Item 2 Staff Report Consider the Preliminary 2002/07 Los Gatos Redevelopment Agency BudgetDATE: TO: FROM: SUBJECT: MEETING DATE: 5/6/02 ITEM NO. COUNCIL/AGENCY AGENDA REPORT April 30, 2002 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS DEBRA J. FIGONE, TOWN MANAGER/EXECUTIVE DIRECTOR CONSIDER THE PRELIMINARY 2002/07 LOS GATOS REDEVELOPMENT AGENCY BUDGET RECOMMENDATION: 1. Open and hold the public hearing 2. Close the public hearing 3. Consider the Preliminary 2002/07 Los Gatos Redevelopment Agency Budget BACKGROUND: Redevelopment Law requires that a redevelopment agency adopt an annual budget that includes: 1. The anticipated revenues of the agency 2. The proposed expenditures of the agency 3. The proposed indebtedness to be incurred by the agency 4. The work program for the coming year 5. An explanation of the previous year's achievements The proposed FY 2002/07 Redevelopment Budget is intended to provide a clear explanation of the above requirements in order that the elected officials, the public and other interested parties can understand the goals, objectives and accomplishments of the Agency in its role of implementing the Central Los Gatos Redevelopment Plan. After Council/Agency consideration of the document, formal adoption of the budget will take place at the meeting in June 2002. PREPARED BY: Bud N. Lortz Community Development Director Marty Woodwort1(1'4 1" Redevelopment Manger Reviewed by: Attorney Clerk,Jinance Community Development Revised: 4/30/02 4:30 pm N:\DEV\Marty\rdabudgetcouncilreport (().wpd PAGE 2 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April 30, 2002 DISCUSSION: Introduction On November, 25, 1991, the Los Gatos Town Council adopted the Redevelopment Plan for the Central Los Gatos Redevelopment Project . The Redevelopment Plan was pursued as a result of the Loma Prieta Earthquake in 1989 and the need to rebuild infrastructure in and around Downtown Los Gatos and enhance the area. Projects such as street and utility reconstruction, parking, streetscape and civic improvements were called out in the Plan. However, the Town was aware that it would take a number of years for tax increment revenues to reach levels whereby major projects could be financed and the projects called out in the Plan implemented. It has been slightly over 10 years since the Redevelopment Plan was adopted and the Agency is now entering into a very exciting period in which significant implementation of the Plan can now take place. A number of factors have occurred and actions taken that now enable significant Agency implementation. First of these is that the tax increment revenue to the Agency has grown significantly in recent years and is now at a level whereby the Agency can finance key projects. As indicated in the "Revenue" section, Agency gross tax increment is estimated to be approximately $3.7 million in 2002/03. In addition the Town has hired full-time, permanent staff to implement projects. These positions include the Redevelopment Manager who began in December, 2001 and key staff in the Parks and Public Works Department to implement the construction of key infrastructure projects. In summary, the Town now has the financial resources and staffing necessary to implement key redevelopment projects in and around the Downtown area. 1. Anticipated Revenues of the Agency The Agency receives the majority of its funds from tax increment revenues. When the Agency was formed in 1991, the tax base for all properties within the Central Los Gatos Redevelopment Area was "frozen" to form the base year. As properties are reassessed because of sales or improvements the tax base grows, and the Agency receives the majority of the difference in property taxes paid between the "base year" and the new level. This is called tax increment financing and is the primary funding mechanism for redevelopment agencies throughout California. This does not result in an increase in taxes to property owners, rather a redistribution of the property taxes to the redevelopment agency in order that it can reinvest the funds within its redevelopment project area. In March 2002, the Agency contracted with the consulting firm of Urban Analytics to update its tax increment projections. Urban Analytics used a conservative 4 percent annual growth rate in tax increment revenues. Based on their projections it is estimated that gross tax increment revenues for 2002/03 will be approximately $3.7 million. The revenues are used in two primary funds: 1) Consolidated 80 Percent Capital Projects/RDA Debt Service Fund, and; 2) "20 percent" Affordable Housing Fund. (Redevelopment Law requires that 20 percent of all tax increment revenues be set - aside in a separate fund and used only for affordable housing purposes.) The Budget document provides the details, however the following charts provide an overview of the estimated gross revenues for the two funds in 2002/03: PAGE 3 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April 30, 2002 CONSOLIDATED 80% CAPITAL PROJECTS (FUND 930) RDA DEBT SERVICE FUND (FUND 950) REVENUES FISCAL YEAR 2002-03 Fund Balance, July 1, 2002 Tax Increment Revenue (Net of 20% Low & Mod. $741,912) Interest Income Lease Income-COP's Bond Proceeds (Net of reserves, discounts & cost of issuance) Total 20% AFFORDABLE HOUSING FUND REVENUES FISCAL YEAR 2002-03 $ 2,967,649 253,000 249,895 9,000,000 $ 12,470,544 Fund Balance, July 1, 2002 Tax Increment Revenue Interest Income 2. Proposed Expenditures of the Agency $ 1,663,480 741,912 71,300 Total $ 2,476,692 As indicated above, the Agency should receive approximately $3.7 million in total revenue for 2002/03 (prior to pass-throughs other expenditures). The Budget document provides a detailed account of the expenditures of the Agency for Program 930 (Capital Projects) 950 (Debt Service) and Program 960 (Affordable Housing). The charts below provide a summary overview of the proposed expenditures along with an explanation of each item for each fund. The budget assumes $9 million in tax exempt bond proceeds: CONSOLIDATED 80% CAPITAL PROJECTS (FUND 930) RDA DEBT SERVICE FUND (FUND 950) EXPENDITURES FISCAL YEAR 2002-03 Fiscal Year available revenues Less Expenditures: Agency Administration Agency overhead paid to Town COP Lease Payments Interest on Town Advance 1992 COP Debt Service 2002 COP Debt Service (Estimated Partial Payment 2002/03) Pass Through Payments To Taxing Entities Redevelopment Projects and Implementation $ 12,470,544 199,934 313,700 249,895 196,850 250,000 290,000 1,391,440 6,833,034 Total Expenditures $ 9,724,853 PAGE 4 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April30, 2002 20% AFFORDABLE HOUSING FUND EXPENDITURES FISCAL YEAR 2002-03 Fiscal Year Available Revenues Less Expenditures Agency Administration Agency Overhead Paid to Town Affordable Housing Projects Explanation of Expenditure Items: $ 2,476,692 63,500 79,400 Total Expenditures $ 142,900 • Pass thru payments to taxing entities: When the Agency was created in 1991, tax sharing agreements were negotiated with educational entities, the open space district and the County. These payments, based on the amount of tax increment the Agency receives, go to these entities to relieve them of any financial burden that the Redevelopment Plan may cause them. • 1992 COP Bond Payments for Parking Lot #4: The Town bonded for approximately $2.5 million in 1992 to finance the construction of the parking garage on Lot #4. Redevelopment Agency tax increment is used to pay the debt service on the bond. • 2002 COP Bond Payments for RDA Capital Projects: These payments are for the principal and interest on a proposed bond issue of approximately $9 million net proceeds to be used on RDA infrastructure projects in the Project Area. • Agency Administration: This pays for the day to day operations of the Agency including salary and benefits of staff, supplies and materials, consultant assistance and the like. • Overhead Charges paid to the Town of Los Gatos: The Agency is a separate legal entity from the Town, however, requires support services from the Town. This expenditure reimburses the Town for such items as office space, utilities, financial functions and, most significantly, the staff time that various members of the Town staff devote to redevelopment activities. Redevelopment Projects and Affordable Housing Projects: These are the funds spent directly, or indirectly, on projects to implement the Redevelopment Plan. They are outlined below for each program. Proposed Expenditures on Projects from 80 Percent Capital Projects Fund The following is a summary of the proposed expenditures for capital projects for year 2002/03. The Budget document tables provide a detailed explanation of the projects and expenditures: PAGE 5 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April 30, 2002 SUMMARY OF CAPITAL PROJECTS EXPENDITURES FY 2002/03 Town Plaza Renovations $ 911,034 Downtown Beautification 3,350,000 Project Area Improvements - Street Reconstruction 1,492,000 Verizon/Post Office/Downtown Parking Improvements 800,000 Alley Improvements 250,000 Fairview Plaza Pedestrian Path Improvements 30,000 Total Expenditures $ 6,833,034 Proposed Expenditures from 20 Percent Fund on Affordable Housing Projects The Agency is in the process of developing an Affordable Housing Strategy, consequently, there are no specific projects for which funds are now targeted. It is expected that the strategy will be adopted by fall 2002 and the Agency will begin pursuing specific projects. Should funding be required for a project in 2002/03, staff would return to the Agency for a budget adjustment. Administrative costs and Town overhead expenses from this fund for FY 2002/03 total approximately $144,000. It should be noted that under Redevelopment Law requires an agency to spend down its housing fund to certain levels within certain time -frames. Over the next few years the Agency will need to undertake one or more projects in order to begin to spend these funds. In the past the Agency has spent funds on the Miles Ave. affordable housing project and the Habitat for Humanity house on Charles St. However, now that the Agency has significant revenue, we will be able to undertake other projects. The Affordable Housing Strategy will present a number of alternatives for use of these funds. 3. Proposed Indebtedness to be Incurred by the Agency In the past the Los Gatos Redevelopment Agency has incurred debt in two ways. First, it has obtained loans from the Town and then repaid the loans with tax increment revenue. Second, it has undertaken the obligation of paying the debt service on the 1992 COP's used to finance the construction of Parking Lot #4. This obligation will remain until 2012, unless it is refinanced or paid off prior to that date. The Agency is now at a point where it has significant tax increment revenues and a number of significant projects to implement. In many cases, redevelopment agencies issue tax exempt bonds when they are in similar situations. The Agency is now considering issuing the first phase of tax exempt bonds providing approximately $9 million of net proceeds to finance key infrastructure projects called for in the Redevelopment Plan. The proposed bonding is a separate item on the agenda, but the proposed $9 million of bond proceeds and their intended uses are included in this proposed budget. Any refinement of these estimates will be done through budget adjustments at the time bonds are sold in FY2002-03. 1 PAGE 6 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April 30, 2002 4. Proposed Work Program for the Coming Year The Agency is proposing an aggressive work program for the coming year. This is made possible with the staffing of the Redevelopment Agency and the Department of Parks and Public Works as well as with anticipated funding for projects. The following is an outline of the proposed work program for FY 2002/03 • Consider issuing Redevelopment Agency tax exempt bonds to fund projects • Complete Town Plaza renovation Complete Phase I of the Downtown Beautification project including constructing new sidewalks and bulb -outs on Santa Cruz Ave. • Reconstruction of specified streets in the Project Area. • Reconstruction of specified alleys in the Project Area • Parking improvements in the Downtown area including reconstructing the VerizonBus Depot lots to provide public parking • Implementation of Parking Management Program with new parking zones throughout the Downtown and increased enforcement • Completion of banner program report for Downtown and Los Gatos Blvd. and the installation of banners • Adoption of the Redevelopment Agency Affordable Housing Strategy and initiation of one or more affordable housing projects • Implementation of the Los Gatos Economic Vitality Program • Implementation of a program to enhance the Los Gatos auto sales environment • Effective administration of the Redevelopment Agency including all reporting and financial management 5. Explanation of the Previous Year's Achievements FY 2001/02 was a year in which the foundation was laid in order to begin an aggressive redevelopment implementation program. The following is a summary of key achievements for the period: • Filled full-time Redevelopment Manager (December 2001) position to implement redevelopment program • Filled Parks and Public Works Director (October 2001) and Town Engineer (January 2002) positions which will be key in implementing public infrastructure projects in the Redevelopment Project Area • Amended, restated and reviewed the Agency's AB 1290 Five Year Implementation Plan • Initiated the reconstruction of Town Plaza in order to become the focal point of the Downtown • Initiated the reconstruction of sidewalks and intersection improvements along Santa Cruz Ave. • Initiated the implementation of the Downtown Parking Management Plan • Initiated the process to implement a new banner program in the Downtown and along Los Gatos Blvd. • Initiated actions to enhance the auto sales business in Los Gatos • Prepared a draft Economic Vitality Program (pending Council review or input) PAGE 7 MAYOR AND TOWN COUNCIL/CHAIR AND BOARD MEMBERS SUBJECT: REDEVELOPMENT AGENCY BUDGET April 30, 2002 • Updated tax increment projections for the Agency and prepared a draft Financing Plan in order for the Agency to consider issuing tax exempt bonds to finance key projects • Council approval of the construction of a Habitat for Humanity house on Charles Ave. for a low income family Completion of 12 very low income rental units on Miles Ave. • Assisted in the acquisition of two key properties on Fiesta Ave. adjacent to the Civic Center • As required by law, filed the Statement of Indebtedness with the County and the Annual Report with the State Controller's Office • Completed Los Gatos business survey • Initiated memberships in key Redevelopment and Economic Development Associations • Initiated preparation of a draft Affordable Housing Strategy to implement programs using the Agency's 20 percent Affordable Housing Set -Aside funds. CONCLUSION: The Los Gatos Redevelopment Agency's FY 2002/07 Budget fulfills Redevelopment Law requirements by outlining revenues, expenditures and indebtedness while explaining the work program for the coming year and the previous year's achievements. The Budget implements an aggressive work program to complete key redevelopment projects in the Downtown area, begin affordable housing projects using 20 percent set -aside funds, and initiates an Economic Vitality Program for the Town. The programs should serve to implement the adopted Redevelopment Plan, Five Year Implementation Plan and eliminate blight and further upgrade and enhance the Project Area in and around the Downtown. In addition, Economic Vitality efforts should enhance revenues to the Town and stimulate business activity. ENVIRONMENTAL ASSESSMENT: Is not a project defined under CEQA, and no further action is required. FISCAL IMPACT: The Redevelopment Agency Budget is based on tax increment revenues that the Agency receives. It is projected that the Agency will have a revenue stream of approximately $20 million (present value) during its 30 year remaining life. As a separate item, the Agency will determine the method to finance projects and may consider issuance of tax exempt bonds. Attachments: 1. Preliminary 2002/07 Redevelopment Agency Budget N:\DEV 1Marty1ydabudgetcouncilreport(1). wpd TOWN OF LOS GATOS The Los Gatos Redevelopment Agency for Fiscal Year July 1, 2002 to June 30, 2007 Town Council Randy Attaway Mayor Sandy Decker .Vice Mayor Steve Blanton .Council Member Steven Glickman Council Member Joseph Pirzynski .Council Member Prepared under the direction of Debra De Mattei Figone .Town Manager Stephen D. Conway Finance and Administrative Services Director 110 E. Main Street, P.O. Box 949, Los Gatos, CA 95031 www.town.los-gatos.ca.us The Los Gatos Redevelopment Agency Fiscal Year 2002-07 Proposed Redevelopment Agency Budget Table of Contents Page Tab One Review of Los Gatos Redevelopment Agency Budget 1 Tab Two RDA Capital Projects - Fund 930 2 Tab Three RDA Debt Service - Fund 950 3 Tab Four RDA Low Moderate Housing - Fund 960 4 Tab Five Project Worksheets 5 Downtown Streetscape Improvements 5-1 Redevelopment Project Area Street Reconstruction Downtown 5-2 Town Plaza Renovations 5-3 Redevelopment Project Area alley Improvements 5-4 Downtown Parking Improvements 5-5 Fairview Plaza Pedestrian Path Improvements 5-6 The Los Gatos Redevelopment Agency Fiscal Year 2002-07 Proposed Redevelopment Agency Budget Table of Contents Page Tab One Review of Los Gatos Redevelopment Agency Budget 1 Tab Two RDA Capital Projects - Fund 930 2 Tab Three RDA Debt Service - Fund 950 3 Tab Four RDA Low Moderate Housing - Fund 960 4 Tab Five Project Worksheets 5 Downtown Streetscape Improvements 5-1 Redevelopment Project Area Street Reconstruction Downtown 5-2 Town Plaza Renovations 5-3 Redevelopment Project Area alley Improvements 5-4 Downtown Parking Improvements 5-5 Fairview Plaza Pedestrian Path Improvements 5-6 RDA Capital Projects All Programs in Fund 930 FUND 930 STATEMENT OF SOURCE AND USE OF FUNDS SOURCE OF FUNDS Beginning Fund Balance Restricted Unrestricted Total Beginning Fund Balance Revenues Interest Income Other Sources / Bond Proceeds Total Revenues Operating Transfers Transfers from RDA Debt Service Total Operating Transfers TOTAL SOURCE OF FUNDS USE OF FUNDS Expenditures Salaries and Benefits Operating Expenditures Capital Projects Internal Service Charges Total Expenditures Operating Transfers Transfer to RDA Debt Service Total Operating Transfers Ending Fund Balance Restricted Unrestricted Total Ending Fund Balance 00/01 Actuals 550,431 01/02 Adjusted 01/02 Estimated 1,481,964 1,481,964 550,431 1,481,964 1,481,964 179,426 63,158 242,584 1,968,500 1,968,500 49,400 1,304 02/03 Proposed 37,100 9,000,000 50,704 9,037,100 363,759 363,759 $ 2,761,515 $ 1,481,964 $ 1,896,427 $ 9,037,100 661,316 421,385 1,082,701 196,850 196,850 1,481,964 1,481,964 66,220 319,000 4,784,934 5,000 64,400 381,427 1,446,900 3,700 125,700 377,200 6,833,034 10,734 5,175,154 1,896,427 7,346,668 (3,693,190) (3,693,190) 1,690,432 1,690,432 TOTAL USE OF FUNDS $ 2,761,515 $ 1,481,964 $ 1,896,427 $ 9,037,100 REDEVELOPMENT CAPITAL PROJECTS Town Plaza Renovations 911,034 Downtown Beautification 3,350,000 Project Area Improvements -Street Reconstruction 1,492,000 Verizon/Post Office /Downtown Parking Improvements 800,000 Alley Improvements 250,000 Fairview Plaza Pedestrian Path Improvements 30,000 TOTAL 6,833,034 Town Plaza Renovation Program 930-0107 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed REVENUES Other Sources Bond Proceeds Operating Transfers 1,700,000 TOTAL REVENUES 1,700,000 EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction 12,314 1,639,934 728,900 906,034 82003 Construction Management - - 5,000 Total Capital Projects 12,314 1,639,934 728,900 911,034 TOTAL EXPENDITURES 12,314 1,639,934 728,900 911,034 Street Reconstruction Downtown Program 930-0217 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed REVENUES Other Sources Bond Proceeds Operating Transfers - 2,650,000 TOTAL REVENUES 2,650,000 EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction - 1,110,000 468,000 1,492,000 82003 Construction Management Total Capital Projects 1,110,000 468,000 1,492,000 TOTAL EXPENDITURES 1,110,000 468,000 1,492,000 Downtown Streetscape Improvements REVENUES Other Sources Bond Proceeds Operating Transfers Program 930-0233 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed 3,600,000 TOTAL REVENUES 3,600,000 EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction 9,670 1,560,000 250,000 3,350,000 82003 Construction Management Total Capital Projects 9,670 1,560,000 250,000 3,350,000 TOTAL EXPENDITURES 9,670 1,560,000 250,000 3,350,000 Downtown Parking Improvements Program 930-0336 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed REVENUES Other Sources Bond Proceeds Operating Transfers 800,000 TOTAL REVENUES 800,000 EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction 82003 Construction Management Total Capital Projects 800,000 800,000 TOTAL EXPENDITURES - 800,000 Fairview Plaza Pedestrian Path Improvements Program 930-0341 00/01 01/02 01/02 02/03 ActuaIs Adjusted Estimated Proposed REVENUES Other Sources Bond Proceeds Operating Transfers TOTAL REVENUES EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction - 30,000 82003 Construction Management - - - Total Capital Projects - 30,000 TOTAL EXPENDITURES - 30,000 Alley Reconstruction Program 930-0344 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed REVENUES Other Sources Bond Proceeds - 250,000 Operating Transfers TOTAL REVENUES 250,000 EXPENDITURES Capital Projects 82001 Engineering Design 82002 Construction 82003 Construction Management Total Capital Projects 250,000 250,000 TOTAL EXPENDITURES 250,000 RDA Debt Service Program 9501/9502/9503/9504 FUND 950 STATEMENT OF SOURCE AND USE OF FUNDS 00/01 Actuals SOURCE OF FUNDS Beginning Fund Balance Restricted Unrestricted (135,123) 182,677 01/02 Adjusted Total Beginning Fund Balance (135,123) 182,677 Revenues Property Tax Lease Income - COPS Interest Income Other Sources Total Revenues 3,232,042 266,325 144,470 19,269 3,117,350 3,662,106 3,117,350 Operating Transfers Transfer from General Fund Transfer from COPS 421,723 Tax Increment - Low/Mod Housing (714,223) (536,320) Tr/From RDA Capital Projects 196,850 Tr/From RDA Low/Mod Housing Total Operating Transfers (95,650) (536,320) 01/02 Estimated 182,677 182,677 3,407,651 252,580 81,510 6,600 3,748,341 363,759 (681,530) 67,814 (249,957) 02/03 Proposed 1,717,736 1,717,736 3,709,561 249,895 215,900 4,175,356 (741,912) (741,912) TOTAL SOURCE OF FUNDS $ 3,431,333 $ 2,763,707 USE OF FUNDS Expenditures Operating Expenditures Interest Town Admin Loan Debt Service - COPS Lot 4 Lease Payment for COPS Lot 4 Debt Service - 2002 COPS Total Expenditures Operating Transfers Transfer to RDA Debt Service Total Operating Transfers Ending Fund Balance Restricted Unrestricted Total Ending Fund Balance $ 3,681,061 5 5,151,180 550,657 816,200 196,850 266,325 252,600 266,324 - 1,280,156 1,068,800 1,968,500 1,968,500 182,677 1,694,907 182,677 1,694,907 897,536 196,850 252,600 252,580 1,599,566 363,759 363,759 1,717,736 1,717,736 1,391,440 196,850 250,000 249,895 290,000 2,378,185 2,772,995 2,772,995 TOTAL USE OF FUNDS $ 3,431,333 $ 2,763,707 $ 3,681,061 $ 5,151,180 RDA Low/Moderate Housing Program 9601 FUND 960 STATEMENT OF SOURCE AND USE OF FUNDS SOURCE OF FUNDS Beginning Fund Balance Restricted Unrestricted Total Beginning Fund Balance Revenues Interest Income Total Revenues 00/01 01/02 01/02 02/03 Actuals Adjusted Estimated Proposed 1,007,520 1,418,614 1,418,614 1,663,480 1,007,520 1,418,614 1,418,614 1,663,480 91,367 75,020 40,000 71,300 91,367 75,020 40,000 71,300 Operating Transfers Tax Increment @ 20% 714,223 536,320 613,716 741,912 Total Operating Transfers 714,223 536,320 613,716 741,912 TOTAL SOURCE OF FUNDS $ 1,813,110 $ 2,029,954 $ 2,072,330 $ 2,476,692 USE OF FUNDS Expenditures Salaries and Benefits 45,629 11,500 31,400 Operating Supplies 144,496 145,400 86,350 109,500 Grants 250,000 310,000 310,000 Internal Service Charges 3,372 1,000 2,000 Total Expenditures 394,496 504,400 408,850 142,900 Operating Transfers Transfer to RDA Debt Service Total Operating Transfers Ending Fund Balance Restricted Unrestricted Total Ending Fund Balance 1,418,614 1,525,554 1,663,480 2,333,792 1,418,614 1,525,554 1,663,480 2,333,792 TOTAL USE OF FUNDS $ 1,813,110 $ 2,029,954 $ 2,072,330 $ 2,476,692 DOWNTOWN STREETSC DE IMPROVEMENTS - REDEVELOPMEI`TT AGENCY FUNDED PROJECT DESCRIPTION This project will fund several downtown beautification improvements consistent with the approved Streetscape Master Plan for Santa Cruz Ave. Specifically, these include landscape and pedestrian improvements at each of the intersecting streets between Main St. and Highway 9 (7 intersections) and Main St. at University Ave. and College Ave. (2 intersections). In addition this project will include the replacement of sidewalks along both sides of Santa Cruz Ave. from Almendra Ave. to Bean Ave. This project is consistent with the Central Los Gatos Redevelopment Plan. FUND: 930 - RDA CATEGORY: Streets and Signals RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: Active PROJECT: 930 - 0233 PPW #: 02 - 33 GENERAL PLAN LINKAGE: Community Design Implementation Strategy 4.14 ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDEDCARRY FUNDS THRU 2002 OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 930 - RDA $1,560,000 $250,000 $1,310,000 $2,040,000 $3,350,000 EXPENDITURE SCHEDULE USE OF FUNDS ACCT NUMBER TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 Construction 82002 $1,560,000 $250,000 $3,350,000 $3,350,000 Construction Management 82003 TOTAL $1,560,000 $250,000 $3,350,000 $3,350,000 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES Funding shown reflects the full project. Project scope is currently under evaluation. Final programming for FY 02-03 will be determined. 5-1 REDEVELOPMENT PROJEC '2EA STREET RECONSTRUCTION DOS 'OWN - REDEVELOPMENT AGENCY PROJECT DESCRIPTION This project funds the continuation of the Town's annual Street Resurfacing Program within the Redevelopment Project Area. The goal is to increase the overall Pavement Condition Index (PCI) from 64 to 75. The work performed will consist of a balanced program of Street Reconstruction and Pavement Overlays, with supplemental ongoing maintenance activities performed by the Town's Parks and Public Works department staff. This project is consistent with the Central Los Gatos Redevelopment Plan. FUND: 930 - RDA CATEGORY: Streets and Signals RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: Active PROJECT: 930 -0217 PPW #: 02-17 GENERAL PLAN LINKAGE: Transportation Element Policies 1.2 and 1.4 ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 CARRY OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 930 - RDA $1,110,000 $468,000 $642,000 $850,000 $450,000 $450,000 $432,000 $432,000 $3,256,000 EXPENDITURE SCHEDULE USE OF FUNDS ACCT NUMBER TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 Construction 82002 $1,110,000 $468,000 $1,492,000 $450,000 $450,000 $432,000 $432,000 $3,256,000 Construction Management 82003 TOTAL $1,110,000 $468,000 $1,492,000 $450,000 $450,000 $432,000 $432,000 $3,256,000 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES Project implementation will be coordinated with underground infrastructure improvements to be implemented by other agencies and the Town. It will follow streetscape improvements and infrastructure work and so timing may be adjusted. 5-2 TOWN PLAZA RENOVATIONS PROJECT DESCRIPTION This project will fund the renovation of the Town Plaza and Santa Cruz Ave./Broadway/Montebello Way intersection in accordance with the approved Plaza and Downtown Streetscape Master Plan. FUND: 930 CATEGORY: Parks Program RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: Active PROJECT: 930 - 0107 PPW #: 01 - 07 GENERAL PLAN LINKAGE: Community Design Element Implementing Strategy 4.14 ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS 2002 CARRY OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 930 - RDA $1,639,934 $728,900 $911,034 $911,034 EXPENDITURE SCHEDULE USE OF FUNDS ACCT TOTAL BUDGETED EXPENDED THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 $0 $220,000 Construction 82002 $906,034 $468,900 $906,034 $906,034 Construction Management 82003 $5,000 $40,000 $5,000 $5,000 TOTAL $911,034 $728,900 $911,034 S911,034 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES Plaza reconstruction began March 25, 2002 to be completed in September, 2002. 5-3 REDEVELOPMENT PRO -'T AREA ALLEY IMPROVEMENTS - R.' VELOPMENT AGENCY FUNDED PROJECT DESCRIPTION This project will fund the reconstruction of several alleys in the Redevelopment Project Area. These include alleys in the Almond Grove neighborhood and the alleys located between Loma Alta and Johnson Ave. This project is consistent with the Central Los Gatos Redevelopment Plan. FUND: 930 - RDA CATEGORY: Streets and Signals RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: Active PROJECT: 930-03xx PPW #: 03-xx GENERAL PLAN LINKAGE: ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDSTHRU CARRY OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 930 - RDA $250,000 $250,000 EXPENDITURE SCHEDULE USE OF FUNDS ACCT NUMBER TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 Construction 82002 $250,000 $250,000 Construction Management 82003 TOTAL $250,000 $250,000 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES This project will be phased to improve alleys meeting certain criteria, including alleys where consensus for the Town to improve the alleys is reached among the residents. Additionally, once further geological and topological analysis is obtained, staff will determine alleys that could be competed during FY 02-03. 5-4 DOWNTOWN PA - 'KING IMPROVEMENTS - REDEVELOP] NT AGENCY FUNDED PROJECT DESCRIPTION This project will fund improvements to the Verizon and Bus Depot parking lots to make them available for public parking for downtown businesses. These improvements are called out in the Downtown Parking Management Plan and are consistent with the goal of providing additional parking downtown per the Central Los Gatos Redevelopment Plan. In addition, improvements to Parking Lot #6 and other parking improvements to the downtown will be accomplished. FUND: 930 - RDA CATEGORY: Streets and Signals RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: Active PROJECT: 930-0336 PPW #: 03 - 36 GENERAL PLAN LINKAGE: ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 CARRY OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 930 - RDA $800,000 $800,000 EXPENDITURE SCHEDULE USE OF FUNDS ACCT NUMBER TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 $70,000 $70,000 Construction 82002 $700,000 $700,000 Construction Management 82003 $30,000 $30,000 TOTAL $800,000 S800,000 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES This project will add additional parking spaces to the downtown area. 5-5 E VIEW PLAZA PEDESTRIAN PATH IMP VEMENTS PROJECT DESCRIPTION This project will resurface the pedestrian pathway that is known as the Turnstyle Walkway, located parallel and adjacent to Pennsylvania Avenue between West Main Street and Fairview Plaza. The pathway is currently in poor condition; resurfacing will provide enhancement as well as pathway improvements. FUND: 410 - Grants and 930 - RDA CATEGORY: Streets and Signals RESPONSIBLE DEPT: Parks and Public Works PROJECT MANAGER: Director of Parks and Public Works PROJECT STATUS: New PROJECT: 410-03xx/930-03xx PPW #: 03-xx GENERAL PLAN LINKAGE: ENVIRONMENTAL DETERMINATION: Categorically Exempt FUNDING SOURCE SOURCE OF FUNDS TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 CARRY OVER FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL 410 - Grants $22,695 $22,695 930 - RDA $30,000 $30,000 TOTAL S52,695 S52,695 EXPENDITURE SCHEDULE USE OF FUNDS ACCT NUMBER TOTAL BUDGETED FUNDS THRU 2002 EXPENDED FUNDS THRU 2002 FY 02-03 FY 03-04 FY 04-05 FY 05-06 FY 06-07 5 YEAR TOTAL Engineering Design 82001 Construction 82002 $52,695 $52,695 Construction Management 82003 TOTAL S52,695 S52,695 ANNUAL ESTIMATED OPERATING BUDGET IMPACT TOTAL PERSONNEL OPERATIONS & MAINTENANCE OTHER COSTS OFFSETTING SAVINGS NET IMPACT PROJECT NOTES Staff have applied for Transportation Development Act (TDA) Article 3 guaranteed funds to reimburse the Town for a majority of this project's cost, the remainder to be RDA funded. 5-6 Town Council Minutes May 6, 2002 Redevelopment Agency Los Gatos, California REDEVELOPMENT AGENCY FINANCING PLAN CONT. Motion by Mr. Glickman, seconded by Mrs. Decker, to authorize staff and the Town's Financial Consultants to analyze the refinancing of the 1992 COP's for Parking Lot #4 as part of the issuance, and if the analysis shows financial benefit to the Agency, that refinancing documents be prepared. Carried unanimously. Motion by Mr. Glickman, seconded by Mrs. Decker, to authorize the Town Manager/Executive Director to enter into an agreement with Jones Hall, (Bond Counsel) in an amount not to exceed $60,000 to be paid for from bond proceeds. Carried unanimously. Motion by Mr. Glickman, seconded by Mrs. Decker, that Council adopt Resolution 2002-68 entitled, RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS DECLARING INTENTION TO REIMBURSE EXPENDITURES FROM THE PROCEEDS OF OBLIGATIONS TO BE ISSUED BY THE TOWN AND DIRECTING CERTAIN ACTIONS. Carried unanimously. LOS GATOS HIGH SCHOOL POOL: CounciVAgency consensus to agree to providing partial funding ($300,000) for the reconstruction of the Los Gatos High School Pool for the community's benefit in concept only until agreements are finalized and brought back to Council. Staff to study and evaluate what the Town can afford within a contract. Town to take a strong move toward finding a way in which to accomplish this funding that will benefit and enhance both entities. Carried unanimously. LOS GATOS REDEVELOPMENT AGENCY/BUDGET FOR 2002-07/HEARING (02.09&27) Marty Woodworth, Town's Redevelopment Agency Manager, gave an overview of the proposed budget noting: The anticipated revenues of the Agency; The proposed expenditures of the Agency; The proposed indebtedness to be incurred by the Agency; The work program for the coming year; and an explanation of the previous year's achievements. Motion by Mrs. Decker, seconded by Mr. Blanton, to close the public hearing. Carried unanimously. Council/Agency consensus to accept the staff report and recommendations concerning the Preliminary 2002-07 Los Gatos Redevelopment Agency Budget Debra Figone, Town Manager, noted that the final budget would return to the Council and Agency in June for adoption. CAPITAL IMPROVEMENT PROGRAM FOR 2002-07 (CIP) (03.09) John Curtis gave an overview of the proposed Capital Improvement Program budget. Speakers from the audience: Ray Davis, resident, spoke in support of televised programming of council meetings remaining in the CIP. Marc Jensen, thanked Council for supporting paved sidewalks and pedestrian improvements at crosswalks. No one else from the audience addressed this issue. TC: D 13: M M050602 2 0