2025-024 - ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025/26 FUNDED BY THE STATE SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 RESOLUTION 2025-024
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF LOS GATOS
ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025/26 FUNDED BY THE STATE
SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter
5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April
2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our Town are aware of the projects proposed for funding in the community and
which projects have been completed each fiscal year; and
WHEREAS,the Town must adopt by resolution a list of all projects proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the Town will receive an estimated $1,831,518 in RMRA funding in Fiscal
Year 2025/26 from SB 1; and
WHEREAS, this is the ninth year in which the Town is receiving SB 1 funding and will
enable the Town to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the Town used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the highest priority and cost-effective projects that
also meet the communities' priorities for transportation investment; and
WHEREAS,the funding from SB1 will help the Town maintain and rehabilitate streets
throughout the Town this year and similar projects into the future; and
1 of 4
Resolution 2025-024 May 20, 2025
WHEREAS, the 2021 California Statewide Local Streets and Roads Needs Assessment
found that the Town's streets and roads are in a "good" condition, and this revenue will help
increase the overall quality of the road system, and over the next decade, will bring Town
streets and roads into a good condition; and
WHEREAS,the SB 1 project list and overall investment in our local streets and roads
infrastructure, with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials, and practices, will have significant
positive co-benefits statewide.
NOW,THEREFORE, BE IT RESOLVED: The foregoing recitals are true and correct, and
the following list of projects will be funded in part or solely with Fiscal Year 2025/26 Road
Maintenance and Rehabilitation Account revenues:
2 of 4
Resolution 2025-024 May 20,2025
Base Bid
Street Begin Location End Location Treatment Estimated Construction
Useful Life of Schedule
Treatment
Almond Blossom Ct Almond Blossom Ln End of Road 20 20 years Summer 2025
Almond Blossom Ln Harwood Rd City Limits 2M0 20 years Summer 2025
Bacigalupi Dr Harwood Rd ' End 20 20 years Summer 2025
Belblossom Dr Belgatos Rd Westhill Dr 20 20 years Summer 2025
Belblossom Way Belwood Gateway Belgatos Rd 20 20 years Summer 2025
Belhaven Dr Harwood Rd Bacigalupi Dr 20 20 years Summer 2025
Be!ridge Dr Harwood Rd Bacigalupi Dr 20 20 years Summer 2025
Belvue Dr Belgatos Rd Bacigalupi Dr 20 20 years Summer 2025
Blossom Hill Rd Highway 880(17) 400' East Of 2M0 20 years ' Summer 2025
Hwy 17
Cambrian View Wy Kensington Wy End 20 20 years Summer 2025
Campos Verde Old Orchard Dr End 20 20 years Summer 2025
Harwood Ct Harwood Rd End 20 20 years Summer 2025
Old Orchard Ct Old Orchard Dr End 20 20 years Summer 2025
Old Orchard Dr Westhill Dr Westhill Dr 20 20 years Summer 2025
Surmont Ct Surmount Dr City Limits 20 20 years Summer 2025
Surmont Dr Westhill Dr End 20 20 years Summer 2025
Westhill Dr Blossom Hill Rd ' Belgatos Rd 20 20 years Summer 2025
Belvue Dr Bacigalupi Dr Harwood Rd 20 20 years Summer 2025
KEY:
2M0 2"Mill and Overlay
20 2"Overlay
3 of 4
Resolution 2025-024 May 20,2025
PASSED AND ADOPTED at a regular meeting of the Town Council of the Town of Los Gatos,
California, held on the 20th day of May of 2025 by the following vote:
COUNCIL MEMBERS
AYES: Rob Rennie, Mary Badame, Maria Ristow, Rob Moore and Mayor Matthew Eludes
NAYS: None
ABSENT: None
ABSTAIN: None
SIGNED:
4% i I _ -
MAYOR OF THE TOWN OF LOS GATOS
LOS GATOS, CALIFORNIA
ATTEST:
--"dij411 /1
TOWN C K OF THE TOWN OF LOS GATOS
LOS GATOS;, CALIFORNIA
4 of 4
Resolution 2025-024 May 20,2025