OBSERVATION: During construction, all excavations
and grading shall be inspected by the Developer’s soils engineer prior to placement of
concrete and/or backfill so they can verify that the actual conditions are as anticipated
in the design-level geotechnical report and recommend appropriate changes in the
recommendations contained in the report, if necessary. The results of the construction
observation and testing shall be documented in an “as-built” letter/report prepared by
the Developer’s soils engineer and submitted to the Town before a certificate of
occupancy is granted.
73. SOIL RECOMMENDATIONS: The project shall incorporate the geotechnical/geological
recommendations contained in the Design-Level Geotechnical Investigation by
Cornerstone Earth Group dated February 10, 2021, and any subsequently required
report or addendum. Subsequent reports or addendum are subject to peer review by
the Town’s consultant and costs shall be borne by the Developer.
IMPROVEMENT PLANS:
74. IMPROVEMENT AGREEMENT: The Developer shall enter into an agreement to construct
public improvements in accordance with Town Code Section 24.40.020. The Developer
shall supply suitable securities for all public improvements that are part of the
development in a form acceptable to the Town in the amount of 100% performance and
100% labor and materials prior to the issuance of any encroachment, grading or building
permit. The Developer shall provide two (2) copies of documents verifying the cost of
the public improvements to the satisfaction of the Engineering Division of the Parks and
Public Works Department. An electronic copy (PDF) of the executed agreement shall be
submitted to the Engineering Division of the Parks and Public Works Department prior
to the issuance of any encroachment, grading or building permit.
UTILITIES:
75. WATER METER: The existing water meters, currently located within the Winchester Blvd
right-of-way, shall be relocated within the property in question, directly behind the
public right-of-way line. The Developer shall repair and replace to existing Town
standards any portion of concrete flatwork within said right-of-way that is damaged
during this activity prior to issuance of a certificate of occupancy.
76. WVSD (West Valley Sanitation District): A Sanitary Sewer Clean-out is required for each
property at the property line, within one (1) foot of the property line per West Valley
Sanitation District Standard Drawing 3, or at a location specified by the Town.
77. CERTIFICATE OF OCCUPANCY: The Engineering Division of the Parks and Public Works
Department will not sign off on a Temporary Certificate of Occupancy or a Final
Certificate of Occupancy until all required improvements within the Town’s right-of-way
have been completed and approved by the Town.
78. GREEN INFRASTRUCTURE MEASURES: Projects which propose work within the Town’s
right-of-way, including but not limited to pavement restoration, street widening,
construction of curb, gutter and/or sidewalk, right-of-way dedication, etc., will be
evaluated by Staff to determine its potential for the implementation of Green
Infrastructure measures and associated improvements.
79. FRONTAGE IMPROVEMENTS: The Developer shall be required to improve the project’s
public frontage (right-of-way line to centerline and/or to limits per the direction of the
Town Engineer) to current Town Standards. These improvements may include but not
limited to curb, gutter, sidewalk, driveway approach(es), curb ramp(s), signs, pavement,
raised pavement markers, thermoplastic pavement markings, storm drain facilities,
traffic signal(s), street lighting (upgrade and/or repaint) etc. Plans for the improvements
must be approved by the Town prior to the issuance of any grading or building permits.
The improvements must be completed and accepted by the Town before the issuance of
any grading or building permits unless otherwise allowed by the Town Engineer.
80. GREEN BICYCLE FACILITIES: The Developer shall install green bike lanes and bike boxes in
directions of improved streets and intersections as directed by the Town Engineer. The
improvements must be completed and accepted by the Town before a Certificate of
Occupancy for any new building can be issued.
81. ADA COMPLIANCE: The Developer shall be required to meet all ADA standards, which
must be completed and accepted by the Town before a Certificate of Occupancy for any
new building can be issued. This may require additional construction measures as
directed by the Town.
82. UNDERGROUND PARKING GARAGE DRAINAGE: Water from the underground parking
garage shall not be discharged onto the public street. The Developer or their
representative shall design a floor drainage system for the garage that collects all
drainage and conveys runoff to the sanitary sewer system. Connecting said drainage
system to the storm drain system is not permitted.
83. TRENCHING MORATORIUM: Trenching within a newly paved street will be allowed
subject to the following requirements:
a) The Town standard “T” trench detail shall be used.
b) A Town-approved colored controlled density backfill shall be used.
c) All necessary utility trenches and related pavement cuts shall be consolidated to
minimize the impacted area of the roadway.
d) The total asphalt thickness shall be a minimum of three (3) inches, meet Town
standards, or shall match the existing thickness, whichever is greater. The final lift
shall be 1.5-inches of one-half (½) inch medium asphalt. The initial lift(s) shall be of
three-quarter (¾) inch medium asphalt.
e) The Contractor shall schedule a pre-paving meeting with the Town Engineering
Construction Inspector the day the paving is to take place.
f) A cape seal topping may be required by the construction inspector depending their
assessment of the quality of the trench paving. If required, the cape seal shall
extend the full width of the street and shall extend five (5) feet beyond the
longitudinal limits of trenching. Cape seal materials shall be approved by the Town
Engineering Construction Inspector prior to placement. All existing striping and
pavement markings shall be replaced upon completion of cape seal operations. All
pavement restorations shall be completed and approved by the Inspector before
occupancy.
84. DRIVEWAY APPROACH: The Developer shall install a minimum of two (2) Town standard
commercial driveway approaches. The new driveway approaches shall be constructed
per Town Standard Plans and must be completed and accepted by the Town before a
Certificate of Occupancy for any new building can be issued. New concrete shall be free
of stamps, logos, names, graffiti, etc. Any concrete identified that is displaying a stamp
or equal shall be removed and replaced at the Contractor’s sole expense and no
additional compensation shall be allowed therefore.
85. CURB RAMPS: The Developer shall construct two (2) curb ramps in compliance with ADA
Standards which must be completed and accepted by the Town before a Certificate of
Occupancy for any new building can be issued. New concrete shall be free of stamps,
logos, names, graffiti, etc. Any concrete identified that is displaying a stamp or equal
shall be removed and replaced at the Contractor’s sole expense and no additional
compensation shall be allowed therefore.
86. SIGHT TRIANGLE AND TRAFFIC VIEW AREA: Any proposed improvements, including but
not limiting to trees and hedges, will need to abide by Town Code Sections 23.10.080,
26.10.065, and 29.40.030.
TRAFFIC AND TRANSPORTATION:
87. FRONTAGE IMPROVEMENTS (TRAFFIC): The Developer shall construct improvements
including and may not be limited to signage, striping, curb/gutter/sidewalk, ADA ramps,
pedestrian crosswalk and street lights at project frontage as directed by the Town
Engineer. Plans for the improvements must be approved by the Town prior to the
issuance of any grading or building permits. The improvements must be completed and
accepted by the Town before the issuance of any grading or building permits unless
otherwise allowed by the Town Engineer.
88. FRONTAGE IMPROVEMENTS (STREET LIGHTS): The Developer shall replace existing
street light fixture with LED light fixture and re-paint existing street light pole. The
improvements must be completed and accepted by the Town before a Certificate of
Occupancy for any new building can be issued.
89. TRAFFIC IMPROVEMENTS (OFF-SITE IMPROVEMENT): Traffic improvements may be
required as determined by traffic study. Construct off-site improvements as required.
Plans shall be prepared by the Developer’s design consultants and submitted to the
Town Engineer for approval prior to construction. The Developer is required to
designate necessary right-of-way for the required widening. Plans for the
improvements must be approved by the Town prior to the issuance of any grading or
building permits. The improvements must be completed and accepted by the Town
before the issuance of any grading or building permits unless otherwise allowed by the
Town Engineer.
90. STREET LIGHT INSPECTION FEES: The Developer shall pay $1,000.00 for the Town’s
inspection of street lights. The fees shall be due at time of building permit application.
91. TRANSPORTATION DEMAND MANAGEMENT PLAN (TDM): The Developer shall prepare a
Transportation Demand Management Plan for the Town of Los Gatos approval prior to
the issuance of any building permit. The TDM shall include the measures such as bicycle
facility provisions, shower facilities, local shuttle service, transit passes and subsidies,
carpool incentive, designated car share parking, and other measures that may be
required by the Town Engineer to obtain a goal of a 15% vehicle trip reduction. The
TDM shall also include a TDM Coordinator and identify the requirement for an annual
TDM effectiveness report to the Town of Los Gatos. A Townwide shuttle program fee
may be required based on TDM findings.
92. BICYCLE FACILITIES: Bicycle facilities including, but may not be limited to, bike lanes and
bike boxes will be provided in all directions and approaches of improved streets and
intersections as directed by Town Engineer.
93. TRAFFIC STUDY: Any development of land use that generates greater traffic impacts
than those assumed in the traffic study report may require an updated traffic study in
accordance with the Town’s traffic impact policy.
94. TRAFFIC IMPACT MITIGATION FEE: Prior to the issuance of any building/grading permits,
the Developer shall pay the project's proportional share of transportation
improvements needed to serve cumulative development within the Town of Los Gatos.
The fee amount will be based upon the Town Council resolution in effect, and the fee
shall be paid before issuance of any grading or building permit. The final traffic impact
mitigation fee for this project is $304,571.72.
95. CONSTRUCTION VEHICLE PARKING: No construction vehicles, trucks, equipment and
worker vehicles shall be allowed to park on the portion of any public (Town) streets
without written approval from the Town Engineer.
96. TRAFFIC CONTROL PLAN: A traffic control plan is required and must be submitted and
approved by the Town Engineer prior to the issuance of an encroachment, grading or
building permit. This plan shall include, but not be limited to, the following measures:
a) Construction activities shall be strategically timed and coordinated to minimize
traffic disruption for schools, residents, businesses, special events, and other
projects in the area. The schools located on the haul route shall be contacted to
help with the coordination of the trucking operation to minimize traffic disruption.
b) Flag persons shall be placed at locations necessary to control one-way traffic flow.
All flag persons shall have the capability of communicating with each other to
coordinate the operation.
c) Prior to construction, advance notification of all affected residents and emergency
services shall be made regarding one-way operation, specifying dates and hours of
operation.
97. CONSTRUCTION TRAFFIC CONTROL: All construction traffic and related vehicular routes,
traffic control plan, and applicable pedestrian or traffic detour plans shall be submitted
for review and approval by the Town Engineer prior to the issuance of an
encroachment, grading or building permit.
98. ADVANCE NOTIFICATION: Advance notification of all affected residents and emergency
services shall be made regarding parking restriction, lane closure or road closure, with
specification of dates and hours of operation.
99. HAULING OF SOIL: Hauling of soil on- or off-site shall not occur during the morning or
evening peak periods (between 7:00 a.m. and 9:00 a.m. and between 4:00 p.m. and 6:00
p.m.), and at other times as specified by the Director of Parks and Public Works. Prior to
the issuance of an encroachment, grading or building permit, the Developer or their
representative shall work with the Town Building Department and Engineering Division
Inspectors to devise a traffic control plan to ensure safe and efficient traffic flow under
periods when soil is hauled on or off the project site. This may include, but is not limited
to provisions for the Developer to place construction notification signs noting the dates
and time of construction and hauling activities, or providing additional traffic control.
Coordination with other significant projects in the area may also be required. Cover all
trucks hauling soil, sand and other loose debris.
100. CONSTRUCTION HOURS: All construction activities, including the delivery of
construction materials, labors, heavy equipment, supplies, etc., shall be limited to the
hours of 8:00 a.m. to 6:00 p.m., weekdays and 9:00 a.m. to 4:00 p.m. Saturdays,
holidays excluded. The Town may authorize, on a case-by-case basis, alternate
construction hours. The Developer shall provide written notice twenty-four (24) hours
in advance of modified construction hours. Approval of this request is at discretion of
the Town.
101. CONSTRUCTION NOISE: Between the hours of 8:00 a.m. to 8:00 p.m., weekdays and
9:00 a.m. to 7:00 p.m. weekends and holidays, construction, alteration or repair
activities shall be allowed. No individual piece of equipment shall produce a noise level
exceeding eighty-five (85) dBA at twenty-five (25) feet from the source. If the device is
located within a structure on the property, the measurement shall be made at distances
as close to twenty-five (25) feet from the device as possible. The noise level at any point
outside of the property plane shall not exceed eighty-five (85) dBA.
102. CONSTRUCTION MANAGEMENT PLAN SHEET: Prior to the issuance of any
encroachment, grading or building permits, the Developer’s design consultant shall
submit a construction management plan sheet (full-size) within the plan set that shall
incorporate at a minimum the Earth Movement Plan, Traffic Control Plan, Project
Schedule, site security fencing, employee parking, construction staging area, materials
storage area(s), construction trailer(s), concrete washout(s) and proposed outhouse
locations. Please refer to the Town’s Construction Management Plan Guidelines
document for additional information.
OTHER PERMITS:
103. SANITARY SEWER BACKWATER VALVE: Drainage piping serving fixtures which have flood
level rims less than twelve (12) inches (304.8 mm) above the elevation of the next
upstream manhole and/or flushing inlet cover at the public or private sewer system
serving such drainage piping shall be protected from backflow of sewage by installing an
approved type backwater valve. Fixtures above such elevation shall not discharge
through the backwater valve, unless first approved by the Building Official. The Town
shall not incur any liability or responsibility for damage resulting from a sewer overflow
where the property owner or other person has failed to install a backwater valve as
defined in the Uniform Plumbing Code adopted by the Town and maintain such device
in a functional operation condition. Evidence of West Sanitation District’s decision on
whether a backwater device is needed shall be provided prior to the issuance of a
building permit.
STORMWATER MANAGEMENT:
104. STORMWATER MANAGEMENT: Construction activities including but not limited to
clearing, stockpiling, grading or excavation of land, which disturbs one (1) acre or more
which are part of a larger common plan of development which disturbs less than one (1)
acre are required to obtain coverage under the construction general permit with the
State Water Resources Control Board. The Developer is required to provide proof of
WDID# and keep a current copy of the storm water pollution prevention plan (SWPPP)
on the construction site and shall be made available to the Town of Los Gatos
Engineering Division of the Parks and Public Works Department and/or Building
Department upon request.
105. BEST MANAGEMENT PRACTICES (BMPs): The Developer is responsible for ensuring that
all contractors are aware of all storm water quality measures and that such measures
are implemented. Best Management Practices (BMPs) shall be maintained and be
placed for all areas that have been graded or disturbed and for all material, equipment
and/or operations that need protection. Removal of BMPs (temporary removal during
construction activities) shall be replaced at the end of each working day. Failure to
comply with the construction BMP will result in the issuance of correction notices,
citations, or stop work orders.
106. STORMWATER DEVELOPMENT RUNOFF: All new development and redevelopment
projects are subject to the stormwater development runoff requirements. Every
Developer or their design consultant shall submit a stormwater control plan and
implement conditions of approval that reduce stormwater pollutant discharges through
the construction, operation and maintenance of treatment measures and other
appropriate source control and site design measures. Increases in runoff volume and
flows shall be managed in accordance with the development runoff requirements.
107. REGULATED PROJECT: The project is classified as a Regulated Project per Provision
C.3.b.ii. and is required to implement LID source control, site design, and stormwater
treatment on-site in accordance with Provisions C.3.c. and C.3.d..
108. SITE DESIGN MEASURES: All projects shall incorporate at least one of the following
measures:
a) Protect sensitive areas and minimize changes to the natural topography.
b) Minimize impervious surface areas.
c) Direct roof downspouts to vegetated areas.
d) Use porous or pervious pavement surfaces on the driveway, at a minimum.
e) Use landscaping to treat stormwater.
109. BIORETENTION SYSTEM: The bioretention system(s) shall be designed to have a surface
area no smaller than what is required to accommodate a 5 inches/hour stormwater
runoff surface loading rate, infiltrate runoff through bioretention soil media at a
minimum of 5 inches per hour, and maximize infiltration to the native soil during the life
of the project. The soil media for bioretention system(s) shall be designed to sustain
healthy, vigorous plant growth and maximize stormwater runoff retention and pollutant
removal. Bioretention soil media that meets the minimum specifications set forth in
Attachment L of Order No. R2-2009-0074, dated November 28, 2011, shall be used.
110. LANDSCAPING: In finalizing the landscape plan for the biotreatment area(s), it is
recommended that the landscape architect ensure that the characteristics of the
selected plants are similar to those of the plants listed for use in bioretention areas in
Appendix D of the Santa Clara Valley Urban Runoff Pollution Prevention Program
(SCVURPPP) C.3 Stormwater Handbook.
111. LANDSCAPE MAINTENANCE AGREEMENT: The Developer shall enter into a Landscape
Maintenance Agreement with the Town of Los Gatos in which the Developer agrees to
maintain the vegetated areas along the project’s Street Name frontage located within
the public right-of-way. The agreement must be completed and accepted by the Town
Attorney prior to the issuance of any encroachment, grading or building permits.
112. EROSION CONTROL: Interim and final erosion control plans shall be prepared and
submitted to the Engineering Division of the Parks and Public Works Department. A
Notice of Intent (NOI) and Storm Water Pollution Prevention Plan (SWPPP) shall be
submitted to the San Francisco Bay Regional Water Quality Control Board for projects
disturbing more than one (1) acre. A maximum of two (2) weeks is allowed between
clearing of an area and stabilizing/building on an area if grading is allowed during the
rainy season. Interim erosion control measures, to be carried out during construction
and before installation of the final landscaping, shall be included. Interim erosion
control method shall include, but are not limited to: silt fences, fiber rolls (with locations
and details), erosion control blankets, Town standard seeding specification, filter berms,
check dams, retention basins, etc. Provide erosion control measures as needed to
protect downstream water quality during winter months. The grading, drainage,
erosion control plans and SWPPP shall be in compliance with applicable measures
contained in the amended provisions C.3 and C.14 of most current Santa Clara County
National Pollutant Discharge Elimination System (NPDES) Municipal Regional Permit
(MRP). Monitoring for erosion and sediment control is required and shall be performed
by the Qualified SWPPP Developer (QSD) or Qualified SWPPP Practitioner (QSP) as
required by the Construction General Permit. Stormwater samples are required for all
discharge locations and projects may not exceed limits set forth by the Construction
General Permit Numeric Action Levels and/or Numeric Effluent Levels. A Rain Event
Action Plan (REAP) must be developed forty-eight (48) hours prior to any likely
precipitation even, defined by a fifty (50) percent or greater probability as determined
by the National Oceanic and Atmospheric Administration (NOAA), and/or whenever rain
is imminent. The QSD or QSP must print and save records of the precipitation forecast
for the project location area from (http://www.srh.noaa.gov/forecast) which must
accompany monitoring reports and sampling test data. A rain gauge is required on-site.
The Town of Los Gatos Engineering Division of the Parks and Public Works Department
and the Building Department will conduct periodic NPDES inspections of the site
throughout the recognized storm season to verify compliance with the Construction
General Permit and Stormwater ordinances and regulations.
113. DUST CONTROL: Blowing dust shall be reduced by timing construction activities so that
paving and building construction begin as soon as possible after completion of grading,
and by landscaping disturbed soils as soon as possible. Further, water trucks shall be
present and in use at the construction site. All portions of the site subject to blowing
dust shall be watered as often as deemed necessary by the Town, or a minimum of
three (3) times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads,
parking areas, and staging areas at construction sites in order to insure proper control of
blowing dust for the duration of the project. Watering on public streets shall not occur.
Streets shall be cleaned by street sweepers or by hand as often as deemed necessary by
the Town Engineer, or at least once a day. Watering associated with on-site
construction activity shall take place between the hours of 8 a.m. and 5 p.m. and shall
include at least one (1) late-afternoon watering to minimize the effects of blowing dust.
All public streets soiled or littered due to this construction activity shall be cleaned and
swept on a daily basis during the workweek to the satisfaction of the Town. Demolition
or earthwork activities shall be halted when wind speeds (instantaneous gusts) exceed
twenty (20) miles per hour (MPH). All trucks hauling soil, sand, or other loose debris
shall be covered.
114. AIR QUALITY: To limit the project’s construction-related dust and criteria pollutant
emissions, the following the Bay Area Air Quality Management District (BAAQMD)-
recommended basic construction measures shall be included in the project’s grading
plan, building plans, and contract specifications:
a) All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and
unpaved access roads) shall be watered two times per day, or otherwise kept dust-
free.
b) All haul trucks designated for removal of excavated soil and demolition debris from
site shall be staged off-site until materials are ready for immediate loading and
removal from site.
c) All haul trucks transporting soil, sand, debris, or other loose material off-site shall be
covered.
d) As practicable, all haul trucks and other large construction equipment shall be
staged in areas away from the adjacent residential homes.
e) All visible mud or dirt track-out onto adjacent public roads shall be removed using
wet power vacuum street sweepers at least once per day, or as deemed appropriate
by Town Engineer. The use of dry power sweeping is prohibited. An on-site track-
out control device is also recommended to minimize mud and dirt-track-out onto
adjacent public roads.
f) All vehicle speeds on unpaved surfaces shall be limited to fifteen (15) miles per hour.
g) All driveways and sidewalks to be paved shall be completed as soon as possible.
Building pads shall be laid as soon as possible after grading unless seeding or soil
binders are used.
h) Post a publicly visible sign with the telephone number and person to contact at the
lead agency regarding dust complaints. This person shall respond and take
corrective action within forty-eight (48) hours. The Air District’s phone number shall
also be visible to ensure compliance with applicable regulations. Please provide the
BAAQMD’s complaint number on the sign: 24-hour toll-free hotline at 1-800-334-
ODOR (6367).
i) All excavation, grading, and/or demolition activities shall be suspended when
average wind speeds exceed twenty (20) miles per hour.
j) Vegetative ground cover (e.g., fast-germinating native grass seed) shall be planted in
disturbed areas as soon as possible and watered appropriately until vegetation is
established.
115. DETAILING OF STORMWATER MANAGEMENT FACILITIES: Prior to the issuance of any
grading or building permits, all pertinent details of any and all proposed stormwater
management facilities, including, but not limited to, ditches, swales, pipes, bubble-ups,
dry wells, outfalls, infiltration trenches, detention basins and energy dissipaters, shall be
provided on submitted plans, reviewed by the Engineering Division of the Parks and
Public Works Department, and approved for implementation.
116. CONSTRUCTION ACTIVITIES: All construction shall conform to the latest requirements of
the CASQA Stormwater Best Management Practices Handbooks for Construction
Activities and New Development and Redevelopment, the Town's grading and erosion
control ordinance, and other generally accepted engineering practices for erosion
control as required by the Town Engineer when undertaking construction activities.
117. STORMWATER DISCHARGE: New buildings, such as food service facilities and/or multi-
family residential complexes or subdivisions, shall provide a covered or enclosed area
for dumpsters and recycling containers. The area shall be designed to prevent water
run-on to the area and runoff from the area. Areas around trash enclosures, recycling
areas, and/or food compactor enclosures shall not discharge directly to the storm drain
system. Any drains installed in or beneath dumpsters, compactors, and tallow bin areas
serving food service facilities shall be connected to the sanitary sewer. The Developer
shall contact the local permitting authority and/or sanitary district with jurisdiction for
specific connection and discharge requirements.
118. SITE DRAINAGE: Rainwater leaders shall be discharged to splash blocks. No through
curb drains will be allowed. Any storm drain inlets (public or private) directly connected
to public storm system shall be stenciled/signed with appropriate “NO DUMPING - Flows
to Bay” NPDES required language. On-site drainage systems for all projects shall include
one of the alternatives included in section C.3.i of the Municipal Regional NPDES Permit.
These include storm water reuse via cisterns or rain barrels, directing runoff from
impervious surfaces to vegetated areas and use of permeable surfaces. If stormwater
treatment facilities are to be used they shall be placed a minimum of ten (10) feet from
the adjacent property line and/or right-of-way. Alternatively, the facility(ies) may be
located with an offset between 5 and 10 feet from the adjacent property and/or right-
of-way line(s) if the responsible engineer in charge provides a stamped and signed letter
that addresses infiltration and states how facilities, improvements and infrastructure
within the Town’s right-of-way (driveway approach, curb and gutter, etc.) and/or the
adjacent property will not be adversely affected. No improvements shall obstruct or
divert runoff to the detriment of an adjacent, downstream or down slope property.
http://www.scvurppp-w2k.com/nd_wp.shtml?zoom_highlight=BIOTREATMENT+SOIL.
119. AGREEMENT FOR STORMWATER BEST MANAGEMENT PRACTICES INSPECTION AND
MAINTENANCE OBLIGATIONS: The property owner shall enter into an agreement with
the Town for maintenance of the stormwater filtration devices required to be installed
on this project by the Town’s Stormwater Discharge Permit and all current amendments
or modifications. The agreement shall specify that certain routine maintenance shall be
performed by the property owner and shall specify device maintenance reporting
requirements. The agreement shall also specify routine inspection requirements,
permits and payment of fees. The agreement shall be recorded, and an electronic copy
(PDF) of the recorded agreement shall be submitted to the Engineering Division of the
Parks and Public Works Department, prior to the release of any occupancy permits.
120. SILT AND MUD IN PUBLIC RIGHT-OF-WAY: It is the responsibility of Contractor to make
sure that all dirt tracked into the public right-of-way is cleaned up on a daily basis. Mud,
silt, concrete and other construction debris SHALL NOT be washed into the Town’s
storm drains.
121. GOOD HOUSEKEEPING: Good housekeeping practices shall be observed at all times
during the course of construction. All construction shall be diligently supervised by a
person or persons authorized to do so at all times during working hours. The
Developer's representative in charge shall be at the job site during all working hours.
Failure to maintain the public right-of-way according to this condition may result in
penalties and/or the Town performing the required maintenance at the Developer's
expense.
GENERAL:
122. NEIGHBORHOOD CONSTRUCTION COMMUNICATION PLAN: Prior to the issuance of an
encroachment, or grading or building permit, the Developer shall initiate a weekly
neighborhood email notification program to provide project status updates. The email
notices shall also be posted on a bulletin board placed in a prominent location along the
project perimeter.
123. PERMIT ISSUANCE: Permits for each phase; reclamation, landscape, and grading, shall
be issued simultaneously.
124. COVERED TRUCKS: All trucks transporting materials to and from the site shall be
covered.
TO THE SATISFACTION OF THE SANTA CLARA COUNTY FIRE DEPARTMENT:
125. Review of this Developmental proposal is limited to acceptability of site access, water
supply and may include specific additional requirements as they pertain to fire
department operations, and shall not be construed as a substitute for formal plan
review to determine compliance with adopted model codes. Prior to performing any
work, the applicant shall make application to, and receive from, the Building
Department all applicable construction permits.
126. FIRE SPRINKLERS REQUIRED: (As noted on Sheet A-0.0) Approved automatic sprinkler
systems in new and existing buildings and structures shall be provided in the locations
described in this Section or in Sections 903.2.1 through 903.2.19 whichever is the more
restrictive. For the purposes of this section, firewalls and fire barriers used to separate
building areas shall be constructed in accordance with the California Building Code and
shall be without openings or penetrations. 1. In other than residential buildings which
require the installation of fire sprinklers for all new buildings according to the California
Residential Code, an automatic sprinkler system shall be provided throughout all new
buildings and structures.
127. FIRE ALARM SYSTEM REQUIRED: (As noted on Sheet A-0.0) A manual and automatic fire
alarm system shall be installed in Group R-2, R-2.1, R-2.2 occupancies.
128. NEW FIRE HYDRANT: (As shown on Sheet LS-1.0 and LS-2.0) Provide fire hydrants at
locations to be determined jointly by the Fire Department and San Jose Water
Company. Maximum hydrant spacing shall be 500 feet, with a hydrant flow of 1,000
GPM at minimum 20 psi, residual. Fire hydrants shall be provided along required fire
apparatus access roads and adjacent public streets. CFC Sec. 507, and Appendix B and
associated Tables, and Appendix C. Required fire flow shall be provided for new fire
hydrant.
129. REQUIRED AERIAL ACCESS: (As shown on Sheet A-1.9) Where required: Buildings or
portions of buildings or facilities exceeding 30 feet (9144 mm) in height above the
lowest level of fire department vehicle access shall be provided with approved fire
apparatus access roads capable of accommodating fire department aerial apparatus.
Overhead utility and power lines shall not be located within the aerial fire apparatus
access roadway. 2. Width: Fire apparatus access roads shall have a minimum
unobstructed width of 26 feet (7925) in the immediate vicinity of any building or portion
of building more than 30 feet (9144 mm) in height. 3. Proximity to building: At least one
of the required access routes meeting this condition shall be located within a minimum
of 15 feet (4572) and a maximum of 30 feet (9144mm) from the building, and shall be
positioned parallel to one entire side of the building, as approved by the fire code
official. [CFC Chp. 5 and SCCFD SD&S A-1].
130. FIRE APPARATUS ACCESS ROADS REQUIRED FOR BUILDINGS AND FACILITIES: Approved
fire apparatus access roads shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or with the jurisdiction. The fire apparatus
access road shall comply with the requirements of this section and shall extend to
within 150 feet of all portions of the facility and all portions of the exterior walls of the
first story of the building as measured by an approved route around the exterior of the
building or facility. [CFC, Section 503.1.1]. Distances of up to 300 feet are approved.
131. TIMING OF INSTALLATION: When fire apparatus access roads or a water supply for fire
protection is required to be installed, such protection shall be installed and made
serviceable prior to and during the time of construction except when approved
alternative methods of protection are provided. Temporary street signs shall be
installed at each street intersection when construction of new roadways allows passage
by vehicles in accordance with Section 505.2. Construction documents. Construction
documents for proposed fire apparatus access, location of fire lanes, security gates
across fire apparatus access and construction documents and hydraulic calculations for
fire hydrant systems shall be submitted to the fire department for review and approval
prior to construction. CFC Sec. 501.3, 501.4.
132. EMERGENCY GATE/ACCESS GATE REQUIREMENTS: (As noted on Sheet A-2.0) Gate
installations shall conform with Fire Department Standard Details and Specification G-1
and, when open shall not obstruct any portion of the required width for emergency
access roadways or driveways. Locks, if provided, shall be fire department approved
prior to installation. Gates across the emergency access roadways shall be equipped
with an approved access devices. If the gates are operated electrically, an approved
Knox key switch shall be installed; if they are operated manually, then an approved Knox
padlock shall be installed. Contact www.knoxbox.com to order key switch for gate. CFC
Sec. 503.6 and 506.
133. FIRE DEPARTMENT CONNECTION: The fire department connection (FDC) for the
structure in support of the sprinkler system shall be installed at the street on the street
address side of the building. It shall be located within 100 feet of a public fire hydrant
and within ten (10) feet of the main PIV (unless otherwise approved by the Chief due to
practical difficulties). FDC's shall be equipped with a minimum of two (2), two-and-one-
half (2- 1/2”) inch national standard threaded inlet couplings. Orientation of the FDC
shall be such that hose lines may be readily and conveniently attached to the inlets
without interference. FDC's shall be painted safety yellow. [SCCFD, SP-2 Standard.]
134. REQUIRED SECONDARY FIRE DEPT. ACCESS: (As shown on Sheet C-2.1) Commercial and
Industrial Developments 1. Buildings exceeding three stories or 30 feet in height.
Buildings or facilities exceeding 30 feet (9144 mm) or three stories in height shall have a
least two means of fire apparatus access for each structure. 2. Buildings exceeding
62,000 square feet in area. Buildings or facilities having a gross building area of more
than 62,000 square feet (5760 mm) shall be provided with two separate and approved
fire apparatus access roads. Exception: Projects having a gross building area of up to
124,000 square feet (11520 mm) that have a single approved fire apparatus access road
when all buildings are equipped throughout with approved automatic sprinkler systems.
Multi-Family Residential Developments (R-1 & R-2 occupancies) 1. Multi-family
residential projects having more than 100 dwelling units shall be equipped throughout
with two separate and approved fire apparatus access roads. CFC Sec. Chp. 5.