Loading...
Item 13 Staff Report General Plan and Hillside Specific Plan Update ProcessTO: FROM: SUBJECT: MEETING DATE: 3/2/98 ITEM NO, / COUNCIL AGENDA REPORT MAYOR AND TOWN COUNCIL TOWN MANAGE GENERAL PLAN AND HILLSIDE SPECIFIC PLAN UPDATE PROCESS AUTHORIZE_ STAFF TO: A. PREPARE RESOLUTION ESTABLISHING GENERAL PLAN TASK FORCE Il WITH A MAXIMUM OF 30 MEMBERS. B. ADVERTISE FOR APPLICATIONS TO FILL VACANCIES ON GENERAL PLAN TASK .FORCE II IN ACCORDANCE WITH TOWN COUNCIL CRITERIA. C. PREPARE NECESSARY REPORTS FOR AMENDING THE GENERAL PLAN TO INCORPORATE SECTIONS OF THE DOWNTOWN SPECIFIC PLAN THAT HAVE NOT BEEN COMPLETED AND REPEAT 1'Hb REMAINDER OF THE DOWNTOWN SPECIFIC PLAN. D. SEND REQUESTS FOR PROPOSALS TO CONSULTANTS FOR DATA COLLECTION DURING THE GENERAL PLAN AND HILLSIDE SPECIFIC PLAN J UPDATE PROCESS. RECOMMENDATION: Authorize staff to: 1. Prepare Resolution establishing General Plan Task Force II with a maximum of 30 members. 2. Advertise for applications to fill vacancies on General Plan Task Force II in accordance with Town Council criteria. 3. Prepare necessary reports for amending the General Plan to incorporate sections of the Downtown Specific Plan that have not been completed and repeal the completed sections of the Downtown Specific Plan. 4. Send Requests for Proposals to consultants for data collection during the General Plan and Hillside Specific Plan update process. BACKGROUND: On January 26, 1998, General Plan Task Force Chair Paul Bruno presented the Task Force Final Report to the Town Council. Many Task Force members were present and provided additional input. The Council commended the Task Force and accepted their recommendations. As part of the "next steps" discussion for the General Plan and Hillside Specific Plan update process, Council requested staff to: 1) Provide a methodology for addressing Task Force issues; 2) Draft a schedule for the update process; and 3) Begin gathering data. PREPARED BY: (continued on page 2) LEE E. BOWMAN PLANNING DIRECTOR Reviewed by: Attorney Finance Revised: 2/25/98 4:52 pm Reformatted: 10/23/95 PAGE 2 MAYOR AND TOWN COUNCIL SUBJECT: GENERAL PLAN AND HILLSIDE SPECIFIC PLAN UPDATE PROCESS February 26, 1998 DISCUSSION: METHODOLOGY Various ideas for the update process were discussed at the January 26, 1998 Council meeting. Task Force and Council members agreed that a combination of the approaches presented in the Council report would be most effective. Staff proposes the following based on the Council's discussion: • Gather data by hiring consultants to provide studies concerning traffic, noise, and soil stability. Conduct a scientific survey of Town residents to follow up the Fall 1997 survey. Hire a planning consultant to complete the Trails and Bikeways Master Plan. This information will be used as a foundation for updated goals and policies to be included in the General Plan and Hillside Specific Plan. • Reactivate General Plan Task Force with a maximum number of 30 members. Members of the 1997 Task Force have been notified of the opportunity to serve on General Plan Task Force I1. Twenty-four members have expressed interest and would continue to represent their constituency groups. Five members do not wish to continue and one has not responded. Council will give first priority to existing Task Force members when filling the Task Force II vacancies. Councilmember Hutchins suggests filling the remaining vacancies with one representative from each of the following: Service Clubs, Churches/ Synagogues, Senior Citizen Groups, Neighborhood Associations, Professional Groups, and Businesses. Task Force I1 will develop new ways to solicit input from school representatives, churches, students, commercial representatives and developers. • Task Force II will conduct facilitated community forums about issues identified in the Task Force Final Report (January 1997). The forums will ensure that all Los Gatos property owners, residents and merchants have an opportunity to provide input about the General Plan/ Hillside Specific Plan update. • Issues identified in the 1997 Task Force Final Report for consideration in the short term will be referred to the General Plan Committee immediately, since these primarily deal with implementation of existing General Plan/ Hillside Specific Plan objectives and implementation measures. • Issues identified in the 1997 Task Force Final Report for comprehensive study will be addressed by Task Force II in order of priority at the community forums. When the Task Force condenses it's findings after the forums, it will present recommendations to the General Plan Committee. • Repeal the Downtown Specific Plan to allow the update process to focus on the General Plan and Hillside Specific Plan. The majority of the Downtown Specific Plan policies and objectives have been implemented, with the exception of creating a Comprehensive Downtown Parking Plan. Council should refer the development of a Parking Plan for the Central Business District to the Parking Commission. Other sections of the Downtown Specific Plan that have not been implemented may be incorporated into the General Plan through an Amendment. • The General Plan Committee will consider Task Force II recommendations and then draft updated issues, goals and implementation measures for each element. The draft General Plan/ Hillside Specific Plan amendments will be submitted to Task Force II for review and comment. The General Plan Committee will consider comments on the draft and develop a final draft. As each element is updated, the General Plan Committee will ensure consistency with other elements of the General Plan and Hillside Specific Plan. This methodology will involve Town staff from all departments. For example, Library staff has shown interest in including questions about support for a new Library in the scientific survey. The update process will be coordinated by the Planning Department with the assistance of a facilitator to coordinate meetings, prepare agendas and distribute materials. A Planning Consultant will also be hired to assist with the update process. PAGE 3 MAYOR AND TOWN COUNCIL SUBJECT: GENERAL PLAN AND HILLSIDE SPECIFIC PLAN UPDATE PROCESS February 26, 1998 PRELIMINARY UPDATE SCHEDULE The methodology described will follow the schedule included as Attachment 1. The goal is to gather data and hold community forums through November 1998 and have the Draft General Plan and Hillside Specific Plan Update prepared and ready for environmental review in April 1999. Task Force II and General Plan Committee meetings are also included during this time frame. GATHERING DATA Staff requests Council authorization to send Requests for Proposals (RFP's) for the consultants listed below. Draft RFP's and consultant lists are attached separately as noted below for each type of consultant: 1. Traffic Engineer to evaluate traffic patterns, project future traffic counts, measure intersection levels of service (LOS) and recommend mitigation measures (Attachments 2 and 3). 2. Acoustical Engineer to monitor, collect and map noise information (Attachments 4 and 5). 3. Geotechnical Engineer to update the Town's earthquake fault and soil stability maps (Attachments 6 and 7). 4. Scientific survey consultant to conduct a survey of Town residents, to determine if results of the survey conducted in October 1997 accurately reflect the residents' concerns and vision for the Town (Attachments 8 and 9). Councilmember Hutchin's suggestions about discovering the sense of community in Los Gatos are included in the Draft RFP (Attachment 9). 5. Planning consultant to complete the Trails and Bikeways Master Plan and format the information into reproducible materials for public hearings (Attachments 10 and 11). Information gathered by these consultants will contribute to the efficacy of General Plan Task Force II and the General Plan Committee during the update process. The Preliminary Schedule (Attachment 1) sets the time frame for data collection and document preparation between April 1998 and March 1999; Task Force Community Forums will occur concurrently in part, with completion of the forums expected by December 1998. Three other consultant roles need to be filled for the update process: a meeting facilitator, planning consultant and environmental consultant. Attachment 12 shows how the consultants will be coordinated by the Town. Staff recommends that Daniella Hamilton of Public Affairs Management (P.A.M.) carry out the meeting facilitation and planning roles, much as she did for the 1997 General Plan Task Force. Ms. Hamilton has indicated an interest in continuing to work with our update process. She is currently preparing a preliminary scope of work and cost estimate. Staff will return to Council this March with a request for authorization to proceed in an agreement with P.A.M. for the meeting facilitation and planning consultation. The RFP's for the environmental consultant will be sent in March 1999. CONCLUSION: Council should review the proposed methodology and preliminary schedule and determine if they are appropriate for the next phase of the General Plan update process. Once Council determines the appropriate methodology and schedule, it should authorize staff to prepare a resolution establishing General Plan Task Force II and advertise for applications to fill vacancies on General Plan Task Force II in accordance with Town Council criteria. Council should decide if the criteria recommended by Council member Hutchins is appropriate for filling the unknown remaining balance of vacancies (after existing Task Force members who are interested are appointed.) Council should also authorize staff to prepare necessary reports for amending the General Plan to incorporate sections of the Downtown Specific Plan that have not been completed and repeal the completed sections of the Downtown Specific Plan and send RFP's to consultants for data gathering. ENVIRONMENTAL ASSESSMENTS: Sending Request for Proposals is not a project defined under CEQA, and no further action is required. Environmental review will be required when a Draft Updated General Plan is prepared. PAGE 4 MAYOR AND TOWN COUNCIL SUBJECT: GENERAL PLAN AND HILLSIDE SPECIFIC PLAN UPDATE PROCESS February 26, 1998 FISCAL IMPACT: Total funding required for each consultants' work will be determined after the proposals are received and evaluated and each scope of work is agreed upon and approved. When staff returns to Council for authorization to enter into an agreement with each consultant, funding sources and costs for the studies will be detailed. At this time it is anticipated that funding will come from the General Plan Update Deposit Account which has a balance of $475,000 as of January 31, 1998 (available funds totalling $42,500 - $50,00 has already been appropriated for the General Plan Task Force expenses from last year). Attachments: 1. Timed Schedule for General Plan and Hillside Specific Plan Update 2. Traffic Engineering Consultant list 3. Draft RFP for Traffic Consultant 4. Acoustical Engineering Consultant list 5. Draft RFP for Noise Consultant 6. Geotechnical Engineering Consultant list 7. Draft RFP for Geotechnical Consultant 8. Scientific Survey Consultant list 9. Draft RFP for Scientific Survey Preparation 10. Trails and Bikeway Consultant list 11. Draft RFP for completion of Trails and Bikeways Master Plan 12. Consultant Coordination Flow Chart LEB:KS:sm N :1DEV\CNCLRPTS\AUTHRFP.GP Traffic Engineering Consultant List TJKM Transportation Consultants 4637 Chabot Drive Pleasanton, CA 94588 Willdan Associates 374 Poli Street, Suite 101 Ventura, CA 93001-2613 RKH Civil and Transportation Engineers 978 Desoto Lane Foster City, CA 94404 Design Engineers Group 860 Faulstich Ct. Suite 100 San Jose, CA 95112-1361 Fehr and Peers Associates, Inc. Attn: Jane Bierstedt, P.E. 1153 Lincoln Avenue, Suite I San Jose, CA 95125 n:\dev\ks\traff.con February 2S a SCOPE p 1. WORk 2. Attend 3. Evaluate 4 12 Project to traffic patter s with l Proj ct future traffic r patterns s 7o v st Re rn f c Recommend lectl on levels Iatlon is ofsery o measures. Ise TO°7°'ide . prepare d uct necessary f s. ma ssar�, or th _ Op studies PLANNING DEPARTMENT (408) 354-6872 FAX (408) 354-7593 February 25, 1998 SUBJECT: REQUEST FOR PROPOSAL FOR PREPARATION OF TECHNICAL DATA COLLECTION FOR CIRCULATION ELEMENT UPDATE Dear Sir or Madam: The Town of Los Gatos is requesting proposals from selected consultants to provide technical information for a General Plan Update. The Los Gatos General Plan was last updated in 1985. The current update will be for the year 2020. To assist you in preparing a proposal for this project objectives and a preliminary scope of work are listed below. The Town's insurance and other standard requirements are attached. OBJECTIVES: • To provide information for the General Plan Update process. • To conduct necessary studies, record data, evaluate data and in some cases prepare maps. SCOPE OF WORK: 1. Attend two meetings with Town staff. 2. Evaluate traffic patterns. 3. Project future traffic counts. 4. Measure intersection levels of service. 5. Recommend mitigation measures. PROPOSAL: If you wish to submit a proposal for this project, it should include the following: 1. Detailed outline of the scope of services and methodology to prepare the information as outlined in the Scope of Work above; 2. Project cost with breakdown of expenses into tasks to be accomplished. A Town Business License is required; 3. List of the materials and information that will be required from the Town; 4. Summary of your firm's experience with similar projects, including samples of work; 5. Background and qualification of personnel to be assigned to this project; 6. Names and phone numbers of persons who may be contacted to verify qualifications and previous performance; and 7. Time schedule addressing all facets of the data collection and study preparation. The time schedule should reflect a start date of April 24, 1998. Proposals must be submitted no later than March 27,1998. If you have any questions regarding this matter, please contact Kristine Syskowski, Assistant Planner at (408)354-6807. Very truly yours, Lee E. Bowman Planning Director ks5\gptf\datagath. rfp Acoustical Engineering Consultant List Colin Gordon and Associates 411 Borel Avenue San Mateo, CA 94402 Environmental Consulting Services 20430 Town Center Lane Cupertino, CA 95014 Edward L. Pack Associates Inc. 13980 Blossom Hill Rd. Los Gatos, CA 95032 SRA Engineering 1650 Zanker Rd. San Jose, CA 95112 ks5\gptflnoise.Ist 1,17005. 4:r4 v.. 4 PLANNING DEPARTMENT (408) 354-6872 FAX (408) 354-7593 February 25, 1998 * * SUBJECT: REQUEST FOR PROPOSAL FOR PREPARATION OF TECHNICAL DATA COLLECTION FOR NOISE ELEMENT UPDATE Dear Sir or Madam: The Town of Los Gatos is requesting proposals from selected consultants to provide technical information for a General Plan Update. The Los Gatos General Plan was last updated in 1985. The current update will be for the year 2020. To assist you in preparing a proposal for this project objectives and a preliminary scope of work are listed below. The Town's insurance and other standard requirements are attached. OBJECTIVES: • To provide information for the General Plan Update process. • To conduct necessary studies, record data, evaluate data and in some cases prepare maps. SCOPE OF WORK: 1. Attend two meetings with Town staff. 2. Monitor, collect and map noise information. PROPOSAL: If you wish to submit a proposal for this project, it should include the following: 1. Detailed outline of the scope of services and methodology to prepare the information as outlined in the Scope of Work above; 2. Project cost with breakdown of expenses into tasks to be accomplished. A Town Business License is required; 3. List of the materials and information that will be required from the Town; 4. Summary of your firm's experience with similar projects, including samples of work; 5. Background and qualification of personnel to be assigned to this project; 6. Names and phone numbers of persons who may be contacted to verify qualifications and previous performance; and 7. Time schedule addressing all facets of the data collection and study preparation. The time schedule should reflect a start date of April 24, 1998. Proposals must be submitted no later than March 27, 1998. If you have any questions regarding this matter, please contact Kristine Syskowski, Assistant Planner at (408)354-6807. Very truly yours, Lee E. Bowman Planning Director ks5\gptf1datagath. rfp Geotechnical Engineering Consultant List Associated Terra Consultants, Inc. 15039 Downing Oak Ct., Suite 3 Los Gatos, CA 95032 Milstone Geotechnical 17020 Melody Lane Los Gatos, CA 95030 Alan Kropp & Associates 2149 Shattuck Avenue, 8th Floor Berkeley, CA 94704 Scott Shewbridge Associates 505 Cypress Point Dr. Apt 129 Mountain View, CA 94043-4837 Berlogar Geotechnical Consultants 5587 Sunol Boulevard Pleasanton, CA 94566 William Lettis & Associates 1777 Botelho Drive, Suite 262 Walnut Creek, CA 94596 Harlan Tait Associates One Kearny St. 7th Floor San Francisco, CA 94108 ks5\gptflgeotech.lst ATTACHMENT 6 PLANNING DEPARTMENT (408) 354-6872 FAX (408) 354-7593 February 25, 1998 * * SUBJECT: REQUEST FOR PROPOSAL FOR PREPARATION OF TECHNICAL DATA COLLECTION FOR SAFETY ELEMENT UPDATE Dear Sir or Madam: The Town of Los Gatos is requesting proposals from selected consultants to provide technical information for a General Plan Update. The Los Gatos General Plan was last updated in 1985. The current update will be for the year 2020. To assist you in preparing a proposal for this project objectives and a preliminary scope of work are listed below. The Town's insurance and other standard requirements are attached. OBJECTIVES: • To provide information for the General Plan Update process. • To conduct necessary studies, record data, evaluate data and in some cases prepare maps. SCOPE OF WORK: 1. Attend two meetings with Town staff. 2. Update the Town's earthquake and soil stability maps. • 1 PROPOSAL: If you wish to submit a proposal for this project, it should include the following: 1. Detailed outline of the scope of services and methodology to prepare the information as outlined in the Scope of Work above; 2. Project cost with breakdown of expenses into tasks to be accomplished. A Town Business License is required; 3. List of the materials and information that will be required from the Town; 4. Summary of your firm's experience with similar projects, including samples of work; 5. Background and qualification of personnel to be assigned to this project; 6. Names and phone numbers of persons who may be contacted to verify qualifications and previous performance; and 7. Time schedule addressing all facets of the data collection and study preparation. The time schedule should reflect a start date of April 24, 1998. Proposals must be submitted no later than March 27, 1998. If you have any questions regarding this matter, please contact Kristine Syskowski, Assistant Planner at (408)354-6807. Very truly yours, Lee E. Bowman Planning Director ks5\gpttldatagath. rfp Scientific Survey Consultant List Center for Community Research at AIR Attn: Robert J. Rossi, Director P.O. Box 1113 Palo Alto, CA 94032 Public Affairs Management Attn: Danielle Hamilton 101 The Embarcadero, Suite 210 San Francisco, CA 94105 ks5\gptflsurvcon.Ist PLANNING DEPARTMENT (408) 354-6872 FAX (408) 354-7593 February 26, 1998 * * * SUBJECT: REQUEST FOR PROPOSAL FOR CONDUCTING SCIENTIFIC SURVEY Dear Sir or Madam: The Town of Los Gatos is requesting proposals from selected consultants to provide technical information for a General Plan Update. The Los Gatos General Plan was last updated in 1985. The current update will be for the year 2020. To assist you in preparing a proposal for this project objectives and a preliminary scope of work are listed below. The Town's insurance and other standard requirements are attached. OBJECTIVES: • To provide information for the General Plan Update process. • To conduct necessary studies, record data, evaluate data and in some cases prepare maps. SCOPE OF WORK: 1. Attend two meetings with Town staff. 2. Conduct a survey of Town residents about land use, circulation, hillside, safety and historic preservation issues, community preservation, etc. 3. Ensure that the survey has a strong quantative orientation based in social science. 4. Structure the survey to reveal Los Gatans shared values, vision and purpose. 5. Provide survey results that assess the sense of community in Los Gatos. PROPOSAL: If you wish to submit a proposal for this project, it should include the following: 1. Detailed outline of the scope of services and methodology to prepare the information as outlined in the Scope of Work above; 2. Project cost with breakdown of expenses into tasks to be accomplished. A Town Business License is required; 3. List of the materials and information that will be required from the Town; 4. Summary of your firms experience with similar projects, including samples of work; 5. Background and qualification of personnel to be assigned to this project; 6. Names and phone numbers of persons who may be contacted to verify qualifications and previous performance; and 7. Time schedule addressing all facets of the data collection and study preparation. The time schedule should reflect a start date of April 24, 1998. Proposals must be submitted no later than March 27, 1998. If you have any questions regarding this matter, please contact Kristine Syskowski, Assistant Planner at (408)354-6807. Very truly yours, Lee E. Bowman Planning Director ks 5\gptndat agath. rfp Trails and Bikeways Planning Consultant List John Cahalan, ASLA 523 King Street Redwod City, CA 94062 Design, Community and Environment Attn: David Early, Principal 2110A Vine Street Berkeley, CA 94709 Sasaki Associates, Inc. Attn: Rober Sabbatini, AICP, ASLA 900 North Point Street Suite B300 Ghiradelli Square San Francisco, CA 94109 Fehr and Peers Associates, Inc. Attn: Jane Bierstedt, P.E. 3685 Mt. Diablo Blvd., Suite 301 Lafayette, CA 94549 Freedman, Tung & Bottomley Attn: Gregory Tung 47 Kearny Street, Suite 500 San Francisco, CA 94108-5522 ks5\gptf\t&b.Ist PLANNING DEPARTMENT (408) 354-6872 FAX (408) 354-7593 February 25, 1998 * * * SUBJECT: REQUEST FOR PROPOSAL FOR PREPARATION OF TECHNICAL DATA COLLECTION FOR COMPLETION OF TRAILS AND BIKEWAY MASTER PLAN Dear Sir or Madam: The Town of Los Gatos is requesting proposals from selected consultants to provide technical information for a General Plan Update. The Los Gatos General Plan was last updated in 1985. The current update will be for the year 2020. To assist you in preparing a proposal for this project objectives and a preliminary scope of work are listed below. The Town's insurance and other standard requirements are attached. OBJECTIVES: • To provide information for the General Plan Update process. • To conduct necessary studies, record data, evaluate data and in some cases prepare maps. SCOPE OF WORK: 1. Attend two meetings with Town staff. 2. Complete the Trails and Bikeways Master Plan 3. Format information into reproducible documents for public hearing presentation. A "1--7 It ,'t 3 '0, r> °" P, B ^r 4 it PROPOSAL: If you wish to submit a proposal for this project, it should include the following: 1. Detailed outline of the scope of services and methodology to prepare the information as outlined in the Scope of Work above; 2. Project cost with breakdown of expenses into tasks to be accomplished. A Town Business License is required; 3. List of the materials and information that will be required from the Town; 4. Summary of your firm's experience with similar projects, including samples of work; 5. Background and qualification of personnel to be assigned to this project; 6. Names and phone numbers of persons who may be contacted to verify qualifications and previous performance; and 7. Time schedule addressing all facets of the data collection and study preparation. The time schedule should reflect a start date of April 24, 1998. Proposals must be submitted no later than March 27, 1998. If you have any questions regarding this matter, please contact Kristine Syskowski, Assistant Planner at (408)354-6807. Very truly yours, Lee E. Bowman Planning Director ks 5\gpttldatagath.rfp quo o 44, q„q U PRELIMINARY SCHEDULE FOR GENERAL PLAN UPDATE TOWN PROCESS SEPT ocr 1 Council Accents General Plan Task Force Recommendations 2 3 4 5 6 7 8 Council Authorizes General Plan U date Schedule Staff Sends RFP for Meeting Facilitator Staff Sends RFP for Planning Consultant Staff Sends RFP for Technical Consultants (Noise. Traffic. etc.) General Plan Committee Considers Issues for Short Term Consultants Respond with Proposals (30-days) Consultants Evaluated by Staff 9 Staff Selects Consultant and Request Authorization to Hire 10 Consultants Prepare Studies and Provides Assistance for Meetings 11 Meeting Facilitator Establishes Meeting Schedules 12 New General Plan Taskforce Member Solicitations 13 14 15 16 17 Town Council Appoints New General Plan Task Force Members Taskforce Beoins Meeting (Outline Sub -area Groups/Issues) 1st Meeting: Tooical Meeting 2nd Meeting: Topical Meeting 3rd Meeting: Tooical Meeting 18 14th Meeting: Topical Meeting 19 I5th Meeting: Topical Meeting 20 !6th Meeting: Tooical Meeting 21 7th Meeting: Summary 22 23 24 General Plan Committee Meetings (Implementation Measures) Planning Consultant Compiles (Update Information & Formating) Admininistrative Draft of General Plan/Hillside Specific Plan Completed 25 Staff Reviews Drafts & Provides Revisions to Consultant 26 27 28 Draft General Plan/Hillside Specific Plan Update Completed Draft Sent Out to Affected Agencies. Districts. Utilities ) 45 Dav Comment Penod NVIRONMENTAL REVIEW/APPROVAL PROCESS '29 30 31 Staff Sends RFP for General Plan/HSP Update EIR to EIR Consultant Consultants Respond with Proposals (30-days EIR Consultants Evaluated by Staff 32 'Town Council Approves EIR Consultant 33 34 35 and Authorizes Funding Consuttant Signs Contract & Meets with Staff for Scooing Mtg. Consultant Prepares and Sends Cut Notice of Preparation Consultant Prepares Administialive Draft E1R 36 Staff Reviews Administrative Draft EIR and Provides Revisions 37 Consuttant Prepares Revised Draft EIR 38 39 40 Consultant Prepares and Notice of Completion with OPR Consultant Prepares and Notice of Draft EIR Availability 45 Dav Comment Period 41 42 43 44 Consultant Responds to Written Comments (10-days) Planning Commission Recommends EIR & Draft General Plan/HSP Updat/ Town Council Certifies Final EiR & Ao roves General Plan/HSP Update Staff Flies Notice of Determination With County COUNTY CONSULTATIONS (if needed) 26a Hillside Specific Plan Update sent to Coun for comment 45 Dav Comment Period Town Staff Meets with County to Coordinate County's Approval Process County Planning Commission Recommends HSP Update County Board of Supervisors approves HSP Update